Air Individual Permit Major Amendment 14300014011 Permittee: Heartland Corn Products Facility name: Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396 Operating permit issuance date: March 6, 2014 Expiration date: March 6, 2019 * All Title I Conditions do not expire Major Amendment: March 23, 2016 Permit characteristics: Federal; Part 70/ Limits to avoid NSR; Limits to avoid NSR The emission units, control equipment and emission stacks at the stationary source authorized in this permit amendment are as described in the Permit Applications Table. This permit amendment supersedes Air Emission Permit No. 14300014010 and authorizes the Permittee to operate and construct the stationary source at the address listed above unless otherwise noted in the permit. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R. 7007.1150 to 7007.1500. Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit. Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the SIP under 40 CFR § 52.1220 and as such as are enforceable by EPA Administrator or citizens under the Clean Air Act. Signature: Carolina Espejel-Schutt This document has been electronically signed. for the Minnesota Pollution Control Agency for Don Smith, P.E., Manager Air Quality Permits Section Industrial Division

Upload: others

Post on 29-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  •  

     Air Individual Permit Major Amendment 

    14300014‐011  Permittee:  Heartland Corn Products 

    Facility name:  Heartland Corn Products 53331 State Highway 19 E Winthrop, MN 55396     

     Operating permit issuance date:  March 6, 2014  Expiration date:  March 6, 2019 * All Title I Conditions do not expire  Major Amendment:  March 23, 2016  Permit characteristics:  Federal; Part 70/ Limits to avoid NSR; Limits to avoid NSR  The emission units, control equipment and emission stacks at the stationary source authorized in this permit amendment are as described in the Permit Applications Table.  This permit amendment supersedes Air Emission Permit No. 14300014‐010 and authorizes the Permittee to operate and construct the stationary source at the address listed above unless otherwise noted in the permit. The Permittee must comply with all the conditions of the permit. Any changes or modifications to the stationary source must be performed in compliance with Minn. R. 7007.1150 to 7007.1500. Terms used in the permit are as defined in the state air pollution control rules unless the term is explicitly defined in the permit.  Unless otherwise indicated, all the Minnesota rules cited as the origin of the permit terms are incorporated into the  SIP under 40 CFR § 52.1220 and as such as are enforceable by EPA Administrator or citizens under the Clean Air Act.  

    Signature:  Carolina Espejel-Schutt   This document has been electronically signed.  for the Minnesota Pollution Control Agency 

    for  Don Smith, P.E., Manager    Air Quality Permits Section    Industrial Division  

       

  • Table of Contents  

      Page  

    1.  Permit applications table ............................................................................................................................................. 3 2.  Where to send submittals ............................................................................................................................................ 4 3.  Facility description ....................................................................................................................................................... 5 4.  Summary of subject items ........................................................................................................................................... 6 5.  Limits and other requirements .................................................................................................................................. 17 6.  Submittal/action requirements ............................................................................................................................... 185 7.  Appendices ............................................................................................................................................................... 213 

    Appendix A. Insignificant Activities and General Applicable Requirements .......................................................... 213 Appendix B: Modeling Inputs ................................................................................................................................. 215 Appendix C: Fence Diagram ................................................................................................................................... 216 Appendix D: HAP Performance Testing Required Compounds ............................................................................. 218 Appendix E: Diesel Idling Prevention Plan ............................................................................................................. 219 Appendix F: Equipment Inventory ......................................................................................................................... 220 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 3 of 230  

     

    1. Permit applications table  Subsequent permit applications: Title description  Application receipt date  Action number Part 70 Reissuance  06/29/2010  14300014‐010 Major Amendment  10/15/2012 updated 01/17/2014  14300014‐010 Administrative Amendment  02/03/2014  14300014‐011 Minor Amendment  08/29/2014  14300014‐011 Major Amendment  05/12/2015 updated 11/24/2015  14300014‐011 

      

        

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 4 of 230  

     

    2. Where to send submittals   

    Send submittals that are required to be submitted to the U.S. EPA regional office to:  Chief Air Enforcement Air and Radiation Branch EPA Region V 77 West Jackson Boulevard Chicago, Illinois 60604 

     Each submittal must be postmarked or received by the date specified in the applicable Table. Those submittals required by Minn. R. 7007.0100 to 7007.1850 must be certified by a responsible official, defined in Minn. R. 7007.0100, subp. 21. Other submittals shall be certified as appropriate if certification is required by an applicable rule or permit condition. 

     Send submittals that are required by the Acid Rain Program to: 

     U.S. Environmental Protection Agency Clean Air Markets Division 1200 Pennsylvania Avenue NW (6204N) Washington, D.C. 20460 

     Send any application for a permit or permit amendment to: 

     Fiscal Services – 6th Floor Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota 55155‐4194 

     Also, where required by an applicable rule or permit condition, send to the Permit Document Coordinator notices of: 

     a. Accumulated insignificant activities b. Installation of control equipment c. Replacement of an emissions unit, and d. Changes that contravene a permit term 

     Unless another person is identified in the applicable Table, send all other submittals to: 

     AQ Compliance Tracking Coordinator Industrial Division Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota 55155‐4194    

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 5 of 230  

     

    3. Facility description   The Heartland Corn Products (Facility) is located at 53331 State Highway 19 E in Winthrop, MN, Sibley County, Minnesota. The Heartland Corn Products (Facility) is a natural fermentation fuel ethanol production plant located at 53331 State Highway 19 E in Winthrop, MN, Sibley County, Minnesota. At the facility, corn is ground and mixed with water and enzymes, cooked, and then fermented in tanks. The resulting liquid is separated from the solids, and distilled to produce pure fuel‐grade ethanol. The pure ethanol is denatured with gasoline, and stored in tanks prior to shipping by truck or rail. Solids from the fermentation process are dried to produce Dry Distillers’ Grain with Solubles, which is sold for use in livestock feed.  Permit Action 010 description:  This permit action was a reissuance of the pt. 70 operating permit, and also included a major amendment to increase the (un‐denatured 200 proof) ethanol production limit from 103.9 million gallons per year to 120 million gallons per year. 

