agenda & area informationftp.dot.state.tx.us/pub/txdot/cst/conference-cpm/2018/agenda.pdf ·...

12
Agenda & Area Information May 23 - 25, 2018 Renaissance Austin Hotel, Austin, TX 2018 Construction, Pavements and Materials Conference

Upload: hoangkiet

Post on 20-Aug-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

2018 Construction, Pavements and Materials Conference 1

Agenda & Area Information

May 23 - 25, 2018Renaissance Austin Hotel, Austin, TX

2018 Construction, Pavements and Materials Conference

2 2018 Construction, Pavements and Materials Conference

Wednesday, May 23, 2018 – Morning Session (TxDOT staff only)

8:00 AM Conference Registration Opens

Construction Meeting (TxDOT staff only)Moderator: Gina Gallegos, P.E.Wedgwood Ballroom

Materials and Pavements Meeting (TxDOT staff only)Moderator: Brett Haggerty, P.E., CSTGlass Oaks Ballroom

9:00 AM

IntroductionGina Gallegos, P.E., CST

Safety Minute, Stretch and FlexOccupational Safety Division

IntroductionBrett Haggerty, P.E., CST

Safety Minute, Stretch and FlexOccupational Safety Division

9:15 AMContractor Performance – Sunset Rule ChangesTucker Ferguson, P.E., BMT Duane Milligan, P.E., DAL

Sampling and Testing RequirementsBrett Haggerty, P.E., CST Thomas Smith, CST

10:15 AM Break

Construction Meeting (TxDOT staff only)Moderator: Gina Gallegos, P.E., CSTWedgwood Ballroom

Materials and Pavements Meeting (TxDOT staff only)Moderator: Brett Haggerty, P.E., CSTGlass Oaks Ballroom

10:30 AMCE&I ChallengesGina Gallegos, P.E., CST Radiation Safety, Nuclear Gauge Requirements

Chris Moore, Texas Department of State Health Services10:50 AM

Manual for Assessing Safety Hardware (MASH)Kenneth Mora, P.E., DES

11:10 AMHistory and Guidance on the Use of New TMA Special SpecificationDavid Valdez, P.E., TRF

Pavements Contacts, Structure, Training Available and Required in PDM, Documents Required for SubmissionEnad Mahmoud, PhD, P.E., MNT

11:30 AM

LuncheonRio Grande Exhibit Hall A

Introduction: Michael Lee, P.E., Director, Engineering and Safety OperationsKeynote Speaker – Commissioner Alvin New, Texas Transportation Commission

2018 Construction, Pavements and Materials Conference 3

Wednesday, May 23, 2018 – Afternoon Session

General SessionModerator: Wayne Ekdahl, P.E., CSTGrand Ballroom

12:45 PMSiteManager UpdatesCullen Pfeiffer, CST

1:00 PMWe Build Texas – How to Build Successful ProjectsShane Cunningham, P.E., TYLJeff Gibson, Gibson & Associates, Inc.

1:30 PMNew SOPs for Bridge ConstructionGraham Bettis, P.E., BRG

2:00 PMCompliance History and General Construction Permit (GCP) RenewalsAdrienne Boer, ENV

2:30 PM Break

3:00 PMFraudulent ActivityAnthony Thomas, CMPParsons Townsend, CMP

4:00 PM

Accelerated Construction Program – Best PracticesDuane Milligan, P.E., DALLacey Rodgers, P.E., CFM, DALKevin Pruski, P.E., BRG

5:00 PM Adjourn

4 2018 Construction, Pavements and Materials Conference

Thursday, May 24, 2018 – Morning Session

8:00 AM Conference Registration Opens

ConstructionModerator: Ken Barnett, P.E.Grand Ballroom A

ConstructionModerator: Wayne Ekdahl, P.E.Grand Ballroom B

Pavement Design InnovationsModerator: Magdy Mikhail, P.E.Wedgwood Ballroom

Materials Forensic ResultsModerator: Enad Mahmoud, P.E.Glass Oaks Ballroom

8:00 AM

Certification Updates

Status of TXAPA New Levels Richard Izzo, P.E., CST

ACI Certification Status Andy Naranjo, P.E., CST

PEPS Work Authorizations & Invoicing ProcessKori Rodriguez, P.E., PEPSTamika Griffin, PEPS

