Page 1: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

Agenda for 498th Meeting ofOperation amp Coordination Sub-Committee of WRPCto be held on 22nd August 2017 at WRPC Mumbai

Item No 1 CONFIRMATION OF THE MINUTES

Minutes of 497th meeting of Operation amp Coordination Sub-Committee(OCC) of WRPC held on 20th July 2017 at WRPC Mumbai were forwarded videletter No WRPCOPNOCC-Minutes2017-1811931 dated 28072017

No Comments have been received Sub-committee may confirm theminutes

Sub-Committee may discuss and confirm the Minutes

Item No 2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OFJULY 2017

21 FREQUENCY PARTICULARS

The average frequency during the month of July 2017 was 4999 Hz Themaximum instantaneous frequency was 5026 Hz at 080050 hrs on06072017 while minimum instantaneous frequency was 4969 Hz at205640 hrs on 09072017 The frequency profile during July 2017 was asunder

Range 01st ndash 31st July 2017( time)

01st ndash 30th June2017( time)

IEGC band(499 lt f lt 5005 Hz) 7615 7505

lt 499 Hz 656 581

gt 5005 Hz 1729 1869

The frequency particulars is enclosed at Annex-21

The Sub-Committee may kindly note

498th OCC AGENDA

22 INTER-REGIONAL EXCHANGES

There was a net inter-regional export of 6904 MUs from WR to other

regions against net export schedule of 6882 MUs

SCH DRAWL ODUDWR-ER 71 -1055 -1126WR-NR -4878 -3975 903WR-SR -2075 -1874 201WR NET -6882 -6904 -22

The Sub-Committee may kindly note

23 VOLTAGE PROFILE

Voltage profile at some of 765400 kV sub-stations during the month of

July 2017 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may kindly note

24 UF RELAY OPERATIONS

As per WRLDC records during July 2017 the system frequency didnrsquot

reach 495 Hz and no UFR operation was reported to WRLDC

The Sub-Committee may kindly note25 POWER CUTS LOAD RESTRICTIONS

Details of Power Cuts and Regulatory measures during July 2017 as

furnished by the State utilities are given in Annex 25

The Sub-Committee may kindly note

498th OCC AGENDA

26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES

Details of generating units under forced outages during July 2017 aregiven in Annex-26

The Sub-Committee may kindly note

27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES

The details of generating units under Planned Outages during July 2017are given in Annex-27

The Sub-Committee may kindly note

Item No 3 OPERATIONAL PLANNING

31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August

amp September 2017 is given in Annex 31

The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

List of proposals for transmission elements outage to be availed during

the month of September 2017 is given in Annex 32

The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017

Details of anticipated restricted amp un-restricted demands for the months

of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate

Item No 4 Operational Statistics for the month of July 2017

The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure

498th OCC AGENDA

Annex 41 - Actual Generation and Requirement for July 2017

Annex 42 - Peak Demand Schedule Vs Actual for July 2017

Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017

Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017

The Sub-Committee may kindly note

Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the

month of July 2017 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE

SYSTEM

Following Constituents have furnished the status of healthiness of SERsDRs

in their systems on the dates below

Sl No Name of Constituent Date ofReceipt

1 PGCILWRTS-I 06062017

2 PGCILWRTS-II 06072017

3 MPPTCL 20072017

4 NTPC 05062017

5 CSPTCL 03082017

6 GETCO 20072017

7 MSETCL 07082017

8 DDDNH

9 GOA 11062017

10 NPCIL

11 NCASSP

12 NHDC

13 Jindal PL 12052017

14 CGPL 05062017

498th OCC AGENDA

15 DB POWER 07082017

16 KWPCL

17 ACBILTRN ENERGY 03082017

18 KSK 14072017

19 GMR CHHATTISHGARH

20 JNSTPS 08052017

21 MB POWER

22 SASAN UMPP 12052017

23 NSPCL 12052017

24 RGPPL

25 SUGEN 08052017

26 RKM POWER

27 ESSAR POWER 08052017

28 BDTCLJTCLRTCL 12052017

29 RELIANCETRANSMISSION

12052017

30 ADANI POWER 03072017

31 JHABUA POWER 11052017

32 EPTCL 08052017

33 TPGL 11052017

The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting

Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR

71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 2: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

22 INTER-REGIONAL EXCHANGES

There was a net inter-regional export of 6904 MUs from WR to other

regions against net export schedule of 6882 MUs

SCH DRAWL ODUDWR-ER 71 -1055 -1126WR-NR -4878 -3975 903WR-SR -2075 -1874 201WR NET -6882 -6904 -22

The Sub-Committee may kindly note

23 VOLTAGE PROFILE

Voltage profile at some of 765400 kV sub-stations during the month of

July 2017 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may kindly note

24 UF RELAY OPERATIONS

As per WRLDC records during July 2017 the system frequency didnrsquot

reach 495 Hz and no UFR operation was reported to WRLDC

The Sub-Committee may kindly note25 POWER CUTS LOAD RESTRICTIONS

Details of Power Cuts and Regulatory measures during July 2017 as

furnished by the State utilities are given in Annex 25

The Sub-Committee may kindly note

498th OCC AGENDA

26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES

Details of generating units under forced outages during July 2017 aregiven in Annex-26

The Sub-Committee may kindly note

27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES

The details of generating units under Planned Outages during July 2017are given in Annex-27

The Sub-Committee may kindly note

Item No 3 OPERATIONAL PLANNING

31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August

amp September 2017 is given in Annex 31

The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

List of proposals for transmission elements outage to be availed during

the month of September 2017 is given in Annex 32

The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017

Details of anticipated restricted amp un-restricted demands for the months

of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate

Item No 4 Operational Statistics for the month of July 2017

The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure

498th OCC AGENDA

Annex 41 - Actual Generation and Requirement for July 2017

Annex 42 - Peak Demand Schedule Vs Actual for July 2017

Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017

Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017

The Sub-Committee may kindly note

Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the

month of July 2017 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE

SYSTEM

Following Constituents have furnished the status of healthiness of SERsDRs

in their systems on the dates below

Sl No Name of Constituent Date ofReceipt

1 PGCILWRTS-I 06062017

2 PGCILWRTS-II 06072017

3 MPPTCL 20072017

4 NTPC 05062017

5 CSPTCL 03082017

6 GETCO 20072017

7 MSETCL 07082017

8 DDDNH

9 GOA 11062017

10 NPCIL

11 NCASSP

12 NHDC

13 Jindal PL 12052017

14 CGPL 05062017

498th OCC AGENDA

15 DB POWER 07082017

16 KWPCL

17 ACBILTRN ENERGY 03082017

18 KSK 14072017

19 GMR CHHATTISHGARH

20 JNSTPS 08052017

21 MB POWER

22 SASAN UMPP 12052017

23 NSPCL 12052017

24 RGPPL

25 SUGEN 08052017

26 RKM POWER

27 ESSAR POWER 08052017

28 BDTCLJTCLRTCL 12052017

29 RELIANCETRANSMISSION

12052017

30 ADANI POWER 03072017

31 JHABUA POWER 11052017

32 EPTCL 08052017

33 TPGL 11052017

The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting

Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR

71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 3: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES

Details of generating units under forced outages during July 2017 aregiven in Annex-26

The Sub-Committee may kindly note

27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES

The details of generating units under Planned Outages during July 2017are given in Annex-27

