498th OCC AGENDA
Agenda for 498th Meeting ofOperation amp Coordination Sub-Committee of WRPCto be held on 22nd August 2017 at WRPC Mumbai
Item No 1 CONFIRMATION OF THE MINUTES
Minutes of 497th meeting of Operation amp Coordination Sub-Committee(OCC) of WRPC held on 20th July 2017 at WRPC Mumbai were forwarded videletter No WRPCOPNOCC-Minutes2017-1811931 dated 28072017
No Comments have been received Sub-committee may confirm theminutes
Sub-Committee may discuss and confirm the Minutes
Item No 2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OFJULY 2017
21 FREQUENCY PARTICULARS
The average frequency during the month of July 2017 was 4999 Hz Themaximum instantaneous frequency was 5026 Hz at 080050 hrs on06072017 while minimum instantaneous frequency was 4969 Hz at205640 hrs on 09072017 The frequency profile during July 2017 was asunder
Range 01st ndash 31st July 2017( time)
01st ndash 30th June2017( time)
IEGC band(499 lt f lt 5005 Hz) 7615 7505
lt 499 Hz 656 581
gt 5005 Hz 1729 1869
The frequency particulars is enclosed at Annex-21
The Sub-Committee may kindly note
498th OCC AGENDA
22 INTER-REGIONAL EXCHANGES
There was a net inter-regional export of 6904 MUs from WR to other
regions against net export schedule of 6882 MUs
SCH DRAWL ODUDWR-ER 71 -1055 -1126WR-NR -4878 -3975 903WR-SR -2075 -1874 201WR NET -6882 -6904 -22
The Sub-Committee may kindly note
23 VOLTAGE PROFILE
Voltage profile at some of 765400 kV sub-stations during the month of
July 2017 furnished by WRLDC is enclosed at Annex-23
The Sub-Committee may kindly note
24 UF RELAY OPERATIONS
As per WRLDC records during July 2017 the system frequency didnrsquot
reach 495 Hz and no UFR operation was reported to WRLDC
The Sub-Committee may kindly note25 POWER CUTS LOAD RESTRICTIONS
Details of Power Cuts and Regulatory measures during July 2017 as
furnished by the State utilities are given in Annex 25
The Sub-Committee may kindly note
498th OCC AGENDA
26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES
Details of generating units under forced outages during July 2017 aregiven in Annex-26
The Sub-Committee may kindly note
27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES
The details of generating units under Planned Outages during July 2017are given in Annex-27
The Sub-Committee may kindly note
Item No 3 OPERATIONAL PLANNING
31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August
amp September 2017 is given in Annex 31
The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period
32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS
List of proposals for transmission elements outage to be availed during
the month of September 2017 is given in Annex 32
The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017
Details of anticipated restricted amp un-restricted demands for the months
of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate
Item No 4 Operational Statistics for the month of July 2017
The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure
498th OCC AGENDA
Annex 41 - Actual Generation and Requirement for July 2017
Annex 42 - Peak Demand Schedule Vs Actual for July 2017
Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017
Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017
The Sub-Committee may kindly note
Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the
month of July 2017 However the details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5
The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE
SYSTEM
Following Constituents have furnished the status of healthiness of SERsDRs
in their systems on the dates below
Sl No Name of Constituent Date ofReceipt
1 PGCILWRTS-I 06062017
2 PGCILWRTS-II 06072017
3 MPPTCL 20072017
4 NTPC 05062017
5 CSPTCL 03082017
6 GETCO 20072017
7 MSETCL 07082017
8 DDDNH
9 GOA 11062017
10 NPCIL
11 NCASSP
12 NHDC
13 Jindal PL 12052017
14 CGPL 05062017
498th OCC AGENDA
15 DB POWER 07082017
16 KWPCL
17 ACBILTRN ENERGY 03082017
18 KSK 14072017
19 GMR CHHATTISHGARH
20 JNSTPS 08052017
21 MB POWER
22 SASAN UMPP 12052017
23 NSPCL 12052017
24 RGPPL
25 SUGEN 08052017
26 RKM POWER
27 ESSAR POWER 08052017
28 BDTCLJTCLRTCL 12052017
29 RELIANCETRANSMISSION
12052017
30 ADANI POWER 03072017
31 JHABUA POWER 11052017
32 EPTCL 08052017
33 TPGL 11052017
The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting
Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR
71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18
SlNo
400 kVSubStn
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
22 INTER-REGIONAL EXCHANGES
There was a net inter-regional export of 6904 MUs from WR to other
regions against net export schedule of 6882 MUs
SCH DRAWL ODUDWR-ER 71 -1055 -1126WR-NR -4878 -3975 903WR-SR -2075 -1874 201WR NET -6882 -6904 -22
The Sub-Committee may kindly note
23 VOLTAGE PROFILE
Voltage profile at some of 765400 kV sub-stations during the month of
July 2017 furnished by WRLDC is enclosed at Annex-23
The Sub-Committee may kindly note
24 UF RELAY OPERATIONS
As per WRLDC records during July 2017 the system frequency didnrsquot
reach 495 Hz and no UFR operation was reported to WRLDC
The Sub-Committee may kindly note25 POWER CUTS LOAD RESTRICTIONS
Details of Power Cuts and Regulatory measures during July 2017 as
furnished by the State utilities are given in Annex 25
The Sub-Committee may kindly note
498th OCC AGENDA
26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES
Details of generating units under forced outages during July 2017 aregiven in Annex-26
The Sub-Committee may kindly note
27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES
The details of generating units under Planned Outages during July 2017are given in Annex-27
The Sub-Committee may kindly note
Item No 3 OPERATIONAL PLANNING
31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August
amp September 2017 is given in Annex 31
The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period
32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS
List of proposals for transmission elements outage to be availed during
the month of September 2017 is given in Annex 32
The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017
Details of anticipated restricted amp un-restricted demands for the months
of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate
Item No 4 Operational Statistics for the month of July 2017
The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure
498th OCC AGENDA
Annex 41 - Actual Generation and Requirement for July 2017
Annex 42 - Peak Demand Schedule Vs Actual for July 2017
Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017
Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017
The Sub-Committee may kindly note
Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the
month of July 2017 However the details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5
The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE
SYSTEM
Following Constituents have furnished the status of healthiness of SERsDRs
in their systems on the dates below
Sl No Name of Constituent Date ofReceipt
1 PGCILWRTS-I 06062017
2 PGCILWRTS-II 06072017
3 MPPTCL 20072017
4 NTPC 05062017
5 CSPTCL 03082017
6 GETCO 20072017
7 MSETCL 07082017
8 DDDNH
9 GOA 11062017
10 NPCIL
11 NCASSP
12 NHDC
13 Jindal PL 12052017
14 CGPL 05062017
498th OCC AGENDA
15 DB POWER 07082017
16 KWPCL
17 ACBILTRN ENERGY 03082017
18 KSK 14072017
19 GMR CHHATTISHGARH
20 JNSTPS 08052017
21 MB POWER
22 SASAN UMPP 12052017
23 NSPCL 12052017
24 RGPPL
25 SUGEN 08052017
26 RKM POWER
27 ESSAR POWER 08052017
28 BDTCLJTCLRTCL 12052017
29 RELIANCETRANSMISSION
12052017
30 ADANI POWER 03072017
31 JHABUA POWER 11052017
32 EPTCL 08052017
33 TPGL 11052017
The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting
Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR
71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18
SlNo
400 kVSubStn
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
26 DETAILS OF GENERATING UNITS UNDER FORCED OUTAGES
Details of generating units under forced outages during July 2017 aregiven in Annex-26
The Sub-Committee may kindly note
27 DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGES
The details of generating units under Planned Outages during July 2017are given in Annex-27
The Sub-Committee may kindly note
Item No 3 OPERATIONAL PLANNING
31 PROPOSED PLANNED MAINTENANCE PROGRAMME OFGENERATING UNITSThe maintenance programme of generating units for the months August
amp September 2017 is given in Annex 31
The Sub-Committee may kindly discuss and finalise the outage scheduleof generating units for the above period
32 OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS
List of proposals for transmission elements outage to be availed during
the month of September 2017 is given in Annex 32
The Sub-Committee may kindly discuss and finalise the outages ofthe transmission elements
33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndashAUGUST amp SEPTEMBER 2017
Details of anticipated restricted amp un-restricted demands for the months
of August amp September 2017 are given in Annex 33The Sub-Committee may like to noteupdate
Item No 4 Operational Statistics for the month of July 2017
The details of actual generation demand drawl of power from gridexchanges etc are given in the following Annexure
498th OCC AGENDA
Annex 41 - Actual Generation and Requirement for July 2017
Annex 42 - Peak Demand Schedule Vs Actual for July 2017
Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017
Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017
The Sub-Committee may kindly note
Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the
month of July 2017 However the details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5
The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE
SYSTEM
Following Constituents have furnished the status of healthiness of SERsDRs
in their systems on the dates below
Sl No Name of Constituent Date ofReceipt
1 PGCILWRTS-I 06062017
2 PGCILWRTS-II 06072017
3 MPPTCL 20072017
4 NTPC 05062017
5 CSPTCL 03082017
6 GETCO 20072017
7 MSETCL 07082017
8 DDDNH
9 GOA 11062017
10 NPCIL
11 NCASSP
12 NHDC
13 Jindal PL 12052017
14 CGPL 05062017
498th OCC AGENDA
15 DB POWER 07082017
16 KWPCL
17 ACBILTRN ENERGY 03082017
18 KSK 14072017
19 GMR CHHATTISHGARH
20 JNSTPS 08052017
21 MB POWER
22 SASAN UMPP 12052017
23 NSPCL 12052017
24 RGPPL
25 SUGEN 08052017
26 RKM POWER
27 ESSAR POWER 08052017
28 BDTCLJTCLRTCL 12052017
29 RELIANCETRANSMISSION
12052017
30 ADANI POWER 03072017
31 JHABUA POWER 11052017
32 EPTCL 08052017
33 TPGL 11052017
The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting
Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR
71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18
SlNo
400 kVSubStn
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
Annex 41 - Actual Generation and Requirement for July 2017
Annex 42 - Peak Demand Schedule Vs Actual for July 2017
Annex 43- Integrated Operation of the System and Operation of Inter State Tielines for July 2017
Annex 47 ndash Details of level of Major Reservoirs in Western Region for July2017
The Sub-Committee may kindly note
Item No 5 SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the
month of July 2017 However the details of minor incidences during the month
received from WRLDC are enclosed at Annexure-5
The Sub-Committee may like to notediscussItem No 6 HEALTHINESS STATUS OF SERsDRs OF EQUIPMENT IN THE
SYSTEM
Following Constituents have furnished the status of healthiness of SERsDRs
in their systems on the dates below
Sl No Name of Constituent Date ofReceipt
1 PGCILWRTS-I 06062017
2 PGCILWRTS-II 06072017
3 MPPTCL 20072017
4 NTPC 05062017
5 CSPTCL 03082017
6 GETCO 20072017
7 MSETCL 07082017
8 DDDNH
9 GOA 11062017
10 NPCIL
11 NCASSP
12 NHDC
13 Jindal PL 12052017
14 CGPL 05062017
498th OCC AGENDA
15 DB POWER 07082017
16 KWPCL
17 ACBILTRN ENERGY 03082017
18 KSK 14072017
19 GMR CHHATTISHGARH
20 JNSTPS 08052017
21 MB POWER
22 SASAN UMPP 12052017
23 NSPCL 12052017
24 RGPPL
25 SUGEN 08052017
26 RKM POWER
27 ESSAR POWER 08052017
28 BDTCLJTCLRTCL 12052017
29 RELIANCETRANSMISSION
12052017
30 ADANI POWER 03072017
31 JHABUA POWER 11052017
32 EPTCL 08052017
33 TPGL 11052017
The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting
Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR
71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18
SlNo
400 kVSubStn
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
15 DB POWER 07082017
16 KWPCL
17 ACBILTRN ENERGY 03082017
18 KSK 14072017
19 GMR CHHATTISHGARH
20 JNSTPS 08052017
21 MB POWER
22 SASAN UMPP 12052017
23 NSPCL 12052017
24 RGPPL
25 SUGEN 08052017
26 RKM POWER
27 ESSAR POWER 08052017
28 BDTCLJTCLRTCL 12052017
29 RELIANCETRANSMISSION
12052017
30 ADANI POWER 03072017
31 JHABUA POWER 11052017
32 EPTCL 08052017
33 TPGL 11052017
The remaining Constituents are requested to submit the status ofhealthiness of their SERsDRs before the meeting
Item No 7 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS TRANSMISSION LINESAND GENERATING UNITS IN WR
71 STATUS OF COMPLETION OF ONGOING SCHEMES FORCOMMISSIONING OF REACTORS IN 2017-18
SlNo
400 kVSubStn
Size(MVAr)
Implementingagency
Expected date ofcommissioning
1 Nanded 125 MSETCL August ndash 20172 Sholapur 125 MSETCL Dec ndash 2017
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
3 Kolhapur 125 MSETCL Dec ndash 20174 Akola 125 MSETCL August ndash 20175 ISP 125 NHDC Oct ndash 2017 expected
(Tendering done)6 Satpura-ISP
Line Rx50 MPPGCL Dec-2017
Chief Engineer SLDC Maharashtra informed following during themeeting
a Commissioning of 125 MVAR shunt reactor at Karad Kolhapur
Solapur by MSETCL ndashTender are floated for above 3 Number
substation
b Planning of additional shunt reactors in south Maharashtra ndash
shunt reactors are planned under phase- II by MSETCL Proposed
125 MVAR Bus reactors are at following 400 KV substations-
1 Chandrapur-II
2 Koradi-II
3 Khaparkheda
4 Bhusawal-II
5 Lonikand-II
6 Chakan
7 Kudus
The WR utilities may kindly intimate the current status on above
72 STATUS OF COMPLETION OF 765400 kV AND ABOVE ONGOINGTRANSMISSION SCHEMES BEING EXECUTEDIMPLEMENTED BYTRANSMISSION AGENCIES
The updated status on various ongoing transmission schemes for the
year 2017-18 as per the current information available is as follows -
SlNo
Name of the Line Cktkm
TargetCompletionDate
Remarks
Powergrid1 400 kV Vapi ndash Kudus DC
Line234 Dec -17 ROWForest
problem
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
2 765 kV Wardha Nizamabad-Hyderabad DC
577+486
Aug - 17 765 kV WardhaNizamabadcommissionedin March-17765 kVNizamabad-Hyderabad DCndash expected inJuly 2017
3 400 kV Aurangabad ndashBoisar line DC line
690 Sept -17
4 765 kV Aurangabad (PG) ndashPadghe (PG) DC
570 Dec -17
5 800 kV Champa ndashKurukshetra Bipole
2574 One pole testcharged on25012017Pole twoexpected at endof July 2017
6 400 kV MOUDA ndashBETUL PG LINES
393 Charged on
7 800 kV Raigarh-PugalurHVDC Bipole
3676 Nov-19 4 out of 10packagesawarded
8 400 kV Lara-Champa 224 Charged on30062017
9 765kV Bhuj-Banaskamta DC 583 Sept 1810 400 kV Mundra UMPP ndash Bhuj
DC190 Dec 18
Chhattishgarh1 400 kV DCDS Raipur (Raita)-
Jagdalpur(DCDS)Commissionedon 26052017
2 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCILSs Raigarh Idle charged on1182015 for anti theftreason
Dec -17
Gujarat1 400 kV DC Vadinar-Amreli
line11685 Dec -17
2 400kV APL-Hadala LILO toHalvad
8940 Oct -17
3 400 kV DC Amreli-Kasorline(Part-1)
16095 March -18
4 400 kV DC Amreli-Kasorline(Part-2)
16434 March -18
5 400 kV DC Amreli-Kasorline(Part-3)
14526 March -18
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-
498th OCC AGENDA
6 400 kV Varsana-Halvad 14339 March -187 400 kV Wanakbori-Soja DC 21317 May 17
8 400 kV Soja-Zerda DC 26892 Nov 189 400 kV Hadala-Shapar Dc 12434 Mar 1910 400 kV Bhogat- Kalawad DC 26057 Mar 2011 400 kV Bhachuunda-Varsana
Dc27616 June 20
Madhya Pradesh
Maharashtra (STU)1 400 kV Bableshwar-Kudus
DC (Quad)July -18 Forest clearance
awaited severeROW problem
Adani Transmission Ltd1 765 kV switching station at
Rajnandgaon- Novrsquo2017 Completed
2 Raipur Pool - Rajnandgaon765 kV DC line
40 Completed Completed
3 Rajnandgaon ndash new poolingstation at near Warora 765 kVDC line
266 Marrsquo2018
4 400 220 kV Substation atMorena
- Decrsquo2017
5 Gwalior 765 400 kV ndash Morena400 kV DC
48 Julyrsquo2017
6 Vindhyachal-IVampV STPP -VindhyachalPool 400 kV DC (Quad)2nd line
27 Decrsquo2017
7 2-Nos 400 kV Line bays atVindhyachalIV STPP Switchyard
- Decrsquo2017
8 1-No 765 kV line bay at SasanUMPP
- Decrsquo2017
9 Sasan UMPP - VindhyachalPooling station 765 kV SCline
6 Decrsquo2017
10 LILO of one circuit ofAurangabad ndash Padghe 765 kVDC line at Pune
64 Marrsquo2018
11 Raigarh (Kotra) ndash Champa(Pool) 765 kV 2nd SC Line
94 Decrsquo2017
12 Champa (Pool) ndashDharamjaygarh 765 kV2nd SC line
49 Decrsquo2017
498th OCC AGENDA
13 Bilaspur pooling station ndashRajnandgaon765 kV DC line
162 Decrsquo2017
14 Sipat ndash Bilaspur Poolingstation 3rd 765 kV SC line
Decrsquo2017
15 1 No 765 kV Line bay at SipatSTPPS of NTPC
Completed ampCharged on30052017
The WR utilities may intimate the current status on above
73 COMMISSIONING OF NEW GENERATING UNITS IN WESTERNREGION AND THE CAPACITY EXPECTED TO BE COMMISSIONEDDURING THE CURRENT YEAR 2017-18
The status regarding Generating units commissioned expected to be
commissioned during the current year 2017-18 according the available
information is as below
Name of the Power Projects UnitNo
Capacity(MW)
Date of CommissioningSchedule Date
GujaratNIL
ChhattisgarhNIL
MaharashtraCHANDRAPUR 8 500 COD on 04062016
CHANDRAPUR 9 500 Commissioned on21032016 COD done on24112016
Madhya Pradesh
Essar Power MP Ltd(Mahan) 2 600 Synchronized on03082017
BLA 2 45 Commissioned on20032017
Central sectorIPP
KSK 3 600 Dec -2017KSK 4 600 Dec ndash 2017RKM 3 360 Sept 2017RKM 4 360 December 2017TRN Energy 2 300 COD on 01052017SKS 1 300 Commissioned on
12062017 COD yet tobe done
SKS 2 300 Expected by Sept 2017
498th OCC AGENDA
Rattan India 3 270 Achieved full load on14042017
NTPC Mouda 4 660 Commissioned on18032017 COD yet tobe done
NTPC Lara 1 800 Dec 2017NTPC Solapur 1 660 Commissioned on
25032017 COD yet tobe done
NTPC Solapur 2 660 April 2018
The WR utilities may intimate the current status on above
Item No 8 MISCELLANEOUS OPERATIONAL ITEMS
81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN ANDPHYSICAL amp CYBER SECURITY (PampCS) IN POWER SECTOR
The current status of submission of CMP and PampCS report (constituent wise)
for the fourth quarter (January 2017 to March 2017) is given below
SrNo
Name ofConstituents
CMP Status PampCS Status
1 NTPC I amp II NTPC I Submitted on 11042017NTPC II Submitted on08032017
__
2 PGCIL I amp II PGCIL I Submitted status on11042017PGCIL II Submitted status on07032017
__
3 WRLDC Report Submitted on 02052017 ReportSubmittedon 020520174 GUJARAT Report Submitted on 05062017
5 MAHARASHTRA Submitted status by SLDCMaharashtra
6 CHHATTISGARH7 MADHYA PRADESH Submitted status by SLDC MP8 DDDNH9 GOA10 NPCIL11 NCA Status Submitted on 0507201712 NHDC
498th OCC AGENDA
13 Jindal PL14 CGPL Status Submitted on 0505201715 DB POWER16 KWPCL17 ACBILTRN
ENERGYStatus Submitted on 05072017
18 KSK Status Submitted on 1407201719 GMR
CHHATTISHGARH20 JNSTPS Status Submitted on 0305201721 MB POWER Status Submitted on 0507201722 SASAN UMPP Status Submitted on 29042017
23 NSPCL Submitted status by NSPCL24 RGPPL25 SUGENDGEN Status Submitted on 0605201726 RKM POWER27 ESSAR POWER28 BDTCLJTCLRTCL29 RELIANCE
TRANSMISSION30 ATIL Status Submitted on 1406201731 JHABUA POWER32 EPTCL
All other constituents are requested to submit the Status Report
82 Monitoring of Schemes funded from PSDF
In the 6th meeting of NPC held on 19th December 2016 at Bengaluru it
was decided that all the RPCs in the monthly OCC meetings may follow up
with the utilities to expedite the completion of schemes by giving due
priority The implementation of most of the schemes are based on the
recommendation of the enquiry committee on grid disturbance of July 2012
headed by Chairperson CEA Therefore timely implementation of these
schemes would enhance the grid security and reliability Accordingly the
details of grant sanctioned from PSDF for the schemes of Western Region is
enclosed at Annexure-82A for the deliberation in the meeting The NPC
has further directed that the status of implementation of above schemes
(physical as well as financial progress) may be reviewed and the utilities be
requested to expedite implementation of the schemes The utilities were
advised to furnish the information in the format enclosed at Annexurendash
82B by first week of every month on regular basis to Member Convener
498th OCC AGENDA
PSDF project monitoring group (AGM NLDC POSOCO) with a copy to NPC
amp WRPC division
Gujarat amp Madhya Pradesh have submitted progressstatus in
prescribed format (Annexure 82C1 and C2)
All other utilities to whom the grants have been sanctioned are
requested to update on the progress of the schemes at the earliest as per
format at Annexure 82B
The Sub-Committee may like to discuss the same
83 Ratification of load generation data for Validation Committee
The load generation data for the period of October 2017 to December
2017( Qndash3) is to be ratified for POC charge calculation
The latest load generation sheet received from WRLDC is enclosed at
Annexure 83
The Sub-Committee may like to discuss the same
84 Review of important grid elements in WR grid
Chief Engineer SLDC Gujarat intimated vide email dated 08082017
that in 497th OCC meeting it was decided that the list of important grid
elements (uploaded in WRLDC website) should be reviewed thoroughly Only
very most important elements shall be kept in list The less sensible
elements shall remove from list The outages of such less sensible elements
shall be given by SLDC only looking to intra State grid condition In ensuing
OCCM the outages of very most important elements of WR grid will
discuss
SLDC ndashGujarat vide its letter dated 220717 submitted the list of
elements(attached at Annexure-84) which are less sensible to grid
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
operation The copy of letter is attached herewith SLDC ndashGujarat requested
WRLDC to remove these elements from list of important element of WR grid
Therefore it is necessary that the list of important grid elements of WR
published on WRLDC website shall be revised based on input given by SLDC
ndash Gujarat
The Sub-Committee may like to discuss the same
Item No 9 WRLDC AGENDA ITEMS
91 STM-1 between WRLDC and Asoj
On 24th July 17 WRLDC SCADA data traffic is protected through STM-1between WRLDC and Asoj Now Terminal Server SCADA data is protectedthrough STM-1 also apart from existing three paths ie from Kalwa toWRLDC
For information to OCC
92 Hot line voice communication between WRLDC andSubstationsGenerating Stations
Status of integration of Orange Hotline phones at major stations in WRwith WRLDC is being discussed in OCC forums from 493rd OCC Thepresent status of integration of hotline phones is given below
Status as on 1st Aug 17
498th OCC AGENDA
In 497th OCCM POWERGRID informed that the connectivity of Orange
hotline phone was extended upto the Interface point (MUX) at the nearest
CTU substation Hotline phone sets were also delivered to the concerned
IPPsISGS stations The IPPsISGS need to lay the optic fibre from their
stations to the Interface point to establish the voice communication
The present status of 44stations where hot line voice communication is
yet to be integrated and the present status of voice communication
integration is given below
SNo Region Station Status1 WR-I 400 kV GMR Warora Voice channel in PLCCFibre is not
integrated from GMR Warora toBhadrawathi for RLDCAction by GMR
2 WR-I 400 kV MOUDA Voice channel in PLCCFibre is notintegrated from Mouda to Wardhafor RLDCAction by Mouda
3 WR-I 400 kV GMR RAIPUR Voice channel in PLCCFibre is notintegrated from GMR Raipur toDurg for RLDCAction by GMR Raipur
4 WR-I 400 kV KWPCL Voice channel in PLCCFibre is notintegrated from KWPCL to Kotrafor RLDCAction by KWPCL
5 WR-I 400 kVESSAR MAHAN Voice channel in PLCCFibre is notintegrated from Essar Mahan toBilaspur for RLDCAction by Essar Mahan
6 WR-I 400 kV BALCO Voice channel in PLCCFibre is notintegrated from Balco toDharamjaygarh for RLDCAction by Balco
7 WR-I 400 kV KSK MAHANADI Voice channel in Fibre is notintegrated from KSK to Champafor RLDCAction by KSK
8 WR-I 400 kV DHARIWAL Voice channel in PLCCFibre is notintegrated from Dhariwal to Parlifor RLDC
498th OCC AGENDA
Action by Dhariwal
9 WR-I 400 kV SKS Voice channel in PLCCFibre is notintegrated from SKS to Kotra forRLDCAction by SKS
10 WR-I 765 kV AURANGABAD OPGW connectivity to Aurangabadwide band node not commissionedAction by WRTS-I PGCIL
11 WR-I 765 kV DHULE OPGW connectivity from Dhule toVadodara wide band node notcommissionedAction by BDTCL
12 WR-I 400 kV RKM Voice channel in Fibre is notintegrated from RKM to Kotra forRLDCAction by RKM
13 WR-I 400 kV SOLAPUR NTPC Voice channel in PLCCFibre is notintegrated from Solapur NTPC toSolapur-PG for RLDCAction by Solapur-NTPC
14 WR-I 400 kV DB POWER Voice channel in PLCCFibre is notintegrated from DB Power to Kotrafor RLDCAction by DB Power
15 WR-I 400 kV NSPCL Voice channel in PLCCFibre is notintegrated from NSPCL to Raipurfor RLDCAction by NSPCL
16 WR-I 400 kV RGPPL 400 Voice channel in PLCCFibre is notintegrated from RGPPL for RLDCAction by RGPPL
17 WR-I 400 kV LANCO 400 Voice channel in PLCCFibre is notintegrated from Lanco to Bilaspurfor RLDCAction by LANCO
18 WR-I 400 kV BHATAPARA Voice channel from Bhatapara toRLDC is not configuredAction by WRTS-I PGCIL
19 WR-I 400 kV JINDAL Voice channel in PLCCFibre is notintegrated from Jindal to Raipurfor RLDCAction by Jindal
20 WR-I 400 kV WARDHA OPGW connectivity to Wardha wideband node not commissionedAction by WRTS-I PGCIL
21 WR-II 400 kV Damoh Phone is working but no one isanswering the call
498th OCC AGENDA
22 WR-II 765 kV Jabalpur VOIP Phone installation is pendingdue to long distance between SDHto control room approx 350 mtsAction by WRTS-II PGCIL
23 WR-II 765 kV Gwalior OPGW connectivity to Bina wideband node not commissionedAction by WRTS-II PGCIL
24 WR-II 765 kV Indore VOIP Phone is not commissionedAction by WRTS-II PGCIL
25 WR-II 400 kV Degham VOIP Phone is not workingAction by WRTS-II PGCIL
26 WR-II 400 kV Pirana VOIP Phone is not commissionedAction by WRTS-II PGCIL
27 WR-II 400 kV Navsari VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by WRTS-II PGCIL
28 WR-II 765 kV Bhopal BDTCL OPGW connectivity from BhopalBDTCL to Indore-PGJabalpur-765wide band node is notcommissionedAction by BDTCL
29 WR-II 765 kV Vadodara VOIP Phone is not commissionedAction by WRTS-II PGCIL
30 WR-II 400 kV Gandhar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 150 mtsAction by NTPCWRTS-II PGCIL
31 WR-II 400 kV Essar Hazira Voice channel in PLCCFibre is notintegrated from Essar to Gandharfor RLDCAction by Essar Hazira
32 WR-II 400 kV DGEN Voice channel in PLCCFibre is notintegrated from DGEN to Navsarifor RLDCAction by DGEN
33 WR-II 400 kV Vindhyachal stage 3 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
34 WR-II 400 kV Vindhyachal stage 4 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
498th OCC AGENDA
35 WR-II 400 kV Vindhyachal stage 5 VOIP Phone is installed in VSTPSStage-II however VSTPS Stage-IIIIV amp V Phones are handed over toNTPC for necessary wiring andinstallationAction by NTPC
36 WR-II 220 kV Kakrapar VOIP Phone installation is pendingdue to long distance between SDHto control room approx 120 mtsAction by NPCILWRTS-II PGCIL
37 WR-II 220 kV Kawas VOIP Phone installation is pendingdue to long distance between SDHto control room approx 600 mtsAction by NTPCWRTS-II PGCIL
38 WR-II 765 kV SASAN OPGW connectivity to Sasan wideband node not commissionedAction by SasanWRTS-II PGCIL
39 WR-II 400 kV JP NIGREE OPGW connectivity from JaypeeNigire to Satna wide band node notcommissionedAction by JP Nigree
40 WR-II 400 kV Jhabua Power Voice channel in PLCCFibre is notintegrated from Jhabua to 765 KVJabalpur for RLDCAction by Jhabua
41 WR-II 400 kV MB POWER Voice channel in PLCCFibre is notintegrated from MB Power to 765KV Jabalpur for RLDCAction by MB Power
