AIR HANDLING UNITS

@Sovereign_AM Sovereign Air Movement

Handling air like nobody else

FM617949

COMPANY PROFILETotal Air Handling Solutions

“We manufacture a comprehensive range of quality bespoke air handling units in Leeds, West Yorkshire. Founded in 2000, Sovereign Air Movement is a family run business based in Leeds. Since its launch, Sovereign has retained most its original staff, which is testament to the excellent working conditions and a sense of pride and passion instilled in every member of the team. “We are extremely proud of our achievements and our goal is to pursue a policy which will only enhance our reputation for manufacturing high quality air handling units”.

John Gill, Managing Director

Our new high spec factory is situated on the new Leeds bypass, with a direct connection to the new M1 - A1 link road. Direct access to the main motorway network means we can transport our units across the country quickly and

OUR CLIENTSA number of our valued clients

OUR PREMISESSovereign HQ

Sovereign Air Movement works closely with some of the most highly regarded contractors and consultants in the Building Services industry, providing air handling solutions for many of the UK’s best loved brands.

ABOUT USSovereign Air Movement

A NEW GENERATIONof Air Handling Systems

A NEW GENERATIONof Air Handling Systems

At Sovereign Air Movement we use a computer aided design system to produce our extensive range of air

handling equipment. We can provide our customers’ with a complete

tailor made package that includes a detailed quotation and drawings.

Our bespoke AHU’s can meet our customers’ precise requirements

and provide a low cost and energy efficient solution. We also offer flat

pack options.

Bespoke Air Handling Units

built to our customers’ exact specifications

We can offer eco design directive as an option

5

6

8

1

2

4

3

5

6

1

2

4

3

HIGH QUALITY AIR HANDLING UNITSDesigned to your exact requirements

We work closely with all our customers, attuned to their varying needs and expectations. This ensures that we deliver innovative solutions and offer maximum value for money.

All Sovereign Air Handling Units are assembled by our skilled engineers.

We aim to adopt the very latest industry technology and all our units are manufactured in accordance with BS EN1886:2007 (incorporating Corrigenum January 2009).

AHU air leakage test was conducted by BSRIA’s test facility during March 2012. Sovereign Air Movement take the environment very seriously in everything we do, from choosing the most efficient fans, minimising wastage of materials and the running of our business which includes savings in water, heating and lighting.

The air handling unit frame system is cut and mitred from extruded Aluminium profiles, then TIG welded to give a secure and rigid frame system capable of supporting internal component decks. TIG welding produces a clean weld, which enhances the air handling unit’s appearance.

Sovereign air handling units are finished in Plastisol Coated Finish Pre Galvanised Mild Steel as standard, which gives a long 25 year life expectancy. The standard finish is Merlin Grey. Other colours are available if required.

1

2

All our panels and internal metal work is designed and punched out on our Prima-Power E5x CNC Turret punch.

The air handling unit frame system can be adapted to suit various sized performances utilising 25 or 50mm deep Rocksilk filled panels.

3

4

All our units are manufactured in accordance withBS EN1886:2007 (Incorporating Corrigenum January 2009)

A NEW GENERATIONof Air Handling Systems

Sovereign’s world class Air Handling Units engineered

to meet your specific climate

requirements - too good looking to be

hidden behind plant room walls!

Sovereign Air Movement Control Devices can be incorporated into any dedicated and/or proprietary Building Management Systems.

Our standard base is 100mm extruded aluminium. We can offer other base frames using welded steel with appropriate lifting points.

5

We use a combination of aluminium connection blocks, external and an internal version if required. Sovereign use high quality door panels with robust high quality door furniture. Outer surface mounted handles reducing air leaks.

Filter Status – differential pressure switches and pressure indication gauges can be fitted as an option.

7

6

7

MANUFACTURINGQuality assured

EXTRA SERVICES - More from Sovereign• Flat pack or kit form configuration for customers to install.• Site re-build service by our engineers.• Air handling unit renovation option. You can have a new AHU using your existing frame work. University

of Leeds is one example.• Full attenuation package to complement your air handling units. These can either be built in or supplied

separately.

Sovereign Air Movement offer complete

Air Handling Solutions; from small void

mounted to Air Handling Units in excess of

40m3/s. We aim to achieve the very best

performance for a competitive price. We

are proud that a large amount of our work

is repeat business from our nationwide

client base.

Sovereign manufacture a wide range

of Air Handling Units to meet various

configurations, which include:

• Packaged systems

• Heat recovery

• Gas fired heaters

• In-house controls

• Thermal brake systems

• Full stainless steel systems

• Double walled systems

OUR SERVICESSovereign Air Movement

1

2

3

4

Here is a step by step assembly of a Heat Recovery Air Handling Unit that incorporated the latest energy

saving equipment to meet the ever demanding Building Regulations specifications.

The new AHU renovation service from Sovereign Air Movement that delivers all

the benefits of a new system...