The Sub-Committee may kindly note

Item No 3 OPERATIONAL PLANNING

31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August

amp September 2017 is given in Annex 31

The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period

32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

List of proposals for transmission elements outage to be availed during

the month of September 2017 is given in Annex 32

The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017

Details of anticipated restricted amp un-restricted demands for the months

of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate

Item No 4 Operational Statistics for the month of July 2017

The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure

498th OCC AGENDA

Annex 41 - Actual Generation and Requirement for July 2017

Annex 42 - Peak Demand Schedule Vs Actual for July 2017

Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017

Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017

The Sub-Committee may kindly note

Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the

month of July 2017 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE

SYSTEM

Following Constituents have furnished the status of healthiness of SERsDRs

in their systems on the dates below

Sl No Name of Constituent Date ofReceipt

1 PGCILWRTS-I 06062017

2 PGCILWRTS-II 06072017

3 MPPTCL 20072017

4 NTPC 05062017

5 CSPTCL 03082017

6 GETCO 20072017

7 MSETCL 07082017

8 DDDNH

9 GOA 11062017

10 NPCIL

11 NCASSP

12 NHDC

13 Jindal PL 12052017

14 CGPL 05062017

498th OCC AGENDA

15 DB POWER 07082017

16 KWPCL

17 ACBILTRN ENERGY 03082017

18 KSK 14072017

19 GMR CHHATTISHGARH

20 JNSTPS 08052017

21 MB POWER

22 SASAN UMPP 12052017

23 NSPCL 12052017

24 RGPPL

25 SUGEN 08052017

26 RKM POWER

27 ESSAR POWER 08052017

28 BDTCLJTCLRTCL 12052017

29 RELIANCETRANSMISSION

12052017

30 ADANI POWER 03072017

31 JHABUA POWER 11052017

32 EPTCL 08052017

33 TPGL 11052017

The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting

Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR

71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 4: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

Annex 41 - Actual Generation and Requirement for July 2017

Annex 42 - Peak Demand Schedule Vs Actual for July 2017

Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017

Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017

The Sub-Committee may kindly note

Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the

month of July 2017 However the details of minor incidences during the month

received from WRLDC are enclosed at Annexure-5

The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE

SYSTEM

Following Constituents have furnished the status of healthiness of SERsDRs

in their systems on the dates below

Sl No Name of Constituent Date ofReceipt

1 PGCILWRTS-I 06062017

2 PGCILWRTS-II 06072017

3 MPPTCL 20072017

4 NTPC 05062017

5 CSPTCL 03082017

6 GETCO 20072017

7 MSETCL 07082017

8 DDDNH

9 GOA 11062017

10 NPCIL

11 NCASSP

12 NHDC

13 Jindal PL 12052017

14 CGPL 05062017

498th OCC AGENDA

15 DB POWER 07082017

16 KWPCL

17 ACBILTRN ENERGY 03082017

18 KSK 14072017

19 GMR CHHATTISHGARH

20 JNSTPS 08052017

21 MB POWER

22 SASAN UMPP 12052017

23 NSPCL 12052017

24 RGPPL

25 SUGEN 08052017

26 RKM POWER

27 ESSAR POWER 08052017

28 BDTCLJTCLRTCL 12052017

29 RELIANCETRANSMISSION

12052017

30 ADANI POWER 03072017

31 JHABUA POWER 11052017

32 EPTCL 08052017

33 TPGL 11052017

The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting

Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR

71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 5: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

15 DB POWER 07082017

16 KWPCL

17 ACBILTRN ENERGY 03082017

18 KSK 14072017

19 GMR CHHATTISHGARH

20 JNSTPS 08052017

21 MB POWER

22 SASAN UMPP 12052017

23 NSPCL 12052017

24 RGPPL

25 SUGEN 08052017

26 RKM POWER

27 ESSAR POWER 08052017

28 BDTCLJTCLRTCL 12052017

29 RELIANCETRANSMISSION

12052017

30 ADANI POWER 03072017

31 JHABUA POWER 11052017

32 EPTCL 08052017

33 TPGL 11052017

The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting

Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR

71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18

SlNo

400 kVSubStn

Size(MVAr)

Implementingagency

Expected date ofcommissioning

1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 6: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected

(Tendering done)6 Satpura-ISP

Line Rx50 MPPGCL Dec-2017

Chief Engineer SLDC Maharashtra informed following during themeeting

a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur

Solapur by MSETCL ndashTender are floated for above 3 Number

substation

b Planning of additional shunt reactors in south Maharashtra ndash

shunt reactors are planned under phase- II by MSETCL Proposed

125 MVAR Bus reactors are at following 400 KV substations-

1 Chandrapur-II

2 Koradi-II

3 Khaparkheda

4 Bhusawal-II

5 Lonikand-II

6 Chakan

7 Kudus

The WR utilities may kindly intimate the current status on above

72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES

The updated status on various ongoing transmission schemes for the

year 2017-18 as per the current information available is as follows -

SlNo

Name of the Line Cktkm

TargetCompletionDate

Remarks

Powergrid1 400 kV Vapi ndash Kudus DC

Line234 Dec -17 ROWForest

problem

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 7: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

2 765 kV Wardha Nizamabad-Hyderabad DC

577+486

Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017

3 400 kV Aurangabad ndashBoisar line DC line

690 Sept -17

4 765 kV Aurangabad (PG) ndashPadghe (PG) DC

570 Dec -17

5 800 kV Champa ndashKurukshetra Bipole

2574 One pole testcharged on25012017Pole twoexpected at endof July 2017

6 400 kV MOUDA ndashBETUL PG LINES

393 Charged on

7 800 kV Raigarh-PugalurHVDC Bipole

3676 Nov-19 4 out of 10packagesawarded

8 400 kV Lara-Champa 224 Charged on30062017

9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj

DC190 Dec 18

Chhattishgarh1 400 kV DCDS Raipur (Raita)-

Jagdalpur(DCDS)Commissionedon 26052017

2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason

Dec -17

Gujarat1 400 kV DC Vadinar-Amreli

line11685 Dec -17

2 400kV APL-Hadala LILO toHalvad

8940 Oct -17

3 400 kV DC Amreli-Kasorline(Part-1)

16095 March -18

4 400 kV DC Amreli-Kasorline(Part-2)

16434 March -18

5 400 kV DC Amreli-Kasorline(Part-3)

14526 March -18

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 8: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV

498th OCC AGENDA

6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17

8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana

Dc27616 June 20

Madhya Pradesh

Maharashtra (STU)1 400 kV Bableshwar-Kudus

DC (Quad)July -18 Forest clearance

awaited severeROW problem

Adani Transmission Ltd1 765 kV switching station at

Rajnandgaon- Novrsquo2017 Completed

2 Raipur Pool - Rajnandgaon765 kV DC line

40 Completed Completed

3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line

266 Marrsquo2018

4 400 220 kV Substation atMorena

- Decrsquo2017

5 Gwalior 765 400 kV ndash Morena400 kV DC

48 Julyrsquo2017

6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line

27 Decrsquo2017

7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard

- Decrsquo2017

8 1-No 765 kV line bay at SasanUMPP

- Decrsquo2017

9 Sasan UMPP - VindhyachalPooling station 765 kV SCline

6 Decrsquo2017

10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune

64 Marrsquo2018

11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line

94 Decrsquo2017

12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line

49 Decrsquo2017

498th OCC AGENDA

13 Bilaspur pooling station ndashRajnandgaon765 kV DC line

162 Decrsquo2017

14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line

Decrsquo2017

15 1 No 765 kV Line bay at SipatSTPPS of NTPC

Completed ampCharged on30052017

The WR utilities may intimate the current status on above

73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18

The status regarding Generating units commissioned expected to be

commissioned during the current year 2017-18 according the available

information is as below

Name of the Power Projects UnitNo

Capacity(MW)

Date of CommissioningSchedule Date

GujaratNIL

ChhattisgarhNIL

MaharashtraCHANDRAPUR 8 500 COD on 04062016

CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016

Madhya Pradesh

Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017

BLA 2 45 Commissioned on20032017

Central sectorIPP

KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on

12062017 COD yet tobe done

SKS 2 300 Expected by Sept 2017

498th OCC AGENDA

Rattan India 3 270 Achieved full load on14042017

NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done

NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on

25032017 COD yet tobe done

NTPC Solapur 2 660 April 2018

The WR utilities may intimate the current status on above

Item No 8 MISCELLANEOUS OPERATIONAL ITEMS

81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR

The current status of submission of CMP and PampCS report (constituent wise)

for the fourth quarter (January 2017 to March 2017) is given below

SrNo

Name ofConstituents

CMP Status PampCS Status

1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017

__

2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017

__

3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017

5 MAHARASHTRA Submitted status by SLDCMaharashtra

6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC

498th OCC AGENDA

13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN

ENERGYStatus Submitted on 05072017

18 KSK Status Submitted on 1407201719 GMR

CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017

23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE

TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL

All other constituents are requested to submit the Status Report

82 Monitoring of Schemes funded from PSDF

In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it

was decided that all the RPCs in the monthly OCC meetings may follow up

with the utilities to expedite the completion of schemes by giving due

priority The implementation of most of the schemes are based on the

recommendation of the enquiry committee on grid disturbance of July 2012

headed by Chairperson CEA Therefore timely implementation of these

schemes would enhance the grid security and reliability Accordingly the

details of grant sanctioned from PSDF for the schemes of Western Region is

enclosed at Annexure-82A for the deliberation in the meeting The NPC

has further directed that the status of implementation of above schemes

(physical as well as financial progress) may be reviewed and the utilities be

requested to expedite implementation of the schemes The utilities were

advised to furnish the information in the format enclosed at Annexurendash

82B by first week of every month on regular basis to Member Convener

498th OCC AGENDA

PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC

amp WRPC division

Gujarat amp Madhya Pradesh have submitted progressstatus in

prescribed format (Annexure 82C1 and C2)

