AGENDA DEPARTMENT OF TRANSPORTATION TRANSPORTATION and NATURAL RESOURCES COMMITTEE STATE ADMINISTRATIVE BOARD T&NR Meeting: November 13, 2002 - Secretary of State’s Office, 3:30 PM State Administrative Board Meeting: November 19, 2002 - State Capitol, 11:00 AM ******************* SUBCONTRACTS 1. Rusche Trucking, Inc. Trucking $60,000.00 4457 Alpine Ave., N.W. Comstock Park, MI 49321 Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds. 2. Reith-Riley Construction Co., Inc. Trucking $60,000.00 867 Egypt Valley Road Ada, MI 49301 Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds. *Denotes a non-standard contract/amendment 11/7/02 Page 1 of 36

Upload: ngokien

Post on 26-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

AGENDA

DEPARTMENT OF TRANSPORTATION

TRANSPORTATION and NATURAL RESOURCES COMMITTEE STATE ADMINISTRATIVE BOARD

T&NR Meeting: November 13, 2002 - Secretary of State’s Office, 3:30 PM

State Administrative Board Meeting: November 19, 2002 - State Capitol, 11:00 AM

******************* SUBCONTRACTS 1. Rusche Trucking, Inc. Trucking $60,000.00

4457 Alpine Ave., N.W. Comstock Park, MI 49321

Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds.

2. Reith-Riley Construction Co., Inc. Trucking $60,000.00

867 Egypt Valley Road Ada, MI 49301

Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds.

*Denotes a non-standard contract/amendment 11/7/02 Page 1 of 36

3. MarJo Construction Services, Inc. Trucking $60,000.00 2635 Wilson Ave., S.W. Grand Rapids, MI 49544

Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds.

4. Yellow Rose Transport, Inc. Trucking $60,000.00

3531 Busch Drive Grandville, MI 49418

Approval is requested to authorize the Kent County Road Commission to award a subcontract to furnish labor and equipment to provide trucking for maintenance (aggregate, snow removal, sand, asphalt, etc.) on various State trunklines throughout Kent County. The project was advertised, and four bids were received. In order to provide a sufficient number of available trucks at different times of the year to meet the maintenance needs, the region recommends award to all four contractors that bid. Work will be awarded based on lowest hourly rate, project location, and availability of type of equipment needed at work site. The contract term will be from the date of award through December 31, 2003. Source of Funds: 100% State Restricted Trunkline Funds.

*Denotes a non-standard contract/amendment 11/7/02 Page 2 of 36

CONTRACTS 5. MUNICIPAL - Cost Participation for Local Agency Construction Contract

Contract (2002-5260) between MDOT and the Crawford County Road Commission will provide for participation in the construction under contract by the County of the following Transportation Enhancement improvements:

Extension and/or replacement of culverts, approach work, grading, and the placement of topsoil and seeding at the following locations:

Pickerel Lake Road over the Middle Branch of Big Creek Walsh Road over East Branch of Big Creek Pioneer Road over Beaver Creek Estimated Funds:

Federal Highway Administration Funds $ 83,165 Crawford County Road Commission Funds $ 20,791 Total Funds $103,956

STE 20900 - 43894 Local Letting

6. RAILROAD FORCE ACCOUNT WORK

Job Number (55632A) under Master Agreement (94-0809) between MDOT and Mid-Michigan Railroad/Rail America, Inc., will provide funding for improvements to a two-track crossing of Mid-Michigan Railroad on M-46 in the village of Breckenridge and a three-track crossing of Mid-Michigan Railroad on M-46 in the city of St. Louis, both locations in Gratiot County. The improvements include crossing reconstruction of all five crossing surfaces with the upgrading of cantilever flashing light signals and the addition of half-roadway gates at the St. Louis location.

Estimated Funds:

Federal Highway Administration Funds $505,000 State Restricted Trunkline Funds 56,000 Total $561,000

*Denotes a non-standard contract/amendment 11/7/02 Page 3 of 36

7. AERONAUTICS - Design Engineering Contract (2003-0075) between MDOT and the St. Clair County Board of Commissioners will provide Federal and State grant funds for design of apron reconstruction and expansion at the St. Clair County International Airport in Port Huron, Michigan. This is a sub-grant issued pursuant to the condition of the Block Grant given to MDOT by the Federal Aviation Administration (FAA). The contract will be in effect for a period of 36 months from the date of award. Source of Funds: FAA Funds (via Block Grant) - $65,700; State Restricted Aeronautics Funds - $3,650; St. Clair County Funds - $3,650; Contract Total - $73,000.

8. AERONAUTICS - Design Engineering

Contract (2003-0088) between MDOT and the City of Fremont will provide Federal and State grant funds for final design of the Runway 18/36 extension at the Fremont Municipal Airport in Fremont, Michigan, Newago County. This is a sub-grant issued pursuant to the condition of the Block Grant given to MDOT by the Federal Aviation Administration (FAA). The contract will be in effect for a period of 36 months from the date of award. Source of Funds: FAA Funds (via Block Grant) - $64,800; State Restricted Aeronautics Funds - $3,600; City of Fremont Funds - $3,600; Contract Total - $72,000.

9. CONSTRUCTION & TECHNOLOGY - Time Extension

Amendatory Contract (99-0316/A2) between MDOT and B.T. Bellner & Associates will extend the contract term by twelve months to provide sufficient time for the consultant to complete the services. The original contract provides for professional services to evaluate MDOT's Preventive Maintenance Program. The revised contract term will be June 11,1999, through December 31, 2003. The total contract amount remains unchanged at $419,400. Source of Funds: 100% State Restricted Trunkline Funds.

10. CONSTRUCTION & TECHNOLOGY - Time Extension

Amendatory Contract (99-0583/A5) between MDOT and Wilcox Professional Services, LLC, will extend the contract term by twenty months to provide sufficient time for the consultant to complete the services. The original contract provides for construction engineering services for M-45. The revised contract term will be July 9,1999, through August 14, 2004. The total contract amount remains unchanged at $2,774,136.06. Source of Funds: 80% Federal Highway Administration Funds and 20% State Restricted Trunkline Funds.

11. CONSTRUCTION & TECHNOLOGY - IDS Engineering Services

Authorization (Z16) under Contract (2000-0366) between MDOT and Great Lakes Engineering Group, LLC, will provide for bridge project scoping services on various jobs in the University Region. This authorization (Z16) is for $150,152.10 and the authorization will be in effect from the date of award through May 30, 2003. The contract term is June 6, 2000, through May 30, 2003. Source of Funds: 80% Federal Highway Administration Funds ($120,121.68) and 20% State Restricted Trunkline Funds ($30,030.42).

