Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION S. N o District Department Agenda Items DC’s Comments Departmental Comments Decision Taken IN 5 TH DDRS Action Taken Report Remarks 1 1 Faridabad HUDA/ HSIIDC Requirement of one more Transport Nagar Transport Nagar in sec-61 (by HUDA) & 67 (by HSIIDC) have been planned. Necessary action, regarding the development of these Transport Nagar is to be taken by HUDA & HSIIDC. Five more sectors for Transportation & communication zone have been proposed in the proposed D.D.P-2031 A.D. Similar requirements from other districts also. Taken note for recommendation. Old Agenda Item 2 Faridabad HUDA/ TRANSPORT General Bus Stand in Sector-12 Tender process for construction on BOT basis to be expedited by Transport Department. 150 Buses have already been allotted under JNNURM and existing Bus Stands does not have sufficient capacity to accommodate these buses. Payment of Rs. 7.5 Crore has been deposited with HUDA on 3-3-2009 for the earmarked 15.01 Acres of land for the proposed Bus Stand and Terminal in Sector-12, Faridabad for the City Bus Service and possession of the said land was taken on 14-12-2009. This project is currently Under Planning Process of the Head Quarter State Transport. May be constructed on BOT basis where ever possible. Matter will be discussed further. Old Agenda Item 3 Faridabad PWD (B&R) Officers House in Officer colony, Sector- 15A, Faridabad The estimate was received back from EIC, Haryana PWD B&R, Chandigarh vide his letter No. 9277 dated 11-12-2008 with the remarks that the estimate be reframed as per new policy being finalized by the Government and revised drawings as per new policy are still awaited. EIC PWD B&R, Chandigarh has reported vide letter no. 1446/Plg dated 20-5-2011. 2.83 acres land is available. Admn. approval Rs.270.81 lacs dated 02.03.09 Hon’ble Bldg.Committee has aprvd.drgs.of new design. Rev. layout plan is to be prepared by CA & got aprvd from Bldg. Committee. FCR vide letter no. 1361-R-4-2011 reported that proposal of another piece of land not received in this department. Land under question is not clear. Vertical/Multi story building may be constructed. Another piece of land is to be identified. Matter may be kept pending. Old Agenda Item 4 Faridabad HUDA/ MCF Multi level parking in Urban Areas. May be considered on BOT basis. As per the guidelines of D.G.T.C.P., 2 acres land for multi level parking have been proposed on Couple of sites may be identified. Committee of DC, Administrator, Old Agenda Item

Upload: buiminh

Post on 22-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

1

1 Faridabad HUDA/

HSIIDC

Requirement of one

more Transport Nagar

Transport Nagar in sec-61 (by HUDA) & 67 (by

HSIIDC) have been planned. Necessary action,

regarding the development of these Transport

Nagar is to be taken by HUDA & HSIIDC.

Five more sectors for Transportation &

communication zone have been proposed in the

proposed D.D.P-2031 A.D.

Similar requirements

from other districts

also. Taken note for

recommendation.

Old

Agenda

Item

2 Faridabad HUDA/

TRANSPORT

General Bus Stand in

Sector-12

Tender process for construction on BOT basis to

be expedited by Transport Department.

150 Buses have already been allotted under

JNNURM and existing Bus Stands does not have

sufficient capacity to accommodate these buses.

Payment of Rs. 7.5 Crore has been deposited with

HUDA on 3-3-2009 for the earmarked 15.01

Acres of land for the proposed Bus Stand and

Terminal in Sector-12, Faridabad for the City Bus

Service and possession of the said land was taken

on 14-12-2009. This project is currently Under

Planning Process of the Head Quarter State

Transport.

May be constructed

on BOT basis where

ever possible. Matter

will be discussed

further.

Old

Agenda

Item

3 Faridabad PWD (B&R) Officers House in

Officer colony, Sector-

15A, Faridabad

The estimate was received back from EIC,

Haryana PWD B&R, Chandigarh vide his letter

No. 9277 dated 11-12-2008 with the remarks that

the estimate be reframed as per new policy being

finalized by the Government and revised

drawings as per new policy are still awaited.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

2.83 acres land is available. Admn. approval

Rs.270.81 lacs dated 02.03.09 Hon’ble

Bldg.Committee has aprvd.drgs.of new

design. Rev. layout plan is to be prepared

by CA & got aprvd from Bldg. Committee.

FCR vide letter no. 1361-R-4-2011 reported that proposal of another piece of

land not received in this department.

Land under

question is not clear.

Vertical/Multi

story building may be

constructed.

Another piece of

land is to be

identified.

Matter may be

kept pending.

Old

Agenda

Item

4 Faridabad HUDA/ MCF Multi level parking in

Urban Areas.

May be considered on BOT basis.

As per the guidelines of D.G.T.C.P., 2 acres land

for multi level parking have been proposed on

Couple of sites

may be identified.

Committee of

DC, Administrator,

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

2

each 100 acres urbanizable area.

Presently, this provision has been done in sectors

75 to 89, 39, 41 to 43 & 66 to 74. This provision

of multi level parking sites will also be made in

the new sectors of D.D.P. 2031 A.D.

HUDA and

Commissioner, MCF

to discuss and find

out the possibilities.

Traffic Police to

enforce the parking to

make them viable.

5 Faridabad Transport/

MCF

City Transport System 150 buses have been allotted to Faridabad depot

under the Jawahar Lal Nehru Urban Renewal

Mission (JnNURM) for ensuring comfortable

transport service to the residents of Faridabad

City.

The routes for this city bus service have been

proposed by Urban Mass Transit Authority

(UMTA) headed by the Commissioner Gurgaon.

A meeting of different officials from Faridabad

City was called by the Hon’ble Chairman,

UMTA(Commissioner Gurgaon) on 17th

September 2010 to decide on the routes and the

per K.M.. fare for these services. On the basis of

the routes decided in the above said meeting this

depot has already started to ply 15 A.C.Volvo

Buses, 20 Swaraj Mazda Mini Buses and 29 ULE

Ordinary Buses obtained under the JnNURM till

date.

Matter will be

discussed further.

Old

Agenda

Item

6 Faridabad HUDA/

Sports

Completion of Indoor

Stadium in Sports

Complex, Sector-12

Faridabad

Matter to be expedited. In case of budget

constraint, matter may be considered on BOT

basis.

The concept has been approved by the Chief

Administrator HUDA Panchkula as per Sr.

Architect HUDA Panchkula letter No. 2759-69

dated 05-10-2010 the rough cost estimate

amounting to Rs. 886.80 Lacs without air

conditioning provision as per approved concept

has been submitted for arranging Administrative

approval. The cork shall be taken after

Administrative approval accordingly.