All other utilities to whom the grants have been sanctioned are

requested to update on the progress of the schemes at the earliest as per

format at Annexure 82B

The Sub-Committee may like to discuss the same

83 Ratification of load generation data for Validation Committee

The load generation data for the period of October 2017 to December

2017( Qndash3) is to be ratified for POC charge calculation

The latest load generation sheet received from WRLDC is enclosed at

Annexure 83

The Sub-Committee may like to discuss the same

84 Review of important grid elements in WR grid

Chief Engineer SLDC Gujarat intimated vide email dated 08082017

that in 497th OCC meeting it was decided that the list of important grid

elements (uploaded in WRLDC website) should be reviewed thoroughly Only

very most important elements shall be kept in list The less sensible

elements shall remove from list The outages of such less sensible elements

shall be given by SLDC only looking to intra State grid condition In ensuing

OCCM the outages of very most important elements of WR grid will

discuss

SLDC ndashGujarat vide its letter dated 220717 submitted the list of

elements(attached at Annexure-84) which are less sensible to grid

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

operation The copy of letter is attached herewith SLDC ndashGujarat requested

WRLDC to remove these elements from list of important element of WR grid

Therefore it is necessary that the list of important grid elements of WR

published on WRLDC website shall be revised based on input given by SLDC

ndash Gujarat

The Sub-Committee may like to discuss the same

Item No 9 WRLDC AGENDA ITEMS

91 STM-1 between WRLDC and Asoj

On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC

For information to OCC

92 Hot line voice communication between WRLDC andSubstationsGenerating Stations

Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below

Status as on 1st Aug 17

498th OCC AGENDA

In 497th OCCM POWERGRID informed that the connectivity of Orange

hotline phone was extended upto the Interface point (MUX) at the nearest

CTU substation Hotline phone sets were also delivered to the concerned

IPPsISGS stations The IPPsISGS need to lay the optic fibre from their

stations to the Interface point to establish the voice communication

The present status of 44stations where hot line voice communication is

yet to be integrated and the present status of voice communication

integration is given below

SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not

integrated from GMR Warora toBhadrawathi for RLDCAction by GMR

2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda

3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur

4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL

5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan

6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco

7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK

8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC

498th OCC AGENDA

Action by Dhariwal

9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS

10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL

11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL

12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM

13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC

14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power

15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL

16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL

17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO

18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL

19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal

20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL

21 WR-II 400 kV Damoh Phone is working but no one isanswering the call

498th OCC AGENDA

22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL

23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL

24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL

25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL

26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL

27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL

28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL

29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL

30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL

31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira

32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN

33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

498th OCC AGENDA

35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC

36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL

37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL

38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL

39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree

40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua

41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power

42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL

44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL

Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working

POWERGRID and other utilities to update the progress

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

93 Primary Response by Generators

The primary response of WR generating units in percentage of ideal

response for last three Grid Events are given below

Highlighted fields corresponds to Zero Generation

On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below

498th OCC AGENDA

Quote

Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs

NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units

All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons

Unquote

In view of above

All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC

498th OCC AGENDA

SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings

OCC may discuss

94 Extension of RGMOFGMO status to SLDC WRLDC

With the support of generating stations WRLDC has integrated RGMO

status of all ISGS and Regional generators in WRLDC SCADA except SSP

The State GeneratorsState IPPs RGMOFGMO visibility at

SLDCWRLDC is in pipeline The present status of RGMOFGMO

visibility of State GeneratorState IPPs at SLDCWRLDC is as follows

Name of

State

Generation

Capacity Mandated

to operate in

RGMOFGMO as

per IEGC

Availability of RGMO

Status at

SLDCWRLDC

of RGMOFGMO

status

VisibilityObservability

at SLDCWRLDC

Maharas

htra 21510 0 0

Gujarat 10196 7650 75

Madhya

Pradesh 6675 2210 33

Chhattisg

arh 2460 0 0

Capacity as on 31st May 2017

498th OCC AGENDA

RGMO Status visibility at SLDC MPWRLDC

RGMO Status visibility at SLDC GujaratWRLDC

States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC

498th OCC AGENDA

95 Telemetry issues

Details of utilities whose data is reporting to WRLDC via unreliable

communication links and whose data is highly intermittent is given

below These utilities may appraise OCC actions being initiated to ensure

100 data availability to WRLDC

Srno

Node Constraints Remarks

1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited

Secondary path through PLCC needsto be established

Balco tointimate thepresent status

2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity

Primary link upto Satna as perconnectivity agreement to beexpedited

Secondary path needs to beestablished

JP Nigrie tointimate thepresent status

3 ChampaHVDC

Telemetry through second gatewaynot available

SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017

4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus

5 400kVLonikhandII

Highly intermittent Maharashtramay update thestatus

498th OCC AGENDA

6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra

Maharashtramay update thestatus

7 Goa The telemetry of Amona amp Kadambanot available

Goa mayintimate thestatus ofAmona

8 DNH The telemetry of DNH not availablesince long

DNH mayupdate thestatus

96 Telemetry of RES

The status of RES telemetry in Maharashtra and WRLDC in the month of

Augrsquo17 is given below The observability of RES telemetry in Maharashtra

is 55

Following Wind developers in Maharashtra are sending pooling data to

WLRDC via FTP

SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)

1 Suzlon 1663 MW

2 Regen 507 MW

3 Continum 80 MW

4 Gamesha 247 MW

5 Panama 72 MW

6 Reliance Global 45 MW

Total 2614 MW

Following Wind developerrsquos data are in pipeline for pooling data to

WLRDC via FTP

498th OCC AGENDA

1 SenvionKenersys

2 Maruti Wind

3 WindwordEnercon

4 TS Wind

5 Inox Wind

6 Vestas Wind

The present status of Telemetred RES at WRLDC is as follows

StateRegion RESInstalledCapacity

(Wind+Solar)in MW

Telemetered RESCapacity at

WRLDC(Wind+Solar) in

MW

of RESVisibilityObservability

at SLDCWRLDC

Gujarat 6578

(5348+1230)

6566 (5339+1227) 998

Maharashtra 5145

(4769+376)

2844 (2614+230) 553

Madhya

Pradesh

3263

(2428+835)

3213 (2378+835) 985

Chhattisgarh 76 (0+76) 66 (0+66) 868

Diu 10 (0+10) 0 0

Daman 41 (0+41) 0 0

WR 15076

(12545+2531)