*Denotes a non-standard contract/amendment 11/7/02 Page 4 of 36

12. CONSTRUCTION AND TECHNOLOGY - IDS - Engineering Services Contract (2003-0073) between MDOT and Great Lakes Engineering Group, LLC, will provide for services for which the consultant is prequalified to be performed on an as needed/when needed basis. The contract will be in effect from the date of award through three years. The total contract amount will be $4,000,000, and the maximum amount of each authorization will be $1,000,000. Authorizations over $100,000 will be submitted to the State Administrative Board for approval. Source of Funds: Federal, State Restricted, or local funds, depending on the particular project authorized.

13. CONSTRUCTION AND TECHNOLOGY - IDS - Engineering Services

Contract (2003-0074) between MDOT and Westshore Consulting will provide for services for which the consultant is prequalified to be performed on an as needed/when needed basis. The contract will be in effect from the date of award through three years. The total contract amount will be $4,000,000, and the maximum amount of each authorization will be $1,000,000. Authorizations over $100,000 will be submitted to the State Administrative Board for approval. Source of Funds: Federal, State Restricted, or local funds, depending on the particular project authorized.

14. DESIGN - Increase Scope and Amount

Amendatory Contract (2000-0024/A9) between MDOT and Orchard, Hiltz & McCliment, Inc., will provide for additional work and increase the contract amount by $253,160.25. The additional work items include, but are not limited to, providing additional design hours for the applicable project/project management system (P/PMS) tasks needed to complete design, coordinating and identifying all utility conflict locations, performing additional survey and design to reconstruct and realign the eastbound I-94 exit ramp terminal at US-12 (Michigan Avenue), and removing and replacing sidewalk from 1.5 meters behind the proposed curb to the existing face of the building within the US-12 right-of-way. The original contract provides for the design of the reconstruction of US-12 (Michigan Avenue) from Firestone Avenue to Livernois Road in the cities of Dearborn and Detroit, Wayne County. The contract term remains unchanged, March 3, 2000, through December 31, 2003. The revised contract amount will be $1,818,846.05. Source of Funds: 81.85% Federal Highway Administration Funds and 18.15% State Restricted Trunkline Funds.

*Denotes a non-standard contract/amendment 11/7/02 Page 5 of 36

15. DESIGN - Increase Scope and Amount Amendatory Contract (2001-0932/A1) between MDOT and HNTB Michigan, Inc., will add the design (preliminary engineering) portion of the road and bridge project work and increase the contract amount by $1,949,943.16 for phase two of the project. The original contract provides for the preparation of preliminary and final scoping packages for the design of the reconstruction and widening of M-59 from East of Crooks Road to Ryan Road in the cities of Rochester Hills, Troy, Sterling Heights, and Shelby Township, within Oakland County and Macomb County (CS 63043 & 50023 - JN 55850) to be performed in two phases and provides the scope and cost for phase one of the project. MDOT made its initial consultant selection for this contract based on the ability of the consultant to perform two phases of the project, with the final phases to be implemented at MDOT's option. The contract term remains unchanged, October 10, 2001, through December 31, 2004. The revised total contract amount will be $2,739,998.45. Source of Funds: 100% State Restricted Trunkline Funds.

16. DESIGN - IDS Design Consultant Services

Contract (2003-0078) between MDOT and Wilcox Professional Services, LLC, will enable MDOT to request specific design services to be performed on an as needed/when needed basis with a written authorization. The contract will be in effect from the date of award through 36 months, unless extended to complete projects. The total obligation of funds under this contract will not exceed $3,000,000, and the maximum amount of each authorization will be $1,000,000. Any individual authorization of $100,000 or more will be submitted to the State Administrative Board for approval. Source of Funds: Federal, Restricted State, or local funds, depending on the particular project authorization.

17. DESIGN - IDS Design Consultant Services

Contract (2003-0079) between MDOT and URS Corporation Great Lakes will enable MDOT to request specific design services to be performed on an as needed/when needed basis with a written authorization. The contract will be in effect from the date of award through 36 months, unless extended to complete projects. The total obligation of funds under this contract will not exceed $3,000,000, and the maximum amount of each authorization will be $1,000,000. Any individual authorization of $100,000 or more will be submitted to the State Administrative Board for approval. Source of Funds: Federal, Restricted State, or local funds, depending on the particular project authorization.

*Denotes a non-standard contract/amendment 11/7/02 Page 6 of 36

18. DESIGN - IDS Design Consultant Services Contract (2003-0080) between MDOT and Woolpert Design, LLP, will enable MDOT to request specific design services to be performed on an as needed/when needed basis with a written authorization. The contract will be in effect from the date of award through 36 months, unless extended to complete projects. The total obligation of funds under this contract will not exceed $2,000,000, and the maximum amount of each authorization will be $400,000. Any individual authorization of $100,000 or more will be submitted to the State Administrative Board for approval. Source of Funds: Federal, Restricted State, or local funds, depending on the particular project authorization.

19. DESIGN - IDS Design Consultant Services

Contract (2003-0081) between MDOT and STS Consultants, Ltd., will enable MDOT to request specific design services to be performed on an as needed/when needed basis with a written authorization. The contract will be in effect from the date of award through 36 months, unless extended to complete projects. The total obligation of funds under this contract will not exceed $2,000,000, and the maximum amount of each authorization will be $400,000. Any individual authorization of $100,000 or more will be submitted to the State Administrative Board for approval. Source of Funds: Federal, Restricted State, or local funds, depending on the particular project authorization.

20. *TRANSPORTATION PLANNING - Framework GIS MOU

Memorandum of Understanding (MOU) (2003-0082) between MDOT and the Michigan Department of Corrections, Michigan State Industries, will provide for hourly work to assist in the integration of the Framework Geographic Information Systems (GIS) database with MDOT databases and analytical systems. The MOU will be in effect from the date of the award through September 30, 2005. The total MOU amount will be $450,000. Source of Funds: Federal Highway Administration Funds - $360,000; State Restricted Trunkline Funds - $90,000.

