AFRICAN DEVELOPMENT BANK
EGYPT
SUSTAINABLE DEVELOPMENT OF ABU RAWASH WASTEWATER
TREATMENT PLANT (ABU-RAWASH-WWTP)
APPRAISAL REPORT
RDGN/AHWS November 2017
Publi
c D
iscl
osu
re A
uth
ori
zed
Publi
c D
iscl
osu
re A
uth
ori
zed
Auth
ori
ezd
Auth
ori
zed
TABLE OF CONTENTS
I – STRATEGIC THRUST & RATIONALE ............................................................................ 1
1.1 Project linkages with country strategy and objectives ......................................................... 1
1.2. Rationale for Bank’s involvement ...................................................................................... 1
1.3. Donor coordination ............................................................................................................. 2
II – PROJECT DESCRIPTION ................................................................................................. 3
2.1. Project components ............................................................................................................. 3
2.2. Technical solution retained and other alternatives explored ............................................... 3
2.3. Project type ......................................................................................................................... 4
2.4. Project cost and financing arrangements ............................................................................ 4
2.5. Project’s target area and population .................................................................................... 5
2.8. Key performance indicators ............................................................................................ 7
III – PROJECT FEASIBILITY ................................................................................................. 7
3.1. Economic and financial performance ................................................................................. 7
3.2. Environmental and Social impacts ...................................................................................... 8
IV – IMPLEMENTATION ...................................................................................................... 10
4.1. Implementation arrangements ........................................................................................... 10
4.2. Monitoring ........................................................................................................................ 13
4.3. Governance ....................................................................................................................... 14
4.4. Sustainability..................................................................................................................... 14
4.5. Risk management .............................................................................................................. 15
4.6. Knowledge building .......................................................................................................... 15
V – LEGAL INSTRUMENTS AND AUTHORITY............................................................... 16
5.1. Legal instrument ............................................................................................................... 16
5.2. Conditions associated with Bank’s intervention ............................................................... 16
5.3. Compliance with Bank Policies ........................................................................................ 16
VI – RECOMMENDATION ................................................................................................... 16
Appendix I. Egypt’s Socio-Economic Indicators .......................................................................I
Appendix II: AfDB Portfolio in Egypt (September 2017) ........................................................ II
Appendix III: Key related projects financed by other development partners in the country ... IV
Appendix IV. Map of the Project Area ..................................................................................... V
Currency Equivalents As of October 2017
1 UA = 1.4133 USD
1 UA = 24.9531 EGP
1 USD = 17.65591 EGP
Fiscal Year
1 July – 30 June
Weights and Measures
1metric tonne = 2204 pounds (lbs)
1 kilogramme (kg) = 2.200 lbs
1 metre (m) = 3.28 feet (ft)
1 millimetre (mm) = 0.03937 inch (“)
1 kilometre (km) = 0.62 mile
1 hectare (ha) = 2.471 acres
1 feddan = 0.42 hectares
i
Acronyms and Abbreviations
ACCF Africa Climate Change Fund
ADB African Development Bank
AFD French Development Agency
CAPW Construction Authority for Potable Water and Wastewater
CPIA Country Policy and Institutional Assessment
CSP Country Strategy Paper
CSS Climate Safeguard System
COEG Country Office Egypt
DPG Development Partners Group
EA Executing Agency
EIB European Investment Bank
EPC Engineering, Procurement, and Construction
ESIA Environmental and Social Impact Assessment
EU European Union
CFRA Country Fiduciary Risk Assessment
GCF Green Climate Fund
GCWW Giza Company for Water and Wastewater
GIZ German Agency for International Cooperation
GoE Government of Egypt
HCWW Holding Company for Water and Wastewater
FM Financial Management
IsDB Islamic Development Bank
KfW (German Bank for International Development Financing)
KFAED Kuwait Fund for Arab Economic Development
M&E Monitoring and Evaluation
MHUUC Ministry of Housing, Utilities, and Urban Communities
MoIIC Ministry of Investment and International Cooperation
MIC TAF Middle Income Countries Technical Assistance Fund
MWRI Ministry of Water Resources and Irrigation
NCB National Competitive Bidding
NWRP National Water Resources Plan
O&M Operation & Maintenance
PCN Project Concept Note
PCR Project Completion Report
PIT Project Implementation Team
PRCA Procurement Risks and Capacity Assessment
PPP Public Private Partnership
PSC Project Steering Committee
UA Units of Account
USD United States Dollar
WSS Water, Wastewater and Sanitation
WB The World Bank
WWTP Wastewater Treatment Plant
VFM Value for Money
ii
Loan Information
Client’s information
BORROWER : The Arab Republic of Egypt
EXECUTING AGENCY : Construction Authority for Potable Water and Wastewater
(CAPW)
Financing plan
Source Amount (USD) Instrument
ADB 100.00 million Loan
AGTF 50.00 million Loan
Government* 237.44 million Counterpart
TOTAL COST 387.44 million *Government of Egypt contribution is in EGP.
ADB and AGTF key financing information
EIRR, NPV (base case) 29.9%, EGP 19,336 million at 10%
Timeframe - Main Milestones (expected)
Concept Note approval October, 2017
Project approval December, 2017
Effectiveness March, 2018
Completion December, 2021
Closing Date December, 2022
Loan Currency United States Dollar (USD)
Loan Type Fully Flexible Loan
Tenor TBD (Up to 25 years inclusive of Grace Period)
Grace period TBD (Up to 8 years)
Average Loan Maturity* TBD (function of the amortization profile)
Repayments Consecutive quarterly payments after grace period
Interest Rate Base Rate +Funding Cost Margin+ Lending Margin + Maturity Premium This Interest Rate will be floored to zero
Base Rate
Floating Base Rate ( 6 Month LIBOR)
A free option to fix the Base Rate is available
Funding Cost Margin The Bank funding cost margin as determined each 1st January and 1st July and applied to the
Base Rate each 1st February, 1st May, 1st august and 1st November
Lending Margin 80 basis points (0.8%)
Maturity Premium - 0% if Average Loan Maturity <= 12.75 years
- 0,10% if 12.75< Average Loan Maturity <=15
- 0,20% if Average Loan Maturity >15 years
Front-end fees 0.25% of the loan amount payable at latest at signature of the loan agreement
Commitment fees 0.25% of the undisbursed amount. Commitment fees start accruing 60 days after signature of the loan agreement and are payable on Payment dates
Option to convert the Base Rate** In addition to the free option to fix the floating Base Rate, the borrower may reconvert the fix
rate to floating or re-fix it on part or full-disbursed amount.
Transaction fees are payable
Option to cap or collar the Base Rate**
The borrower may cap or set both cap and floor on the Base Rate to be applied on part or full disbursed amount
Transaction fees are payable
Option to convert loan
currency**(Only for ADB loan)
The borrower may convert the loan currency for both undisbursed or disbursed amounts in full
or part to another approved lending currency of the Bank Transaction fees are payable
iii
Project Summary
Project Overview: The Sustainable Development of Abu Rawash Wastewater Treatment Plant
(ARWWTP) aims to protect the environment and water resources from pollution and to reduce
health risks due to discharge of untreated wastewater to the drains and canals and enhance
water re-use. The project is aligned to Egypt’s Sustainable Development Strategy: 2030 Vision,
its current five-year Macroeconomic Framework and Strategy (MFS FY14/15-FY18/19), and
the Cabinet’s comprehensive reform program. It is also in line with the Bank’s High Fives
Agenda and the Bank’s Ten Year Strategy through development of critical infrastructure and
contribution to green growth, focusing mainly on improving quality of life of people and Feed
Africa. The project cost is estimated at USD 387.4 million to be financed by ADB (USD100
million), AGTF (USD50 million), and the Government of Egypt (USD237.4 million). It will
be implemented in four years.
The main outcomes of the project are a) upgrade or improve the quality of existing primary
treatment system of 1.2 million m3 per day to include secondary treatment, and b) increase or
expand the treatment plant’s capacity from 1.2 million m3 to 1.6 million m3 per day of both
primary and secondary treatment. The treated wastewater can be used in agriculture activities
and therefore will contribute to the improvement of livelihoods and income generating for the
surrounding communities with a significant positive impact on health. The project will benefit
more than 8 million people (men, women and children) in the broader project service area
covering eastern side of the River Nile, Cairo-Alexandria Desert Road, mainly in the Giza
Governorate in the West Bank of the River Nile. Sharqia, El-Behira, Kafr El-Sheikh and
Monofia Governorates. This will result in increased incomes and food security in these
communities with increased economic off-farm activity as well. Furthermore, the project will
create more than 1,200 job opportunities during implementation and operation. In addition,
more than 4000 indirect jobs are also expected to be created in various areas, including SMEs
in tourism, agriculture, and fisheries for unskilled, semi-skilled, and skilled persons.
Needs Assessment: The Abu Rawash WWTP was designed from the onset to be developed in
phases in response to the growth of the catchment population and resulting demand for services.