BENEFITS OF AHU RENOVATION

• Save between 30% and 50% on the cost of a new AHU installation, using

your existing framework• Renovation can be done outside working hours and also in stages to

minimise disruption• Everything is manufactured to

BS EN1886:2007• Extend AHU life by up to 15 years

Benefit from Sovereign’s industry leading technology to improve system

specification and performance

Contact us to arrange a site survey

Renovate your existing AHU

RepAIRerfrom Sovereign Air Movement

BEFORE RepAIRer AFTER RepAIRer

AHU AHU

FAN FAN

COIL COIL

CONTROL SOLUTIONSOnboard or loose supplied control packages available for all applications

Here at Sovereign Air Movement

we have the in-house expertise

to allow us to design, specify,

build, supply, install and

commission control panels to

suit any process, whether a like

for like replacement or new

build.

With our own workshop and

team of qualified Panel Builders,

Electricians and Software

Engineers, we are able to

competitively offer panel

building solutions to suit any

HVAC Solution.

By working closely with our

Control Partners, Key Suppliers,

Panel Builders and Estimating

Staff, we are dedicated to

keeping up-to-date with

emerging technologies and

innovations.

CASE STUDY 1Freshney Place Grimsby - G-Tech Ltd

With footfall in excess of 12 million

visitors per year, the 46,450m2

Freshney Place Shopping Centre

accounts for more than 57% of

Grimsby’s retail provision. As part

of an ongoing update programme,

Sovereign Air movement were

approached by G-Tech to replace or

upgrade the existing AHU’s which

had been operating on the site for

more than 25 years.

Freshney Place has been

accredited with the ‘Investors in

the Environment’ Silver Award, and

part of their mission statement is to:

‘Carry out regular maintenance and

improvement programmes to ensure

we operate an environmentally

responsible building’.

Sovereign’s own policy of ensuring

required energy standards are

met for building ventilation, made

the collaboration with G-Tech and

Freshney Place a natural choice.

Each unit would be a direct

replacement for the older systems

and include a 100kW gas fired

heater and heat wheel recovery

system for maximum efficiency. With

the old units and ducting stripped

out, transport was arranged for

delivery of the next generation

units in five sections together with

a trailer and crane. Sovereign’s

regular transport company, Five Star

Haulage of Leeds, played a key role

in tentatively manoeuvring the units

via a ramp onto the shopping centre

roof; a challenging operation in itself.

With the units bolted together and

all internal wiring and ductwork

modifications complete, we passed

on to our client to link with their

control systems. When fully wired,

Sovereign arranged for testing of the

gas burner and full commissioning

took place.

CASE STUDY 2Amazon Warehouse - Rugby Gateway

Sovereign Air Movement have won

a first order with PWP Building

Services to supply five Air Handling

Units for a vast new Amazon facility

at Rugby Gateway; a 120 acre prime

site development situated at the

heart of the UK logistics ‘Golden

Triangle’. The 120,000 Sq. ft.

Amazon Warehouse and Distribution

Centre was opened in August 2017.

Sovereign are proud to have

supplied and completed installation

of the five air handling units

together with the necessary

secondary equipment to provide

a cost effective and practical air

handling solution for this eminent

project.

The installation comprised:

• 2 Spot Cooling units (one

external to the building with the

other internal mounted on the

mezzanine) c/w dx cooling to

serve the main warehouse floor

area with a duty of 10.85m3/s.

These units incorporate Reverse

cycle evaporative cooling with a

capacity of 200kw.

• 1 Ground Floor Amenities Heat

Recovery AHU supply 0.4m3/s

extract 0.31 m3/s. Actual Heat

Recovery efficiency up to 90%.

• 1 First Floor Offices Heat

Recovery AHU supply 1.08m3/s

extract 0.8m3/s. Actual Heat

Recovery efficiency up to 86%.

• 1 Kitchen Supply AHU 2.82m3/s.

incorporating tempered air

supply to main kitchen extract

canopy below.

CASE STUDY 3Wigan Fire Station - Quartzelec

Sovereign Air Movement are pleased

to have supplied the Air Handling

Unit to the prestigious new Wigan

Community Fire and Ambulance

Station. With low running costs

high on the client’s list of priorities,

we installed a high efficiency heat

recovery system with a thermal heat

wheel option in order to provide

optimal heat recovery at the lowest

possible cost.

The unit itself is situated external

to the building and set within the

confines of the complex and full

inbuilt protection and roof were

included. The supply and extract

fans are all EC type plug fans and

inverter controlled to maximise

efficiency. As with all Sovereign’s EC

range they conform to the Energy

related Product (ErP) Directive.

Sovereign prepared the unit by

painting all the exterior louvres

in a way that complemented the

cladding of the building. Delivered

in one section, the unit was craned

into position on a pre-installed base

frame: the entire installation process

took about one hour to complete.