21. *TRANSPORTATION PLANNING - America's Transportation Stories Exhibitions

Contract (2003-0083) between MDOT and the Edison Institute will distribute Demonstration Funds included in the FY 2002 DOT Appropriations Act to create exhibitions related to "America's Transportation Stories." The contract will be in effect from the date of award through December 31, 2003. The contract amount will be $2,000,000. Source of Funds: Federal Highway Administration Funds - $2,000,000.

*Denotes a non-standard contract/amendment 11/7/02 Page 7 of 36

BID LETTING STATE PROJECTS 22. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211001 $ 7,106,361.57 $ 7,091,546.67 PROJECT M 29012-46573 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - FEBRUARY 24, 2003 COMPLETION DATE - SEPTEMBER 25, 2003 -0.21 %

5.65 mi of cold milling, roadway reconstruction, widening, bituminous resurfacing, concrete pavement repairs, and rehabilitation of eight (8) bridges, and a bridge replacement, on M-46 from Grafton to Crosswell and on US-127 Business Route from Lincoln Road to M-46, located in the city of St. Louis, Pine River, Bethany, Winn, Mt. Pleasant, Deerfield, Coe and Spaulding Townships, Gratiot, Isabella, and Saginaw Counties.

5.00 % DBE participation required BIDDER AS-READ AS-CHECKED

C.A. Hull Co., Inc. $ 7,732,013.03 Same 3 E. C. Korneffel Co. J. Slagter & Son Construction Co Walter Toebe Construction Co. $ 7,772,441.65 Same 4 Prince Bridge & Marine, LTD. Fisher Contracting & Central Asphal $ 7,091,546.67 Same 1 ** Midwest Bridge/Valley Asphalt $ 7,370,450.65 Same 2

4 Bidders

Source of Funds: 46573A State Restricted Trunkline Funds 100 % 55588A Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 % 55598A Federal Highway Administration Funds 80.00 % State Restricted Trunkline Funds 20.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 8 of 36

23. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211002 $ 3,571,556.78 $ 3,769,802.25 PROJECT AIM 17033-38043 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - SEPTEMBER 20, 2003 5.55 %

8.32 mi of hot mix asphalt overlay, joint repairs, guardrail upgrading and permanent pavement markings on I-75 from north of M-80 (Tone Road) to north of M-28 in Kinross and Dafter Townships, Chippewa County.

10.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Bacco Construction Company $ 4,127,926.04 Same 3 Rieth-Riley Construction Co., Inc. Payne & Dolan, Inc. $ 3,769,802.25 Same 1 ** ABC Paving Company H & D, Inc. $ 3,830,947.70 Same 2

3 Bidders

Source of Funds: 38043A Federal Highway Administration Funds 90.00 % State Restricted Trunkline Funds 10.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 9 of 36

24. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211003 $ 2,995,836.10 $ 2,297,956.73 PROJECT NH 82141-51501 LOCAL AGRMT. 02-5479, 02-5480 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - OCTOBER 10, 2003 -23.30 %

Superstructure replacement, pier repair, guardrail upgrading and approach work on S01-3 and S01-4 at US-24 (Telegraph Road) under M-102 (8 Mile Road) in the cities of Detroit and Southfield, Wayne and Oakland Counties.

7.00 % DBE participation required BIDDER AS-READ AS-CHECKED

C.A. Hull Co., Inc. $ 3,179,938.62 Same 6E. C. Korneffel Co. $ 2,297,956.73 Same 1 **

J. Slagter & Son Construction Co Midwest Bridge Company $ 2,655,796.43 Same 5 Angelo Iafrate Construction Company Dan's Excavating, Inc $ 2,628,971.25 Same 4 Posen Construction, Inc. $ 2,379,591.20 Same 2 Walter Toebe Construction Co. $ 2,407,995.85 Same 3

6 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

51501A Detroit 1.16 % Federal Highway Administration Funds 81.85 % Southfield 1.11 % State Restricted Trunkline Funds 15.88 %

*Denotes a non-standard contract/amendment 11/7/02 Page 10 of 36

25. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211004 $ 2,123,519.03 $ 1,948,446.91 PROJECT NH 75022-45611 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 29, 2003 -8.24 %

9.548 miles of cold milling and two-course hot mix asphalt overlay, including shoulders, guardrail and safety work from railroad to County Road 432, and joint replacement, pin and hanger replacement and painting of entire structure (R01) on US-2 over railroad 3.1 mi east of Manistique, in the townships of Manistique and Doyle, Schoolcraft County.

10.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Bacco Construction Company $ 2,099,549.59 Same 2 Rieth-Riley Construction Co., Inc. Payne & Dolan, Inc. $ 1,948,446.91 Same 1 **

2 Bidders

Source of Funds: 45611A Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 % 58706A Federal Highway Administration Funds 80.00 % State Restricted Trunkline Funds 20.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 11 of 36

26. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211006 $ 2,053,591.32 $ 2,038,400.84 PROJECT MG 54022-45799 LOCAL AGRMT. % OVER/UNDER EST. START DATE - APRIL 13, 2003 COMPLETION DATE - OCTOBER 03, 2003 -0.74 %

5.3 mi of hot mix asphalt crushing and shaping, intermittent reconstruction for grade improvement, minor widening, guard- rail, and hot mix asphalt resurfacing on M-20 from McKinley Road to 13 Mile Road in Colfax and Martiny Townships, Mecosta County.

10.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Rieth-Riley Construction Co., Inc. $ 2,038,400.84 Same 1 ** Payne & Dolan, Inc. Central Asphalt, Inc. Elmer's Crane & Dozer, Inc. Bernie Johnson Trucking, Inc. $ 2,083,055.95 Same 2

2 Bidders

Source of Funds: 45799A Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 % 27. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211007 $ 1,624,126.05 $ 1,604,128.65 PROJECT ST 46072-50610 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 31, 2003 -1.23 %

4.8 mi of cold milling, hot mix asphalt resurfacing and guardrail upgrading on M-52 from Valley Road to M-50 in Franklin, Tecumseh, Adrian, and Raisin Townships, Lenawee County.