Rehabilitation of FM Roads Under TrafficDarlene Goehl, P.E., TTI

Sinkholes from Gypsum VeinsAldo Madrid, P.E., ELPTom Scullion, TTIKevin Stafford, PhD, SFA

8:30 AMRio Hondo Lift BridgeAndres Espinoza, P.E., PHR

Inspector Development Program (IDP) OverviewScott Starkjohann, CST

Quick Remediation Strategies for DrainageCharles Gurganus, P.E., TTI

Petrography CapabilitiesJefferey Perabo, CST

9:00 AMFlexible Start DatesLonnie Ragsdale, P.E., CST

Guardrail Inspection for Quality AssuranceChris Weber, P.E., ELP

District Experience with Rubblization of Concrete PavementMelissa Benavides, P.E., MNTTom Scullion, P.E., TTI

Enhancements with GPREnad Mahmoud, PhD, P.E., MNTDarlene Goehl, P.E., TTI

9:30 AM Break

ConstructionModerator: Ken Barnett, P.E.Grand Ballroom A

ConstructionModerator: Wayne Ekdahl, P.E.Grand Ballroom B

Project SelectionModerator: Brett Haggerty, P.E.Wedgwood Ballroom

Asphalt and GeosyntheticsModerator: Jerry Peterson, P.E.Glass Oaks Ballroom

10:00 AMPrecast Bridge SegmentsEduardo DeLeon, P.E., LRD

Harbor Bridge ProjectJoseph Briones, P.E., CRP

Pavement Analyst PA Data Tools, Construction Work History, Surface Age and ROW ImagesJenny Li, PhD, P.E., MNT

Panel Discussion: District Experience with SPG ProjectsDaniel Garcia, P.E., PHRWes Kimmell, P.E., AMA

10:30 AMQuestions and Answers on the DBE ProgramDave Tovar, CIV

Contract Claims – StatisticsMark Maloy, P.E., CST

11:00 AM

Update on OJT and Contractors Annual FHWA 1391LaShaundra Sam, CIV

Project Closeout ProceduresWayne Ekdahl, P.E., CST

Introduction to MAP-21 and Transportation Asset ManagementMark McDaniel, P.E., MNT

Paving Grids vs. Paving FabricsRon Baker, P.E., LBBJeff Rasche, TensarMike Samueloff, Huesker

11:30 AM

LUNCHEONRio Grande Exhibit Hall A

Introduction: Wayne Ekdahl, P.E., CSTKeynote Speaker – Jennifer Woodard, Executive Vice President, Associated General Contractors of Texas

2018 Construction, Pavements and Materials Conference 5

Thursday, May 24, 2018 – Afternoon Session

ConstructionModerator: Wayne Ekdahl, P.E.Grand Ballroom A

ConstructionModerator: Ben Engelhardt, P.E.Grand Ballroom B

Geotechnical, Soils, & AggregatesModerator: Richard Izzo, P.E.Wedgwood Ballroom

Flexible PavementsModerator: Robert Lee, P.E.Glass Oaks Ballroom

1:00 PMCST AE Mentoring ServicesMichael Bostic, P.E., CST

Focusing on TxDOT’s Highway Safety Samuel Salazar, OCCJeff Chennault, OCC

FDR Projects and Tools AvailableLewis Nowlin, P.E., SJT

The State of Asphalt BindersJerry Peterson, P.E., CSTRyan Barborak P.E., CST

1:30 PM

Accelerated Bridge Construction, West Dallas StreetJohn Elam, P.E., HOUPaul Eley, HOU

Managing Project Schedules (Techniques)Casey McGee, P.E., ABLPaul Norman, P.E., ABL

Applications Using Emulsion and Foamed AsphaltStephen Sebesta, TTI

From SP+ to BMD Ramon Rodriguez, LRD

2:00 PM

On-Time & On-Budget Performance Measures

How They’re Calculated Juan Urrutia, P.E., CST

Panel Discussion: District Challenges Chris Cowen, P.E., BRY Buddy Williams, P.E., ATL Daniel Garcia, P.E., PHR

