MINING MANAGEMENT PLAN (MMP) FOR
EXTRACTIVE OPERATIONS
- SUGGESTED TEMPLATE -
INSTRUCTIONS ON THE USE OF THIS DOCUMENTAn Authorisation for extractive activities can only be issued on the completion and acceptance of a MMP.
An MMP is required for new projects, when operations change significantly from the previous plan or on an annual report basis for each active extractive area.
This Advisory Note contains instructions and some examples of Mine Management issues for consideration by extractive projects in the preparation of an MMP.
Each section contains examples of issues which may be relevant to an operation. The operator should assess which are relevant to their site, or whether other factors need consideration, but are not listed here.
The commitments to continuous improvement should have a defined objective and completion date placed on them so that there is a measurable time frame.
The Extractive Operations MMP Structure Guide is available on the department’s website at: www.minerals.nt.gov.au/mineralsforms#mining
THIS ADVISORY NOTE AND PLAN IS NOT TO BE TAKEN AS A DEFINITIVE RESPONSE TO THE DEPARTMENTS REPORTING REQUIREMENTS BUT
SHOULD BE UTILISED BY OPERATORS AS A BASIS TO THE DEVELOPMENT OF A PROJECT-SPECIFIC MINING MANAGEMENT PLAN (MMP) THAT
INCORPORATES A PROGRAM OF CONTINUOUS IMPROVEMENT.
Department of Mines and EnergyPage 1 of 21
{OPERATOR/COMPANY NAME}
{YEAR}
MINING MANAGEMENT PLAN
FOR
{PROJECT/SITE}
Authorisation Number – if applicable
**(The Extractive Operations Mining Management Plan Structure Guide is available as a guide to this template)
Department of Mines and Energy Page 2 of 21
CONTENTS
AMENDMENTS 41.0 OPERATOR DETAILS 5
1.1 ORGANISATIONAL STRUCTURE / CHART 61.2 WORKFORCE 6
2.0 PROJECT DETAILS 62.1 MAP OF SITE LOCATION AND LAYOUT 72.2 HISTORY OF DEVELOPMENT AND CURRENT STATUS 82.3 PROPOSED ACTIVITIES AND MINING SCHEDULE 92.4 OTHER RELEVANT INFORMATION 9
3.0 CURRENT PROJECT SITE CONDITIONS 104.0 ENVIRONMENTAL MANAGEMENT SYSTEM 11
4.1 ENVIRONMENTAL POLICY AND RESPONSIBILITIES 114.2 LEGAL AND OTHER REQUIREMENTS 114.3 OBJECTIVES AND TARGETS 114.4 IDENTIFICATION OF ENVIRONMENTAL ASPECTS AND IMPACTS 114.5 MANAGEMENT OF IDENTIFIED ENVIRONMENTAL IMPACTS 124.6 INDUCTION AND TRAINING 134.7 IDENTIFIED STAKEHOLDERS AND CONSULTATION 134.8 EMERGENCY PROCEDURES AND INCIDENT REPORTING 134.9 ENVIRONMENTAL AUDITS AND INSPECTIONS 134.10 DOCUMENTATION 134.11 ENVIRONMENTAL PERFORMANCE REPORTING 13
5.0 REHABILITATION AND CLOSURE PLAN 145.1 STATUS OF CURRENT REHABILITATION 155.2 COSTING OF CLOSURE ACTIVITIES 15
6.0 PERFORMANCE OBJECTIVES 15APPENDICES 16ATTACHMENT A – GLOSSARY OF TERMS 17ATTACHMENT B – SPECIFIC SITE PRACTICES 18
Department of Mines and Energy Page 3 of 21
AMENDMENTS
Section Amendment
Department of Mines and Energy Page 4 of 21
1.0 OPERATOR DETAILS
Operator Name:
Key Contact Person/s:
Postal Address:
Street Address:
Phone:
Fax:
Email:
Department of Mines and Energy Page 5 of 21
1.1 ORGANISATIONAL STRUCTURE / CHART
1.2 WORKFORCE
2.0 PROJECT DETAILS
Project Name:
Location:
Site Access:
Mining Interest/s:
Title holder/s:
Department of Mines and Energy Page 6 of 21
2.1 MAP OF SITE LOCATION AND LAYOUT
N
Department of Mines and Energy Page 7 of 21
2.2 HISTORY OF DEVELOPMENT AND CURRENT STATUS
Historical Mining______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Summary of Activities against the Previous MMP