10.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Thompson-McCully Company $ 1,606,545.75 Same 2 Barrett Paving Materials, Inc. $ 1,604,128.65 Same 1 ** Gerken Paving, Inc. $ 1,852,691.55 Same 3 Crestline Paving & Excavating Co.,

3 Bidders

Source of Funds: 50610A Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 %

*Denotes a non-standard contract/amendment 11/7/02 Page 12 of 36

28. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211009 $ 397,760.46 $ 488,594.71 PROJECT M 53032-60363 LOCAL AGRMT. % OVER/UNDER EST. START DATE - SEPTEMBER 09, 2003 COMPLETION DATE - 15 working days 22.84 %

4.28 mi of overband crackfill, two-course microsurfacing, slurry seal paved shoulders on US-10/31, from Brye Road to US-31 (east junction) in Amber Township, Mason County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 514,406.38 Same 2 Fahrner Asphalt Sealers, Inc. $ 571,969.50 Same 3 Terry Construction, Inc. $ 488,594.71 Same 1 **

3 Bidders

Source of Funds: 60363A State Restricted Trunkline Funds 100 % 29. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211010 $ 134,037.37 $ 143,477.80 PROJECT STG 27023-58495 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 28, 2003 7.04 %

64.314 mi of non-freeway sign upgrading on US-2, from the state line to the Iron west county line in the cities of Ironwood, Bessemer, and Wakefield, Ironwood, Bessemer, Wakefield, Marenisco, and Watersmeet Townships, Gogebic County.

BIDDER AS-READ AS-CHECKED

Midwest Bridge Company Highway Service Company, Inc. $ 158,727.25 Same 3 Action Traffic Maintenance, Inc. $ 144,273.36 Same 2 Trans Tech Electric, L.P. $ 168,100.00 Same 4 J & J Contracting, Inc. Enviro Products, Inc. $ 143,477.80 Same 1 **

4 Bidders

Source of Funds: 58495A Federal Highway Administration Funds 99.72 % State Restricted Trunkline Funds 0.28 %

*Denotes a non-standard contract/amendment 11/7/02 Page 13 of 36

30. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211011 $ 41,935.95 $ 30,851.48 PROJECT STG 70041-58509 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 05, 2003 COMPLETION DATE - MAY 30, 2003 -26.43 %

8.010 mi of non-freeway sign upgrading on M-45 from US-31 easterly to Allendale in Grand Haven, Robinson, and Allendale Townships, Ottawa County.

BIDDER AS-READ AS-CHECKED

Midwest Bridge Company Highway Service Company, Inc. $ 39,320.50 Same 4 Action Traffic Maintenance, Inc. $ 53,357.50 Same 5 Trans Tech Electric, L.P. $ 38,217.20 Same 3J & J Contracting, Inc. $ 30,851.48 Same 1 **

Enviro Products, Inc. $ 34,604.30 Same 2 5 Bidders

Source of Funds: 58509A Federal Highway Administration Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 14 of 36

31. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211018 $ 584,196.68 $ 624,409.01 PROJECT BHT 34021-51900 LOCAL AGRMT. % OVER/UNDER EST. START DATE - APRIL 28, 2003 COMPLETION DATE - JULY 16, 2003 6.88 %

Bridge replacement, peat removal, approach work and replacing riprap on M-50 over Duck Creek in the township of Campbell, Ionia County.

5.00 % DBE participation required BIDDER AS-READ AS-CHECKED

C.A. Hull Co., Inc. L. W. Lamb, Inc. E. C. Korneffel Co. J. Slagter & Son Construction Co S. L. & H. Contractors, Inc. Milbocker and Sons, Inc. $ 646,521.58 Same 2 Midwest Bridge Company Fisher Contracting Company Hardman Construction, Inc. $ 624,409.01 Same 1 ** Walter Toebe Construction Co. $ 784,760.60 Same 8 E.T. MacKenzie Company $ 689,749.01 Same 6 Davis Construction, Inc. $ 669,328.70 Same 4 Anlaan Corporation $ 669,566.21 Same 5 Prince Bridge & Marine, LTD. $ 664,182.51 Same 3 Quantum Construction Company Youngstrom Contracting Heystek Contracting Inc. J.E. Kloote Contracting, Inc. $ 693,799.51 Same 7

8 Bidders

Source of Funds: 51900A Federal Highway Administration Funds 80.00 % State Restricted Trunkline Funds 20.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 15 of 36

32. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211021 $ 3,122,171.40 $ 2,862,458.20 PROJECT AIM 63174-56686 LOCAL AGRMT. 02-5475, 02-5476 % OVER/UNDER EST. START DATE - MAY 01, 2003 COMPLETION DATE - AUGUST 15, 2003 -8.32 %

21.03 km of cold milling, bituminous resurfacing, joint repairs and detector loops on I-75 from 13 Mile Road northerly to M-59 in the cities of Troy, Madison Heights, and Auburn Hills in Oakland County.

A 2003 highway preventive maintenance project.

12.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Cadillac Asphalt Paving Co. Thompson-McCully Company $ 2,976,021.00 $ 2,976,021.40 5 Ajax Paving Industries, Inc. $ 2,955,236.32 Same 2 John Carlo, Inc. $ 3,068,456.56 Same 6Ace Asphalt & Paving $ 2,862,458.20 Same 1 **

Angelo Iafrate Construction Company $ 2,964,011.24 Same 3 Barrett Paving Materials, Inc. $ 2,969,640.04 Same 4 ABC Paving Company

6 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

56686A Agency A-City of Troy 0.92 % Agency B -City of Madison Heights 0.07 % Federal Highway Administration Funds 90.00 % State Restricted Trunkline Funds 9.01 %

*Denotes a non-standard contract/amendment 11/7/02 Page 16 of 36

33. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211022 $ 1,351,568.55 $ 1,107,093.06 PROJECT ASTT 79032-48599 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MARCH 31, 2003 COMPLETION DATE - JUNE 14, 2003 -18.09 %

7.3 km of cold milling, joint repairs, bituminous overlay, and safety upgrades on M-15 from the north village limits of Vassar northerly to M-46 in the townships of Denmark and Tuscola, Tuscola County.

10.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Saginaw Asphalt Paving Co $ 1,107,093.06 Same 1 ** Valley Asphalt Company $ 1,222,949.53 Same 2 Pyramid Paving & Contracting $ 1,232,326.18 Same 3

3 Bidders

Source of Funds: 48599A Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 % 34. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211023 $ 1,306,590.81 $ 1,117,836.48 PROJECT M 25092-53199 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 08, 2003 COMPLETION DATE - AUGUST 23, 2003 -14.45 %

7.915 mi of cold milling, joint repairs and hot mix asphalt overlay on M-15 from north of Flint Street to south of Dodge Road in the city of Davison in Davison, Forest and Richfield Townships, Genesee County.