Director, Sports vide letter no. M&C-

Lib-2011/8225 dated 20-5-2011 work for

completion of Indoor Hall is being done by

HUDA.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

3

7 Faridabad Municipal

Corporation,

Faridabad

Augmentation of water

supply amounting

Rs.493.00 crores

The requirement of permission for construction of

truss bridges at seven places out of which 2 Nos.

permissions have been granted by the office of

U.P. Irrigation department, Mathura (U.P.) and

remaining 5 permissions are still awaited from

the U.P. Irrigation Department, Okhla, New

Delhi.

Municipal Corporation, Faridabad had made

various correspondences with U.P. Irrigation

Department but nothing has been achieved till

now the last letter dated 11.04.2011.

There is too much crisis of drinking water during

summer season in Faridabad city and it is very

urgent to construct the truss bridges and make

water available to the public.

Therefore, the matter may be taken up with the

U.P. Govt. at Higher level.

New Item

8 Faridabad Municipal

Corporation,

Faridabad

Revamping of Sewer

System of Old Faridabad

Zone amounting

Rs.103.00 crores.

New Item

9 Faridabad Sports Renovation and

providing additional

facilities at Haryana

State Sports Stadium

Complex Sector-12,

Faridabad

An amount of Rs. 1125 lacs are required for

various facilities in complex for sports like

Boxing, Kabaddi, Gym, Astro turf, synthetic

track, flood lights- athletics track and Badminton

Hall. The funds may be provided by the sports

department.

Director, Sports vide letter no. M&C-

Lib-2011/8225 dated 20-5-2011 these

works relates to construction, laying of

synthetic surface and installation of flood

lights and other works under the agenda.

These will be considered when the

Proposals is received from the President,

Distt. Sports Council –cum- DC, Faridabad.

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

4

10 Faridabad Sports Renovation and

providing additional

facilities at Raja Nahar

Singh Stadium

An amount of Rs. 760 lacs may be provided by

the sports department for renovation and

providing additional facilities in Raja Nahar

Singh Stadium.

Director, Sports vide letter no. M&C-

Lib-2011/8225 dated 20-5-2011 these

works relates to construction, laying of

synthetic surface and installation of flood

lights and other works under the agenda.

These will be considered when the

Proposals is received from the President,

Distt. Sports Council –cum- DC, Faridabad.

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

5

11 Gurgaon PWD (B&R) Officers residences 50 flats 12 crore

FC PWD informed that the deptt. is working

upon the final details reg. implementation.

As informed by the dept.

No land has yet been allocated/allotted for this

purpose. PWD will frame the estimate only after

confirmation regarding land.

There is acute shortage of residential

accommodation for the officers in Gurgaon.

Therefore, 2-3 acres of land may be earmarked

for the construction of residential flats by HUDA.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

that Land is to be given by HUDA. In the

meeting taken by Commissioner Gurgaon,

HUDA had agreed to give 2 to 3 acres of

land and after finalization of land Architect

Department will be asked to prepare

drawings.

FCR vide letter no. 1361-R-4-2011 reported that matter pending with DC and

Chief Architect. DO reminder issued from

SSR on 21-4-2011.

It was directed that a

separate meeting be

fixed for this point.

Old

Agenda

Item

12 Gurgaon PWD (B&R)

Revenue

Rest House In 4th DDRS it was informed that :

FCTP readily accepted the proposal & agreed to

provide land for rest house besides HUDA

Gymkhana.

2-3 acres of land may be earmarked by HUDA

for the purpose of constructing the Rest house.

The site in sector 50 measuring 1.91 acres has

been proposed by HUDA.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

that HUDA has agreed to give 2 to 3 acres

of land

It was asked to look

for land near the

highway.

Old

Agenda

Item

13 Gurgaon HUDA Urban

Local Bodies

& PWD

(B&R)

Multilevel parking Case has to be decided by the Govt.

As per the report of Commissioner Municipal

Corporation : the case for approval in principal

for construction of multilevel parking at Kaman

Sarai on BOT basis has been sent to the Financial

Commissioner & Principal Secretary, Govt. of

Haryana. Urban Local Bodies , Chandigarh vide

letter no. CE/MCG/2009/1559dt. 05/06/2009 and

further reminder to Director, Urban Local Bodies,

Chandigarh vide letter no. CE/MCG/2010/386 dt:

26.05.2010 & CE/MCG/2010/2203 dt.

31.12.2010

Municipal

Corporation,

Gurgaon, HUDA and

Deputy

Commissioner to

look into the matter.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

6

As per the Report of SE, HUDA-II: Land which

was to be made available by the PWD (B&R) has

not been handed over to HUDA till date.

However, HUDA has planned two Nos. Multi

Level Parking one at MG Road, Sec-28 &

another in Sector-43 at Gurgaon. The bid on BOT

basis of Sector-43 site has been received. Only 2

firm submitted their bid but non of the firm full

fill the criteria/ norms as approved in the DNIT.

Both the firm are not eligible. Therefore, it has

been decided by the HUDA to construct

Multilevel Parking at their own, The Sr.

Architect, HUDA, Panchkula vide his office

memo No. 52 dt. 08.01.2010 informed that to

with hold further work on estimate/ construction

till further instructions are issued in the matter

after seeing the response of sector-29 multi story

parking which is being under taken by S.E.-I,

HUDA, Gurgaon. No response for multilevel

parking in sec-29 has been received.

So far as Multilevel parking in sec-28, M.G.

Road is concerned it is intimated that part of the

land was under litigation in the Hon'ble High

Court vide CWP No. 9142/04, 9181/04,7922/03

and 14583/03. Hon'ble High Court had disposed

of the above CWP in favour of petitioner; further

action will be taken only after land is made

available.

14 Gurgaon Health Trauma Centre in newly

constructed General

Hospital at Gurgaon

Financial Commissioner Health. MD NRHM &

Director General Health Services visited the

construction sites. Decision in this regards is to

be taken at the government level. But till now

final decision is not received in this office that

this hospital will be working under whom & at

what level.

During last DDRS the Chief Administrator

HUDA requested to allow the use of 100 bedded

Though not

sanctioned by GOI

but still proposal

should be sent to the

state government.

The amount can be

given from the state

budget.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

7

General Hospital building in Sector-10, GGN

being constructed by them for Trauma centre by

making necessary additions and alteration as per

GOI guidelines on 06-06-07. And the Civil

Surgeon informed that a separate building can be

constructed for Trauma center in the available 2.5

acre in the upcoming building of General

Hospital at Sector-10 Gurgaon. Reminder has

been issued by DGHS to the Chief Administrator,

HUDA on 25-07-07, 14-09-07, 06-12-07. He is

also corresponding with HUDA at his own level

in this regard

15 Gurgaon Municipal

Corporation,

Gurgaon /

Transport dept.

