AFTA-WFIRST Astrophysics Focused Telescope Assets - Wide-Field Infrared Survey Telescope (WFIRST) Kevin Grady September 9-10, 2013 1

Upload: others

Post on 16-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

AFTA-WFIRST Astrophysics Focused Telescope Assets - Wide-Field Infrared Survey Telescope (WFIRST)

Kevin Grady September 9-10, 2013

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1  

Page 2: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

Agenda – September 9th

9:30  Welcome  9:40  Mee/ng  Plan  David  Spergel,  Neil  Gehrels  9:50  Headquarters  Update  Paul  Hertz  10:20  Project  Report  

           Overview  Kevin  Grady              Requirements  Development  Process  Mark  Melton  

11:00  Break  11:20  Project  Report  con/nued  

           Telescope  Update    Jennifer  Dooley              Cycle  4  Design  Update  Dave  Content              AFTA-­‐WFIRST    Coronagraph  Design    Stuart  Shaklan,  Feng  Zhao  

12:20  Lunch  

2  

Page 3: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

Agenda – September 9th continued

1:10  Japan  Interest  in  AFTA-­‐WFIRST  Toru  Yamada  1:30  Coronagraph  Selec/on  Plan  Gary  Blackwood  2:00  ExoPAG  Study  Analysis  Group  9  Report  Remi  Soummer  2:30  Giant  Planet  Atmosphere  Modeling  Adam  Burrows    (by  phone)  2:50  Disk  Science  with  AFTA  Tom  Greene  3:10  Break  3:30  Splinter  Mee/ngs  

 1)    Coronagraph  Requirements  (Bruce  Macintosh)    2)    Survey  &  DE  Requirements  with  Considera/on  of  Euclid  &  LSST              (Alan  Dressler,  David  Weinberg,  Jason  Rhodes)  

6:30  Dinner    

3  

Page 4: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

Agenda – September 10th

4  

9:00  Report  Out  from  Splinter  Mee/ngs  Bruce  Macintosh,  Alan  Dressler  11:00  Euclid  Status  Yannick  Mellier  11:20  Break  11:40  Full-­‐Sky  1-­‐Year  Survey  Op/on  David  Spergel,  Chris  Hirata  12:10  Lunch  1:10  Plan  Forward  Neil  Gehrels,  David  Spergel  2:00  Adjourn    

Page 5: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

August 2, 2013

Project Manager Kevin Grady

Deputy Project Manager Cathy Peddie

Project Support Linda Barbour

Science Definition Team Chair David

Spergel Neil Gehrels

Project Support Manager

Bill Hensley Contract Officer

Julie Janus

Chief Safety Officer

CM/Data Mgmt/PS/ Library Beverly Townsend

Science Definition Team

Michael Seiffert (JPL) John Trauger (JPL) Jeffrey Kruk Edward Cheng Kenneth Carpenter Bernard Rauscher Richard Barry

Payload Systems Manager

Cathy Peddie

Coronagraph Manager

Feng Zhao

JPL provided

Wide-Field Instrument Manager

Dave Content

Telescope Manager

Jennifer Dooley

Coronagraph Technology Nick Siegler

Coronagraph Instr Mgr

Feng Zhao

Payload Systems Eng Dave Content

Instrument Systems

Clifton Jackson

Financial Analyst Katie Bisci

Structures/Mechanical – Jeffrey Stewart, Flight Dynamics – Mark Woodard Nerses Armani, Cory Powell I&T - Kelvin Garcia Thomas Wallace Mechanisms – Walter Smith Optics – Bert Pasquale, David Vaughnn Detectors – Augustyn Waczynski, Thermal – John Hawk, Hume Peabody Edward Cheng GNC – Eric Stoneking, David Olney Electrical – Joseph Miko Alice Liu

Project Scientist Neil Gehrels

Mark Melton

Architect – Stuart Shaklan Systems – Marc Foote Optical Eng – Mike Rud Mechanical - Mike Underhill Thermal – Dan Klein

Architect – Rich Capps Structural - Zensheu Chang Systems - Renaud Goullioud Optics - Gary Kuan Thermal – Hung Pham Exelis COTR - David VanBuren Exelis – Laura Abplanalp

Spacecraft & Instrument Carrier

Study Manager Mark Melton

Mission System Engineer John Ruffa

HQ APD

Page 6: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

AFTA-WFIRST Follow-on Study Charter Study Content

•  Continue pre-formulation activities for AFTA-WFIRST addressing two NWNH Decadal Survey No. 1 priorities: -  Widefield infrared survey -  Technology development for a planet-imaging mission beyond 2020

•  Continue development of science requirements, investigation approaches, key mission parameters to support refinement and optimization of the AFTA-WFIRST DRM.