The first stage, designed as a primary treatment system, had a capacity of 400,000m3/day and
it was expanded to its current capacity of 1.2 million m3/day. However the current inflow into
the plant exceeded the capacity by more than .4 million m3/day and the current project was
supposed to be in operation as of 2015. With the increasing inflow, the quality of the effluent
also deteriorated. With increasing population and demand for food, many in the downstream
areas reverted to the use of the effluent for agriculture albeit the risks to the public health and
in contravention to the Egyptian laws. The project aims to bring down the effluent quality to
acceptable limit for reuse in agriculture and hence its design includes secondary treatment
system.
Bank’s Added Value: The Bank’s intervention in this project will add significant value to the
investment made by the Government of Egypt for this important Wastewater Treatment Plant.
This project is critical to the country considering the extent of water scarcity problems,
enhancing water quality, and treated wastewater reuse. The inclusion of the feasibility study
for waste to energy as part of the project will enable the Bank to provide technical assistance
to Egypt to find an appropriate financing mechanism including climate finance to enhance the
greening of the AWWTP. In addition, the Bank’s holistic approach, combining investment with
capacity building, is its distinct characteristic of focusing on development and sustainability.
The Bank’s intervention will contribute the much needed financial resources by GOE, as it
strives to improve environmental sustainability and quality of life in line with its Sustainable
Development Strategy: Vision 2030.
iv
Knowledge Management: The knowledge gained through the implementation of several
projects and studies in the sector in Egypt has been duly applied in designing this project. In
the same pattern, the knowledge that will be generated by this Project will be instrumental in
designing and managing subsequent phases of the Wastewater Treatment Projects generally,
and the proposed Green Sludge Facility Phase of Abu-Rawash to generate electricity from Bio-
Gas. The lessons from the design, construction and management of projects of such magnitude
will be useful to many other countries in the region. The lessons learnt and experience gained
will be documented for dissemination in workshops, discussions and seminars. Even during
construction, the Bank will encourage groups from regional countries to visit the plant for
learning purposes and knowledge dissemination.
v
RESULTS-BASED LOGICAL FRAMEWORK Country and Project Name: Egypt – Sustainable Development of Abu Rawash Wastewater Treatment Plant
Purpose of the project: To improve environmental sustainability and quality of life of people and to improve quality of water resources in
agriculture through re-use of treated wastewater.
RESULTS CHAIN
PERFORMANCE INDICATORS MEANS OF
VERIFICATION
RISKS/MITIGATION
MEASURES Indicator
(including CSI) Baseline Target
IMP
AC
T
Improved public
health and
poverty
alleviation due
to improved
sanitation and
environmental
protection
GDP health Expenditure
on water and sanitation
related diseases
Under 5 infant mortality
Rate
Reduce incidences of
waterborne diseases
> .7%
(2016)
33/1000
(2016)
17000cases
/100,000 in
2016
Less than
0.1%
(2025)
10/1000
(2037)
<3000/100000 by 2037
MoF/National statistics
1) Risk: Implementation
delays: Mitigation: Use of advance
contracting to facilitate timely
start-up of construction. The
project will be executed
through a PIT with strong
management for coordination.
In addition, an international
engineering firm will be
recruited to support the PIT in
supervision of project
implementation and
management. CAPW already
have experience in
implementing previous projects
(Gabal Al Asfar WWTP) using
the same institutional
arrangements.
2) Risk: Lack of capacity to
maintain and sustain the system
Mitigation: Adopt standard
WWTP system similar to the
other wastewater treatment
plants managed by the EA, and
by including at least 3-year
operational period during
which the contractor will
operate the plant and provide
on-the-job training to the relevant staff.
3) Risk: Continued low tariffs
unable to cover O&M costs.
Mitigation: Introduction of
cost reflective tariff system
which also allow for social
tariffs, supported by
sensitization campaigns will
mitigate such a risk.
4) Risk: availability and timely
release of counterpart funding.
Mitigation: Close follow up
with the borrower will be made
during implementation to
ensure timely allocation and
availability of local counterpart
funding.
OU
TC
OM
ES
Improve
treatment from
primary to
secondary
treatment
Secondary Treatment
Capacity (mc/d)
operational at existing plant
0million
(2017)
(only
Primary
treatment
1.2 million
(2021)
Secondary
treatment
CAPW/HCWW
Annual Reports
Increased plant
Treatment
capacity
Plant Treatment Capacity
increased by 400,000
m3/day
1.2
million
(2017)
1.6 million
(2021)
Quality of
wastewater
effluent released
from the WWTP
meets national
standard1
Suspended Solids (SS) and
Biological Oxygen
Demand (BOD5) reduced
> 178 mg/l
and 250
mg/l in 2016
20 mg/l and
20mg/l
respectively by 2021
Plant Operation Report
Environmental Agency
Report
Safe reuse of
treated
wastewater
Proportion of un-treated
wastewater used in
agriculture in the
surrounding areas (%)
100%
(2017)
< 20%
(2021)
Job creation Number of jobs directly
created through the project
(at least 27% for women)
0
(2017)
1200
(2021)
Project progress and
completion reports
OU
TP
UT
S
Upgrading of
primary WWTP
facilities to
secondary TP
Upgraded and Expanded
WWTP
0
(2017)
1
(2021)
Annual report
Preparatory
activities for
sludge
management
Feasibility study and tender
documents prepared for
sludge management with
energy production
0
(2017)
1
(2020)
Documents validated by
EA
Provision of
institutional and
technical
support
Number of on the job
training programs on E&S
& social inclusion
No. of heath & hygiene
promotion campaigns
0
0
8
(8, >50%
of women)
Annual Report
QPR and Annual report
KE
Y
AC
TIV
ITIE
S
Components:
a) Wastewater Treatment Plant Upgrading and Expansion
b) Environment, Social, Climate Change and Institutional
Support
c) Project Management and Engineering Services
Source Amount (Mil USD)
GoE 237.44
ADB Loan 100.00
AGTF Loan 50.00
Total 387.44
1 There are five quality indicators which the plant shall meet following upgrading: Biological Oxygen Demand (BOD5) < 20mg/l; Total Suspended Solids (TSS)
< 20 mg/l; Chemical Oxygen Demand < 80mg/l; Fat, Oil, Grease (FOG) < 5mg/l; Faecal Coliforms <1000 No./100ml
vi
Project Time Frame
10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
Project Preparation
Project Appraisal
Board Approval
Signing
Effectiveness
Launching
First Disbursement
Consultancy Services (Supervision)
Bid Opening
F& T Evaluation
Contract Award
Supervision Services
Project Implementation
Contract Award
Design
Civil Works
Electro-mechanical Works
Commissioning Period
Operation and Maintenance
O & M
Institutional Capacity Building and Studies
Training and Capacity Building
Awareness, Sensitization & Promotion
Waste to Energy FS
Supervision Monitoring and Evaluation
Quarter Progress Reports (QPR) Q Q Q Q Q Q Q Q Q Q Q
Field Supervision Mission F F F F F F
Mid-Term Review M
Financial Audit (Submission) A A A A
Project Completion
PCR C
Advance Contracting Project Completion Project Closure
Egypt: SUSTAINABLE DEVELOPMENT OF ABU RAWASH WASTEWATER TREATMENT PLANT (ABU-RAWASH-WWTP)2017
Activity2018 2019 2020 2021 2022 2023
1
REPORT AND RECOMMENDATION OF THE MANAGEMENT OF THE AFDB
GROUP TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE
GOVERNMENT OF THE ARAB REPUBLIC OF EGYPT FOR ABU-RAWASH
WASTEWATER TREATMENT PLANT
Management submits the following Report and Recommendation on a proposed ADB loan of
USD 100 million and AGTF loan of USD 50 million to finance the Sustainable Development
of Abu-Rawash Wastewater Treatment Plant in Egypt.
I. STRATEGIC THRUST & RATIONALE
1.1 Project linkages with country strategy and objectives
1.1.1 The Bank’s current Country Strategy Paper (CSP) 2015-2019 for Egypt is anchored
on two pillars. Pillar I: Infrastructure in support of Stabilization and Economic Recovery; and
Pillar II: Governance in support of Inclusive Growth to Reduce Poverty. The proposed
operation is in alignment with Pillar No. 1 to foster sustainable and inclusive growth, and
improve the business environment. The project aims to improve environmental sustainability
and quality of life of people and increase available water resources from the re-use of treated
wastewater in agriculture. The project objective is aligned with the Bank’s High Fives Agenda
and the Bank’s Ten Year Strategy through development of critical infrastructure and
contribution to green growth, focusing on improving quality of life of people and Feed Africa.
It fits well with the Bank’s IWRM policy as it aims to enhance the availability of good quality
water for environmental sustainability and productive purposes. The operation is also aligned
with the Bank Group’s Private Sector Development policy, particularly in promoting local
entrepreneurship.