    The major amendment included in the reissuance also revised the paved road fugitive dust requirements, added a fire pump diesel engine to the permit (installed circa 2006 as part of a project authorized by permit No. 14300014‐005, but not included in that permit), provided flexibility to add, replace, and modify certain emission units, removed the Methanator Flares (because they were not operated), revised the permit modeling appendix due to recent modeling, and corrected errors and omissions in the Delta permit database.  Permit Action 011 description:  This permit action is a major amendment to add a combined heat and power unit with combustion turbine (EQUI 164) and duct burner (EQUI 165) to provide on‐site steam and electricity. The existing boilers will remain as a backup. The facility also proposes to increase ethanol production to 124.9 million gallons per year through process improvements. This production increase will not involve increases in grain throughput or DDGS output limits. All grain handling and DDGS loading/unloading operations at the East Plant will end once West Plant construction is completed. After construction, these operations will be at the West Plant only. The hours for these operations will be expanded from 10 (7AM‐5PM) to 12 hours (6AM‐6PM) per day. Fermenters #6 and #7 that were permitted but never built will be built and represented as EQUI 120 and EQUI 138. VRTO #1 will be replaced by a new VRTO #1 (EQUI 162), cooling towers will be relocated and a new Fermenter #6 (EQUI 161), DDGS Bin #3 (EQUI 163) and Corn Bin #7 (EQUI 166) will be added to the West Plant. 

    This permit action also includes a minor amendment to add a 2 million gallon storage tank for denatured ethanol (EQUI 75), and an administrative amendment for a 120‐day test extension.    

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 6 of 230  

     

     4. Summary of subject items 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    ACTV5: All AI's     COMG1: Baghouse Monitoring Requirements 

    has members 

    STRU7, STRU10, STRU71, STRU72, STRU85, STRU86, TREA12, TREA14, TREA32, TREA33, TREA43, TREA44 

    COMG3: Natural Gas Usage Recordkeeping 

    has members 

    EQUI4, EQUI6, EQUI22, EQUI51, EQUI52, EQUI56, EQUI57, EQUI164, EQUI165, TREA11, TREA15, TREA16, TREA29, TREA45 

    COMG4: HAP Limits, Monitoring, and Recordkeeping 

    has members 

    EQUI4, EQUI6, EQUI51, EQUI52, EQUI179, STRU9, STRU68, STRU69, STRU70, STRU79, STRU87 

    COMG5: Scrubber Monitoring Requirements 

    has members 

    STRU68, STRU69, STRU79, TREA30, TREA31, TREA34 

    COMG6: Leaks From Equipment In VOC Service ‐ subp. VV 

    has members 

    FUGI6, FUGI7, TREA41 

    COMG7: Storage Tanks Subject To NSPS Subp. Kb 

    has members 

    EQUI104, EQUI105, EQUI106, 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description EQUI128, EQUI129, EQUI130, EQUI131, EQUI148, EQUI157, EQUI160 

    COMG8: Storage Tanks Not Subject To NSPS Subp. Kb 

    has members 

    EQUI103, EQUI107, EQUI132 

    COMG9: Leaks From Equipment In VOC Service ‐ subp. VVa 

    has members 

    FUGI6, FUGI7, TREA41 

    EQUI103: Denaturant Tank #3; Unleaded Gas (Fixed Roof only; 18 mgal) 

       

    EQUI104: 200 proof shift Tank #2; Ethanol (120 mgal) 

       

    EQUI105: 200 proof shift Tank #1; Ethanol (120 mgal) 

       

    EQUI106: Denaturant Tank #1; Unleaded Gas (39 mgal) 

       

    EQUI107: 190 proof Tank #1; Ethanol & Water (Fixed Roof only; 39.72 mgal) 

       

    EQUI10: Beer Well #1 East Plant ‐ Fermentation Equipment 

    sends to  STRU79: East Plant Fermentation Scrubber (CE 003) 

    EQUI10: Beer Well #1 East Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA30: Packed‐Gas Adsorption Column 

    EQUI11: Corn Dump Pit/Auger #2 Captured Emissions ‐ Material Handling Equipment 

    is controlled by 

    TREA32: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 7 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    EQUI129: 200 proof Tank #3; Ethanol (100 mgal) 

       

    EQUI12: Corn Elevator #2 West Plant ‐ Elevator 

    is controlled by 

    TREA32: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 8 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Plant DDGS Truck Loading Building Uncaptured Emissions ‐ Material Handling Equipment 

    Plant DDGS Truck Loading Building Uncaptured Emissions 

    EQUI172: West Plant DDGS Loadout Captured Emissions ‐ Material Handling Equipment 

    sends to  STRU15: West Plant DDGS Loadout Captured Emissions 

    EQUI173: West Plant DDGS Truck Loading Building Captured Emissions ‐ Material Handling Equipment 

    sends to  STRU16: West Plant DDGS Truck Loading Building Captured Emissions 

    EQUI174: Corn Dump Pit/Auger #2 Uncaptured Emissions ‐ Material Handling Equipment 

    sends to  STRU17: Corn Dump Pit/Auger #2 Uncaptured Emissions 

    EQUI175: Corn Dump Pit/Auger #3 Uncaptured Emissions ‐ Material Handling Equipment 

    sends to  STRU18: Corn Dump Pit/Auger #3 Uncaptured Emissions 

    EQUI176: DDGS Dryer B East Plant Multiple Cyclone ‐ Other Emission Unit 

    sends to  STRU9: VRTO #1 Stack East Plant (CE 036) 

