ahmed khalil cv & resume

7
Page 1 of 7 Curriculum Vitae Ahmed Gouda Khalil Mobile Phone: (00971)-562968874 / (00964)- 7815357376 E-mail: [email protected]/[email protected] Career Objective A Stimulating and Rewarding career with good growth prospects in Engineering and Industries to Coordinate with all activities of water and Waste Water treatment Plant by using my Technical and Practical knowledge. CAREER HIGHLIGHTS Highly experienced and skilled in the water and wastewater treatment plants operation and maintenance to support project management from conceptual level, Planning stage, execution stage to project close-out. The experience encompasses of the following scope of works: Design, Install, Commission, Operate and maintain the drinking water treatment plant such as: Reverses Osmosis (RO), Ultra-Filtration, Multimedia/Sand filters, Softening………..etc. Design, Install, Commission, Operate and maintain Domestic/Industrial wastewater treatment plant such as: Extended aeration, conventional aeration, Moving Bed Bio-Reactor (MBBR), Membrane Bio-Reactor (MBR)……………..etc. Operate and maintain different departments of the cane sugar factory. Experiences Total Experience 16 Years and 4 months till date Design, Install, Commission, Operate and maintain the drinking water treatment plant with different capacity. Design, Install, Commission, Operate and maintain domestic/industrial wastewater treatment plant with different capacity. Design, Install, Commission, Operate and maintain oil field seawater supply project according to oil filed injection water quality standards. Operate and maintain cane sugar factory according to standard limits and equipment datasheet and supplier recommendations. January 2013 Present Employer: TISS Electromechnical Company Abu Dhabi UAE. Job title: Operation and Processing manager. Job Description Prepare site survey of projects and study and approved tender Documents & specifications. To prepare suitable design and specification for RO water desalination plant & wastewater treatment plant. To prepare inquiry and make procurement for all equipments and send it to the (international and local) suppliers. To prepare Pricing spread sheet, cost estimation and technical commercial proposal. To follow-up with the client about quotation and negotiation.

Upload: ahmed-khalil

Post on 07-Jan-2017

19 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Ahmed Khalil CV & Resume

Page 1 of 7

Curriculum Vitae

Ahmed Gouda Khalil

Mobile Phone: (00971)-562968874 / (00964)- 7815357376

E-mail: [email protected]/[email protected]

Career Objective

A Stimulating and Rewarding career with good growth prospects in Engineering and

Industries to Coordinate with all activities of water and Waste Water treatment Plant by using

my Technical and Practical knowledge.

CAREER HIGHLIGHTS

Highly experienced and skilled in the water and wastewater treatment plants operation and maintenance to support project management from conceptual level, Planning stage, execution stage to project close-out.

The experience encompasses of the following scope of works:

Design, Install, Commission, Operate and maintain the drinking water treatment plant such as: Reverses Osmosis (RO), Ultra-Filtration, Multimedia/Sand filters, Softening………..etc.

Design, Install, Commission, Operate and maintain Domestic/Industrial wastewater treatment plant such as: Extended aeration, conventional aeration, Moving Bed Bio-Reactor (MBBR), Membrane Bio-Reactor (MBR)……………..etc.

Operate and maintain different departments of the cane sugar factory.

Experiences

Total Experience – 16 Years and 4 months till date

Design, Install, Commission, Operate and maintain the drinking water treatment plant with different capacity.

Design, Install, Commission, Operate and maintain domestic/industrial wastewater treatment plant with different capacity.

Design, Install, Commission, Operate and maintain oil field seawater supply project according to oil filed injection water quality standards.

Operate and maintain cane sugar factory according to standard limits and equipment datasheet and supplier recommendations.

January 2013 – Present

Employer: TISS Electromechnical Company – Abu Dhabi – UAE.

Job title: Operation and Processing manager.

Job Description

Prepare site survey of projects and study and approved tender Documents & specifications.

To prepare suitable design and specification for RO water desalination plant & wastewater treatment plant.

To prepare inquiry and make procurement for all equipments and send it to the (international and local) suppliers.

To prepare Pricing spread sheet, cost estimation and technical commercial proposal.

To follow-up with the client about quotation and negotiation.

Page 2: Ahmed Khalil CV & Resume

Page 2 of 7

To develop the plant process and equipments capacity to be able and more competitive with the market competitors.

To Execute the project successfully as per and within the contractual requirement and standards.