12689(10331+2538) 842

Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration

97 Operating Procedures for Western Regional Grid

In compliance with IEGC clause 51 (f) Operating Procedures for Western

Regional Grid was updated for the year 2017 and uploaded in WRLDC

website at following URLs

498th OCC AGENDA

httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf

httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf

Utilities are requested to give their valuable feedback

98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations

In Western Region most of the IPPs were connected radially to pooling

stations through two feeders Under N-1 contingency of evacuation path

the total generation is evacuated through single feeder Under N-1-1

contingency there will be a complete blackout at IPP substation Under

N-1 contingency of evacuation path the angular separation between few

IPP generators and pooling substations observed from PSSe studies are

given below

SNoName OfGenerat

or

InstalledCapacity

Generation

considered

Evacuationpath

Considered

Angularseparationbetweenadjacent

busesduring N-1Contingenc

y

Consequences of

N-1-1Contingenc

y

1MB

Power

1200 MW

(2 X 600) 1100MW

400 kV MBPower-Jabalpur PSDC

27 Degree Blackout

2 JPNigrie

1320 MW

(2 X 660)1240MW

400 kV JPNigrie-SatnaDC

18 degree Blackout

3JhabuaPower

1200 MW

(2 X 600) 1100MW

400 kVJhabua-Jabalpur PSDC

9 Degree Blackout

4 GMRRaipur

1370 MW

(2 X 685)1260MW

400 kV GMRRaipur-Durg 75 Degree Blackout

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

DC

5KWPCL

600 MW

(1 X 600)1100MW

400 kVKWPCL-KotraDC

3 degree Blackout

6RKM

1440 MW

(4 X 360)660MW

400 kV RKM-Kotra DC 3 Degree Blackout

7 DBPower

1200 MW

(2 X 600)1100MW

400 kV DBPower-KotraDC

2 Degree Blackout

8KSK

1200 MW

( 2 X 600)1100MW

400 kVChampa-KSKDC

17 Degree Blackout

As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below

Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large

MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned

To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration

498th OCC AGENDA

OCC members may discuss

99 High Voltage nodes in WR

Voltage Deviation Index (VDI) of important nodes in WR is being

computed regularly by WRLDC on daily weekly monthly and yearly

basis and these reports are being published in WRLDC website Based on

VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at

765 kV and 400 kV are given below

Voltage Deviation Index (VDI) - 765 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange

(HHMM)(iii)(i+ii)

VDI

(iii)(Total No

ofHoursin a

Month)

MaxVoltag

e

MinVoltage

lt728kV(i)

728 kV-800 kV

gt800kV(ii)

1 Durg 8089 77374 000 8369 1631 12122 016

2 Kotra 80485 78497 000 9454 546 4037 005

3 Tamnar 80504 78511 000 9779 221 1626 002

4Vadodar

a 80591 76307 000 9862 138 1016 001

Voltage Deviation Index (VDI) - 400 kV Substations

SNoStationName

Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of

VDI

(iii)(Total No of

MaxVoltage

MinVoltage

lt380kV

380kV-420

kV

gt420kV

498th OCC AGENDA

IEGCrange(HHMM) (iii)(i+ii)

Hours ina Month)

1 Karad 43403 38215 000 2261 7739 57548 077

2 Dhule 43674 40236 000 2532 7468 55537 075

3 Raigarh 42676 41535 000 2549 7451 55421 075

4 Wardha 42887 38132 000 3450 6550 48718 065

5 Dehgam 43643 38083 000 4237 5763 42844 058

6 Kalwa 43729 39762 000 5467 4533 33714 045

7 Parli 43402 39629 000 6025 3975 29546 040

8 Mapusa 43386 38932 000 6716 3284 24421 033

9 Kasor 42674 40979 000 6890 3110 23125 031

10 Damoh 42634 38448 000 7431 2569 19106 026

11 Amreli 42954 4055 000 7756 2244 16656 022

12 Vapi 42995 39377 000 8062 1938 14412 019

13 Raipur 42485 40000 000 8089 1911 14211 019

14Khandw

a 42966 4049 000 8470 1530 11349 015

15Magarw

ada 42865 39261 000 8648 1352 10034 014

16 Boisar 42731 39137 000 9124 876 6511 009

17 Nagda 42565 4046 000 9249 751 5551 008

18 Kala 42665 39096 000 9294 706 5231 007

Above computations are based on WRLDC SCADA Data

Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam

OCC may like to discuss

498th OCC AGENDA

910 Voltage regulation by RES

As per section 164 of the CEAs Manual on transmission planning

criteria The wind and solar farms shall maintain a power factor of 098

(absorbing) at their grid interconnection point for all dispatch scenarios

by providing adequate reactive compensation

In addition to the above the manual on transmission planning criteria

states that there shall be no reactive power flow UP through 400220 kV

400132 kV 220132 kV 22066 kV whenever voltage on HV side of

such ICT is more than 1025 per unit

Severe high voltage is observed at various locations in WR grid

particularly when the injection from RES is high

At the interstate level there is a mechanism for voltage dependent

reactive energy settlement Reactive charges are payable for MVAR

injection at voltage gt 103 of nominal Similarly Reactive charges are

payable for MVAR drawal at voltage lt 97 of nominal at the interface

point

SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following

Tariff structure for Reactive Energy exchange by RES in theirStates

Constraints if any for utilizing the available capability of RESfor voltage regulation

911 Electricity Demand Pattern Analysis

POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo

for all the States based on the statistical analysis of eight (8) yearsrsquo time-

series SCADA data The report is available at

498th OCC AGENDA

httpsposocoinreportselectricity-demand-pattern-analysis

The report provides useful information on demand pattern

decomposition of demand data into seasonal and trends etc at an all

India level each of the five (5) regions and thirty four (34) statesUTs

This information will be helpful in generation transmission and

distribution planning by the central and state level power system

planning agencies The utilities could refer this report for power

procurement and portfolio management

For information to OCC

912 Status of Implementation of SAMAST

This subject was discussed in 75th CCM and 34th WRPC meetings

It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states

The checklist for implementation of SAMAST in SLDC is as tabulatedbelow

S No Activity

1 Identification of Intra State Entities

2 Demarcation of Interface boundary for each Intra State Entity

3 Assessment of Meters - Main Check and Standby

4 Assessment of Automatic Meter Reading logistics requirement

5 Assessment of IT infrastructure (Hardware and Software)requirement

6 Preparation of Bill of Quantities (considering logistics alreadyin place)

498th OCC AGENDA

7 Preparation of Detailed Project Report and completion of firststakeholder workshop

8 Approval of the State-specific SAMAST scheme by SERC

9 Commencement of Load Forecasting by SLDC

10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities

11 Formation of a State Power Committee for preparation ofAccount

12 Establishment of State Regulatory Pool Account

13 Application for funding from Central GovernmentPSDF

14 Inviting tenders

15 Placement of Award

16 Adequacy of Human Resources in SLDC as approved by SERC

17 Implementation of the recommended IT infrastructure-Hardware

18 Completion of boundary metering and AMR system (as perDPR)

19 Implementation of the recommended IT applications- Software

a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website

20 Computation of transmission losses for each 15-min by SLDC

498th OCC AGENDA

21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website

a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra

State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra

STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection

Withdrawalh Implemented Schedule ndash DC Entitlement Injection

Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid

i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from

SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks

k Plot of measured Transmission Losses for at least fourweeks

22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation

23 Two stakeholder workshops by SLDC on SAMAST system

24 Quarterly Reconciliation Certificate from all State Poolmembers

25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC

All SLDCs may furnish the compliance with respect to each point

Item No 10 DATE AND VENUE OF NEXT OCC MEETING

It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017

The Sub- Committee may like to note as above

Anaulagnak 21

maah jaulaa[- 2017

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4999 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000

485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000

485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000

488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000

495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909

497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0

TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2017

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

जलाई2017

Voltage Profile during the month of July2017 Annex-23

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417

10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419

400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior

भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418

422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395

10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419

Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

400kV 400kV

धल बोईसर कलवा कराड़ असोज दहगाम

16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381

422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381

Date

Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755

10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763

इदौर

765Kv 765KvIndoreBina

400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा

16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768

427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752

Date

Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769

10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768

Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771

780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757

( )

Power System Operation Corporation Ltd

(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai

ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday

then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered

2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs

3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

process HTLT Industries M(b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

SaUnya NilSaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-PhaseSupply(DLF)

01072017 31072017 2319 2233 2258

21 Three-PhaseSupply(Irrigation)

01072017 31072017 2330 2236 2311

21 Three-PhaseSupply(Mixed)

01072017 31072017 0949 0917 0939

3 Anya jaanakarI3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

idnaaMk Datetk To idnaaMk

DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

Max(Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337

ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

pit idna kula jaa- kTaOtITotal Energy Cut

(MUs dayFrom To

(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717

SaUnya Nil

0-00 MW

SaUnya Nil

0000

SaUnya Nil

2400

SaUnya Nil

000MUsday

(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012

SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900

22 Single-Phase Supply 01072017 31072017 1800 1800 1800

3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samayaRestriction Time

p`it idna kulajaa- kTaOtI

TotalEnergy Cut(MUs day)

sao From tkTo

(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump

(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)