    EQUI176: DDGS Dryer B East Plant Multiple Cyclone ‐ Other Emission Unit 

    is controlled by 

    TREA11: VRTO #1 (new) 

    EQUI177: DDGS Dryer A East Plant Multiple Cyclone ‐ Other Emission Unit 

    sends to  STRU9: VRTO #1 Stack East Plant (CE 036) 

    EQUI177: DDGS Dryer A East Plant Multiple Cyclone ‐ Other Emission Unit 

    is controlled by 

    TREA11: VRTO #1 (new) 

    EQUI178: DDGS Dryer #3 West Plant Multiple Cyclone ‐ Other Emission Unit 

    sends to  STRU70: VRTO #2 West Plant (CE 012) 

    EQUI178: DDGS Dryer #3 West Plant Multiple Cyclone ‐ Other Emission Unit 

    is controlled by 

    TREA29: VRTO No. 2 

    EQUI179: DDGS  sends to  STRU88: DDGS 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Cooling Cyclone (CE011) East Plant 

    Cooling Cyclone East Plant (CE011) 

    EQUI179: DDGS Cooling Cyclone (CE011) East Plant 

    is controlled by 

    TREA46: Single Cyclone 

    EQUI17: Fermenter #1 West Plant ‐ Fermentation Equipment 

    sends to  STRU68: West Plant CO2 Scrubber (CE 008) 

    EQUI17: Fermenter #1 West Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI181: Corn Dump Pit/Auger East Plant 

    sends to  STRU85: Grain Handling East Plant (CE001) 

    EQUI181: Corn Dump Pit/Auger East Plant 

    is controlled by 

    TREA43: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 9 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 10 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    EQUI1: Fermenter #5 East Plant ‐ Fermentation Equipment 

    sends to  STRU79: East Plant Fermentation Scrubber (CE 003) 

    EQUI1: Fermenter #5 East Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA30: Packed‐Gas Adsorption Column 

    EQUI20: Fermenter #4 West Plant ‐ Fermentation Equipment 

    sends to  STRU68: West Plant CO2 Scrubber (CE 008) 

    EQUI20: Fermenter #4 West Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI21: Beer Well #2 West Plant ‐ Fermentation Equipment 

    sends to  STRU68: West Plant CO2 Scrubber (CE 008) 

    EQUI21: Beer Well #2 West Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI22: DDGS Dryer #3 West Plant ‐ Dryer/Oven, unknown firing method 

    is controlled by 

    TREA29: VRTO No. 2 

    EQUI24: DDGS Bin #1 West Plant ‐ SIlo/Bin 

    is controlled by 

    TREA14: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 11 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Equipment  Scrubber (CE 003) 

    EQUI34: Fermenter #4 East Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA30: Packed‐Gas Adsorption Column 

    EQUI35: Liquefaction Tank #1 East Plant ‐ Liquefaction Equipment 

    sends to  STRU69: East Plant Distillation Scrubber (CE 005) 

    EQUI35: Liquefaction Tank #1 East Plant ‐ Liquefaction Equipment 

    is controlled by 

    TREA31: Packed‐Gas Adsorption Column 

    EQUI36: Yeast Tank #2 East Plant ‐ Fermentation Equipment 

    sends to  STRU69: East Plant Distillation Scrubber (CE 005) 

    EQUI36: Yeast Tank #2 East Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA31: Packed‐Gas Adsorption Column 

    EQUI38: Yeast Tank #1 East Plant ‐ Fermentation Equipment 

    sends to  STRU69: East Plant Distillation Scrubber (CE 005) 

    EQUI38: Yeast Tank #1 East Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA31: Packed‐Gas Adsorption Column 

    EQUI39: 190 Proof Run‐Down East Plant ‐ Separation Equipment 

    is controlled by 

    TREA31: Packed‐Gas Adsorption Column 

    EQUI3: Side Stripper #1 East Plant ‐ Stripping Equipment 

    is controlled by 

    TREA31: Packed‐Gas Adsorption Column 

    EQUI40: Scalper #2 West Plant ‐ Other Emission Unit 

       

    EQUI41: Beer Stripper #2 West Plant ‐ Stripping Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI42: Rectifier #2 West Plant ‐ 

    is controlled by 

    TREA34: Packed‐Gas 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Distillation Equipment 

    Adsorption Column 

    EQUI43: Side Stripper #2 West Plant ‐ Stripping Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI44: Molecular Sieve #2 West Plant ‐ Separation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI45: Evaporator #2 West Plant ‐ Dehydrator 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI46: Liquefaction Tank #1 West Plant ‐ Liquefaction Equipment 

    sends to  STRU68: West Plant CO2 Scrubber (CE 008) 

    EQUI46: Liquefaction Tank #1 West Plant ‐ Liquefaction Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI47: Liquefaction Tank #2 West Plant ‐ Liquefaction Equipment 

    sends to  STRU68: West Plant CO2 Scrubber (CE 008) 

    EQUI47: Liquefaction Tank #2 West Plant ‐ Liquefaction Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI49: Yeast Tank #2 West Plant ‐ Fermentation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI4: Boiler #1 East Plant ‐ Boiler 

       

    EQUI50: 190 Proof Run‐Down Tank West Plant ‐ Separation Equipment 

    is controlled by 

    TREA34: Packed‐Gas Adsorption Column 

    EQUI51: Utility Boiler #3 West Plant ‐ Boiler 

       

    EQUI52: Utility Boiler #4 West Plant ‐ Boiler 

       

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 12 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    EQUI53: Ethanol Loadout #2 West Plant (Railcar) ‐ Loading‐Unloading Equipment 

    is controlled by 

    TREA15: Ethanol Loading Rack Flare #1 

    EQUI54: Wetcake Loadout and Storage West Plant ‐ Loading‐Unloading Equipment 

       