To make quality control of the final treated effluent within the acceptable limits as per the Specifications given in the standards proposal.

To instruct operators for effective and efficient operation of the plant.

To Co-ordinate with the executive and managing director for all the activities and plans related to develop the business and market needing.

To maintain and calculate mass balance and sludge (SRT) in typically design parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow and extended aeration}.

To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the designing standards.

To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.

To conduct various experiments in the Influent and Effluent along with lab technicians.

To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the concerned authority.

Reference Projects

Project: Common Seawater Supply Project (CSSP–Demonstration facility Plan)

Location: Khor Al Zubair – Basrah – Iraq.

Client: SOC (South Oil Company at IRAQ).

Consultant: CH2MHILL.

EPC Contractor: TISS Electromechnical Company.

The project objective: The objective of the project is to develop a technical solution to implement a Common Seawater Treatment Facility (STF) for the Zubair, Rumaila, West Qurna 1, West Qurna 2, and Majnoon oil fields in Southern Iraq. Each of these oil fields requires water injection to ensure proper oil reservoir maintenance and maximize oil recovery. The scope of work: Plan, design, procure, construct, and operate a demonstration facility to validate design criteria and confirm the selected treatment system can successfully achieve the stated water quality goals.

Project: TSE Polishing Plant with capacity 6600 cubic meter per day.

Location: District Cooling Plant (DCP) – Lusail Marina Phase # 1 – Doha – Qatar.

Client: Marafeq Qatar.

EPC Contractor: BUTEC / ADC – Energy System Abu Dhabi.

Sub-Contractor: TISS – Electromechanical Company.

The project objective: Due to scarcity of water resources in the Gulf countries and the world, most of the GCC countries tended to use treated sewage effluent (TSE) as an alternative to drinking water in the district cooling plant. So The project objective is to develop the process design concepts for TSE-Polishing plant shall be installed to meet water quality required by district cooling plant. The scope of work:

Plan, design, procure, construct, install and commission a polishing plant (capacity=6,600

m3/day) which include ultra-filtration (UF) and reverse osmosis (RO) with all related

equipments.

March 2012 – January 2013

Employer: Kadhema Scientific Consultancy and Service (KSCS) Co, Kuwait. Job title: Operation and Processing Engineer.

Job Description

To prepare the site survey of the projects and study tender documents and approved the total tender specifications.

To make and prepare the suitable calculations and specification for the all wastewater treatment plant equipments.

Page 3: Ahmed Khalil CV & Resume

Page 3 of 7

To prepare the techno-commercial proposal and calculate the total cost, installation cost and commissioning cost.

To follow-up with the client about the quotation and negotiation about it.

To develop the plant process and equipments capacity and models to be able and more competitive with the market competitors.

To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended aeration successfully as per and within the contractual requirement and standards process.

To Maintain the Quality of the Treated Effluent within the acceptable limits as per the Specifications given in the standards proposal.

To Guide the Process personnel for effective and efficient operation of the plant.

To Co-ordinate with the Project Manager for all the activities related to the development of the Process.

To maintain and calculate mass balance and sludge (SRT) in typically design parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow and extended aeration}.

To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the designing standards.

To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.

To conduct various experiments in the Influent and Effluent along with lab technicians.

To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the concerned authority.

Reference Projects

Project: Industrial wastewater Treatment Plant with capacity = 2500 m3/day.

Location: Subhan industrial area – Kuwait city - Kuwait.

Client: PEPSI-COLA Kuwait.

EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.

The project objective: The objective of the project is to treat the industrial wastewater produced from beverage factories using Sequence Batch Reactors (SBR) technology to meet the criteria of the treated wastewater discharged into the sewerage system. The scope of work: Plan, design, procure, construct, install and commission wastewater treatment plant with capacity 2500 m

3/day and all related equipments.

Project: Industrial wastewater Treatment Plant with capacity = 1500 m3/day.

Location: Subhan industrial area – Kuwait city - Kuwait.

Client: AMERICANA - Kuwait.

EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.

The project objective: The objective of the project is to treat the industrial wastewater produced from Bakeries and Meat factories using Dissolved air flotation (DAF) technology with extended aeration system to meet the criteria of the treated wastewater discharged into the sewerage system. The scope of work: Plan, design, procure, construct, install and commission wastewater treatment plant with

capacity 2500 m3/day and all related equipments.