Internal city Transport The position is same as earlier supplied by the

Transport Commissioner Haryana vide his memo

no. 6530-04/STA-I dt.11-11-08 in this regard.

A separate proposal

should be prepared

by the transport

department in

consultation with

Municipal

Corporation,

Gurgaon.

Old

Agenda

Item

16 Gurgaon Revenue/PWD

(B&R)/Irrigati

on

Construction of Mini

Sectt. At Sohna on the

land of Irrigation

department.

Total land of Irrigation department 53 Kanal 17

Marla is suitable for the construction of Mini

Sectt.at Sohna.. The land is situated at the cross

roads of Rewari-Palwal Road & Gurgaon Alwar

Highways. One side of land is on Palwal Road

and other one lies on Delhi-Alwar Road. The site

is highly beneficial to the public in general. Bus

Stand is also situated nearby. SDM,Tehsil,

Irrigation and other offices can be shifted here.

Present Tehsil building is in city area having

small area & building is in dilapidated condition.

SDM Sohna office is running in Gurgaon.

FCR vide letter no. 1361-R-4-2011

reported that proposal not received in this

department.

New Item

17 Gurgaon HUDA Status of Building of

poly Clinic & General

Hospital and to make

these Hospital

functioning.

Poly Clinic building in Sector-31 is under

construction having an area 1.38 Acre. Covered

area 2042 Sqm. This building will be completed

by 31.07.2011. The Poly clinic may be made

operational at the earliest.

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

8

18 Gurgaon HUDA Construction of

Multipurpose Hall in

Tao Devi Lal Stadium on

the pattern of MDU

Rohtak.

There is no Multipurpose Hall for indoor sports.

A city like Gurgaon needs to have such sports

facility. The sports department or HUDA may

take up for construction of Multipurpose Hall in

Tao Devi Lal Stadium.

New Item

19 Gurgaon. HUDA Construction of District

Level Auditorium Hall.

There is no Auditorium Hall with good sitting

capacity in Gurgaon. There is a requirement of

such Hall for various official and cultural

functions which are held by the various

organizations. The Auditorium can be managed

by the Municipal Corporation, Gurgaon. The

construction of such Auditorium may be taken up

by HUDA.

New Item

20 Gurgaon. HUDA Construction of another

HUDA Gymkhana Club

in Gurgaon.

The site for HUDA Gymkhana Club is available.

The buildings of present club are very insufficient

and have been constructed in old design. A new

club with better facility is needed in Gurgaon for

the plot holders. The construction may be taken

up by HUDA.

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

9

21 M/garh PWD B&R (i) Bye-Pass around

Narnaul

Detailed Project Report has been prepared. Land

Acquisition proposal of 5 villages has been sent

to Government for vetting.

Govt. of Haryana has proposed to undertake an

ambitious project for four lanning of Rai

Malikpur (Rajasthan Border) to Narnaul-

Mohindergarh – Bhiwani - Kharak corridor with

bye pass to Narnaul, Nangal Chaudhary, Nangal

Serohi and Bhiwani on Design Build Finance

Operate and Transfer “DBFOT” basis / mode.

The estimated cost of this project is Rs. 1201.70

crores and the construction period is 30 months

from the appointed date. The project has been

approved by standing Finance Committee of

Haryana Govt. This is an integrated project

including bye-pass Narnaul.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

that Detailed Project Report has been

prepared. Govt. of Haryana has

proposed to undertake an ambitious project

for four lanning of Rai Malikpur (Rajasthan

Border) to Narnaul – Mohindergarh –

Bhiwani – Kharak corridor with bye pass to

Narnaul, Nangal Chaudhary, Nangal Serohi

and Bhiwani on Design and Bhiwani on

design Build Finance Operate and Transfer

“DBFOT” basis / mode. The estimated cost

of this project is Rs. 1201.70 crores and the

construction period is 30 months from the

appointed date. The project has been

approved by standing Finance Committee of

Haryana Govt. This is an integrated project

including bye – pass Narnaul. RFQ has

been done. It is expected that by Sept. 2011,

the concessionaire will be placed in position

and work will be start from March, 2012.

Chief Secretary

directed that the

PWD (B&R) should

explore the

possibility to

undertake this project

on BOT basis if the

funding cannot be

arranged even in

phases.

Old

Agenda

Item

22 M/garh PWD B&R 4-Lanning of Kotputli-

Bhiwani Road (SH-17

and MDR-129. Cost 40

crores.

Detailed Project report has been prepared.

Section 4 of land in 34 villages already done.

Objection under section-5 being heard Technical

bids already invited.

Govt. of Haryana has proposed to undertake an

ambitious project for four lanning of Rai

Malikpur (Rajasthan Border) to Narnaul-

Mohindergarh – Bhiwani - Kharak corridor with

bye pass to Narnaul, Nangal Chaudhary, Nangal

Serohi and Bhiwani on Design Build Finance

Operate and Transfer “DBFOT” basis / mode.

The estimated cost of this project is Rs. 1201.70

crores and the construction period is 30 months

from the appointed date. The project has been

--do-- It was directed that

the department

should look into the

matter and take an

appropriate decision

within two months

positively.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

10

approved by standing Finance Committee of

Haryana Govt. This is an integrated project

including bye-pass Narnaul.

23 M/garh PWD B&R 4-Lanning of Rewari-

Narnaul-Singhana Road

(SH-26)

In view of the traffic, this 4-laning is required. 4

laning up to Rewari District orders already done

(6 Km). Approval needed for the work in

Mahendergarh District.

Keeping in view the present traffic load &

volume the strengthening of road has been

completed from District Border to Narnaul Km.

81.24 to 105.63 under Head-5054 and

improvement of road in Rewari District territory

has been approved and work is in progress.

Strengthening from Narnaul to Singhana upto

District Boundary has been approved by the

MOST and the work stands completed.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

that Road stretch in Rewari District territory

has been approved and work is in progress.

Strengthening from Narnaul to Singhana

upto Distt. Boundary has been approved and

the work stands completed.

The 4- lanning of this road is very

essential as heavy commercial vehicles are

plying on this road for carrying the building

/ Road material to NCR Region.

It was directed that

the department

should look into the

matter and take an

appropriate decision

within two months

positively.

Old

Agenda

Item

24 M/garh PWD B&R Construction of

Auditorium.

Auditorium at Narnaul: -

One auditorium is already being constructed. Rs.

