AHERA Program Management & Lead Consulng School Districts ABC Adelanto Hunngton Beach Union High Garden Grove San Bernardino Saddleback Santa Ana Victorville Roman Catholic Diocese of Orange Roman Catholic Diocese of San Diego Property Owners CB Commercial Real Estate Koll Management Services Morgan Stanley Real Estate Primestor Development, Inc. Industrial Unilever McMullen Oil Company Brea Cañon Oil Company Government County of Riverside Real Estate Services County of Orange General Services County of San Bernardino Engineering Services City of San Diego Los Angeles County Dept. of Public Works Orange County Water District Banks/Insurance Co. Stancorp Financial Group World Trade Bank Union Bank of California REPRESENTATIVE CLIENT LIST (All Services) Pending renovaon projects may create major liabilies if asbestos program documents are not reviewed during the project's planning phase and proacvely manage potenal issues. The Reynolds Group (TRG) has been providing environmental consulng, assessment, and oversight services to Southern California school districts and commercial building owners since our founding in 1989. The Asbestos Hazard Emergency Response Act (AHERA), created in the mid-1980s, did not require school districts to invesgate exterior building components/materials. Consequently, stucco, window caulking, and roofing systems have generally not been tested for asbestos content. Also, many school districts elected to assume that certain building materials contained asbestos without actually tesng the materials. Many mes, sampling was not properly performed or did not sasfy current project needs. Prior to starng renovaon, modernizaon, or demolion work, local air quality management districts now mandate that "suspect" exterior and interior materials impacted by the project be properly tested for asbestos content. Abang materials assumed to contain asbestos is a needless project expense that is beer spent elsewhere. A supplemental sampling program allows a school district to beer assess the costs of pending construcon projects and reduce accidental asbestos exposures. TRG has provided supplemental asbestos invesgaons for numerous school districts in the Winter and Spring months in preparaon for Summer renovaon projects. Roofing replacement programs and expansion projects that were previously untested or assumed materials, such as sprayed acouscal ceiling texture, plaster or drywall, window sealants and flooring materials, require a thorough review of your asbestos management plan. TRG is ready to assist you in that review to complete a supplemental invesgaon, if needed. Unfortunately, we have also been involved in emergency responses aſter asbestos has been disturbed unwingly. TRG can provide design/abatement specificaons, bid phase assistance, and documentaon/monitoring/clearance services during any required asbestos abatement work. We are available to review and update your management plans or complete your 3-year re-inspecons to promote compliance with AHERA record-keeping requirements. Modernizaon Planning and AHERA Compliance/Renovaon

Upload: others

Post on 31-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AHERA Program Management & Lead onsulting...TRG has provided supplemental asbestos investigations for numerous school districts in the Winter and Spring months in preparation for Summer

AHERA Program Management & Lead Consulting

School Districts ABC Adelanto Huntington Beach Union High Garden Grove San Bernardino Saddleback Santa Ana Victorville Roman Catholic Diocese of Orange Roman Catholic Diocese of San Diego

Property Owners CB Commercial Real Estate Koll Management Services Morgan Stanley Real Estate Primestor Development, Inc. Industrial Unilever McMullen Oil Company Brea Cañon Oil Company

Government County of Riverside Real Estate Services County of Orange General Services County of San Bernardino Engineering Services City of San Diego Los Angeles County Dept. of Public Works Orange County Water District Banks/Insurance Co. Stancorp Financial Group World Trade Bank Union Bank of California

REPRESENTATIVE CLIENT LIST (All Services)

