Page 1: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

AIM Timelines, Tools, and Support

Page 2: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

AIM Roles and Responsibilities

Policy, Program, and WO Budget—Gordon Toevs

Implementation—National Operations Center (Emily Kachergis, terrestrial lead and Scott Miller, aquatics lead)

Training, Study Design—ARS Jornada, USU/NAMC (Jason Karl and Sarah McCord, Scott Miller)

State Program, Budget, Coordination—State AIM Leads

Office Project Coordination and Budget—Project Leads

Page 3: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

AIM Project Contacts

Planning and Funding Design

Baili [email protected]

303-236-7342

Project EvaluationAnalysis and Reporting

Emily [email protected]

303-236-0071

Data Collection and QAQC and Ingestion

Sarah [email protected]

303-236-2716

Page 4: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

AIM Project Design Worksheet and Process Model

Page 5: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

BLM National Operations Center

Enterprise

database

• Monitoring Manual and Technical References

• Data capture and storage with DIMA/SARAH and TerrADat/AquADat

• Master sample • AIM landscape toolbox website• Webinars and calls• QA/QC protocols and

documentation • Benchmark (threshold)

determination tools – O/E type models for aquatics

• Geocortex reporting tools• R-Shiny tool statistical analysis• And more underway!!!

AIM Tools Available

Page 6: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center
Page 7: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

Quality Assurance (done throughout the year at all levels)

Level 2: State QC

Field Crew QA

Level 1: Crew Lead/Field Office/District Office QC

DIMA/SARAH finalization

QC and dataset merge

Training / calibration Calibration

Pre-season DIMA/SARAH preparation

Level 3: National Operations Center QC

Mid-season check-in2

Share previous year’s data with

FOs

QC and SQL ingestion

(data is “locked”)

Jan Feb March April May June July Aug Sept Oct Nov Dec

Feb March April May June July Aug Sept Oct Nov DecJan

Periodic DIMA/SARAH

checks1

Mid-season check-in2

Calibration Calibration

*Determine exact timing by subtracting crew training time from desired monitoring start date

1Periodic DIMA checks should be done every few weeks once data collection has started (more frequent at the start of data collection to catch errors).2Mid-season check-ins should be done about 4 weeks after data collection has started.

Page 8: AIM Timelines, Tools, and Support. AIM Roles and Responsibilities Policy, Program, and WO Budget—Gordon Toevs Implementation—National Operations Center

Feb March April June July Aug Sept Oct Nov DecJan

NOC

State Office

Field Office

Field Crew

Sample Design• Plots• Strata • Study area• Project

design worksheet

Field Data• DIMA/SARAH• Photos• Sample

Design DB• Field season

summary

TerrADat/AquADat/HAF

Early DIMA/SARAH

Training Data Collection & QA QC

Office Plot Evaluation

QC Data

QC Data

QC Data

Use Data

Use Data

Calibration data

May