1.1.2 Egypt’s development strategy is built around the “Sustainable Development Strategy:
2030 Vision”, the five-year Macroeconomic Framework and Strategy (MFS FY14/15-
FY18/19), and the Cabinet’s comprehensive reform program. The strategy is designed to
address four key challenges: (i) a large population with growing basic needs and high social,
spatial and economic expectations; (ii) a difficult macroeconomic situation that has constrained
fiscal space; (iii) insufficient and inefficient infrastructure; and (iv) a weak business
environment that undermines competiveness, growth, and job creation. The proposed operation
responds directly to the first and third key challenges and it is identified as one of the top
priority projects in the strategy. In terms of the sector strategy, the project is well aligned with
the National Water Resources Plan through its emphasis and contribution to the safeguarding
of Egypt’s water resources and preservation of the environment and the ecosystem while
advancing socio-economic benefits.
1.2 Rationale for Bank’s involvement
1.2.1 Egypt’s future challenge will revolve around the declining water per capita availability
due to population growth, limited or dwindling water resources, demand increases, food gap,
pollution and climate change. Protecting and enhancing the quality of water in the River Nile,
canals and drainage systems is one of the several interventions to address the challenge. These
water bodies (mainly agriculture drainage) receive heavy loads of municipal waste (treated and
untreated) polluting the water quality and endangering public health. In order to address these
issues, the National Water Resources Plan (NWRP) identified measures for improvement of
water quality in the water bodies that includes increasing and enhancing the municipal
wastewater treatment plants. Among these plants, the upgrading and expansion of the Abu
Rawash Wastewater Treatment Plant has been considered among the highest priority by the
GOE as clearly indicated in Egypt’s MFS.
2
1.2.2 Since 2009, the Bank has been involved in Egypt’s water sector mainly through the
financing of the Gabal Al Asfar Waste Water Treatment Plan Phase 2 project with a similar
objective as the proposed intervention at Abu Rawash. The Bank also supported the Helwan
Waste Water Treatment Plant PPP Transaction Advisory study to enable the GoE to make
informed judgment and decisions regarding the implementation approach and financing
strategy. In view of the Bank’s recent activities in similar initiatives in the country, the GOE
submitted its financing request to the Bank demonstrating GOE’s confidence in the ability of
the Bank to provide technical support and financial resources to fund the proposed project. The
Bank’s intervention will contribute to much needed resources by GOE, as it strives to improve
environmental sustainability and quality of life in line with its Sustainable Development
Strategy: Vision 2030.
1.3. Donor coordination
1.3.1 Several development partners (bilateral and multi-lateral DPs) are supporting the water
sector in Egypt. Key sector supporters, in addition to the Bank, are the World Bank (WB), EU,
KfW, AFD, EBRD, EIB, USAID, GIZ, and the Government of Netherlands. The DPs support
includes investment operations, institutional and sector reforms, and technical assistance to
enhance capacity building. The Bank is very active and collaborates with all DPs through the
Development Partners Sub-Group on Water (sharing information, participation at water events,
periodic meetings, etc.). The main development partners active in the sector are shown in the
matrix below.
Sector or subsector*
Size
GDP Exports Labor Force
[Water and Sanitation] [1.2%] n.a [1.0%]
Players - Public Annual Expenditure (average 2007-2012)**
Government Donors
[EU]
[5%]
[UA 540 m] [UA 210 m] [World Bank] [30%]
[61%] [39%] [EBRD] [20%]
[EIB] [24%]
[AfDB] [3%]
Level of Donor Coordination
Existence of Thematic Working Groups [Y]
Existence of SWAPs or Integrated Sector Approaches [N]
ADB's Involvement in donors coordination*** [M]****
**** L: leader, M: member but not leader, none: no involvement
3
II. PROJECT DESCRIPTION
2.1. Project components
2.1.1 The project’s development objective is to protect the environment and water resource
from pollution and to reduce health risks due to discharge of untreated wastewater to the drains
and canals, and enhance water re-use. The main outcomes of the project are: a) upgrade or
improve the quality of existing primary treatment system of 1.2 million m3 per day to include
secondary treatment, and b) increase or expand the treatment plant’s capacity from 1.2 million
m3 to 1.6 million m3 per day of both primary and secondary treatment. Provision of secondary
treatment facilities is essential to meet effluent standards in Egypt and to improve the water
quality environment of the drainage system.
2.1.2 The project is composed of 3 components namely: (i) Wastewater Infrastructure
Upgrading and Expansion; (ii) Environment, Social, Climate Change and Institutional Support;
and (iii) Project Management and Engineering Services.
Table 2.1
Project Components
Component name Est. cost
(USD million)
Component Outputs
1. Wastewater
Infrastructure
Upgrading and
Expansion
377.58 upgrading the existing 1.2 million m3/d primary treatment plant
in Abu Rawash WWTP to secondary treatment;
expand the existing plant capacity by additional 400,000 m3/d to
reach a total plant capacity of 1.6 million m3/day with primary
and secondary treatments
2. Environment,
Social, Climate
Change and
Institutional
Support
0.627 capacity building to address critical shortcomings at Construction
Authority for Potable Water and Wastewater (CAPW), Holding
Company for Water and Wastewater and Giza Company for
Water and Wastewater (GCWW),
public outreach to sensitize communities, water user associations,
agricultural committees on good practices and benefits of the
project and safe re-use of effluent,
undertake studies to identify and design agricultural interventions
for the benefit of the existing communities, and
carry out feasibility study for the Sludge Management Facility for
energy production (including PPP option)
3. Project
Management and
Engineering
Services
9.235 Project Management and Engineering Supervision
M&E
Financial Management, Audit, etc.
Total 387.44
2.2. Technical solution retained and other alternatives explored
2.2.1 The design of the project is combining both the public and private sectors comparative
advantages. The government has carried out initial scoping and feasibility studies to identify
solutions to protect the environment and promote public health. As the operation of large
wastewater treatment plants involves complex process engineering and the application of latest
technology and innovation in the design for efficiency, the project has employed a design and
build approach. The technological and design risk is transferred to the private sector. The
project has also included an operator role for the first three years during which adequate
capacity is built through the hands on training within the public sector operator.
4
2.2.2 In terms of alternative techniques of wastewater treatment, the most preferred system
adopted for the project is the conventional activated sludge process. The main reasons for the
selection of the method have been due to (i) efficiency of the system to remove more than 90%
of the BOD and SS (ii) integration and utilisation of existing facility and space economically,
(iii) other large scale wastewater treatment plants in the country apply similar method and
therefore eases challenge of operation and maintenance. The other possible processes which
were rejected are shown in the table below. It is important to note that the project is
incorporating a feasibility for sludge management and energy production as a follow up project.
Table 2.2
Project alternatives considered and reasons for rejection
Alternative name Brief description
Reasons for rejection
Waste Stabilisation
Ponds
This method treats sewage in a series of
ponds. The method requires a very large
area.
The method does not allow to fully utilise the
existing plant and its space.
It requires huge area of land
Oxidation ditch
process (ODP) /
Extended Aeration
/ Sequential Batch
Reactor Methods
These methods don’t require primary
clarification to reduce organic load Suitable for lower BOD-SS loading operation; Not suitable for large scale plant application Existing primary facilities will not be utilised
Aerated Lagoons This is a mixed aerobic biological
reactor without recycling
Requires large area and power consumption is
high
2.3. Project type
2.3.1 The Sustainable Development of Abu Rawash WWTP Project is a stand-alone project
as big and complex projects in the water sector are implemented as stand-alone operations.
2.4. Project cost and financing arrangements
2.4.1 The total cost of the Project is estimated at USD 387.44 million (equivalent UA 274
million), net of taxes and duties, of which USD 237.8 million (61.4%) is in foreign currency
and USD 149.67 million (38.6%) in local costs. Table 2.3 below provides a summary of the
estimated project costs by component. These estimates are based on information provided by
the executing agency, for EPC plus 3 years operations as extracted from the updated proposals.
In addition, physical contingency of 5% and price contingency of 3% per year has been applied.
Table 2.3
Project cost estimates by component (in USD ‘000) No. Component Local
Cost Foreign
Cost
Total
% Total Base
1 Wastewater Treatment Plan Upgrading and
Expansion, with 3Y O & M
127,827 217,000 344,827 97.5%
2 Environment, Social Climate Change and
Institutional Support
571 - 571 0.2%
3 Project Management and Engineering
Services
8,410 - 8,410 2.4%
Sub Total 136,807 217,000 353,807 100.0%
Physical Contingencies 6,840 10,850 17,690
Price Contingencies 6,019 9,924 15,942
Total 149,666 237,774 387,440
38.6% 61.4% 100.0%
5
2.4.2 The Project will be financed by AfDB, AGTF and GoE as shown in the financing plan
presented in Table 2.4 below. The total Bank Group financing is USD 150 million, comprising
of AfDB loan of USD 100 million and AGTF loan of USD 50 million. These funds will be
used to finance part of component 1 of the project. GOE will contribute 62% of the total project
cost in EGP for the equivalent of USD 237.44, covering components 1, 2 and 3 of the project.