(B) Un-Scheduled(a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)0000 (Av)0000(Av)0000 (Av)

1Rural 6530 MW (Avg) For 9903 Hrs

2Town Feeders (C-1to C-6 amp X) 000(Av)

-

-

-0000

--

-

-

-

-0000

--

-

-

-

-

-000

--

020

-

3 Industries 8437 MW (Avg) For 12309Hrs

029

Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply

- - - -

2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector

ivavarNa Details sao FromidnaaMk Date

tk ToidnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -

3 Anya jaanakarI Any other information SaUnya Nil

Annex-26

जलाई 2017Details of forced unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period

2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem

3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem

4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD

5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD

6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD

7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD

8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD

9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault

10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD

11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD

12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD

13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS

14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD

15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD

16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD

17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD

18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow

19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD

20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD

21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD

22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD

23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD

24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem

25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD

26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD

27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD

28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD

29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD

30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD

31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD

32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL

33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD

34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD

35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal

36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH

37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD

38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD

39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD

40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL

41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD

42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD

43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD

44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD

45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL

46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD

47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD

48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD

49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL

50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD

51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD

52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD

53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD

54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD

55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD

56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD

57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD

58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD

59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown

60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown

61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown

62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule

63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch

64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL

65 पायोनीरPIONEER(262+127) 1

MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule

66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule

67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule

68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule

69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work

70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule

71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule

72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage

73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage

74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule

75 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule

76 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule

77 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule

78 खापरखड़ाKhaparkheda 5

MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule

79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)

80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem

81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension

82 खापरखड़ाKhaparkheda 1

MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD

83 खापरखड़ाKhaparkheda 3

MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL

84 खापरखड़ाKhaparkheda 4

MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low

85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule

86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD

87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule

88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem

89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem

90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule

91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork

92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL

93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL

94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance

95 आरजीपीपीएलRGPPL-1B

RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage

96 आरजीपीपीएलRGPPL-1A

RGPPL 320 1330 8-07-2014 Still out Still out Less requisition

97 आरजीपीपीएलRGPPL 2A

RGPPL 230 1805 18-05-2017 Still out Still out Unit change over

98 आरजीपीपीएलRGPPL 2B

RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable

99 AMRAVATITPP(INDIABULL)-3

RATTAN POWERINDIA LTD

270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5

100 AMRAVATITPP(INDIABULL)-4

RATTAN POWERINDIA LTD

270 0020 09-06-2017 Still out Still out Low Schedule

101 AMRAVATITPP(INDIABULL)-5

RATTAN POWERINDIA LTD

270 0139 09-06-2017 Still out Still out Low Schedule

102 AMRAVATITPP(INDIABULL)-2

RATTAN POWERINDIA LTD

270 0424 09-06-2017 Still out Still out Low Schedule

103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem

104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD

105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD

106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD

107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD

108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD

109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD

110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD

111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD

112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD

113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD

114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel

115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL

116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem

117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD

118KORBA(W) EXTN

CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL

119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL

120KORBA(W) CSETCL 3

CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer

121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High

122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel

123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL

124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem

125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage

126 एपीएल मदराAPL Mundra 3

Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock

127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition

128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD

129 एपीएमएल मदराAPL Mundra 7

Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017

Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss

130 एपीएमएल मदराAPL Mundra 3

Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD

131 एपीएमएल मदराAPL Mundra 1

Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD

132 एपीएमएल मदराAPL Mundra 8

Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem

133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD

134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem

135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to

heavy jerk

136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule

137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule

138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection

139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD

140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD

141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD

142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule

143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule

144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule

145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage

146GMR CHHATISGARH 2

GMR 685 0110 02-08-2016 Still out Still out No Schedule

147GMR_CHHATISGARH 1

GMR 685 0200 22-07-2017 Still out Still out No schedule

148 झाबआ पावरJhabua Power 1

JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip

149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated

150KSK Mahanadi 1

KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking

151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline

152 आरकएम पावरRKM Power 2

RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains

153 आरकएम पावरRKM Power 1

RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT

154 आरकएम पावरRKM Power 2

RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule

155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem

156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault

157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem

158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock

159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem

160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip

161TRN Energy 2

ACBIL 300 0319 09-07-2017 Still out Still out CTL

162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains

163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem

164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem

165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest

166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling

167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements

168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD

169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD

170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD

171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD

172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD

173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD

174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD

175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days

176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration

177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD

178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works

179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD

180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD

Note Units out for more than 72 hrs are only included

Annex-27

जलाई 2017Details of planned unit outages during the month of July 2017

अन

SlNo

Unitसघटक

ConstituentIPPमता

मगावॉटCapMW

सoFrom

समय

सoFrom

समय

कारणReason

Time Date Time Date

1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out

Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH

2 एसएलपीपीSLPP 3

GSECL 125 0000 26-07-2017 Still out Still out AOH

3 Chandrapur-

3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH

4 खापरखड़ाKhaparkheda 2

MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH

5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH

6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH

7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH

8SGTPS 5

MPPGCL 500 0000 28-06-2017 Still out Still out AOH

9 सातपरा Satpura IV

2MPPGCL 250 0253 20-07-2017 Still out Still out AOH

10SGTPS 5

MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH

11SGTPS 2

MPPGCL 210 0000 25-07-2017 Still out Still out AOH

12 JP

BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH

13 KORBA(W)CSETCL 2

CSPTCL 210 2350 31-07-2017 Still out Still out AOH

14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH

15VSTPS 3

NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH

16KSTPS 1

NTPC 200 0057 28-07-2017 Still out Still out AOH

ANNEXURE 31

(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH

221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH

3 CHHATTISHGARH

31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH

5 Central Sector

51KSTPS

5500

24-Aug-17 22-Sep-17 BLR OH

52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017

Capacity Outage Plan

MAHARASHTRA

MADHYAPRADESH

ReasonS No Unit No

ANNEXURE 32Date Time Date Time

1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS

STERLITE WR-II C INDORE

2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU

5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work

POWERGRID WR-II C VCHAL

7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC

22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina

POWERGRID WR-II C RHQ

23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II

POWERGRID WR-II R BINA

27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY

32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor

33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL

Agency Type Site

LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017

SN KV Line Element From To Basis Reason System

51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO

58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita

1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc

CSPTCL CSPTCL

59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)

1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40

CGPL CGPL

60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL

61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800

Daily

Annual Maintenance NTPC NTPC

62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R

64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end

POWERGRID WR-II C BHACHAU

65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna

POWERGRID WR-II R SATNA

66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE

70

400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay

72

400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

73

400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti

Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE

74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R

76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS

77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

POWERGRID WR-II R BINA

78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE

80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI

82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration

POWERGRID WR-II C VCHAL

85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end

STERLITE WR-II R BINA

89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA

91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS

04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai

POWERGRID WR-II C DAMOH

93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL

110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR

4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R

112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I

4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R

113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R

114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL

122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi

POWERGRID WR-II C ITARSI

125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur

05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR

135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily

For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC

ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I

POWERGRID WR-II R BINA

136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay

147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV

05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)

NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL

153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II

5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work

PGCIL GETCO

156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO

157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE

163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur

06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

POWERGRID WR-II C JABALPUR PS

165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR

168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL

170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers

POWERGRID WR-II R RHQ

171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR

173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC

220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II

POWERGRID WR-II R BINA

174

400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

180

400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

181

765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

183

765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT

184

765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL

186

4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL

187

4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL

188

400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL

189

400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

190

400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

192

400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL

193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO

203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL

205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR

POWERGRID WR-II C INDORE

206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur

07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily

For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC

220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I

POWERGRID WR-II R BINA

215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS

07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay

224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS

225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily

Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR

228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance

232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance

233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP -Asoj willbe kept off

253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO

255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily

TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR

POWERGRID WR-II C INDORE

256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur

08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme

STERLITE WR-II C JABALPUR PS

258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA

261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU

262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL

WR-II R RAJGARH

265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily

For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end

POWERGRID WR-II R BINA

266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL

284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R

289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO

293

400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off

294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily

Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work

POWERGRID WR-II C ITARSI

296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR

297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur

09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI

317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur

11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS

318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL

320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING

POWERGRID WR-II R PIRANA

321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA

324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL

348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R

356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO

361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc

CSPTCL CSPTCL

362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)

11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL

363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R

364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur

12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass

POWERGRID WR-II C KHANDWA

366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL

368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system

POWERGRID WR-II C BOISAR

373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA

374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS

12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA

375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL

400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO

407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of

SSP - Kasor willbe kept off

408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE

409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur

13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS

410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss

POWERGRID WR-II C KHANDWA

411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI

412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL

415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL

445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO

448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)

13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL

449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH

451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass

POWERGRID WR-II C KHANDWA

452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA

455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R

480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE

486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL

490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT

POWERGRID WR-II C BHACHAU

491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM

492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR

493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE

503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC

Maintenance

504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc

MPPTCL MPPTCL R

519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R

520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO

526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)

15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL

527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL

532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous

For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines

WRTS-II POWERGRID C RHQ

533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)

POWERGRID WR-II R KHANDWA

534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur

POWERGRID WR-II C SHUJALPUR

535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL

536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB

POWERGRID WR-II C BHACHAU

537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ

540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period

POWERGRID WR-II R RHQ

541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL

555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR

560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work

POWERGRID WR-II R RHQ

563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period

POWERGRID WR-II C RHQ

564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL

565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS

18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR

568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL

571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT

POWERGRID WR-II C BHACHAU

572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily

Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline

POWERGRID WR-II R RHQ

576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance

590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R

601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO

604

400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required

605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO

606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end

18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc

CSPTCL CSPTCL

607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)

18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL

608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL

611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI

615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul

19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL

616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay

624

765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily

TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE

625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R

641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

645

400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required

646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO

648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS

20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL

650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS

POWERGRID WR-II R PIRANA

651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ

655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE

672

400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE

673

400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti

Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE

674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL

678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO

684

400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required

685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)

20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL

689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH

690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC

POWERGRID WR-II C INDORE

691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul

21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL

694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB

POWERGRID WR-II C BHACHAU

695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL

697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass

POWERGRID WR-II C RHQ

698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL

719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing

MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL

721

400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required

722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul

22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL

726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH

728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period

POWERGRID WR-II C RHQ

729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL

743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO

748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)

22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL

749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL

750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)

POWERGRID WR-II R RHQ

751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL

762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R

764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU

765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder

POWERGRID WR-II C RHQ

766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period

POWERGRID WR-II C RHQ

767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR

771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul

25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL

772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line

POWERGRID WR-II R RHQ

774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line

786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL

790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work

MPPTCL MPPTCL R

791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI

797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod

WR-II C RHQ

799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE

812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR

813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod

WR-II C RHQ

815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay

824

220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE

825

220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily

Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE

826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line

828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal

stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork

830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily

Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period

WR-II C RHQ

846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO

862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube

POWERGRID WR-II C GWALIOR

863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY

866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction

Work

867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R

871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work

MPPTCL MPPTCL R

872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL

873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL

876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily

Bay Maintenance work Relay CB CT Testing

MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO

Anaulagnak 33

Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017

AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017

1 gaujarat

saIimat 13100 15200 7500 9240

AsaIimat 13140 15240 7510 9250

2 maQya p`doSa

saIimat 6850 7905 4400 5350

AsaIimat 6850 7905 4400 5350

3 CltaIsagaZ

saIimat 36865 3785 20545 2093

AsaIimat 36865 3785 20545 2093

4 maharaYT

saIimat 18700 19600 11600 11700

AsaIimat 18750 19650 11650 11750

5 gaaovaa

saIimat 570 565 335 340

AsaIimat 573 670 347 345

6 dmana dIva

saIimat 325 320 205 210

AsaIimat 342 325 207 215

7 DI ena eca

saIimat 700 740 475 490

AsaIimat 731 745 507 500

8 piScama xao~

saIimat 50310 50560 32200 32500

AsaIimat 50500 50660 33215 32600

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaulaa[- 2017

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 682 75

]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000

3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422

4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Actual vaastivak

ACTUAL GENERATION amp AVALABILITY FOR JULY 2017

Actual vaastivak

Anaulagnak 41

37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874

kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139

11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020

2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18

10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568

kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050

10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680

kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7

kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240

kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23

10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0

kula jalaIya TOTAL(H) 32968 459 7066

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250

10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0

kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549

TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558

C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800

kula DD ampDNH (T) 72528 1132

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0

kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513

kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212

210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516

kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600

kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118

kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218

kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000

kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500

RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33

kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524

(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF

maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998

saIimat Restricted 13100

AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004

maQya p`doSa MADHYA PRADESH

pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982

saIimat Restricted 6850

AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500

CltaIsagaZ CHHATTISGARH

pMjaIkRt Registered 3722 3722 31072017 2300 4999

saIimat Restricted 36865

AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013

maharaYT MAHARASHTRA

pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998

gaaovaa GOA

pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993

AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50

nyaUnatma pMjaIkRt maaMga Min Registered Demand

essaar ESSAR(ESIL)

pMjaIkRt Registered 889 - - 889 15072017 2200 5000

AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dmana evaM dIva DD

pMjaIkRt Registered 319 - - 319 21072017 1100 5002

AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand

dadra va na hvoalaI DNH

pMjaIkRt Registered 738 - - 738 27072017 1200 4999

AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand

piScama xao~ WESTERN REGION

pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997

saIimat Restricted 50310

AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997

nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 HVDC back-to back link(WR-NR)-Pole 1 7332400