42 WR-II 400 kV TAPS-3amp4 Voice channel in PLCCFibre is notintegrated from TAPS-3amp4 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
43 WR-II 220 kV TAPS-1amp2 Voice channel in PLCCFibre is notintegrated from TAP-1amp2 toBoisarPhadge for RLDCAction by NPCILWRTS-II PGCIL
44 WR-II 400 kV Betul VOIP Phone is not commissionedAction by WRTS-II PGCIL
Goa SLDC at Madgao started functioning from 9th May 2017 but hotline phone is not working
POWERGRID and other utilities to update the progress
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
93 Primary Response by Generators
The primary response of WR generating units in percentage of ideal
response for last three Grid Events are given below
Highlighted fields corresponds to Zero Generation
On 31st July 2017 Honrsquo CERC had given its order for petition no84MP2015 filed by NLDC on seeking direction to the utilities tocomply with the provisions of Regulation 52 (f) (g) (h) and (i) of theCentral Electricity Regulatory Commission (Indian Electricity GridCode) Directions given by CERC in this regard is quoted below
498th OCC AGENDA
Quote
Considering the fact that further measures have been put inplace to facilitate desirable primary response the Commissionstarting from the month of September 2017 shall be closelywatching the primary response of ISGSs as reported byPOSOCONLDCs At the State level SLDCs shall report thefrequency response of intra-State generators to the concernedSERCs
NLDCs and SLDCs through the assistance of POSOCO shall startthe process of selecting independent third parties capable ofundertaking periodic checkups to monitor the RGMOFGMOresponse To start with selected independent third parties shallbe sent to the generating stations which are not providing thedesired RGMOFGMO response Independent Third Parties shallensure generator has not in any way preventeddisabled thegovernor from providing the desired response In case even afterenabling the governors units are not able to provide the desiredresponse as per the provisions of the Grid Code third partiesbased on the submissions of the generators shall bring out thetechnical constraints if any which limit the primary responseof the units
All ISGSs are directed to provide primary response compulsorilyin terms of Regulation 52 (f) (g) (h) and (i) of the Grid Codefailing which we would not hesitate in initiating action underSection 142 of Electricity Act 2003 for not providing desiredRGMOFGMO response without any valid reasons
Unquote
In view of above
All generators whose primary response is zero may explain thereasons for non-performance of generator governors incompliance with IEGC
498th OCC AGENDA
SLDCs may calculate frequency response of state generatorsregularly and share the same to WRLDCWRPC for the eventsreported by WRLDC in OCC meetings
OCC may discuss
94 Extension of RGMOFGMO status to SLDC WRLDC
With the support of generating stations WRLDC has integrated RGMO
status of all ISGS and Regional generators in WRLDC SCADA except SSP
The State GeneratorsState IPPs RGMOFGMO visibility at
SLDCWRLDC is in pipeline The present status of RGMOFGMO
visibility of State GeneratorState IPPs at SLDCWRLDC is as follows
Name of
State
Generation
Capacity Mandated
to operate in
RGMOFGMO as
per IEGC
Availability of RGMO
Status at
SLDCWRLDC
of RGMOFGMO
status
VisibilityObservability
at SLDCWRLDC
Maharas
htra 21510 0 0
Gujarat 10196 7650 75
Madhya
Pradesh 6675 2210 33
Chhattisg
arh 2460 0 0
Capacity as on 31st May 2017
498th OCC AGENDA
RGMO Status visibility at SLDC MPWRLDC
RGMO Status visibility at SLDC GujaratWRLDC
States may apprise OCC the present status of RGMOFGMO signalextension to SLDCWRLDC
498th OCC AGENDA
95 Telemetry issues
Details of utilities whose data is reporting to WRLDC via unreliable
communication links and whose data is highly intermittent is given
below These utilities may appraise OCC actions being initiated to ensure
100 data availability to WRLDC
Srno
Node Constraints Remarks
1 BALCO Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary FO link uptoDharamjaygarh as per connectivityagreement to be expedited
Secondary path through PLCC needsto be established
Balco tointimate thepresent status
2 JP Nigrie Communication link is GPRS sincecommissioning even after permanentconnectivity
Primary link upto Satna as perconnectivity agreement to beexpedited
Secondary path needs to beestablished
JP Nigrie tointimate thepresent status
3 ChampaHVDC
Telemetry through second gatewaynot available
SecondaryLink fromChampa HVDCto WRLDC isavailable since28th July 2017
4 IEPL The telemetry is highly intermittent Maharashtramay update thestatus
5 400kVLonikhandII
Highly intermittent Maharashtramay update thestatus
498th OCC AGENDA
6 Tillari The telemetry of 220kV Tillari whichhave interfacing line with Goa grid isnot available causing problems indrawl calculations of Goa andMaharashtra
Maharashtramay update thestatus
7 Goa The telemetry of Amona amp Kadambanot available
Goa mayintimate thestatus ofAmona
8 DNH The telemetry of DNH not availablesince long
DNH mayupdate thestatus
96 Telemetry of RES
The status of RES telemetry in Maharashtra and WRLDC in the month of
Augrsquo17 is given below The observability of RES telemetry in Maharashtra
is 55
Following Wind developers in Maharashtra are sending pooling data to
WLRDC via FTP
SNo Wind developer Installed capacity of Windwhose data is being pooledthrough FTP(As informed by WindDeveloper)
1 Suzlon 1663 MW
2 Regen 507 MW
3 Continum 80 MW
4 Gamesha 247 MW
5 Panama 72 MW
6 Reliance Global 45 MW
Total 2614 MW
Following Wind developerrsquos data are in pipeline for pooling data to
WLRDC via FTP
498th OCC AGENDA
1 SenvionKenersys
2 Maruti Wind
3 WindwordEnercon
4 TS Wind
5 Inox Wind
6 Vestas Wind
The present status of Telemetred RES at WRLDC is as follows
StateRegion RESInstalledCapacity
(Wind+Solar)in MW
Telemetered RESCapacity at
WRLDC(Wind+Solar) in
MW
of RESVisibilityObservability
at SLDCWRLDC
Gujarat 6578
(5348+1230)
6566 (5339+1227) 998
Maharashtra 5145
(4769+376)
2844 (2614+230) 553
Madhya
Pradesh
3263
(2428+835)
3213 (2378+835) 985
Chhattisgarh 76 (0+76) 66 (0+66) 868
Diu 10 (0+10) 0 0
Daman 41 (0+41) 0 0
WR 15076
(12545+2531)
12689(10331+2538) 842
Maharashtra SLDC to apprise OCC the present status of RESTelemetry integration
97 Operating Procedures for Western Regional Grid
In compliance with IEGC clause 51 (f) Operating Procedures for Western
Regional Grid was updated for the year 2017 and uploaded in WRLDC
website at following URLs
498th OCC AGENDA
httpwrldcorgdocsWR_OPERATING_PROCEDURE_2017pdf
httpwrldcindocsWR_OPERATING_PROCEDURE_2017pdf
Utilities are requested to give their valuable feedback
98 Angular Separation between Radially Connected Generation nodesand Adjacent Substations
In Western Region most of the IPPs were connected radially to pooling
stations through two feeders Under N-1 contingency of evacuation path
the total generation is evacuated through single feeder Under N-1-1
contingency there will be a complete blackout at IPP substation Under
N-1 contingency of evacuation path the angular separation between few
IPP generators and pooling substations observed from PSSe studies are
given below
SNoName OfGenerat
or
InstalledCapacity
Generation
considered
Evacuationpath
Considered
Angularseparationbetweenadjacent
busesduring N-1Contingenc
y
Consequences of
N-1-1Contingenc
y
1MB
Power
1200 MW
(2 X 600) 1100MW
400 kV MBPower-Jabalpur PSDC
27 Degree Blackout
2 JPNigrie
1320 MW
(2 X 660)1240MW
400 kV JPNigrie-SatnaDC
18 degree Blackout
3JhabuaPower
1200 MW
(2 X 600) 1100MW
400 kVJhabua-Jabalpur PSDC
9 Degree Blackout
4 GMRRaipur
1370 MW
(2 X 685)1260MW
400 kV GMRRaipur-Durg 75 Degree Blackout
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
DC
5KWPCL
600 MW
(1 X 600)1100MW
400 kVKWPCL-KotraDC
3 degree Blackout
6RKM
1440 MW
(4 X 360)660MW
400 kV RKM-Kotra DC 3 Degree Blackout
7 DBPower
1200 MW
(2 X 600)1100MW
400 kV DBPower-KotraDC
2 Degree Blackout
8KSK
1200 MW
( 2 X 600)1100MW
400 kVChampa-KSKDC
17 Degree Blackout
As per 621 (b) section of CEA planning criteria 2013 understeady state conditions ldquoThe angular separation between adjacentbuses under (lsquoN-1rsquo) conditions shall not exceed 30 degreerdquo It isobserved that the angular separation for n-1 contingency in caseof MB Power is close to 30degrees Oscillations observed in Gridon 7th July 17 1959 under n-1 contingency of 400 kV MB Power-Jabalpur-PS SS is shown below
Similarly the angular separation for n-1 contingency at JaypeeNigrie is also large
MB Power and Jaypee Nigrie to confirm whether the PSS at theirstation is commissioned and tuned
To ensure system security under n-1 contingency thesegenerating stations may plan SPS for safe evacuation ofgeneration
498th OCC AGENDA
OCC members may discuss
99 High Voltage nodes in WR
Voltage Deviation Index (VDI) of important nodes in WR is being
computed regularly by WRLDC on daily weekly monthly and yearly
basis and these reports are being published in WRLDC website Based on
VDI computed for the monthly of Julyrsquo17 the high voltage nodes in WR at
765 kV and 400 kV are given below
Voltage Deviation Index (VDI) - 765 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Total noof hoursout ofIEGCrange
(HHMM)(iii)(i+ii)
VDI
(iii)(Total No
ofHoursin a
Month)
MaxVoltag
e
MinVoltage
lt728kV(i)
728 kV-800 kV
gt800kV(ii)
1 Durg 8089 77374 000 8369 1631 12122 016
2 Kotra 80485 78497 000 9454 546 4037 005
3 Tamnar 80504 78511 000 9779 221 1626 002
4Vadodar
a 80591 76307 000 9862 138 1016 001
Voltage Deviation Index (VDI) - 400 kV Substations
SNoStationName
Voltage (in Volts) Voltage (in of Time) Totalno ofhoursout of
VDI
(iii)(Total No of
MaxVoltage
MinVoltage
lt380kV
380kV-420
kV
gt420kV
498th OCC AGENDA
IEGCrange(HHMM) (iii)(i+ii)
Hours ina Month)
1 Karad 43403 38215 000 2261 7739 57548 077
2 Dhule 43674 40236 000 2532 7468 55537 075
3 Raigarh 42676 41535 000 2549 7451 55421 075
4 Wardha 42887 38132 000 3450 6550 48718 065
5 Dehgam 43643 38083 000 4237 5763 42844 058
6 Kalwa 43729 39762 000 5467 4533 33714 045
7 Parli 43402 39629 000 6025 3975 29546 040
8 Mapusa 43386 38932 000 6716 3284 24421 033
9 Kasor 42674 40979 000 6890 3110 23125 031
10 Damoh 42634 38448 000 7431 2569 19106 026
11 Amreli 42954 4055 000 7756 2244 16656 022
12 Vapi 42995 39377 000 8062 1938 14412 019
13 Raipur 42485 40000 000 8089 1911 14211 019
14Khandw
a 42966 4049 000 8470 1530 11349 015
15Magarw
ada 42865 39261 000 8648 1352 10034 014
16 Boisar 42731 39137 000 9124 876 6511 009
17 Nagda 42565 4046 000 9249 751 5551 008
18 Kala 42665 39096 000 9294 706 5231 007
Above computations are based on WRLDC SCADA Data
Persistent high voltages are observed at 765 kV Durg 400 kV Karad400 kV Dhule 400 kV Raigarh 400 kV Wardha and 400 kV Dehgam
OCC may like to discuss
498th OCC AGENDA
910 Voltage regulation by RES
As per section 164 of the CEAs Manual on transmission planning
criteria The wind and solar farms shall maintain a power factor of 098
(absorbing) at their grid interconnection point for all dispatch scenarios
by providing adequate reactive compensation
In addition to the above the manual on transmission planning criteria
states that there shall be no reactive power flow UP through 400220 kV
400132 kV 220132 kV 22066 kV whenever voltage on HV side of
such ICT is more than 1025 per unit
Severe high voltage is observed at various locations in WR grid
particularly when the injection from RES is high
At the interstate level there is a mechanism for voltage dependent
reactive energy settlement Reactive charges are payable for MVAR
injection at voltage gt 103 of nominal Similarly Reactive charges are
payable for MVAR drawal at voltage lt 97 of nominal at the interface
point
SLDC Maharashtra Madhya Pradesh and Gujarat may apprise OCCregarding the following
Tariff structure for Reactive Energy exchange by RES in theirStates
Constraints if any for utilizing the available capability of RESfor voltage regulation
911 Electricity Demand Pattern Analysis
POSOCO has prepared a report on ldquoElectricity Demand Pattern Analysisrdquo
for all the States based on the statistical analysis of eight (8) yearsrsquo time-
series SCADA data The report is available at
498th OCC AGENDA
httpsposocoinreportselectricity-demand-pattern-analysis
The report provides useful information on demand pattern
decomposition of demand data into seasonal and trends etc at an all
India level each of the five (5) regions and thirty four (34) statesUTs
This information will be helpful in generation transmission and
distribution planning by the central and state level power system
planning agencies The utilities could refer this report for power
procurement and portfolio management
For information to OCC
912 Status of Implementation of SAMAST
This subject was discussed in 75th CCM and 34th WRPC meetings
It is understood that MP-SLDC is implementing the SAMASTrecommendations at an estimated project cost of Rs 302 Crore90 of the cost has been sanctioned as grant from PSDF MP SLDCmay share the details of the project and its progress for the benefitof other states
The checklist for implementation of SAMAST in SLDC is as tabulatedbelow
S No Activity
1 Identification of Intra State Entities
2 Demarcation of Interface boundary for each Intra State Entity
3 Assessment of Meters - Main Check and Standby
4 Assessment of Automatic Meter Reading logistics requirement
5 Assessment of IT infrastructure (Hardware and Software)requirement
6 Preparation of Bill of Quantities (considering logistics alreadyin place)
498th OCC AGENDA
7 Preparation of Detailed Project Report and completion of firststakeholder workshop
8 Approval of the State-specific SAMAST scheme by SERC
9 Commencement of Load Forecasting by SLDC
10 Commencement of Interchange Scheduling by SLDC for allthe Intra State Entities
11 Formation of a State Power Committee for preparation ofAccount
12 Establishment of State Regulatory Pool Account
13 Application for funding from Central GovernmentPSDF
14 Inviting tenders
15 Placement of Award
16 Adequacy of Human Resources in SLDC as approved by SERC
17 Implementation of the recommended IT infrastructure-Hardware
18 Completion of boundary metering and AMR system (as perDPR)
19 Implementation of the recommended IT applications- Software
a User Registrationb Short term Open Access Processingc Schedulingd Meter Data Processing and Validatione Accountingf Settlementg Billing and Clearingh Data Archival and Retrievali Management Information Systemj SLDC Website
20 Computation of transmission losses for each 15-min by SLDC
498th OCC AGENDA
21 Preparation of Energy Accounts by SPCSLDC andPublication of the following on SPCSLDC website
a Process document (SAMAST handbook) for the Stateb At least four weekly deviation accounts for all intra
State Entitiesc At least one monthly State Energy Account (SEA)d List of tie lines for each Intra State Entity with Intra
STSe List of Interface Energy Meters to be used in accountingf CTPT ratios to be used in accountingg Formula to be used for computation of Injection
Withdrawalh Implemented Schedule ndash DC Entitlement Injection
Schedule Withdrawal Schedule STOA scheduleScheduled Losses Interchange with Regional Grid
i Deviation Rates as notified by SERCj Comparative plot of Actual Interchange computed from
SCADA and from Energy Meter data of each Intra StateEntity for at least four weeks
k Plot of measured Transmission Losses for at least fourweeks
22 Clearing of Pool Ac Credit Debit for at least four weeks andits reconciliation
23 Two stakeholder workshops by SLDC on SAMAST system
24 Quarterly Reconciliation Certificate from all State Poolmembers
25 Annual lsquoPeer reviewrsquo of SAMAST by any SLDCRLDC
All SLDCs may furnish the compliance with respect to each point
Item No 10 DATE AND VENUE OF NEXT OCC MEETING
It is proposed to hold 499th OCC meeting at WRPC Mumbai on 20092017
The Sub- Committee may like to note as above
Anaulagnak 21
maah jaulaa[- 2017
1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat
11 MAXIMUM FREQUENCY 5009 Hz BETWEEN 0700 Hrs amp 0800 Hrs Hrs ON 06072017
AiQaktma AavaRit
12 MINIMUM FREQUENCY 4982 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 19072017
nyaUnatma AavaRit
13 AVERAGE FREQUENCY 4999 Hz
AaOsat AavaRit
2 INSTANTANEOUS takailak
21 MAXIMUM FREQUENCY 5026 Hz AT 080050 Hrs ON 06072017
AiQaktma AavaRit
22 MINIMUM FREQUENCY 4969 Hz AT 205640 hrs Hrs ON 09072017
nyaUnatma AavaRit
3 AGE OF TIME WHEN FREQUENCY WAS JULY 2017 JUNE 2017 MAY 2017
AavaRit ka samaya p`itSat maoM
31 BELOW 485 Hz 000 000 000
485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000
485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000
488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 000 000
492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 000 000 000
495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 656 581 909
497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 7615 7550 7145
499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1729 1869 1946
5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000
515 hTja ko pr
41 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI
42 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI
43 NO OF TIMES FREQUENCY 0 0 0
TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI
maoM AavaRit ko AaMkDaoM ka ivavarNa
FREQUENCY PARTICULARS DURING JULY 2017
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)
जलाई2017
Voltage Profile during the month of July2017 Annex-23
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 417 407 424 411 414 404 424 411 421 409 419 407 412 390 423 418 425 4192 418 403 421 408 414 401 423 411 422 411 421 408 415 383 424 418 425 4183 419 407 423 408 416 403 423 410 422 410 420 408 413 394 424 418 425 4194 422 402 424 405 419 399 425 414 423 407 423 404 414 393 425 417 427 4175 418 406 419 405 413 402 426 420 420 408 419 406 415 394 423 417 424 4196 418 404 420 407 412 401 423 413 417 408 419 407 412 388 422 417 424 4157 412 400 420 407 408 397 421 408 418 405 415 402 409 389 421 414 422 4178 415 403 421 407 411 400 420 410 421 405 418 404 411 394 419 412 422 4169 416 402 422 409 413 399 420 407 420 407 417 405 412 391 421 414 423 417
10 417 402 424 408 414 400 422 409 420 407 418 405 416 389 421 415 424 41811 417 404 421 406 413 400 422 409 420 405 417 404 413 394 422 414 423 41812 416 405 423 409 413 401 422 412 421 407 419 405 415 397 421 414 423 41813 418 408 424 414 414 405 425 389 422 412 419 410 415 391 421 414 424 41914 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 419
400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV
रायपर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indorer Gwalior
भोपाल खडवा इटारसी दमोह नागदा इदौरRaipur Raigarh
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
14 416 409 422 412 413 405 425 413 422 414 419 411 411 392 421 416 424 41915 419 406 423 413 415 404 423 415 422 413 421 410 410 390 422 416 424 41816 416 404 421 411 412 401 423 412 423 412 419 409 411 389 422 416 424 41717 414 403 418 405 410 398 422 410 420 408 417 406 408 390 421 414 423 41718 416 405 420 409 412 402 421 410 421 410 418 408 409 390 423 417 423 41919 415 405 423 407 412 401 422 409 421 408 418 406 406 391 423 417 425 41820 419 405 423 411 413 400 421 410 422 407 420 406 417 395 423 417 427 41821 419 406 424 414 414 400 422 413 423 411 421 409 416 393 423 416 424 41722 418 405 424 411 414 401 423 411 422 409 420 407 413 392 423 416 425 41823 421 405 425 411 416 402 423 411 422 412 420 410 414 389 422 416 424 41724 421 407 425 411 418 404 425 409 426 410 425 408 412 396 424 415 424 41825 422 407 430 410 418 403 424 412 425 410 423 408 412 391 422 415 425 41726 418 407 424 411 414 403 425 413 423 410 421 408 409 390 420 415 423 41827 417 408 424 409 413 403 421 412 421 409 421 408 408 394 421 414 425 41728 420 411 425 414 415 405 422 416 424 411 422 410 412 395 420 413 423 41729 419 409 426 415 415 404 419 419 424 412 422 410 413 394 420 413 423 41630 419 408 423 414 413 403 419 419 422 413 420 411 411 390 419 413 424 41831 418 405 423 409 413 399 422 384 421 409 420 406 410 391 420 400 425 418
422 400 430 405 419 397 426 384 426 405 425 402 417 383 425 400 427 415
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 420 414 427 416 433 412 428 406 423 400 431 405 432 414 419 405 432 4172 421 414 426 416 431 410 429 404 424 409 432 401 431 382 420 409 432 4193 421 415 427 413 430 408 426 401 422 399 431 404 431 413 418 403 432 4164 422 413 428 412 434 407 427 399 421 397 430 405 431 410 420 401 433 3945 419 414 425 412 430 405 429 398 421 399 431 404 431 413 418 402 411 3966 419 413 425 421 429 406 428 400 421 397 432 404 431 413 419 402 412 3947 417 410 425 425 430 407 425 398 420 400 428 405 428 409 416 401 411 3958 415 408 425 425 430 408 427 399 421 397 430 402 430 409 418 400 411 3939 418 410 425 425 431 406 425 399 419 399 427 405 432 409 417 403 409 395
10 418 412 425 425 430 402 425 401 418 398 427 404 429 412 415 401 408 39311 417 411 425 415 430 405 428 397 418 393 427 400 428 410 416 399 425 39112 417 411 424 417 431 405 427 398 419 391 427 398 429 406 417 399 430 41313 417 412 426 417 432 409 429 405 419 394 427 399 430 407 418 403 432 40014 418 413 426 418 436 414 430 410 423 405 431 400 430 414 418 404 433 41615 419 413 426 416 434 419 427 409 425 400 435 407 430 413 418 406 430 41716 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 419
Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa
400kV 400kV
धल बोईसर कलवा कराड़ असोज दहगाम
16 419 412 425 419 432 414 429 407 421 402 433 408 430 410 419 408 433 41917 419 411 425 415 433 407 432 406 425 398 435 404 430 412 418 403 433 41518 420 415 425 417 431 410 433 413 425 402 436 410 434 416 419 406 431 41719 420 414 425 421 433 405 431 408 424 396 435 403 433 416 418 402 432 38420 421 415 427 417 433 415 433 412 422 400 432 408 432 415 418 402 431 41521 420 413 427 417 433 414 434 413 425 405 436 413 433 417 420 405 434 38722 420 413 427 416 435 414 430 411 423 399 434 406 424 420 419 402 433 41823 419 412 425 417 434 415 432 414 426 406 436 415 420 420 420 410 435 42324 420 412 428 416 434 413 431 409 427 400 437 407 420 420 423 402 436 41425 418 411 429 414 435 412 431 400 423 396 435 403 429 418 421 402 434 41426 417 412 416 416 433 409 428 402 422 396 433 403 432 413 421 402 434 41427 417 410 416 416 434 406 428 398 420 393 431 401 433 415 419 404 431 41628 416 410 416 416 437 420 427 400 422 401 433 410 431 415 423 404 435 41529 416 409 416 416 436 418 426 399 421 395 433 405 432 412 420 404 432 41530 415 409 416 416 433 417 425 403 420 401 431 412 431 416 418 406 430 41731 416 407 425 381 433 413 426 396 421 394 432 402 429 410 419 401 432 381
422 407 429 381 437 402 434 396 427 391 437 398 434 382 423 399 436 381
Date
Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 424 414 417 403 422 408 427 405 427 403 422 402 425 404 420 399 791 763 784 7642 425 416 420 405 421 407 428 411 427 406 423 412 424 411 423 403 793 756 787 7593 424 412 418 404 421 408 426 403 428 402 422 399 424 403 420 396 789 765 788 7624 425 410 418 402 421 406 426 400 434 392 421 395 423 397 420 396 796 763 793 7545 424 412 420 404 422 408 425 403 426 404 420 399 422 402 420 399 793 766 784 7636 423 412 419 402 424 408 424 399 430 401 421 395 422 399 420 397 791 759 784 7607 423 412 418 404 422 410 424 403 428 402 420 399 420 401 420 399 779 756 775 7528 423 410 418 401 424 407 426 400 426 389 422 397 423 398 420 395 779 761 781 7589 423 413 418 405 423 411 422 402 431 398 418 399 420 402 420 400 786 756 783 755
10 422 411 416 403 420 409 422 400 428 408 419 397 420 399 418 393 786 759 785 75711 422 410 415 403 421 409 420 396 428 397 417 392 420 394 416 392 795 763 782 75812 422 410 417 401 422 407 421 394 425 394 417 391 418 393 417 388 787 769 783 75913 423 413 419 402 423 409 423 398 431 389 420 394 420 395 419 395 788 766 785 76714 424 414 419 405 423 411 426 406 428 396 422 403 423 406 420 402 790 767 783 76815 422 414 418 406 423 412 427 403 428 406 422 399 424 401 420 398 790 764 788 76916 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 763
इदौर
765Kv 765KvIndoreBina
400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV
बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जतपर वापी मापसा कला मगरवाड़ा हज़ीरा
16 424 416 419 402 423 408 427 405 427 399 421 402 425 405 422 397 787 759 783 76317 424 413 416 402 423 408 428 404 428 406 424 397 425 399 423 396 784 763 779 75718 425 415 415 404 422 411 427 405 428 400 423 401 425 404 421 397 785 763 782 76519 425 413 414 403 421 411 427 399 429 407 422 395 425 398 421 393 782 764 782 76020 424 412 415 402 421 410 425 402 431 400 420 399 422 401 421 399 789 765 786 75921 425 414 418 405 425 414 427 406 432 401 424 403 424 406 421 398 792 766 786 76422 424 412 421 406 428 412 425 402 428 401 422 399 424 402 420 397 790 766 786 76123 425 417 420 403 426 411 429 409 430 411 425 406 427 409 423 405 798 758 790 76124 426 411 419 402 425 409 430 401 432 403 427 399 429 400 424 394 795 772 794 76625 426 413 418 401 424 409 424 398 428 397 421 396 423 397 421 400 797 768 793 76526 425 412 419 401 426 408 424 397 428 403 421 395 422 396 421 397 791 765 787 76527 424 413 419 401 426 410 422 396 430 405 419 393 422 395 419 396 785 768 787 76628 427 413 422 401 430 408 423 401 427 400 420 398 420 400 422 394 789 771 789 77129 425 412 420 400 425 408 423 398 428 405 419 394 421 398 420 392 790 771 789 77030 423 414 418 401 424 409 421 403 432 409 418 401 420 402 416 397 789 765 788 768
427 410 422 400 430 406 430 394 434 389 427 391 429 393 424 388 798 756 794 752
Date
Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min
1 772 756 781 757 802 791 802 792 797 770 800 791 796 756 773 764 796 769 805 7762 774 754 783 751 801 787 801 787 798 775 800 781 803 741 765 758 792 768 799 7733 771 758 778 760 801 788 802 788 796 765 802 781 791 762 772 760 794 770 805 7684 777 759 788 760 803 786 804 786 802 766 802 783 801 759 773 756 797 766 803 7705 775 759 785 760 799 788 801 787 793 769 794 774 799 760 768 760 792 767 800 7646 772 756 783 754 799 790 800 789 795 770 796 783 796 752 769 756 790 769 798 7737 766 752 771 749 796 786 797 786 789 763 791 785 789 752 765 757 780 761 792 7658 764 755 768 755 796 786 796 785 796 764 791 781 791 759 766 757 783 762 794 7689 767 753 778 752 798 787 799 788 796 768 790 781 792 752 768 759 786 766 800 769
10 767 755 777 753 799 787 800 787 790 765 800 781 792 753 770 758 789 767 801 76711 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 768
Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv
Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
11 776 758 780 760 797 788 797 788 793 765 795 780 790 757 768 759 789 765 799 76812 772 760 780 763 800 787 800 787 794 764 798 781 795 763 769 760 788 764 801 76613 776 756 779 757 799 791 800 791 797 772 801 789 794 757 769 762 790 774 803 78114 772 757 783 760 802 792 803 792 798 776 808 797 795 760 771 763 792 778 801 77915 773 759 780 757 801 790 801 790 800 779 806 794 792 756 771 761 791 775 801 76116 769 755 779 754 800 787 800 786 797 778 806 790 790 755 770 758 790 771 799 77617 766 755 773 755 797 785 797 785 794 769 805 786 789 758 768 757 788 767 800 77218 765 754 775 754 797 791 798 789 796 776 803 792 791 757 769 762 788 775 797 77519 766 756 776 757 804 787 805 786 794 770 807 787 783 757 771 761 791 770 799 76820 768 758 777 759 805 788 801 790 794 769 809 787 799 761 772 762 792 773 802 77721 772 756 782 758 798 786 796 788 798 776 799 785 797 762 772 760 792 773 799 77422 774 756 787 757 801 790 799 791 798 766 802 785 796 760 769 758 792 770 801 77123 780 755 793 755 801 786 801 787 800 776 801 784 801 754 771 759 794 769 798 77224 775 759 786 766 798 788 797 791 806 774 800 784 798 768 771 760 793 774 802 77025 775 758 786 758 799 786 799 786 802 773 800 782 798 759 770 759 793 769 802 76726 771 757 780 758 796 787 796 786 802 773 798 784 792 756 768 760 793 772 800 77227 768 758 777 760 802 785 803 785 802 775 797 779 788 760 768 758 792 766 803 75728 770 759 779 761 798 786 798 785 804 778 802 780 792 762 768 760 792 772 801 76729 770 760 779 763 797 786 797 786 804 776 800 784 794 761 767 759 789 772 796 76430 772 757 783 759 799 788 800 787 798 780 808 785 795 756 769 760 792 775 804 771
