Agenda Item Number _____6______
Memo To: Plan Commission, Village Board
Fr: Trevor Fuller, Planning and Zoning Administrator
Re: ACTION RE: PETITION FROM BERNIE VAN EPEREN & CHRIS BATTLE REQUESTING PRELIMINARY APPROVAL OF A PLANNED DEVELOPMENT DISTRICT TO CONSTRUCT A MULTI-FAMILY RESIDENTIAL APARTMENT BUILDING ON PARCELS AL-55 & AL-55-1, LOCATED AT 2050 RIVERSIDE DRIVE (current Allouez Business Center office building) Date: 13 December 2018 Attached are the proposed plans submitted by Bernie Van Eperen and Chris Battle for the preliminary review of the
planned development district at 2050 Riverside Drive. Representatives from the development will be present at the
meeting to talk about the project and answer any questions.
Planned Development District Process
The PDD process offers both the village and the developer flexibility from the zoning code. Not all details of the plan
need to be consistent with what is required in the zoning code, but deviation from the zoning code should be to
promote a development that is innovative in design, character, and quality.
The Plan Commission and Village Board are asked to make a decision on the preliminary plan review of the multi-family
apartment building proposal. Site specific details of the project should be discussed and concerns should be brought to
the attention of the developer, however, preliminary plan approval or disapproval should be on project concept only –
whether or not the proposed project would be consistent with the purpose, spirit, and intent of the Village
Comprehensive Plan, other village development plans, and the purpose defined in Article VI of Chapter 475 of the village
ordinances.
The petitioner is not prohibited from resubmitting the same or different proposal in the future if preliminary approval is
not obtained. Furthermore, approval is preliminary only and does not bind the Village of Allouez to final approval of the
project.
Reasons for a Planned Development District at this time include height and use. The property is zoned “Commercial,”
which allows for multi-family or mixed-use through a conditional use. The zoning of the properties to the immediate
north and south of this property allow for this use by right. Commercial zoning allows for a four story or 50-foot
structure. The proposed development is five stories and approximately 62-feet in height from Riverside Drive. The fifth
floor is shown to be setback from the building edge.
Recommendation
Staff has reviewed the presented plans and has shared initial comments with representatives of the development. Staff
recommends preliminary approval of the proposed project concept given that the concept is a similar use to a use
recently amended to be allowed in the “Commercial” Zoning District under a conditional use permit. The developer
should continue to work with staff in developing a final site plan that is consistent with the Village of Allouez
Comprehensive Plan and meets the necessary permit requirements.
The Plan Commission is asked to recommend to the Village Board to approve, not to approve, or table the PDD
petition. If the recommendation is not to approve, reason for the recommendation must be provided. The Plan
Commission can only table a decision for up to two months.
Preliminary PDD Review – Staff Comments
Site: 2050 Riverside Drive (Parcel AL-55 & AL-55-1) Petitioner: Bernie Van Eperen and Chris Battle Zoning Department review
Items to consider for preliminary approval:
This parcel is not specifically mentioned in the Comprehensive Plan or in the Riverside Drive and
Webster Avenue Corridor Study; however, the area to the immediate north is proposed multi-
family in the corridor study.
The proposed use is allowed in “Commercial” zoning districts through a conditional use permit
and is surrounded by property zoned “Light Industrial” to the north and south, which allows for
this use by right.
The property is located on an arterial road (STH 57/Riverside Drive), with complimentary
building uses in the area.
Items to consider for final approval:
The building setback is in line with the other buildings in the area. However, reconfiguring the
building to have parking on the side of the building and the building closer to the street should
be considered.
Commercial zoning allows for a four story or 50-foot structure. The proposed development is
five stories and approximately 62-feet in height from Riverside Drive. The fifth floor is shown to
be stepped back from the building edge, which is ideal should the extra story be considered.
The Comprehensive Bicycle and Pedestrian Plan calls for a pedestrian connection to the north
and south of the property (St. Joseph Street and Allouez Avenue, respectively). Although public
connection is not necessarily required, a private connection to the trail from the building is
suggested for residents of the building.
A pedestrian connection should be provided from where the proposed sidewalk is planned for
Riverside Drive/STH 57 to the front entrance of the building.
Building finishes and features should be of similar quality in the “front” and “back” of the
building, since the “back” is facing the Fox River.
The massing of the building should be broken up by architectural variations in the façade.
Parking does not appear to meet the standards of the zoning code, but less parking can be
considered, especially if designated bicycle parking is provided. If the building has mixed use
elements, designated parking during business hours only should be considered.
Green space seems to be adequate at this time.
All other zoning requirements for “Commercial” stipulated in Chapter 475 of Village Ordinances
should be met to the highest degree possible.
Fire Department review
Initial comments approved the idea to have a sprinkler system in the building and a paved drive around
the building. Will review more when detailed site plans are submitted for final approval.
Parks, Recreation, and Forestry Department review
No comments at this time. Will review more when detailed site plans are submitted for final approval.
Public Works Department review
No comments at this time. Will review more when detailed site plans are submitted for final approval.
Building Inspection review
No comments at this time. Will review more when detailed site plans are submitted for final approval.
Date Reviewed: December 13, 2018
Comments Submitted By: Trevor Fuller, Village of Allouez Planning & Zoning Administrator
5 STORY
APARTMENT
- PHASE 1 -
- PHASE 2 -
COURTYARD
STORMWATER
RETENTION
IN/OUT
@ LL 2
LOBBY
IN/OUT
@ LL 1
TRAFFIC
TRAFFIC
TR
AFFIC
TW
O
WAY
TR
AFFIC
SCALE: 1" = 40'-0"09/10/18
NEW RiversidePLANNING
SITE PLAN Phase 20' 80'40'20'
SCALE:09/10/18
NEW RiversidePLANNING
PERSPECTIVES Phase 2
RIVERSIDE DRIVE LOOKING SOUTH RIVERSIDE DRIVE LOOKING NORTH
FOX RIVER TRAIL LOOKING SOUTH FOX RIVER TRAIL LOOKING NORTH
7411172
1178
766 766
7361140
1140
741
8001197
771
1246747 747 1187
1139736STOR
T/C
774
1376
816
816
816
1129 1245
T/C
11571220
TERRACE
TERRACE
803
1152
50
T/C
50
T/C
LO
BB
Y
RETAIL
8702 SF
OFFICE
9054 SF
AMENITIES
SCALE: 1/64" = 1'-0"09/10/18
NEW RiversidePLANNING
LAYOUTS
FLOOR 02,03,04 FLOOR 05LL2 LL1 FIRST FLOOR
FOX
RIVER
TRAIL DRIVEWAY
LOOP
SURFACE
PARKING
RIVERSIDE
DRIVE
PARKING
BUSINESS / RESTAURANT / APT LOBBY AND AMENITIES
APARTMENTS
APARTMENTS
APARTMENTS
PARKING
APARTMENTS14' - 8"
11' - 4"
11' - 4"
11' - 4"
13' - 8"
10
' - 0
"10
' - 0
"
01
02
03
04
05
LL1
LL2
SCALE: 3/64" = 1'-0"09/10/18
NEW RiversidePLANNING
SECTION