AIM Training Traditional “Buttonology” Courses AIM I – 2 FY 16 convenings, 1 on each coast AIM II – 6 convenings CPM/LO Module – 16 conveningsTRANSCRIPT
AIM Program Software Status
FRB/CCB Meeting
24 February 2016
AIM Program Software Includes:
• AIM I• AIM II• AIM Learning Object Module• Content Planning Module
AIM TrainingTraditional “Buttonology” Courses• AIM I
– 2 FY 16 convenings, 1 on each coast• AIM II
– 6 convenings• CPM/LO Module
– 16 convenings
E2E TrainingTraining in support of the NETC E2E/Sailor 2025 Process:• Based on NAVEDTRAs, MIL-HDBKs, & DIDs• NETC Sailor 2025 End-to-End Process SOP
updates to be added when available• Course overhaul underway:
– Update to include BCA and Reengineering topics
– Incorporate Sailor 2025 SOP
E2ETraining(contd)
• Starting in Mar 16, will be taught monthly at Dam Neck and at 6 different learning centers or fleet concentration areas through 31 Aug 16
• Distance Learning version of current E2E ILT course implemented for facilitated asynchronous delivery via NETC N7 Sakai instance – as pre-requisite and reach-back after formal training
AIM Program Updates
CPM Update – v 5.8 – Mar 16
• New CMS Event functionality• Change CMS to use hour:minute
format
CPM Update – Spring 2016• Versioning• Table of Specifications• Addition of two new reports (Users by
Center, Projects by Center)• Automatic bookmarking in the CPM• JDTA Notification Email changes• Update to User request screen
CPM Update – Spring 2016(contd)
• Prevent multiple logins by the same user on different machines
• Miscellaneous cross-site scripting security issue bug fixes
• Copy/paste Occupations• Create Duty, Sub-task, Step from
OCCSTDs, not just Tasks
AIM/LO Module Update – Spring 2016• Portion marking• CPM/LO Module versioning• Enhance user privilege structure in AIM to
support collaborative government-vendor learning content development in Central Site instances
• NMCI Win 7/Office 2010 support, including converting all sheets to DOCX format.
• Allow deletion of resources used within approved materials
AIM/LO Module Update – Spring 2016 (contd)
• Multiple Discussion Points per Page in LO Module LP output
• Allow creation/use of Sheets in Self-Paced (IMI) Sections
• Purpose of the Course for AIM II LP/TG• Multi-volume TGs in AIM II• Add “How to Use” entry in AIM II LP/TG
AIM/LO Module Update – Spring 2016 (contd)
• Letter of Promulgation in AIM II• Course Master Schedule in front matter of AIM II
LP• In AIM II, prompt the user on whether to use the
latest TPP or TCCD data when creating a Rev/Change to a Course or creating a modification TPP; whether to push data from a Modification TPP to the TCCD upon locking the TPP
• Display selected PowerPoint slides in the LO Module
AIM/LO Module Update – Spring 2016 (contd)
• Automatic bookmarking in the LO Module• Add option to include/exclude the Front Matter
from the LO Module preview• Add ‘delete unused exercises’ option to AIM I
ECG module.• In the LO Module, print the full Sheet number
when printing a sub-set of sheets
LO Module Integration into CPM – ‘Webification’
• Long-term NETC plan is to integrate LO Module functions into CPM as a fully web-based application
Phase 1• Core of LO Module creation in CPM
‒ delivered and accepted by govt Jan 14
Phase 2• Significant improvements in importing
LO Module files, “filled in holes” from Phase 1‒ Approved FEB 15
Future Development• Phase 3 (100% of desktop client
functionality and operational replacement for LO Module desktop client): ECP underway under current TO 0045
• Schedule and required funding are TBD based on several factors, including freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module
Issues• Replace current Word editor for TG sheets
with web-based editor and migrate existing Word-based TG Sheets into new editor
• Identify, test, and implement new print engine
• Work with NETC N6 to scope server requirements and network bandwidth to support far greater user and data load on CPM than current Plan, Analyze, and Design phases of ISD process
AIM Support• Currently handled by NAWCTSD,
with contractor support• REMEDY is now the formal Help
Desk interface for filing initial Trouble Reports
Backup Slides
[table of all AIM sw enhancements and release planning]
CPM/LO Module Support for NETC E2E/Sailor 2025 Process
LO Module
ILT Content Design/Development and Test Item Development
IMI Content Design and Test Item Development
ILT/IMI Content and Test ItemSurveillance/Maintenance
CPMBaseline Task
Definition(OCCSTDs and O*NET-based NTC Taxonomy)
Work Performance Definition
(JDTA)
Front-end Analysis(FEA)
ILT and IMI Learning Content Design
(learning objectives /COI)
Planning Data(TPP/TCCD/IMDP)
Content Outline Draft w Versioned
Learning Objectives
and Metadata
Versioned Learning
Objective and Content Outline Updates
IMI Authoring Tool
Technical Data[XML/HTML/smart PDF/S1000D IETMs]
Links to Authoritative Tech Data / Updates
IMI content design data,
test items
Baseline IMI content
Updated IMI content
LMS / CCS
- CCS: personalize, deliver
(w IETM links), track, and report
run-time ILT/blended content
- LMS: deliver, track, and report
run-time self-paced content – deliver all
assessments
- CCS/LMS: synchronize PC Sim
scenarios with student
workstations
LegendAuthoring tools
Content delivery tools
ChangeImpact data, updated test items
Learner PC for self-
paced
ECR for ILT/
blended
Updated 12 Feb 16
Baseline ILT content
Updated ILT content
RTM
PQS