July 2008- March 2012

Employer: KCC Engineering and contracting company (KCCeC ), Kuwait. Job title: Operation and Processing Engineer

Job Description

To Execute Operation and Process of the Project No. SE / S / 137 and Project No.:SE/S/128. Successfully as per and within the contractual requirement.

To Organize the Process as per Plant requirements and scheduling the daily activities.

To Maintain the Quality of the Treated Effluent within the acceptable limits as per the Specifications given in the Contract by the Ministry.

Page 4: Ahmed Khalil CV & Resume

Page 4 of 7

To Guide the Process personnel for effective and efficient operation of the plant.

To Co-ordinate with the Project Manager and MPW for all the activities related to the development of the Process.

To maintain and calculate mass balance and sludge (SRT).

To maintain and calculate (HRT) for aeration and clarifiers basins.

To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.

To conduct various experiments in the Influent and Effluent along with MPW lab personnel.

To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the concerned authority.

To carry out the Treatment of Thickened Sludge and Operation of Belt Press Equipments using high quality Cationic Polymers.

To arrange the Disposal of Waste Sludge Out side the Plant.

To prepare Internal Work Orders and Request for Inspection, and submit to the Ministry for approval.

To Co-ordinate with Plant Services manpower for Land Scaping & Irrigation works and maintains the Plant area Clean & Green.

To Co-ordinate with Safety Officer and take utmost care towards safety of the Work Force.

To Co-ordinate with Instrumentation Engineer for Calibration of Flow measuring devices as per the Preventive Maintenance Schedule.

To Co-ordinate with Project Manager for preparing Monthly payment bill and getting monthly work orders from Ministry of Public Works.

To Co-ordinate with our inside and outside supplier for getting chemicals and materials required for wastewater treatment plant and laboratory tests.

Reference Projects

Project: Al JAHRA wastewater treatment plant (Capacity= 120,000 m3/day).

Location: Amgarah area – Jahra city - Kuwait.

Client: Ministry of Public Work (MPW) - Kuwait.

EPC Contractor: KCC Engineering and contracting company.

The project objective: Operate and maintain the sewage treatment plant using extended aeration system and attached activated sludge according to the design standards and criteria of treated wastewater used in irrigation. The scope of work: Operate and maintain wastewater treatment plant with capacity 120,000 m

3/day.

Project: Al REKKA wastewater treatment plant (Capacity= 250,000 m3/day).

Location: AL AHMADI city - Kuwait.

Client: Ministry of Public Work (MPW) - Kuwait.

EPC Contractor: KCC Engineering and contracting company.

The project objective: Operate and maintain the sewage treatment plant using extended aeration system and attached activated sludge according to the design standards and criteria of treated wastewater used in irrigation. The scope of work:

Operate and maintain wastewater treatment plant with capacity 250,000 m3/day.

Nov.2004 – July 2008

Egyptian Sugar and Integrated Industrial company (ESIIC), Egypt. Job title: Operation and Processing Engineer.

Job Description

In charge for Operation and Maintenance of sulfur Dioxide production plant.

In charge for Operation and Maintenance of milk of lime (Calcium Hydroxide) production plant.

In charge for operation of raw and mixed Juice extraction (by mills & diffuser) plant.

In charge for operate and maintenance of raw and mixed cane Juice treatment plant (chemicals & thermal treatment).

Page 5: Ahmed Khalil CV & Resume

Page 5 of 7

In charge for Juice clarifier plant and Mud of juice filtration plant.

In charge for Juice evaporation plant and concentrated syrup production.

To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the concerned authority.

To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.

To Co-ordinate and contact with our inside and outside supply of materials required for all production processes.

To Co-ordinate with factory and other work shop for repairing and maintenance our equipments required in our factory processes.

To maintain and calculate mass and energy balance for cane sugar factory.

To maintain and calculate Capacity of all our equipments in cane sugar factory.

Reference Projects

Project: Qus Cane Sugar Factory.

Location: Qus city - QENA Governorate - Egypt

Owner: Egyptian Sugar and Integrated Industrial company (ESIIC).

The project objective: The project objective to produce white or brown sugar from cane sugar using sugar factory with capacity of 1500 ton of white/brown sugar and bi-products such as Molasses and Bagasse. The scope of work: Operate and maintain cane sugar factory to produce white/brown sugar according to the design criteria and equipment datasheet.

May 2000 – Oct. 2004

SYSTEM TECHNIQUE – Water Management, Giza, Egypt. Job title: Operation and Processing Engineer.