Mining Interests (i.e. titles) EMP EMP
Amount extracted during last 12 months
Amount proposed for extraction in the last MMPTotal area (ha) cleared/disturbed during last 12 monthsTotal area (ha) proposed for clearing in the last MMP
Summary of Existing Disturbances and Infrastructure
Mining Interests (i.e. titles) EMP EMP
Pit area (ha)
Haul roads (ha)
Stockpile areas (ha)
Sediment traps/dams (m³)
Process plant, mill, crusher area (m²)
Workshops/sheds (m²)
Offices/demountables (m²)
Fuel storage area (m²)
Department of Mines and Energy Page 8 of 21
2.3 PROPOSED ACTIVITIES AND MINING SCHEDULE
Summary of Proposed Activities and Mining Schedule
Mining Interests (i.e. titles) EMP EMP
Target materials (e.g. sand, gravel)
Material reserves (tonnes)
Amount proposed for extraction in the next 12 monthsSize and number of pits proposed(Length: x Width: x Depth: m)What time of the year will extraction occur?How long is extraction expected to occur?
Rate of extraction
Road/track clearing required(Kilometres: x Width: m)
Exploration (i.e. drill holes/costeans)
Will topsoil be removed for rehabilitation purposes?
Total area (ha) proposed for clearing
Other:
Summary of Extractive Program____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
2.4 OTHER RELEVANT INFORMATION
Department of Mines and Energy Page 9 of 21
3.0 CURRENT PROJECT SITE CONDITIONS
Site Conditions Description
Geology
Hydrology
Flora
Fauna
Land Use
Historical, Aboriginal, Heritage Sites
Department of Mines and Energy Page 10 of 21
4.0 ENVIRONMENTAL MANAGEMENT SYSTEM
4.1 ENVIRONMENTAL POLICY AND RESPONSIBILITIES
4.2 LEGAL AND OTHER REQUIREMENTS
4.3 OBJECTIVES AND TARGETS
Objective Target
4.4 IDENTIFICATION OF ENVIRONMENTAL ASPECTS AND IMPACTS
Aspect Impact Risk Rating
Department of Mines and Energy Page 11 of 21
4.5 MANAGEMENT OF IDENTIFIED ENVIRONMENTAL IMPACTS
CategoryIdentified Environmental Impact/s
Management (Prevention)
Management (Remediation) Monitoring
Water Management
Invasive Species Management
Flora and Fauna Management
Waste Management
Noise and Air Quality Management
Culture and Heritage Management
Hazardous Materials and Hydrocarbon Management
Department of Mines and Energy Page 12 of 21
4.6 INDUCTION AND TRAINING
4.7 IDENTIFIED STAKEHOLDERS AND CONSULTATION
4.8 EMERGENCY PROCEDURES AND INCIDENT REPORTING
4.9 ENVIRONMENTAL AUDITS AND INSPECTIONS
4.10 DOCUMENTATION
4.11 ENVIRONMENTAL PERFORMANCE REPORTING
Department of Mines and Energy Page 13 of 21
5.0 REHABILITATION AND CLOSURE PLAN
Disturbance/Infrastructure
Rehabilitation (Details)
Schedule (Timing)
Closure Objectives /
Targets
Monitoring and
Remediation
Pits
Haul roads/tracks
Stockpile area/s
Sediment traps/dams
Workshops/sheds
Process plant/mill/crusher area
Offices/demountables
Fuel storage area
Other
Department of Mines and Energy Page 14 of 21
5.1 STATUS OF CURRENT REHABILITATION
Mining Interest/s EMP EMPArea opened (ha)Area closed (ha)Total outstanding (ha)
NOTE: Photo evidence must be provided of any rehabilitation undertaken (particularly if seeking release of security).
5.2 COSTING OF CLOSURE ACTIVITIES
Summary TableDisturbance Type Calculated Total Cost
Infrastructure $
Extractive Workings $
Exploration $
Access and Haul Roads $
Decommissioning & Post Closure $
15% Contingency $
TOTAL COST $
NOTE: Attach details of workings showing $/units of measure used.
