Agile Planning in Sports Training
Managing the Uncertainty
Mladen JovanovićBelgrade, 2015
![Page 2: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/2.jpg)
Sources of Uncertainty & Risk?
• Competition Calendar & Opponents• Job security (minimum viable product)• Biological variations (individual)• Weather• Finance• Too much information (Paralysis by analysis)• Mental biases (over planning)• Injuries• Much, much more
![Page 3: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/3.jpg)
“Waterfall” planning
![Page 4: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/4.jpg)
Problems with “Waterfall”
• Uncertainty highest at the beginning of the project• Over planning• False sense of security• Not really good with unknown problems and unknown solutions• Useful in more “certain” fields• Is sport such a field?
![Page 5: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/5.jpg)
Solutions?
• “Iterative” approaches to planning• Agile approach• MVP – most viable product• Avoid over-‐planning since we don’t have the information at the start• Action based• Processes “embedded”• Take uncertainty into account
![Page 6: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/6.jpg)
![Page 7: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/7.jpg)
![Page 8: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/8.jpg)
![Page 9: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/9.jpg)
![Page 10: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/10.jpg)
Antifragile?
![Page 11: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/11.jpg)
Applications to Sports Planning?
• “Waterfall” still needed, but not enough• NOTHING NEW:
• Vertical Integration• Tschienemodel• Tactical periodization• “Micro dictates Macro” – Stuart McMillan• Everything is done, only the volume varies
• Embedded testing and planning• Variability without variability• Blocks more similar than different
• In-‐season vs pre-‐season)• Easier re-‐introduction of injured players• Easier coordination between starting players and reserves
![Page 12: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/12.jpg)
Continued
• Dan Baker Wave• Dan Pfaff 3 day roll-‐over plan• Jim Wendler 5/3/1• Charlie Francis• John Kiely• Raymond Verheijen• Complex-‐Parallel approach
![Page 13: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/13.jpg)
Agile Periodization?
![Page 14: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/14.jpg)
Standardized work?
![Page 15: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/15.jpg)
Standardized work? Continued
![Page 16: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/16.jpg)
Standardized work? Continued
• Principle/Philosophy based = Standardize work• PDAC Cycle = Experiment• Standardized work = CHECKLIST (basics)• Standardize work = Team practices (complement)
![Page 17: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/17.jpg)
Strength Training
• DUP (Daily Undulating Periodization/Planning)• Avoid “downside” (i.e. soreness)• Maintain volume/intensity• Make things “variable” (rotate exercises – introduce them early)
Day 1 Day 21x6 @ 75%1x4 @ 80%1x2 @ 85%
1x10 @ 60%1x8 @ 70%1x6 @ 80%
1x2 @85-‐90%3x6 @70-‐75%
1x6 @75-‐80%2x10 @60-‐65%
Week 1 Week 2 Week 36/4/2 5/4/3 3/2/1
8/6/4 10/8/6 12/10/8
![Page 18: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/18.jpg)
Conditioning
• Provide “balance” and smooth transition• HARD/EASY
Week 1 Week 2 Week 3Strides RSA Anaerobic Power
Aerobic Power (long) Extensive Intervals Aerobic Power (long)
![Page 19: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/19.jpg)
Tactical/Skill Training
![Page 20: Agile&Planning&in&Sports& Training...Applications&to&Sports&Planning? • “Waterfall”)still)needed,but)not)enough • NOTHING)NEW: • Vertical)Integration • Tschiene model •](https://reader035.vdocument.in/reader035/viewer/2022062915/5e8c991e3f339034a4680022/html5/thumbnails/20.jpg)
Find more?