Agenda for the meeting to discuss Revision of LTA quantum in respect of
Kudgi STPS
1. LTA pertaining to Kudgi STPS
a. KSEB vide letter dated 25-09-2017 (ANNEXURE A) had stated that with installed capacity
of 2400 MW and Normative Auxiliary Consumption of 5.75 %, the ex-bus capability of
Kudgi STPS works out to only 2262 MW. Accordingly, share of the beneficiaries needs to be
analyzed. It was also stated that as per Clause (6) of CERC (Sharing of ISTS Charges and
Losses) third amendment, 2015, in case the commissioning of a generating station or a unit
thereof is delayed, the generator shall be liable to pay withdrawal charges corresponding to
its long Term Access from the date the LTA is granted by CTU becomes effective.
b. 36th
CCM opined that NTPC (applicant) may have to approach CTU for surrender of
additional capacity. It shall be required to relinquish the capacity in accordance with the
Connectivity Regulations.
c. NTPC (Applicant) was requested to approach CTU for revising the LTA quantum by
relinquishing the excess LTA quantum of 130.49 MW.
d. SRPC vide letter dated 03.01.2018 had taken up the issue with NTPC. NTPC vide letter
dated 02.01.2018 (ANNEXURE B) had taken up the issue of LTA revision to 2,262 MW
(against the granted LTA of 2392.49 MW) with COO, CTU.
e. Further, NTPC, vide letter dated 7.2.2018 (ANNEXURE C), requested beneficiaries to take
up the matter with CTU for revision/relinquishment of LTA for Kudgi STPS.
***
सतासूचच/ Address List
1. िुख् य अवभयंत वि वण्य), एपीपीसीसी, हदैर ब द
Chief Engineer (Comml.), APPCC, Hyderabad.
2. अपर वनदशेक वपररयोजन ),पी सी के ल, क िेरी भिन, बेंगलूर
Additional Director (Proj.), PCKL, Kaveri Bhavan, Bengaluru.
3. लेख वनयंत्रक, एसएलडीसी-टीबीसी-केपीटीसीएल, बेंगलूरु Controller of Accounts, SLDC- TBC, KPTCL, Bangalore.
4. श्री आर िी ददलीप कुि र, अिीक्षक अवभयंत , एसएलडीसी, केपीटीसीएल, बेंगलूरु
Shri R.V. Dilip Kumar, Superintending Engineer, SLDC, KPTCL, Bengaluru.
5. क यसक री अवभयतं वएलडी) एसएलडीसी, केएसईबी, कलिसेरी
Executive Engineer (LD), SLDC, KSEB, Kalamassery.
6. अिीक्षक अवभयंत वएलडी ि जीओ) टैनट्र न्द् ् को, चेन्द् नै
Superintending Engineer (LD & GO), TANTRANSCO, Chennai.
7. क यसक री अवभयतं वविड), टैनट्र न्द् ् को, चेन्द् नै
Executive Engineer (Grid), TANTRANSCO, Chennai.
8. िुख् य अवभयंत वि वण् य), टीएसपीसीसी, हदैर ब द
Chief Engineer (Comml.), TSPCC, Hyderabad
9. ि ह प्रबंिक वि वण् य) सीसी, एनटीपीसी, ् कोप क ं लेक् स, नई ददल् ली
General Manager (Comml.), CC, NTPC, SCOPE Complex, New Delhi.
10. ि ह प्रबंिक, एसआरएलडीसी, पोसोको, बेंगलूरु
General Manager, SRLDC, POSOCO, Bengaluru
11. वित् त प्रिुख, एसआरएलडीसी, पोसोको, बेंगलूरु
Head of Finance, SRLDC, POSOCO, Bengaluru
12. General Manager, Kudgi STPS, State Highway 124, Kudgi, Karnataka 586216
13. General Manager (Comml.), Southern Region Head Quarters, MCH Commercial Complex,
Rashtrapati Road, Gandhi Nagar, Secunderabad, Telangana- 500003
14. िह प्रबंिक वि वण् य), दक्षे-।, प िरविड, सिकिं दिाबाद
General Manager (Comml.), SRTS-I, PGCIL, Secunderabad
15. सह . िह प्रबंिक वि वण् य), दक्षे-।।, प िरविड, बेंगलूरु
AGM (Comml.), SRTS-II, PGCIL, Bengaluru
KERALA STATE ELECTRICITY BOARD Ltd.Office of the Chief Engineer(Transmission System OPeration)
LD Centre, H.M.T.Colony P"O., Kalamassery - 683 503.
No. udgi t2017-11t Q-, 4-L
To,
The Member SecretarY
SRPC
Bangalore
Sub: Transmission charges pertaining to Kudgi STPS -reg'
Ref:- 1. Corrigendum to RTA for Aug,2017 Vide Ltr no. SRPC/SE-1/5(RTA)12017
dtd 5.9.17
2. Letter No. C/ENG /SEFITAILS/10/013-R1 dtd 23.01.15 of PGCIL
Attention is invited to the corrigendum to the RTA for the month of
August 2OL7 dated 5.g.L7 under the reference cited No.1 wherein it is mentioned
that the corrigendum is issued subsequent to the letter of CTU for including the
entire LTA quantum of Kudgi STPS of 2392.49MW and in that the MW apportioned
to Kerala by CTU is 123.21MW.
On scrutiny it is seen that the quantum of 2392.49 MW is exceeding the ex-bus
capability of the station. Also on examining the LTA granted by cTU is for
23gZ.4gMW and the quantum against Kerala is given as 119.18 MW. With Installed
Capacity of 2400MW (BO0*3) and Normative Auxiliary consumption of 5.75olo, the
Ex-Bus capability of Kudgi is only 2262MW. Hence the corresponding share of Kerala
is only 101.63MW. Further the power evacuated through Karnataka sTU is also to
be considered while finalising the LTA quantum'
i
i nf,orre: O48 4 2555965,255595A,9496019100 Fax: 0484 2543850
i Email : [email protected] [email protected]
i Website: www.kseb.in, CIN :U40100K12011SGC02V 424
CESO/EELDIIIAEELD3/RTA I K Dt 2s0e"2017
R"glrt"*d Offi.": Vydyuthi ehavanam, Pattom, Thi ruvananthapuram - 695004
We bsite: w@, Cl N :U40100KL2OL1SG CO27 424
ANNEXURE B (1/2)
Only one unit at Kudgi has declared commercial operation. The COD of other two
units are delayed. As per clause (6) of CERC (Sharing of ISTS charges and losses)
third amendment 2OL5" in case the commissioning of a generating station or
unit thereof is delayed , the generator shall be liable to pay withdrawal
charges corresponding to its long Term Access from the date the LTA is
granted by CTU becomes effective," Hence the transmission charges for the
capacity under COD is only to be paid by the beneficiaries.
The matter may kindly be examined and RTA of August 2OL7 may please be revised.
Transmission QVstemi*-f:11fr':
"
Coy submitted to :-The CE (Commercial & Tariff), KSEB Ltd, Vydyuthi Bhavanam,
Pattom Th iruvanathapu ram for information.