2.34 Crore are available through schemes like

BRGF-& D Plan. An allocation of Rs. 2.10 Crore

is required to complete this auditorium. This can

be used to conduct various workshops, seminars

& cultural activities. PWD B&R may provide the

balance funds for completion.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

that One auditorium is already being

constructed Rs 2.34 crores are available

through schemes like BRGF (Backward

Regions Grant Fund) & D Plan. An

allocation of Rs 2.10 crores is required to

complete this Auditorium. This auditorium

is being constructed by Panchayati Raj

Deptt

It is not possible to

construct auditorium

of 2000 strength of

students. The

principal govt.

college requested this

strength upto 1000.

The land is available

with college for this.

The detail reasons of

necessity of this

auditorium will be

sent separately.

Old

Agenda

Item

25 M/garh HSIDC Creation of HSIDC

Industrial Growth

Central at Narnaul.

A suitable site for IMT has been identified on

Nangal Chaudhry road. Two alternative sites

have also been identified. Recently a meeting

regarding establishment of new industrial sector

at Narnaul was convened by Deputy

Commissioner Mahendragarh at Narnaul on

25.3.2011 to finalize the feasibility of the site

amongst the three sites, a team consists of various

department was constituted to inspect the site and

MD HSIDC was

directed to take up

the matter

immediately.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

11

the committee visited at Tehla Mukandpura road

on 25.3.2011 and the committee submitted its

report on 25.3.2011 to the Deputy Commissioner

Narnaul. A team comprising of XEN DHBVN,

XEN P.H., DTP, AGM HSIDC, GM DIC &

DDPO Narnaul selected these sites. Case is

being sent to the Government.

In this it is submitted that two sites near

Mahendergarh opposite village Paiga & near

Narnaul adjacent village Fazlipur &

Sheonathpura were identified which fall in

industrial Zone in the District Development Plan

2021-AD. MD HSIIDC was requested to depute

the inspection team to finalize the suitable site

vide DO No. 10746/MA dated 7.1.2009 and

subsequent letters dated 8.1.2009, 30.7.2009,

6.11.2009, 9.12.2009, 2.7.2010 & 14.7.2010,

nothing has been heard from HSIIDC so far.

26 M/garh PWD B&R (v) Up gradation of

Narnaul-Behrod road as

State Highway.

The length of this road in this district is 7.30 km

with carriage way width of 5.50 metre. This road

connects Behrod NH-8 and Alwar town of

Rajasthan State & this has already declared State

Highway No. 14 in Rajasthan State. Keeping in

view vehicular traffic it is recommended that this

road may also be got declared State Highway in

Haryana also The case has been sent to Engineer-

in-Chief, Haryana, PWD B&R Brach,

Chandigarh vide S.E. (Bhiwani) memo No. 236

dated 29.1.08 for approval. The name of State

Highway in Rajasthan territory “Bharatpur -

Alwar -Behrore-Narnaul road (SH-14) Km. 0 to

182.00 upto Haryana Border. The take off point

of ODR in Haryana is Km. 182.00 having a

length of 7.30 Km. in Haryana from Km. 182.00

to 189.30.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

reported that the case has been sent to

Engineer-in-Chief, Haryana PWD B&R Br.,

Chandigarh, vide S.E. (Bhiwani) memo No.

236 dt. 29.01.2008. The same of State

highway in Rajsthan. Increase due to

recently establishment of Central University

at Mohindergarh (Jant-Pali). To minimize

the traffic volume of NH-8, to avoid

congestion in Dharuhera and Rewari and to

connect the NCR area directly to Central

University, a new road network is required

through shortest possible route. To fulfill

this purpose as well as a better connectivity

to Central University at Mohindergarh, a

E.I.C., Haryana PWD

(B&R) was advised

to take up the matter

immediately.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

12

Declaration of State Highway may be done.

Widening & strengthening of this road is

required. Width may be increased to 23 feet (7

Mtr) from 18 feet.

shortest route is marked which connects

Rohtak – Jhajjar-Rewari Road (NH-71A)

and various important villages like \as

Turkanpur, Naya Gaon, Dhanigarhbaps,

dhani, Gothra Tappa Dhina and Kanina.

The approximate length of new purposed

road is 53 km. and in this way traveling

distance will be reduced by 12 km. After

construction of this new express road, a

through connectivity by green filed

alignment will be available which will

reduce the travelling time also. The new

road will be constructed 6-lane with study

and DPR has already been invited by XEN

(NCR) PWD B&R Narnaul vide memo NO.

1752-1765 dt. 9.05.2011 (NCR)

27 M/garh PWD (Water

Supply and

Sanitation)

Construction of

Sewerage treatment plant

and extension of balance

Sewerage Line in

remaining area of

Narnaul town (Estimated

cost Rs. 814.80 lacs)

2 Nos tenders for laying sewer line amounting to

Rs 323.20 lacs & Rs 386.70 lacs has already been

invited.

Construction work needs to be expedited.

Estimate has already

been approved.

Old

Agenda

Item

28 M/garh PWD (B&R) Bilaspur Chowk (NH-

8)to Kanina road (a

distance of 53.0 Km)

This road will provide great connectivity to

District Mahendragarh from Gurgaon. It will

byepass Rewari. It will reduce the distance by

about 20 Kms and act as a growth promoting

project.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

The existing road network between Bilaspur

Chowk (NH-8) to Kanina crosses the

important cities like Dharuhera & Rewari &

its length is approx. 65 kms. The

importance of this road will increase due to

recently establishment of Central University

at Mohindergarh 9 jqn5-Pali ). To

minimize the traffic volume of NH-8, to

avoid congestion in Dharuhera and Rewari

and to connect the NCR area directly to

Central University, a new road network is

required through shortest possible route.

To fulfill this purpose as well as a better

New item.

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

13

connectivity to Central University at

Mohindergarh, a shortest route is marked

which connects Rohtak-Jhajjar-Rewari road

(NH-71A) and various important villages

like as Turkanpur, Naya Gaon,

Dhanigarhbaps, Dhani, Gothra Tappa

Dahina and Kanina. The approximate

length of new proposed road is 53 km and

in this way traveling distance will be reduce

ed by 12 km. After constr4uction of this

new express road, a through connectivity by

green field alighment will be available

which will reduce the traveling time also.

The new road will be constructed 6-lane

with divided carriageway with central

verge of 2 m width. The ROW of this road

has been proposed 100 m and roadway

width 25 m wide. The composition for the

road crust has been proposed 500 mm thick

sub base and base course, 100 mm binder

coarse and 40 mm BC as wearing coat. The

average height of road is taken 1.5 m from

the NGLs.

Keeping in view ROW as 100 mm wide,

about 1310 acre land acquisition will be

done with approx. cost of Rs. 458 crores

including solitiam. The cost of construction

alongwith utility shifting and afforestation

etc. will be Rs. 250 crores. Hence total cost

comes out of Rs. 708 crores.