780 752 793 749 805 785 805 785 806 763 809 774 803 741 773 756 797 761 805 757
( )
Power System Operation Corporation Ltd
(A Government of India Enterprise)Western Regional Load Despatch CentreMumbai
ANNEXURE-5Power CutRestrictions in Western Region for the month of July-2017
k gaujarat Gujarat
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut Restriction on Industriesa) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday
then they will have to staggered on notified day only amp cannot avail as per their choiceb) All industries are required to keep their recess timings staggered
2 kRiYa va gaamaINa xao~aoM kao ivaVut AapUit-2 Power supply to Agricultural amp Rural Sectorsa) 08 Hrs power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply given duringrest of 16 Hrs by providing LSTC
b) Jyotigram Yojana 24 hrs
3 Anya jaanakarI3 Any other information NILK maQya p`doSa Madhya Pradesh
1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
p`it idna kula jaa- kTaOtITotal Energy Cut
(MUs daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous
process HTLT Industries M(b) Baar inayamana Load Shedding
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
SaUnya Nil
(c) Anya jaanakarI Other information1Weekly Off2Staggering of power supply
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
SaUnya NilSaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector -
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-PhaseSupply(DLF)
01072017 31072017 2319 2233 2258
21 Three-PhaseSupply(Irrigation)
01072017 31072017 2330 2236 2311
21 Three-PhaseSupply(Mixed)
01072017 31072017 0949 0917 0939
3 Anya jaanakarI3 Any other information
SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From
idnaaMk Datetk To idnaaMk
DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day
Max(Hrs)
Min (Hrs) Average (Hrs)
31 Commissionary H Qtrs 01072017 31072017 2348 2323 234032 District Head Qtrs 01072017 31072017 2352 2331 234533 Tehsil Head Qtrs 01072017 31072017 2346 2317 2337
ga maharaYT Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of
power cut (MW)
pabandI ka samayaRestriction Timing
pit idna kula jaa- kTaOtITotal Energy Cut
(MUs dayFrom To
(a) Power CutsRestriction on HTLT Industries(b) Load SheddingFrom 010717 to 310717
SaUnya Nil
0-00 MW
SaUnya Nil
0000
SaUnya Nil
2400
SaUnya Nil
000MUsday
(c) Any other information1Weekly Off2 Staggering of power supplyIndustrial Staggering LSwithdrawn from 03022012
SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per day
Max (Hrs) Min (Hrs) Average (Hrs)21 Three-Phase Supply 01072017 31072017 1000 800 0900
22 Single-Phase Supply 01072017 31072017 1800 1800 1800
3 Anya jaanakarI Any other informationThere is no load shedding on industrial feeders in Maharashtra
Ga CtIsagaZ Chhattisgarh1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid1 Power Cut Restriction on Industries Load Shedding in the state etc
ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)
pabandI ka samayaRestriction Time
p`it idna kulajaa- kTaOtI
TotalEnergy Cut(MUs day)
sao From tkTo
(A) Scheduled(a) (i) Power CutsRestriction on HT Industries(ii) Power CutsRestrictionon LT Industries(iii) Power CutsRestrictionon Rural(iv) Agriculture pump
(v)Urban Sub-Urban(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled(a) Load Shedding
0000(Av)
0000(Av)
0000 (Av)0000 (Av)0000(Av)0000 (Av)
1Rural 6530 MW (Avg) For 9903 Hrs
2Town Feeders (C-1to C-6 amp X) 000(Av)
-
-
-0000
--
-
-
-
-0000
--
-
-
-
-
-000
--
020
-
3 Industries 8437 MW (Avg) For 12309Hrs
029
Total Energy Cutday 049( b) Any other information1Weekly Offstaggering ofpower supply
- - - -
2 kRiYa xao~ kao ivaVut AapUit-2 Power supply to Agricultural Sector
ivavarNa Details sao FromidnaaMk Date
tk ToidnaaMk Date
p`it idna AapUit- GaMTo Supply Hours per dayMax (Hrs) Min (Hrs) Average (Hrs)
21 Three-Phase Supply 01072017 to 31072017 180022 Single-Phase Supply - - - - -23 RemarksNote - - - - -
3 Anya jaanakarI Any other information SaUnya Nil
Annex-26
जलाई 2017Details of forced unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 उकाई Ukai-2 GSECL 120 1600 09-04-2016 Still out Still out Long restoration period
2 उकई Ukai 1 GSECL 120 0318 07-05-2016 Still out Still out Excitation problem
3 STPS 2 GSECL 120 1305 24-09-2016 Still out Still out Bunker problem
4 STPS 1 GSECL 120 1800 26-09-2016 Still out Still out RSD
5 डीजीबीsपी DGBP 1 GSECL 107 0210 08-04-2017 Still out Still outRSD
6 हाजीरा Hazira(Extn) GSECL 351 2328 04-05-2017 Still out Still out RSD
7 डीजीबीपी DGBP 3 GSECL 375 2334 13-05-2017 Still out Still out RSD
8 जीपीपीसी GPPC 2 GSECL 351 2358 01-06-2017 Still out Still out RSD
9 उकाई Ukai 6 GSECL 500 0627 05-06-2017 Still out Still out Rotor Earth fault
10 जीपक GPEC 1 GSECL 218 2119 11-06-2017 2009 19-07-2017 RSD
11 उतरण UTRAN STG II 1 GSECL 375 2343 15-06-2017 Still out Still out RSD
12 GTPS 4 GSECL 210 1905 16-06-2017 0438 26-07-2017 RSD
13 STPS 4 GSECL 250 1940 17-06-2017 0230 01-07-2017 Choke up in boiler RHS
14 Wanakbori 1 GSECL 210 2200 19-06-2017 Still out Still out RSD
15 Wanakbori 2 GSECL 210 1805 19-06-2017 Still out Still out RSD
16 जीपक GPEC 3 GSECL 218 1501 27-06-2017 1014 13-07-2017 RSD
17 जीपक GPEC 2 GSECL 218 1528 27-06-2017 0742 06-07-2017 RSD
18 बीईसीएल BECL 1 GSECL 250 1005 28-06-2017 0544 05-08-2017Main steam temperaturelow
19 GTPS 3 GSECL 210 1311 28-06-2017 0442 27-07-2017 RSD
20 Wanakbori 7 GSECL 210 0729 29-06-2017 0331 18-07-2017 RSD
21 Wanakbori 6 GSECL 210 1028 29-06-2017 Still out Still out RSD
22 Wanakbori 5 GSECL 210 1636 29-06-2017 0738 06-08-2017 RSD
23 Wanakbori 3 GSECL 210 1854 29-06-2017 Still out Still out RSD
24 बीईसीएल BECL 2 GSECL 250 0342 30-06-2017 1122 05-07-2017 Coal feeding problem
25 एसएलपीपी SLPP 1 GSECL 125 1700 30-06-2017 1158 06-07-2017 RSD
26 Wanakbori 4 GSECL 210 0003 01-07-2017 Still out Still out RSD
27 उकाई Ukai 3 GSECL 200 0016 01-07-2017 1117 19-07-2017 RSD
28 STPS 4 GSECL 250 0230 01-07-2017 1105 10-07-2017 RSD
29 STPS 3 GSECL 250 1038 01-07-2017 1818 05-08-2017 RSD
30 GTPS 5 GSECL 210 1054 01-07-2017 0625 08-07-2017 RSD
31 उकाई Ukai 4 GSECL 200 1755 01-07-2017 1343 08-07-2017 RSD
32 ALTPS 1 GSECL 125 0452 04-07-2017 1206 10-07-2017 BTL
33 जीपीपीसी GPPC 1 GSECL 351 1023 05-07-2017 1205 30-07-2017 RSD
34 जीपक GPEC 2 GSECL 218 1636 07-07-2017 1925 13-07-2017 RSD
35 एसएलपीपी SLPP 1 GSECL 120 2015 08-07-2017 1500 13-07-2017Boiler parametersabnormal
36 बीईसीएल BECL 2 GSECL 250 2131 08-07-2017 1351 12-07-2017 DLH
37 उकाई Ukai 5 GSECL 210 1358 10-07-2017 0613 20-07-2017 RSD
38 STPS 4 GSECL 250 1120 11-07-2017 0655 21-07-2017 RSD
39 एसएलपीपी SLPP 2 GSECL 125 1644 11-07-2017 Still out Still out RSD
40 एसएलपीपी SLPP 4 GSECL 125 0441 13-07-2017 0907 18-07-2017 BTL
41 जीपक GPEC 3 GSECL 218 1214 14-07-2017 1845 19-07-2017 RSD
42 GTPS 3 GSECL 210 1409 14-07-2017 0314 18-07-2017 RSD
43 जीपक GPEC 2 GSECL 218 0736 15-07-2017 0943 19-07-2017 RSD
44 बीईसीएल BECL 2 GSECL 250 0826 15-07-2017 0930 21-07-2017 RSD
45 ALTPS 1 GSECL 125 1020 16-07-2017 1117 19-07-2017 BTL
46 जीपक GPEC 1 GSECL 218 2212 19-07-2017 Still out Still out RSD
47 जीपक GPEC 3 GSECL 218 2240 19-07-2017 2018 27-07-2017 RSD
48 जीपक GPEC 2 GSECL 218 2312 19-07-2017 1032 26-07-2017 RSD
49 एसएलपीपी SLPP 1 GSECL 125 0815 21-07-2017 1225 25-07-2017 BTL
50 उकाई Ukai 4 GSECL 200 1128 21-07-2017 1032 06-08-2017 RSD
51 Wanakbori 7 GSECL 210 1843 21-07-2017 2230 28-07-2017 RSD
52 डीजीबीपी DGBP 2 GSECL 112 2358 21-07-2017 0556 26-07-2017 RSD
53 िज GTPS 5 GSECL 210 0032 22-07-2017 Still out Still out RSD
54 बीईसीएल BECL 2 GSECL 250 0850 22-07-2017 Still out Still out RSD
55 STPS 4 GSECL 250 0946 22-07-2017 2005 07-08-2017 RSD
56 उकाई Ukai 5 GSECL 210 1900 22-07-2017 0545 01-08-2017 RSD
57 एसएलपीपी SLPP 3 GSECL 125 1041 23-07-2017 0000 26-07-2017 RSD
58 जीपक GPEC 3 GSECL 218 2117 27-07-2017 Still out Still out RSD
59 कोराडी Koradi-6 MAHAGENCO 210 0102 20-03-2015 Still out Still out Economic shutdown
60 Parli 4 MAHAGENCO 210 1947 05-07-2015 Still out Still out Economic shutdown
61 Parli 5 MAHAGENCO 210 1455 06-07-2015 Still out Still out Economic shutdown
62 WPCL 1 MAHAGENCO 135 1703 16-02-2016 Still out Still out Low Schedule
63 WPCL 2 MAHAGENCO 135 2146 29-02-2016 Still out Still outChange over against unit-3as per scheduled dispatch
64 भसावल Bhusawal 2 MAHAGENCO 210 1935 14-06-2016 Still out Still out BTL
65 पायोनीरPIONEER(262+127) 1
MAHAGENCO 388 1745 07-02-2017 Still out Still out Low schedule
66 जयगढ़ Jaigad 2 MAHAGENCO 300 2358 31-05-2017 Still out Still out Low schedule
67 PARLI 7 MAHAGENCO 250 0004 13-06-2017 Still out Still out Low schedule
68 भसावल Bhusawal 3 MAHAGENCO 210 0601 13-06-2017 Still out Still out Low schedule
69 वीआईपीएल VIPL 1 MAHAGENCO 300 0830 13-06-2017 Still out Still out GT work
70 PARLI 6 MAHAGENCO 250 0002 14-06-2017 Still out Still out No schedule
71 PARLI 8 MAHAGENCO 250 0008 17-06-2017 Still out Still out Low schedule
72 WPCL 4 MAHAGENCO 135 0901 23-06-2017 Still out Still out Coal Shortage
73 भसावल Bhusawal 4 MAHAGENCO 500 0038 24-06-2017 2344 11-07-2017 Hydrogen leakage
74 भसावल Bhusawal 5 MAHAGENCO 500 0000 26-06-2017 1134 12-07-2017 Less schedule
75 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 1020 26-06-2017 0955 06-07-2017 Low schedule
76 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 2350 27-06-2017 0458 08-07-2017 Low schedule
77 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2351 27-06-2017 0634 08-07-2017 Low schedule
78 खापरखड़ाKhaparkheda 5
MAHAGENCO 2357 28-06-2017 2223 06-07-2017 Low schedule
79 Nasik 3 MAHAGENCO 210 0325 01-07-2017 1200 10-07-2017BTL (converted to ZeroSchedule from 1000HrsDT04th July 17)
80 WPCL 3 MAHAGENCO 135 1211 07-07-2017 2349 18-07-2017 ID FAN Problem
81 Nasik 4 MAHAGENCO 210 1428 10-07-2017 Still out Still out Boiler validity extension
82 खापरखड़ाKhaparkheda 1
MAHAGENCO 210 2353 11-07-2017 0406 07-08-2017 RSD
83 खापरखड़ाKhaparkheda 3
MAHAGENCO 210 0840 12-07-2017 0423 08-08-2017 BTL
84 खापरखड़ाKhaparkheda 4
MAHAGENCO 210 0336 13-07-2017 Still out Still out Drum level low
85 भसावल Bhusawal 5 MAHAGENCO 500 0600 15-07-2017 Still out Still out No schedule
86 Nasik 5 MAHAGENCO 210 0000 16-07-2017 Still out Still out RSD
87 भसावल Bhusawal 4 MAHAGENCO 500 2346 17-07-2017 1159 31-07-2017 No schedule
88 WPCL 4 MAHAGENCO 135 0350 19-07-2017 0437 23-07-2017 ID fan problem
89 Chandrapur 5 MAHAGENCO 500 2229 22-07-2017 1620 26-07-2017Primary air pre-heaterproblem
90 खापरखड़ाKhaparkheda 5 MAHAGENCO 500 0000 25-07-2017 1927 30-07-2017 Zero schedule
91 उरण Uran 6 MAHAGENCO 108 0045 26-07-2017 Still out Still outAir filter replacementwork
92 वीआईपीएल VIPL 2 MAHAGENCO 300 1102 30-07-2017 0427 02-08-2017 BTL
93 Chandrapur 5 MAHAGENCO 500 0126 31-07-2017 1050 03-08-2017 BTL
94 Trombay 7A TPC 120 0251 22-07-2017 1227 28-07-2017 Routine Maintenance
95 आरजीपीपीएलRGPPL-1B
RGPPL 320 2300 31-03-2014 Still out Still outDry preservationGasshortage
96 आरजीपीपीएलRGPPL-1A
RGPPL 320 1330 8-07-2014 Still out Still out Less requisition
97 आरजीपीपीएलRGPPL 2A
RGPPL 230 1805 18-05-2017 Still out Still out Unit change over
98 आरजीपीपीएलRGPPL 2B
RGPPL 1324 07-06-2017 Still out Still outAs per schedule Changeover of units as 3b isavailable
99 AMRAVATITPP(INDIABULL)-3
RATTAN POWERINDIA LTD
270 1431 05-06-2017 Still out Still outlow schedule Change overof unit-5
100 AMRAVATITPP(INDIABULL)-4
RATTAN POWERINDIA LTD
270 0020 09-06-2017 Still out Still out Low Schedule
101 AMRAVATITPP(INDIABULL)-5
RATTAN POWERINDIA LTD
270 0139 09-06-2017 Still out Still out Low Schedule
102 AMRAVATITPP(INDIABULL)-2
RATTAN POWERINDIA LTD
270 0424 09-06-2017 Still out Still out Low Schedule
103 सातपरा Satpura II 6 MPPGCL 200 1150 21-02-2017 Still out Still out Deaerator Problem
104 सातपरा Satpura II 7 MPPGCL 210 1500 10-03-2017 Still out Still out RSD
105 सातपरा Satpura III 9 MPPGCL 210 2034 07-05-2017 Still out Still out RSD
106 सातपरा Satpura III 8 MPPGCL 210 1817 08-05-2017 0210 02-07-2017 RSD
107 Singaji 2 MPPGCL 600 1850 29-05-2017 0000 02-07-2017 RSD
108 Singaji 1 MPPGCL 600 1345 09-06-2017 0032 09-07-2017 RSD
109 SGTPS 4 MPPGCL 210 1345 18-06-2017 Still out Still out RSD
110 SGTPS 2 MPPGCL 210 1546 18-06-2017 Still out Still out RSD
111 SGTPS 4 MPPGCL 210 1345 18-06-2017 0722 08-07-2017 RSD
112 SGTPS 2 MPPGCL 210 1546 18-06-2017 0136 09-07-2017 RSD
113 SGTPS 3 MPPGCL 210 1202 21-06-2017 0705 18-07-2017 RSD
114 JP Bina 2 MPPGCL 250 0109 01-07-2017 0443 22-07-2017Smoke detected in turbinecontrol panel
115 SGTPS 2 MPPGCL 210 0855 10-07-2017 1151 14-07-2017 BTL
116 एमबी पावरMB Power 1 MPPGCL 600 1140 12-07-2017 1224 16-07-2017Tripped due to APHproblem
117 Singaji 1 MPPGCL 600 1715 23-07-2017 1904 27-07-207 RSD
118KORBA(W) EXTN
CSPTCL 500 1810 19-07-2017 1714 22-07-2017 BTL
119 KORBA(E) 5 CSPTCL 120 1255 20-07-2017 1720 27-07-2017 ETL
120KORBA(W) CSETCL 3
CSPTCL 210 2325 26-07-2017 1235 30-07-2017For oil filtration ofGenerator transformer
121 मारवा Marwa TPS 1 CSPTCL 500 1540 27-07-2017 1405 30-07-2017 Turbine Temperature High
122 KORBA(E) 5 CSPTCL 120 1930 27-07-2017 1240 02-08-2017 Loss of fuel
123 KORBA(E) 6 CSPTCL 120 1115 31-07-2017 1558 07-08-2017 BTL
124 सीजीपीएल CGPL 30 CGPL 830 0134 18-05-2017 1808 14-07-201HP Heater amp Bottom ashhopper Problem
125 सीजीपीएल CGPL 10 CGPL 830 2043 08-06-2017 0110 06-07-2017Re heater spray lineleakage
126 एपीएल मदराAPL Mundra 3
Adani Power Ltd 330 1758 24-06-2017 2350 17-07-2017 Deterioration of coal stock
127 APL Mundra 4 Adani Power Ltd 330 2022 26-06-2017 2329 17-07-2017Deterioration in coal stockposition
128 APL Mundra 1 Adani Power Ltd 330 1605 11-07-2017 0448 17-07-2017 RSD
129 एपीएमएल मदराAPL Mundra 7
Adani Power Ltd 660 1504 18-07-2017 0853 24-07-2017
Tripped due to suddenblockage of coal in 3 noof mills and boiler trippedon flame loss
130 एपीएमएल मदराAPL Mundra 3
Adani Power Ltd 330 1431 22-07-2017 2220 06-08-2017 RSD
131 एपीएमएल मदराAPL Mundra 1
Adani Power Ltd 330 1531 22-07-2017 0450 31-07-2017 RSD
132 एपीएमएल मदराAPL Mundra 8
Adani Power Ltd 660 1806 24-07-2017 Still out Still out Coal mill problem
133 जपीएल JPL Stg-II 3 JPL 600 0954 17-06-2016 Still out Still out Less scheduleRSD
134 जपीएल JPL Stg-II 1 JPL 600 0000 11-06-2017 Still out Still outTaken out due to coalfeeding problem
135 जपीएल JPL Stg-II 4 JPL 600 1613 24-06-2017 Still out Still outLoss of all fuel due to
heavy jerk
136 जपीएल JPL Stg-I I JPL 250 0005 25-06-2017 Still out Still out RSD less schedule
137 जपीएल JPL Stg-I 4 JPL 250 0212 01-07-2017 0509 20-07-2017 RSD low export schedule
138 जपी JP Nigrie 1 JAYPEE 660 0230 01-07-2017 2117 28-07-2017 Generator inspection
139 ईपीजीएल EPGL 1 ESSAR 600 0937 01-07-2017 1858 08-07-2017 RSD
140 ईपीजीएल EPGL 2 ESSAR 600 1219 22-07-2017 1918 29-07-2017 RSD
141 उनोसजन UNOSUGEN-1 TPGL 382 2155 04-03-2016 Still out Still out RSD
142 डीजीईएन DGEN-52 TPGL 400 2000 25-11-2016 Still out Still out No schedule
143 डीजीईएन DGEN-51 TPGL 400 1928 02-12-2016 Still out Still out No schedule
144 डीजीईएन DGEN-53 TPGL 400 1912 23-12-2016 Still out Still out Low schedule
145 एमको EMCO II GMR 300 1511 19-06-2017 1143 14-07-2017Cooling water lineleakage
146GMR CHHATISGARH 2
GMR 685 0110 02-08-2016 Still out Still out No Schedule
147GMR_CHHATISGARH 1
GMR 685 0200 22-07-2017 Still out Still out No schedule
148 झाबआ पावरJhabua Power 1
JHABUAP 600 1643 30-05-2017 Still out Still out CW Pump trip
149 KWPCL 1 KWPCL 600 2212 22-05-2017 Still out Still outStator earth faultprotection operated
150KSK Mahanadi 1
KMPCL 600 0635 14-07-2017 0910 21-07-2017Ash conveying linechoking
151 आरकएम RKM Power 1 RKMPPL 360 1707 12-06-2017 1314 13-07-2017Due to loss of evacuationline
152 आरकएम पावरRKM Power 2
RKMPPL 360 1030 10-07-2017 1821 21-07-2017COAL shortage due to lesssupply because of rains
153 आरकएम पावरRKM Power 1
RKMPPL 360 1155 17-07-2017 Still out Still out Fault in the GT
154 आरकएम पावरRKM Power 2
RKMPPL 360 1913 22-07-2017 Still out Still out Taken As per schedule
155 बालको BALCO 4 BALCO 135 0210 07-07-2017 Still out Still out ESP problem
156 बालको BALCO 3 BALCO 135 1253 26-06-2017 2033 16-07-2017 Stator earth fault
157 बालको BALCO 2 BALCO 300 0413 20-07-2017 1657 28-07-2017Problem in Ash conveyingsystem
158 बालको BALCO 1 BALCO 300 0009 24-07-2017 Still out Still outOverhauling and Low CoalStock
159 Lanco 2 LANCO 300 1334 23-07-2017 Still out Still out Air pre heater problem
160 एमसीसीपीएल MCCPL 1 ACBIL 300 2144 23-07-2017 1447 01-08-2017 Master Fuel Trip
161TRN Energy 2
ACBIL 300 0319 09-07-2017 Still out Still out CTL
162 डीबी पावर DB Power I DBPL 600 0009 10-07-2017 0527 18-07-2017Wet coal and difficulty infetching coal from minesdue to heavy rains
163 KAPS 2 NPCIL 220 1409 01-07-2015 Still out Still out Nuclear reactor side problem
164 KAPS 1 NPCIL 220 0852 11-03-2016 Still out Still out Reactor side problem
165 ट TAPS 4 NPCIL 540 1955 23-04-2017 Still out Still outBi-Annual maintenanceand routine surveillancetest
166 ट TAPS 1 NPCIL 160 1909 04-06-2017 Still out Still out Refueling
167 ट TAPS 3 NPCIL 540 1630 11-07-2017 Still out Still outEmergency mandatoryreactor inspection as perregulatory requirements
168 कावास Kawas GT 1B NTPC 106 2332 01-06-2017 Still out Still out RSD
169 कावास Kawas ST 1C NTPC 106 2357 01-06-2017 Still out Still out RSD
170 कावास Kawas GT 1A NTPC 106 0007 02-06-2017 Still out Still out RSD
171 Gandhar GT ST 1 NTPC 219 1629 20-06-2017 0628 11-07-2017 RSD
172 मौदा Mouda 2 NTPC 500 1618 25-06-2017 2045 28-07-2017 RSD
173 मौदा Mouda 3 NTPC 660 1526 27-06-2017 Still out Still out RSD
174 मौदा Mouda 1 NTPC 500 0931 30-06-2017 0054 10-07-2017 RSD
175 KSTPS 7 NTPC 500 2349 30-06-2017 2331 24-07-2017 Over hauling for 25 days
176 VSTPS 12 NTPC 500 1202 08-07-2017 1927 14-07-2017Turbine bearing highvibration
177 गाधार Gandhar GT ST 3 NTPC 219 0552 18-07-2017 0900 24-07-2017 RSD
178 गाधारGandhar GT ST 3 NTPC 219 0900 24-07-2017 1130 27-07-2017Inspection andmaintenance works
179 मौदा Mouda 1 NTPC 500 1708 24-07-2017 0512 02-08-2017 RSD
180 गाधारGandhar GT ST 3 NTPC 216 1130 27-07-2017 0900 03-08-2017 RSD
Note Units out for more than 72 hrs are only included
Annex-27
जलाई 2017Details of planned unit outages during the month of July 2017
अन
SlNo
Unitसघटक
ConstituentIPPमता
मगावॉटCapMW
सoFrom
समय
सoFrom
समय
कारणReason
Time Date Time Date
1 Trombay 6 TPC 500 0000 06-03-2016 Still out Still out
Unit 6 is kept undereconomic shutdownsince 4th Mayrsquo160000hrs after AOH
2 एसएलपीपीSLPP 3
GSECL 125 0000 26-07-2017 Still out Still out AOH
3 Chandrapur-
3MAHAGENCO 210 2324 05-06-2017 1618 24-07-2017 AOH
4 खापरखड़ाKhaparkheda 2
MAHAGENCO 210 2316 14-06-2017 0933 07-08-2017 AOH
5 पारस Paras 4 MAHAGENCO 250 0004 21-06-2017 0606 17072017 AOH
6 कोराडी Koradi 7 MAHAGENCO 210 0122 21-06-2017 Still out Still out AOH
7 जयगढ़ Jaigad 4 MAHAGENCO 300 2041 04-07-2017 1230 04-08-2017 AOH
8SGTPS 5
MPPGCL 500 0000 28-06-2017 Still out Still out AOH
9 सातपरा Satpura IV
2MPPGCL 250 0253 20-07-2017 Still out Still out AOH
10SGTPS 5
MPPGCL 500 0000 28-06-2017 0042 01-08-2017 AOH
11SGTPS 2
MPPGCL 210 0000 25-07-2017 Still out Still out AOH
12 JP
BINAMPPGCL 250 0001 30-07-2017 Still out Still out AOH
13 KORBA(W)CSETCL 2
CSPTCL 210 2350 31-07-2017 Still out Still out AOH
14 APML Tiroda 3 Adani Power Ltd 660 2348 14-07-2017 0004 01-08-2017 AOH
15VSTPS 3
NTPC 210 0116 03-07-2017 0810 06-008-2017 AOH
16KSTPS 1
NTPC 200 0057 28-07-2017 Still out Still out AOH
ANNEXURE 31
(MW) From To1 GUJARAT14 SLPP 4 125 26-Aug-17 15-Sep-17 AOH15 ALTPS 1 125 01-Sep-17 30-Sep-17 AOH
221 SATPURA 6 200 1-Sep-17 15-Sep-17 AOH
3 CHHATTISHGARH
31441 WPCL Unit 2 135MW 3Sep2017 14Sep2017 AOH
5 Central Sector
51KSTPS
5500
24-Aug-17 22-Sep-17 BLR OH
52 KSTPS 6 500 26-Aug-17 29-Aug-17 ESP GD Test53 MOUDA 2 500 01-Sep-17 26-Sep-17 BLR and Gen Overhaul54 VSTPS 10 500 15-Sep-17 10-Oct-17 Boiler + CW duct coating55 VSTPS 4 210 05-Sep-17 30-Sep-17 Boiler modification56 SIPAT 3 660 30-Aug-17 13-Oct-17 BOILER+LPT+GEN57 KAWAS GT-2A 106 01-Sep-17 09-Sep-17 CI + WHRB -RLA58 SASAN 6 01-Sep-17 30-Sep-17 AOH
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2017 AND SEPTEMBER 2017
Capacity Outage Plan
MAHARASHTRA
MADHYAPRADESH
ReasonS No Unit No
ANNEXURE 32Date Time Date Time
1 765 Bhopal - Indore 01Sep17 1000 01Sep17 1800 Daily removal of quad conductor from terminal equipmentsat Indore PS
STERLITE WR-II C INDORE
2 765 Bus-I at Pooling stationjabalpur 01Sep17 1000 02Sep17 1800 Daily For Vindhyachal Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
3 400 50MVAR Bina-I Line Reactor at Shujalpur 01Sep17 1000 15Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
4 400 400 kV Jetpur Mundra ckt 2 01Sep17 800 01Sep17 1800 Daily Attending Bus 2 Y-ph PG Iso inpresence of SampSEngineer at Jetpur GETCO end POWERGRID WR-II C BHACHAU
5 400 Sami2 Tie Bay (Bay 422) at Dehgam 01Sep17 900 01Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
6 765 1500MVA ICT 3 at Vchal 01Sep17 900 02Sep17 1800 Daily RTCC COMMISSIONING WORK amp CSDCommsioning work
POWERGRID WR-II C VCHAL
7 765 765 KV Sasan-Satna Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC8 765 765KV Satna-Gwalior Ckt-1 01Sep17 900 30Sep17 1800 Daily INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC9 220 220KV Chhegaon-Khandwa Ckt-2 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC10 220 220KV Omkareshwar-Chhegaon Ckt-1 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC11 220 220KV Barwaha-Chhegaon Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC12 220 220KV Seoni-Seoni MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC13 400 400KV Korba-Birsinghpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC14 400 400KV Mundra-Jetpur Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC15 400 400KV Dehgam-Nagda Ckt-1 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC16 765 765KV Indore- 765-Bina 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC17 220 400 Bina MPPTCL-220 Bina MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC18 220 220KV Bina-Shivpuri Ckt-12MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC19 220 220KV Rajgarh-Rajgarh Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC20 220 220KVShujalpur-Shujalpur Ckt-12 MPPTCL 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK MPPTCL WR-II C ULDC21 400 400 KV Sasan-Vindhyachal 01Sep17 900 30Sep17 1800 Daily ONLINE INSTALATION OF OPGW WORK POWERGRID WR-II C ULDC
22 765 Seoni - Bina 01-Sep-17 930 01-Sep-17 1300 Daily Erection of CB and BPI for implementation of NGRBypass scheme at Bina
POWERGRID WR-II C RHQ
23 400 Anuppur - Jabalpur Ckt1amp2 01-Sep-17 700 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
24 220 Kawas - Haldarwa Ckt1amp2 01Sep17 800 15Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
25 765 765KV Vchal-Satna Line1 01Sep17 900 01Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
26 220 201ICT MB amp 220KV Main bus-1 at Bina 01Sep17 930 01Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89A Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-II
POWERGRID WR-II R BINA
27 400 HVDC POLE-1 Main Bay (403) at Bhadrawati 01-Sep-17 900 01-Sep-17 1800 Daily Yearly AMP WRTS-I WRTS-I R Bay28 400 ICT1 amp Future Tie bay (402) at Bilaspur PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay29 765 ICT1_765400kv_CHAMPA 01-Sep-17 900 01-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT30 765 765 Kv Champa - 2 Main bay 819 at Durg PS 01-Sep-17 900 01-Sep-17 1800 Daily AMP of bay WRTS-I WRTS-I R Bay31 765 765KV BILASPUR LINE MAIN BAY(712) AT DHARAMJAYGARH(KORBA) SS01-Sep-17 900 01-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY
32400 BUS REACTOR_400kV_50MVAR_PUNE 01-Sep-17 900 01-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor
33 400 400KV_BUS-2 at Seoni 01-Sep-17 900 01-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus34 400 kV 400kV WARDHA-AKOLA I 01-Sep-17 900 01-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE35 765 kV 765 KV ICT-3 Main bay (709) at Wardha 01-Sep-17 900 01-Sep-17 1800 Daily AMP work CB timing is to be done WRTS-I WRTS-I R bay36 400 400 kV Sipat 2 amp Future Tie bay(408) at Raipur SS 01-Sep-17 930 01-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay37 765 765kV Bus_1 at Aurangabad 01-Sep-17 800 02-Sep-17 1800 Continuous For construction of new Solapur bays WRTS-I WRTS-I C Bus38 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_1 01-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE39 765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 01-Sep-17 900 08-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR40 400 400kV KORBA-BIRSINGHPUR II 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-II WRTS-I C LINE-AR41 400 400kV WARDHA-PARLI I 01-Sep-17 600 30-Sep-17 1800 Daily Online OPGW work AR to be kept in Non auto mode WRTS-I WRTS-I C LINE-AR42 765 kV 765kV SEONI-WARDHA I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW stringing workWRTS-I WRTS-I C LINE-AR43 400 kV 400kV WARDHA-PARLI I 01-Sep-17 900 30-Sep-17 1800 Daily AR to be kept in Non Auto mode for Online OPGW Stringing workWRTS-I WRTS-I C LINE-AR44 400 400kV RAPP-Sujalpur Ckt-2 1-Sep-17 900 1-Sep-17 1700 Daily Maintenance Work RTCL RTCL R45 400 KV 400KV Bus Coupler Karad 01-Sep-17 1000 01-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL46 400 KV 400KV BUS COUPLER 400KV Koradi ss 01-Sep-17 1000 01-Sep-17 1700 Daily Retrofitting of Over current relay as a back up to Busbar ProtectionMSETCL MSETCL47 400kV Main BAY (401) of 400kV side of ICT 1 at Koradi III Sub Station01-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL48 400KV 400 KV Dabhol- Nagothane line II 01-Sep-17 800 06-Sep-17 1800 Daily Hill cutting work at loc No 132-133 92-93 amp 42-43 MSETCL MSETCL49 400KV 400KV Karad -New Koyna ckt 1 amp 2 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL50 400KV 400KV Jejuri - Lonikand 01-Sep-17 700 30-Sep-17 1900 Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW workMSETCL MSETCL
Agency Type Site
LIST OF PROPOSALS OF TRANSMISSION ELEMENTS PLAN FOR THE MONTH OF SEPTEMBER 2017
SN KV Line Element From To Basis Reason System
51 400KV 400kV Partial A bus Padgha 01-Sep-17 000 03-Sep-17 24 continuous Replacement of A bus Quadruple Conductor in upper sectionMSETCL MSETCL52 400KV 400KV Chandrapur II -Nanded Ckt-II 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL53 400KV 400KV Chandrapur GCR-Parli Ckt-III 01-Sep-17 800 02-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL54 220 220KV Bina-Bina(PGCIL) 1-Sep-17 800 1-Sep-17 1700 daily For routine testing amp maintenance of equipments MPPTCL MPPTCL R55 400 400220 KV 315 MVA ICT-3 Vadavi 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO56 400 400 KV Chorania-Amreli 01-Sep-17 800 01-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO57 400 400 KV Asoj - Kosamba 01-Sep-17 800 01-Sep-17 1800 Daily Maintenance work GETCO GETCO
58 400 400 KV Raita-Khedamara-I feeder at 400 KV SsRaita
1-Sep-17 0800 hrs 1-Sep-17 1700 hrs --- Schedule Maintenace Reactor Breaker CTIsolator LA CVT amp WT etc
CSPTCL CSPTCL
59 400 421 52 and 420 52 breakers (GT40 Main Breakerand Tie Breaker of GT40 and Jetpur-2)
1Sep17 800 30Sep17 2000 ContinuousReplacement of GT40 Line Isolaotr and RelayTesting of GT40
CGPL CGPL
60 400 ACBIL-MCCPL 400 KV Ckt 2 1-Sep-2017 0700 3-Sep-2017 1800 Daily AMP ACBIL ACBIL
61 400KV 400KV Mouda Bus Reactor1 1-Sep-17 900 3-Sep-17 1800
Daily
Annual Maintenance NTPC NTPC
62 765kV 765KV SC Aurangabad-Dhule Line AR OFF 01-Sep-17 700 01-Sep-17 1800 Daily AR in Non Auto mode for tower top patrolling BDTCL BDTCL R63 765kV 765400 KV ICT 1 at BDTCL Bhopal 01-Sep-17 1000 01-Sep-17 1200 Daily For switching with the spare ICT BDTCL BDTCL R
64 400 400 kV Jetpur Mundra ckt 1 02Sep17 800 02Sep17 1800 Daily Attending Reactor and Line Isolator in presence ofSampS Engineer at Jetpur GETCO end
POWERGRID WR-II C BHACHAU
65 765 765KV Vchal-Satna Line2 02Sep17 900 02Sep17 1800 Daily For Making Quad Jumper Twin on Line Equipment atSatna
POWERGRID WR-II R SATNA
66 765 765 kV Bina-Jabalpur I Line 02Sep17 930 02Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
67 400 400 KV BUS-1 at Talegaon 02-Sep-17 900 02-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bus68 400 400KV_BUS-1 at Seoni 02-Sep-17 900 02-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bus69 400 400Kv SOLAPUR(NTPC)-SOLAPUR(PG)_2 02-Sep-17 800 02-Sep-17 1800 CONT POWER LINE CROSSING STRINGING WORKS NTPC3amp4WRTS-I WRTS-I C LINE
