air force center for engineering and the environment building information modeling
DESCRIPTION
Air Force Center for Engineering and the Environment Building Information Modeling Major Patrick C. Suermann PhD, PE, LEED AP AFCEE/CME August 11, 2009. Personal Background. Experience Renovation Construction Teaching Technology Education USMA1995 USAFA1997 TX A&M2003 UF2009. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/1.jpg)
Air Force Center for Engineering and the Environment
Building Information Modeling
Major Patrick C. SuermannPhD, PE, LEED AP
AFCEE/CMEAugust 11, 2009
Air Force Center for Engineering and the Environment
Building Information Modeling
Major Patrick C. SuermannPhD, PE, LEED AP
AFCEE/CMEAugust 11, 2009
![Page 2: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/2.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Personal Background
Experience• Renovation• Construction• Teaching• Technology
EducationEducation• USMAUSMA 19951995• USAFAUSAFA 19971997• TX A&MTX A&M 20032003• UFUF 20092009
![Page 3: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/3.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Sir Ronald A. Fisher
Fisher was opposed to conclusion that smoking causedcaused lung cancer.
He compared the correlations to a correlation between the import of apples and the rise of divorce in order to show that “correlation does not imply causation.”
Source: http://en.wikipedia.org/wiki/R.A._Fisher
![Page 4: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/4.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Overview
NBIMS Interactive Capability Maturity Model (NBIMS I-CMM)
USAF and USACE BIM Initiatives
DoD-wide construction productivity benchmarking
![Page 5: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/5.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
[A] Building Information Model[ing] (BIM) is a digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition. A basic premise of BIM is collaboration by
different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information in the BIM to support and reflect the roles of that stakeholder.
![Page 6: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/6.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
NBIMS I-CMM
6
Sections 4.1 & 4.2Sections 4.1 & 4.2
http://www.buildingsmartalliance.org/nbims/
![Page 7: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/7.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
USAF
http://www.afcesa.af.mil/library/cemagazine/index.asp
![Page 8: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/8.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Dynamic Prototyping
8
![Page 9: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/9.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Project Overview
Kit of Parts – Structural Assumes load
bearing exterior masonry
Assumes concrete structure with maximum 30’ spans
Stair Unit A Unit B Unit C Support Commons
![Page 10: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/10.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Project Overview
Test Configurations
![Page 11: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/11.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Army Transformation
Army TransformationMILCON Transformation
Centers of StandardizationUSACE BIM Implementation
![Page 12: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/12.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
ERDC TR 06-10
![Page 13: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/13.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Attachment F
13
![Page 14: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/14.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Attachment F
Strengths: Promotes BIM use on projects Spells out minimum modeling requirements Platform Neutral for non-COS Projects Promotes Competition Tied to Army BIM Road Map, COBIE, etc.
Challenges: Nebulous “Implementation Plan” Min end product required still = just drawings Without interoperability portfolio-wide, sharing will remain
difficult BIM in FM limited
14
![Page 15: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/15.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
USACE
United States Army Corps of EngineersProgram Summary: Evaluated in CCGs
FY10: $34.8 Billion
![Page 16: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/16.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
USACE
MP6: Amber, 91% Cost Growth
MP7: Red, 76% Project Time Growth
MP8: Red, 76% BOD Time Growth
MP9: Red, 41% Timeline (Duration) Growth
MP10: Red, 27% Financial Closeout
Note: Taken from CCG Report for all on-going projects as of 13 APR 09 for all Program years
Average Score: 62%
![Page 17: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/17.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Benchmarking Approach
Compare Projects to Similar Facilities by CAT CODE
Apply the Central Limit Theorem to Summarize/Characterize Traditional Projects
Establish 90% or 95% Confidence Intervals
![Page 18: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/18.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Sample View
18
![Page 19: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/19.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
NBIMS Interactive Capability Maturity Model (NBIMS I-CMM)
USACE and USAF BIM Initiatives
DoD-wide construction productivity benchmarking
19
Summary
![Page 20: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/20.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
http://www.bimwiki.com
http://www.bimwiki.com
![Page 21: Air Force Center for Engineering and the Environment Building Information Modeling](https://reader035.vdocument.in/reader035/viewer/2022070418/56815957550346895dc6939c/html5/thumbnails/21.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e21
BIM in the Federal Gov’t
Tactical Implementation
Stra
tegi
c/O
pera
tiona
l