BIDDER AS-READ AS-CHECKED

Saginaw Asphalt Paving Co $ 1,229,559.37 Same 2 Valley Asphalt Company $ 1,117,836.48 Same 1 ** Thompson-McCully Company $ 1,364,921.24 Same 4 Ace Asphalt & Paving $ 1,424,590.86 Same 5 Barrett Paving Materials, Inc. $ 1,297,163.40 Same 3

5 Bidders

Source of Funds: 53199A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 17 of 36

35. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211024 $ 1,256,602.60 $ 1,082,361.15 PROJECT M 11015-60509 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 05, 2003 COMPLETION DATE - JULY 25, 2003 -13.87 %

4.56 mi of concrete pavement repair on eastbound I-94 from west of I-94BL easterly to St. Joseph River and from west of St. Joseph River to St. Joseph River in Lincoln, St. Joseph and Royalton Townships, Berrien County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Kamminga & Roodvoets, Inc. Kelcris Corporation $ 1,233,632.03 Same 2 Snowden, Inc. $ 1,299,513.50 Same 3 Causie Contracting, Inc. $ 1,082,361.15 Same 1 ** Florence Cement Company Niles Concrete Sawing & Constructio The Hunt Paving Company, Inc. $ 1,699,907.67 Same 4

4 Bidders

Source of Funds: 60509A State Restricted Trunkline Funds 100 % 36. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211028 $ 481,601.04 $ 496,401.80 PROJECT M 38101-60198 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 21, 2003 COMPLETION DATE - SEPTEMBER 30, 2003 3.07 %

6.208 mi of cold milling and non-structural hot mix asphalt overlay on I-94 eastbound from Michigan Avenue to Sandstone Road and I-94 westbound east of Sandstone Road to Sandstone Road in the townships of Parma and Sandstone, Jackson County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Thompson-McCully Company $ 496,401.80 Same 1 ** Aggregate Industries - Central Regi

1 Bidder

Source of Funds: 60198A State Restricted Trunkline Funds 100 % 37. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

*Denotes a non-standard contract/amendment 11/7/02 Page 18 of 36

PROPOSAL 0211029 $ 469,191.60 $ 449,754.06

PROJECT M 42012-60563 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - AUGUST 18, 2003 COMPLETION DATE - 15 working days -4.14 %

5.67 mi of hot mix asphalt overlay and shoulder paving on US-41 from M-26 to Fort Wilkins, on M-26 from Brockway Mountain Drive to US-41, Eagle River to Phoenix and Eagle Harbor, and from Copper Harbor to Fort Wilkinson State Park in the townships of Houghton, Eagle Harbor and Grant, Keweenaw County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Bacco Construction Company $ 563,322.25 Same 2Payne & Dolan, Inc. $ 449,754.06 Same 1 **

2 Bidders

Source of Funds: 60563A State Restricted Trunkline Funds 100 % 72821A Federal Highway Administration Funds 80.00 % State Restricted Trunkline Funds 20.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 19 of 36

38. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211030 $ 450,838.84 $ 417,076.20 PROJECT MIR 52997-59169 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 05, 2003 COMPLETION DATE - AUGUST 15, 2003 -7.49 %

0.7 mi of hot mix asphalt, aggregate base, curb and gutter, and storm sewer on Northern Michigan University/ North Physical Education Facility Road in the city of Marquette, Marquette County.

BIDDER AS-READ AS-CHECKED

Bacco Construction Company $ 509,901.80 Same 5 A. Lindberg & Sons, Inc. $ 425,776.00 Same 2 Snowden, Inc. Payne & Dolan, Inc. Associated Constructors, LLC $ 464,144.25 Same 3 Smith Paving, Inc. $ 491,082.00 Same 4C. Oberstar Excavating, Inc. $ 417,076.20 Same 1 **

5 Bidders

Source of Funds: 59169A State Restricted Trunkline Funds 100 % 59182A State Restricted Trunkline Funds 100 % 39. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211031 $ 253,269.61 $ 285,197.45 PROJECT M 43022-60358 LOCAL AGRMT. % OVER/UNDER EST. START DATE - SEPTEMBER 01, 2003 COMPLETION DATE - 18 working days 12.61 %

3.12 mi of cold milling and hot mix asphalt resurfacing, joint repairs and intermittent shoulder repair on US-10 from west of Deer Lake Road to Patterson Road in the townships of Chase and Richmond, Lake and Osceola Counties.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Rieth-Riley Construction Co., Inc. $ 285,197.45 Same 1 ** Payne & Dolan, Inc. Elmer's Crane & Dozer, Inc. $ 294,999.50 Same 2 Bernie Johnson Trucking, Inc.

2 Bidders

Source of Funds: 60358A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 20 of 36

40. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211032 $ 221,685.00 $ 214,259.20 PROJECT M 58041-60111 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 30, 2003 -3.35 %

4.4 mi of two course microsurfacing and overband crack fill treatment on M-50 from the Lenawee/Monroe County line to Wilcox Road in Dundee Township, Monroe County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 214,259.20 Same 1 ** Terry Construction, Inc. $ 230,285.60 Same 2

2 Bidders

Source of Funds: 60111A State Restricted Trunkline Funds 100 % 41. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211033 $ 291,122.00 $ 363,946.40 PROJECT M 81063-60145 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 27, 2003 COMPLETION DATE - JUNE 30, 2003 25.02 %

4.2 mi of microsurfacing with crack preparation on US-12 from I-94 to the Washtenaw/Wayne County line in Ypsilanti Township, Washtenaw County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 363,946.40 Same 1 ** Terry Construction, Inc. $ 372,305.24 Same 2

2 Bidders

Source of Funds: 60145A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 21 of 36

42. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211035 $ 474,857.10 $ 519,218.90 PROJECT M 71073-60355 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 15, 2003 COMPLETION DATE - JUNE 27, 2003 9.34 %

12.20 miles of crack sealing and chip sealing on US-23 from Ocqueoc Road northerly to the Presque Isle north county line in Ocqueoc and Bearinger Townships, Presque Isle County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

John Carlo, Inc. $ 664,657.20 Same 5 Highway Maintenance and Constructio $ 605,388.86 Same 4 D & D Contracting, Inc. $ 601,875.98 Same 3 H & D, Inc. $ 519,218.90 Same 1 ** Fahrner Asphalt Sealers, Inc. $ 580,090.18 Same 2 Terry Construction, Inc.