70
400 kV 400kV WARDHA-AKOLA II 02-Sep-17 800 02-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE71 765 kV 765 KV Seoni-2 amp BR-2 Tie bay (711) at Wardha 02-Sep-17 900 02-Sep-17 1800 Daily AMP work CT tan delta is to be done WRTS-I WRTS-I R bay
72
400 400kV Wardha - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV IEPL-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
73
400 400kV IEPL - Warora (Quad) Line 02-Sep-17 900 03-Sep-17 1800 Conti
Powerline crossing works of 400kV DC LILO of bothckts of Wardha - Parli TL (LOOP IN ) between towerlocation Nos100 amp 110 (400kV Wardh - Warora linetower nos 112amp113) amp LOOP OUT between towerlocation Nos150 amp 160 (400kV Wardh - Warora linetower nos 109amp110)Note Due to DC TL 400kV Wardha-Warora lineoutage also required on same date MSETCL WRTS-I C LINE
74 400kV Tie Bay (402) of ICT-1 amp Line-4 at Koradi III Sub Station02-Sep-17 900 01-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL75 400 400KV Itarsi-I Main CB at 400 kv ss Bhopal 2-Sep-17 900 14-Sep-17 1700 cont For CB replacaement and 3No CT replacement work MPPTCL MPPTCL R
76 765 Bus-II at Pooling stationjabalpur 03Sep17 1000 04Sep17 1830 DailyFor Urai Bay Extension work at PoolingstationJabalpur POWERGRID WR-II C JABALPUR PS
77 765 765 kV Bina-Jabalpur II Line 03Sep17 930 03Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
POWERGRID WR-II R BINA
78 400KV 500 MVA ICT I Kalwa 03-Sep-17 900 03-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL79 765 ICT1 at Indore SS 04Sep17 1000 04Sep17 1800 Daily AMP of ICT POWERGRID WR-II R INDORE
80 400 VINDHYACHAL 1 MAIN BAY (403) at JABALPUR 04Sep17 900 10Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
81 220 220KV Vapi-Magarwada-1 Main Bay 209 04Sep17 900 04Sep17 1700 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI
82 400 Bus 1 at Bhachau 04Sep17 800 07Sep17 1800 Daily RTV Coating of 400KV BUS 1 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
83 220 Ranasan2 Bay (Bay 208) at Dehgam 04Sep17 900 04Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
84 765 765400 KV ICT 2 at Vchal PS 04Sep17 900 04Sep17 1800 Daily RTCC COMMISSIONING WORK amp OTI WTICalibration
POWERGRID WR-II C VCHAL
85 220 Vapi - Karadpada Ckt1 04-Sep-17 700 05-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
86 765 765KV Sasan-Satna Line1 04Sep17 900 04Sep17 1800 Daily For Isolater repair work in Tie Bay POWERGRID WR-II R SATNA87 400 400KV Vapi-Boisar 04-Sep-17 800 04-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
88 765 765 kV Bina-Jabalpur III Line 04Sep17 930 04Sep17 1600 Daily For implementation of NGR bypass scheme in LineReactor at Bina end
STERLITE WR-II R BINA
89 220 Bus-I at Kala 04Sep17 1000 05-Sep-17 1300 Daily Testing of Bus bar protection POWERGRID WR-II R KALA90 220 Bus-II at Kala 04Sep17 1400 05-Sep-17 1700 Daily Testing of Bus bar protection POWERGRID WR-II R KALA
91 765 Main Bay of 765 kV ICT2 (Bay 706) at VadodaraGIS
04Sep17 1000 04-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
92 765 Satna-Bina ckt2 04Sep17 830 04Sep17 1830 DailyInstallation of Diamond crossing of earth wire for765KV DC JBP-ORAI DC line at loc no 710 to720 of Jbp Orai
POWERGRID WR-II C DAMOH
93 400 Khandwa-1 LR at Dhule 04-Sep-17 800 04-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR94 765KV 765KV Durg-1 amp BR Tie Bay (702) at Champa PS 04-Sep-17 900 04-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay95 765 SWITCHABLE LR_765kV_WARDHA 1_DURG PS 04-Sep-17 900 04-Sep-17 1800 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR96 765 765KVJABALPUR-4 TIE BAY(726) AT DHARAMJAYGARH(KORBA) SS04-Sep-17 900 04-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY97 400 BHILAI_MAIN_BAY_415 at Seoni 04-Sep-17 900 04-Sep-17 1800 Daily For AMP Work CT Oil sampling WRTS-I WRTS-I R Bay98 400 400KV PARLI-1 Main Bay (413) at Solapur 04-Sep-17 900 04-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY99 400 kV 400kV WARDHA-AKOLA I 04-Sep-17 900 04-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE100 765 kV 765 KV Bus Reactor -2 Main bay (712) at Wardha 04-Sep-17 900 04-Sep-17 1800 Daily AMP work CB Timing CT tan delta is to be done WRTS-I WRTS-I R bay101 765 765kV DURG PS- CHAMPA_1 amp 2 04-Sep-17 900 06-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR102 400 400kV RAPP-Sujalpur Ckt-1 4-Sep-17 900 4-Sep-17 1700 Daily Maintenance Work RTCL RTCL R103 400 Korba Raipur ckt-3 04092017 0730 hrs 06092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance104 400 Sipat-Ranchi Ckt-2 040917 0730 hrs 060917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance105 400KV 400220KV 300MVA ICT I 400KV Koradi ss 04-Sep-17 900 04-Sep-17 1300 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeMSETCL MSETCL106 400kV 400 kV Station Transformer 2 Main and Tie bay at Tiroda Plant04-Sep-17 900 05-Sep-17 1800 Continuous ST 2 relay Testing amp Bay Equipment Testing and MaintenanceAPML APML107 400kV Main Bay (403) of Line-4 at Koradi III Sub Station 04-Sep-17 900 04-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL108 400 kV 400 kV Akola- Bhusawal Line 04-Sep-17 1200 06-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL109 400KV 400KV TBC-II Bay 400KV SS Chandrapur 04-Sep-17 800 Hrs 08-Sep-17 1800 Hrs for 05 day Continous Basis1) Servicing amp Overhauling of PG-I PG-II amp PG-III Isolator 2) Alingment of Isolators400KV AC MSETCL
110 400 400 KV NAGDA MAIN CB of 400KV ICT-III 4-Sep-17 900 15-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
111 400 400 KV SS KATNI 400KV 125 MVA BHELREACTOR
4-Sep-17 900 5-Sep-17 17l00 cont For post monsoon maintenance work MPPTCL MPPTCL R
112 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -I
4-Sep-17 700 4-Sep-17 17l00 daily For post monsoon maintenance work MPPTCL MPPTCL R
113 400 400KV Indore- Nagda 4-Sep-17 1000 5-Sep-17 1700 cont Replacement of 400KV CT MPPTCL MPPTCL R
114 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-I 4-Sep-17 900 4-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
115 220 220KV Pandhurna-Kalmeshwar 4-Sep-17 900 5-Sep-17 1700 cont For shifting of location of 220kv PT substation MPPTCL MPPTCL R116 400 400 KV Hadala - APL line 04-Sep-17 800 04-Sep-17 1800 Daily Bay and line Maintenance work GETCO GETCO117 400 400 KV Dehgam-Vadavi - 2 04-Sep-17 800 04-Sep-17 1800 Daily Maintenance work GETCO GETCO118 400 400 KV Bus-1 at Chorania 04-Sep-17 800 04-Sep-17 1800 Daily Bus maintenance work GETCO GETCO119 220 220 KV Charadva-Bhimasar line No 1 04-Sep-17 800 04-Sep-17 1800 Daily Bay Maintenance GETCO GETCO120 765 765kV Main Bus-I at Sasan UMPP 04092017 800 04092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
121 400 MCCPL-Bharari 400 KV Ckt1 4-Sep-2017 0700 8-Sep-2017 1800 Daily AMP ACBIL ACBIL
122 400KV 400KV Mouda Bus3 4-Sep-17 900 6-Sep-17 1800 Daily Annual Maintenance NTPC NTPC123 400 BUS-I AT INDORE SS 05Sep17 1000 05Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
124 400 400kV Itarsi-Indore2 Line 05Sep17 900 30Sep17 1700 ContinuousShifting of terminal equipments for converting50MVAR Line Reactor as Switchable Reacor atItarsi
POWERGRID WR-II C ITARSI
125 765765KV Jabalpur-Bina1 switchable Reactor alongwith Reactor bay(815 Reactor Bay) at Poolingstationjabalpur
05Sep17 1000 05Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
126 220 Kawas- Navsari 1 amp 2 05Sep17 800 09Sep17 1800 Continuous Line Shifting work for DFCC railway Corridor POWERGRID WR-II C NAVSARI127 220 220KV Vapi-Vapi Bay-205 at Vapi 05Sep17 900 05Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI128 400 400KV BUS-1 at Pirana SS 05Sep17 900 05Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA129 Gandhar1 Tie Bay (Bay 402) at Dehgam 05Sep17 900 05Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM130 765 701LRB (Jaipur2 LR Bay) at Gwalior 05Sep17 1000 05Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
131 400 Rajgarh-SSP1 Line 05Sep17 1000 05Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
132 400 Vindhyachal - Jabalpur Ckt1 05Sep17 900 06Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ133 765 705 Tie Bay Sasan1 amp ICT2 at Satna SS 05Sep17 900 06Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA134 400 400Kv Boisar-Padghe 05-Sep-17 800 05-Sep-17 1600 Daily OPGW SAG ADJUSTMENT POWERGRID WR-II R BOISAR
135 220 201ICT MB amp 220KV Main bus-2 at Bina 05Sep17 930 05Sep17 1800 Daily
For attending the frequent hot spot problem in 201-89B Isolator and bay will be shifted on TBC
ICT will remain in service through TBC bay ampTransfer Bus and all other feeder will remain inservice through BUS-I
POWERGRID WR-II R BINA
136 400 Khandwa-2 LR at Dhule 05-Sep-17 800 05-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R LR137 765KV 765KV DJAIGARH- CHAMPA 05-Sep-17 900 05-Sep-17 1730 Daily 715-89L Line Isolator (R-Ph) replacement work at Champa endWRTS-I WRTS-I R Line138 765 765KV RANCHI -2 MAIN BAY(728) AT DHARAMJAYGARH(KORBA) SS05-Sep-17 900 05-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY139 400 MAIN BUS 1_AT KOTRA PS 05-Sep-17 900 05-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS140 765400 ICT1_765400kv_PUNE(GIS) 05-Sep-17 900 05-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT141 400 SWITCHABLE LR_400kV_PUNE(GIS) 4_PUNE 05-Sep-17 900 05-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Reactor142 400 AT1 (765KV)_MAIN_BAY_410 (400kV Side) at Seoni 05-Sep-17 900 05-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
143 220 220KV BUS-2 at Solapur 05-Sep-17 900 05-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS144 400 kV 400kV WARDHA-AKOLA II 05-Sep-17 900 05-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE145 765 kV 765 KV Wardha -Seoni 2 reactor 05-Sep-17 900 05-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR146 400 400KV Koradi Main bay at Bhilai SS 05-Sep-17 930 05-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay
147 400KV BAY NO 412 VINDHYACHAL POOLING LINE-ISTAGE-IV
05092017 0730 hrs 07092017 1900 Hrs Continuous HOTSPOT ATTEND (Bus shutdown required forattending the Hot spot)
NTPC NTPC Maintenance148 400KV Dhule-SSNNL Ckt-1 Dhule 05-Sep-17 800 05-Sep-17 1800 Daily Maintenance work MSETCL MSETCL149 400220kV 315MVA ICT 1 BBLR 05-Sep-17 900 05-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL150 400KV 400 KV A Bus at 400 KV Nagothane SS 05-Sep-17 800 06-Sep-17 1700 continuous 400 KV Dabhol I Bay 29 A PG Isolater repairing MSETCL MSETCL151 400kV Main Bay (404) of ICT-2 at Koradi III Sub Station 05-Sep-17 900 05-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL152 400KV 400 KV New Koyna -Karad II NEW Koyna 05-Sep-17 900 05-Sep-17 1900 Daily Routing mainteance work at substation MSETCL MSETCL
153 400 400 KV BINA 315MVA BHEL Xmer-III (CGL) 5-Sep-17 800 5-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
154 400 400 KV SS PITHAMPUR 400KV 50 MVARREACTOR -II
5-Sep-17 700 5-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
155 220 220 KV Haldarwa - Jhanor line No 1 05-Sep-17 800 05-Sep-17 1800 Daily Hot point attending on Bkr amp Isolator amp Isolatoralignment work
PGCIL GETCO
156 400 400 KV Soja-Kansari line 05-Sep-17 800 05-Sep-17 1800 Daily Line Impedance and Signature test by MS Ramalex GETCO GETCO
157 400 400 KV Chorania-Kasor 05-Sep-17 800 05-Sep-17 1800 Daily Conditioning Monitoring Work GETCO GETCO158 220 220 KV Charadva-Bhimasar line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO159 400 400 KV APL Varsana line No 2 05-Sep-17 800 05-Sep-17 1800 Daily Bay Maintenance work GETCO GETCO160 400 400220kV 315 MVA ICT - 2(Jetpur) 05-Sep-17 800 05-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
161 765kV 702 Tie Bay of 765 kV Bhopal-Indore line at BDTCLBhopal 05-Sep-17 800 06-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
162 400 BUS-II AT INDORE SS 06Sep17 1000 06Sep17 1800 Daily erection of equipment for Bay extension works POWERGRID WR-II C INDORE
163 400 Main-2 of 400kV Jabalpur-Itarsi3 line at Itarsi SS 06Sep17 900 06Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
164 765765KV Jabalpur-Bina2 switchable Reactor alongwith Reactor bay(818 Reactor Bay) at Poolingstationjabalpur
06Sep17 1000 06Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
POWERGRID WR-II C JABALPUR PS
165 220 220KV Vapi-Bhilad-1 Bay-206 at Vapi 06Sep17 900 06Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI166 220 ICT2 Main Bay (Bay 203) at Dehgam 06Sep17 900 06Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM167 765 704LRB (Jaipur1 LR Bay) at Gwalior 06Sep17 1000 07Sep17 1800 Daily AMP work and NGR LA Replacement work POWERGRID WR-II R GWALIOR
168 400 Rajgarh-SSP2 Line 06Sep17 1000 06Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
169 765 765 KV SATNA 1 LINE REACTOR at Vchal PS 06Sep17 900 06Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL
170 220 Vapi - Karadpada Ckt2 06-Sep-17 700 07-Sep-17 1800 DailyAMP of line and terminal equipment amp removing ofpolymer insulator grading rings from tower end in alltowers
POWERGRID WR-II R RHQ
171 220 220KV BAVEKAR-WADA 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR172 220 22OKV Wada-padghe Line 06-Sep-17 800 08-Sep-17 1800 Daily Strining work of 400kv Kala-Kudus Line MSETCL WR-II C BOISAR
173 220 204Bina MB amp 220KV Main bus-1 at Bina 06Sep17 930 06Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89A Isolator and bay will be shifted on TBC
220V BINA-BINA line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-II
POWERGRID WR-II R BINA
174
400 BUS REACTOR_400kV_80MVAR_DHULE 06-Sep-17 800 06-Sep-17 1800 Daily for BHEL Bushings Tan delta measurements WRTS-I WRTS-I R BR175 765 SWITCHABLE LR_765kV_WARDHA 2_DURG PS 06-Sep-17 800 06-Sep-17 900 Daily AMP of SLR amp bay WRTS-I WRTS-I R SLR176 400 MAIN BUS 1_AT KOTRA PS 06-Sep-17 900 06-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS177 765400 ICT2_765400kv_PUNE(GIS) 06-Sep-17 900 06-Sep-17 1800 Daily AMP WRTS-I WRTS-I R ICT178 400 ICT1_MAIN_BAY_412 at Seoni 06-Sep-17 900 06-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay179 400 400KV BUS-1 at Solapur 06-Sep-17 900 06-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
180
400 kV 400kV WARDHA-AKOLA I 06-Sep-17 900 06-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
181
765 kV 765 KV Wardha -Seoni 1 reactor 06-Sep-17 900 06-Sep-17 1800 Daily For completion of balance fire fighting work WRTS-I WRTS-I C LR182 765 kV 765 KV Durg-4 Main bay (715) at Wardha 06-Sep-17 900 06-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
183
765 ICT 4 at Tamnar PS 06-Sep-17 1000 06-Sep-17 1800 Daily For commissioning of CSD relay of ICT4 through 765 kV Tie and Main BaysWRTS-I WRTS-I C ICT
184
765 765kV AURANGABAD(PG)-SOLAPUR II 06-Sep-17 800 07-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line185 400kV Bus Coupler BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL
186
4000KV Talandge - Karad 1 Talandge 06-Sep-17 900 06-Sep-17 1800 Daily Quarterly Maintenance work and replacement of JumperMSETCL MSETCL
187
4000KV 400220KV 315MVA ICT II 400KV Koradi ss 06-Sep-17 900 06-Sep-17 1800 Daily Retrofitting of over curent relay for implementation of Load Trimming SchemeDiagnostic Testing and Preventive Bay maintenanceMSETCL MSETCL
188
400KV 401-Line Bay (Spare line) at Thaptitanda Substation 06-Sep-17 1000 06-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL
189
400KV 400 KV Main Bus -II ( 403-52 amp 406 -52 Will be made Off) Lamboti06-Sep-17 800 06-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
190
400kV 80MVAR Reactor 1 BBLR 06-Sep-17 900 06-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL191 400kV Tie Bay (405) of ICT-2 amp Line-3 at Koradi III Sub Station06-Sep-17 900 06-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
192
400kV Parli -Solapur line Parli 06-Sep-17 1000 06-Sep-17 1600 Day Line Signature Analysis MSETCL MSETCL
193 400 400 KV BINA 315MVA BHEL Xmer-III 6-Sep-17 800 6-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
194 400 400 KV PITHAMPUR 315MVA ICT-I 6-Sep-17 700 7-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
195 400 400KV Nagda -ISP 6-Sep-17 900 7-Sep-17 1700 cont For isolator and panel replacement work MPPTCL MPPTCL R196 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 6-Sep-17 900 6-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R197 220 220KV Damoh(PGCIL)-Sagar -II 6-Sep-17 900 6-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
198 220 220KV Rajgarh(PGCIL) -Rajgarh(Dhar) IC-II 6-Sep-17 900 6-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
199 400 40022033 KV 315 MVA ICT-1(Hadala) 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO200 400 400 KV Soja-Wanakbori line 06-Sep-17 800 06-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO201 400 400 KV Chorania-Kasor 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO202 400 400 KV Varsana Kansari line 06-Sep-17 800 06-Sep-17 1800 Daily Maintenance work GETCO GETCO
203 400 315 MVA ICT-I at 400 KV Ss Raita 6-Sep-17 0800 hrs 7-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
204 765 765kV Main Bus-II at Sasan UMPP 06092017 800 06092017 190000 Continuous Construction of 765kV Bay Extension at Sasan UMPP by CWRTLSASAN UMPP CWRTL
205 400 ITARSI CKT 1 LR AT INDORE SS 07Sep17 1100 07Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICETHIS REACTOR SCHEME SHALL BE CONVERTEDFOR SWITCHABLE SHEME Line will be taken intoservice without LR
POWERGRID WR-II C INDORE
206 400 Main-2 of 400kV Jabalpur-Itarsi4 line at Itarsi SS 07Sep17 900 07Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
207 765765KV Jabalpur-Bina3 switchable Reactor alongwith Reactor bay(821 Reactor Bay) at Poolingstationjabalpur
07Sep17 1000 07Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
208 400 BUS REACTOR-II MAIN BAY (415) at Shujalpur 07Sep17 1000 07Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR209 220 220KV Vapi-Bhilad-2 Bay-207 at Vapi 07Sep17 900 07Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI210 400 BR1 Main Bay (Bay 401) at Dehgam 07Sep17 900 07Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
211 400 Rajgarh-Nagda1 Line 07Sep17 1000 07Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
212 400 Vindhyachal - Jabalpur Ckt2 07Sep17 900 08Sep17 1800 Daily AMP and insulation on TP tower jumpers POWERGRID WR-II R RHQ213 765 702Tie Bay ICT1 amp Bina1 at Satna SS 07Sep17 900 08Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
214 220 204Bina MB amp 220KV Main bus-2 at Bina 07Sep17 930 07Sep17 1800 Daily
For attending the frequent hot spot problem in 204-89B Isolator and bay will be shifted on TBC
220KV Bina-Bina line will remain in service throughTBC bay amp Transfer Bus and all other feeder willremain in service through BUS-I
POWERGRID WR-II R BINA
215 765 Main Bay of Vadodar Indore line (bay 704) atVadodara GIS
07Sep17 1000 07-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
216 400 Chandrapur-4 amp Raipur-2 Tie Bay (417) at Bhadrawati 07-Sep-17 900 07-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay217 765 Korba amp ICT-3_Tie Bay (713) at Bilaspur PS 07-Sep-17 900 07-Sep-17 1800 Daily AMP works (CB DCRMGC CT Tan Delta) WRTS-I WRTS-I R Bay218 400KV 400kV Bus-1A at Chamap 07-Sep-17 900 07-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus219 400 400kV KOLHAPUR (MSETCL)- KOLHAPUR (GIS) I 07-Sep-17 1000 07-Sep-17 1800 Daily For Line and main bay AMP works WRTS-I WRTS-I R LINE220 765 765KV BUS-I AT DHARAMJAYGARH(KORBA) SS 07-Sep-17 900 07-Sep-17 1800 Daily For connectivity of Jharsuguda 03 Main bay WRTS-I WRTS-I C BUS221 400 400kV Wardha- 2 Main Bay (404) at Parli 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay222 400 Chakan amp Padghe Tie bay (402) at Talegaon 07-Sep-17 900 07-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay223 400 KHANDWA1_MAIN_BAY_421 at Seoni 07-Sep-17 900 07-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay
224400 400KV BUS-2 at Solapur 07-Sep-17 900 07-Sep-17 1800 DAILY STATCOM CIMISSIONING WORKS WRTS-I WRTS-I C BUS
225 400 kV 400kV WARDHA-AKOLA II 07-Sep-17 900 07-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
226765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
227765 kV SWITCHABLE LR_765kV_ABAD 1_WARDHA 07-Sep-17 900 07-Sep-17 1800 Daily
Erection of bushing for spare reactorNote Aurangabad-1 SLR amp Aurangabad-1 SLROutages required on same time WRTS-I WRTS-I C LR
228 765 kV 765 KV Abad-1 Main bay (716) at Wardha 07-Sep-17 900 07-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay229 220 220 kV Raipur Bhilai 3 Line 07-Sep-17 930 07-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line230 400KV 400KV Bus-1 Sectioniser Bay (425) at Champa 07-Sep-17 900 08-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay231 400 Korba 400KV Bus Sectionalizer-1 07092017 0730 hrs 09092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance
232 400 Sipat-Raipur Ckt-3 070917 0730 hrs 090917 1900 Hrs Continuous For Annual maint works NTPC NTPC Maintenance
233400kV 400kV A Bus Outage Padghe (Bus coupler will be off)07-Sep-17 000 10-Sep-17 240000 continuous Replacement of A Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
234 400KV 400 KV Bus coupler khadka SStn 07-Sep-17 900 07-Sep-17 1300 Daily for commissioning of Backup to 400 KV Bus Coupler relayMSETCL MSETCL235 400KV Babhaleshwar-Dhule-Ckt-1 BBLR 07-Sep-17 900 07-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL236 400220kV 501 MVA ICT 2 Jejuri 07-Sep-17 900 07-Sep-17 1800 Daily Maintenance work MSETCL MSETCL237 400 KV 400KV LONIKAND Karad 07-Sep-17 1000 07-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL238 400 KV 400 KV Khadka - Koradi Line and bay Khadka 07-Sep-17 900 07-Sep-17 1700 Daily CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL239 400kV 80MVAr Bus Reactor 1 at Tiroda Plant 07-Sep-17 900 07-Sep-17 1800 Daily BR1 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL240 400kV Main Bay (406) of Line-3 at Koradi III Sub Station 07-Sep-17 900 07-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL241 400KV 400 KV Dabhol- Nagothane line I 07-Sep-17 800 12-Sep-17 1800 Daily String replacement work MSETCL MSETCL242 400220KV 501MVA ICT-I bay No 419 amp 418 (Main amp Tie bay) at Lonikand-II Substation07-Sep-17 900 07-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL243 400kV 400kV Parli -Nanded Ckt-I Parli M 07-Sep-17 900 07-Sep-17 1600 Daily Line Signature Analysis MSETCL MSETCL244 400220kV 315MVA ICT 2 Parli M 07-Sep-17 800 07-Sep-17 1800 Daily DC leakage attending work MSETCL MSETCL245 400220kV 501 MVA ICT 3 400 KV Nagothane SS 07-Sep-17 800 07-Sep-17 1800 Daily Routine Maintenance work MSETCL MSETCL246 220KV Pusad-Deoli(PGCIL) Line 07-Sep-17 800 09-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
247 400 400 KV BINA 315MVA BHEL Xmer-I 7-Sep-17 800 8-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
248 400 400KV SSTPS(MALWA)- Pithampur-II 7-Sep-17 900 7-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
249 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 7-Sep-17 900 7-Sep-17 1800 daily 220 kv CVT jumpering work MPPTCL MPPTCL R250 220 220 KV Haldarwa -Kawas line No 1 07-Sep-17 800 07-Sep-17 000 Daily Bay maintenance work at Haldarva SS PGCIL GETCO251 400 400 KV Soja-PGCIL( Dehgam) line 07-Sep-17 800 07-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
252400 400 KV Kasor - SSP 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP -Asoj willbe kept off
253 400 400 KV Chorania-Vadavi-1 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO254 400 400 KV Chorania -Kosamba-2 07-Sep-17 800 07-Sep-17 1800 Daily Maintenance work GETCO GETCO
255 400 ASOJ2 LR AT INDORE SS 08Sep17 1000 08Sep17 1130 Daily
TO TAKE LINE REACTOR OUT FROM SERVICEDRYING OUT OF REACTOR SHALL BE CARRIEDOUT AND LINE SHALL BE TAKEN INTO SERVICEWITHOUT LINE REACTOR
POWERGRID WR-II C INDORE
256 400 Main-2 of 400kV Satpura-Itarsi line at Itarsi SS 08Sep17 900 08Sep17 1700 DailyOnline replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
257 765765KV Jabalpur-Bhopal switchable Reactor alongwith Reactor bay(824 Reactor Bay) at Poolingstationjabalpur
08Sep17 1000 08Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme
STERLITE WR-II C JABALPUR PS
258 400 RAPP CKT-I TIE BAY (414) at Shujalpur 08Sep17 1000 08Sep17 1800 Daily AMP works POWERGRID WR-II R SHUJALPUR259 220 220KV Vapi-Bhilad-3 Bay-208 at Vapi 08Sep17 900 08Sep17 1600 Daily AMP of CB line taken on TBC POWERGRID WR-II R VAPI260 400 400KV BUS-2 at Pirana SS 08Sep17 900 08Sep17 1800 Daily AMP POWERGRID WR-II R PIRANA
261 400 Bus 2 at Bhachau 08Sep17 800 11Sep17 1800 Daily RTV Coating of 400KV BUS 2 BPI amp Bus Isolators POWERGRID WR-II C BHACHAU
262 400 Gandhar1 Main Bay (Bay 403) at Dehgam 08Sep17 900 08Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM263 765 711 bay ( 765kV Bina1 Tie bay) at Gwalior 08Sep17 1000 08Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
264 400 Rajgarh-Nagda2 Line 08Sep17 1000 08Sep17 1700 Daily For AMP of Line Terminal Equipments POWERGRIDMPPTCL
WR-II R RAJGARH
265 765 765 kV 240 MVAr Switchable Line Reactor of Bina-Gwalior-III line at Bina end 08Sep17 930 08Sep17 1600 Daily
For implementation of NGR bypass scheme in LineReactor at Bina end Line will be in service with LR atBina end
POWERGRID WR-II R BINA
266 400 Parli-1 amp Chandrapur-3 Tie Bay (420) at Bhadrawati 08-Sep-17 900 08-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay267 765 Sipat-1 amp Seoni-2_ Tie bay (708) at Bilaspur PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP works (CB CRM DCRM) WRTS-I WRTS-I R Bay268 400KV 400KV Pole-1 Main Bay(464) at HVDC Champa 08-Sep-17 900 08-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay269 765 SWITCHABLE LR_765kV_CHAMPA 1_DURG PS 08-Sep-17 900 08-Sep-17 1800 Daily AMP of LR amp bay WRTS-I WRTS-I R LR270 400 MAIN BAY_400kV KOTRA PS-RAIGARH I_AT KOTRA PS08-Sep-17 900 08-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY271 400 BUS_REACTOR2_MAIN_BAY_433 at Seoni 08-Sep-17 900 08-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay272 400 400kV ALKUD Main Bay (415) at Solapur 08-Sep-17 900 08-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY273 400 kV 400kV WARDHA-AKOLA I 08-Sep-17 900 08-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE274 765 765kV AURANGABAD(PG)-SOLAPUR I 08-Sep-17 800 09-Sep-17 1800 Continuous For swapping of 765kV Solapur line in solapur bays and pending construction pointsWRTS-I WRTS-I C Line275 765 765KV BUS-II AT DHARAMJAYGARH(KORBA) SS 08-Sep-17 900 09-Sep-17 1800 Continous For connectivity of Jharsuguda 03 amp 04 Main bay WRTS-I WRTS-I C BUS276 400KV Babhaleshwar-Dhule-Ckt-2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL277 400 KV 400 KV Deepnagar-ThapthiTanda Deepnagar SStn08-Sep-17 800 08-Sep-17 1200 Daily LSA of Line MSETCL MSETCL278 400 KV 400 KV Deepnagar-Waluj Deepnagar SStn 08-Sep-17 1300 08-Sep-17 1800 Daily LSA of Line MSETCL MSETCL279 400220kV 500MVA ICT I 400 kV RS Dn Deepnagar 08-Sep-17 800 08-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL280 400KV KORADI-BHUSAWAL 08-Sep-17 800 08-Sep-17 1700 Daily 1)Restring ing of conductor (being low clearance) betwee location no05-06amplocation no111-1122) line signature testMSETCL MSETCL281 400220kV 315MVA ICT 2 Waluj 08-Sep-17 900 08-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL282 220 kV 220 kV Chitegaon - Chittepimpalgaon (PGCIL) Ckt - I Chitegaon08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work of line and bus isolators MSETCL MSETCL283 400KV 125 MVAr Bus Reactor Main bay 402 amp Tie Bay 403 at Warora08-Sep-17 800 08-Sep-17 1700 Daily Rotuine bay maintenance work of 125 MVAr bus Reactor Bay No 402 at WaroraMSETCL MSETCL
284 400kV 80MVAR Reactor 2 BBLR 08-Sep-17 900 08-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL285 400kV Tie Bay (408) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station08-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL286 400KV 400 kV Main bay 407 ( Main Bay Aurangabad Ckt 2) at 400 kV Akola08-Sep-17 1100 08-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
287 400 400 KV BINA 315MVA BHEL Xmer-I 8-Sep-17 800 9-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
288 400 400KV Indore-ISP-I 8-Sep-17 1000 9-Sep-17 1700 daily Replacement of 400KV CT MPPTCL MPPTCL R