    EQUI55: DDGS Cooler West Plant (CE 013/CE 012/SV 018) ‐ Cooler 

    is controlled in parallel by 

    TREA29: VRTO No. 2 

    EQUI55: DDGS Cooler West Plant (CE 013/CE 012/SV 018) ‐ Cooler 

    is controlled in parallel by 

    TREA3: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 13 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    FUGI9: West Plant Truck Traffic 

       

    STRU10: DDGS Handling Baghouse #2 (CE 037) 

    receives from 

    EQUI163: DDGS Bin #3 West Plant ‐ Silo/Bin 

    STRU11: Combustion Turbine with Duct Burner 

    receives from 

    EQUI164: Combustion Turbine 

    STRU11: Combustion Turbine with Duct Burner 

    receives from 

    EQUI165: Duct Burner 

    STRU12: West Plant Grain Receiving Uncaptured Emissions 

       

    STRU13: West Plant DDGS Loadout Uncaptured Emissions 

       

    STRU14: West Plant DDGS Truck Loading Building Uncaptured Emissions 

       

    STRU15: West Plant DDGS Loadout Captured Emissions 

       

    STRU16: West Plant DDGS Truck Loading Building Captured Emissions 

       

    STRU17: Corn Dump Pit/Auger #2 Uncaptured Emissions 

       

    STRU18: Corn Dump Pit/Auger #3 Uncaptured Emissions 

       

    STRU19: Dryer Building ‐ East Plant 

       

    STRU20: Process Building ‐ East Plant 

       

    STRU21: Process Building (South) ‐ East Plant 

       

    STRU22: Maintenance Building ‐ East Plant 

       

    STRU23: Grain Receiving ‐ East Plant 

       

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    STRU24: Process Building ‐ West Plant 

       

    STRU25: Cooling Tower 1 ‐ East Plant 

       

    STRU26: Cooling Tower 2 ‐ East Plant 

       

    STRU27: Grain Receiving ‐ West Plant 

       

    STRU28: Boiler Building 

       

    STRU29: Office     STRU30: Cooling Towers ‐ West Plant 

       

    STRU31: Cooling Tower 3 ‐ East Plant 

       

    STRU32: Denatured Ethanol Tank ‐ West 

       

    STRU33: Fermenter 1 ‐ West 

       

    STRU34: Fermenter 2 ‐ West 

       

    STRU35: Beerwell ‐ West 

       

    STRU36: Fermenter 3 ‐ West 

       

    STRU37: Fermenter 4 ‐ West 

       

    STRU38: Corn Silo 1 ‐ West 

       

    STRU39: Corn Silo 2 ‐ West 

       

    STRU40: DDGS Bin 1 ‐ West 

       

    STRU41: DDGS Bin 2 ‐ West 

       

    STRU42: Corrosion Inhibitor ‐ West 

       

    STRU43: 200 Proof Tank 1 ‐ West 

       

    STRU44: 190 Proof Tank ‐ West 

       

    STRU45: Denatured Tank ‐ West 

       

    STRU46: Fermenter 1 ‐ East 

       

    STRU47: Beerwell ‐ East 

       

    STRU48: Fermenter 2 ‐ East 

       

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 14 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    STRU49: Corn Silo 1 ‐ East 

       

    STRU50: Corn Silo 2 ‐ East 

       

    STRU51: Corn Silo 3 ‐ East 

       

    STRU52: Corn Silo 4 ‐ East 

       

    STRU53: Corn Silo 5 ‐ East 

       

    STRU54: Corn Silo 6 ‐ East 

       

    STRU55: T24     STRU56: 190 Proof Tank ‐ East 

       

    STRU57: Denatured Tank ‐ East 

       

    STRU58: 200 Proof Tank 1 ‐ East 

       

    STRU59: 200 Proof Tank 2 ‐ East 

       

    STRU5: Ethanol Loading Rack Flare #1 (CE 018) 

    receives from 

    EQUI5: Ethanol Loadout #1 East Plant (Trucks) ‐ Loading‐Unloading Equipment 

    STRU60: Denatured Ethanol Tank ‐ East 

       

    STRU61: Denatured Ethanol Tank 2 ‐ West 

       

    STRU62: 200 Proof Tank 2 ‐ West 

       

    STRU63: Fermenter 3 ‐ East 

       

    STRU64: Fermenter 4 ‐ East 

       

    STRU65: Fire Pumphouse 

       

    STRU66: Fire Water Tank 

       

    STRU67:      STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI161: Fermenter #6 West Plant ‐ Fermentation Equipment 

    STRU68: West Plant CO2 Scrubber (CE 

    receives from 

    EQUI41: Beer Stripper #2 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    008)  West Plant ‐ Stripping Equipment 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI42: Rectifier #2 West Plant ‐ Distillation Equipment 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI43: Side Stripper #2 West Plant ‐ Stripping Equipment 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI44: Molecular Sieve #2 West Plant ‐ Separation Equipment 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI45: Evaporator #2 West Plant ‐ Dehydrator 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI49: Yeast Tank #2 West Plant ‐ Fermentation Equipment 

    STRU68: West Plant CO2 Scrubber (CE 008) 

    receives from 

    EQUI50: 190 Proof Run‐Down Tank West Plant ‐ Separation Equipment 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI27: Liquefaction Tank #2 East Plant ‐ Liquefaction Equipment 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI30: Evaporator ‐ Dehydrator 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI39: 190 Proof Run‐Down East Plant ‐ Separation Equipment 

    STRU69: East Plant Distillation Scrubber 

    receives from 

    EQUI3: Side Stripper #1 East 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 15 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    (CE 005)  Plant ‐ Stripping Equipment 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI7: Beer Stripper #1 East Plant ‐ Stripping Equipment 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI8: Rectifier East Plant ‐ Distillation Equipment 

