aib panel removal

7
Case Study: AIB Panel Removal

Upload: jan-alvino

Post on 22-Jan-2017

13 views

Category:

Business


0 download

TRANSCRIPT

Page 1: AIB Panel Removal

Case Study:

AIB Panel Removal

Page 2: AIB Panel Removal

Amiante STR Limited

Our Services

Our company provides the highest standard of professionalism and workmanship.  We understand customers are often wary and concerned at the potential hazards of asbestos and asbestos containing materials or ACM’s.

We provide the full range of asbestos services, from asbestos surveying, asbestos encapsulation or if necessary asbestos removal and disposal. Our aim is to provide quality workmanship at a price that ensures the health, safety and welfare of our clients and our staff. We also provide asbestos consultancy services as well as asbestos training.

Our philosophy is to ensure that all of our customers are able to make informed decisions about asbestos management issues.

Page 3: AIB Panel Removal

AIB Panel Removal

Page 4: AIB Panel Removal

PROJECT

Amiante STR Ltd were required as part of a demolition project to carry out the

removal of AIB ceiling and door panels. The building was due to be demolished

and before that could commence the asbestos hazard needed to be removed.

Amiante STR Ltd constructed a working polythene enclosure to enable the removal

of the panels.

AIB Panel Removal

Page 5: AIB Panel Removal

P E T EPeople, Environment, Tools and Exposure

PETE represents a process encompassing Health & Safety, risk assessment and project management. PETE assists in ensuring that all aspects of a project are managed safely.Below are a few of the PETE considerations taken into account on this project.

[This PETE is all of the people involved above who must have asbestos awareness training to ensure they are legally compliant for controlling the risks to People, Environment, Tools and Exposure].

• Amiante STR Ltd were commissioned by the demolition contractor who was also working on site at the time.

• This means we are working to the demolition contractor’s site specific requirements therefore our method

statement and risk assessment had to be submitted to the demolition contractor before our works could

commence for their approval, to enable the contractor to comply with their health and safety responsibilities.[This PETE represents the safe removal of asbestos materials in compliance with current legislation and is also our reminder to assess all of the risks to our own staff of People, Environment, Tools and Exposure and not just the asbestos risk].

• Working within and old disused building, they needed to report to the demolition contractor for a site induction

then sign in at the start and end of each shift and also to comply with their site safety and fire procedural

requirements at all times.

[This PETE is where those planning a project ask about the impact of People, Environment, Tools and Exposure to the project. Includes

Client discussions, site surveying, estimating or consultancy].

• The works had to be notified to the Health & Safety Executive 14 days prior to start date. Risk assessment & method statements were prepared with particular emphasis on the fact that the building was already in a state of disrepair.

• Works had to be carried out under fully controlled conditions requiring the erection of polythene enclosures which

were taken under negative pressure to prevent the release of asbestos fibres.

Page 6: AIB Panel Removal

Our Vision

Working together to create a safer environment by building an international consultancy providing asbestos solutions worldwide.

Our Values

To act openly and respect everyone

To work safely to prevent, accidents, incidents or near misses

To be honest and trustworthy in all of our actions

To remember the customer pays for the service they receive

Our Mission

To reduce the spread and exposure of asbestos at all times

To create a safer environment for everyone

To provide a reliable solution for anyone with an asbestos problem

To provide an income for our staff and shareholders

Amiante STR Limited

Page 7: AIB Panel Removal

Providing asbestos solutions to create a safer environment

[email protected]

Hampshire: 023 9223 0700London: 020 8531 4969

Head Office: Unit 5, Falcon Court, Parklands Business Park, Forest Road, Denmead, Hampshire, PO7 6BZ

People, Environment, Tools and Exposure

P E T E