air dose rates inside the buildings...june 30, 2016 tokyo electric power company holdings, lnc. air...
TRANSCRIPT
June 30, 2016Tokyo Electric Power Company Holdings, lnc.
Air Dose Rates inside the Buildings
Sampling Period
Unit 1: from April 1, 2016 to April 30, 2016
FlammabilityControl System (B)
Fukushima Daiichi NPS Unit 1 Reactor Building 1st Floor [mSv/h]
PrimaryContainment Vessel
Fukushima Daiichi NPS Unit 1 Reactor Building 2nd Floor [mSv/h]
PrimaryContainment Vessel
Heat Exchanger
Heat Exchanger
Primary Loop Recirculation System - Motor-Generation Set
40mSv/h
Fukushima Daiichi NPS Unit 1 Reactor Building 3rd Floor [mSv/h]
Primary Containment Vessel
Spent FuelPool
Primary Loop Recirculation System -Motor-Generation Set
Fukushima Daiichi NPS Unit 1 Reactor Building 4th Floor [mSv/h]
PrimaryContainment Vessel
Spent Fuel Pool
DryerSeparator
Pool
FlammabilityControl System (A)
Fukushima Daiichi NPS Unit 1 Reactor Building 5th Floor [mSv/h]
Spent Fuel Pool
DryerSeparator
Pool
Fukushima Daiichi NPS Unit 1 Turbine Building 1st Basement Floor [mSv/h]
Diesel Generator
Condenser Motor-DrivenReactor FeedWater Pump
Condensate Pump
Fukushima Daiichi NPS Unit 1 Turbine Building 1st Floor [mSv/h]
Condenser
Fukushima Daiichi NPS Unit 1 Turbine Building 2nd Floor [mSv/h]
MainGenerator
Low Pressure Steam Turbine High Pressure
Steam Turbine
Fukushima Daiichi NPS Unit 1 Radioactive Waste Treatment Facility 1st Floor [mSv/h]
Fukushima Daiichi NPS Unit 2 Radioactive Waste Treatment Facility 1st FloorUnits 1 and 2 Drum Loading Dock [mSv/h]
Fukushima Daiichi NPS Units 1 and 2 Service Building 1st Floor [mSv/h]
Fukushima Daiichi NPS Units 1 and 2 Service Building 2nd Floor [mSv/h]