5 Bidders

Source of Funds: 60355A State Restricted Trunkline Funds 100 % 43. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211036 $ 379,377.50 $ 499,761.72 PROJECT M 32012-60006 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 28, 2003 COMPLETION DATE - AUGUST 29, 2003 31.73 %

8.96 mi of double chip seal with minor crack pretreatment on M-25 from Weaver Road to west village limits of Port Austin and on M-53 from Severance Road to M-81 in the townships of Hume, Port Austin, Evergreen and Greenleaf, Huron and Sanilac Counties.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

John Carlo, Inc. $ 499,761.72 Same 1 ** D & D Contracting, Inc. $ 505,205.96 Same 2 Fahrner Asphalt Sealers, Inc. $ 514,415.08 Same 3 Terry Construction, Inc.

3 Bidders

Source of Funds: 60006A State Restricted Trunkline Funds 100 % 44. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

*Denotes a non-standard contract/amendment 11/7/02 Page 22 of 36

PROPOSAL 0211037 $ 345,064.50 $ 293,383.34

PROJECT M 41024-60283 LOCAL AGRMT. % OVER/UNDER EST. START DATE - AUGUST 04, 2003 COMPLETION DATE - AUGUST 29, 2003 -14.98 %

8.44 mi of concrete crack sealing, concrete joint and crack repair, spall repair and overband crack fill on I-96 west of Whitneyville Road easterly to the Kent/Ionia county line in the townships of Cascade and Lowell, Kent County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Kamminga & Roodvoets, Inc. $ 396,467.50 Same 3 Kelcris Corporation $ 293,383.34 Same 1 ** Snowden, Inc. Causie Contracting, Inc. $ 299,276.24 Same 2 Scodeller Construction, Inc. The Hunt Paving Company, Inc.

3 Bidders

Source of Funds: 60283A State Restricted Trunkline Funds 100 % 45. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211038 $ 247,089.00 $ 230,958.58 PROJECT M 45021-60259 LOCAL AGRMT. % OVER/UNDER EST. START DATE - MAY 19, 2003 COMPLETION DATE - 9 working days -6.53 %

1.99 mi of hot mix asphalt cold milling and resurfacing with intermittent shoulder widening on M-72 from Gray Road easterly to M-22 in the townships of Elmwood and Garfield, Leelanau and Grand Traverse Counties.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Rieth-Riley Construction Co., Inc. $ 230,958.58 Same 1 ** Elmer's Crane & Dozer, Inc. $ 234,824.90 Same 2 Bernie Johnson Trucking, Inc.

2 Bidders

Source of Funds: 60259A State Restricted Trunkline Funds 100 % 46. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211039 $ 234,648.50 $ 277,060.34 PROJECT M 13131-60569

*Denotes a non-standard contract/amendment 11/7/02 Page 23 of 36

LOCAL AGRMT. % OVER/UNDER EST. START DATE - JUNE 02, 2003 COMPLETION DATE - JUNE 20, 2003 18.07 %

2.24 mi of microsurfacing and overband crack fill on M-96 from Clark Road east to I-94BL in the cities of Battle Creek and Springfield, Calhoun County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 277,060.34 Same 1 ** Fahrner Asphalt Sealers, Inc. $ 384,974.50 Same 3 Terry Construction, Inc. $ 297,967.50 Same 2

3 Bidders

Source of Funds: 60569A State Restricted Trunkline Funds 100 % 47. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211040 $ 180,000.00 $ 201,539.40 PROJECT M 20022-60373 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 28, 2003 COMPLETION DATE - AUGUST 28, 2003 11.97 %

9.186 mi of crack sealing and chip sealing on M-72 from east of Stephan Bridge Road easterly to west of M-18 junction in Grayling and South Branch Townships, Crawford County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

John Carlo, Inc. $ 252,883.40 Same 2 Highway Maintenance and Constructio $ 255,212.40 Same 3 D & D Contracting, Inc. $ 260,881.80 Same 5H & D, Inc. $ 201,539.40 Same 1 **

Fahrner Asphalt Sealers, Inc. $ 255,407.28 Same 4 Terry Construction, Inc.

5 Bidders

Source of Funds: 60373A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 24 of 36

48. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211043 $ 1,046,633.94 $ 863,541.15 PROJECT M 49021-60216 LOCAL AGRMT. % OVER/UNDER EST. START DATE - AUGUST 04, 2003 COMPLETION DATE - 24 working days -17.49 %

11.52 mi of cold milling and placing hot mix asphalt surface course, ultra thin hot mix asphalt on shoulders on US-2 from west of the Mackinac/Schoolcraft county line easterly to east of M-117 in Newton, Garfield and Mueller Townships in Mackinac and Schoolcraft Counties.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Bacco Construction Company $ 969,371.60 Same 2 Rieth-Riley Construction Co., Inc. Payne & Dolan, Inc. $ 863,541.15 Same 1 ** H & D, Inc. $ 1,115,784.69 Same 3

3 Bidders

Source of Funds: 60216A State Restricted Trunkline Funds 100 % 49. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211044 $ 589,516.80 $ 614,755.00 PROJECT M 72061-60376 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 08, 2003 COMPLETION DATE - AUGUST 15, 2003 4.28 %

6.06 mi of crack sealing and microsurfacing on I-75 northbound and southbound south of 9 Mile Hill Road northerly to north of M-18 in the township of Higgins in Roscommon County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 629,746.00 $ 626,902.00 2Terry Construction, Inc. $ 614,755.00 Same 1 **

2 Bidders

Source of Funds: 60376A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 25 of 36

50. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211045 $ 249,242.20 $ 241,349.92 PROJECT M 03035-60590 LOCAL AGRMT. % OVER/UNDER EST. START DATE - JULY 14, 2003 COMPLETION DATE - AUGUST 22, 2003 -3.17 %

4.141 mi of overband crack fill and microsurfacing just north of I-196/US-31 split northeast to north of the M-40 junction at the CSX railroad overpass in the city of Holland, Fillmore Township in Allegan County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Strawser Incorporated $ 241,349.92 Same 1 ** Terry Construction, Inc. $ 254,263.32 Same 2

2 Bidders

Source of Funds: 60590A State Restricted Trunkline Funds 100 % 51. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211048 $ 658,772.00 $ 626,600.00 PROJECT IM 33045-60536 LOCAL AGRMT. 02-5499, 02-5500 % OVER/UNDER EST. START DATE - JUNE 02, 2003 COMPLETION DATE - JUNE 26, 2003 -4.88 %

3.51 mi of hot mix asphalt cold milling and resurfacing, ramp and shoulder sealing on I-496 from I-96 north to Trowbridge Road exit in the cities of Lansing and East Lansing in Ingham County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

Thompson-McCully Company $ 626,600.00 Same 1 ** Aggregate Industries - Central Regi $ 684,156.45 Same 2

2 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

60536A Federal Highway Administration Funds 90.00 % City of Lansing 0.68 % State Restricted Trunkline Funds 9.32 % 52. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

*Denotes a non-standard contract/amendment 11/7/02 Page 26 of 36

PROPOSAL 0211049 $ 907,572.14 $ 937,382.50 PROJECT M 09101-60250 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - SEPTEMBER 01, 2003 3.28 %

12.320 mi of overband crack fill, single chip seal, shoulder chip seal, and single course microsurfacing on US-10 from west of Flajole Road to I-75/US-23 and on M-25 from I-75/US-23 to Bay City city limits in Bangor, Monitor and Williams Townships, Bay County.