Details of ADB and AGTF financing are provided in Annex B2. The Bank appraisal mission
discussed and agreed with the relevant Ministries on the above financing and the proposed
conditions stated in Section V of this document.
Table 2.4
Sources of financing
Sources of Funds (USD '000) %
ADB Loan 100,000 25.81
AGTF Loan 50,000 12.91
GOE 237,440 61.28
Total 387,440 100.00
Table 2.5
Program cost by category of expenditure (in USD ‘000) No. Category of Expenditure Local Cost Foreign Cost
Total
1 Goods 127,827 217,000 344,827
2 Services 6,031 - 6,031
3 Miscellaneous 2,950 - 2,950
Sub Total 136,807 217,000 353,807
Physical Contingencies 6,840 10,850 17,690
Price Contingencies 6,019 9,924 15,942
Total 149,666 237,774 387,440
Table 2.6
Expenditure schedule by component (in USD ‘000) No. Component 2018
2019
2020
2021 Total
1 Wastewater Treatment Plan Upgrading and
Expansion, with 3Y O & M
63,174 125,266 109,608 46,779 344,827
2 Environment, Social Climate Change and
Institutional Support
143 143 143 143 571
3 Project Management and Engineering Services 2,102 2,102 2,102 2,102 8,410
Sub Total 65,419 127,511 111,853 49,024 353,807
Physical Contingencies 3,271 6,376 5,593 2,451 17,690
Price Contingencies - 4,017 7,152 4,773 15,942
Total 68,690 137,903 124,598 56,248 387,440
2.5. Project’s target area and population
2.5.1 The proposed Project will benefit more than 8 million people (men, women and
children) in the project service area covering eastern side of the River Nile, Cairo-Alexandria
Desert Road, mainly in the Giza Governorate in the West Bank of the River Nile. It will serve
directly Giza Governorate (including 6th of October City and indirectly Monofia, El-Behira,
6
Kafr El-Sheikh, Sharqia Governorates. The plant is located at Abu-Rawash village, which is
one of the main villages of Kerdasa District with total population of 27,564, who will benefit
from job creation and hygiene promotion. Other beneficiaries include people living in villages
downstream of the plant and along the system draining the effluent from the plant into Barakat
drain, with an estimated population of more than 407,608. This population will also benefit
from an improved environment and consequent reduction of diseases associated with untreated
wastewater.
2.6. Participatory process for project identification, design and implementation
2.6.1 Consultations regarding the project started since 2013 and continued during pre-
preparation mission in 2015, the preparation, and appraisal missions in February and
September 2017 respectively. In addition, intergovernmental consultations among relevant
institutions has been going on since 2013. Institutions consulted include CAPW, Ministry of
International Cooperation (MIC), Holding Company of Water and Wastewater (HCWW), Giza
Company, Ministry of Health, Ministry of Irrigation. DPs, namely WB, AFD, KfW, EU, EIB,
EBRD, and JICA were met. Visit to the proposed project site for infrastructure and outlet of
the drainage was carried out. Consultations and discussion with beneficiary communities
surrounding the wastewater treatment plan, beneficiaries from downstream along the drainage
and upstream of El Giza Governorate took place during the preparation of the ESIA.
2.6.2 During the consultations, community members raised their concern that as the volume
of water in the canals for irrigation is not enough, they have little choice but to use drainage
water for irrigation even for cultivating edible crops, which could lead to severe health hazards
to farmers, and consumers, at large. The issue was also raised that the Abu-Rawash WWTP
should ensure the interaction with the representatives of the local communities surrounding the
wastewater treatment plant as well as other stakeholders such as Kerdasa City Council heads.
2.6.3 The primary and secondary treatment of the wastewater at Abu Rawash will mitigate
the health hazards and help the farmers to irrigate their fields in accordance with the ‘Egyptian
Code of 2014 for the reuse of wastewater’. The project will benefit the population living along
the Barakat Drain as well as communities living downstream. Temporary and permanent jobs
will be created for the local communities. The consultations will be done quarterly during
implementation as part of the ESIA and will be supervised by the E&S focal point of the
executing agency.
2.7 Bank Group experience, lessons reflected in project design
2.7.1 The Bank has accumulated experience in the water and sanitation sector in Egypt and
across the continent. Besides, lessons learnt and experience of other development partners
supporting the water and sanitation sector in Egypt have also been taken into account in the
project. These lessons include, the need to include at least 3 years operation period after
completion of construction works. This will allow the contractors to operate the plant and to
provide on the job training to the relevant staff of the executing agency. Other lessons taken
into account are: (i) the need to address institutional issues while supporting infrastructure
development, ii) the importance of having Monitoring and Evaluation Unit specific to the
project to provide analytical content in progress reports; (iii) need to streamline and avoid
having numerous and onerous conditions precedent to effectiveness to avoid delayed
effectiveness of projects. These lessons have been incorporated and the Bank is also working
closely with the other development partners (WB, EIB, EBRD, EU, AFD, and KfD) in
implementing this programme under the Joint Integrated Sector Approach (JISA).
7
2.8 Key performance indicators
2.8.1 The key performance indicators for monitoring of project achievements are identified
and captured in the results based logical framework. The project’s main outcomes are a clean
environment and subsequent improvement in health through reduction of water and sanitation
related diseases. The main key performance indicators to be monitored during implementation
include enhanced treatment system, incremental capacity added to the treatment plant, quality
of effluent and reception by communities of information campaign regarding improved
sanitation and hygiene. The plant’s throughput will be monitored everyday using the
strategically placed measuring devises, while the quality of the effluent will be monitored using
the existing laboratory at the site. The responsiveness of health messages will be monitored
through regular surveys carried out on the concerned communities.
2.8.2 The implementing agency (CAPW) will be responsible for project implementation
and will monitor its outputs and the agreed performance indicators. The PIT shall closely
monitor progress and liaise closely with both the project consultant and the contractor to ensure
achievement of both its outputs and outcomes. Regular reporting by the PIT (progress reports,
Audit reports, and mid-term review report, etc) will keep the GOE and the Bank fully informed
of the progress. The concerned parties will take timely action to comply with the
recommendations contained in these reports.
III. PROJECT FEASIBILITY
3.1. Economic and financial performance
Table C.1: Key economic figures
EIRR 29.9% and ENPV EGP 19,336 million (at 10% base case)
NB: detailed calculations are available in Annex B7
3.1.1 The underlying assumptions for the calculation of the EIRR are provided in Annex
B6. The economic analysis of the project has been undertaken by comparing “with” and
“without project” of the various costs and benefits that will accrue to the beneficiaries of
improved and sustainable wastewater treatment system. The principal benefit of the project is
treated waste water meeting the required national health standards, which will enhance the
environmental benefits of the residents in the project and surrounding areas. The main
assumptions are: health benefits from improved sanitation services comprising improved
sewerage and faecal sludge management systems, incremental economic value of treated
wastewater representing environmental and socioeconomic benefits downstream of the
treatment plant, as well as economic value of sludge produced from the improved facilities.
On the cost side, these include investment costs, replacement costs, and other items as part of
operation and maintenance costs comprising of staff costs, energy, chemicals and repairs and
other overhead costs have been taken into account. The economic life of the investment is
estimated as 25 years, all the costs and benefits considered are net of duties and taxes. The
project’s economic rate of return is estimated at 29.9%. The value is higher than the
opportunity cost of capital of 10% and thus is considered economically viable. Sensitivity
analysis to test the robustness of the EIRR was carried out to determine the impact of adverse
variations. The EIRR changes to 26.7% assuming that investment cost increases by 20%, and
to 25.7% assuming that the benefits of the project are decreased by 20%. The analysis shows
that the project is economically viable and socially beneficial for Egypt.
8
3.2 Environmental and Social impacts
Environment
3.2.1 The project has numerous environmental benefits as it will improve the water quality
of effluent discharged and its compliance with the legal standards; decreasing the pollution of
the water resources especially in the Nile River which is the final discharge point of the treated
wastewater and reduce the waterborne related diseases in surrounding communities along main
drains and rivers. Besides, the project will create job opportunities during its construction phase
and operation phases, create various training and research opportunities and contribute to
improve the quality of life of the population especially with regards to the sanitation coverage
of Greater Cairo.
3.2.2 Overall, the project is not likely to generate major negative impacts as all construction
activities will be within the actual plant boundaries and no land acquisition will be required to
expand the WWTP. In addition, the existing capacity of the sludge lagoons facility (20 basins
with a total area of 84 ha located within 1,470 ha of a free of use land owned by HCWW will
not require any expansion. Thus, the project will not require any land acquisition, neither has
an impact on involuntary physical and/or economic displacement. According to National
Environmental Policy requirements, the project is under Category C (Black List) given its
capacity of 1.2 million m3/day. Even though the project will not generate significant adverse
environmental impacts, its scale (large-scale urban wastewater treatment plant) made it eligible
for category 1 as per the Bank Integrated Safeguard System (ISS) (category validated by the
Safeguards Department on 22 March 2015).
