Agenda 14/3/2014 A. Fabich 1 Introductions orning: Proposals (5) fternoon: proposals (4) lunch Discussion/wrap-up

Upload: aricin

Post on 06-Jan-2016

47 views

Category:

Documents


0 download

DESCRIPTION

Agenda. Introductions. Morning: Proposals (5). lunch. Afternoon: proposals (4). Discussion/wrap-up. HiRadMat - Status. Adrian Fabich HiRadMat Scientific Board CERN , 14th March 2014. Overview. Report from HiRadMat experiments in 2012 Shut-down work Summary of 2014 proposals. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Agenda

A. Fabich 1

Agenda

14/3/2014

Introductions

Morning: Proposals (5)

Afternoon: proposals (4)

lunch

Discussion/wrap-up

Page 2: Agenda

HiRadMat - Status

Adrian Fabich

HiRadMat Scientific BoardCERN, 14th March 2014

Page 3: Agenda

A. Fabich 3

Overview

• Report from HiRadMat experiments in 2012

• Shut-down work

• Summary of 2014 proposals

14/3/2014

Page 4: Agenda

A. Fabich 4

2012 experiments

• 9 experiments completed• On average 4 weeks between 2 experiment– Partially grouped

14/3/2014

Page 5: Agenda

A. Fabich 5

2012 - Protons to HiRadMat

• Total: 1.4*1016 protons• About 48 hours of SPS cycling for HiRadMat

– Preparation, waiting and extractions– Similar time span in 2011 for commissioning

14/3/2014

Page 6: Agenda

A. Fabich 6

Experiments in 2012

• RIB target R&D • LHC transfer collimator (2x)• BLM validation• RP benchmarking• Crystal collimation

PhDs completed:Juan Blanco, Nov. 2013

Nikos Charitonidis, March 201403/04/2013

Beam tunneling(HRMT12)

TE/MPER. Schmidt et al.

Powder target(HRMT10)C. Densham et al.

Page 7: Agenda

A. Fabich 7

TPSG4 - 2012

14/3/2014

Page 8: Agenda

A. Fabich 8

Shut-down work

• Installation of additional cabling– Mainly for vacuum and HQ signal

• Removal of experiments from – Remainders in TNC:

• LPROT (HRMT12): follow-up required• TISD (HRMT01): removal delayed by availability of class-A lab• TPSG4 (HRMT06) on target location: removal in April 2014

• Removal of WNAF collimator blocks– Minimum advancement– lengthy preparations for and discussions with authorities

14/3/2014

Page 9: Agenda

A. Fabich 9

Proposals

• 12 applications– Named 14xx (year 2014 + running number)– Running number in the order of reception

• 9 invited for presentation/discussion

• 3 proposals to be discussed “offline”“placing them on the radar screen”– TPGS4 (1402): repetition with slightly higher intensity– Supra Magnet (1406): later availability– Microphone (1411): purely parasitic

14/3/2014

Page 10: Agenda

A. Fabich 10

Beam parameter space

14/3/2014

Page 11: Agenda

A. Fabich 11

Time frame

• One experiment interested in ion operation• Half the user groups are interested in TA (Transnational Access)

14/3/2014

Page 12: Agenda

A. Fabich 12

Aim of Today

Review the proposals• Primarily based on the scientific value

But also • in view of schedule• Technical feasibility– Note: 3e13 p/pulse is the limit until spring 2015– at a later stage might reach 5e13 p/pulse

Follow-up: Written report on the view by the Board14/3/2014