6.0PERFORMANCE OBJECTIVES
Department of Mines and Energy Page 15 of 21
APPENDICES
Any other document(s) referred to in the MMP should be included in the Appendix, such as:
Copies of approvals may be included in an Appendix.
Copies of monitoring reports to meet statutory requirements may be included in an Appendix.
Copies of rehabilitation agreements.
Copies of AAPA search results
Department of Mines and Energy Page 16 of 21
ATTACHMENT A – GLOSSARY OF TERMSTERM MEANINGAudit Means any systematic investigation or appraisal of procedures or
operations for the purpose of determining conformity with prescribed procedures.
CEO Means the Chief Executive Officer, within the meaning of the Public Sector Employment and Management Act, of the Agency administering this Act.
Contractor Means a person who under a contract performs work or supplies a service in connection with an exploration activity on a site.
Critical Incidents Means an event on a mining site that has the potential to cause a significant adverse effect on the environment.
Emergency Response A plan for the minimisation of environmental harm in the event of an emergency.
Employee Means a person employed by a company.Environment Means land, air, water, organisms and ecosystems on a site and
includes: the well-being of humans; structures made or modified by humans; the amenity values of the site; and economic, cultural and social conditions
Environmental Aspects The elements of an organisations activities or products or services that can interact with the environment.
Environmental Impacts Any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organisation’s environmental aspects.
Hazardous Material A substance having properties capable of having adverse affects on the environment.
Issues An important topic of discussion or point in question i.e. management of risk.
MMA Mining Management Act.MSDS Material Safety Data Sheet. It is provided by manufacturer or supplier
of hazardous materials, and describes the properties and nature of the material.
Operator Means the operator for a mining site referred to in Mining Management Act section 10.
Plant Includes machinery, pressure vessels, equipment, appliances, implements, scaffolding and tools, any component of the plant and anything fitted or connected to the plant.
Serious Accidents Means an event on a site that causes material environmental harm.
Department of Mines and Energy Page 17 of 21
ATTACHMENT B – SPECIFIC SITE PRACTICES
Item to be Addressed Status Comments1 The extractive mineral permit may be
used only for the extraction, obtaining or removal of sand, gravel, rocks or soil from the natural surface of land, or of the bed beneath waters, for the purpose other than extracting, producing or refining minerals from the sand, gravel, rocks or soil, or processing the sand, gravel, rocks or soil by non-mechanical means.
Yes
No
2 All extraction operations carried out on the area shall be subject to the provisions of the Mine Management Act and the Regulations there under and to all other laws of the Northern Territory as are applicable.
Yes
No
3 The extractive permit holder shall conduct programs and other activities no closer than: 125 metres from any major road or
railway, Ye
s N
o
20 metres from any telephone, or telegraph lines and cables,
Yes
No
17 metres from any power lines and cables,
Yes
No
25 metres of any salt or fresh water watercourse and associated vegetation,
Yes
No
and in such a way as not to interfere with water pipelines, Ye
s N
o dams or reservoirs, Ye
s N
o gas, pipelines, Ye
s N
oand the lawful activities or rights of any person on or in relation to land adjacent to the area.
4 Unless otherwise approved in a plan of operation: all costeans and sampling pits shall
be backfilled on completion of sampling, or within thirty (30) days of opening,
Yes
No
each borrow area shall be confined to an area of not more than one (1) hectare. Natural vegetation strips not less than twenty-five (25) metres in width shall separate each borrow area from an adjacent area,
Yes
No
after clearing of vegetation - the top layer of not less than ten (10) centimetres of material shall be removed and stockpiled and
Yes
No
Department of Mines and Energy Page 18 of 21
Item to be Addressed Status Comments no extraction or carting of material
shall take place on Sundays and Public Holidays nor before 7 am and after 7 pm on any other day.
Yes
No
extraction should not exceed two metres on an Extractive Mineral Permit. An Extractive Mineral Lease is required if extraction is to exceed two metres.
Yes
No
5 Vegetation clearing from the extractive area shall be either. Stockpiled in a clear area (not
amongst surrounding vegetation) for re-spreading on completion of activities or
Yes
No
Pushed to the middle of the clear area for burning
Yes
No
Burnt material is to be stockpiled with the top-layer in a clear area (not amongst surrounding vegetation) for re-spreading on completion of activities.