289 220 220KV Dhar - Rajgarh(PGCIL) 8-Sep-17 900 8-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
290 400 400 KV Amreli-Chorania 08-Sep-17 800 09-Sep-17 1700 Daily Maintenance work GETCO GETCO291 400 400 KVHadala-Varsana line 08-Sep-17 800 08-Sep-17 1800 Daily Maintenance work GETCO GETCO292 400 400 KV Wanakbori-PGCIL line 08-Sep-17 800 08-Sep-17 1800 Daily Line Impedance and Signature test work GETCO GETCO
293
400 400 KV Asoj - Chorania No 1 08-Sep-17 900 08-Sep-17 1900 Daily Maintenance work GETCO GETCO Auto reclose of400 KV Kasor-SSP line will bekept off
294 765kV 703 Main Bay of ICT-1 at BDTCL Bhopal 08-Sep-17 800 09-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
295 400 Reactor Backup Impedance of 400kV Itarsi-Indore2line 09Sep17 900 09Sep17 1700 Daily
Online replacement of LCD display of P442 MicomRelay Main-1 relay will remains in service duringreplacement work
POWERGRID WR-II C ITARSI
296 400 Vindhyachal - Jabalpur ckt1 09Sep17 900 09Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR
297 765 765KV Jabalpur-Dharmjaygarh1 Line along withReactor at Pooling stationjabalpur
09Sep17 1000 09Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
298 400 Pirana-Dehgam1 09Sep17 900 09Sep17 1700 Daily AMP works of TE POWERGRID WR-II C DEHGAM299 765 765 KV SATNA 2 LINE REACTOR at Vchal PS 09Sep17 900 09Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL300 400 405 Tie Bay Nigre2 and ICT2 at Satna SS 09Sep17 900 09Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA301 400 401Bina-2 main bay at Bina 09Sep17 930 09Sep17 1800 Daily For AMP work POWERGRID WR-II R BINA302 400 Chandrapur-3 Main Bay (421) at Bhadrawati 09-Sep-17 900 09-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay303 400KV 400KV Pole-1 Tie Bay(463) at HVDC Champa 09-Sep-17 900 09-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay304 400 Kharghar Main bay (403) at Talegaon 09-Sep-17 900 09-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay305 765 765kV RAICHUR-2 amp Future Tie bay (714) at Solapur 09-Sep-17 900 09-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY306 400 kV 400kV WARDHA-AKOLA II 09-Sep-17 900 09-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE307 765 kV 765 KV Abad-1 amp Durg-3 Tie bay (717) at Wardha 09-Sep-17 900 09-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay308 765 kV SWITCHABLE LR_765kV_ABAD 2_WARDHA 09-Sep-17 900 15-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR309 400 KV 400 KV Khadka- Akola Ckt Line and bay Khadka 09-Sep-17 900 09-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test amp LSA of Line MSETCL MSETCL310 400kV Main Bay (409) of 400KV Line-2 of Koradi II - Kordai III SS at Koradi III Sub Station09-Sep-17 900 08-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL311 400 400 KV Chorania-Amreli 09-Sep-17 800 09-Sep-17 1800 Daily Line PMM work GETCO GETCO312 400 400 KV Varsana Hadala 09-Sep-17 800 09-Sep-17 1800 Daily Maintenance work313 400 400kV Bus Reactor-1 Main Bay (413) at Parli 10-Sep-17 1000 10-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay314 400 400KV Khandwa-Dhule Ckt-I 10-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE315 765 BAY 706( MAIN BAY ICT2) AT INDORE SS 11Sep17 1000 12Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE316 400 400220kV 500MVA ICT-2 at Itasi SS 11Sep17 900 18Sep17 1700 Daily For Commissioning of CSD POWERGRID WR-II C ITARSI
317 765 765KV Jabalpur-Dharmjaygarh2 Line along withReactor at Pooling stationjabalpur
11Sep17 1000 11Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme POWERGRID WR-II C JABALPUR PS
318 220 Navsari GIS - Navsari GETCO 1 11Sep17 800 12Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
319 400 315 MVA ICT1 at Betul 11Sep17 830 11Sep17 1830 Daily CSD Fine Tuning in Bay 406 POWERGRID WR-II C BETUL
320 400 PIRANA-DEHGAM 2 LINE 11Sep17 900 11Sep17 1800 Daily LINE ISOLATOR ALIGNMENT WORK amp BCUCHECKING
POWERGRID WR-II R PIRANA
321 400 404 bay ( 400kV BR-1 Main bay) at Gwalior 11Sep17 1000 11Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR322 765 765 KV BUS REACTOR at Vchal PS 11Sep17 900 11Sep17 1800 Daily WTIOTI CALIBRATION WORK POWERGRID WR-II R VCHAL323 765 709 Main Bay Bina2 at Satna SS 11Sep17 900 12Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA
324 400 Aurangabad Lie Reactor-I at Boisar 11-Sep-17 900 11-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
325 400 405Bina-1 amp 400kv220kv ict TB at Bina 11Sep17 930 11Sep17 1800 Daily For AMP work CT tan delta POWERGRID WR-II R BINA326 765 765kV WARDHA - AURANGABAD(PG) II 11-Sep-17 800 11-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line327 400 ACBIL-1_Main Bay (413) at Bilaspur PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP works (CB DCRM) WRTS-I WRTS-I R Bay328 400KV 400kV Bus-2A at Champa 11-Sep-17 900 11-Sep-17 1730 Daily For Isolator Allignment WRTS-I WRTS-I R Bus329 765 765 Kv ICT -1 Main bay(703T) at Durg PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay330 765 765KV RANCHI -1 amp JGUDA-1 TIE BAY(732) AT DHARAMJAYGARH(KORBA) SS11-Sep-17 900 11-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY331 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 11-Sep-17 900 11-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY332 400 Lonikand 4 amp ICT 2 Tie bay (414) at Talegaon 11-Sep-17 900 11-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay333 400 400kV RAIPUR-SIPAT III 11-Sep-17 1000 11-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line334 400 ICT2_MAIN_BAY_406 at Seoni 11-Sep-17 900 11-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay335 400 AT1-ICT1_TIE_BAY_411 at Seoni 11-Sep-17 1500 11-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay336 400 ICT2_400220kv_SOLAPUR 11-Sep-17 900 11-Sep-17 1800 DAILY 33KV AUX SUPPLY EXTENSION WORKS AND EMULSIFIRE PAINTINGWRTS-I WRTS-I C ICT337 400 kV 400kV WARDHA-AKOLA I 11-Sep-17 900 11-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE338 765 kV 765 KV Durg -3 Main bay (718) at Wardha 11-Sep-17 900 11-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay339 220 220 kV Raipur Urla Line 11-Sep-17 930 11-Sep-17 1730 Daily AMP work and relay testing at Raipur SS WRTS-I WRTS-I R Line340 400KV 400KV Bus-2 Sectioniser Bay (426) at Champa 11-Sep-17 900 12-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay341 765 765kV DJAIGARH-JABALPUR 1 amp 2 11-Sep-17 900 13-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR342 765 kV 765KV Aurangabad -2 Main bay (713) at Wardha 11-Sep-17 900 15-Sep-17 1800 Continuous Mechanism box replacement work WRTS-I WRTS-I R bay343 400 Korba 400KV Bus Sectionalizer-2 11092017 0730 hrs 13092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance344 400KV BUS COUPLER 3 11092017 0730 hrs 12092017 1900 Hrs Continuous ANNUAL BAY MAINTENANCE AND TESTING NTPC NTPC Maintenance345 400 KV 400 KV Khadka-Koradi Line 11-Sep-17 600 12092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL346 400KV Waluj-Babhleshwar Waluj 11-Sep-17 1000 11-Sep-17 1800 Daily Routine Maintenance Dignostic testing amp Line signature testing workMSETCL MSETCL347 400KV 400KV Solapur Alkud Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL
348 400KV 400KV Alkud Kolhapur Line Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL349 400kV Tie Bay (411) of 400KV Line-1 of Koradi II - Koradi III at Koradi III Sub Station11-Sep-17 900 11-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL350 400 kV 400 kV Akola- Nandgaonpeth Line 11-Sep-17 1200 13-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL351 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola11-Sep-17 800 11-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL352 400 kV 400 KV Nagothane - Padghe II Line Nagothane 11-Sep-17 900 11-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL353 400KV 400KV Main Bus 1 amp 2 Alkud 11-Sep-17 800 11-Sep-17 1800 Daily Quarterly Maint Work MSETCL MSETCL354 220 kV 220 kV Badnera-PGCIL Line 11-Sep-17 800 11-Sep-17 1700 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL355 400 400 KV INDORE 315MVA Xmer-IV 11-Sep-17 1000 14-Sep-17 1700 cont For CB replacement load will be Transfer on TBC MPPTCL MPPTCL R
356 400 400 KV BINA 315MVA BHEL Xmer-II 11-Sep-17 800 11-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
357 400 400 KV PITHAMPUR 315MVA ICT-II 11-Sep-17 700 12-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R358 400 400KV Birsingpur-Katni 11-Sep-17 900 11-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R359 220 220KV Gwalior(PGCIL)-Malanpur -I 11-Sep-17 900 11-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R360 400 400220 KV 315 MVA ICT-4 Vadavi 11-Sep-17 800 11-Sep-17 1800 Daily LV TBC wiring work GETCO GETCO
361 400 315 MVA ICT-II at 400 KV Ss Raita 11-Sep-17 0800 hrs 12-Sep-17 1700 hrs Continuous Schedule Maintenace ICT Breaker CT Isolator LAand Rountine testing works etc
CSPTCL CSPTCL
362 400 Mundra Jetpur-1 Line (along with Main and Tiebreaker of Jetpur-1)
11Sep17 900 12Sep17 2100 Daily Protection testing and trials PGCIL CGPL
363 765kV 765 kv bus reactor at BDTCL Bhopal 11-Sep-17 800 12-Sep-17 1800 Daily For AMP works BDTCL BDTCL R
364 765 765KV Jabalpur-Dharmjaygarh3 Line along withReactor at Pooling stationjabalpur
12Sep17 1000 12Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
365 400 Khandwa -Betul -Ckt1 12Sep17 900 12Sep17 1800 Daily Online tuning of CSD relay of bay 424 at khandwass
POWERGRID WR-II C KHANDWA
366 400 400KV Kala-1 Main Bay-415 at Vapi 12Sep17 900 12Sep17 1600 Daily AMP of Bay Equipments POWERGRID WR-II R VAPI367 400 315 MVA ICT1 at Betul 12Sep17 830 12Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL
368 400 400 Mundra Bhachau 1 12Sep17 800 12Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
369 765 701 Bay (765kV Jaipur2 Line Main bay) at Gwalior 12Sep17 1000 13Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
370 220 Bay 201 (ICT-1Bay ) at Rajgarh 12Sep17 1000 12Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
371 400 Vadodara - Pirana Ckt1 12Sep17 800 13Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
372 400 Aurangabad Lie Reactor-II at Boisar 12-Sep-17 900 12-Sep-17 1800 Daily 145KV CB Erection Work for implementation ofNGR bypass system
POWERGRID WR-II C BOISAR
373 765 707Satna-1 main bay at Bina 12Sep17 930 12Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA
374 765 Tie Bay of Vadodar Indore line (bay 705) atVadodara GIS
12Sep17 1000 12-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA
375 765 765kV WARDHA - AURANGABAD(PG) III 12-Sep-17 800 12-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line376 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) I12-Sep-17 800 12-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line377 400KV 400KV Filter bank Main Bay (460) at HVDC Champa 12-Sep-17 900 12-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay378 765 765KV JHARSUGUDA -2 MAIN BAY(730) AT DHARAMJAYGARH(KORBA) SS12-Sep-17 900 12-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY379 765 MAIN BAY__ICT4_765400kv_AT KOTRA PS 12-Sep-17 900 12-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY380 400 GIS 2 main Bay (407) at Talegaon 12-Sep-17 900 12-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay381 400 400kV RAIPUR-BHADRAVATI I 12-Sep-17 1000 12-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line382 400 FUTURE amp AT3_TIE_BAY_429 at Seoni 12-Sep-17 900 12-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay383 400 SATPURA_MAIN_BAY_413 at Seoni 12-Sep-17 1500 12-Sep-17 1800 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay384 400 400KV NTPC-1 amp FUTURE Tie Bay (420) at Solapur 12-Sep-17 900 12-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY385 400 kV 400kV WARDHA-AKOLA II 12-Sep-17 900 12-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE386 765 kV 765 KV Seoni-1 amp Future Tie bay (726) at Wardha 12-Sep-17 900 12-Sep-17 1800 Daily for CT oil sampling WRTS-I WRTS-I R Bay387 400 kV 400 kV Bus 1 at Wardha 12-Sep-17 900 13-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus388 400 HVDC_POLE2_BHADRAWATI 12-Sep-17 900 23-Sep-17 1800 continuous Replacement of conv tx P2 South (R amp Y) ph Outage will be availed on readyness of new Conv txWRTS-I WRTS-I R POLE389 400 Tarapur-Padghe-2 12-Sep-17 900 14-Sep-17 1800 cont AMP PGCIL NPCIL R390 400220kV 501MVA ICT-3 at 400KV Dhule 12-Sep-17 900 12-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL391 400kV Tranfer Bus Coupler BBLR 12-Sep-17 900 12-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance work MSETCL MSETCL392 400kV 400 kV Bus Reactor 2 at Tiroda Plant 12-Sep-17 900 12-Sep-17 1800 Daily BR2 Maintenance and testing relay testing amp bay equipment maintenanceATIL ATIL393 400kV Main Bay (412) of400KV Line-1 of Koradi II - Kordai III at Koradi III Sub Station12-Sep-17 900 12-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL394 400KV 400 KV New Koyna -Jaigad I NEW Koyna 12-Sep-17 800 12-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL395 400KV 400KV C BUS WITH TBC at 400KV Kharghar 12-Sep-17 800 12-Sep-17 1800 Daily RampM and testing work MSETCL MSETCL396 400KV Talandge - Karad 2 Talandge 12-Sep-17 900 12-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL397 400KV 40022033 kV ICT- 2 With Bay 405 amp 406 at 400 kV Akola12-Sep-17 800 12-Sep-17 1800 Daily Routine Maintenance amp testing work painting work and agency balance worksMSETCL MSETCL398 400KV Chandrapur 2 - Warora Ckt-1 12-Sep-17 800 12-Sep-17 1700 Daily Diagnostic Testing MSETCL MSETCL399 400KV 400KV CHD-I CHD-II CKT NoII Bay 400KV SS Chandrapur12-Sep-17 800 Hrs 13-Sep-17 1800 Hrs Daily 1) Hot Spot Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL
400 400 400 KV BINA 315MVA BHEL Xmer-II 12-Sep-17 800 12-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
401 400 400KV Sarni- Seoni 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R402 400 400KV Seoni-Bhilai 12-Sep-17 900 12-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
403 220 220KV Badod-Kota 12-Sep-17 900 12-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
404 220 220KV Gwalior(PGCIL)-Malanpur -II 12-Sep-17 900 12-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R405 220 220KV Gwalior(PGCIL)-Gwalior-II-ckt -I 12-Sep-17 900 12-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R406 400 400 KV Chorania-Vadavi-2 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO
407400 400 KV Asoj - SSP 12-Sep-17 800 12-Sep-17 1800 Daily Maintenance work GETCO GETCO Auto reclose of
SSP - Kasor willbe kept off
408 765 Bay 707(Main Bay BR-I) at Indore Ss 13Sep17 1000 14Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II RR INDORE
409 765 765KV Jabalpur-Dharmjaygarh4 Line along withReactor at Pooling stationjabalpur
13Sep17 1000 13Sep17 1800 Daily Erection amp commissioning of Circuit Breaker amp BPIfor implementation of NGR Bypass Scheme STERLITE WR-II C JABALPUR PS
410 400 Khandwa -Betul -Ckt2 13Sep17 900 13Sep17 1800 Daily Online tuning of CSD relay of bay 428 amp 429 atkhandwa ss
POWERGRID WR-II C KHANDWA
411 220 Navsari GIS - Navsari GETCO 2 13Sep17 800 14Sep17 1800 Daily AMP work at GETCO Navsari Bay and Navsari GISbay Attending Shut down nature defects in Line POWERGRID WR-II R NAVSARI
412 400 315MVA ICT-I at Shujalpur 13Sep17 1000 13Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR413 220 Bus-1 at Vapi 13Sep17 900 13Sep17 1600 Daily AMP of Bus-1 POWERGRID WR-II R VAPI414 400 125 MVAr Bus Reactor at Betul 13Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 404 POWERGRID WR-II C BETUL
415 400 400 Mundra Bhachau 2 13Sep17 800 13Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
416 220 Bay 202 (Bhopawar1 Line Bay ) at Rajgarh 13Sep17 1000 13Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH417 765 765 KV BUS 1 at Vchal PS 13Sep17 900 13Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL418 765 711 Tie Bay BR 1 amp Gwalior 1 at Satna SS 13Sep17 900 14Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA419 765 708Satna-1 amp Indore tie bay at Bina 13Sep17 930 13Sep17 1800 Daily For AMP work CB DCRM amp Timing only POWERGRID WR-II R BINA420 765 765kV WARDHA - AURANGABAD(PG) IV 13-Sep-17 800 13-Sep-17 1800 Daily For construction of new wardha 1200400kV stringing worksWRTS-I WRTS-I C Line421 765 Sipat-1_Main bay (709) at Bilaspur PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP works (CB Timing CT Tan delta) WRTS-I WRTS-I R Bay422 400KV 400KV Filter bank Tie Bay (461) at HVDC Champa 13-Sep-17 900 13-Sep-17 1730 Daily AMP Works WRTS-I WRTS-I R Bay423 765 765 Kv Wardha -1 Main bay (815) at Durg PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay424 765 765KV RANCHI-1 MAIN BAY(731) AT DHARAMJAYGARH(KORBA) SS13-Sep-17 900 13-Sep-17 1800 Daily AMP WORKS OF BAY WRTS-I WRTS-I R BAY425 765 MAIN BUS 1_AT KOTRA PS 13-Sep-17 900 13-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS426 400 kV ICT1_400220kv_MAPUSA 13-Sep-17 900 13-Sep-17 1500 Daily Providing insulation coating in tertiary conductor WRTS-1 WRTS-I R ICT427 400 GIS 2 amp GIS 3 tie bay (408) at Talegaon 13-Sep-17 900 13-Sep-17 1800 Daily For AMP works WRTS-I WRTS-I R Bay428 400 BUS_REACTOR1-KHANDWA2_TIE_BAY_423 at Seoni13-Sep-17 900 13-Sep-17 1300 Daily For CT Oil sampling work WRTS-I WRTS-I R Bay429 400 400KV NTPC-2 Main Bay (424) at Solapur 13-Sep-17 900 13-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY430 400 kV 400kV WARDHA-AKOLA I 13-Sep-17 900 13-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE431 765 kV 765 KV Seoni-1 Main bay (725) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily For replacement of damaged cable of CB WRTS-I WRTS-I R Bay432 765 kV 765 KV Abad-3 Main bay (719) at Wardha 13-Sep-17 900 13-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay433 400 kV 400kV WARDHA-PARLI I 13-Sep-17 900 13-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE434 400 400 kV Wardha-2 Main bay (430) at Raipur SS 13-Sep-17 930 13-Sep-17 1730 Daily work at Raipur SS WRTS-I WRTS-I R Bay435 400 400kV Aurangabad(MS)-Aurangabad(PG)-1 Bay at Waluj13-Sep-17 800 14-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay436 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL437 400KV Bay 411 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 900 13-Sep-17 1200 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL438 400KV Tie Bay 412 Koradi-1 400KV Khaperkheda Sstn 13-Sep-17 1300 13-Sep-17 1600 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL439 400KV 404-Line Bay (Spare Line) at Thaptitanda Substation 13-Sep-17 1000 13-Sep-17 1700 Daily Measurement of CT Tan delta (Routine maintenance work)MSETCL MSETCL440 400KV 400 KV Lamboti-Parli Line 13-Sep-17 800 13-Sep-17 1700 Daily Line Maintenance Work By Lamboti Sdn MSETCL MSETCL441 400KV Babhaleshwar-Padghe-Ckt-2 BBLR 13-Sep-17 900 13-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL442 400kV 400 kV main Bus-1 at Koradi III SS 13-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL443 400KV Chandrapur 2 - Warora Ckt-2 13-Sep-17 800 13-Sep-17 1500 Daily Diagnostic Testing MSETCL MSETCL444 400KV 401 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-1) at 400 KV Chandrapur-2 Substation13-Sep-17 1000 13-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL
445 400 400 KV BINA 315MVA BHEL Xmer-II 13-Sep-17 800 13-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
446 400 40022033 KV 315 MVA ICT-2 (Hadala) 13-Sep-17 800 13-Sep-17 1800 Daily Maintenance work GETCO GETCO447 400 400 KV Chorania - Asoj - 1 13-Sep-17 800 13-Sep-17 1800 Daily Condition monitoring work GETCO GETCO
448 400 Mundra Bhachau-1 Line (along with Main and Tiebreaker of GT50 and Bhachau-1)
13Sep17 900 14Sep17 2100 Daily Protection testing and trials PGCIL CGPL
449 765kV 765 kV Main Bus -2 at BDTCL Bhopal 13-Sep-17 800 14-Sep-17 1800 Daily For AMP works BDTCL BDTCL R450 400 500 MVA ICT3 at Damoh 14Sep17 930 14Sep17 1800 Daily For CSD installation POWERGRID WR-II C DAMOH
451 400 Khandwa -Seoni -Ckt2 14Sep17 900 14Sep17 1800 Daily Online tuning of CSD relay of bay 430 at khandwass
POWERGRID WR-II C KHANDWA
452 400 315MVA ICT-II at Shujalpur 14Sep17 1000 14Sep17 1800 Daily Retrofitting of GE P633 Relay amp AMP works POWERGRID WR-II C SHUJALPUR453 400 125 MVAr Bus Reactor at Betul 14Sep17 830 14Sep17 1830 Daily CSD Fine Tuning in Bay 405 POWERGRID WR-II C BETUL454 400 PIRANA-VADODARA 2 LINE 14Sep17 900 14Sep17 1800 Daily AMP OF TERMINAL EQUIPMENTS POWERGRID WR-II R PIRANA
455 400 400 Bhachau Ranchodpura 1 14Sep17 800 14Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
456 400 Gandhar2 Main Bay (Bay 404) at Dehgam 14Sep17 900 14Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM457 400 407 bay ( 400kV ICT-2 Main bay) at Gwalior 14Sep17 1000 14Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR458 220 Bay 203 (Bus Coupler Bay ) at Rajgarh 14Sep17 1000 14Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
459 400 Vadodara - Pirana Ckt2 14Sep17 800 15Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
460 400 400KV Vapi-Boisar 14-Sep-17 1400 14-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR461 765 711Bus reactor amp Gwalior-1 tie bay at Bina 14Sep17 930 14Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA462 400 Bus Coupler bay (bay 405) at Vadodara GIS 14Sep17 1000 14-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA463 765 MAIN BUS 1_AT KOTRA PS 14-Sep-17 900 14-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS464 400 400kV BHILAI-BHADRAVATI I 14-Sep-17 1000 14-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line465 765 SOLAPUR_765KV BUS-1 14-Sep-17 900 14-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BUS466 400 kV 400kV WARDHA-AKOLA II 14-Sep-17 900 14-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE467 765 kV 765 KV Wardha-Durg -4 Non-Switchable LR at Wardha14-Sep-17 900 14-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R LR468 400 kV 400kV WARDHA-PARLI II 14-Sep-17 900 14-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
469 765KV 765KV Bus-1 Sectioniser Bay (713) at Champa 14-Sep-17 900 15-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay470 400 kV 400 kV Bus 2 at Wardha 14-Sep-17 900 15-Sep-17 1800 Continuous bus extension for new 400 KV Abad line WRTS-I WRTS-I C Bus471 765 765kV KOTRA PS-DURG PS I amp II 14-Sep-17 900 16-Sep-17 1800 Daily Both ckts AR kept in Non auto Mode for Tower top patrollingWRTS-I WRTS-I R Line-AR472 400 Korba Birsingpur Ckt-2 14092017 0730 hrs 16092017 1900 Hrs Continuous For Annual Testing amp Maintenance NTPC NTPC Maintenance473 400 KV JEJURI-KOYNA ST IV LINE 400 KV JEJURI 14-Sep-17 930 14-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL474 400kV 400 kV main Bus-2 at Koradi III SS 14-Sep-17 900 13-Sep-17 1800 Daily Bus Maintenace and related equipment testing MEGPTCL MEGPTCL475 400KV 422 and 421 -Bay (Main amp Tie bay of Lonikand-II-Lonikand I Interconnector Ckt II) at Lonikand-II Substation14-Sep-17 900 14-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL476 400kV Parli -Lonikand CKT-I line Parli M 14-Sep-17 1000 14-Sep-17 1800 Day Hardware tightening and fixing work at loc no- 127134146MSETCL MSETCL477 400 400 KV KATNI 315MVA BHEL Xmer 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R478 400 400 KV NAGDA 315MVA ICT-III 14-Sep-17 900 15-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
479 400 400 KV BINA 315MVA BHEL Xmer-II 14-Sep-17 800 14-Sep-17 1700 daily For routine testing and maintenance of equipments MPPTCL MPPTCL R
480 220 220KV Badod-Modak 14-Sep-17 900 14-Sep-17 1800 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
481 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -I 14-Sep-17 900 14-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R482 400 400 KV Kansari-Vadavi-1 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO483 400 400220kV 500 MVA ICT - 4(Jetpur) 14-Sep-17 800 14-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO484 400 Spare ICT(400 KV Chornia) 14-Sep-17 800 14-Sep-17 1800 Daily Maintenance work GETCO GETCO485 765 Bay708(Tie Bay for ICT-I) at indore Ss 15Sep17 1000 16Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II INDORE
486 400 VINDHYACHAL 2 MAIN BAY (404) at JABALPUR 15Sep17 900 21Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
487 400 Khandwa -Indore -Ckt1 15Sep17 900 15Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-2 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
488 220 Bus-2 at Vapi 15Sep17 900 15Sep17 1600 Daily AMP of Bus-2 POWERGRID WR-II R VAPI489 400 315 MVA ICT2 at Betul 15Sep17 830 15Sep17 1830 Daily CSD Fine Tuning in Bay 403 POWERGRID WR-II C BETUL
490 400 400 Bhachau Ranchodpura 2 15Sep17 800 15Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB amp CT
POWERGRID WR-II C BHACHAU
491 400 Soja Line Tie Bay (Bay 414) at Dehgam 15Sep17 900 15Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM
492 400 408 bay ( 400kV ICT-2 amp BR-2 Tie bay) at Gwalior 15Sep17 1000 15Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR
493 220 Bay 204 (Bhopawar2 Line Bay ) at Rajgarh 15Sep17 1000 15Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH494 765 765 KV BUS 2 at Vchal PS 15Sep17 900 15Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL495 765 715 Main Bay Gwalior2 at Satna SS 15Sep17 900 16Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA496 400 400kV AURANGABAD(PG)-AURANGABAD(MSETCL) II15-Sep-17 800 15-Sep-17 1800 Daily for providing earth switch female contacts corona rings to line isolator and CT jumper replacement at Msetcl waluj SSWRTS-I WRTS-I R Line497 765 765 Kv Kotra -1 Main bay(811) at Durg PS 15-Sep-17 900 15-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay498 400 400kV MAPUSA CKT-2 MAIN BAY (403) AT KOLHAPUR-GIS15-Sep-17 1000 15-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY499 400 kV 400kV KOLHAPUR (GIS)-MAPUSA I 15-Sep-17 900 15-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line500 765 BILASPUR2- amp AT3_TIE_BAY_717 at Seoni 15-Sep-17 900 15-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R Bay501 765 765KV RAICHUR-1 amp 765KV BR Tie Bay (717) at Soalpur15-Sep-17 900 15-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY502 400 kV 400kV WARDHA-AKOLA I 15-Sep-17 900 15-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE
503 400KV VINDHYACHAL BUS-7 SHUTDOWN 15092017 0730 hrs 15092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC
Maintenance
504 400KV TIE LINE-I (STAGE 4 TO STAGE 5) SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
505 400KV BAY NO 401 STAGE 4 SHUTDOWN 15092017 0730 hrs 26092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
506 400KV BAY NO 402 STAGE 4 TIE LINE I TIE BAYSHUTDOWN 15092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
507 400kV 400Kv Partial B bus outage Padghe + 400kV Padghe-Nagothane ckt-1+ HVDC -2 bay15-Sep-17 000 17-Sep-17 24 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL508 400kV Parli - Nanded Ckt-II Parli M 15-Sep-17 900 15-Sep-17 1600 Daily Line Signature Analysis amp CT Tan Delta Measurement workMSETCL MSETCL509 400220kV 500MVA ICT II 400 kV RS Dn Deepnagar 15-Sep-17 800 15-Sep-17 1800 Daily Diagnostic Testing work amp allied works MSETCL MSETCL510 400 KORADI - NANDGAONPETH (RPL) CKT 15-Sep-17 800 15-Sep-17 1700 Daily 1)Line signature test2) replacement tightening of missing hardwaresnutbolts on conductorsjumpers earth wire at various locationsMSETCL MSETCL511 400KV 400 KV Adani ckt No I (bay411) at 400 KV Ss Warora15-Sep-17 800 15-Sep-17 1700 Daily Rotuine bay maintenance work of 400 KV Adani ckt No I (bay411) at WaroraMSETCL MSETCL512 400KV Babhaleshwar-Bhusawal BBLR 15-Sep-17 900 15-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL513 765KV 707-LR switchable Line reactor of 765KV Akola-II Aurangabad(Ektuni)-III Line-2 at Akola-II SS15-Sep-17 1000 15-Sep-17 1800 Daily For HV bushing dismantling of discharged 707-LR Yph reactor of 765KV Akola-II Aurangabad-III line-2 at Akola-II SSMEGPTCL MEGPTCL514 400KV 400 KV Dabhol New- Koyna line II 15-Sep-17 800 15-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL515 400KV 400 kV Main 408 (Main Bay of Wardha CKt- 1) at 400 kV Akola15-Sep-17 1100 15-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL516 400KV 400KV CHD-I CHD-II CKT NoI Bay 400KV SS Chandrapur15-Sep-17 800 Hrs 15-Sep-17 1800 Hrs Daily 1) Attending of PG-I PG-II amp CBI Isolator 2) Reactor Side IPS Tube Removing work400KV AC MSETCL517 400KV Chandrapur 2 - Nanded Ckt-1 15-Sep-17 800 16-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