    STRU69: East Plant Distillation Scrubber (CE 005) 

    receives from 

    EQUI9: Molecular Sieve #1 East Plant ‐ Separation Equipment 

    STRU6: Ethanol Loading Rack Flare #2 (CE 019) 

    receives from 

    EQUI53: Ethanol Loadout #2 West Plant (Railcar) ‐ Loading‐Unloading Equipment 

    STRU70: VRTO #2 West Plant (CE 012) 

    receives from 

    EQUI22: DDGS Dryer #3 West Plant ‐ Dryer/Oven, unknown firing method 

    STRU70: VRTO #2 West Plant (CE 012) 

    receives from 

    EQUI55: DDGS Cooler West Plant (CE 013/CE 012/SV 018) ‐ Cooler 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI11: Corn Dump Pit/Auger #2 Captured Emissions ‐ Material Handling Equipment 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI12: Corn Elevator #2 West Plant ‐ Elevator 

    STRU71: Grain  receives  EQUI13: Corn 

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Handling West Plant (CE 006) 

    from  Bin #5 West Plant ‐ Silo/Bin 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI14: Corn Bin #6 West Plant ‐ Silo/Bin 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI166: Corn Bin #7 West Plant ‐ Silo/Bin 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI28: Corn Elevator #4 West Pant ‐ Elevator 

    STRU71: Grain Handling West Plant (CE 006) 

    receives from 

    EQUI29: Corn Dump Pit/Auger #3 Captured Emissions ‐ Material Handling Equipment 

    STRU72: Hammermills 3 & 4 West Plant (CE 007) 

    receives from 

    EQUI15: Hammermill #3 West Plant ‐ Milling Equipment 

    STRU72: Hammermills 3 & 4 West Plant (CE 007) 

    receives from 

    EQUI16: Hammermill #4 West Plant ‐ Milling Equipment 

    STRU78: DDGS Cooler #2 (CE 013) bypass 

    receives from 

    EQUI55: DDGS Cooler West Plant (CE 013/CE 012/SV 018) ‐ Cooler 

    STRU79: East Plant Fermentation Scrubber (CE 003) 

       

    STRU7: DDGS Handling Baghouse (CE 035) 

    receives from 

    EQUI24: DDGS Bin #1 West Plant ‐ SIlo/Bin 

    STRU7: DDGS Handling Baghouse (CE 035) 

    receives from 

    EQUI25: DDGS Bin #2 West Plant ‐ Silo/Bin 

    STRU82: Utility Boiler Stack 

    receives from 

    EQUI4: Boiler #1 East Plant ‐ Boiler 

    STRU82: Utility Boiler Stack 

    receives from 

    EQUI51: Utility Boiler #3 West Plant ‐ Boiler 

    STRU82: Utility  receives  EQUI52: Utility 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 16 of 230  

     

    SI ID:  Description 

    Relationship Type 

    Related SI ID: Description 

    Boiler Stack  from  Boiler #4 West Plant ‐ Boiler 

    STRU82: Utility Boiler Stack 

    receives from 

    EQUI6: Boiler #2 East Plant ‐ Boiler 

    STRU85: Grain Handling East Plant (CE001) 

       

    STRU86: Hammermills 1 & 2 East Plant (CE002) 

       

    STRU87: VRTO #1 Stack East Plant (CE010) 

       

    STRU88: DDGS Cooling Cyclone East Plant (CE011) 

       

    STRU8: Diesel Fire Pump Engine Stack 

    receives from 

    EQUI26: Fire Pump Engine CI 575 hp (01/2006) ‐ Reciprocating IC Engine 

    STRU9: VRTO #1 Stack East Plant (CE 036) 

    receives from 

    EQUI56: DDGS Dryer B East Plant ‐ Dryer/Oven, unknown firing method 

    STRU9: VRTO #1 Stack East Plant (CE 036) 

    receives from 

    EQUI57: DDGS Dryer A East Plant ‐ Dryer/Oven, unknown firing method 

    TFAC1: Heartland Corn Products 

       

    TREA11: VRTO #1 (new) 

       

    TREA12: Fabric Filter ‐ Low Temperature, i.e., T

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 17 of 230  

     

     5. Limits and other requirements  Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation TFAC 1  14300014  Heartland Corn 

    Products  

      5.1.1    Production 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 18 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. R. 7011.0150, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.5    Grain Storage Capacity: The facility permanent grain storage capacity is limited to less than 2.5 million bushels to avoid classification as a grain terminal elevator under 40 CFR pt. 60, subp. DD. [Minn. R. 7007.0800, subp. 2] 

      5.1.6    The Permittee shall retain on‐site and continue implementation of the Diesel Emission Idling Prevention Plan (Appendix E) submitted to MPCA on June 9, 2006. Any proposed changes to the plan shall be submitted to the MPCA for review and approval prior to implementation. [Minn. R. 7007.3000, Minn. R. 7009.0020, Title I Condition: 40 CFR 52.21] 

      5.1.7    PERMIT SHIELD: Subject to the limitations in Minn. R. 7007.1800, compliance with the conditions of this permit shall be deemed compliance with the specific provision of the applicable requirement identified in the permit as the basis of each condition. Subject to the limitations of Minn. R. 7007.1800 and 7017.0100, subp. 2, notwithstanding the conditions of this permit specifying compliance practices for applicable requirements, any person (including the Permittee) may also use other credible evidence to establish compliance or noncompliance with applicable requirements.  This permit shall not alter or affect the liability of the Permittee for any violation of applicable requirements prior to or at the time of permit issuance. [Minn. R. 7007.1800, (A)(2)] 

      5.1.8    The Permittee shall comply with National Primary and Secondary Ambient Air Quality Standards, 40 CFR pt. 50, and the Minnesota Ambient Air Quality Standards, Minn. R. 7009.0010 to 7009.0080. Compliance shall be demonstrated upon written request by the MPCA. [40 CFR pt. 50, Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.9    Circumvention: Do not install or use a device or means that conceals or dilutes emissions, which would otherwise violate a federal or state air pollution control rule, without reducing the total amount of pollutant emitted. [Minn. R. 7011.0020] 