A 2003 highway preventive maintenance project.

BIDDER AS-READ AS-CHECKED

John Carlo, Inc. $ 952,050.96 Same 2 Highway Maintenance and Constructio D & D Contracting, Inc. Strawser Incorporated $ 1,018,220.33 Same 3 Fahrner Asphalt Sealers, Inc. $ 1,144,232.20 Same 4 Terry Construction, Inc. $ 937,382.50 Same 1 **

4 Bidders

Source of Funds: 60250A State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 27 of 36

LOCAL PROJECTS 53. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211012 $ 775,917.07 $ 759,961.00 PROJECT CM 41401-50242-2 LOCAL AGRMT. 02-5421 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - 270 calendar days -2.06 %

Installation of remote radio repeaters for area wide signal system in the city of Grand Rapids, Kent County.

BIDDER AS-READ AS-CHECKED

Windemuller Electric, Inc. Trans Tech Electric, L.P. $ 847,789.00 Same 2John R. Howell, Inc. $ 759,961.00 Same 1 **

DVT Electric, Inc 2 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

50242A Federal Highway Administration Funds 99.05 % Grand Rapids 0.95 %

*Denotes a non-standard contract/amendment 11/7/02 Page 28 of 36

54. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211013 $ 507,361.50 $ 472,262.35 PROJECT STUL 39405-72432 LOCAL AGRMT. 02-5488 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JULY 03, 2003 -6.92 %

0.69 km of roadway reconstruction including machine grading, removing bituminous surface, bituminous pavement, drainage structures, sanitary sewer, concrete curb and gutter, and pavement markings on 11th Street from north of Parkview Avenue to Stadium Drive, Kalamazoo County.

6.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Hoffman Bros., Inc. $ 498,086.55 Same 3 Kamminga & Roodvoets, Inc. $ 603,474.58 Same 8 Milbocker and Sons, Inc. Peters Construction Co. $ 472,262.35 Same 1 ** Bailey Excavating, Inc. Kalin Construction Co., Inc. $ 474,594.06 Same 2 Nashville Construction Company $ 619,360.38 $ 619,040.38 9 Brenner Excavating, Inc. $ 543,269.10 Same 5 Niles Concrete Sawing & Constructio Balkema Excavating, Inc. $ 572,785.75 Same 7 Robert Bailey Contractors, Inc. $ 513,913.13 Same 4 Triangle Excavators, Inc. $ 567,780.80 $ 568,530.80 6

9 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

72432A Kalamazoo County 23.90 % Federal Highway Administration Funds 76.10 %

*Denotes a non-standard contract/amendment 11/7/02 Page 29 of 36

55. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211014 $ 862,190.00 $ 819,845.50 PROJECT CMG 81406-53651 LOCAL AGRMT. 02-5477 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - DECEMBER 15, 2003 -4.91 %

Interconnect signals citywide in the city of Ann Arbor, Washtenaw County.

BIDDER AS-READ AS-CHECKED

Harlan Electric Company Severance Electric Co., Inc. Posen Construction, Inc. Trans Tech Electric, L.P. $ 954,920.00 Same 4 Motor City Electric Utilities Co. $ 1,196,288.97 Same 5 Metropolitan Power & Lighting, Inc. John R. Howell, Inc. $ 867,832.00 Same 2 Rauhorn Electric, Inc. $ 819,845.50 Same 1 ** Corby Energy Services, Inc. $ 872,719.50 Same 3

5 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

53651A Federal Highway Administration Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 30 of 36

56. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211015 $ 2,725,697.00 $ 2,064,882.74 PROJECT EDCF 25544-50109 LOCAL AGRMT. 02-5474 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - AUGUST 30, 2003 -24.24 %

1.53 km of widening from two (2) to five (5) lanes with curb and gutter on Holly Road from I-75 to McCandlish Road in Genesee County.

7.00 % DBE participation required BIDDER AS-READ AS-CHECKED

Saginaw Asphalt Paving Co Valley Asphalt Company A. J. Rehmus & Son, Inc. Lanzo Construction Company $ 2,391,747.71 Same 7 Fisher Contracting Company Thompson-McCully Company $ 2,238,881.78 Same 2 Ajax Paving Industries, Inc. Angelo Iafrate Construction Company $ 2,300,655.17 Same 5 Dan's Excavating, Inc $ 2,430,523.83 Same 10 W.P.M. Inc. Champagne and Marx Excavating Barrett Paving Materials, Inc. Rohde Brothers Excavating,Inc. C & D Hughes, Inc. $ 2,629,307.16 Same 14 ABC Paving Company $ 2,647,384.62 Same 15 Pamar Enterprises Inc Zito Construction Co. $ 2,240,100.83 Same 3 L. D'Agostini & Sons, Inc. $ 2,485,187.46 Same 12 The Oakland Excavating Company $ 2,526,205.13 Same 13 Six-S, Inc. $ 2,400,142.00 Same 9 Ron Bretz Excavating, Inc. $ 2,374,092.51 Same 6 Genoak Construction Company $ 2,064,882.74 Same 1 ** Youngs Environmental Cleanup, Inc. $ 2,297,268.07 Same 4 L. J. Construction, Inc. $ 2,442,336.82 Same 11 M.V.A. Contracting Corp. Todd T. Kneisel Construction Co. $ 2,392,767.95 Same 8

15 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

50109A Genesee County 20.00 % Federal Highway Administration Funds 80.00 %

*Denotes a non-standard contract/amendment 11/7/02 Page 31 of 36

57. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211019 $ 6,502,563.70 $ 5,219,131.31 PROJECT ABHT 39042-47647 , ETC LOCAL AGRMT. 02-5473 % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - JUNE 01, 2004 -19.74 %

Removal of existing structures, construction of prestressed concrete box beam bridges, and related approach work on South Sprinkle Road over the Norfolk Southern Railroad, South Sprinkle Road over the Kalamazoo River and South Sprinkle Road Over M-96 (King Highway) in Comstock Township, Kalamazoo County.