518 400 400 KV BHOPAL 315MVA Xmer-III 15-Sep-17 900 25-Sep-17 1700 cont For attending oil leakge from turret of HV and LVbushing from radiator inspection window etc
MPPTCL MPPTCL R
519 400 400 KV INDORE 315MVA Xmer-IV 15-Sep-17 10000 16-Sep-17 1700 cont X-mer will be OFF due to replacement of 400KV CB MPPTCL MPPTCL R
520 220 220KV Pithampur - Rajgarh(PGCIL) -II 15-Sep-17 900 15-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
521 220 220KV Gwalior(PGCIL)-Mahalgaon -I 15-Sep-17 900 15-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R522 220 220KV Shujalpur(MP)-Shujalpur(PGCIL) -II 15-Sep-17 900 15-Sep-17 1800 daily Add DPR Installation work MPPTCL MPPTCL R523 220 220KV Seoni(PG)- Chhindwara-I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R524 220 220KV Damoh(PGCIL)-Tikamgarh -I 15-Sep-17 900 15-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R525 400 400220 KV 315 MVA ICT-4 Vadavi 15-Sep-17 800 15-Sep-17 1800 Daily HV TBC wiring work GETCO GETCO
526 400 Mundra Bhachau-2 Line (along with Main and Tiebreaker of Bhachau-2)
15Sep17 900 16Sep17 2100 Daily Protection testing and trials PGCIL CGPL
527 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 15092017 80000 15092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL528 400 Tie Line -1 (Stage -IV to Stage V) of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL529 400 401 main Bay Tie Line from Stage-IV to Stage-V of Vindhyanchal-IV NTPC Switchyard15092017 80000 26092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL530 400 402 Tie Bay of Vindhyanchal-IV NTPC Switchyard 15092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL531 400 kV 400 KV SC Vindhyachal Korba (CKT II) 15-Sep-17 800 15-Sep-17 1900 Daily Power line crossing of 400 KV SC Vindhyachal Korba (CKT II) at Tower No 51 amp 52 by 765 kV SC Sasan - UMPP - Vindhychal pool line at Loc No AP 30 - AP 40PGCIL CWRTL
532 400 Mundra - Limbdi DC line 16-Sep-17 0700 24-Sep-17 1800 Contineous
For de-stringing amp dismantle of existing towerTaping Tower erection at 10 amp 320 and Stringing ofnew lines from 10 and 320 and to commission as400kV Mundra-Bachacu Ctk 1amp2 and Bachau -Limibi Ckt1amp2 lines
WRTS-II POWERGRID C RHQ
533 400 Khandwa -Indore -Ckt2 16Sep17 900 16Sep17 1800 DailyLine AMP amp Terminal Equipment AMP work(Autoreclosure of Khandwa -Indore Ckt-1 to be kept onNon auto Mode)
POWERGRID WR-II R KHANDWA
534 400 50MVAR Bina-II Line Reactor at Shujalpur 16Sep17 1000 30Sep17 1800 ContinuousConstruction of Reactor Switching Scheme bays atShujalpur Line will be in service without LR atShujalpur
POWERGRID WR-II C SHUJALPUR
535 400 315 MVA ICT2 at Betul 16Sep17 830 16Sep17 1830 Daily CSD Fine Tuning in Bay 402 POWERGRID WR-II C BETUL
536 400 125MVAr Bus Reactor at Bhachau 16Sep17 800 16Sep17 1800 Daily RTV coating of Reactor Main bay amp Tie Bayisolators CB
POWERGRID WR-II C BHACHAU
537 400 Vadodara - Pirana Ckt1 16Sep17 800 16Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt2 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
538 220 Vapi - Magarwada Ckt1amp2 16-Sep-17 600 23-Sep-17 1500 ContinuousShifting of 220 Vapi- Magarwada DC line betweenlocno 62-65 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
539 400 Seoni-Sarni 16Sep17 800 16Sep17 1800 Daily Stringing of 765kV DC Gadarwara - Warora line MPPTCL WR-II C RHQ
540 220 Kakrapar - Vapi Ckt1amp2 16Sep17 800 30Sep17 1800 DailyOnline PID testing of insulator strings AR of bothCkt1 amp2 to be kept in non auto mode during thetesting period
POWERGRID WR-II R RHQ
541 400 400Kv Boisar-Padghe 16-Sep-17 900 16-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR542 765 765kV Main Bus Bar-1 16Sep17 930 16Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA543 400 TBC bay at Asoj end (Bay 415) at Vadodara GIS 16Sep17 1000 16-Sep-17 1700 Daily for CB AMP POWERGRID WR-II R VADODARA544 765 MAIN BUS 2_AT KOTRA PS 16-Sep-17 900 16-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS545 400 kV 400kV KOLHAPUR (GIS)-MAPUSA II 16-Sep-17 900 16-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line546 765 SWITCHABLE LR_765kV_RAICHUR 2_SOLAPUR 16-Sep-17 900 16-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEME AND EMULSIFIRE PAINTINGWRTS-I WRTS-I R LR547 400 kV 400kV WARDHA-AKOLA II 16-Sep-17 900 16-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE548 765 kV BUS REACTOR_765kV_330MVAR_WARDHA 16-Sep-17 900 16-Sep-17 1800 Daily AMP of reactor WRTS-I WRTS-I R BR549 400 400kV Aurangabad(MS)-Aurangabad(PG)-2 Bay at Waluj16-Sep-17 800 17-Sep-17 1800 Continuous for removal of CB PIR WRTS-I WRTS-I R Bay550 400 400KV Khandwa-Dhule Ckt-II 16-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-II WRTS-I R LINE551 765 kV SWITCHABLE LR_765kV_ABAD 3_WARDHA 16-Sep-17 900 23-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR552 500KV Chandrapur-padgha HVDC POLE-1 Chandrapur 16-Sep-17 0800 Hrs 21-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL553 400KV Dhule-SSNNL Ckt-2 Dhule 16-Sep-17 800 16-Sep-17 1800 Daily Maintenance work MSETCL MSETCL554 400 KV 400 KV Khadka-Deepnagar Ckt No-1 Khadka SStn 16-Sep-17 900 16-Sep-17 1700 Daily CT amp CVTs C amp Tan delta test MSETCL MSETCL
555400220kV 501MVA ICT 3 BBLR 16-Sep-17 900 16-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL556 400KV 400 KV Dabhol New -Koyna line I 16-Sep-17 800 16-Sep-17 1800 Daily PID String replacement work MSETCL MSETCL557 400KV Chandrapur 2 - Nanded Ckt-I 16-Sep-17 600 30-Sep-17 1700 Daily For PID Work Shifting of auto reclose switch to non auto modeMSETCL MSETCL558 220 220KV Gwalior(PGCIL)-Mahalgaon -II 16-Sep-17 900 16-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R559 400 Nagda-Dehgam Ckt-I 17Sep17 1000 17Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR
560 400 ICT 1 at Bhachau 17Sep17 800 17Sep17 1800 Daily RTV coating of ICT 1 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
561 400 Gandhar - Navsari Ckt2 17Sep17 800 17Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
562 220 Gavasad - Mangrol DC 17Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline Outage required due to heavy induction duringexecution of work
POWERGRID WR-II R RHQ
563 400 Vadodara - Pirana Ckt2 17Sep17 800 17Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollutionAR of Ckt1 to bekept in no auto mode duirng outage period
POWERGRID WR-II C RHQ
564 400 KV Talegaon Kalwa 17-Sep-17 900 17-Sep-17 1800 One day Routine Maintenance amp testing work MSETCL MSETCL
565 400 400KV Damoh-Kanti line2 amp ICT1 TIE Bay(402Bay ) at Damoh SS
18Sep17 930 18Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
566 400 Bus-I at MPPTCL Indore SS 18Sep17 1000 19Sep17 1800 Continuous ITARSI2 BUS-I ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
567 400 Vindhyachal - Jabalpur ckt2 18Sep17 900 18Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II C JABALPUR
568 400 BUS-1at Navsari 18Sep17 900 18Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI569 400 Nagda-Dehgam Ckt-II 18Sep17 1000 18Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR570 400 315 MVA ICT2 at Betul 18Sep17 830 18Sep17 1830 Daily CSD Fine Tuning in Bay 401 POWERGRID WR-II C BETUL
571 400 63MVAr Bus Reactor at Bhachau 18Sep17 800 18Sep17 1800 Daily RTV coating of Bus Reactor Main bay amp Tie Bayisolators CB amp CT
POWERGRID WR-II C BHACHAU
572 400 ICT1 Main Bay (Bay 406) at Dehgam 18Sep17 900 18Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM573 400 400 KV BUS 1 at Vchal PS 18Sep17 900 18Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL574 400 Anuppur-Jabalpur 1 18-Sep-17 800 19-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
575 400 Gandhar - Kosambha 18Sep17 800 18Sep17 1800 Daily
Providing 66KV HV Insulation on Gandhar -Kosamba amp Gandhar- Navsari line between locno92-93 to maintain electrical clearance at thecrossing point of 220kV Gavasad - Mangrol GETCOline
POWERGRID WR-II R RHQ
576 765 716 Main Bay Vchal2 at Satna SS 18Sep17 900 19Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA577 400 400Kv Boisar-Padghe 18-Sep-17 1400 18-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR578 765 712Gwalior-1 main bay at Bina 18Sep17 930 18Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA579 765 BR Main bay 701 at Aurangabad 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay580 400 LANCO-2_Main Bay (422) at Bilaspur PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay581 765 765 Kv Wardha -1 Main bay (715) at Durg PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay582 765 765kV DJAIGARH-RANCHI I 18-Sep-17 1000 18-Sep-17 1300 Daily TO ATTEND CORONA ISSUES INSIDE THE WAVETRAP WHICH IS CAUSING FREQUENT PLCC ALARAMSWRTS-I WRTS-I R LINE583 765 MAIN BUS 2_AT KOTRA PS 18-Sep-17 900 18-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS584 400 400kV RAIPUR-BHADRAVATI II 18-Sep-17 1000 18-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line585 400 400KV_315MVA_ICT-2_at Seoni 18-Sep-17 900 18-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT586 400 400KV ALKUD amp PARLI-1 Tie Bay (414) at Solapur 18-Sep-17 900 18-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R BAY587 400 kV 400kV WARDHA-AKOLA I 18-Sep-17 900 18-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE588 765KV 765KV Bus-2 Sectioniser Bay (714) at Champa 18-Sep-17 900 19-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay589 400KV VINDHYACHAL-MAHAN LINE 18092017 0730 hrs 20092017 1900 Hrs Continuous HOTSPOT ATTEND AND BAY MAINTENANCE NTPC NTPC Maintenance
590 400KV VINDHYACHAL BUS-8 SHUTDOWN 18092017 0730 hrs 18092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
591 400KV BAY NO 403 STAGE 4 FUTURE BAY SHUTDOWN 18092017 0730 hrs 07102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
592 400 KV 400220KV 315 MVA ICT-III Karad 18-Sep-17 1000 18-Sep-17 1700 Daily Quarterly Maint work MSETCL MSETCL593 400 KV 400Kv Khadka-Akola Line 18-Sep-17 600 19092017 1700 Daily PID Testing AR in Non auto mode MSETCL MSETCL594 400KV Waluj-Babhleshwar Waluj 18-Sep-17 1000 23-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL595 400KV Babhaleshwar-Aurangabad BBLR 18-Sep-17 900 18-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL596 400 kV 400 kV Koradi- Bhusawal Line 18-Sep-17 1200 20-Sep-17 1800 Daily PID testing of insulator strings by Hot line Uint Akola AR shall be kept in non auto modeMSETCL MSETCL597 400KV 400 kV Tie bay 412 (Tie Bay of Nandgaon- Wardha 2 ) at 400 kV Akola18-Sep-17 1100 18-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL598 400KV (3105) MVA ICT-II amp Its Bay 400KV SS Chandrapur18-Sep-17 800 Hrs 26-Sep-17 1800 Hrs for 09 days Continous BasisReplacement of B- ph ICT-II By repaired 105 MVA Spare ICT400KV AC MSETCL599 400 400 KV INDORE 315MVA Xmer-III 18-Sep-17 1000 19-Sep-17 1700 cont For replacement of transformer Aircell MPPTCL MPPTCL R600 400 400 KV NAGDA MAIN CB of 400KV ICT-I 18-Sep-17 900 29-Sep-17 1700 cont For replacement of MAIN CB MPPTCL MPPTCL R
601 400 400KV SSTPS(MALWA)- Pithampur-I 18-Sep-17 900 18-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
602 400 400KV Itarsi-Bhopal-I 18-Sep-17 900 18-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R603 400 400 KV APL Kansari line 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO
604
400 400 KV SSP-Dhule-1 18-Sep-17 800 18-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 2 willbe required
605 400 500MVA 400220 KV ICT No 1(Asoj) 18-Sep-17 800 18-Sep-17 1800 Daily Condition monitoring GETCO GETCO
606 400400 KV Raita-Korba west feeder at 400 KV Ss Raitaas well as at 400 KV Switchyard at HTPS KorbaWest end
18-Sep-17 0800 hrs 19-Sep-17 1700 hrs ContinuousTo attain oil leakage in PRV of Reactor ampMaintenace work of Breaker CT Isolator LA CVTamp WT etc
CSPTCL CSPTCL
607 400 Mundra Mansar Line (along with Main and Tiebreaker of GT30 and Mansar)
18Sep17 900 19Sep17 2100 Daily Protection testing and trials PGCIL CGPL
608 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 18092017 80000 18092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL609 400 403 main Bay of Vindhyanchal-IV NTPC Switchyard 18092017 80000 07102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL610 500 KV 500 KV HVDC Chandrapur - Padghe Line 18-Sep-17 800 18-Sep-17 1900 Daily Power line crossing of 500 KV HVDC Chandrapur - Padghe Line at Tower No1605 amp 1606 by 765 kV DC Aurangabad-Padge line LILO to Pune GIS at Loc No AP 30- AP 40MSETCL CWRTL
611 400 315MVA ICT1 MAIN Bay (403Bay ) at Damoh SS 19Sep17 930 19Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
612 400 BUS-2 at Navsari 19Sep17 900 19Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI613 400 Nagda-Shujalpur Ckt-I 19Sep17 1000 19Sep17 1800 Daily Retrofitting amp testing of relay at Nagda POWERGRID WR-II C SHUJALPUR614 400 315MVA ICT-2 at Vapi 19Sep17 900 19Sep17 1800 Daily Isolator replacement and AMP of ICT-2 POWERGRID WR-II C VAPI
615 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 1 at Betul
19Sep17 830 19Sep17 1830 Daily CSD Fine Tuning in Bay 407R POWERGRID WR-II C BETUL
616 400 KANSARI-KANKROLI LINE 19Sep17 900 19Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
617 400 ICT 2 at Bhachau 19Sep17 800 19Sep17 1800 Daily RTV coating of ICT 2 Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
618 220 ICT1 Main Bay (Bay 201) at Dehgam 19Sep17 900 19Sep17 1700 Daily Bay AMP works POWERGRID WR-II R DEHGAM619 400 409 bay ( 400kV BR-2 Main bay) at Gwalior 19Sep17 1000 19Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR620 220 Bay 205 (ICT2 Bay ) at Rajgarh 19Sep17 1000 19Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH621 765 Seoni - Wardha Ckt1 19Sep17 800 20Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ622 765 715Gwalior-2 main bay at Bina 19Sep17 930 19Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA623 765 Dhule Main bay-704 at Aurangabad 19-Sep-17 900 19-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay
624
765 765kV DJAIGARH-RANCHI II 19-Sep-17 1000 19-Sep-17 1300 Daily
TO ATTEND CORONA ISSUES INSIDE THEWAVETRAP WHICH IS CAUSING FREQUENTPLCC ALARAMSROTATION OF SPARE REACTOR WITH LINEREACTOR FOR ATTENDING OIL LEACKAGES WRTS-I WRTS-I R LINE
625 220 kV 220 kV Mapusa- Amona ckt 19-Sep-17 900 19-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line626 400 400kV RAIPUR-BHADRAVATI III 19-Sep-17 1000 19-Sep-17 1800 Daily For attending the shut down defects WRTS-I WRTS-I R Line627 400 ICT1_400220kv_SOLAPUR 19-Sep-17 900 19-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R ICT628 400 kV 400kV WARDHA-AKOLA II 19-Sep-17 900 19-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE629 765 kV 765kV SEONI-WARDHA I 19-Sep-17 900 19-Sep-17 1800 Daily For CSD commissioning amp AR logic checking WRTS-I WRTS-I C LINE630 400 kV 400 KV Abad-1 Main bay (404) at Akola 19-Sep-17 900 19-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay631 400 400 kV NSPCL 2 Main bay (436) at Raipur SS 19-Sep-17 930 19-Sep-17 1730 Daily AMP wrk at Raipur SS WRTS-I WRTS-I R Bay632 400 400kV RANCHI-SIPAT I 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line633 400 400kV RANCHI-SIPAT II 19-Sep-17 800 24-Sep-17 1800 Continious For Rectification of Bend C-leg at Tower No 664 on permanent basisWRTS-I WRTS-I R Line634 400 Tarapur-Padghe-1 19-Sep-17 900 21-Sep-17 1800 cont AMP PGCIL NPCIL R635 400 KV 400KV TBC Karad 19-Sep-17 1000 19-Sep-17 1700 Daily Quarterly Maint Work MSETCL MSETCL636 220 KV 220kV Bhugaon - PGCIL (DEOLI) 19-Sep-17 900 19-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL637 400 kV 400 kV Station Transformer 5 at Tiroda Plant 19-Sep-17 900 20-Sep-17 1800 Continuous Staion Transformer amp Bay Equipment Testing amp Maintenance Relay TestingAPML APML638 400220kV 315MVA ICT 2 New Koyna 19-Sep-17 800 19-Sep-17 1800 Daily Routing mainteance work at substation MSETCL MSETCL639 400kV 400kV Chandrapur (Old GCR)-Parli ckt-III Girwali 19-Sep-17 900 19-Sep-17 1600 Daily Earthwire clamp tightening at Loc No 892 and conductor hardware tightening at loc No 890 891amp CT Tan Delta Measurement amp CB DCRM testing workMSETCL MSETCL640 400 400 KV KATNI 315MVA TELK Xmer 19-Sep-17 1000 20-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R
641 400 400KV Rajgarh-SSP-I 19-Sep-17 700 19-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
642 400 400KV Itarsi-Bhopal-II 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R643 220 220KV Malanpur-Auriya 19-Sep-17 900 19-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R644 400 400 KV Varsana Kansari line 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
645
400 400 KV SSP-Dhule-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Dhule No 1 willbe required
646 400 500MVA 400220 KV ICT No 2(Asoj) 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO647 400 400 KV Kansari-Vadavi-2 19-Sep-17 800 19-Sep-17 1800 Daily Maintenance work GETCO GETCO
648 400 400KV Damoh-Kanti line1 MAIN BAY (404 Bay) atDamoh SS
20Sep17 930 20Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
649 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
20Sep17 830 20Sep17 1830 Daily CSD Fine Tuning in Bay 408 POWERGRID WR-II C BETUL
650 400 KANSARI-BHINMAL LINE 20Sep17 900 20Sep17 1800 Daily AR SCHEME TESTING AND CLEANING WORK atKANSARI GETCO SS
POWERGRID WR-II R PIRANA
651 400 400 Bhachau Versana 2 20Sep17 800 20Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
652 400 412 bay ( 400kV BR-3 Main bay) at Gwalior 20Sep17 1000 20Sep17 1800 Daily AMP WORKS POWERGRID WR-II R GWALIOR653 220 Bay 206 (Pithampur Line Bay ) at Rajgarh 20Sep17 1000 20Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH654 400 Anuppur-Jabalpur 2 20-Sep-17 800 21-Sep-17 1800 Daily AMP of line and SS terminal equipment POWERGRID WR-II R RHQ
655 400 Navsari - Magarwada Ckt2 20Sep17 800 21Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt1 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
656 765 717 Tie Bay Vchal2 amp BR2 at Satna SS 20Sep17 900 21Sep17 1800 Daily AMP Work POWERGRID WR-II R SATNA657 400 40kv Tarapur-Boisar-I 20-Sep-17 900 20-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR658 765 765kV Main Bus Bar-2 20Sep17 930 20Sep17 1800 Daily For checking of Bus Bar protection POWERGRID WR-II R BINA659 765 Padghe-2 Main bay 707 at Aurangabad 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Works at Aurangabad WRTS-I WRTS-I R Bay660 400 LANCO-2 amp Future_Tie Bay (423) at Bilaspur PS 20-Sep-17 900 20-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay661 765 765 Kv Kotra -2 amp wardha -1 Tie bay (814) at Durg PS20-Sep-17 900 20-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay662 400 400kV PUNE (FUTURE) MAIN BAY (409) AT KOLHAPUR-GIS20-Sep-17 1000 20-Sep-17 1800 Daily For bay AMP works WRTS-I WRTS-I R BAY663 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS20-Sep-17 900 20-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY664 220 kV 220 kV Mapusa- Ponda ckt 20-Sep-17 900 20-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line665 765 765KV ICT_1_1500 MVA_at Seoni 20-Sep-17 900 20-Sep-17 1800 Daily For AMP Work WRTS-I WRTS-I R ICT666 400 400 KV SEONI KHANDWA CKT -1 42998 0333333333 42998 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE667 400 BUS REACTOR_400kV_63MVAR_SOLAPUR 20-Sep-17 900 20-Sep-17 1800 DAILY EMULSIFIRE PAINTING WORKS WRTS-I WRTS-I R BR668 400 kV 400kV WARDHA-AKOLA I 20-Sep-17 900 20-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE669 765 kV 765 KV Aurangabad-3 amp Durg-2 Tie Bay (720) at Wardha20-Sep-17 900 20-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay670 400 kV 400 KV Abad-2 Main bay (407) at Akola 20-Sep-17 900 20-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay671 400 kV 400kV BHADRAVATI-PARLI I 20-Sep-17 900 20-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE
672
400 400kV Koradi (II)-Wardha (PG) Ckt-I 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-IEPL ckt-IIoutage also required on same date MSETCL WRTS-I C LINE
673
400 400kV Koradi (II)-IEPL Ckt-II 20-Sep-17 700 21-Sep-17 1800 Conti
Power Line Crossing of 765kV DC Gadarwara -Warora TL betweem Tower No 1370 amp 1380(400kV DC MSETCL Line Tower Nos 159 amp 160)Note Due to DC TL 400kV Koradi(II)-Wardha(PG)ckt-I outage also required on same date MSETCL WRTS-I C LINE
674 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-220-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL675 400 KV 400 KV Main Bus -1 Khadka SStn 20-Sep-17 900 20-Sep-17 1700 Daily For replacement of PG isolator of 400132 kv 315 MVA ICT-III (ICT-III should be shifted on TBC)MSETCL MSETCL676 400 KV 400220KV SPARE ICT 400KV Koradi ss 20-Sep-17 1000 20-Sep-17 1700 Daily Diagnostic Testing and Preventive Bay maintenance MSETCL MSETCL677 400KV 400 KV Main Bus -I ( 401-52 amp 404 -52 Will be made Off) Lamboti20-Sep-17 800 20-Sep-17 1800 Daily Routine Maintenance Work MSETCL MSETCL
678 400KV Babhaleshwar-Ektuni-Ckt-1 BBLR 20-Sep-17 900 20-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL679 765KV 765 kV Aurangabad(Ektuni)-III Akola-II Line-1 at MSETCL 765400KV Aurangabad-III (Ektuni) SS20-Sep-17 1100 20-Sep-17 1400 Daily For changeover of Repaired 706LR R-ph Line reactor against Spare reactor of 765 kV Aurangabad-III Akola-II line-1 at MSETCL 765400KV Aurangabad-III (Ektuni ) SSMSETCL MEGPTCL680 400KV 404 Main Bay only (Main Bay of Chandrapur-2-Switching ckt-2) at 400 KV Chandrapur-2 Substation20-Sep-17 1000 20-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL681 400 400KV Damoh-Katni 20-Sep-17 900 20-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R682 400 400KV Nagda-Rajgarh-II 20-Sep-17 900 21-Sep-17 1700 cont For isolator and CT replacement work MPPTCL MPPTCL R683 400 40022033 KV 315 MVA ICT-3(Hadala) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO
684
400 400 KV SSP - Rajgarh - 1 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 2will be required
685 400 315MVA 400220 KV ICT No 3(Asoj) 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO686 400 500MVA ICT-1 at Chorania 20-Sep-17 800 20-Sep-17 1800 Daily Maintenance work GETCO GETCO687 400 400 KV Jetpur Amreli - 1 20-Sep-17 800 20-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
688 400 Mundra Jetpur-2 Line (along with Main and Tiebreaker of GT40 and Jetpur-2)
20Sep17 900 21Sep17 2100 Daily Protection testing and trials PGCIL CGPL
689 400 315MVA ICT2 MAIN Bay (406 Bay ) at Damoh SS 21Sep17 930 21Sep17 1800 Daily AMP work POWERGRID WR-II R DAMOH
690 400 Bus-II at MPPTCL Indore SS 21Sep17 1000 22Sep17 1800 Continuous ITARSI2 BUS-II ISOLATOR RETROFITTINGDURING SHUTDOWN OF BUS-I ITARSI2 SHALLBE IN SERVICE THROUGH TBC
POWERGRID WR-II C INDORE
691 400 Vindhyachal - Jabalpur ckt2 21Sep17 900 21Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II C JABALPUR692 400 315 MVA ICT 2 AT NAVSARI 21Sep17 900 21Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
693 400 400 KV Mauda - Betul 2 along with 50 MVAr non-switchable Line Reactor at Betul
21Sep17 830 21Sep17 1830 Daily CSD Fine Tuning in Bay 409 POWERGRID WR-II C BETUL
694 400 400 Bhachau Versana 1 21Sep17 800 21Sep17 1800 Daily RTV coating of Line Main bay amp Tie Bay isolatorsCB
POWERGRID WR-II C BHACHAU
695 220 Bay 207 (Transfer Bus Coupler Bay ) at Rajgarh 21Sep17 1000 21Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH696 400 400 KV BUS 2 at Vchal PS 21Sep17 900 21Sep17 1800 Daily BUS OUTAGE FOR EXTANSION WORK POWERGRID WR-II C VCHAL
697 400 Vindhyachal - Satna Ckt1amp2 21Sep17 800 28Sep17 1800 ContinuousShifting modifiction of 400lV DC Vinldhyachal -Satna Ckt1amp2 towers for four lanning of Rewa-Varanasi (NH-7) at Amarpatan bypass
POWERGRID WR-II C RHQ
698 765 Seoni - Wardha Ckt2 21Sep17 800 22Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ699 765 718Gwalior-3 main bay at Bina 21Sep17 930 21Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA700 765 ICT2_765400kv_BILASPUR 21-Sep-17 900 21-Sep-17 1800 Daily DGA sampling and CSD rectification WRTS-I WRTS-I R ICT701 765 MAIN BAY__240MVAR_BUS REACTOR_AT KOTRA PS21-Sep-17 900 21-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY702 220 kV 220 kV Mapusa- Tivim ckt 1 21-Sep-17 900 21-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line703 765 ICT1_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT704 765 ICT2_765400kv_SOLAPUR 21-Sep-17 900 21-Sep-17 1800 DAILY OLTC PARALLEL OPERATION COMMISSIONING WORKSWRTS-I WRTS-I C ICT705 400 kV 400kV WARDHA-AKOLA II 21-Sep-17 900 21-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE706 765 kV 765 KV Durg-2 Main Bay (721) at Wardha 21-Sep-17 900 21-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay707 400 kV 400 KV Abad-2 Tie bay (406) at Akola 21-Sep-17 900 21-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay708 400 kV 400kV DHARIWAL TPP-PARLI II 21-Sep-17 900 21-Sep-17 1800 Daily To attain shutdown nature work Line maintenance WRTS-I WRTS-I R LINE709 400KV 400KV KSK-3 Main Bay (444) at Champa 21-Sep-17 900 22-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay710 765 AT1_MAIN_BAY_712 at Seoni 21-Sep-17 900 23-Sep-17 1800 Contineous AMP Work and faulty interrupter replacement work of CBWRTS-I WRTS-I R Bay711 400KV 405-Bay (TIE Bay ICT 2 amp Koyna ST IV line) at 400 KV Jejuri21-Sep-17 930 21-Sep-17 1730 Daily Annual Maintenance of bays equipment MSETCL MSETCL712 220 KV 220kV PGCIL (DEOLI) -Pusad 21-Sep-17 900 21-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL713 765KV Tie Bay (708) of Tiroda Line-2 to Akola Line-1 at Koradi III SS21-Sep-17 900 20-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL714 400220KV 167 MVA Spare ICT bay No 401 at Lonikand-II Substation 21-Sep-17 900 21-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL715 400KV 400KV TBC Lonikand 21-Sep-17 900 21-Sep-17 1700 Daily Routine Maintenance work MSETCL MSETCL716 400kV Parli -Lonikand CKT-II line Parli M 21-Sep-17 1000 21-Sep-17 1800 Day Hardware tightening and fixing work at loc no-01020304 amp CB DCRM amp Timimg test workMSETCL MSETCL717 400KV 403 Tie Bay and 404 Main Bay of 501MVAICT-1 at Nanded Substation21-Sep-17 1100 21-Sep-17 1700 Daily Annual Maintenance of bays equipment MSETCL MSETCL718 400220kV 501 MVA ICT 3 Talandge 21-Sep-17 900 21-Sep-17 1800 Daily Quarterly Maintenance work and Back Up relay retrofitting workMSETCL MSETCL
719 400KV Babhaleshwar-Ektuni-Ckt-2 BBLR 21-Sep-17 900 21-Sep-17 1700 DailyBay Maintenance workRelay CB CT Testing
MSETCL MSETCL720 220KV Pusad-Deoli(PGCIL) Line 21-Sep-17 800 23-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL
721
400 400 KV SSP - Rajgarh - 2 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO Non autoreclose code for400 KV SSP-Rajgadh No 1will be required
722 400 500MVA 400220 KV ICT No 4(Asoj) 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO723 400 500 MVA ICT-3 at Chorania 21-Sep-17 800 21-Sep-17 1800 Daily Maintenance work GETCO GETCO724 400 315 MVA ICT 3 AT NAVSARI 22Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
725 400 50 MVAr switchable Line Reactor of 400 KV Betul -Khandwa 2 at Betul
22Sep17 830 22Sep17 1830 Daily CSD Fine Tuning in Bay 410R POWERGRID WR-II C BETUL
726 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-1 Bay onTBC 22Sep17 800 23Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
727 220 Bay 208 (Dhar Line Bay ) at Rajgarh 22Sep17 1000 22Sep17 1700 Daily For Circuit breaker Testing POWERGRID WR-II R RAJGARH
728 400 Navsari - Magarwada Ckt1 22Sep17 800 23Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Ckt2 to bekept in non auto mode during outage period
POWERGRID WR-II C RHQ