29 M/garh Railway Provision of New

Railway line connecting

Alwar-Behror-Narnaul-

Mahendergarh- Dadri-

Jhajjar.

This Railway line will provide connectivity to

Mahendergarh & Dadri. A direct train to

Chandigarh is an important need of this area.

New item.

30 M/garh Archeological/

Tourism

Development of Jal

Mahal as a Tourist

destination.

This monument is being preserved by

Archeological Survey of India. Proper lighting

and landscaping can make it a tourist attraction.

Archaeological Survey of India is willing to

The Director, Tourism deptt. vide letter

no. TM-11/E-II dated 20-5-2011 reports

that keeping in view the comments of DC

the necessary action to develop this

New item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

14

cooperate with the District Administration in this

regard.

monument as tourist destination is required

to be taken by the Archaeology department.

31 M/garh Tourism Renovation of Birbal Ka

Chhatta as Tourist

destination.

This monument needs urgent protection. Without

restoration it’s glory will be lost for ever. It will

evolve as a major tourist destination.

The Director, Tourism deptt. vide letter

no. TM-11/E-II dated 20-5-2011 reports

that in this context a proposal for Chatta Rai

Bal Mukund DAss at Narnaul was received

from the Archaeology department for

approval and an amount of Rs. 85 lacs has

been approved during the year 2008-09 and

2009-10 by the state govt. for the

conservation/ preservation/ restoration work

under the TFC Grant for Heritage

conservation improvement of infrastructure.

These funds have been deposited with the

Archaeology department, Haryana for

executing the work. The work is in progress

and an amount of Rs. 17.70 lacs have been

incurred.

New item.

32 M/garh PWD (B&R) Connecting

Mahendergarh road to

Rewari (Neerpur

Chowk, Rewari Chowk)

This will connect the Rewari road to

Mahendergarh road. It will make the town

congestion free & will also act as a growth centre.

An estimate with an estimated cost of Rs 54.00

crore for construction of Eastern Bye pass

starting from Narnaul-Mahendergarh road (near

village Nagthiari) to village Neerpur (Rewari-

Narnaul road) village Seka-Mandhana-Khanpur

road which will meet on Narnaul-Nangal

Chaudhry road near village Kanwi has been

prepared by XEB PWD B&R Narnaul.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

This will connect the Rewari road to

Mohindergarh road. It will make the town

congestion free & will also act as a growth

centre.

Approx. length of the proposed bye pass is

5.00 km. Necessary financial bid for

preparation of feasibility study and DPR has

already been invited by EE PWD B&R

Narnaul vide memo No. 1752-65 dated

9.5.2011 (NCR)

New item.

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

15

33 Mewat Transport Grant of permit to

private operators in

Mewat District.

Deputy Commissioner Mewat in consultation

with Secy. RTA, GM Roadways and

representative of various cooperative transport

societies made a proposal to issue permits on 64

routes. The proposal to issue permit on the

specific routes was sent to Transport

Commissioner Haryana. Further progress in the

matter is still awaited from Transport

Commissioner

Matter was kept

pending

Old

Agenda

Item

34 Mewat Health

Shortage of Medical

Officers

Out of 86 posts of Medial Officers sanctioned in

District Mewat, 39 are lying vacant. At GH

Mandikhera there is no physician specialist, child

specialist, Eye specialist or a gynecologist. None

of the CHCs has any specialist except one

Pediatrician at CHC Nuh and one Orthopedicion

at CHC F.P. Jhirka

Old

Agenda

Item

35 Mewat Sports

District Sport Stadium

Provision for a stadium has been made in the

master plan for Nuh town in the master

development plan.

At the time of Hon’ble CM visit to Mewat

District on 19.2.2011, an announcement was

made for Govt. Girls College at Village Salaheri

at the place earmarked for sports stadium. A

separate provision for sports stadium has been

made in the master plan of Nuh town.

Director, Sports vide letter no. M&C-

Lib-2011/8225 dated 20-5-2011 reports

that distt. Level sports stadium will be

constructed by sports department after the

land is provided free of cost by the Town &

Country Planning department. Also the

proposal for construction of distt. Level

sports stadium is awaited from the distt.

Sports council –cum- DC, Mewat.

Old

Agenda

Item

36 Mewat Education

Setting up of Senior

Secondary Schools in

Mewat district and

private bus facility for

girls.

The construction of building for Sr. Sec. School

is complete in all respects. Last touch of white

wash is being done by PWD (B&R) Nuh. The

education department may go ahead to start the

academic session 2011-12.

Case of up gradation of Girls Sen.Sec. School

Ujina, Nuh was forwarded to DSE Haryana

p

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

16

Chandigarh. Govt. Girl. High School Nagina,

Hassanpur Toaru, Rathiwas, Hurthal, Biwan &

Rawli needs to be upgraded. Case of GHS

Gangoli has already been forwarded to DSE

Haryana, Chandigarh. The status is awaited from

HQ.

There is no provision for free private bus

facility.

37 Mewat Transport

Streamlining of

Transport system in

Mewat District.

At the present there are 42 buses in the fleet for

District Mewat. Out of which 20 buses are not in

operations due to shortage of conductors.

Moreover around 20 buses are 7-10 years old and

not fit for road worthiness.

During the last DDRS the transport

Commissioner, Haryana vide letterno. 6503-

04/STA-1 dated 11-11-2008 has to depute the

Traffic Manager but the sub-depot is still waiting

for Traffic Manager.

Agenda

No. 44 of

5th

DDRS

38 Mewat Town &

Country

Planning

Setting up of HUDA

Sector in Mewat District

The process for land acquisition in the towns of

Nuh and Taoru has already been initiated.

Notification under section 4&6 of Land

Acquisition Act have been issued for acquisition

of 275 acres of land in Nuh town. Similarly

notification under section 4 has been issued for

acquisition of 410 acres of land for residential

sectors of HUDA in Taoru.

FC&PS, Town &

Country Planning

informed that they

have sorted out water

issue with public

health & department

going to acquire the

land very soon.

Agenda

No. 45 of

5th

DDRS

39 Mewat Agriculture/

Education

Transfer of surplus land

from Agriculture Deptt.

To Education Deptt. and

HSAMB for setting up

of 10+2 Govt. Schools,

DIET and Horticulture

Complex at Nuh.

193 kanal 92 marla of land is surplus with the

agriculture department in Nuh. To implement CM

announcement for setting up of Govt 10+2 school

and DIET and Horticulture Complex.

7 acres of land was transferred to the education

department. The construction of the school is

almost complete.

7 acres land has been

transferred to the

Education

Department. Tender

of 10+2 schools has

been called. Case of

land for Horticulture

complex is pending at

Govt. level.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

17

No grant has been sanctioned by Govt. or the

department for setting up DIET building so far.