      5.1.10    Air Pollution Control Equipment: Operate all pollution control equipment whenever the corresponding process equipment and emission units are operated. [Minn. R. 7007.0800, subp. 16(J), Minn. R. 7007.0800, subp. 2] 

      5.1.11    Operation and Maintenance Plan: Retain at the stationary source an operation and maintenance plan for all air pollution control equipment. At a minimum, the O & M plan shall identify all air pollution control equipment and control practices and shall include a preventative maintenance program for the equipment and practices, a description of (the minimum but not necessarily the only) corrective actions to be 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 19 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation taken to restore the equipment and practices to proper operation to meet applicable permit conditions, a description of the employee training program for proper operation and maintenance of the control equipment and practices, and the records kept to demonstrate plan implementation. [Minn. R. 7007.0800, subp. 14, Minn. R. 7007.0800, subp. 16(J)] 

      5.1.12    Operation Changes: In any shutdown, breakdown, or deviation the Permittee shall immediately take all practical steps to modify operations to reduce the emission of any regulated air pollutant. The Commissioner may require feasible and practical modifications in the operation to reduce emissions of air pollutants. No emissions units that have an unreasonable shutdown or breakdown frequency of process or control equipment shall be permitted to operate. [Minn. R. 7019.1000, subp. 4] 

      5.1.13    Fugitive Emissions: Do not cause or permit the handling, use, transporting, or storage of any material in a manner which may allow avoidable amounts of particulate matter to become airborne. Comply with all other requirements listed in Minn. R. 7011.0150. [Minn. R. 7011.0150] 

      5.1.14    Noise: The Permittee shall comply with the noise standards set forth in Minn. R. 7030.0010 to 7030.0080 at all times during the operation of any emission units. This is a state only requirement and is not enforceable by the EPA Administrator or citizens under the Clean Air Act. [Minn. R. 7030.0010‐7030.0080] 

      5.1.15    Inspections: The Permittee shall comply with the inspection procedures and requirements as found in Minn. R. 7007.0800, subp. 9(A). [Minn. R. 7007.0800, subp. 9(A)] 

      5.1.16    The Permittee shall comply with the General Conditions listed in Minn. R. 7007.0800, subp. 16. [Minn. R. 7007.0800, subp. 16] 

      5.1.17    Changes/Modifications That May Trigger New Source Review and/or Part 63 Major Source Status Prohibited:   This permit contains limits and requirements to keep the facility a minor source under New Source Review and the National Emission Standards for Hazardous Air Pollutants (NESHAP) program. The Permittee cannot make any change to the source that qualifies as a Title I modification (as defined at Minn. R. 7007.0100, subp. 26), or that would make the source a major source under New Source Review or the NESHAP program until a permit amendment has been issued. This includes changes that might otherwise qualify as insignificant modifications, or that could otherwise be permitted as minor or moderate amendments. [Minn. R. 7011.7000, Title I Condition: Avoid major modification under 40 CFR 52.21(b)(23)(i) & Minn. R. 7007.3000, Title I Condition: Avoid major source under 40 CFR 52.21(b)(1)(i) & Minn. R. 7007.3000, Title I Condition: Avoid major source under 40 CFR 63.2] 

      5.1.18    Changes/Modifications That May Affect Modeled Parameters 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 20 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation or Processes Subject To Limits Based On 40 CFR Section 52.21 and Minn. R. 7007.3000:   Except as allowed by this permit, the Permittee can not make any changes to process equipment subject to requirements based on 40 CFR Section 52.21(j) and/or (k) without obtaining the appropriate amendment required under Minn. R. ch. 7007. This includes changes that might otherwise qualify as insignificant modifications, or that could otherwise be permitted as minor or moderate amendments. [Minn. R. 7007.0800, subp. 2] 

      5.1.19    Equipment Inventory: The Permittee shall maintain a written list of all emission units and control equipment that vent through STRU 5‐11, 68‐72, 78, 79, 82, 85 and 86. The Permittee shall update the list to include any new, modified, or replaced equipment prior to making any permitted changes described in subject items STRU 5‐11, 68‐72, 78, 79, 82, 85 or 86 of this permit.     The Permittee shall use the tables in Appendix F to maintain the list. Appropriate data shall be entered for all data fields in Appendix F emission unit tables A and B.     Removed equipment shall be shown in the table(s) with equipment data struck‐out. Modified equipment shall be shown in the table(s) with current equipment data, and past equipment data struck. [Minn. R. 7007.0800, subp. 2] 

      5.1.20    Equipment Labeling: The Permittee shall permanently affix a unique number to each emission unit for tracking purposes. The numbers shall correlate the unit to the appropriate EQUI, STRU, TREA, and COMG numbers used in this permit. The number can be affixed by placard, stencil, or other means. The number shall be maintained so that it is readable and visible at all times from a safe distance. If equipment is added, it shall be given a new unique number; numbers from replaced or removed equipment shall not be reused. [Minn. R. 7007.0800, subp. 2] 

      5.1.21    Daily Ethanol Production Recordkeeping: Once each day, the Permittee shall calculate and record the ethanol production for the previous calendar day. [Minn. R. 7007.0800, subps. 4‐5, Title I Condition: 40 CFR 52.21(j)(BACT) & Minn. R. 7007.3000, Title I Condition: Avoid major source under 40 CFR 52.21(b)(1)(i) & Minn. R. 7007.3000] 

      5.1.22    Recordkeeping: By the 15th day of every month, record the following:  1. gallons of pure (undenatured) ethanol produced during the previous month based on the daily production records, and   2. gallons of pure ethanol produced during the previous 12 months (12‐month rolling sum). [Minn. R. 7007.0800, subps. 4‐5] 