3.2.3 An Environmental and Social Impact Assessment study (ESIA) was prepared for the
project and validated by the Egyptian Environmental Affairs Agency (EEAA), which is the
principal authority that coordinates environmental management in Egypt. The validation
certificate was delivered for the project on 2 March 2016. The ESIA was reviewed by the
project team in 2017 during the preparation phase to meet the Bank’s requirements and was
approved internally by Safeguards prior the mandatory disclosure for 120 days on the Bank’s
website on May 15th, 2017.
3.2.4 The direct negative impacts identified are the common impacts related to the
construction phase and are due to the construction works and movement of machines. This
includes mainly sound pollution, dust emission, public safety and health hazards, disruption of
surface water drainage and pollution and disposal of waste. The project will not affect
negatively any sensitive or protected area. During operations, no major adverse impacts on the
environment are expected, however some environmental, health and safety issues related to
routine works such as accidental leakages, labours injury and chemical/biological hazards are
noted.
3.2.5 With regard to the cumulative impacts, after upgrading the capacity of the plant up to
1.6 million m³/day and implementing a secondary treatment, an extra sludge quantity will be
generated in addition to the sludge produced from Zenein plant (estimated at 10,800 m³/day).
The total sludge flow estimated at 39,797 m³/day will be pumped into 20 unlined lagoons
currently located in the desert.
3.2.6 In terms of residual risks and impacts, the water borne diseases affecting the
surrounding communities along the main drains and rivers will remain as long as the
agricultural farms will keep using the un-treated effluent from drains to irrigate non-authorized
crops in violation to the national Law 48/1982, Code 501/2005, Ministerial Decree
No.383/2015.
9
3.2.7 In order to mitigate the project’s negative impacts including the cumulative and
residual impacts , an environmental and social management plan including a feasibility study
for the construction of a Sludge Management Facility, an environmental awareness component,
a monitoring program and a detailed training program have been prepared. The budget for these
activities (USD 153,000) is included as part of the overall project cost.
Climate Change
3.2.8 The Abu Rawash project presents a good opportunity for accessing climate finance to
address climate issues while ensuring sustainable development with its high potential for
contributing to both mitigation and adaptation.
Gender
3.2.9 The 2015 Global Gender Gap Index2 ranks Egypt at 136 out of 145 countries
worldwide. Women have significantly lower participation in the labour force than men (26%
vs 79%) and lower literacy (65% literacy for women vs 82% of males).3 This situation is
mirrored in the project areas. Low literacy and socio-cultural dynamics limit women’s
participation and hence reduces their chances to equal opportunities. Moreover, low public
participation and illiteracy among women and children who dropped out of school has reduced
public awareness about the dangers of environmental hazards. Residents on the farms affiliated
to the wastewater treatment plant and the surrounding area currently have no access to the
sewer services and depend on decentralized sanitation facilities. The most common method for
collecting the drainage water is through the scavenge trucks. In the absence of this, women
may discharge the drainage by themselves into drains or nearby areas. This constitutes a
tremendous health hazard to women and children and burdens women with extra tasks, as they
are responsible from household chores and taking care of sick member of the households.
3.2.10 While, the project will benefit all households serviced by Abu Rawash WWTP
irrespective of their income or if the household has a male or female head, specific gender
impact is anticipated in the Abu Rawash Village where the plant is situated and along the Brakat
Drain where the treated wastewater is discharged. Three major issues have been identified: (i)
limited women’s participation, (ii) environmental hazard impact on women, and (iii) limited
access to income for improving their living conditions. The project’s interventions address
these issues through: (i) Gender-sensitive public health awareness for communities residing in
the surroundings of the plants and along the drains. (ii) Effective participation of women in
water and sanitation committees by increasing public awareness on the importance of women’s
involvement and gender-related issues. (iii) Encourage women from the local community to
work during construction and operation. Currently, female employment in the sector is 29%.
While a low parentage of women employment during the construction is envisaged due to low
capacity and communities’ acceptance, 29% of women during operations is likely to be met4.
In order to cover these activities, an estimated EGP 1.2 million has been allocated. A full gender
and social analysis is provided in annex B8.
Social
3.2.11 The project has identified the following social challenges: (i) the treated water
disposed into Barakat drain further to other drains does not comply with concerned Egyptian
or international standards for safe disposal into drains. (ii) Malpractices of the communities
resulting in environmental and health hazards. (iii) High rate of unemployment rate due to the
2 Measures disparities between men and women across countries, 3 Ahram-on line November 2015 4 The team is working toward getting a supplementary grant for increasing women’s participation in the sector through support to the
water and sanitation vocational training centers.
10
stagnation and reduction of the tourism and closure of a number of small factories and stores.
(v) Limited institutional capacity to address environmental, health, and social safeguards and
for incorporating gender and social equity needs. Refer to Annex B8 for more information.
3.2.12 The project intends to address these issues through its components. Expected impact:
(i) Positive health impact: better quality of treated wastewater will decrease the
disease burden, particularly non-communicable diseases that are predominant,
such as Hepatitis C, renal failure and kidney diseases, as well as various forms
of cancer.
(ii) Increased Employment Opportunities: It is envisaged that 1200 jobs will be
created during construction and operation, primarily related to waste water
management. In addition, more than 4000 indirect jobs (current experiences
shows more than 27% are for female) are expected to be created in various areas,
including SMEs in tourism, agriculture, and fisheries for unskilled, semi-skilled,
and skilled persons.
(iii) Positive economic impact: opportunities for micro and small enterprises; as
well as opportunities for local contractors and local suppliers of building
materials. Moreover, the improvement in health will reduce the household’s
expenditure on health treatment and reduce vulnerability.
(iv) Expanding gender diversity: encourage to increase women employment in the
sector by facilitating gender inclusion through internship program of Al Giza
WSSC and the contractor.
Involuntary resettlement
3.2.13 No resettlement is expected from the project. The ABWWTP is established on
government land. Construction of ARWWTP has been done in stages and phases. The plant
still has area reserved for the remaining planned expansion works. This land is already fenced
off and is not available or accessible to the public.
IV. IMPLEMENTATION
4.1. Implementation arrangements
4.1.1 The ABWWTP Project shall be implemented using existing institutional arrangements
incorporating lessons and experience gained from similar operations. The project will be
implemented over four years. The GOE is the borrower of the ADB and AGTF loans while
CAPW, under the Ministry of Housing, Utilities and Urban Communities (MHUUC), will be
the Executing Agency (EA). The project will be implemented using existing structures of
CAPW and taking into account lessons learnt from similar operations, particularly Gabal El
Asfar Wastewater treatment project. CAPW has the experience in the implementation of
similar projects having implemented the earlier phases of the same plant as well as other
sewerage projects. The EA (CAPW) has constituted within its Construction Department, a
Project Implementation Team (PIT), comprising a Project Coordinator, 4 Engineers (Electrical,
Mechanical and 2 Sanitary), one of whom will be experienced in procurement/contracts
management and another with expertise in M&E), Environmental/Social Specialist, Gender
and Social officer, and Project Accountant. The PIT will be directly in charge of the project
implementation. The PIT will be assisted by an experienced Engineering supervision services
consultancy firm. Recruitment of the consultancy firm is in progress and is to be finalized
before 31 January 2018. This is included as one of the undertakings of the loan. The CAPW
shall be responsible for overall coordination of the project and reporting obligations to the
Bank.
11
4.1.2 In addition, and in line with GOE’s current practice of ensuring effective project
coordination across ministries, a Project Steering Committee (PSC) shall be stablished
comprising various relevant stakeholders, including HHCW, GWSC, Ministry of Environment,
Ministry of Finance, the Ministry of International Cooperation (MIC), Ministry of Health,
Ministry of Social Solidarity, Ministry of Environment, Giza Governorate, to be chaired by the
MHUUC to oversee the implementation of the project. The PSC will be responsible for the
strategic direction and coordination of the Project. See Annex B.3 for implementation details.
4.1.3 Procurement Arrangements
4.1.3.1 Procurement of goods (including non-consultancy services), works and the acquisition
of consulting services, financed by the Bank for the project, will be carried out in accordance
with the “Procurement Policy and Methodology for Bank Group Funded Operations” (BPM),
dated October 2015 and following the provisions stated in the Financing Agreement. Public
Procurement in Egypt is governed by the Law 89/1998 “the Law” which was enacted by the
decree 1367/1998, which includes the Executive Regulation (ER) of the Law. A Country
fiduciary risk assessment (CFRA) was carried out in July 2015 by the Bank and found that (i)
there are barriers to participation of foreign bidders, including mandatory Joint venture lead by
a national; (ii) there is no standard Bidding documents; (iii) all Procurement methods are not
described unambiguously and conditions under which to be used are not clarified; (iv) there is
no General Condition of contract; (v) alternative Dispute Resolution (ADR) provisions such as
Arbitration is not mandatory; and , (vi) the complaint mechanism body is not independent, has
no authority for decision and the outcome of the review is not enforceable. The CFRA
concluded that the risk for the use of BPS (Egypt’s Public Procurement system) in Bank-
financed project is Substantial. The Bank reviewed the CFRA findings during the appraisal
mission and confirmed the risk as Substantial. In light of above, Bank Procurement Policy and
Methodology (BPM) are applicable to all procurement package planed under this project.