So no construction work could be started for the

building of DIET Mewat.

91 kanal 19 marla land is required for horticulture

complex. 55 kanal 19 marla of land has been

transferred to the market committee Nuh for

development of New Vegetable Market at Nuh.

Administrative approval of Rs 8 crore has been

received. The work is under process but seems to

be held up

45 kanal 14 marla of land is still available for

agriculture department for further extension. It is

requested that land may be transferred for these

projects

40 Mewat Chief

Secretary

Special incentives for the

employees posted in the

district.

Special incentives may be given to the employees

and officers posted in this district, so that all the

vacancies are filled up. Govt may work out the

form and modality of the incentive.

On the pattern of Doctors at least 33% of gross

salary, special incentives may be given to

employees & Officers posted in Mewat District.

Position to be

reviewed

Old

Agenda

Item

41 Mewat Transport/

HUDA

Opening of Heavy Motor

Vehicles Driving School

Heavy Vehicle Driving is the largest source of

employment for the youth in Mewat. Motor

driving especially the heavy vehicle driving is

perceived as one of the core competences of

Mewat people.

It would be in the fitness of things to open a

Heavy Vehicle Driving School in district Mewat

on the lines of such schools being run in Rohtak

and Bahadurgarh. The project will go a long way

in reducing casual road accidents and enlarging

the scope for employment.

New Item

42 Mewat Women and

Child

Working Women Hostel

at Nuh

Women, in special, are scary of their posting in

Mewat primarily on account of virtual absence of

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

18

Development residential accommodation. This applies to both

government and public sectors including a large

number of women associated with NGOs

working in Mewat. A Working Women Hostel at

district headquarter is need of the hour. A

proposal under a relevant specific scheme of

Govt. of India should be moved. The Govt. of

India will bear 75% of the construction cost. The

land for the hostel and the remaining 25% of the

cost can be made available by MDA.

43 Mewat Agriculture Setting up of Krishi

Vigyan Kendra in

Mewat.

When District Mewat came into existence in

April,2005, it had Krishi Vigyan Kendra at

village Mandkola . After Mandkola becoming a

part of a separate Palwal District, there is no

Krishi Vigyan Kendra in District Mewat.

Mewat is predominantly an agricultural district

therefore, setting up of a Krishi Vigyan Kendra in

the district is one of the imperatives.

FC Agriculture has reported:

KVK, Mandkola was started with the basic

concept to cater the need of Mewat area.

Although administratively the village

Mandkola falls under Palwal district yet

KVK is wholly catering to the need of

farmers of Mewat district. Further, in a

meeting held under the chairmanship of

Hon’ble Chief Minister on 22-4-2010 it was

decided that 50 acres of land be provided in

Indri village (Mewat district). The decision

was with reference to allotment of land of

KGK, Gurgaon.

KVK, Mandkola will continue to serve the

farmers of Mewat district till independent

KVK is established at Indri village.

New Item

44 Mewat PWD (B&R) Approach Road to

Medical College Nalhar

The construction of Medical College at Nalhar is

about to be completed. It is expected that the

OPD section may start in the second half of the

current year. It is disconcerting to note that the

site of the Medical College has no proper

approach. An elaborate proposal for acquisition

of land and construction of approach road from

Gurgaon-Alwar road is pending approval with

F.C. PWD (B&R). The process of approval and

subsequent execution of the work needs to be

expedited.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

Estimate for Rs 15.39 crore stands

submitted to the Govt for administrative

approval under Head 5054.

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

19

45 Mewat Water Supply

and Sanitation

Water supply scheme for

Nalhar Medical college,

Nuh Town and 17 No.

surrounding villages.

The water supply scheme is based on canal water

with intake point at village Badli in Jhajjar

District of 14 MLD capacity. A rising main of

600mm dia around 61 Km from village Badli to

Hill top along KMP will carry the required

discharge. From C.W.T. at hill top the water will

reach to Nuh Town and 17 No. villages through

transmission mains of 300 mm dia.) The

implementation of scheme will improve water

supply status of Nuh town to 135 lpcd and in 17

No. villages to 70 lpcd. The detailed project

report with a project cost of Rs. 86 Crore is

pending with NCR-PB New Delhi for technical

appraisal & financial assistance.

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

20

46 Palwal Revenue/

PWD (B&R)

Mini Secretariat Palwal

(A) Constn. Admin.

Block

(b) Constn Judicial

Block

(c) Constn Residential

Houses for Revenue

Officers & Officials

(d) Constn Residential

Houses Judicial Officers

& Officials

(e) Constn of Road and

parking campus

boundary wall etc.

100% DPC, 42% floor slab, 20% Joinery, 20%

Elect, Wiring, 10% P.H. Internal Completed

further work is in progress

Work in progress, Basement completed, G.F slab

85% & 1st floor slab 85% & IInd floor slab 85%

& IIIrd floor slab 85% roof slab 90% laid and

75% plaster, 60% Joinery, 30% P.H. internal,

40% El. wiring comp.

The work has been allotted to the agency but the

work not started for want of revised drawing from

chief Architect, Haryana.

The work has been allotted to the agency but the

work not started for want of revised drawing from

chief Architect, Haryana.

85% work of Boundary wall comp. and further

work is in progress.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

1.Admn. Block – B+G+4. Str. compltd. Of

basement & 65% of GF, 40% FF, 20% 2nd

floor. Brick work in progress.

2. Judicial Block- Basement +G+4. Str.

Compltd. except 15% slab of 3rd

& 4th

floor.

Plastering 85%, flooring 50%.

3. Judicial & Revenue Houses:- Work

allotted but could not be started as drgs. As

per rev. norms and recently aprvd by the

Bldgs. Committee is yet to be recvd.

4. Boundary wall:- Completed except

security boundary wall of Judicial Block.

To be taken up on

priority before forth

coming Lok Sabha

Election.

Old

Agenda

Item

47 Palwal N.H.A.I

PWD (B&R)

Construction of fly over

on N.H.-2 Near Bus

stand Palwal.

Since Palwal town is spread on both sides of the

National Highway, there are daily traffic jams

especially during peak traffic hours i.e. morning

& evenings. These cause a lot of inconvenience

to the local people as well as to

national/international tourists going to Agra.

Therefore, it is proposed that N.H.A.I. may be

requested to provide a flyover on N.H.2 near the

Bus Stand.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

NHAI is constructing flyovers

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

21

48 Palwal Railway Deptt.

PWD (B&R)

Construction of R.O.B

on Rashulpur Railway

Phatak.