Sovereign Air Movement comments:

“We have worked closely with our

valued client Quartzelec on this

esteemed project and have recently

received a further order for two Air

Handling Units at Menai Science

Park. We very much look forward to

building on our business relationship

and future collaboration.”

CASE STUDY 4Santander Bradford

Sovereign Air Movement recently

carried out a Full Refurbishment on

the Air Handling Units at Santander

Bradford Head Offices to bring the

units in line with the latest European

Directive 2009/125/EC.

• The unit casings were cleaned

and treated for rust protection

• The access side on each unit.

was fully replaced with double

skinned insulated panels and

access doors with viewing ports.

• New Fresh air Inlet Dampers

were fitted.

• New high efficiency long life LED

Lamps were fitted in all access

sections.

• Inverter Driven Plug Fans with

High Efficiency IE2 motors were

fitted to comply with the latest

ERP Directive.

• All Coils were replaced including:

the Frost LPHW Coil, the Chilled

Water Coil Reheat Coil and

• Run-Around Coil.

• Coils were all Copper Tubes

Copper Fins Electro tinned finish.

• New Filter Frames with Filter

Clamps.

• New G4 Panel and F9 Ridged

Bag Filters.

• New Filter Differential Pressure

Switches and Magnahelic

Gauges.

• The units were worked on during

regular working hours and all

deadlines were met. The finish

was to a high standard and both

the customer and consultants

were very pleased with the

outcome.

CASE STUDY 5Cartwright Hall Museum - Bradford

Sovereign Air Movement Supplied

a new Air Handling Unit for the

newly refurbished David Hockney

Hall in the Cartwright Hall Bradford

Museum.

Sovereign manufactured an Air

Handling Unit to do a Supply and

Extract Airflow of 2.0m3/s @ 300

Pascal external static pressure.

The unit was manufactured to meet

the British Museum Society and ERP

Directive Specifications and include:

Inverter Driven Plug Fans, Filters to

G4 and F7 Grade, Thermal Wheel

Heat Recovery, DX Cooling Coil,

LPHW Heating Coil, Electric Heater

Battery, Inlet and Supply Dampers

and 3 way mixing section c/w

dampers.

The unit casing was finished

internally and externally with

plastisol coated finish panels. A full

drain tray was fitted under the entire

AHU to catch any water spillage and

unit was supplied and installed in the

plant room within the allotted time

and fell well within the project brief.

CASE STUDY 6Kellogg’s Manchester

This project involved two Air Handling

Unit designs: the first was to cover

an area of 25.0m3/s and the second

to cover 22.0m3/s. Both units were

produced to identical size parameters,

after establishing that each unit would

be capable of handling the required air

volumes.

Both units were a replacement of

existing units which were no longer fit

for purpose. The two units were to be

located in the Cornflake line operating

area.

Manufactured by Sovereign, the product

brief specified that the units must be

produced to Kellogg’s own design

criteria. Food grade standard was an

essential factor with the facility for full

wash down capability. This meant there

would have to be a comprehensive

drainage system with drain trays

positioned beneath all the units.

The units comprised of the following

construction & items:

• Both Units were 50mm fully welded

aluminium frames and finish painted.

• 200mm fully welded and painted

steel base.

• Plastisol Outer panels with 304

Stainless Steel Grade Internal Panels.

• Weather Cowl & 316L Stainless Steel

Inlet Dampers.

• Steam Frost Coil - Copper/Copper,

stainless steel 304 casing.

• Pre filters/ISO Course, Secondary

Filters/ISO ePM175% mounted in 304

Stainless Steel Filter Frames.

• Chilled Water Cooling Coil – Copper/

Copper Electro Tinned, Stainless

Steel 304 Casing.

• Duel (duty/duty) fans – painted

Impeller. (Each Fan on AHU01 has a

45.0Kw motor, & on AHU02 they had

30.0Kw Motors).

• The Kellogg’s specification to meet

food grade standard, drain trays

were fitted in all areas to allow for

full wash down of the units.

• The fan motors have to be mounted

on an additional internal base in

order to allow wash down but also

handle the weight of the fan/motors.

• High Grade Synthetic Filter Ridged

Bag Filters - C/W 304 Stainless Steel

Filter Frames.

CASE STUDY 7JCT Porsche

Sovereign were successful in winning

this prestigious order to supply 3

Packaged integrated air handling

units to provide, supply and extract

air to the showroom and offices at

the Porsche dealership in Leeds.

These units were designed to

match up with the original unit roof

openings to eliminate any roof work

requirements. Once the old units

were removed, the new units could

then be craned into position, fixed

to the original roof mountings, wired

and be ready to run within a couple

of hours. The installation window to

carry out the work was extremely

narrow due to strict time constraints.

The whole operation had to be

carried out within one day which

included de-commissioning and

removal of the original units. The

installation was achieved on time

and to the customer’s satisfaction.

These Sovereign units installed

were built to the highest efficiency

specifications and meet the latest

ERP regulations.