4.00 % DBE participation required BIDDER AS-READ AS-CHECKED

C.A. Hull Co., Inc. L. W. Lamb, Inc. E. C. Korneffel Co. J. Slagter & Son Construction Co Milbocker and Sons, Inc. $ 5,219,131.31 Same 1 ** Midwest Bridge Company $ 6,788,548.74 Same 7 Hardman Construction, Inc. $ 5,740,481.78 Same 4 Posen Construction, Inc. $ 5,797,203.75 Same 6 Walter Toebe Construction Co. $ 5,764,941.20 Same 5 E.T. MacKenzie Company Davis Construction, Inc. Anlaan Corporation $ 5,597,043.38 Same 3 Prince Bridge & Marine, LTD. $ 5,315,621.52 Same 2 J.E. Kloote Contracting, Inc.

7 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

47647A Federal Highway Administration Funds 80.00 % State Restricted Trunkline Funds 20.00 % 56552A Kalamazoo County 5.99 % Federal Highway Administration Funds 79.17 % State Restricted Trunkline Funds 14.84 % 59716A Kalamazoo County 6.26 % Federal Highway Administration Funds 78.94 % State Restricted Trunkline Funds 14.80 %

*Denotes a non-standard contract/amendment 11/7/02 Page 32 of 36

58. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211034 $ 429,102.00 $ 386,887.37 PROJECT BRO 63025-53464 , ETC LOCAL AGRMT. 02-5478 % OVER/UNDER EST. START DATE - APRIL 07, 2003 COMPLETION DATE - JUNE 15, 2003 -9.84 %

Removal of two (2) single span steel beam bridges, construction of two (2) single span pressure treated timber bridges and related approach work on Navarra Court over White Lake Canal and on Lake Grove Drive over White Lake Canal, White Lake Township, Oakland County.

BIDDER AS-READ AS-CHECKED

C.A. Hull Co., Inc. E. C. Korneffel Co. $ 497,732.56 Same 7 J. Slagter & Son Construction Co S. L. & H. Contractors, Inc. $ 468,649.12 Same 6 Angelo Iafrate Construction Company Dan's Excavating, Inc $ 417,802.80 Same 2 Posen Construction, Inc. $ 441,564.12 Same 5 Walter Toebe Construction Co. $ 508,174.38 Same 9 E.T. MacKenzie Company $ 386,887.37 Same 1 ** Waterfront Construction Inc $ 439,966.40 $ 439,966.44 4 Prince Bridge & Marine, LTD. Warren Contr & Dev. $ 499,949.00 Same 8 Heystek Contracting Inc. L. J. Construction, Inc. $ 424,760.00 Same 3

9 Bidders

By association with the above construction contract we are also asking for approval of the above-referenced cost participation agreement.

Source of Funds:

53464A Oakland County 5.47 % Federal Highway Administration Funds 79.60 % State Restricted Trunkline Funds 14.93 % 56616A Oakland County 6.21 % Federal Highway Administration Funds 78.98 % State Restricted Trunkline Funds 14.81 %

*Denotes a non-standard contract/amendment 11/7/02 Page 33 of 36

REAL ESTATE PROJECTS 59. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID

PROPOSAL 0211042 $ 119,200.00 $ 93,800.00 PROJECT NH 41064-33336B01 , ETC LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - DECEMBER 31, 2004 -21.31 %

Demolition of department owned real estate parcels in Robinson and Allendale Townships, Ottawa County and in Caledonia and Grand Rapids Townships, Kent County.

BIDDER AS-READ AS-CHECKED

Bierlein Companies, Inc. $ 105,800.00 Same 2Pitsch Wrecking Company $ 93,800.00 Same 1 **

Homrich, Inc. Dore & Associates Contracting, $ 133,400.00 Same 4 E.T. MacKenzie Company $ 110,480.00 Same 3

4 Bidders

Source of Funds: 33336B01 Federal Highway Administration Funds 81.85 % State Restricted Trunkline Funds 18.15 % 47840B03 State Restricted Trunkline Funds 100 % 56066B01 State Restricted Trunkline Funds 100 % 59320B01 State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 34 of 36

60. LETTING OF NOVEMBER 01, 2002 ENG. EST. LOW BID PROPOSAL 0211046 $ 15,000.00 $ 10,700.00 PROJECT M 73171-73423 LOCAL AGRMT. % OVER/UNDER EST. START DATE - 10 days after award COMPLETION DATE - DECEMBER 31, 2005 -28.67 %

Demolition of department owned real estate parcels in Saginaw County.

BIDDER AS-READ AS-CHECKED

Bierlein Companies, Inc. $ 17,800.00 Same 3 Pitsch Wrecking Company $ 26,000.00 Same 7 Bourdow Trucking Company $ 20,958.00 Same 5 Homrich, Inc. $ 24,700.00 Same 6 Dore & Associates Contracting, $ 20,700.00 Same 4 Champagne and Marx Excavating Rohde Brothers Excavating,Inc. $ 17,100.00 Same 2 Shaw Contracting/CRS $ 10,700.00 Same 1 **

7 Bidders

Source of Funds: 73423B-01 State Restricted Trunkline Funds 100 %

*Denotes a non-standard contract/amendment 11/7/02 Page 35 of 36

In accordance with MDOT’s policies and procedures and subject to concurrence by the Federal Highway Administration, the preparation and execution of the appropriate documents approved by the Attorney General, and compliance with all legal and fiscal requirements, the Director recommends for approval by the State Administrative Board the items on this agenda. The approval by the State Administrative Board of these contracts does not constitute the award of same. The award of contracts shall be made at the discretion of the Director-Department of Transportation when the aforementioned requirements have been met. Subject to exercise of that discretion, I approve the contracts described in this agenda and authorize their award by the responsible management staff of MDOT to the extent authorized by, and in accordance with, the December 14, 1983, resolution of the State Transportation Commission and the Director’s delegation memorandum of January 16, 2001.

Respectfully submitted,

Gregory J. Rosine Director

*Denotes a non-standard contract/amendment 11/7/02 Page 36 of 36