4.1.3.2. Procurement Risks and Capacity Assessment (PRCA): the assessment of procurement
risks at the Country, Sector, and Project level and procurement capacity of the Executing
Agency (EA), were undertaken. The outcome of these assessments have informed the decisions
on the procurement regimes (BPS, Bank or Third party) being used for specific transactions or
groups of similar transactions under the project. The appropriate risks mitigation measures have
been included in the procurement PRCA action plan proposed in Annex B5, Para. 5.3.8.
4.1.3.3 Executing Agency Procurement Capacity Assessment/ The Construction Authority for
Potable Water and Wastewater (CAPW), will have the overall responsibility of overseeing the
implementation of the project. To meet the objective of the Bank’s procurement policy, the
mission has carried out an assessment of CAPW’s procurement capacity and noted that CAPW
has adequate capacity in procurement management. CAPW is already familiar with Bank rules
and procedures through the implementation of current Helwan Study and Gabal Al Asfar
Project. It was agreed that CAPW will use their own –Projects Department to complete the
process of finalizing the contract with the intended awarded contract under close monitoring
from the Bank. The implementation of the Project will use existing arrangements incorporating
lessons and experience gained with other similar Projects and a qualified engineering firm will
be recruited for works supervision including contract management and supervision during the
operation period. CAPW will be provided with hands-on training and support from the
procurement officer at COEG, as part of the project launching and during the implementation
of the activities.
4.1.3.4 Independent Procurement review of the construction contract
The main procurement package to be financed from the ADB loan will be the construction of
the wastewater plant. The GOE launched in Jan 2013 an open invitation to companies
12
worldwide in order to express interest in prequalifying for the upgrading and expansion of Abu
Rawash wastewater treatment plant (WWTP) in West Cairo (GIZA) based upon a PPP
contractual arrangement of 20-25 years’ duration. The bidding process was governed by Law
67 of 2010 (the Law regulating Partnership with the private sector in infrastructure projects,
services and public utilities) which stipulates transparent bidding and contract implementation
conditions and prescribes award to the Most Economically Advantageous Bid (VFM). .
The Bank and GOE agreed to engage an Independent Procurement Review (IPR) specialist in
order to look into the feasibility of the Bank’s concurrence with GOE’s decision to negotiate
the contract with the winner.
The Independent Consultant recruited by the Bank examined the proceedings of the
prequalification and bidding processes and confirmed that there were no irregularities that
could taint compliance with the law or the integrity of these processes. The outcome of the
competition does represent evident “Value for Money” for the Bank and the GOE while
ensuring a “fit for purpose” procurement arrangement that will save valuable project
implementation time considering the urgent need of ending the contamination of the Nile as a
result of the discharge of the current poorly treated effluent into its fresh waters which is
forcing a shutdown of numerous potable water treatment plants downstream the Nile.
4.1.3.5 In light of the foregoing, the Bank concluded that the bidding process was compliant
with internationally accepted practices and the Bank Procurement Policy principles (VFM,
FfP). In order for the Bank to finalize the review of bidding process, in line with the advance
contracting procedures and the BPM, GOE shall use the standard contract incorporated in the
AfDB version of the Multilateral Development Banks’ Harmonized Standard Bidding
Document for Design, Supply and Installation and Commissioning of Plant for Bank’s Prior
review and approval at each stage of the implementation process for the main procurement
package. In addition, further details on the change of membership of the recommended Joint
Venture will be provided.
4.1.4 Financial Management
4.1.4.1 The financial management (FM) of the project will be based on the existing systems
of CAPW. These systems were assessed in accordance with the Bank FM policies and
procedures and covered each FM component adequacy: budgeting, accounting, internal
control, treasury management, financial reporting and external auditing. In assessing the FM
capacity, the team used the country fiduciary risk assessment (CFRA) conducted in 2015 and
the financial management performance of Bank-financed projects executed by CAPW, namely
Gabal Al-Asfar Project (loan of 53 M€) and Helwan Study Project (grant of 0.6 MUA). The
assessment concluded that the current applicable FM systems are well developed and capable
of managing the project resources with an overall moderate risk level. Some mitigating
measures are required to enable these systems to meet the Bank requirements on project
reporting and auditing.
4.1.4.2 CAPW has experience with similar projects financed by the Bank and adequate
budgeting and treasury processes including the newly introduced electronic payment system.
As a public service authority, its internal control environment imposes clear segregation of
duties, prior authorization of commitments and ex-ante controls of payments. However, there
is no internal audit function based on internationally accepted audit standards and risk-based
approach and the cash-based accounting system in place is largely manual and should be used
with some improvements to provide the project with the adequate and timely financial
information. Therefore, CAPW will assign, as part of the project implementation team, a
financial management officer with adequate qualifications and previous experience with donor
funded projects acceptable to the Bank to handle the day-to-day financial activities of the
13
Project and ensure timely recording of all project transactions and adequate filing of project
documents. CAPW will provide to the Bank, on 1st of August of each year, the necessary
evidence (through the corresponding budgetary allocations) on the availability of the
counterpart funds needed to carry out the project. Using a simple application, allowing
automated compilation of project financial statements and reports, CAPW will submit quarterly
financial reports for the project and annual financial statements duly audited by an external
auditor covering the entire project components and sources of funds.
4.1.5 Audit: The executing agency (CAPW) financial statements are audited by the
Accountability State Authority (ASA, formerly CAO), which is the Egyptian Supreme Audit
Institution. The audits are technically conducted in compliance with INTOSAI standards and
are prepared within six months of the end of the fiscal year. However the ASA reports are
treated as confidential according to the current legislation in Egypt and cannot be
communicated to the Bank. Therefore, an independent private auditor acceptable to the Bank
will be recruited to audit the project annual financial statements in compliance with the Bank
standard TOR for audit of investment operations. The audit fees will be paid by GoE once the
audit reports are accepted by the Bank. The external auditor report shall include all project’s
components and activities, cover all sources of funds (the Bank, co-financiers funding and
CAPW own resources) and be submitted to the Bank no later than six months after the end of
each Egyptian fiscal year (i.e. before 31 December).
4.1.6. Disbursement Arrangements: Disbursement of the Bank (ADB) and AGTF loans
will be made using the Direct Payment Method of disbursement, in accordance with Bank rules
and procedures as laid out in the Disbursement handbook. The Bank will issue disbursement
letters, which provide specific guidelines on key disbursement procedures and practices.
4.2. Monitoring
4.2.1 M&E of the project will be carried out as a regular management function by the
Project Steering Committee (PSC) and the PIT based on the baseline data and indicators
defined in the result based logical framework. The M&E Expert who is also a member of the
PIT will be fully responsible for collecting and analysing data for reporting. In addition, Bank
supervision missions will be undertaken twice per year and the Bank will undertake desk
supervision quarterly, providing feedback and following up on progress reports. A mid-term
review will be undertaken during the second year of implementation. The PIT/CAPW will
prepare quarterly Progress Reports, annual technical and financial audits. Upon completion,
CAPW will prepare and submit to the Bank a project completion report (PCR).
Table 4.1
Key Milestones Timeframe Milestone Monitoring process/feedback loop
December 2017 AfDB Board of Directors Loan approval
January 2018 Sign contract with
Engineering Consultant
Signing contract of Engineering Supervision Consultant
January 2018 Signing of Loan
Agreements
Loan Agreements signed between GoE and AFDB/AGTF.
February2018 Award of construction
contract
Signing of construction contract
March 2018 Loan Effectiveness Launching mission; Loan conditions approved by the Bank
March 2018 Construction start Construction commences. Monthly construction
supervision reports; Bank’s comments on the annual and
quarterly reports; Supervision missions
June 2019 Mid-Term Review Assessment of progress/performance, restructuring if
needed
December 2021 Project completion Commissioning of construction
December 2021 Project completion Report Project completion mission
14
4.3. Governance
4.3.1 The 2014 Presidential elections paved the way for Egypt’s restored stability following
three years of difficult political transition. The new constitution was ratified in January 2014
and presidential elections were organized in May 2014 paving the way for Egypt’s economic
rebound and stability. The electoral constituencies’ law was approved in December 2014 and
constituted the final legal step before the next parliamentary elections. The forthcoming
elections will represent the final milestone of the political roadmap set forth in July 2013.