2 HVDC back-to back link(WR-NR)-Pole 2 7440000

3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE

1765 -I

765kV Seoni to Wardha-I 7440000

2765 -II

765kV Seoni to Wardha-II 7440000

3765 -I

765kV Seoni to Bilaspur-I 7440000

4765 -II

765kV Seoni to Bilaspur-II 7440000

5765 -I

765kV Durg to Wardha I 4334000

6765 -II

765kV Durg to Wardha II 7385700

7765 -III

765kV Durg to Wardha III 7075000

8765 -IV

765kV Durg to Wardha IV 4304000

9765 कवी धरमजयगड स जबलपर-

I 765kV Dgarh to Jabalpur I 5372100

10765 कवी धरमजयगड स जबलपर-

II 765kV Dgarh to Jabalpur II 6250800

11765 कवी धरमजयगड स जबलपर-

III 765kV Dgarh to Jabalpur III 5544300

12765 कवी धरमजयगड स जबलपर-

IV 765kV Dgarh to Jabalpur IV 4632800

13765 -

I 765kV Dgarh to New Ranchi I 7405700

14765 -

II 765kV Dgarh to New Ranchi II 7440000

15765 कवी धरमजयगड स झारसगड़ा-

I 765kV Dgarh to Jharsuguda I 7433800

16765 कवी धरमजयगड स झारसगड़ा-

II 765kV Dgarh to Jharsuguda II 7440000

17765 -

I 765kV Wardha to Nizamabad I 7440000

18765 -

II 765kV Wardha to Nizamabad II 7440000

19765 कवी सोलापर स रायचर -

I 765kV solapur to Raichur I 7260700

20765 कवी सोलापर स रायचर -

II 765kV solapur to Raichur II 7440000

21765 कवी धल स वडोदरा-

I 765kV Dhule to Vadodara I 5265600

22765 कवी इदौर स वडोदरा-

I 765kV Indore(PG) to Vadodara I 7412500

23765 -

I 765kV Gwalior to Phagi I 7440000

24765 -

I 765kV Gwalior to Phagi II 7405600

25765 -

I 765kV Gwalior to Agra I 7440000

26765 -

II 765kV Gwalior to Agra II 7440000

27400

400kV Bhilai to Koradi 7440000

28400

400kV Bhilai to Bhadravati 7440000

29400 -I

400kV Raipur to Bhadravati-I 7440000

30400 ndashII

400kV Raipur to Bhadravati-II 7440000

31400 ndashIII

400kV Raipur to Bhadravati-III 7440000

32400 कवी सातपरा स कोराडी

400kV Satpura to Koradi 7313200

33400 कवी खडवा स धल-I

400kV Khandwa-Dhule-I 7440000

34400 कवी खडवा स धल-II

400kV Khandwa-Dhule-II 7204900

भार WRLDC Mumbai

35400 कवी इदौर स असोज-I

400kV Indore to Asoj-I 7433100

36400 कवी इदौर स असोज-II

400kV Indore to Asoj-II 7380900

37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900

38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900

39400 कवी वापी स बोईसर

400kV Vapi-Boisar 7440000

40400 कवी रायगढ़ स रौरकला

400kV Raigarh to Rouerkela I 7193200

41400

400kV Raigarh to Sterlight 7344900

42400 कवी रायगढ़ स झरसगड़ा I

400kV Raigarh to Jharsuguda I 7163500

43400 कवी रायगढ़ स झरसगड़ा II

400kV Raigarh to Jharsuguda II 7440000

44400 कवी नागदा स दहगाम-I

400kV Nagda to Dehgam I 7440000

45400 कवी नागदा स दहगाम-II

400kV Nagda to Dehgam II 7440000

46400 ndashI

400kV Raipur to Wardha-I 7440000

47400 ndashII

400kV Raipur to Wardha-II 7440000

48220 -II

220kV K(E) to Budhipadar-II 7131200

49220 -III

220kV K(E) to Budhipadar-III 7440000

भार WRLDC Mumbai

Anaulagnak 47Annex-47

maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM

Corresponding Figure of themonth Last Year

ivavarNa Particularsgau ] iva ina ila GUVNL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017

9585

Levels in Mtrs str maITr maoM

ena eca DI saI NHDC

[Midra saagar Indira Sagar

39283 64490

map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

39528

]ka[- Ukai

65377

9791

25021

25884

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

OutageDuration

Date Time Date Time Time

1 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil Nil GI-1 Nil

2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC

MSETCL 02072017 919 02072017 1020 101

B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation

Nil Nil GI-1 Nil

3 WR

Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2

MPPGCLMPPTCL 07072017 1840 07072017 1940 100

400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs

Nil Nil GI-1 NIl

4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II

PGCIL 10072017 920 10072017 1025 105

220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower

Nil 182 GI-1 0197

5 WR

Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler

MSETCL 15072017 1640 15072017 1716 036

Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit

Nil Nil GI-1 Nil

6 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona

GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0019

7 WR

Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona

GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit

Nil 80 GI-1 0016

8 WR

Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6

NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3

954 Nil GI-2 Nil

ANNEXURE - 5

Load Loss(MW)

Category asper CEA

standards

Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss

(MW)SNo Region Name of Elements

9 WR

Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2

MSETCL 22072017 923 22072017 956 033

LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it

Nil Nil GI-2 Nil

10 WR

Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9

APLATIL 24072017 1229 24072017 1629 400

Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation

373 251 GI-2 0008

11 WR

Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa

NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation

Nil Nil GI-1 Nil

Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details

Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF

(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)

SrNo

State UT No ofSchemes

Scope of Work (Scheme) ApprovedCost

GrantSanctioned

Date ofSanction

FundsReleased

of fundDisbursed againstgrant Sanctioned

Status

1 MadhyaPradesh

5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC

400 36 17032016 0 000

Renovation and Upgradation ofprotection system of substations ofMPPTCL

10300 927 17032016 927 1000

Renovation Upgradation ofprotection system of substations inMPPGCL

5234 4711 0592016 471 1000

Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )

621 559 0592016 000 000

Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL

745 671 22052017 000 000

2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL

6852 6167 0592016 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL

503 453 16052017 000 000

3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline

167 15 1152015 135 9000 Completed

Load Forecasting Scheme in the stateof Gujarat

370 37 04082015 000 000

Wind generation forecasting in theState of Gujarat

162 162 17032015 000 000

Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO

3237 2913 02012017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL

2839 2555 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL

3751 3376 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL

1577 1419 22052017 000 000

Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL

6332 5699 22052017 000 000

4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor

4615 3461 16052017 000 000

Installation of Data Concentrators inMSETCL

1041 937 16052017 000 000

Installation of RTUs for 132 kVSubstations of MSETCL

2565 770 16052017 000 000

Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL

1572 1415 22052017 000 000

Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra

3258 2932 22052017 000 000

TOATAL 20 56141 4835 1533 317

24a) date and Reference of LOA

24b) Amount of LOA

251 Ist Installment

252 IInd installment

253 IIIrd installment

No Supply DescriptionQty AS

PER LOA

QuantityReceived

during Month

Sch Act

1 item Details

11

12

hellip

Erection Descriptionworks as per

LOAProgress

During MonthBalance

2 work details

21

22

hellip

3 Others

CUMMULATIVE PROGRESS Till date BALANCE

Annexure -82 B

25 Date of Disbursement and amount

1 Name of the Scheme

13 StateRegion

12 Executing Agency

11 Name of the substation and its Location

CUMMULATIVE PROGRESS Till date

Reporting Format to the PSDF Project Monitoring Group

Remarks

27 Date of handing over of Site to entity (in case of turnkey projects)

23 Approved Grant by Monitoring Committee ( Rs In Lakhs)

24 Date of Requisition by the Entity

Signature with seal of the Nodal Officer

Report for the Month of ____MM YY________

26 Date of Scheduled completion of Work

22 Total Approved Cost of the Scheme

21 Date of Agreement of Entity with State GovtNLDC

2 Date of Sanction order

Annexure-82 C2

1 Name of the Scheme

11 Name of the substation and its Location

12 Executing Agency

13 StateRegion

2 Date of Sanction Order

21 Date of Agreement of Entity with State Govt NLDC

22 Total Approved Cost of Scheme

23 Approved Grant by Monitoring Committee (Rs In Lakhs)

24 Date of Requisition by the Entity

24 a) Date and Reference of LOA

24 b) Amount of LOA

25 Date of Disbursement and amount

251 Ist Installment

252 IInd Installment

253 IIIrd Installment

26 Date of Scheduled completion of work

27 Date of Handling over of Site to entity ( In case of Turn key project)

Sch Act1 Item Details

11 Supply of hardware amp Sofwtare modules Lot Nil

12 Deployment of software modules Lot Nil Development Customization in progress

Reporting Format to the PSDF Project Monitoring Group

Implementation of Integrated System for ABTOA and MIS for MPSLDC

MPSLDC

Ms Kalki Communication Tech Pvt Ltd Bangalore

MADHYA PRADESHWESTERN REGION

17032016

22062016

Rs400 Lakhs

Rs360 LAKHS

06082016 Letter No 07-05174-A1723

Balance Remark

Rs30162 LAKHS

RECEIVED (Rs 36 Lakhs)

RECEIVED (Rs 5429 Lakhs)

Not Yet Received (Rs16288 Lakhs)

30 Sept 2017

Full quantity of hardware amp Operatingsoftwares were received

30 Sept 2017

Report for the Month of JUNE 2017

No Supply DiscriptionQty AS PER

LOA

QuantityReceived during

Month

CUMMULATIVEPROGRESS till date

1 2 3 4

Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average

2015-16 Average

2016-17 Average

Projected Demand for (Oct 2017 - Dec 2017) before normalization

Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701

Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP

Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814

Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675

Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf

DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)