Contractor Performance – Sunset Rule ChangesTucker Ferguson, P.E., BMT

Geogrid for Base ReinforcementJorge Zornberg, PhD, P.E., CTR

Alternate Bids for Underseal vs. Tack vs. MembraneGisel Carrasco, P.E., AUS

2:45 PM Break

ConstructionModerator: Wayne Ekdahl, P.E.Grand Ballroom A

ConstructionModerator: Ben Engelhardt, P.E.Grand Ballroom B

Rigid PavementsModerator: Andy Naranjo, P.E.Wedgwood Ballroom

Traffic MaterialsModerator: Johnnie Miller, P.E.Glass Oaks Ballroom

3:15 PMPanel Discussion: Managing CE&I (Best Practices) – Metro vs. RuralJohn Elam, P.E., HOURay Wells, P.E., AIA EngineersRodney Svec, P.E., YKMRandy Bena, P.E., Volkert

Risk Based Stewardship and Oversight (RBSO), Projects of Division Interest (PoDI), & Compliance Assessment Program (CAP)Carl Highsmith, FHWA

Fly Ash Supply UpdateMasoud Moradian, PhD, CST

Retroreflectivity Verification ProgramAdam Pike, P.E., TTI

3:45 PM

Managing Unexpected Finds during Construction (HAZMAT)Doug Mack, ENV

Precast Concrete Pavement Panels Andy Naranjo, P.E., CST

4:15 PMSafety ContingenciesEddie Reyes, P.E., SAT

Panel Discussion: Public Involvement During Construction (Best Practices)Casey McGee, P.E., ABLPaul Eley, HOUNoemi Rojas, HNTB

Construction / Performance of RCCLewis Nowlin, P.E., SJTRuben Carrasco, P.E., CST

Proper Identification of “Dead” SignsJohnnie Miller, P.E., CST

4:45 PMStatus of CCAM and Review of Updates in the DocumentWayne Ekdahl, P.E., CST

Alternate Cements for Accelerated ConstructionAndy Naranjo, P.E., CST

Ultra-High-Pressure Water CuttingEric Lykins, P.E., BWD

5:00 PM Adjourn

6 2018 Construction, Pavements and Materials Conference

Friday, May 25, 2018 (TxDOT staff only)

Construction (TxDOT staff only)Moderator: Gina Gallegos, P.E.Ballroom A

Materials and Pavements (TxDOT staff only)Moderator: Brett Haggerty, P.E.Ballroom B

8:00 AMLocal Government OversightDavid Millikan, P.E., TPP

Panel Discussion: Best Practices in Cement Treating Base Materials on Rehab ProjectsJames Robbins, P.E., BRYAl Aramoon, P.E., DALMiles Garrison, P.E., ATL

8:30 AMStatus of E-Verify and Electronic BiddingJesse Lineberger, CST

8:45 AM Removing Bridges Containing Lead-Based PaintDoug Beer, P.E., BRG9:00 AM

Unbalanced BidsJuan Urrutia, P.E., CST

9:30 AM Break

General SessionGina Gallegos, P.E., CSTGrand Ballroom

10:00 AMPanel Discussion: Questions and AnswersConstruction Division Leads

11:00 AMClosing RemarksGina Gallegos, P.E., CST

11:30 AM Adjourn

2018 Construction, Pavements and Materials Conference 7

Renaissance Austin Floor Plan

Atrium Level - Renaissance Austin Hotel

Plaza Level - Renaissance Austin Hotel

Luncheon

8 2018 Construction, Pavements and Materials Conference

Arboretum Map

LET’S BE SOCIALFollow us on your favorite network.For promotions and events,visit visit thearboretum.com.

Guests with general questions or those needing special assistance are encouraged to contact the mall management office at:

(512) 338-4755

QUESTIONS?

Barnes& Noble

Heroes & LegaciesCigars & Gifts

Loop 360

Lens

Crafte

rs

Gymbor

ee

Am

y’s

Ice

Cre

am

Sung

lass

Teap

ioca

Hut

Con’ Olio

Oils & Vinegars

SavorySpice Shop

Organic Nail

& Lash Spa

Soft Sugarboo & Co.