Rasulpur Road connects a number of villages to

Palwal town. It has to cross a railway line. Due to

heavy traffic on railway line, there is long waiting

line at this crossing causing inconvenience to a

large number of villagers. Thus in order to avoid

accidents and also smooth flow of traffic etc, it is

desirable in public interest to construct ROB on

Rasulpur Railway Crossing.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

To be considered subsequently. TUV =

3,90,779/- Latest Report: level crossing is

very busy. This road leads from Palwal to

Hassanpur & in between, there are at least

12 villages and 2/3 grain markets

New Item

49 Palwal HSIIDC/

HUDA

Construction of

Auditorium/ Convention

Center

Palwal at present a district headquarter, does not

have any Auditorium. Since this district is

situated on National Highway and falls within

NCR a dire need of Auditorium is here in district

Palwal.

New Item

50 Palwal P.W.D (B&R) Construction/ extension

of Circuit House.

This district has only one Rest House comprises 5

suits only which is not enough for a district

situated at National Highway and falling in NCR.

Therefore, additional rooms for Circuit House are

much needed for the district.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

Revenue Deptt to decide. New proposal.

New Item

51 Palwal Development

& Panchayat

Deptt.

Construction of Zila

Parishad

Bhawan/Panchayat

Bhawan.

For smooth functioning of Panchayati Raj

institutions and in consonance with the spirit of

constitution 73rd Amendment it is desirable to

have a Zila Parishad building in district Palwal.

New Item

52 Palwal Housing

Board/ HUDA

Setting up of Housing

Board Colony at Hathin

As intimated by the Administrator, Housing

board vide letter no. HBH/CE/2011/1530 dated

28-4-2011 the Chief Parliamentary Secretary

(Housing) Sh. Jaleb Khan has desired to set-up a

Housing Board Colony at Hathin. At present, no

land is available with Housing Board Haryana

and acquisition of private land is a lengthy

process. Therefore, it is requested that matter for

making land available from Government

Departments such as HUDA, Urban Local Bodies

or any other department may be discussed

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

22

53 Rewari PWD (B&R) Shortage of Govt.

Residential Houses in

the district especially

Mewat, Gurgaon &

Faridabad

There are only 47 govt. quarters (4-A Type, 16-B

Type, 8-C Type & 19-D Type) are available in

district. There is acute shortage of Govt.

accommodation in this district. It is pointed out

that about 135 govt. quarters (15 for A Type, 20

for B Type and 50 each for C & D Type) are

required to meet out the demand for which about

6300 sq.yard land is available in the campus of

old Court and about 19 acres land is available in

village Devlawas for residential purpose.

Demarcation has been got done for the aforesaid

land in village Devlawas and campus of old

Court. The land is available in the campus of old

court and village Devlawas has been inspected by

Executive Engineer, PWD (B&R), Rewari. Site

Plan is under preparation with him.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

A/A amounting to Rs.537.00 lacs for

Revenue Houses. was accorded on dated

18.08.2009 & work was allotted on

29.01.2010. Works could not be started as

revised layout plan and arch. Drgs. Have

not yet been received from CA.

A/A for Judicial Houses received for 456.40

lacs dated 26.11.2009 and work stands

allotted but could not be stated as revised

layout plan and arch. Drgs. Have not yet

been received from CA.

The Deputy Commissioner Rewari has been

requested vide EE Rewari letter No 5594-95

dated 09.05.11 to direct the Tehsildar

Rewari for demarcation of land at village

Develawasand old court complex to prepare

site plan for construction of house.

It was directed that a

separate meeting be

fixed for this point.

Old

Agenda

Item

54 Rewari HUDA Management of Flood

Water effecting

Dharuhera

HUDA in order to save Dharuhera must:

Raise, widen and strengthen its Periphery

Road to act as Ring Bandh.

Properly plan its inlet and outlet channels of

water.

Tie-up with NHAI to widen the existing

culverts and plan new converts.

Tie-up with Haryana State Pollution Control

Board and its Rajasthan counter part to ensure

that only treated water is discharged so that no

industrial waste finds its way in Haryana.

During rainy season this untreated discharge

CS desired that

Commissioner,

Gurgaon may

convene a separate

meeting of the

concerned

Department and to

sort out this issue.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

23

escape into the territory of Malpura so the issue

may please be taken up with District

Administration of Alwar for permanent solution

to the problem.

55 Rewari Transport Shifting of existing Bus

Stand

Rewari Town is today one of the most congested

towns of Haryana because of its industrial and

commercial prominence. Existing Bus Stand in

the Town is adding to the ever increasing

congestion. Hence, it would be in the larger

public interest to shift the existing Bus Stand to a

new site on Dharuhera Road.

The site marked for transport depot in the

Draft Development Plan-2021 AD (under

section 5 (4) of Act. No. 41 of 1963) is not

suitable keeping in view the public convenience.

Ideal Site for the new Roadways Depot will

be near the Rao Tula Ram Stadium on Rewari

Dharuhera Road.

Present fleet strength of Rewari Depot is 145

buses which is likely to go upto 200 buses in next

5 years. The land required for bus stand and

workshop will be approximately 20 Acres.

DTP, Rewari and General Manager, Haryana

Roadways, Rewari reported that the Govt. has

approved the proposed site in sector-12

measuring 20 Acres 5 K 16M vide Director

General State Transport letter No. 294/CA-1/C

dated 01-04-2011 further action is being taken as

per decision of the Government. Proposal for

acquiring the above land along with draft

notification Act has been sent to The Director

General, State Transport, Haryana, Chandigarh

vide this office memo no. 328/HRDF dated 27-

04-2011.

CS desired to

expedite the proposal

Old

Agenda

Item

56 Rewari Home Construction of New Land for the construction of new District Jail, Land for the construction of New District CS desired to Old

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

24

District Jail Rewari has been acquired.

1.

2. No Budget has been given for the construction of

new District Jail yet.

3.

Budget will be allowed in the financial year

2007-08 as intimated by the Director of Prisons,

Haryana vide letter No. 172/GIE/B-1 dated

03.01.07

Superintendent District Jail, Rewari has

intimated that total land measuring 402 Kanal 12

Marla has been acquired in village Phideri,

Rewari for the construction of new building of

District Jail Rewari. The acquired land was

owned by Gram Panchayat Phideri and other

residence of Phideri village. It is further

submitted that The Director General of Prisons

Haryana, Panchkula has requested the Chief

Architect, Haryana, Chandigarh to supply

revised/ reduced scope of work along with

amended drawings vide letter No. 18723 DG

Jails/2009/B.2 dated 24.06.09. No intimation has

been received in this regard in this office so far.

On receipt of these drawings, these will be

submitted to the M.D. Haryana Police Housing

Corporation, Panchkula, for preparation of

revised cost estimates. On receipt of the revised

cost estimates, necessary administrative approval

will be sought from the Govt.

Jail, Rewari has been acquired.