Pending renovation projects may create major liabilities if asbestos program documents are not reviewed during the project's planning phase and proactively manage potential issues. The Reynolds Group (TRG) has been providing environmental consulting, assessment, and oversight services to Southern California school districts and commercial building owners since our founding in 1989. The Asbestos Hazard Emergency Response Act (AHERA), created in the mid-1980s, did not require school districts to investigate exterior building components/materials. Consequently, stucco, window caulking, and roofing systems have generally not been tested for asbestos content. Also, many school districts elected to assume that certain building materials contained asbestos without actually testing the materials. Many times, sampling was not properly performed or did not satisfy current project needs. Prior to starting renovation, modernization, or demolition work, local air quality management districts now mandate that "suspect" exterior and interior materials impacted by the project be properly tested for asbestos content. Abating materials assumed to contain asbestos is a needless project expense that is better spent elsewhere. A supplemental sampling program allows a school district to better assess the costs of pending construction projects and reduce accidental asbestos exposures. TRG has provided supplemental asbestos investigations for numerous school districts in the Winter and Spring months in preparation for Summer renovation projects. Roofing replacement programs and expansion projects that were previously untested or assumed materials, such as sprayed acoustical ceiling texture, plaster or drywall, window sealants and flooring materials, require a thorough review of your asbestos management plan. TRG is ready to assist you in that review to complete a supplemental investigation, if needed. Unfortunately, we have also been involved in emergency responses after asbestos has been disturbed unwittingly. TRG can provide design/abatement specifications, bid phase assistance, and documentation/monitoring/clearance services during any required asbestos abatement work. We are available to review and update your management plans or complete your 3-year re-inspections to promote compliance with AHERA record-keeping requirements.

Modernization Planning and AHERA Compliance/Renovation

Page 2: AHERA Program Management & Lead onsulting...TRG has provided supplemental asbestos investigations for numerous school districts in the Winter and Spring months in preparation for Summer

AHERA Program Management & Lead Consulting

P.O. Box 1996 P: (714) 730-5397 Tustin, CA 92780 F: (714) 730-6476 [email protected] www.reynolds-group.com CA General Contractor License #659765 AHAZB Serving California Since 1989

SUCCESS STORIES

Private Property Owner – Procedure 5 Plan Emergency Response The Reynolds Group (TRG) was contracted by a property owner who had received a “Notice to Compliance” from the South Coast Air Quality Management District (SCAQMD) based on the roof replacement done in December 2013. TRG performed a limited asbestos survey to assess if the roofing debris had asbestos contained materials (ACM) impacted by the roof replacement. The survey resulted with two interior and one exterior sample containing detectable asbestos fibers. Finally, TRG prepared a Procedure 5 Plan for the property owner to address the decontamination of the interior and exterior space to be in compliance. School District – Asbestos Abatement and Renovation TRG was asked to step in for a consultant that had created a large amount of ill-will with all parties during a very high profile, multi-million dollar school upgrade and renovation project. TRG met will all parties, established clear and realistic abatement objectives, and then managed the project. The result was that asbestos abatement never became an issue on the critical path for the other construction trades, “emergencies” such as previously undiscovered asbestos were handled without incident, and our client spent virtually no time managing or worrying about how asbestos was being handled. School District – Asbestos and Lead Survey for Modernization TRG was contracted by the Victor Valley Union High School District to perform asbestos and lead surveys at portions of a junior high school within the district that were slated for modernizations. Working under tight scheduling requirements from the district, TRG successfully completed and reported the surveys within the designated time period, allowing the school district to move their projects forward on schedule. School District – Pre-Demolition Asbestos Survey TRG was contracted by the San Bernardino County Superintendent of Schools to perform asbestos surveys of select buildings that were to be demolished at four different schools within the San Bernardino County District. The asbestos surveys were successfully performed and reported within the contract budget and in less time than allowed under contract conditions. School District – 3-Year AHERA Re-Inspections TRG was hired by the Adelanto School District to perform asbestos, lead, and mold inspections to comply with the federally-mandated AHERA re-inspections every three years. TRG completed the inspection and updated the school binder of past inspections.

School District – Limited Asbestos Survey Garden Grove Unified School District contacted TRG to perform limited asbestos surveys on the roofs of various elementary and intermediate schools in the district. TRG was able to perform the investigation during school hours and provide the district a report of each school. School District – 3-Year AHERA Re-Inspections TRG was retained by the Diocese of San Diego to perform the federally-mandated 3-year AHERA (Asbestos Hazard Emergency Response Act) re-inspections. The re-inspections included 39 schools within the Diocese of San Diego. TRG completed the inspections on time and on budget. Private Property Owner – Pre-Demolition Asbestos Survey The client hired TRG to perform an asbestos survey of the interior of a vacant lease space in Hacienda Heights for ACM. TRG performed the investigation in a quick turnaround and was able to refer the client to an asbestos abatement contractor to successfully remove the ACM on the property.