729 220 Bus 1 at Satna SS 22Sep17 900 23Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA730 765 721Jabalpur-3 main bay at Bina 22Sep17 930 22Sep17 1800 Daily For AMP works DCRM amp Timing POWERGRID WR-II R BINA731 400 400 Kv ICT 1 Main bay(403T) at Durg PS 22-Sep-17 900 22-Sep-17 1800 Daily AMP of Bay WRTS-I WRTS-I R Bay732 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS22-Sep-17 900 22-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY733 220 kV 220 kV Mapusa- Tivim ckt 2 22-Sep-17 900 22-Sep-17 1500 Daily Modification of Line side equipment connection arrangementWRTS-1 WRTS-I R Line734 400 400KV Solapur-2 Main Bay (412) at Parli 22-Sep-17 1000 22-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay735 765 SWITCHABLE LR_765kV_PUNE(GIS)_SOLAPUR 22-Sep-17 900 22-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R LR736 400 kV 400kV WARDHA-AKOLA I 22-Sep-17 1000 22-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE737 765 kV 765 KV Durg -1 amp Abad-4 Tie bay (723) at Wardha 22-Sep-17 900 22-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay738 400 kV 400kV WARDHA-AKOLA II 22-Sep-17 900 22-Sep-17 1800 Daily AMP of line CT at Akola Ss WRTS-I WRTS-I R LINE739 400 400 kV Durg-1 amp BR-2 Tie Bay (444) at Raipur SS 22-Sep-17 930 22-Sep-17 1730 Daily AMP work at Raipur SS WRTS-I WRTS-I R Bay740 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-2 + HVDC BAY - 122-Sep-17 000 24-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in Upper section (HVDC side)MSETCL MSETCL741 500KV Chandrapur-Padghe HVDC POLE-II line 22-Sep-17 0800 Hrs 28-Sep-17 0800Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL742 4001166kV 416 Main amp 415 Tie Bay of Station TF 4A 80 MVA at 400 Kv Deepnagar22-Sep-17 800 22-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL
743 400 400KV SSTPS(MALWA)- Chhgoan 22-Sep-17 900 22-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
744 400 400KV Sarni- Indirasagar 22-Sep-17 900 22-Sep-17 1700 cont For line maintenance work MPPTCL MPPTCL R745 220 220KV Seoni(PG)- Chhindwara-II 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R746 220 220KV Annupur-Kotmikala -I 22-Sep-17 900 22-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R747 400 40022033 KV 315 MVA ICT - 1(Kansari) 22-Sep-17 800 22-Sep-17 1800 Daily Breaker timing testing work GETCO GETCO
748 400 Mundra Limbdi Line (along with Main and Tie breakerof Bus Reactor and Limbdi)
22Sep17 900 23Sep17 2100 Daily Protection testing and trials PGCIL CGPL
749 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
23Sep17 830 23Sep17 1830 Daily CSD Fine Tuning in Bay 411 POWERGRID WR-II C BETUL
750 400 Jabalpur-Itarsi Ckt3amp4 23Sep17 800 30Sep17 1800 ContinuousShifting modifiction of 400lV DC Jablapur-ItarsiCkt3amp4 towers for four lanning of Obedullaganj -Betul (NH-69)
POWERGRID WR-II R RHQ
751 400 40kv Tarapur-Boisar-I 23-Sep-17 1400 23-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR752 765 703Seoni Main bay at Bina 23Sep17 930 29Sep17 1800 Cont Replacement of Main CB MB POWERGRID WR-II R BINA753 765 TIE BAY OF 765Kv ICT3 amp TAMNAR-1_AT KOTRA PS23-Sep-17 900 23-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BAY754 765 SWITCHABLE LR_765kV_AURANGABAD 1_SOLAPUR23-Sep-17 900 23-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR755 400 kV 400kV WARDHA-AKOLA II 23-Sep-17 900 23-Sep-17 1800 Daily Replacement of Conventional Insulators with Polymer insulators in major crossings line Power River NH SH Railway Crossings for public safety AR in Non Auto Mode for other ckt will be required during above periodWRTS-I WRTS-I C LINE756 765 kV 765 KV Durg -1 Main bay (724) at Wardha 23-Sep-17 900 23-Sep-17 1800 Daily For sampling of CT WRTS-I WRTS-I R Bay757 400 kV 400kV Wardha-1 Main bay (408) at Akola 23-Sep-17 900 23-Sep-17 1800 Daily AMP of bay CT at Akola Ss WRTS-I WRTS-I R bay758 400 KV 400 KV Main Bus -2 Khadka SStn 23-Sep-17 900 23-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL759 220 KV 220kV Bhugaon - PGCIL (DEOLI) and 220kV PGCIL (DEOLI) -Pusad23-Sep-17 900 23-Sep-17 1700 Daily Fixing of Damper Damper MSETCL MSETCL760 400220kV 315MVA ICT 2 BBLR 23-Sep-17 900 23-Sep-17 1700 Daily Routine Maintenance amp Servicing and allignment of PG isolators workamp Quarterly maianteance workMSETCL MSETCL761 765KV Main Bay (707) of Tiroda Line-2 at Koradi III SS 23-Sep-17 900 22-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL
762 400 400KV SSTPS(MALWA)- Julwania 23-Sep-17 900 23-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
763 220KV Damoh(PGCIL)-Damoh-I 23-Sep-17 900 23-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R
764 220 220 kV Bus 1 at Bhachau amp 220 kV ICT-2 Bay onTBC 24Sep17 800 25Sep17 1800 Daily RTV coating of Bus Isolators and BPI POWERGRID WR-II C BHACHAU
765 220 Kawas -Navsari 1amp2 24Sep17 900 30Sep17 1800 ContinuousShifting of 220 DC Kawas-Navsari line betweenlocno 96-98 to facilitate clearance for DFCCIRailway line corrioder
POWERGRID WR-II C RHQ
766 400 Navsari - Magarwada Ckt1amp2 24Sep17 800 25Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt1amp2 to bekept in non mode during outage period
POWERGRID WR-II C RHQ
767 400 kV 400kV Wardha-2 Main bay (411) at Akola 24-Sep-17 900 24-Sep-17 1800 Daily AMP work related to bay at Akola Ss WRTS-I WRTS-I R bay768 765 kV SWITCHABLE LR_765kV_ABAD 4_WARDHA 24-Sep-17 900 30-Sep-17 1800 continuous for spare reactor switching scheme checking WRTS-I WRTS-I C LR769 765 Bay 709( Main bay for ICT1) at Indore SS 25Sep17 1000 26Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE770 400 ICT2 MAIN BAY (424) AT JABALPUR 25Sep17 900 30Sep17 2000 Continuous CB Retrofitting POWERGRID WR-II R JABALPUR
771 400 400 KV Mauda - Betul 1 along with 50 MVAr non-switchable Line Reactor at Betul
25Sep17 830 25Sep17 1830 Daily CSD Fine Tuning in Bay 412 POWERGRID WR-II C BETUL
772 765 765 kV Gwalior-Satna2 Line 25Sep17 1000 25Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
773 400 400KV INDORE-ASOJ2 25Sep17 1000 26Sep17 1800 Daily Replacement of defective earthiwire at various spansof line
POWERGRID WR-II R RHQ
774 400 Seoni - Khandwa Ckt 1amp2 25Sep17 800 26Sep17 1800 Continuous Stringing of 765kV DC Gadarwara - Warora line POWERGRID WR-II C RHQ775 220 Bus 2 at Satna SS 25Sep17 900 26Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA776 400 40kv Tarapur-Boisar-II 25-Sep-17 900 25-Sep-17 1300 Daily code for Online Main-I relay replacement POWERGRID WR-II R BOISAR777 400 501Bina-2 main bay at 400KV MPPTCL Bina 25Sep17 930 25Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA778 800KV HVDC_POLE1_CHAMPA 25-Sep-17 900 25-Sep-17 1730 Daily For Testing WRTS-I WRTS-I R Pole779 765 SWITCHABLE LR_765kV_AURANGABAD 2_SOLAPUR25-Sep-17 900 25-Sep-17 1800 DAILY AMP WORKS AND COMMISSIONING OF SPARE SELECTION SCHEMEWRTS-I WRTS-I R LR780 400 kV 400 kV Parli -1 amp 765kV ICT-1 Tie bay (405) at Wardha25-Sep-17 900 25-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay781 400 400 kV Korba-2 Tie bay at Bhilai SS 25-Sep-17 930 25-Sep-17 1730 Daily AMP work at Bhilai SS WRTS-I WRTS-I R Bay782 400KV 400KV KSK-4 Main Bay (445) at Champa 25-Sep-17 900 26-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R Bay783 765 WARDHA1_LINE_721L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line784 765 WARDHA2_LINE_724L 25-Sep-17 900 26-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line785 765 765kV DJAIGARH-RANCHI I 25-Sep-17 800 28-Sep-17 1800 Daily For Replacement of Quad spacer Cap against DamageOpenWRTS-I WRTS-I R Line
786 400KV VINDHYACHAL BUS-7 SHUTDOWN 25092017 0730 hrs 25092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
787 400KV Waluj-Bhusawal Waluj 25-Sep-17 1000 30-Sep-17 1700 Daily PID testing work by hotline technique MSETCL MSETCL788 765KV Main Bay (710) of Tiroda Line-1 at Koradi III SS 25-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL789 400 kV 400 kV Main bay 413 ( Main Bay Nandgaon) at 400 kV Akola25-Sep-17 1100 25-Sep-17 1700 Daily Routine Maintenance amp testing work MSETCL MSETCL
790 400 400KV Rajgarh-SSP-II 25-Sep-17 700 25-Sep-17 1900 dailyFor rectification of defects observed during routinepatrolling amp to attend the damper arcing horn fo ampbroken disc replacement work
MPPTCL MPPTCL R
791 400 400KV Indore (PGCIL Hathuniya )-Pithampur-II 25-Sep-17 900 25-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
792 400 400KV Main BUS -I at 400 kv ss Nagda 25-Sep-17 900 26-Sep-17 1700 cont For bus routine maintenance work MPPTCL MPPTCL R793 220 220 KV Navsari - Kawas 1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO794 400 400 KV Chorania-Kosamba-1 25-Sep-17 800 25-Sep-17 1800 Daily Maintenance work GETCO GETCO795 400 Bus 7 of Vindhyanchal-IV NTPC Switchyard 25092017 80000 25092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL796 400 Bus Reactor AT NAVSARI 26Sep17 900 22Sep17 1800 Daily AMP work POWERGRID WR-II R NAVSARI
797 765 765 kV Gwalior-Satna1Line 26Sep17 1000 26Sep17 1800 Daily Replacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
798 400 Magarwada - Boisar 26Sep17 800 26Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Kala to be kept in non auto mode during outageperiod
WR-II C RHQ
799 400 901Bina-3 main bay at 400KV MPPTCL Bina 26Sep17 930 26Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA800 400 ICT-1_Main Bay (401) at Bilaspur PS 26-Sep-17 900 26-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay801 400 400kV SOLAPUR (PG) - KOLHAPUR (MSETCL) CKT-226-Sep-17 1000 26-Sep-17 1800 Daily For Line side equipment AMP works at Kolhapur (MSETCL) endWRTS-I WRTS-I R LINE802 400 SWITCHABLE LR_400kV_KARAD_SOLAPUR 26-Sep-17 900 26-Sep-17 1800 DAILY AMP AND TESTING OF BUSHINGS WRTS-I WRTS-I R LR803 765 765 KV SEONI BINA LINE 43004 0333333333 43005 075 Daily liquidation of shut down nature defects WRTS-II WRTS-I R LINE804 400 KV 400 KV TBC Khadka SStn 26-Sep-17 900 26-Sep-17 1700 Daily CTs C amp Tan delta test MSETCL MSETCL805 765KV Tie Bay (705) of ICT-2 and Bus Reactor at Koradi III SS26-Sep-17 900 23-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL806 400220kV 315 MVA ICT 2 Talandge 26-Sep-17 900 26-Sep-17 1800 Daily Qurterly MaintWork MSETCL MSETCL807 220 220KV Bina(PGCIL)-Shivpuri 26-Sep-17 900 26-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R808 220 220 KV Navsari - Kawas 2 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work PGCIL GETCO809 400 40022033 KV 315 MVA ICT - 2(Kansari) 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO810 400 400 KV Chorania-Kosamba-1 26-Sep-17 800 26-Sep-17 1800 Daily Maintenance work GETCO GETCO811 765 Bay712( Main Bay BR-II) at Indore SS 27Sep17 1000 28Sep17 1800 Daily AMP OF BAY EQUIPMENTS POWERGRID WR-II R INDORE
812 400 ICT2 AT JABALPUR 27Sep17 900 27Sep17 1900 Daily Dismantling CB poles as overhead bus is charged POWERGRID WR-II R JABALPUR
813 765 765kV Gwalior-Bina3 Line 27Sep17 1000 27Sep17 1600 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
814 400 Magarwada - Kala 27Sep17 800 27Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution AR of Magarwada -Boisar to be kept in non auto mode during outageperiod
WR-II C RHQ
815 400 Bus 1 at Satna SS 27Sep17 900 28Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA816 400 40kv Tarapur-Boisar-II 27-Sep-17 1400 27-Sep-17 1700 Daily For tripping and AR Trials of Main-I relay POWERGRID WR-II R BOISAR817 400 902Bina-3 tie bay at 400KV MPPTCL Bina 27Sep17 930 27Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA818 400 Dhariwal amp EMCO-1 Tie Bay (423) at Bhadrawati 27-Sep-17 900 27-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay819 400 ICT-2_Main Bay (404) at Bilaspur PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP works (CB Timings and CT tan delta meas) WRTS-I WRTS-I R Bay820 400 MAIN BUS 2_AT KOTRA PS 27-Sep-17 900 27-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS821 400 400KVSolapur-1 Main Bay (409) at Parli 27-Sep-17 1000 27-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay822 400 400kV_ICT-1 Main Bay (410) at solapur 27-Sep-17 900 27-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY823 400 kV 400 kV Parli -1 Main bay (406) at Wardha 27-Sep-17 900 27-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay
824
220 220kV Warora-Wardha Ckt-I 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Hinganghat ckt-II outage also required on same date MSETCL WRTS-I C LINE
825
220 220kV Warora-Hinganghat Ckt-II 27-Sep-17 700 27-Sep-17 1800 Daily
Power Line Crossing of 765kV DC Gadarwara -Warora Tr Line betweem Tower No 1690 amp 1700(220kV DC MSETCL Line Tower Nos 272 amp 273)Note Due to DC TL 220kV Warora-Wardha ckt-Ioutage also required on same date MSETCL WRTS-I C LINE
826 765 BINA1_LINE_727L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-II WRTS-I C Line827 765 WARDHA2_LINE_724L 27-Sep-17 900 28-Sep-17 1800 Contineous For Tower Strengthening of 765KV Auxiliary Bus WRTS-I WRTS-I C Line
828 400KV BAY NO 410 STAGE 4 FUTURE BAY SHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
829 400KV BAY NO 411 STAGE 4 POOLING LINE-I TIE BAYSHUTDOWN 27092017 0730 hrs 12102017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachal
stage 4 switchyard by Adani Transmission NTPC NTPC ConstructionWork
830 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL831 765KV Main Bay (706) of Bus Reactor at Koradi III SS 27-Sep-17 900 25-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL832 400KV 410 Main Bay only (Main Bay of Chandrapur-2-Dhariwal ckt-2) at 400 KV Chandrapur-2 Substation27-Sep-17 1000 27-Sep-17 1800 Daily Routine Maintenance amp Dignostic testing work MSETCL MSETCL833 400kV 400Kv Partial B bus outage Padghe + Kalwa-Padghe-127-Sep-17 000 29-Sep-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (HVDC side)MSETCL MSETCL834 400 400 KV BHOPAL 315MVA Xmer-II 27-Sep-17 900 27-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
835 400 400KV Indore (PGCIL Hathuniya )-Pithampur-I 27-Sep-17 900 27-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
836 220 220KV Annupur-Kotmikala -II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R837 220KV Damoh(PGCIL)-Damoh-II 27-Sep-17 900 27-Sep-17 1800 daily For line maintenance work MPPTCL MPPTCL R838 400 400 KV Bus Coupler(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO839 400 400 KV Bus- 1(Asoj) 27-Sep-17 900 27-Sep-17 1800 Daily Maintenance work GETCO GETCO840 220 220 KV Navsari - Dastan 1 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO841 400 40022033 KV 315 MVA ICT - 3(Kansari) 27-Sep-17 800 27-Sep-17 1800 Daily Maintenance work GETCO GETCO842 400 410 main Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL843 400 411 Tie Bay of Vindhyanchal-IV NTPC Switchyard 27092017 80000 12102017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
844 765 765kV Gwalior-Jaipur1 Line 28Sep17 1000 28Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad toTwin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
845 400 Magarwada - Boisar amp Magarwada - Kala 28Sep17 800 29Sep17 1800 Daily
Replacement of all porcelain disc insulator stringswith CLR Polymer insulators in complete line to avoidtripping due to heavy pollution Outage required inboth circuits to replace in Multi Circuit towers due toheavy induction AR of both Kala-Vapi Ckt 1amp2 to bekept in non auto mode during outage period
WR-II C RHQ
846 400 1002Bina-4 tie bay at 400KV MPPTCL Bina 28Sep17 930 28Sep17 1800 Daily For AMP works MPPTCL WR-II R BINA847 400 Dhariwal Main Bay (424) at Bhadrawati 28-Sep-17 900 28-Sep-17 1800 Daily AMP WRTS-I WRTS-I R Bay848 400 MAIN BUS 2_AT KOTRA PS 28-Sep-17 900 28-Sep-17 1800 Daily AMP 2017 - 2018 WRTS-I WRTS-I R BUS849 400 400kV NTPC-2 amp ICT-1 Tie Bay (423) at Solapur 28-Sep-17 900 28-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY850 400 kV 400 kV Parli -2 Main bay (409) at Wardha 28-Sep-17 900 28-Sep-17 1800 Daily AMP work related to bay WRTS-I WRTS-I R bay851 765 ICT5_765400kv_CHAMPA 28-Sep-17 900 29-Sep-17 1730 Daily AMPWarranty Tests WRTS-I WRTS-I R ICT852 500KV BIPOLE (POLE-1 amp POLE-2) Chandrapur 28-Sep-17 0800 Hrs 29-Sep-17 2000Hrs Continuous For Annual Outage maintenance workDignostic work of Substation EquipmentHVDC Lines EtcMSETCL MSETCL853 400 KV JEJURI-LONIKAND LINE 400 KV JEJURI 28-Sep-17 930 28-Sep-17 1730 Daily Maintenance work testing work MSETCL MSETCL854 765KV Main Bay (704) of ICT-2 at Koradi III Sub Station 28-Sep-17 900 27-Sep-17 1800 Daily Maintenace of Bay Equipments MEGPTCL MEGPTCL855 400KV Talandge- Solapur 1 Talandge 28-Sep-17 900 28-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL856 400KV 400KV Chandrapur II -Nanded Ckt-II 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL857 400KV 400KV Chandrapur GCR-Parli Ckt-III 28-Sep-17 800 29-Sep-17 1800 Daily For PID WorkShifting of auto reclose switch to non auto modeMSETCL MSETCL858 400 400 KV BHOPAL 315MVA Xmer-II 28-Sep-17 900 28-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R859 400 400 KV NAGDA 315MVA ICT-I 28-Sep-17 900 29-Sep-17 1700 cont For post monsoon maintenance work MPPTCL MPPTCL R860 220 220 KV Navsari - Dastan 2 28-Sep-17 800 28-Sep-17 1800 Daily Maintenance work GETCO GETCO861 400 400 KV Jetpur Amreli - 2 28-Sep-17 800 28-Sep-17 1800 Daily for application of Silicone Compound GETCO GETCO
862 765 765kV Gwalior-Jaipur2 Line 29Sep17 1000 29Sep17 1800 DailyReplacement of line terminal equipment jumper fromquad to Twin and Interconnection of Line Terminalequipment with IPS Tube
POWERGRID WR-II C GWALIOR
863 400 Bus 2 at Satna SS 29Sep17 900 30Sep17 1800 Continuous Bus Extension Work and stability testing POWERGRID WR-II C SATNA864 765 765 kV Bus-2 at Bilaspur PS 29-Sep-17 900 29-Sep-17 1800 Daily AMP works WRTS-I WRTS-I R Bus865 400 400kV NTPC-4 amp ICT-2 Tie Bay (429) at Solapur 29-Sep-17 900 29-Sep-17 1800 DAILY AMP WORKS WRTS-I WRTS-I R BAY
866 400KV VINDHYACHAL BUS-8 SHUTDOWN 29092017 0730 hrs 29092017 1900 Hrs Continuous Construction of 02 nos of bays at NTPC Vindhyachalstage 4 switchyard by Adani Transmission NTPC NTPC Construction
Work
867 400 KV 400 KV Khadka-Deepnagar Ckt -2 Khadka SStn 29-Sep-17 900 29-Sep-17 1700 Daily CVTs C amp Tan delta test MSETCL MSETCL868 4001166kV 419 Main amp 418 Tie Bay of Station TF 4B 80 MVA at 400 kV Deepnagar 29-Sep-17 800 29-Sep-17 1800 Daily Annual Maintenance of bays equipment amp diagnostic testingMEGPTCL MEGPTCL869 400KV Talandge- Solapur 2 Talandge 29-Sep-17 900 29-Sep-17 1800 Daily Qurterly MaintWork PGCIL MSETCL870 400 400 KV BHOPAL 315MVA Xmer-II 29-Sep-17 900 29-Sep-17 1700 daily For post monsoon maintenance work MPPTCL MPPTCL R
871 400 400KV Indore-ISP-II 29-Sep-17 900 29-Sep-17 1600 daily Tightening of jumper cone arching horn amp othermaintenance work
MPPTCL MPPTCL R
872 400 Bus 8 of Vindhyanchal-IV NTPC Switchyard 29092017 80000 29092017 200000 Continuous Construction of 400 kV Line bay Extension at Vindhyachal VSTPP Stage-IV by CWRTLNTPC ViindhyachalVSTPPCWRTL
873 400 ICT2 AT JABALPUR 30Sep17 900 30Sep17 1900 Daily Erecton of new CB interrupter POWERGRID WR-II R JABALPUR874 400 400 KV Wardha-1 amp Pune-1 Tie Bay (402) at Parli 30-Sep-17 1000 30-Sep-17 1800 Daily For AMP works at Parli WRTS-I WRTS-I R Bay875 400kV 400Kv Partial B bus outage Padghe + Padghe-Babhaleshwar ckt 1 amp 2 (2 days each ckt)30-Sep-17 000 03-Oct-17 240000 continuous Replacement of B Bus Quadruple Conductor in lower section (315MVA ICT side)MSETCL MSETCL
876400220kV 501MVA ICT 4 BBLR 30-Sep-17 900 30-Sep-17 1700 Daily
Bay Maintenance work Relay CB CT Testing
MSETCL MSETCL877 220 220KV Mahegaon-Auriya 30-Sep-17 900 30-Sep-17 1700 daily For line maintenance work MPPTCL MPPTCL R878 400 400 KV Chorania - Vadavi - 2 30-Sep-17 800 30-Sep-17 1800 Daily Maintenance work GETCO GETCO
Anaulagnak 33
Agast 2017 AaOr Agast 2017 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2017 AND SEPTEMBER 2017
maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT
maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2017 Agast 2017 Agast 2017 Agast 2017
AUGUST 2017 SEPTEMBER 2017 AUGUST 2017 SEPTEMBER 2017
1 gaujarat
saIimat 13100 15200 7500 9240
AsaIimat 13140 15240 7510 9250
2 maQya p`doSa
saIimat 6850 7905 4400 5350
AsaIimat 6850 7905 4400 5350
3 CltaIsagaZ
saIimat 36865 3785 20545 2093
AsaIimat 36865 3785 20545 2093
4 maharaYT
saIimat 18700 19600 11600 11700
AsaIimat 18750 19650 11650 11750
5 gaaovaa
saIimat 570 565 335 340
AsaIimat 573 670 347 345
6 dmana dIva
saIimat 325 320 205 210
AsaIimat 342 325 207 215
7 DI ena eca
saIimat 700 740 475 490
AsaIimat 731 745 507 500
8 piScama xao~
saIimat 50310 50560 32200 32500
AsaIimat 50500 50660 33215 32600
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
maah jaulaa[- 2017
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
k (A) gaujarat GUJARAT
jalaIya HYDRO 1 ]k[- Ukai - 1 682 75
]k[- Ukai - 2 075 75]k[- Ukai - 3 403 75]k[- Ukai - 4 014 0]k[- Ukai (Total) 1174 227 0000
2 ]k[- ela baI saI eca Ukai LBCH - 1 081 2]k[- ela baI saI eca Ukai LBCH - 2 049 2]k[- ela baI saI eca Ukai LBCH (Total) 131 4 0000
3 kDanaa Kadana - 1 775 55 0000kDanaa Kadana - 2 753 58 0000kDanaa Kadana - 3 1025 53kDanaa Kadana - 4 2499 57 0422kDanaa Kadana (Total) 5051 60 0422
4 pnama PANAM amp Madhuban Dam 1 amp 2 386 9 0024 6 kula jalaIya TOTAL(H) 6742 225 0612
tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 000 0 00622 TaoronT pavar ilaimaToD yauinaT DI 6645 118 64613 TaoronT pavar ilaimaToD yauinaT [- 7142 122 65354 TaoronT pavar ilaimaToD yauinaT ef 7372 124 70295 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0647
10 Qauvarna tapIya Dhuvaran - GT 1 000 0 222011 Qauvarna tapIya Dhuvaran - GT 2 000 0 000012 Qauvarna tapIya Dhuvaran - STG 4113 9813 ]ka[- yauinaT 1 Ukai -1 000 0 000014 ]ka[- yauinaT 2 Ukai -2 000 0 000015 ]ka[- yauinaT 3 Ukai -3 4668 201 543816 ]ka[- yauinaT 4 Ukai -4 5503 200 608517 ]ka[- yauinaT 5 Ukai -5 5053 214 588018 ]ka[- yauinaT 6 Ukai -6 000 0 179619 gaaMQaInagar 1 Gandhinagar - 1 000 0 000020 gaaMQaInagar 2 Gandhinagar - 2 000 0 000021 gaaMQaInagar 3 Gandhinagar - 3 1769 213 239822 gaaMQaInagar 4 Gandhinagar - 4 2275 210 298023 gaaMQaInagar 5 Gandhinagar - 5 4521 214 605224 vaNakbaaorI 1 Wanakbori - 1 000 0 000025 vaaNakbaaOrI 2 Wanakbori - 2 000 026 vaaNakbaaOrI 3 Wanakbori - 3 000 027 vaaNakbaaOrI 4 Wanakbori - 4 500 528 vaaNakbaaOrI 5 Wanakbori - 5 000 029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 2722 21531 ]trna Utran GT 1 000 0 000032 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 068235 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
Actual vaastivak
ACTUAL GENERATION amp AVALABILITY FOR JULY 2017
Actual vaastivak
Anaulagnak 41
37 isaka Sikka - 1 000 0 002738 isaka Sikka - 2 1008 401 375939 kcC ilagnaa[-T Kutch Lignite - 1 216 56 721340 kcC ilagnaa[-T Kutch Lignite - 2 577 5741 kcC ilagnaa[-T Kutch Lignite - 3 305 7342 kcC ilagnaa[-T Kutch Lignite - 4 747 60 335643 saUrt ilagnaa[-T Surat Lignite - 1 3936 119 485544 saUrt ilagnaa[-T Surat Lignite - 2 2652 124 307845 saUrt ilagnaa[-T Surat Lignite - 3 5571 128 539146 saUrt ilagnaa[-T Surat Lignite - 4 5894 125 690747 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 4095 96 721348 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5967 10249 jaI Aa[- pI saI ela GIPCL GT - 1 000 0 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1266 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1551 3352 jaI Aa[- pI saI ela GIPCL ST - 1 1386 2953 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 000056 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 019 131 013560 jaI pI [- saI GPEC GT - 2 1257 124 021661 jaI pI [- saI GPEC GT - 3 301 128 017662 jaI pI [- saI GPEC STG 794 12563 jaI esa [- jaI GSEG GT - 1 000 0 000064 jaI esa [- jaI GSEG GT - 2 000 065 jaI esa [- jaI GSEG STG 000 066 Sugen (GT 1 + GT 2) 19302 362 1067667 saIpIpI sao Aayaat Imp from CPP+MUNDRA 278923 3874
kula tapIya Total (T) 425405 11285 335236kula jalaIya+tapIya Total (H+T) 432147 12261 335848ivaMD [najaI- Wind Energy 147700kula jalaIya+tapIya+hvaa Total (H+T+Wind) 579847 14533ivainamaya Exchanges 175283saIimat jaa- maaMga Restricted Energy Req 755130
K (B) MADHYA PRADESH
jalaIya HYDRO1 cambala pir Chambal Pr(50share) 1185 139
11 gaaMQaI saagar Gandhi Sagar 1843 92 008012 raNaa p`tap sagar RPSagar 028 86 002013 javaahr sagar Jawahar Sagar 499 99 0020
2 ponca Pench 935 147 00603 baargaI Bargi 1324 40 00604 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 8360 323 03306 banasaagar Bansagar-2 (Deolondh) 944 607 banasaagar Bansagar-3 (Silpara) 276 16 00508 banasaagar Bansagar-4 (Zinaha) 213 10 00209 maoDIKoDa Medikheda 002 18
10 ibarisaMGapur Birsingpur 760 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 000 0 005013 Omkareshwar 4147 383 036114 [Midra saagar Indira Sagar 7225 821 0568
kula jalaIya TOTAL(H) MPPGCL 24435 1765 1111
k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL1 AmarkMTk II AMK II Unit -1 000 0 144902 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 15219 224 0
Actual vaastivak
4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 04606 satpura II Satpura-II Unit 7 000 07 satpura II Satpura-II Unit 8 000 0 16508 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 17014 267 26050
10 satpura III Satpura-III Unit 11 10667 175 1589011 esajaITIpIesa 1 SGTPS Unit - 1 10667 175 1589012 esajaITIpIesa 2 SGTPS Unit - 2 4429 18413 esajaITIpIesa 3 SGTPS Unit - 3 5036 174 1584014 esajaITIpIesa 4 SGTPS Unit - 4 8589 19315 esajaITIpIesa 5 SGTPS Unit - 5 000 016 SSTPS 18462 615 14680
kula tapIya Total (T) 104103 2450 92620kula jalaIya+tapIya Total (H+T) 148551 4412 93731Injection from WIND 68657 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 217207 4412ivainamaya Exchanges 248134saIimat jaa- maaMga Rest En Req 465341
ga (C) CHHATTISGARH
jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 1500 120 00802 Gangrel 100 10 00103 Mini Micro KWB 300 7
kula jalaIya TOTAL(H) CSEB 1900 137 0090tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 2764 31 90802 kaorbaa (pU) Korba (E) Unit-2 2764 283 kaorbaa (pU) Korba (E) Unit-3 2764 444 kaorbaa (pU) Korba (E) Unit-4 2784 425 kaorbaa (pU) Korba (E) Unit -5 3685 120 112506 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 00008 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24430
10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 (DSPM 1) 18135 253 1408012 KORBA(EB) Extn - 2 (DSPM 2 18224 253 14240
kula tapIya Total (T) 170942 1993 14456013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0
kula tapIya Total (T+IPP) 170942 1993kula jalaIya+tapIya Total (H+T) 172842 2130 144650ivainamaya Exchanges 33985 0saIimat jaa- maaMga Rest En Req 206827 2130
Ga (D) MAHARASHTRA
jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 8166 555 16062 kaoyanaa III Koyna III 4724 2403 kaoyanaa IV Koyna IV 2911 10004 kaoyanaa DIpIeca Koyna DPH 232 375 TaTa jalaIya TATA Hydro 11540 459 54606 vaOtrNaa Vaitarna 766 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 000 09 pOzana Paithan 516 23
10 itlaarI Tillari 698 6211 BaIra Tola rosa Bhira Tail Race 1308 8012 GaTGar Ghatghar 544 25013 Anya CaoTo jalaIya Small Hydro (others) -2137 0
kula jalaIya TOTAL(H) 32968 459 7066
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)
tapIya THERMAL
Actual vaastivak
3 naaisak 3 Nasik Unit -3 8697 2004 naaisak 4 Nasik Unit -4 4120 2065 naaisak 5 Nasik Unit -5 5931 1996 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 26845 4928 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 15044 250
10 Tambao 7A gaOsa Trombay -7A (Gas) 5922 123 275711 Tambao 7ba Trombay -7B (WHR) 3429 7012 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 000 014 kaoraDI 7 Koradi Unit -7 85681 180215 Bausaavala 2 Bhusawal Unit -2 000 016 Bausaavala 3 Bhusawal Unit -3 000 017 Bausaavala 4 Bhusawal Unit -4 5515 50018 Bausaavala 4 Bhusawal Unit -5 2297 41019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 000 022 parlaI 6 Parli Unit -6 000 023 parlaI 7 Parli Unit -7 000 024 KaprKoDa 1 Khaperkheda Unit -1 1354 17525 KaprKoDa 2 Khaperkheda Unit -2 000 026 KaprKoDa 3 Khaperkheda Unit -3 1668 18527 KaprKoDa 4 Khaperkheda Unit -4 2101 18028 KaprKoDa 5 Khaperkheda Unit -5 15225 50030 parsa Paras-3 15837 26031 parsa Paras-4 7022 25732 ]rna Uran (Gas) 27290 43333 ]rna Uran (WHR) 000 0 559234 caMd`pur 1 Chandrapur Unit -1 000 035 caMd`pur 2 Chandrapur Unit -2 000 20636 caMd`pur 3 Chandrapur Unit -3 3029 19737 caMd`pur 4 Chandrapur Unit - 4 11940 42538 caMd`pur 5 Chandrapur Unit -5 23517 44739 caMd`pur 6 Chandrapur Unit -6 28962 146140 caMd`pur 7 Chandrapur Unit -7 87021 041 DhaNaU 1 Dahanu Unit-1 15575 250 1522442 DhaNaU 2 Dahanu Unit-2 15538 250 1522443 CPP 251961 34994644 RGPPL Share 000 0
kula tapIya Total (T) 671521 10585 353686MAH Wind + Solar Generation 147819 0kula jalaIya +tapIya Total (H+T+Wind) 852308 13508 399549
TOTAL (H+T)ivainamaya Exchanges 346915saIimat jaa- maaMga Rest En Req 1199223
ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1805 30ivainamaya Exchanges 30436saIimat jaa- maaMga Rest En Req 32616 558