Meanwhile, the GoE has been deploying efforts to restore security and implement critical
policy reforms to further consolidate economic and political stability. At sector level, water
sector governance has been evolving through sector reforms aimed at streamlining and
strengthening sector institutions, with separation of roles and responsibilities for policy setting,
regulation and service provision. The Bank in collaboration with development partners will
remain engaged to support government to deepen and consolidate sector reforms.
4.3.2 As regards procurement within the project, CAPW has internally inbuilt checks and
balances to ensure transparency and fight corruption. Procurement is carried out by an
independent Committee of 12 people, comprising staff of the Authority and from other
Government organizations and ministries including Ministry of Finance. The Committee
undertakes its evaluation according to set rules and procedures, and submits its
recommendations to the Chairperson of CAPW for approval. The Chairperson approves
contract awards on behalf of the Minister of MHUUC. For the proposed project, a reputable
engineering consultancy firm will be recruited to assist with supervise construction works. In
addition, a provision has been made under the project for an annual audit to be carried out
covering all aspects of project implementation. In addition, the PIT will include an expert with
adequate experience in procurement and contract management.
4.4. Sustainability
4.4.1 To ensure technical sustainability, the project includes a requirement for the
consortium of contractor to operate and maintain the plant for three years following
construction. Both the consultant and the consortium of contractors will be mandated to train
additional counterpart staff of the executing agency and the operator, on all aspects of the
project’s O&M to promote technology transfer. In addition, the proposed project is similar to
other treatment plants managed by the executing agency.
4.4.2 In order to ensure financial and economic long term sustainability of the sector, the
water and wastewater policy is targeting continued progress towards cost recovery in service
provision through user charges. Currently it is estimated that the recurrent cost of the project
(operation and maintenance) will be approximately EGP 91 million per year. For the existing
facilities, the costs are met through Government subsidies. The recently approved tariff
adjustment (effective August 2017) shows GoE’s commitment to set the sector on solid
foundation of cost recovery. In this regard, GOE is committed to implement a program of tariff
adjustments for WSS services in order to ensure sustainability of service provision including
investment. These adjustments will also take into account the social nature of services and the
needs of the poor. The government plans to reach O&M cost recovery in the short term (up to
two years), O&M cost plus replacement (medium term) and full cost recovery as its long term
plans. In this regard, the government continues to demonstrate its commitment by issuing
required decrees, as done recently with Prime Minister’s decree number 1730 of 2017 to ensure
financial sustainability of water and wastewater service delivery and reduce dependency of
sector institutions on Government subsidy.
4.4.3 One of the challenges of the water sector in Egypt is the need to protect and enhance
the quality of water in its river, canals and drainage systems. The water bodies receive heavy
15
load of municipal waste deteriorating the water quality and endangering public health. The
GoE has in the past two decades invested more than 60 billion EGP and is currently updating
its NWRP 2017-37, with an investment plan of requiring more than EGP 885 billion. The
NWSP has identified measures for improving water quality in the water bodies that includes
increasing and enhancing the municipal wastewater treatment plants to curtail pollution of
water bodies. The proposed project is part of GoE long term plans and is a manifestation of the
government’s commitment to the development of the sector.
4.5. Risk management
The following risks shall be monitored and the required mitigating measures will be taken.
RISKS MITIGATION MEASURES (rating)
1. Project
Implementation
delays
The project will be executed through one contract, which is at advanced stage of
procurement/contract negotiations. Use of advance contracting will facilitate timely
start-up of construction. Constant and continuous supervision and monitoring by an
engineering consultant who will be hired by the EA. The EA will be required to (i)
adopt best practice in contract management, and (ii) strictly follow-up contract
execution. Besides, the EA already has experience in implementing similar big
projects (example Gabal Al Asfar project) using the same procurement/contractual
arrangements. (Medium)
2. Low tariffs: unable
to meet O&M costs
GOE committed to introduce cost reflective tariff system which will allow for social
tariffs, supported by sensitization campaigns. With Prime Minister’s decree number
1730 of 2017, effective August 2017, tariff has been increased with the objective to
reach O&M recovery in the short term and full cost recovery in the long term.
(Medium)
3. Limited technical
capacity to operate
and maintain
infrastructure
The EA adopting standard systems with the other similar wastewater treatment
plants managed by the EA, and by including at least 3-year operational period during
which the consortium of contractors will operate the plant and provide on-the-job
training to the relevant staff. Incorporate on the job training and capacity building of
CAPW/GWWC personnel to operate and maintain the facilities. (Low)
4. Availability and
timely release of
Counterpart
funding
The GoE will be providing significant financing for infrastructure activities.
Government is committed to implement this project of “national interest”.
Designated as a “National project”, the GoE is committed to implement the project.
In addition, close follow up with the borrower will be made during implementation
to ensure timely allocation and availability of counterpart funding. (Medium)
4.6. Knowledge building
4.6.1 The knowledge gained through the implementation of several projects and studies in
the sector in Egypt has been duly applied in designing this project. In the same pattern, the
knowledge that will be generated by this Project will be instrumental in designing and
managing similar projects in the sector in the future. The results from the proposed studies and
other surveys, including the socio-economic impact study will inform the stakeholders on how
to put the acquired knowledge attributes into practical use for better results-oriented
achievements and sustained benefit flows.
4.6.2 With the current trend of population growth in major cities in Africa, many institutions
continue to grapple with the mammoth problem of managing wastewater in their countries.
Management of wastewater has direct impact on the quality of the environment and especially
on water resources. The project is therefore expected to generate considerable interest and
knowledge, on how to resolve problems associated with management of large volumes of
wastewater. The lessons from the design, construction and management of projects of such
magnitude will be useful to many other countries in the region. The lessons learnt and
experience gained will be documented for dissemination in workshops, discussions and
seminars. Even during construction, the Bank will encourage groups from regional countries
to visit the plant for learning purposes and knowledge dissemination. Bank supervision
16
missions, quarterly and annual progress reports, mid-term review, audit and completion reports
will provide an opportunity to capture knowledge on relevant aspects of the project. This will
include its design, implementation modalities, procurement, as well as operations and
management, which will be available for analysis and will be shared both within the Bank and
with other development partners as well as authorities in RMCs.
V. LEGAL INSTRUMENTS AND AUTHORITY
5.1. Legal instrument
The Project will be financed by an ADB and AGTF loans.
5.2. Conditions and undertakings associated with Bank’s intervention
5.2.1 Conditions Precedent to Entry into Force of the Loan Agreement: The entry into
force of the Loan Agreement shall be subject to the fulfilment by the Borrower of the provisions
of Section 12.01 of the General Conditions Applicable to Loans and Guarantee Agreements of
the ADB.
5.2.2 Conditions Precedent to First Disbursement of the Loan: The obligation of the
Bank to make the first disbursement of the loan shall be conditional upon entry into force of
Loan Agreement in accordance with 5.2.1 above.
5.2.3 Undertaking:
The Borrower undertakes to:
(i) Provide evidence acceptable to the Bank of having recruited an Engineering
Supervision Consultant by 31st January 2018, to support in the contracting
process between CAPW and the contractor, review the design, and supervise the
construction; and
(ii) Implement the Project in accordance with national legislation and the
Environmental and Social Impact Assessment (ESIA), and report to the Bank
on a quarterly basis in a form acceptable to the Bank on the implementation of
the ESIA.
5.3. Compliance with Bank Policies
This Project complies with all applicable Bank policies.
VI. RECOMMENDATION
Management recommends that the Board of Directors of the Bank approve the proposal for an
ADB loan of USD 100 million and AGTF loan of USD 50 million to the Arab Republic of
Egypt for the purposes and subject to the conditions stipulated in this report.
I
Appendix I. Egypt’s Socio-Economic Indicators
Arab Republic of Egypt: Selected Economic Indicators, 2011/12–2016/171/
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17
Prel. Proj.