•  Update the April 2013 Design Reference Mission (DRM). •  Develop cost and schedule scenarios. •  Overall mission cost is to be kept as low as possible while still

achieving all or part of the science priorities for a widefield infrared survey telescope and exoplanet technology and science maturation.

•  Internal coronagraph will be included, consistent with the DRM and requirements for the WFIRST survey and the existing telescope hardware.

•  Modularity to facilitate emerging robotic servicing capabilities shall continue to be studied.

6  

Page 7: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

AFTA-WFIRST Follow-on Study Charter Study Focus Areas

•  Optimization of observatory to reduce risk and minimize cost •  Requirements development, refinement and flowdown, including calibration •  Operations concept refinement, survey yield predictions and survey

efficiency drivers, including calibration •  Continue the study of spectroscopy capability options •  Maturation of the AFTA coronagraph instrument design, including a science

assessment vs. performance, and a study of required observatory stability •  Payload structural, thermal and optical performance assessments •  Science case versus difficulty and risk of extending the long wavelength

cutoff as far as 2.4 micron •  Reexamination of filter selection in light of long wavelength cutoff conclusion

above •  Investigation of a possible all-sky one filter survey that could be done in one

year •  Continuation of maturing estimates of expected microlensing rates, including

dynamic range requirements for microlensing •  Modifications to the telescope assets to maximize the science return with

minimal costs

7  

Page 8: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

2013 2014May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Preliminary  AFTA  Mission  Study  ScheduleTASK

Observatory  Design  Reference  Development

         Widefield  Telescope/IC/SC  Design  Update

         Coronagraph  Design  UpdateStr/Thermal/Optical  Analysis          Telescope  IC,  WFI  Thermal  Models          IC,  Telescope  Widefield  FEM          Coronagraph  FEM  &  TM          Performance  Assessments2.5  Micron  Cutoff  Assessment          Telescope  AMS  EDU  Cold  Test  &  Coupon  

         Develop  Widefield/Telescope  Thermal  

         Analyze  PerformanceCoronagraph  Architecture  (ACWG)          Analyze  Coronagraph  Options  &  Select

         TAC  &  HQ  BriefingObservatory  Pointing  Analyses  (TBR)          Develop  Control  ACS  Simulation          Slew/Settle/Stability  PerfRequirements  Development          Level  1's          Level  2'sInstrumentation  Science  SimulationsRefine  Operations  ConceptDevelop  P/L  Level  GSE  Rqmts  &  Test  Flow

         Requirements          Develop  Test  Flow          Develop  Design  Concept  OptionsCalibration  Instrument          RequirementsDevelop  Conceptual  GSE  DesignsUpdate  Mission  Schedule  &  LCC

11/15 5/15 11/15

8/25 3/31 11/15

9/6

5/31 9/20 12/15 6/15 12/15

7/15 12/20 5/1

11/15 2/15 6/30 7/31

8/30 2/28

8/1 11/15

12/31 2/15 8/15

7/23

#1

9/25

#2

10/22

#3

7/25 9/2410/23

10/15

TAC

11/10 11/2512/6

HQ

12/15 7/15

1/15 3/15 5/15 7/15 9/15

10/31 1/30 4/30 7/31

12/31 3/31 6/30

2/28 11/30

3/1 9/15

3/31 9/15

5/15 11/30

3/15 9/15

4/7 11/30

3/1 4/30U/C

11/30

chart  A-­‐7  as  of  8/29

Coupon

TAC

AFTA-WFIRST Study Schedule

8  

Page 9: AFTA-WFIRST · AFTA-WFIRST Follow-on Study Charter Study Focus Areas • Optimization of observatory to reduce risk and minimize cost • Requirements development, refinement and

9  9  

Conclusion

•  Key products of the study:

-  Updated Design Reference Mission (DRM)

-  Further development of requirements and operations concept

-  Updated cost & schedule

•  Study deliverables:

-  Interim report in April 2014

-  Final report in Jan 31, 2015

-  Aerospace CATE due Feb 27, 2015