african elephant crossing at the cleveland metroparks zoo the leed process may 19, 2011 jerimiah...
TRANSCRIPT
African Elephant Crossing at the Cleveland MetroParks ZooThe LEED Process
May 19, 2011
Jerimiah Luckett - LEED AP
Common Pre-Requisites• Inclusion of basic “green” practices into everyday
standards. ▫ Construction Activity Pollution Prevention (Erosion
Controls)▫ Fundamental Commissioning▫ Minimum Energy Performance▫ Fundamental Refrigerant Management▫ Storage & Collection of Recyclables▫ Minimum IAQ Performance (ASHRAE 62.1)▫ Environmental Tobacco Smoke Control
Sustainable Site Development•Site Selection•Development Density & Community
Connectivity•Brownfield Redevelopment
Sustainable Site Development•Public Transportation Access•Bicycle Storage & Changing Rooms•Low Emitting & Fuel Efficient Vehicles•Parking Capacity
Sustainable Sites•Protect & Restore Habitat (50% excluding ftprnt
or 20% including ftprnt, whichever is greater)
•Maximize Open Space (25%, equal, 20% - depends on existing zoning code language)
•Stormwater Management: Quantity Control
•Light Pollution Reduction
Water Efficiency•Water Use Reduction: 30%, 35%
Energy & Atmosphere• Optimize Energy Performance•Measurement & Verification•Green Power
▫35%, 70%, 100%
Materials & Resources•Construction Waste Management: 50% -
75%•Recycled Content: 10% - 20%•Regional Materials: 10% - 20%
Indoor Environmental Quality•Outdoor Air Delivery Monitoring•Increased Ventilation•Construction IAQ Mgmt. Plan
▫During Construction▫Before Occupancy
Indoor Environmental Quality•Low Emitting Materials:
▫Adhesives and Sealants▫Paints & Coatings▫Carpet▫Composite Wood & Agrifiber
Indoor Environmental Quality•Lighting System Design & Controllability•Thermal Comfort: Controllability•Thermal Comfort: Design (ASHRAE 55)•Thermal Comfort: Verification