Output and prices
Real GDP (market prices) 2.2 2.1 2.2 4.2 3.8 4.0
Consumer prices (average) 8.6 6.9 10.1 11.0 10.2 18.2
Public finances
General Government2/
Revenue and grants
21.1 21.9 23.7 21.9 20.3 25.5
Expenditures (incl. net acquisition of financial assets) 31.1 35.3 36.7 33.5 32.0 33.1
Overall balance -10.0 -13.4 -12.9 -11.5 -12.0 -10.0
Primary balance -4.9 -6.3 -5.8 -4.8 -4.4 -1.8
Gross Debt 74.6 84.8 86.3 89.0 94.6 93.8
External 9.3 10.8 9.9 8.0 7.7 10.1
Domestic 65.3 74.0 76.4 81.0 86.8 83.7
Budget sector3/ Revenue and grants 18.3 19.0 20.8 19.1 17.6 22.9
Expenditures (incl. net acquisition of financial assets) 28.4 32.0 33.9 30.6 29.4 30.5
Of which: Fuel subsidies 5.8 7.0 6.6 4.0 3.0 2.6
Of which: Food subsidies 1.8 1.8 1.7 1.7 1.5 1.4
Monetary sector Credit to the private sector 7.1 9.8 7.4 16.7 14.2 8.3
Reserve money6/ 5.1 20.4 14.8 33.3 -1.6 16.1
Broad money (M2) 8.3 18.4 17.1 16.4 18.6 16.7
Treasury bill rate, 3 month (average, in percent) 13.4 13.4 10.9 11.4 11.8 19.7
External sector
Merchandise trade balance -11.3 -10.8 -11.2 -11.7 -11.0 -12.5
Current account -3.7 -2.2 -0.8 -3.7 -5.5 -5.2
Capital and financial account (incl. errors and omissions) -3.7 1.1 0.9 5.5 4.6 1.7
Foreign direct investment (net in billions of USD) -3.7 3.6 3.8 6.1 6.7 9.4
Gross international reserves (in billions of USD) 15.2 14.5 16.3 19.5 17.1 22.0
In months of next year’s imports of goods and services 2.7 2.5 2.7 3.6 3.1 3.7
Financing gap (in billions of USD) … … … … 0.0 16.3
Memorandum items: Nominal GDP (in billions of Egyptian pounds) 1,656.6 1,843.8 2,101.9 2,429.8 2,777.8 3,434.1
Nominal GDP (in billions of USD) 275.8 285.4 301.5 330.2 … …
GDP per capita (in USD) 3,347 3,370 3,478 3,710 … …
Unemployment rate (period average, percent) 12.4 13.0 13.4 12.9 12.7 12.3
Poverty rate (percent) n.a. 26.3 … … … …
Populations (in millions) 82.4 84.7 86.7 89.0 90.2 92.3
Sources: Egyptian authorities; and IMF estimates and projections. 1/ Fiscal year ends June 30. 2/ General government includes the budget sector, the National Investment Bank (NIB), and social insurance funds. 3/ Budget sector comprises central government, local governments, and some public corporations. 4/ Includes multilateral and bilateral public sector borrowing, private borrowing and prospective financing (in 2011/12). 5/ Debt at remaining maturity and stock of foreign holding of T-bills.
II
Appendix II: AfDB Portfolio in Egypt (September 2017)
Sectoral
% Source of Finance
Bank Approval
Date Effective
Age (years)
Closing Date
Approved Amount (UA m)
Total Disbursed
(UA m)
% Disbursed
Suez Thermal Power Plant
ADB-L 15-Dec-10 8-Oct-12 4.43 30-Nov-17 327.30 240 74%
Ain Sokhuna Thermal Power
ADB-L 22-Dec-08 19-Aug-09 7.53 30-Jun-17 296.10 284.14 97%
Alcazar Energy Egypt Solar I
ADB Priv 4 Sept
2017 12.74 0 0
Delta for Renewable Energy ADB Priv
4 Sept 2017 12.74 0 0
Shapoorji Pallonji Energy Egypt
ADB Priv 4 Sept
2017 13.44 0 0
Egyptian Refining Company
ADB Priv 17-Mar-10 21-Jun-12 4.72 15-May-16 128.17 128.17 100.00%
Egyptian Refining Company sub convention loan ADB Priv 17-Mar-10 21-Jun-12 4.72 15-May-16 16.02 16.02 100.00%
Sub-Total – Power (6) 48.1% 807 671 83.2%
Airport Centre of excellence
MIC TAF 16-Apr-15 29-May-
15 1.82 31-Dec-19 1.2 0.0002 0.00%
Sub-Total - Transport (1) 0.1% 1.2 0.0002 0.0%
Actuarial modelling study for implementation of national health insurance system MIC TAF 18-Aug-16 20-Sep-16 0.53
31 Dec 2017 0.18 0.11 59%
Support to Parliament: Building Capacity and Mainstreaming Inclusive Growth and Decentralization MENA TF 11-Jun-14 11-Jun-14 2.78 30-Sep-17 1.96 0.07 4
Rx Health Care Fund (Equity)
ADB Priv 19-Oct-16 N/A 14.33
Supporting the Upgrading of Informal Settlements MIC TAF 2-Nov-16 12-Feb-17 0.13 31-Mar-19 0.40 0.00 0.00%
Sub-Total – Social (4) 1.0% 16.87 0.18 1.05
Green Growth: Industrial Waste Management and SME entrepreneurship Hub MENA TF 15-May-13 19-Dec-13 3.25 30-Sep-17 1.39 0.8 57.3%
Restructuring of the Nasser Social Bank – Phase 1 MIC TAF 11-Oct-16 9-Feb-17 0.00 30-Jun-18 0.40 0.10 25.22%
Support to Micro, Small & Medium Enterprises in Organic Clusters Project MENA TF 20-Feb-13
29-May-13 3.80 30-Dec-17 1.39 1.39 100%
Sub-Total - Finance (3) 0.2% 3.17 2.29 72.3%
Gabel El-Asfar Wastewater Treatment Plant ADB-L 7-Oct-09 28-Jun-10 7.51 31-Dec-17 44.08 36.7 84%
Sub-Total – Water & Sanitation (1) 2.64% 4.08 36.7 84%
III
Franchising Sector Support Program ADB-L 25-Feb-09 14-Jun-10 6.72 15/12/2017 28.74 20.38 70.91%
Navisat - Transaction Advisory services for procurement of NAVISAT system NEPAD-IPPF 4-Mar-13
19-May-13 3.83 30-Jun-17 1.07 0.09 8.41%
Strengthening the Rule of Law: Effective and transparent delivery of justice and rule-making MENA TF 11-Jun-14 25-Sep-14 2.49 31-Aug-17 1.72 0.10 5.82%
Support to EAPD
MIC TAF 30-Apr-15 3-Jun-15 1.81 31-Dec-17 1.20 0.74 61.7%
Strengthening of INP MIC TAF 8-May-15 11-Dec-15 1.29 25-Feb-18 1.20 0.76 63.6%
Modernization of CBE’s Clearing and Settlement Depositary System MIC TAF 10-Jul-15 1-May-16 0.91 30-Dec-17 0.89 0.02 1.8%
Economic Governance and Energy Support Program ADB - L 15-Dec-15 4-Jan-16 1.23 31-Dec-16 360.82 360.82 100.00%
Emergency Humanitarian Assistance for Alexandria flood victims
EMERGENCY GRANT 9-Nov-15 15-Nov-15 1.36 31-Dec-17 0.72 0.72 100.00%
Building Capacity and Institutional Strengthening of Ministry of International Cooperation MENA TF 30-Dec-15 21-Apr-16 0.94 31-Dec-19 3.132 0.19 6.07%
Economic Governance and Energy Support Program- Phase II ADB - L 13-Dec-16 31-Dec-17 360.82 360.82 100%
Strengthening capacity of Administrative Control Agency to combat corruption MENA TF
23 May 2017
2.55 0 0
Sub-Total – Multi Sector (11)
45.62% 763.86 744.64 97.6%
Feasibility study and CB for use of RE for pumping irrigation water
MIC TAF 1-Mar-15 27-Oct-15 1.42 31-Mar-18 0.80 0.12 14.6%
National Drainage III ADB-L 17-Jun-15 1-Jun-16 0.83 31-Dec-21 41.17 4.55 11.71%
National Drainage III Technical Assistance MIC TAF 1-Feb-16 31-Aug-16 0.58 31-Dec-21 0.40 0.039 10%
Sub-Total – Agriculture & Irrigation (3) 2.53% 42.37 4.7 11.10%
SUBTOTAL: 29 (7 public sector loans + 5 private sector loans (4 loan + 1 equity) + 17 grants (9 MIC TAF; 6 MENA TF; 1 NEPAD-IPPF; 1 Emergency Relief)) 1,677 1,460 87.1%
IV
Appendix III: Key related projects financed by other development partners in the
country
Name of Project Financier(s) Amount
USD million
Year to be
commissioned
Sustainable Rural Sanitation services for
Results (P4R)
WB 550 2015
Improved Water and wastewater Services
Programme (IWSP)
KfW, EIB, AFD, EU &
GoE
391.6 2012
Integrated Sanitation and Sewerage
Infrastructure Project
WB, Netherlands, GTZ
& GoE
201.5 2012
Kashinar Drainage Depollution Project EU, EIB, EBRD 600 2015
Water Sector Reform Programme (WSRP) EU 60 2012
Fayoum Expansion Depollution and WWTP
Project
EU, EBRD, EIB 525 2017
Kafr El Sheikh Wastewater Expansion Project EU, EBRD, EIB 205 2017
Alexandria East Sludge Facility AFD 62
Gabel Asfer Wastewater Treatment project –
Phase II – Stage II
AfDB 66.5
El-Rahawy Drainage Sanitation project Kuwait Fund for Arab
Economic
Development
140 2016
Exchange Rate used for Euro = 1.25 USD
V
Appendix IV. Map of the Project Area
Location of Abu-Rawash Wastewater Treatment Plant on the geographical map (Greater Cairo Map – Scale 1:100,000)
Satellite Image for Land Cover and Land Use.