Surroundings

Jos. A. B

ank

Renaissance

Hotel

Everything

But W

ater

Janieand

Jack

Franc

esca

’s

Collect

ions

Z Gall

erie

Orvis

Great Hills Trail

US

Hw

y 18

3

Lovesac

Lamps

Plus

GameStop

Dru

nk F

ish

Jap

anes

e F

oo

d

LaB

elle

Sal

on

& S

pa

Five G

uys

Burger

s &

Fries

Gap K

ids /

babyG

apEm

prizo

Texas Tech

Edward JonesInvestments

Ray’s Watch & Jewelry Repair

Arboretum Dental

Parking Garage

THE ARBORETRUM DIRECTORY A 0917

MANAGED BY

WASHINGTONPRIME GROUP

The Arboretum

CHILDREN’S FASHION & SPECIALTY

babyGap B

Gap Kids B

Gymboree D

Janie and Jack B

HOTEL

Renaissance Hotel

HOME DÉCOR & FURNISHINGS

Pottery Barn B

Lamps Plus C

Lovesac C

Sugarboo & Co. B

Z Gallerie B

JEWELRY & WATCHES

Francesca’s Collections B

Ray’s Watch & Jewelry Repair C

MEN’S FASHION & SPECIALTY

Gap B

Jos. A. Bank C

Orvis B

ELECTRONICS & ELECTRONICS ACCESSORIES

Barnes & Noble D

GameStop D

SHOES & FOOTWEAR

Orvis B

SAS Shoes B

RESTAURANTS & FOOD

Amy’s Ice Cream D

Blue Baker A

Brio Tuscan Grille A

The Cheesecake Factory D

Drunk Fish Japanese Food D

Estância Churrascaria A

Brazilian Steakhouse

Five Guys Burgers & Fries D

Teapioca C

Zoës Kitchen B

PERSONAL & PROFESSIONAL SERVICES

Arboretum Dental C

Edward Jones Investments C

LaBelle Salon & Spa D

PERSONAL & PROFESSIONAL SERVICES CONT.

LensCrafters D

Organic Nail & Lash Spa C

Ray’s Watch & Jewelry Repair C

Texas Tech C

SPECIALTY RETAIL, GIFTS & LUGGAGE

Con’ Olio Oils & Vinegars C

Emprizio B

Heroes & Legacies Cigars & Gifts D

Orvis B

Savory Spice Shop C

Sunglass Hut C

Tervis B

WOMEN’S FASHION & SPECIALTY

Chico’s/Soma Intimates B

Everything But Water B

Francesca’s Collections B

Gap B

Orvis B

Soft Surroundings B

LEGEND

Restrooms

Security

Elevator

Wi-Fi

Parking

Conference location

2018 Construction, Pavements and Materials Conference 9

Notes

10 2018 Construction, Pavements and Materials Conference

Notes

2018 Construction, Pavements and Materials Conference 11

Contact Information

In Case of Emergency Dial 911

Austin Police Department: Non-emergency (512) 974-2000

Conference Emergency Contact: Bunny Neible (512) 461-6957 cell

Nearest Emergency Facility

Arboretum: First Choice Emergency 10407 Jollyville Rd, Austin, 78759 (512) 628-0470

Domain: Baylor Scott & White Clinic − Austin North Burnet 2608 Brockton Dr., Austin, 78758 (512) 654-4050

Professional Development Hours (PDHs)

The Texas Board of Professional Engineers (TBPE) requires engineers to obtain at least 15 professional development hours (PDHs) within the year as a condition for license renewal. The Board defines a PDH as, “a contact hour (clock hour) of Continuing Education Program (CEP) activity.”

Engineers can earn PDHs by, “presenting or attending seminars, in-house courses, workshops, or professional or tech-nical presentations made at meetings, conventions, or conferences sponsored by a corporation, other business entity, professional or technical societies, associations, agencies, or organizations, or other group.” For more comprehensive information on earning PDHs, visit the TBPE website and reference Board rule §137.17, Continuing Education Program.

For claimed activities, the TBPE requires the license holder to maintain some hard-copy documentation of the type of activ-ity, sponsoring organization, location, duration, speaker name, and PDH credits earned. We recommended retaining this agenda as supporting documentation.

12 2018 Construction, Pavements and Materials Conference

Project Tracker: Your Gateway to TxDOT Transportation Projects TPP

Real-Time Profiler CST M&P Rigid Pavements Branch

Capabilities of the Petrography Lab CST M&P Petrography Lab

Electronic Bidding Systems (EBS) CST Contract Letting

CMISD (SiteManager) Group CST Construction and Materials Information System Development (CMISD)

Pavement Analysis Equipment and Capabilities Pavement Analysis

Employee and Executive Communications Section Communications Division

Applications in Geospatial Remote Sensing CST Traffic Materials

TxDOT HRD

Retroreflectivity Verification Program Texas A&M Transportation Institute

Exhibitors

Plaza Level - Renaissance Austin Hotel

Exhibit Hall