Job Description

To prepare the site survey of the projects and study tender documents and approved the total tender specifications.

To make and prepare the suitable calculations and specification for the all wastewater treatment plant equipments.

To prepare the techno-commercial proposal and calculate the total cost, installation cost and commissioning cost.

To follow-up with the client about the quotation and negotiation about it.

To develop the plant process and equipments capacity and models to be able and more competitive with the market competitors.

To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended aeration successfully as per and within the contractual requirement and standards process.

To Maintain the Quality of the Treated Effluent within the acceptable limits as per the Specifications given in the standards proposal.

To Guide the Process personnel for effective and efficient operation of the plant.

To Co-ordinate with the Project Manager for all the activities related to the development of the Process.

To maintain and calculate mass balance and sludge (SRT) in typically design parameters for commonly used processes such as {MBBR, SBR, Conventional plug flow and extended aeration}.

To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the designing standards.

To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.

To conduct various experiments in the Influent and Effluent along with lab technicians.

To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the concerned authority.

Page 6: Ahmed Khalil CV & Resume

Page 6 of 7

Reference Projects

Project: Reverse Osmosis (RO) plant with capacity 2,000 m3/day.

Location: SONESTA Beach resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.

Client: SONESTA Resorts and Hotels - Egypt.

EPC Contractor: SYSTEM TECHNIQUE company, Egypt.

The project objective:

Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and hotels tended to use treated seawater as drinking water source. So The project objective is to design and install RO plant to treat seawater and meet drinking water criteria and limits. The scope of work: Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,000 m

3/day)

according to the design standards and criteria of treated seawater used in drinking and other applications.

Project: Reverse Osmosis (RO) plant with capacity 1,500 m3/day.

Location: HYATT REGENCY resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.

Client: HYATT REGENCY Hotels - Egypt.

EPC Contractor: SYSTEM TECHNIQUE company, Egypt.

The project objective:

Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and hotels tended to use treated seawater as drinking water source. So The project objective is to design and install RO plant to treat seawater and meet drinking water criteria and limits. The scope of work:

Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 1,500 m3/day)

according to the design standards and criteria of treated seawater used in drinking and other

applications.

Project: Reverse Osmosis (RO) plant with capacity 2,500 m3/day.

Location: Mövenpick Resorts – Sharm El Sheikh City – South Sinai Gov. - Egypt.

Client: Mövenpick Hotels - Egypt.

EPC Contractor: SYSTEM TECHNIQUE company, Egypt.

The project objective:

Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and hotels tended to use treated seawater as drinking water source. So The project objective is to design and install RO plant to treat seawater and meet drinking water criteria and limits. The scope of work: Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,500 m

3/day)

according to the design standards and criteria of treated seawater used in drinking and other

applications.

Project: Reverse Osmosis (RO) plant with capacity 800 m3/day.

Location: HYATT REGENCY resorts – Taba City – South Sinai Gov. - Egypt.

Client: HYATT REGENCY Hotels - Egypt.

EPC Contractor: SYSTEM TECHNIQUE company, Egypt.

The project objective:

Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and hotels tended to use treated seawater as drinking water source. So The project objective is to design and install RO plant to treat seawater and meet drinking water criteria and limits. The scope of work:

Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 800 m3/day)

according to the design standards and criteria of treated seawater used in drinking and other

applications.

Educational Details

B.Sc. Of Chemical 1999 South Valley university, Egypt. First Class (72.5%)

Target Job

Job location Any Country

Page 7: Ahmed Khalil CV & Resume

Page 7 of 7

Job Category Process and Operation for Water / Waste Water Treatment plants.

Employment Type Permanent / Contract.

Employment Status Full Time

Current location United Arab Emirates (UAE).

Driving License UAE driving license (Valid upto: 2022)

Computer Skills

Processing System

1. MS Windows, MS Office (Word / Excel / Power Point / Internet access). 2. AUTO CAD software and design in to 2 dimensions.

Significant Skills Excellent Team Work and Technical Support

Good Analytical, Organizational and Interpersonal Skills

Good Leadership, People Management, self motivation & negotiating Skills

Highly disciplined work habits, Dedication towards work & commitments

Accurate planning and completion of the work schedule in time

Excellent English Language and Presentation Skills

Languages Known English, Arabic.

Personal Information

Father’s Name

Nationality

Religion

Date of Birth

Ahmed Gouda Khalil

Egyptian

Muslim

16/01/1976

Up-Date: 15.06.2016 Ahmed G. Khalil