      5.1.23    Performance Testing: Conduct all performance tests in 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 21 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation accordance with Minn. R. ch. 7017 unless otherwise noted in in this permit. [Minn. R. ch. 7017] 

      5.1.24    Performance Test Notifications and Submittals: Performance Tests are due as outlined in this permit.  Performance Test Notification (written): due 30 days before each Performance Test Performance Test Plan: due 30 days before each Performance Test Performance Test Pre‐test Meeting: due 7 days before each Performance Test Performance Test Report: due 45 days after each Performance Test Performance Test Report ‐ Microfiche Copy: due 105 days after each Performance Test  The Notification, Test Plan, and Test Report may be submitted in an alternative format as allowed by Minn. R. 7017.2018. [Minn. R. 7017.2018, Minn. R. 7017.2030, subps. 1‐4, Minn. R. 7017.2035, subps. 1‐2] 

      5.1.25    Limits set as a result of a performance test (conducted before or after permit issuance) apply until superseded as stated in the MPCA's Notice of Compliance letter granting preliminary approval. Preliminary approval is based on formal review of a subsequent performance test on the same unit as specified by Minn. R. 7017.2025, subp. 3. The limit is final upon issuance of a permit amendment incorporating the change. [Minn. R. 7017.2025, subp. 3] 

      5.1.26    Monitoring Equipment Calibration ‐ The Permittee shall either:  1. Calibrate or replace required monitoring equipment every 12 months; or 2. Calibrate at the frequency stated in the  manufacturer's specifications.  For each monitor, the Permittee shall maintain a record of all calibrations, including the date conducted, and any corrective action that resulted. The Permittee shall include the calibration frequencies, procedures, and manufacturer's specifications (if applicable) in the Operations and Maintenance Plan. Any requirements applying to continuous emission monitors are listed separately in this permit. [Minn. R. 7007.0800, subp. 4(D)] 

      5.1.27    Operation of Monitoring Equipment: Unless noted elsewhere in this permit, monitoring a process or control equipment connected to that process is not necessary during periods when the process is shutdown, or during checks of the monitoring systems, such as calibration checks and zero and span adjustments. If monitoring records are required, they should reflect any such periods of process shutdown or checks of the monitoring system. [Minn. R. 7007.0800, subp. 4(D)] 

      5.1.28    Recordkeeping: Retain all records at the stationary source, unless otherwise specified within this permit, for a period of five (5) years from the date of monitoring, sample, 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 22 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation measurement, or report. Records which must be retained at this location include all calibration and maintenance records, all original recordings for continuous monitoring instrumentation, and copies of all reports required by the permit. Records must conform to the requirements listed in Minn. R. 7007.0800, subp. 5(A). [Minn. R. 7007.0800, subp. 5(C)] 

      5.1.29    Recordkeeping: Maintain records describing any insignificant modifications (as required by Minn. R. 7007.1250, subp. 3) or changes contravening permit terms (as required by Minn. R. 7007.1350, subp. 2), including records of the emissions resulting from those changes. [Minn. R. 7007.0800, subp. 5(B)] 

      5.1.30    If the Permittee determines that no permit amendment or notification is required prior to making a change, the Permittee must retain records of all calculations required under Minn. R. 7007.1200. [For expiring permits, these records shall be kept for a period of five years from the date the change was made or until permit reissuance, whichever is longer. ][For non‐expiring permits, these records shall be kept for a period of five years from the date that the change was made.] The records shall be kept at the stationary source for the current calendar year of operation and may be kept at the stationary source or office of the stationary source for all other years. The records may be maintained in either electronic or paper format. [Minn. R. 7007.1200, subp. 4] 

      5.1.31    Shutdown Notifications: Notify the Commissioner at least 24 hours in advance of a planned shutdown of any control equipment or process equipment if the shutdown would cause any increase in the emissions of any regulated air pollutant. If the owner or operator does not have advance knowledge of the shutdown, notification shall be made to the Commissioner as soon as possible after the shutdown. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R. 7019.1000, subp. 3.  At the time of notification, the owner or operator shall inform the Commissioner of the cause of the shutdown and the estimated duration. The owner or operator shall notify the Commissioner when the shutdown is over. [Minn. R. 7019.1000, subp. 3] 

      5.1.32    Breakdown Notifications: Notify the Commissioner within 24 hours of a breakdown of more than one hour duration of any control equipment or process equipment if the breakdown causes any increase in the emissions of any regulated air pollutant. The 24‐hour time period starts when the breakdown was discovered or reasonably should have been discovered by the owner or operator. However, notification is not required in the circumstances outlined in Items A, B and C of Minn. R. 7019.1000, subp. 2.  At the time of notification or as soon as possible thereafter, the owner or operator shall inform the Commissioner of the cause of the breakdown and the estimated duration. The 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 23 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation owner or operator shall notify the Commissioner when the breakdown is over. [Minn. R. 7019.1000, subp. 2] 

      5.1.33    Notification of Deviations Endangering Human Health or the Environment: As soon as possible after discovery, notify the Commissioner or the state duty officer, either orally or by facsimile, of any deviation from permit conditions which could endanger human health or the environment. [Minn. R. 7019.1000, subp. 1] 

      5.1.34    Notification of Deviations Endangering Human Health or the Environment Report: Within 2 working days of discovery, notify the Commissioner in writing of any deviation from permit conditions which could endanger human health or the environment. Include the following information in this written description:  1. the cause of the deviation;  2. the exact dates of the period of the deviation, if the deviation has been corrected; 3. whether or not the deviation has been corrected;  4. the anticipated time by which the deviation is expected to be corrected, if not yet corrected; and  5. steps taken or planned to reduce, eliminate, and prevent reoccurrence of the deviation. [Minn. R. 7019.1000, subp. 1] 

