african elephant crossing at the cleveland metroparks zoo the leed process may 19, 2011 jerimiah...

11
African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Upload: ezra-quinn

Post on 01-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

African Elephant Crossing at the Cleveland MetroParks ZooThe LEED Process

May 19, 2011

Jerimiah Luckett - LEED AP

Page 2: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Common Pre-Requisites• Inclusion of basic “green” practices into everyday

standards. ▫ Construction Activity Pollution Prevention (Erosion

Controls)▫ Fundamental Commissioning▫ Minimum Energy Performance▫ Fundamental Refrigerant Management▫ Storage & Collection of Recyclables▫ Minimum IAQ Performance (ASHRAE 62.1)▫ Environmental Tobacco Smoke Control

Page 3: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Sustainable Site Development•Site Selection•Development Density & Community

Connectivity•Brownfield Redevelopment

Page 4: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Sustainable Site Development•Public Transportation Access•Bicycle Storage & Changing Rooms•Low Emitting & Fuel Efficient Vehicles•Parking Capacity

Page 5: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Sustainable Sites•Protect & Restore Habitat (50% excluding ftprnt

or 20% including ftprnt, whichever is greater)

•Maximize Open Space (25%, equal, 20% - depends on existing zoning code language)

•Stormwater Management: Quantity Control

•Light Pollution Reduction

Page 6: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Water Efficiency•Water Use Reduction: 30%, 35%

Page 7: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Energy & Atmosphere• Optimize Energy Performance•Measurement & Verification•Green Power

▫35%, 70%, 100%

Page 8: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Materials & Resources•Construction Waste Management: 50% -

75%•Recycled Content: 10% - 20%•Regional Materials: 10% - 20%

Page 9: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Indoor Environmental Quality•Outdoor Air Delivery Monitoring•Increased Ventilation•Construction IAQ Mgmt. Plan

▫During Construction▫Before Occupancy

Page 10: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Indoor Environmental Quality•Low Emitting Materials:

▫Adhesives and Sealants▫Paints & Coatings▫Carpet▫Composite Wood & Agrifiber

Page 11: African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

Indoor Environmental Quality•Lighting System Design & Controllability•Thermal Comfort: Controllability•Thermal Comfort: Design (ASHRAE 55)•Thermal Comfort: Verification