C (F) dmana AaOr dIva DAMAN amp DIU 21561 332ja (G) dadra nagar hvaolaI DNH 50968 800
kula DD ampDNH (T) 72528 1132
k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)(H) koMd``Iya xao~ Central Sector
1 ena pI saI NPC11 tara`pur 1 TAPS Unit -1 950 160 584112 tara`pur 2 TAPS Unit -2 11310 16013 tara`pur 3 TAPS Unit -3 12227 540 2946014 tara`pur 4 TAPS Unit -4 000 015 kakrapr 1 KAPS Unit -1 000 540 326016 kakrapr 2 KAPS Unit -2 000 0
kula ena pI saI NPC Total 24487 14002 ena TI pI saI NTPC
Actual vaastivak
21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 11065 211 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14478 215 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14941 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 37054 51425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 35525 51526 kaorbaa esaTIpIesa 6 KSTPS Unit-6 36530 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 7835 513
kula kaorbaa KSTPS Total 157428 2696 9933127 ivanQa esaTIpIesa 1 VSTPS Unit-1 11186 21428 ivanQa esaTIpIesa 2 VSTPS Unit-2 13587 21329 ivanQa esaTIpIesa 3 VSTPS Unit-3 672 212
210 ivanQa esaTIpIesa 4 VSTPS Unit-4 13127 213211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11989 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 13999 215213 ivanQa esaTIpIesa 7 VSTPS Unit-7 28567 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 33700 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 32230 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 34377 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 34125 516
kula ivanQayaacala VSTPS Total 288166 REF 19549 31 saIpt -1 -SIPAT-1 48389 67100 32 saIpt -2 -SIPAT-2 48708 67500 33 saIpt -3 -SIPAT-3 48087 67600 34 saIpt -4 -SIPAT-4 36335 51500 35 saIpt -5 SIPAT-5 36313 51600
kula saIpt -SIPAT TOTAL 217832 305300 1113241 kvaasa gaOsa 1e Kawas GT-1A 000 042 kvaasa gaOsa 1baI Kawas GT-1B 000 043 kvaasa esaTI 1saI Kawas ST-1C 000 044 kvaasa gaOsa 2e Kawas GT-2A 6462 10645 kvaasa gaOsa 2baI Kawas GT-2B 6476 10446 kvaasa esaTI 2saI Kawas ST-2C 7424 118
kula kvaasa KGPS Total 20361 328 659551 gaMQaar gaOsa 1 Gandhar GT-1 5482 14252 gaMQaar gaOsa 2 Gandhar GT-2 8168 14353 gaMQaar gaOsa 3 Gandhar GT-3 4583 14354 gaMQaar esaTI 4 Gandhar ST-4 9941 218
kula gaMQaar GGPS Total 28174 646 730761 maaOda 1 Mauda -1 11044 495 000062 maaOda 2 Mauda -2 2843 511 0000
kula maaOda MAUDA Total 13887 1006 1679761 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 37494 500
RGPPL TOTAL 37494 500 1049871 esa esa pI SSP RBPH - 1 000 072 esa esa pI SSP RBPH - 2 000 073 esa esa pI SSP RBPH - 3 000 074 esa esa pI SSP RBPH - 4 004 075 esa esa pI SSP RBPH - 5 009 16976 esa esa pI SSP RBPH - 6 013 16877 esa esa pI SSP CHPH - 1 872 3378 esa esa pI SSP CHPH - 2 031 3379 esa esa pI SSP CHPH - 3 357 36710 esa esa pI SSP CHPH - 4 623 33711 esa esa pI SSP CHPH - 5 461 33
kula esa esa pI SSP Total 2370 505 023781 kula poMca Pench Total 935 147 006082 Jindal Injection 000 083 Amarkantak Lanco 000 0
(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2579524
(J) ]plabQata Availability REFnaoT ivainamaya Net Exchanges -619894]plabQa jaa- Energy Availability REF
maah jaulaa[- 2017 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2017 ANNEX-42
rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kula Total
gaujarat GUJARAT
pMjaIkRt Registered 12273 - - - 12273 13072017 1600 4998
saIimat Restricted 13100
AsaIimat Unrestricted 13140 12273 0 859 0 12282 13072017 1600 4998
nyaUnatma pMjaIkRt maaMga Min Registered Demand 7655 7655 24072017 0200 5004
maQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7461 - - - 7461 08072017 2015 4982
saIimat Restricted 6850
AsaIimat Unrestricted 6850 7461 0 4700 0 7508 08072017 2015 4982
nyaUnatma pMjaIkRt maaMga Min Registered Demand 4712 4712 03072017 1500
CltaIsagaZ CHHATTISGARH
pMjaIkRt Registered 3722 3722 31072017 2300 4999
saIimat Restricted 36865
AsaIimat Unrestricted 36865 3265 646 1600 0 3927 29072017 2000 4986
nyaUnatma pMjaIkRt maaMga Min Registered Demand 2288 2288 01072017 1400 5013
maharaYT MAHARASHTRA
pMjaIkRt Registered 19913 - - - 19913 10072017 140000 5000
saIimat Restricted 19600
AsaIimat Unrestricted 19650 19881 0 4871 0 19930 10072017 130000 4993
nyaUnatma pMjaIkRt maaMga Min Registered Demand 13157 13157 22072017 0400 4998
gaaovaa GOA
pMjaIkRt Registered 570 558 - - 558 22072017 2000 4993
AsaIimat Unrestricted 570 558 0 137 - 559 22072017 2000 50
nyaUnatma pMjaIkRt maaMga Min Registered Demand
essaar ESSAR(ESIL)
pMjaIkRt Registered 889 - - 889 15072017 2200 5000
AsaIimat Unrestricted 889 0 0 - 889 15072017 2200 5000
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dmana evaM dIva DD
pMjaIkRt Registered 319 - - 319 21072017 1100 5002
AsaIimat Unrestricted 319 0 0 - 319 21072017 1100 5002
nyaUnatma pMjaIkRt maaMga Min Registered Demand
dadra va na hvoalaI DNH
pMjaIkRt Registered 738 - - 738 27072017 1200 4999
AsaIimat Unrestricted 738 0 - - 738 27072017 1200 4999
nyaUnatma pMjaIkRt maaMga Min Registered Demand
piScama xao~ WESTERN REGION
pMjaIkRt Registered 42999 - - - 42999 10072017 1200 4997
saIimat Restricted 50310
AsaIimat Unrestricted 50500 42999 0 45 0 43044 10072017 1200 4997
nyaUnatma pMjaIkRt maaMga Min Registered Demand 32035 32035 24072017 0400 NOTE LS = Load Shedding
PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering
माह जलाई 2017 ANNEXURE- 43Jul-17अन समातर PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS
1 HVDC back-to back link(WR-NR)-Pole 1 7332400
2 HVDC back-to back link(WR-NR)-Pole 2 7440000
3 HVDC back-to back link(WR-SR) 6693400टाई लाईन TIE LINE
1765 -I
765kV Seoni to Wardha-I 7440000
2765 -II
765kV Seoni to Wardha-II 7440000
3765 -I
765kV Seoni to Bilaspur-I 7440000
4765 -II
765kV Seoni to Bilaspur-II 7440000
5765 -I
765kV Durg to Wardha I 4334000
6765 -II
765kV Durg to Wardha II 7385700
7765 -III
765kV Durg to Wardha III 7075000
8765 -IV
765kV Durg to Wardha IV 4304000
9765 कवी धरमजयगड स जबलपर-
I 765kV Dgarh to Jabalpur I 5372100
10765 कवी धरमजयगड स जबलपर-
II 765kV Dgarh to Jabalpur II 6250800
11765 कवी धरमजयगड स जबलपर-
III 765kV Dgarh to Jabalpur III 5544300
12765 कवी धरमजयगड स जबलपर-
IV 765kV Dgarh to Jabalpur IV 4632800
13765 -
I 765kV Dgarh to New Ranchi I 7405700
14765 -
II 765kV Dgarh to New Ranchi II 7440000
15765 कवी धरमजयगड स झारसगड़ा-
I 765kV Dgarh to Jharsuguda I 7433800
16765 कवी धरमजयगड स झारसगड़ा-
II 765kV Dgarh to Jharsuguda II 7440000
17765 -
I 765kV Wardha to Nizamabad I 7440000
18765 -
II 765kV Wardha to Nizamabad II 7440000
19765 कवी सोलापर स रायचर -
I 765kV solapur to Raichur I 7260700
20765 कवी सोलापर स रायचर -
II 765kV solapur to Raichur II 7440000
21765 कवी धल स वडोदरा-
I 765kV Dhule to Vadodara I 5265600
22765 कवी इदौर स वडोदरा-
I 765kV Indore(PG) to Vadodara I 7412500
23765 -
I 765kV Gwalior to Phagi I 7440000
24765 -
I 765kV Gwalior to Phagi II 7405600
25765 -
I 765kV Gwalior to Agra I 7440000
26765 -
II 765kV Gwalior to Agra II 7440000
27400
400kV Bhilai to Koradi 7440000
28400
400kV Bhilai to Bhadravati 7440000
29400 -I
400kV Raipur to Bhadravati-I 7440000
30400 ndashII
400kV Raipur to Bhadravati-II 7440000
31400 ndashIII
400kV Raipur to Bhadravati-III 7440000
32400 कवी सातपरा स कोराडी
400kV Satpura to Koradi 7313200
33400 कवी खडवा स धल-I
400kV Khandwa-Dhule-I 7440000
34400 कवी खडवा स धल-II
400kV Khandwa-Dhule-II 7204900
भार WRLDC Mumbai
35400 कवी इदौर स असोज-I
400kV Indore to Asoj-I 7433100
36400 कवी इदौर स असोज-II
400kV Indore to Asoj-II 7380900
37400 -I(GIS) 400kV Kolhapur(GIS)-Mapusa-I 4724900
38400 -II(GIS) 400kV Kolhapur(GIS)-Mapusa-II 4734900
39400 कवी वापी स बोईसर
400kV Vapi-Boisar 7440000
40400 कवी रायगढ़ स रौरकला
400kV Raigarh to Rouerkela I 7193200
41400
400kV Raigarh to Sterlight 7344900
42400 कवी रायगढ़ स झरसगड़ा I
400kV Raigarh to Jharsuguda I 7163500
43400 कवी रायगढ़ स झरसगड़ा II
400kV Raigarh to Jharsuguda II 7440000
44400 कवी नागदा स दहगाम-I
400kV Nagda to Dehgam I 7440000
45400 कवी नागदा स दहगाम-II
400kV Nagda to Dehgam II 7440000
46400 ndashI
400kV Raipur to Wardha-I 7440000
47400 ndashII
400kV Raipur to Wardha-II 7440000
48220 -II
220kV K(E) to Budhipadar-II 7131200
49220 -III
220kV K(E) to Budhipadar-III 7440000
भार WRLDC Mumbai
Anaulagnak 47Annex-47
maah jaulaa[- 2017 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str
kmaaMk
Sl No
1
11 maah ko AMt maoMAt the end of the month
12 ipClao vaYa- [sa maah ko Anau$p AaMkDoM
Corresponding Figure of themonth Last Year
ivavarNa Particularsgau ] iva ina ila GUVNL
LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2017
9585
Levels in Mtrs str maITr maoM
ena eca DI saI NHDC
[Midra saagar Indira Sagar
39283 64490
map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL
39528
]ka[- Ukai
65377
9791
25021
25884
gaaMQaIsaagar Gandhisagar kaoyanaa Koyna
OutageDuration
Date Time Date Time Time
1 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 01072017 532 01072017 640 108Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil Nil GI-1 Nil
2 WRTripping of1220 kV Lonikand II - Bhosari2220 kV Lonikand I - II IC
MSETCL 02072017 919 02072017 1020 101
B Phase 220 kV PT got burst and ledto Bus Bar Protection operation at220 kV Bus 1 At 400220 kVLonikhand 2 Substation
Nil Nil GI-1 Nil
3 WR
Tripping of1400220 kV 500 MVA SGTPS Birsingpur ICT2210 MW SGTPS Unit No 13220 kV Birsingpur - Amarkantak II4220 kV Birsingpur - Rewa5220 kv Birsingpur - Birsingpur IV622033 kV 40 MVA Station Transformer 1722033 kV 40 MVA Station Transformer 2
MPPGCLMPPTCL 07072017 1840 07072017 1940 100
400220 kV 500 MVA Birsingpur ICTtripped while charging along multiple220 kv elements from BirsinghpurSs
Nil Nil GI-1 NIl
4 WRTripping of1220 kV Magarwada(PG)-Magarwada(DD)-I2220 kV Magarwada(PG)-Magarwada(DD)-II
PGCIL 10072017 920 10072017 1025 105
220kV Magarwada(PG) -Magarwada-1 amp 2 tripped on B- ph fault causingpartial blackout at 22066 kVMagarwada Substation and lower
Nil 182 GI-1 0197
5 WR
Tripping of1220 kV Lonikand - Theur 22220 kV Lonikand - Lonikand 2 IC3400220 kV 315 MVA ICT 2422022 kV 50 MVA ICT 1522022 kV 50 MVA ICT 26220 kV Bus coupler
MSETCL 15072017 1640 15072017 1716 036
Tripping of 220 kV Bus 2 and allassociated connected elements atLonikhand due to LBB operation forfault on 220 kV Lonikhand-Theur 2circuit
Nil Nil GI-1 Nil
6 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Tillari - Amona3220 kV Mapusa - Amona
GoaMSETCL 20072017 1330 20072017 1344 014Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0019
7 WR
Tripping of1220 kV Mahalakshmi - Amona2220 kV Halkarni - Tillari3220 kV Tillari - Amona4220 kV Mapusa - Amona
GoaMSETCL 20072017 1945 20072017 1957 012Tripping of multiple lines fromAmona Substation due to fault on220 kV Tillari-Amona circuit
Nil 80 GI-1 0016
8 WR
Tripping of1400 kV Korba - Bhatapara SC2400 kV Korba - Raipur 43400 kV Korba - Sipat SC4400 kV Korba - Vindhyachal 25400 kV Korba - Birsingpur 16400 kV Korba - Birsingpur 27500 MW KSTPS Unit 58500 MW KSTPS Unit 6
NTPC 21072017 2126 21072017 106 340Bus Bar Protection operation at 400kV Bus 3 and 4 at korba NTPC due toproblem in VAJ-C relay in Bus 3
954 Nil GI-2 Nil
ANNEXURE - 5
Load Loss(MW)
Category asper CEA
standards
Energy Unserved(MU)OwnerAgency Outage Revival Event Generation Loss
(MW)SNo Region Name of Elements
9 WR
Tripping of1500 kV HVDC Chandrapur Padghe Pole 12400 kV Padghe - Bableshwar 13400 kV Padghe - Nagothane 14400 kV Padghe - Tarapur 15400 kV Padghe - Kalwa 26400220 kV 315 MVA ICT 17400220 kV 315 MVA ICT 2
MSETCL 22072017 923 22072017 956 033
LBB protection operation of 400 kVPadghe - Bableshwar 1 at Padghe Ssleading to the tripping of 400 kV Bus1 and associated elementsconnected to it
Nil Nil GI-2 Nil
10 WR
Tripping of1500 KV HVDC Mundra - Mohindargarh Pole 12500 KV HVDC Mundra - Mohindargarh Pole 23660 MW APL Unit 9
APLATIL 24072017 1229 24072017 1629 400
Due to Tower Collapse of HVDCmundra Mohindergarh Bipole DCline fault occurred and resulted in itstripping followed by associated SPSoperation
373 251 GI-2 0008
11 WR
Tripping of1220 kV OSP-Nirmani2 220 kV OSP-Birwaha3 220 kV OSP-chhagoan4 220 kV OSP-Khandwa
NHDC 26072017 545 26072017 626 041Due to over voltage and over currentprotection operation several 200 kV linestripped from Omkareshwar Substation
Nil Nil GI-1 Nil
Disclaimer The Above details are based on the preliminaryflash report of the event and may change after finalisation of the detailed reportThe qunatum of loadgeneration loss is based on details given by SLDC and utility and may vary later with updated details
Annexure-82AWESTERN REGION SCHEMES FUNDED FROM PSDF
(Amount in Rupees Crores)( Amount in Rs Crores) (As on 31052017)
SrNo
State UT No ofSchemes
Scope of Work (Scheme) ApprovedCost
GrantSanctioned
Date ofSanction
FundsReleased
of fundDisbursed againstgrant Sanctioned
Status
1 MadhyaPradesh
5 Implementation of Integrated systemfor ABT Open Access and MIS forMP-SLDC
400 36 17032016 0 000
Renovation and Upgradation ofprotection system of substations ofMPPTCL
10300 927 17032016 927 1000
Renovation Upgradation ofprotection system of substations inMPPGCL
5234 4711 0592016 471 1000
Installation of 125MVAR Bus BarReactors at 400kV substation ofMPPGCL(SSTPP Khandwasubstation )
621 559 0592016 000 000
Installation of 50 MVAR LineReactor at 400kV substation at STPS-MPPGCL
745 671 22052017 000 000
2 Chhattisgarh 2 Scheme forReplacementrenovationUpgradationof protection system and SwitchyardEquipment of EHV substations inCSPTCL
6852 6167 0592016 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) by CSPTCL
503 453 16052017 000 000
3 Gujarat 8 Installation of Automatic DemandManagement System in the state ofGujarat in order to improve griddiscipline
167 15 1152015 135 9000 Completed
Load Forecasting Scheme in the stateof Gujarat
370 37 04082015 000 000
Wind generation forecasting in theState of Gujarat
162 162 17032015 000 000
Installation of Super ConductingFault Current Limiter (SCFCL) at220 kV Haldarva substation ofGETCO
3237 2913 02012017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofMGVCL
2839 2555 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofUGVCL
3751 3376 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofDGVCL
1577 1419 22052017 000 000
Installation of automatic switchedcapacitors on 11kV Feeders ofPGVCL
6332 5699 22052017 000 000
4 Mharashtra 5 Replacement of existing 015 ACSRwolf conductor of 132kV Balapur-Patur-Malegoan corridor and 02ACSR wolf conductor of 132kVKhapri-Besa (Nagpur Ring MainLine) by High Ampacity (HTLS)Conductor
4615 3461 16052017 000 000
Installation of Data Concentrators inMSETCL
1041 937 16052017 000 000
Installation of RTUs for 132 kVSubstations of MSETCL
2565 770 16052017 000 000
Installation of Capacitor Banks atHV amp EHV level at various EHVsubatations under Nashik amp Punezones in MSETCL
1572 1415 22052017 000 000
Implementation of AutomaticDemand Management Scheme(ADMS) on 3311kV HV feeders inMaharashtra
3258 2932 22052017 000 000
TOATAL 20 56141 4835 1533 317
24a) date and Reference of LOA
24b) Amount of LOA
251 Ist Installment
252 IInd installment
253 IIIrd installment
No Supply DescriptionQty AS
PER LOA
QuantityReceived
during Month
Sch Act
1 item Details
11
12
hellip
Erection Descriptionworks as per
LOAProgress
During MonthBalance
2 work details
21
22
hellip
3 Others
CUMMULATIVE PROGRESS Till date BALANCE
Annexure -82 B
25 Date of Disbursement and amount
1 Name of the Scheme
13 StateRegion
12 Executing Agency
11 Name of the substation and its Location
CUMMULATIVE PROGRESS Till date
Reporting Format to the PSDF Project Monitoring Group
Remarks
27 Date of handing over of Site to entity (in case of turnkey projects)
23 Approved Grant by Monitoring Committee ( Rs In Lakhs)
24 Date of Requisition by the Entity
Signature with seal of the Nodal Officer
Report for the Month of ____MM YY________
26 Date of Scheduled completion of Work
22 Total Approved Cost of the Scheme
21 Date of Agreement of Entity with State GovtNLDC
2 Date of Sanction order
Annexure-82 C2
1 Name of the Scheme
11 Name of the substation and its Location
12 Executing Agency
13 StateRegion
2 Date of Sanction Order
21 Date of Agreement of Entity with State Govt NLDC
22 Total Approved Cost of Scheme
23 Approved Grant by Monitoring Committee (Rs In Lakhs)
24 Date of Requisition by the Entity
24 a) Date and Reference of LOA
24 b) Amount of LOA
25 Date of Disbursement and amount
251 Ist Installment
252 IInd Installment
253 IIIrd Installment
26 Date of Scheduled completion of work
27 Date of Handling over of Site to entity ( In case of Turn key project)
Sch Act1 Item Details
11 Supply of hardware amp Sofwtare modules Lot Nil
12 Deployment of software modules Lot Nil Development Customization in progress
Reporting Format to the PSDF Project Monitoring Group
Implementation of Integrated System for ABTOA and MIS for MPSLDC
MPSLDC
Ms Kalki Communication Tech Pvt Ltd Bangalore
MADHYA PRADESHWESTERN REGION
17032016
22062016
Rs400 Lakhs
Rs360 LAKHS
06082016 Letter No 07-05174-A1723
Balance Remark
Rs30162 LAKHS
RECEIVED (Rs 36 Lakhs)
RECEIVED (Rs 5429 Lakhs)
Not Yet Received (Rs16288 Lakhs)
30 Sept 2017
Full quantity of hardware amp Operatingsoftwares were received
30 Sept 2017
Report for the Month of JUNE 2017
No Supply DiscriptionQty AS PER
LOA
QuantityReceived during
Month
CUMMULATIVEPROGRESS till date
1 2 3 4
Oct-14 Nov-14 Dec-14 Oct-15 Nov-15 Dec-15 Oct-16 Nov-16 Dec-16 2014-15 Average
2015-16 Average
2016-17 Average
Projected Demand for (Oct 2017 - Dec 2017) before normalization
Chattisgarh 3284 2923 3086 3757 3174 3319 3242 3058 3500 3098 3417 3267 3429 Gujarat 13369 12815 11846 14062 13276 12317 14134 12911 12883 12677 13218 13309 13701
Madhya Pradesh 8394 9477 9717 9975 10146 10902 8832 10867 11501 9196 10341 10400 11183 11400 As per data given by MP
Maharashtra 19654 19045 18696 20594 19781 19077 20462 20298 19835 19132 19817 20198 20782 Daman amp Diu 297 297 297 307 307 296 327 314 296 297 303 312 320 Dadra Nagar Haveli 635 635 688 729 716 729 784 761 721 653 725 755 814
Goa 463 421 451 448 406 422 487 531 411 445 425 476 480 ESIL 575 571 517 387 585 493 732 622 656 571 488 670 675
Western Region 42614 42462 43035 48199 44645 44902 46090 46865 47463 Notes1 Projections are based on the past 3 years monthly Peak Demand Met data available on the website of CEA2 The above projections are being done for financial year 2017-2018 (Q3) ie October 2017 to December 20173 Projections are being done based on the forecast function available in MS Office Excel4 CEA Reports can be accessed from the following linkshttpwwwceanicinreportsmonthlypowersupply2016psp_peak-10pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2016psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-12pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-11pdfhttpwwwceanicinreportsmonthlypowersupply2015psp_peak-10pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_12pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_11pdfhttpwwwceanicinreportsmonthlygm_div_reppower_supply_position_reppeakPeak_2014_10pdf
DEMAND FORECAST USING PAST 3 YEARS DATA (Oct 2017 - Dec 2017)
Data given by
DICsComments
2014-15 2015-16 2016-17
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
1 MP WR 4739 4739 As per data given by MP 5992 5992
Koradi TPS 9 660 432
Koradi TPS 10 660 432
3 Chattisgarh WR 3468 3468 3468
4 Gujarat WR 9994 Bhavnagar TPP 2 250 164 164 10158 10158
5 Goa WR 0 0 0
6 DampD WR 0 0 0
7 DNH WR 0 0 0
8 Vindhyachal WR 4631 4631 4631
9 Ratnagiri Dabhol WR 659 659 659
10 TAPS (1234) WR 1183 1183 1183
11 Jindal WR 768 768 768
12 LANCO WR 575 575 575
13 NSPCL Bhilai WR 429 429 429
14 Korba WR 2486 2486 2431 2431
15 SIPAT WR 2858 2858 2809 2809
16 CGPL WR 3708 3708 3708
17 Mauda WR 681 Mauda 3 660 432 432 1113 1135 1135
18 Gandhar WR 388 388 200 200
19 Kawas WR 354 354 200 200
20 SSP WR 708 708 708
15715864
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
Maharashtra 14852WR 157152
As per data given by NTPC
As per data given by NTPC
SlNo Entities Regio
n
Projections based on
3 Years Data
Bus Name Unit No
Installed Capacity
Gen considere
d
Sub Total Bus Name Unit No
Installed
Capacity
Gen considere
dSub Total TOTAL
Comments From DICs Others(if any)
Figure as per
CommentsPoC Data
Projected Generation before normalization
wrt projected All India Peak Demand
(MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW) (MW)
Generation Projection (October 2017 - December 2017)Generation declared Commercial from
1st Jan 17 to 30th June17Generation declaredexpected to be declared Commercial
from 1st July17 to 30th Sep17
21 KAPS WR 203 203 203
22 Essar Mahan WR 531 Essar Mahan 2 600 393 393 924 924
23 BALCO WR 611 611 611
24 KSK Mahanadi WR 668 668 668
25 Vandana Vidyut WR 0 0 0
26 Sasan UMPP WR 3811 3811 3811
27 Tamnar TPP (Jindal Extn) WR 971 971 971
28 DGEN WR 438 438 438
29 DB Power Ltd WR 1150 1150 1150
30 Korba West WR 508 508 508
31 Dhariwal WR 278 278 As per data given by Dhariwal 273 273
32 Raikheda TPP (GMR) WR 0 0 0
33 JP Nigrie WR 1193 1193 As per JP Nigrie 1240 1240
34 GMR Warora WR 557 557 557
35 ACBIL+Spectrum+MCCPL WR 610 610 610
36 MB Power (Anuppur) WR 576 576 As per data given by MB Power 1131 1131
37 RKM Power WR RKM Power 2 360 232 232 RKM Power 3 360 232 232 464 464
38 Jhabua Power WR 266 266 266
39 TRN Energy WR 280 TRN Energy 2 300 196 196 476 476
40 Sholapur STPP WR Sholapur STPP 1 660 435 435 435 As per data given by NTPC 435 435
TOTAL 65133 1724 1224 68080 69506
Note1 Projections are based on monthly maximum injection in the last 3 years from actual metered data2 Generation forecast has been done based on the following criteria(i) If there is an increasing trend then last year average generation has been considered(ii) Otherwise average of past three year average generation has been considered3 In case of new generators where past data was not available following has been assumed(i) 080 plf for hydro generators (ii) 07 plf for thermal generators(iii) 03 plf for gas stations
Sl No Line Name End-1 End-2 Id Line
Owner
End-1
Owner
End-2
Owner
Km Conductor Type SIL
(Unco mpen
sated)
11 Amreli - Hadala Line Amreli Hadala 1 GETCO GETCO GETCO 165 Twin ACSR Moose 517
12 Amreli - Chorania Line Amreli Chorania 1 GETCO GETCO GETCO 164 Twin ACSR Moose 517
13 Amreli - Jetpur Line1 Amreli Jetpur 1 GETCO GETCO GETCO 96 Twin ACSR Moose 517
14 Amreli - Jetpur Line2 Amreli Jetpur 2 GETCO GETCO GETCO 66 Twin ACSR Moose 517
21 Asoj - Chorania Line1 Asoj Chorania 1 GETCO GETCO GETCO 177 Twin ACSR Moose 517
22 Asoj - Chorania Line2 Asoj Chorania 2 GETCO GETCO GETCO 166 Twin ACSR Moose 517
24 Asoj - Wanakbori Line Asoj Wanakbori 1 GETCO GETCO GETCO 76 Twin ACSR Moose 517
107 Chorania - Kosamba Line1 Chorania Kosamba 1 GETCO GETCO GETCO 230 Twin ACSR Moose 517
108 Chorania - Kosamba Line2 Chorania Kosamba 2 GETCO GETCO GETCO 230 Twin ACSR Moose 517
139 Hadala - Varsana Line Hadala Varsana 1 GETCO GETCO GETCO 159 Twin ACSR Moose 517
140 Hadala - Vadinar Line1 Hadala Vadinar 1 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
141 Hadala - Vadinar Line2 Hadala Vadinar 2 GETCO GETCO ESSAR 113 Twin ACSR Moose 517
196 Kasor - Chorania Line Kasor Chorania 1 GETCO GETCO GETCO 103 Twin ACSR Moose 517
311 Ranchodpura (Vadavi) - Zerda (Kansari) 1 Ranchodpur a Zerda(Kansa ri) 1 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
312 Ranchodpura (Vadavi) - Zerda (Kansari) 2 Ranchodpur a Zerda(Kansa ri) 2 WRTGPL GETCO GETCO 140 Twin ACSR Moose 517
313 Ranchodpura (Vadavi) - Chorania 1 Ranchodpur a Chorania 1 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
314 Ranchodpura (Vadavi) - Chorania 2 Ranchodpur a Chorania 2 WRTGPL GETCO GETCO 103 Twin ACSR Moose 517
344 Soja - Wanakbori Line Soja Wanakbori 1 GETCO GETCO GETCO 95 Twin ACSR Moose 517
346 Soja - Zerda(Kansa ri) Line Soja Zerda(Kansa ri) 1 GETCO GETCO GETCO 135 Twin ACSR Moose 517
368 Ukai - Kosamba Line1 Ukai Kosamba 1 GETCO GETCO GETCO 81 Twin ACSR Moose 517
369 Ukai - Kosamba Line2 Ukai Kosamba 2 GETCO GETCO GETCO 68 Twin ACSR Moose 517
382 Veloda - Charnaka Line1 Veloda Charnaka 1 GETCO GETCO GETCO 199 Twin ACSR Moose 517
383 Veloda - Charnaka Line2 Veloda Charnaka 2 GETCO GETCO GETCO 199 Twin ACSR Moose 517
415 Zerda(Kansa ri) - Varsana Line1 Zerda(Kansa ri) Varsana 1 GETCO GETCO GETCO 258 Twin ACSR Moose 517
List of intra State EHV lines to be removed from important list published by WRLDC
Sl No Name of line End-1 End-2 Id Line Owner Length(in Km) Conductor Type
16 Bhilad-Vapi-PG1 Bhilad Vapi-PG 1 GETCO 21 Single Zebra
17 Bhilad-Vapi-PG2 Bhilad Vapi-PG 2 GETCO 22 Single Zebra
18 Bhilad-Vapi-PG3 Bhilad Vapi-PG 3 GETCO 22 Single Zebra
31 Dehgam-Ranasan1 Dehgam Ranasan 1 GETCO 20 Single Zebra
32 Dehgam-Ranasan2 Dehgam Ranasan 2 GETCO 20 Single Zebra
33 Dehgam-Khanpur1 Dehgam Khanpur 1 GETCO 12 Single Zebra
34 Dehgam-Khanpur2 Dehgam Khanpur 2 GETCO 12 Single Zebra
44 Halvad-Bhimasar1
(Now Bhimasar - Mansar line 1)
Halvad Bhimasar 1 GETCO 150 Single Zebra
45 Halvad-Bhimasar2
(Now Bhimasar - Mansar line 2)
Halvad Bhimasar 2 GETCO 150 Single Zebra
52 Kakrapar-Vav1 Kakrapar Vav 1 GETCO 43 Single Zebra
53 Kakrapar-Vav2 Kakrapar Vav 2 GETCO 43 Single Zebra
65 Kawas-Vav1 Kawas Vav 1 WRTS-2 37 Single Zebra
66 Kawas-Vav2 Kawas Vav 2 WRTS-2 37 Single Zebra
67 Kawas-Ichchapur1 Kawas Ichchapur 1 GETCO 3 Single Zebra
68 Kawas-Ichchapur2 Kawas Ichchapur 2 GETCO 3 Single Zebra
91 Nasik-Navsari1 Nasik Navsari 1 MSETCL 171 Single Zebra
92 Nasik-Navsari2 Nasik Navsari 2 MSETCL 171 Single Zebra
Morbi - Bhimasar Morbi Bhimasar Single Zebra
Sartanpar - Bhimasar Sartanpar Bhimasar Single Zebra
List of 220 kV lines to be removed from important element list available on WRLDC website
Sl No Sub-Station ID MVA Voltage Ratio Owner Normal Tap
Position
Present Tap
Position
5 Amreli 1 315 400220 GETCO 9b 9
6 Amreli 2 315 400220 GETCO 9b 9
7 Amreli 3 315 400220 GETCO 9b 9
8 APL-Mundra 1 315 400220 APL 9b 9
9 APL-Mundra 2 315 400220 APL 9b 9
10 Asoj 1 500 400220 GETCO 9 12
11 Asoj 2 500 400220 GETCO 9 12
12 Asoj 3 315 400220 GETCO 9b 12
13 Asoj 4 315 400220 GETCO 9b 12
54 Charnaka 1 315 400220 GETCO 9b 9
55 Charnaka 2 315 400220 GETCO 9b 9
56 Charnaka 3 315 400220 GETCO 9b 9
58 Chorania 1 500 400220 GETCO 9 13
59 Chorania 2 500 400220 GETCO 9 13
60 Chorania 3 500 400220 GETCO 9 13
73 GPEC 1 500 400220 GETCO 9 11
77 Hadala 1 315 400220 GETCO 9b 9
78 Hadala 2 315 400220 GETCO 9b 9
79 Hadala 3 315 400220 GETCO 9b 9
92 Jetpur 4 500 400220 GETCO 9 9b
93 Jetpur 1 315 400220 GETCO 9b 9b
94 Jetpur 2 315 400220 GETCO 9b 9b
95 Jetpur 3 315 400220 GETCO 9b 9b
108 Kasor 1 315 400220 GETCO 9b 9
109 Kasor 2 315 400220 GETCO 9b 9
110 Kasor 3 315 400221 GETCO 9b 9
128 Kosamba 1 315 400220 GETCO 9b 8
129 Kosamba 2 315 400220 GETCO 9b 8
130 Kosamba 3 315 400220 GETCO 9b 8
131 Kosamba 4 500 400220 GETCO 9b 8
141 Mansar 1 315 400220 GETCO 9b 9b
142 Mansar 2 315 400220 GETCO 9b 9b
174 Pirana-T 1 315 400132 TPL 9 9
175 Pirana-T 2 315 400132 TPL 9 9
176 Pirana-T 3 315 400132 TPL 9 9
177 Pirana-T 4 315 400132 TPL 9 9
206 Soja 1 500 400220 GETCO 9 11
207 Soja 2 500 400220 GETCO 9 11
208 Soja 3 500 400220 GETCO 9 11
216 Sugen 1 315 400220 TPL 9b 1
217 Sugen 2 315 400220 TPL 9b 1
218 Sugen 3 315 400220 TPL 9b 1
220 Ukai 1 500 400220 GETCO 9b 9
226 Varsana 1 315 400220 GETCO 9b 5
227 Varsana 2 315 400220 GETCO 9b 5
228 Varsana 3 315 400220 GETCO 9b 5
229 Veloda 1 500 400220 GETCO 9b 9b
230 Wanakbori 1 500 400220 GETCO 9b 9
List of ICTs to be removed from list of Important elements
SNo Substation Reactors Total MVAR Rated Voltage
2 Amreli 1X50 + 1X125 175 420
5 Asoj 1X50 50 420
20 Charnaka 1x125 125 420
22 Chorania 1X50 + 1X125 175 420
34 Hadala 1X50 + 1X125 175 420
41 Jetpur 1X50 + 1X63 113 420
47 Kasor 1X50 + 1X125 175 420
53 Kosamba 1X80 80 420
56 Mansar 1x63 63 420
74 Ranchodpura 1X50 + 1X125 175 420
82 Soja 1X50 + 1X80 130 420
86 Varsana 1X50 + 1X125 175 420
87 Veloda 1x125 125 420
94 Zerda(Kansari) 1X50 + 1X125 175 420GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
GETCO
Owner
GETCO
GETCO
List of reactors to be removed from list of Important elements
of WR
B List of 400 kV Bus Reactors
- COV LETTERpdf
- textpdf
- 21pdf
- 231pdf
- 232pdf
- 233pdf
- 234pdf
- 25pdf
- 267pdf
- 31pdf
- 32pdf
- 33pdf
- 41pdf
- 42pdf
- 43pdf
- 47pdf
- 5pdf
- 82Apdf
- 82Bpdf
- 82C1pdf
- 82C2pdf
- 83PDF
-
- Dnd_WR
- Grn_WR
-
- 84pdf
-