Yes
No
6 Where extraction takes place in a stream bed or watercourse: material shall not be removed from
within a distance of two hundred (200) metres upstream or downstream of any bridge, culvert, road invert, recognised crossing or authorised pipeline or gauging stations,
Yes
No
material shall not be removed from the vicinity of any steep bank which is likely to erode or in a manner liable to cause erosion or destruction to the watercourse,
Yes
No
the whole area underlying the branches of any tree shall be left in an undisturbed state, and where trees form a clump, the undisturbed area shall be defined as being within straight lines joining the outside limits of the branches of adjacent trees,
Yes
No
the banks formed by excavation shall be battered to a gradient not steeper than one vertical to two horizontal,
Yes
No
access ramps shall be kept to a minimum number,
Yes
No
bunds and/or drainage structures shall be constructed across all access ramps to prevent channelling and erosion and where there is a completion or suspension of operations, prior to the Wet, or machinery is removed from the site.
Yes
No
Department of Mines and Energy Page 19 of 21
Item to be Addressed Status Comments7 Where dredging takes place in a
watercourse: all operations shall be in accordance
with and subject to the Mine Management Act and Regulations, material shall not be removed from within a distance of two hundred (200) metres upstream or downstream of any bridge, culvert, road invert, recognised crossing or authorised pipeline or gauging station,
Yes
No
material shall not be removed from the vicinity of any steep bank in a manner which is likely to erode, or liable to cause erosion or destruction to, the watercourse,
Yes
No
the whole area underlying the branches of any tree shall be left in an undisturbed state, and where trees form a clump, the undisturbed area shall be defined as being within straight lines joining the outside limits of the branches of adjacent trees,
Yes
No
access ramps shall be kept to a minimum number,
Yes
No
prior to each Wet season during the term of this Permit and on completion of mining operations, bunds and/or drainage structures shall be constructed across all access ramps to prevent channelling and erosion,
Yes
No
the holder shall ensure that discharge from the dredge or any fluid or material used on or in conjunction with the dredge, does not pollute the watercourse, and
Yes
No
where sand is being stockpiled and drainage run off is onto steep slopes, water shall be diverted into settlement ponds before being conveyed by pipeline or trough arrangement back into the river or onto grassed waterways to minimise erosion; and where water intersects a roadway it shall be via a pipeline constructed beneath the roadway.
Yes
No
8 Along the access road to the extracting site, a sign shall be erected in a prominent position at the boundary of the area and shall indicate in letters not less than fifteen (15) centimetres in height:
“DANGER – EXTRACTION SITE – KEEP OUT”
Yes
No
Department of Mines and Energy Page 20 of 21
Item to be Addressed Status Comments9 The holder shall erect warning signs
"Trucks Entering" or similar, either side of the access road on the main road i.e. 150m before the entrance as per Australian Standard AS 1742.2-1994 W5-22C for major highway and AS 1742.2-1994 W5-22B for minor roads.
Yes
No
10
The holder shall minimise the creation of mosquito breeding habitats.
Yes
No
11
Boundary Lines
Metal post or cairn of stones shall be erected at each corner of application area a minimum of 1m in height
Yes
No
Boundary directions should be indicated using a lock spit (rocks or trenches), the two arms of which are not less than 1m in length and 150mm in height.
Yes
No
The boundary lines between each metal post or cairn of stones shall be cleared to a width of not more than 1m to provide a clear line of site between each metal post or cairn of stones. If mature trees are present in the proposed cleared area they should be flagged.
Yes
No
Additional metal posts or cairns of stones shall be used where there is no clear line of site over the complete boundary length.
Yes
No
A metal plate clearly specifying title, date and time of marking out, size of area, subject of application and full name and address of applicant shall be affixed to the datum post.
Yes
No
Boundary posts or cairns of stones shall be maintained in good order and condition.
Yes
No
12
The holder shall minimise the creation of noise and dust and will apply the guidelines of the Waste Management and Pollution Control Act to disturbances at the lease boundary.
Yes
No
Department of Mines and Energy Page 21 of 21