Data given by

DICsComments

2014-15 2015-16 2016-17

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

1 MP WR 4739 4739 As per data given by MP 5992 5992

Koradi TPS 9 660 432

Koradi TPS 10 660 432

3 Chattisgarh WR 3468 3468 3468

4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158

5 Goa WR 0 0 0

6 DampD WR 0 0 0

7 DNH WR 0 0 0

8 Vindhyachal WR 4631 4631 4631

9 Ratnagiri Dabhol WR 659 659 659

10 TAPS (1234) WR 1183 1183 1183

11 Jindal WR 768 768 768

12 LANCO WR 575 575 575

13 NSPCL Bhilai WR 429 429 429

14 Korba WR 2486 2486 2431 2431

15 SIPAT WR 2858 2858 2809 2809

16 CGPL WR 3708 3708 3708

17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135

18 Gandhar WR 388 388 200 200

19 Kawas WR 354 354 200 200

20 SSP WR 708 708 708

15715864

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

Maharashtra 14852WR 157152

As per data given by NTPC

As per data given by NTPC

SlNo Entities Regio

n

Projections based on

3 Years Data

Bus Name Unit No

Installed Capacity

Gen considere

d

Sub Total Bus Name Unit No

Installed

Capacity

Gen considere

dSub Total TOTAL

Comments From DICs Others(if any)

Figure as per

CommentsPoC Data

Projected Generation before normalization

wrt projected All India Peak Demand

(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)

Generation Projection (October 2017 - December 2017)Generation declared Commercial from

1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial

from 1st July17 to 30th Sep17

21 KAPS WR 203 203 203

22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924

23 BALCO WR 611 611 611

24 KSK Mahanadi WR 668 668 668

25 Vandana Vidyut WR 0 0 0

26 Sasan UMPP WR 3811 3811 3811

27 Tamnar TPP (Jindal Extn) WR 971 971 971

28 DGEN WR 438 438 438

29 DB Power Ltd WR 1150 1150 1150

30 Korba West WR 508 508 508

31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273

32 Raikheda TPP (GMR) WR 0 0 0

33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240

34 GMR Warora WR 557 557 557

35 ACBIL+Spectrum+MCCPL WR 610 610 610

36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131

37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464

38 Jhabua Power WR 266 266 266

39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476

40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435

TOTAL 65133 1724 1224 68080 69506

Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations

Sl No Line Name End-1 End-2 Id Line

Owner

End-1

Owner

End-2

Owner

Km Conductor Type SIL

(Unco mpen

sated)

11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517

12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517

13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517

14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517

21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517

22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517

24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517

107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517

108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517

139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517

140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517

196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517

311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517

313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517

344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517

346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517

368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517

369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517

382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517

383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517

415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517

List of intra State EHV lines to be removed from important list published by WRLDC

Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type

16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra

17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra

18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra

31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra

32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra

33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra

34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra

44 Halvad-Bhimasar1

(Now Bhimasar - Mansar line 1)

Halvad Bhimasar 1 GETCO 150 Single Zebra

45 Halvad-Bhimasar2

(Now Bhimasar - Mansar line 2)

Halvad Bhimasar 2 GETCO 150 Single Zebra

52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra

53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra

65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra

66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra

67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra

68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra

91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra

92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra

Morbi - Bhimasar Morbi Bhimasar Single Zebra

Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra

List of 220 kV lines to be removed from important element list available on WRLDC website

Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap

Position

Present Tap

Position

5 Amreli 1 315 400220 GETCO 9b 9

6 Amreli 2 315 400220 GETCO 9b 9

7 Amreli 3 315 400220 GETCO 9b 9

8 APL-Mundra 1 315 400220 APL 9b 9

9 APL-Mundra 2 315 400220 APL 9b 9

10 Asoj 1 500 400220 GETCO 9 12

11 Asoj 2 500 400220 GETCO 9 12

12 Asoj 3 315 400220 GETCO 9b 12

13 Asoj 4 315 400220 GETCO 9b 12

54 Charnaka 1 315 400220 GETCO 9b 9

55 Charnaka 2 315 400220 GETCO 9b 9

56 Charnaka 3 315 400220 GETCO 9b 9

58 Chorania 1 500 400220 GETCO 9 13

59 Chorania 2 500 400220 GETCO 9 13

60 Chorania 3 500 400220 GETCO 9 13

73 GPEC 1 500 400220 GETCO 9 11

77 Hadala 1 315 400220 GETCO 9b 9

78 Hadala 2 315 400220 GETCO 9b 9

79 Hadala 3 315 400220 GETCO 9b 9

92 Jetpur 4 500 400220 GETCO 9 9b

93 Jetpur 1 315 400220 GETCO 9b 9b

94 Jetpur 2 315 400220 GETCO 9b 9b

95 Jetpur 3 315 400220 GETCO 9b 9b

108 Kasor 1 315 400220 GETCO 9b 9

109 Kasor 2 315 400220 GETCO 9b 9

110 Kasor 3 315 400221 GETCO 9b 9

128 Kosamba 1 315 400220 GETCO 9b 8

129 Kosamba 2 315 400220 GETCO 9b 8

130 Kosamba 3 315 400220 GETCO 9b 8

131 Kosamba 4 500 400220 GETCO 9b 8

141 Mansar 1 315 400220 GETCO 9b 9b

142 Mansar 2 315 400220 GETCO 9b 9b

174 Pirana-T 1 315 400132 TPL 9 9

175 Pirana-T 2 315 400132 TPL 9 9

176 Pirana-T 3 315 400132 TPL 9 9

177 Pirana-T 4 315 400132 TPL 9 9

206 Soja 1 500 400220 GETCO 9 11

207 Soja 2 500 400220 GETCO 9 11

208 Soja 3 500 400220 GETCO 9 11

216 Sugen 1 315 400220 TPL 9b 1

217 Sugen 2 315 400220 TPL 9b 1

218 Sugen 3 315 400220 TPL 9b 1

220 Ukai 1 500 400220 GETCO 9b 9

226 Varsana 1 315 400220 GETCO 9b 5

227 Varsana 2 315 400220 GETCO 9b 5

228 Varsana 3 315 400220 GETCO 9b 5

229 Veloda 1 500 400220 GETCO 9b 9b

230 Wanakbori 1 500 400220 GETCO 9b 9

List of ICTs to be removed from list of Important elements

SNo Substation Reactors Total MVAR Rated Voltage

2 Amreli 1X50 + 1X125 175 420

5 Asoj 1X50 50 420

20 Charnaka 1x125 125 420

22 Chorania 1X50 + 1X125 175 420

34 Hadala 1X50 + 1X125 175 420

41 Jetpur 1X50 + 1X63 113 420

47 Kasor 1X50 + 1X125 175 420

53 Kosamba 1X80 80 420

56 Mansar 1x63 63 420

74 Ranchodpura 1X50 + 1X125 175 420

82 Soja 1X50 + 1X80 130 420

86 Varsana 1X50 + 1X125 175 420

87 Veloda 1x125 125 420

94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

GETCO

Owner

GETCO

GETCO

List of reactors to be removed from list of Important elements

of WR

B List of 400 kV Bus Reactors

  • COV LETTERpdf
  • textpdf
  • 21pdf
  • 231pdf
  • 232pdf
  • 233pdf
  • 234pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 82Apdf
  • 82Bpdf
  • 82C1pdf
  • 82C2pdf
  • 83PDF
    • Dnd_WR
    • Grn_WR
      • 84pdf
Page 9: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 10: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 11: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 12: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 13: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 14: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 15: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 16: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 17: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 18: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 19: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 20: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 21: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 22: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 23: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 24: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 25: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 26: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 27: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 28: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 29: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 30: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 31: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 32: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 33: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 34: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 35: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 36: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 37: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 38: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 39: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 40: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 41: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 42: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 43: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 44: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 45: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 46: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 47: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 48: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 49: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 50: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 51: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 52: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 53: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 54: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 55: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 56: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 57: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 58: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 59: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 60: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 61: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 62: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 63: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 64: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 65: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 66: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 67: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 68: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 69: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 70: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 71: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 72: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 73: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 74: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 75: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 76: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 77: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 78: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 79: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 80: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 81: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 82: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 83: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 84: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 85: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 86: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 87: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 88: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 89: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 90: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV
Page 91: Agenda for 498 August 2017 at WRPC, Mumbaiwrpc.nic.in/occ/498occ_agenda.pdf9 765kV Bhuj-Banaskamta DC 583 Sept 18 10 400 kV Mundra UMPP – Bhuj DC 190 Dec 18 Chhattishgarh 1 400 kV