The administrative approval for Rs. 18.28

Crores for construction of new District Jail

Rewari was sought vide this office letter no.

33745 GI/B.1 dated 05.09.06 from the

Government. The matter was under

considerations with the Govt. in the

meantime a revised rough cost estimates

for Rs. 36.88 Crores for construction

of above said Jail were received from MD,

HPHC, Panchkula and the same were sent

to Government for administrative approval

vide this office letter no. 18719-21 DG

Jails/08/B.1 dated 04.07.08. The

Government vide its memo no. 31/5/1998-

4JJ(II) dated 16.10.08 asked for reducing

the cost estimates subsequent to which

Chief Architect was asked to prepare

revised drawings after reducing the scope of

work. Chief Architect has recently sent

these drawings which are being finalised by

the Prisons Department.

expedite the matter

regarding

administrative

approval for the

District Jail

Agenda

Item

57 Rewari Revenue/

HUDA

Additional Land for

Mini Secretariat.

Transfer of additional 8 acres of land to Revenue

Department in Mandi Township, Rewari for the

Mini Secretariat is required. Matter is pending

with HUDA. HUDA may be directed to expedite.

The Executive Engineer , PWD (B&R) Rewari

reported that the site plan for the proposed Mini

Secretariat Phase-II and parking has been sent to

FCR vide letter no. 1361-R-4-2011 reported that matter pending with FC town

and Country Planning and HUDA, reminder

issued on 17-5-2011.

CS desired that

Financial

Commissioner,

Revenue and

C.A.HUDA to

expedite the matter.

Old

Agenda

Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

25

Chief Architect, Chandigarh vide his letter No.

109 dated 02.01.2009. The brief description of

required accommodations for extension of Mini

Secretariat phase II and parking etc has also been

sent to Chief Architect on dated 03.1.2009 & Lay

Out Plan is awaited from Chief Architect,

Haryana Chandigarh. The matter is pending with

Financial Commissioner & Principal Secretary to

Govt. Haryana, Revenue & C.A. HUDA,

Haryana Chandigarh for transfer of 8 Acre land

from HUDA to Revenue department.

58 Rewari PWD (B & R) ROB on Rewari-

Shahjanpur Road

There is a heavy rush of heavy vehicles on

Shahjhanpur- Rewari Road. The Jaipur – Rewari

Railway crossing this road near Grain Market,

Rewari. Due to this heavy rush a long queue is

formed during the closure of Phattak and a time

of several hours is taken in clearing the traffic

some time, so it requires a ROB for the Railway

Line for smooth plying of traffic on the road to

provide a relief to the traffic to save time and

money from the wastage of fuel.

District Town Planner, Rewari reports that the

proposal for acquisition of land for constructions

of by pass road to connect existing by pass road

with the Narnaul road, crossing over the existing

railway line at container depot, wherein proposal

to construct ROB on the road junction of

Shanjanpur road and by pass road has made and

sent to the Administrator, HUDA, Gurgaon on

18-03-2011.

The matter is pending with LAO. Gurgaon for

notification under section-4.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

Rewari shahjhanpur road crosses Delhi

Jaipur Railway Line at level crossing No

61-A. There is proposal for constn of ROB

on this level crossing at LC No 61A Km

1/5-6. The rough cost estimate for constn of

3 lanes ROB for Rs 3025.50 lacs (State

Share 1292.33 lacs + Railway Share

1733.27 lacs) stands submitted to Chief

Bridge Engineer NWR HQ office Jaipur

vide this office No 2021-23 dated

09.09.2010

New Item

59 Rewari Local Bodies

department

Shopping Complex-cum-

Auditorium

There is no Auditorium in the Rewari city for

holding any district level function . A great

difficulty is being faced due to this. So it is

proposed to construct a Auditorium-cum-

Shopping Complex in Rewari City for any

New Item

Agenda of 6th DDRS to be held on 24-5-2011 at 11.30 AM through Video Conferencing- GURGAON DIVISION

S.

N

o

District Department Agenda Items DC’s Comments Departmental Comments Decision Taken

IN 5TH

DDRS

Action Taken

Report

Remarks

26

district level celebration. Secretary, Municipal

Council, Rewari Municipal Council, Rewari has

intimated that Resolution No. 2 dated 22-04-

2011 has been passed for construction of an

auditorium-cum-shopping complex on the

Municipal Council, Land at Maharana Pratap

Chowk, Rewari measuring about 3000 sq.yards.

This project has to be constructed on the BOT

basis.

60 Rewari PWD (B & R) Construction of

approaches of ROB at

level crossing N0-56 on

Delhi-Rewari-Jaipur

railway line crossing

HUDA Byepass & level

crossing N0-I on

Rewari-Jhajjar-Rohtak

Railway line crossing

Rewari-Pataudi Road

(SH-26) in Rewari

District.

New Railway line between Rohtak-Jahjjar Rewari is

being laid by Railways. There is a proposal for

construction of integrated ROB on Rewari Pataudi

Road and HUDA Bye Pass (SH-26) near Rewari Town

on this Railway line. One of such busy railway

crossing is situated in Rewari Town crossing HUDA

Bye-pass road on Delhi Jaipur line bearing railway

crossing No-56. Hence composite ROB on both level

crossing is required.

Executive Engineer, PWD (B & R), Rewari &

Executive Engineer, HSRDC, Rewari reports that the

approximate cost of this ROB is Rs. 195.14 Crores (

HSRDC share 165 .00 Corers + Railway Share 30.14

Crores) This project has to be constructed on the BOT

basis as informed by Head Office, HSRDC, Panchkula.

At present the project proposal is pending with

Commissioner, PWD (B&R), Haryana, Chandigarh.

EIC PWD B&R, Chandigarh has

reported vide letter no. 1446/Plg dated

20-5-2011.

The rough cost estimate for utility shifting

for Rs 1706.12 lacs stands submitted to the

MD HSRDC Panchkula vide this office

memo no 878 dated 08.04.11 and further

movement of the case pertains to MD

HSRDC Panchkula

New Item

61 Divisional

Commissio

ner Office

Chief

Secretary

Office

Strengthening of

Divisional

Commissioner’s Office

by Posting an HCS

Officer to assist the

Commissioner.

Proposal has been sent by the Commissioner,

Gurgaon Division to the FCR vide this office

letter no.BA1/2008/6238 dated 2-6-2008 and No.

BA1/2010/8254 dated 27-9-2010. The FCR has

forwarded the case to the Chief Secretary,

Haryana (S-I Branch) vide no. 3298-Est.-2-

08/12076 dated 4-12-2008. Now the matter is

pending at the level of Chief Secretary office.

The point is well

made and it was

decided that a formal

proposal be sent to

the government by

the office of

Commissioner in this

regard.

Old

Agenda

Item