      5.1.35    Application for Permit Amendment: If a permit amendment is needed, submit an application in accordance with the requirements of Minn. R. 7007.1150 through Minn. R. 7007.1500. Submittal dates vary, depending on the type of amendment needed.  Upon adoption of a new or amended federal applicable requirement, and if there are more than 3 years remaining in the permit term, the Permittee shall file an application for an amendment within nine months of promulgation of the applicable requirement, pursuant to Minn. R. 7007.0400, subp. 3. [Minn. R. 7007.0400, subp. 3, Minn. R. 7007.1150 ‐ 7007.1500] 

      5.1.36    Extension Requests: The Permittee may apply for an Administrative Amendment to extend a deadline in a permit by no more than 120 days, provided the proposed deadline extension meets the requirements of Minn. R. 7007.1400, subp. 1(H). Performance testing deadlines from the General Provisions of 40 CFR pt. 60 and pt. 63 are examples of deadlines for which the MPCA does not have authority to grant extensions and therefore do not meet the requirements of Minn. R. 7007.1400, subp. 1(H). [Minn. R. 7007.1400, subp. 1(H)] 

      5.1.37    Emission Inventory Report: due on or before April 1 of each calendar year following permit issuance, to be submitted on a form approved by the Commissioner. [Minn. R. 7019.3000‐7019.3100] 

      5.1.38    Emission Fees: due 30 days after receipt of an MPCA bill. [Minn. R. 7002.0005‐7002.0095] 

      5.1.39    The Permittee must submit a Risk Management Plan (RMP) 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 24 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation under 40 CFR pt. 68. Each owner or operator of a stationary source, at which a regulated substance is present above a threshold quantity in a process, shall design and implement an accidental release prevention program. An initial RMP must be submitted no later than the latest of the following dates: 1) June 21, 1999; 2) Three years after the date on which a regulated substance is first listed under 40 CFR Section 68.130; or 3) The date on which a regulated substance is first present above a threshold quantity in a process. A full update and resubmission of the RMP is required at least once every five years. The five‐year anniversary date is reset whenever the Permittee fully updates and resubmits their RMP. Submit RMPs to the Risk Management Plan Reporting Center, P.O. Box 1515, Lanham‐Seabrook, Maryland 20703‐1515. RMP information may be obtained at http://www.epa.gov/swercepp or by calling 1‐800‐424‐9346. [40 CFR pt. 68] 

      5.1.40    CO Dispersion Modeling: The parameters used in CO modeling (for permit No. 14300014‐005) are listed in Appendix B of this permit. [Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.41    NOx Dispersion Modeling (Tier 1): The parameters used in NOx modeling (for permit No. 14300014‐008) are listed in Appendix B of this permit. The parameters describe the operation of the facility at maximum permitted capacity. The purpose of listing the parameters in Appendix B is to provide a benchmark for future changes. [Minn. R. 7009.0010‐7009.0080, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.42    Modeled Parameters for PM2.5: The parameters used in PM2.5 modeling dated April 2015 for permit number 14300014‐011 are listed in Appendix B of this permit. The parameters describe the operation of the facility at maximum permitted capacity. The purpose of listing the parameters in the appendix is to provide a benchmark for future changes. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.43    Equivalent or Better Dispersion (EBD) Modeling Triggers (Modeling Not Required) for PM2.5: Changes that do not require a permit amendment or require an administrative permit amendment do not trigger the EBD Modeling Submittal requirement. The Permittee shall keep updated records on site of all modeled PM2.5 parameters and emission rates listed in Appendix B. The Permittee shall submit any changes to modeled PM2.5 parameters and emission rates with the next required modeling submittal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.44    EBD Modeling Triggers (Modeling Required) for PM2.5: Changes that require, or would require, a minor, moderate, or major permit amendment due to an increase in PM2.5 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 25 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation emissions and affect any modeled PM2.5 parameter or emission rate listed in Appendix B, or an addition to the information documented in Appendix B, trigger the EBD Remodeling Submittal requirement. The Permittee shall include previously made changes to modeled PM2.5 parameters and emission rates listed in Appendix B that did not previously trigger the EBD Modeling Submittal requirement with this modeling submittal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.45    EBD Modeling at Reissuance for PM2.5: The Permittee shall submit an EBD Modeling Submittal with the permit reissuance application (due as stated elsewhere in this permit) that addresses any changes made during the permit term that did not require a permit amendment but that affected any modeled PM2.5 parameter or emission rate documented in Appendix B, or an addition to the information documented in Appendix B and that did not trigger the EBD Modeling Triggers (Modeling Required) requirement. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.46    EBD Modeling Submittal for PM2.5: For changes meeting the criteria in the EBD Modeling Triggers (Modeling Required) requirement, the Permittee shall submit an EBD modeling submittal in accordance with the current version of the MPCA Air Dispersion Modeling Guidance and shall wait for written approval (for major amendments, in the form of an issued permit amendment; for moderate amendments, in the form of a construction authorization letter) before making such changes. For minor amendments, written approval of the EBD modeling may be given before permit issuance; however, this approval applies only to the EBD modeling and not to any other changes. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.47    EBD Modeling Submittal Content for PM2.5: The information submitted must include, for stack and vent sources, source emission rate, location, height, diameters, exit velocity, exit temperature, discharge direction, use of rain caps or rain hats, and, if applicable, locations and dimensions of nearby buildings. For non‐stack/vent sources, this includes the source emission rate, location, size and shape, release height, and, if applicable, any emission rate scalars, and the initial lateral dimensions and initial vertical dimensions and adjacent building heights. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.48    Outdated EBD Baseline Modeling for PM2.5: Prior to conducting the EBD analysis, the Permittee shall use the 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 26 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation current version of the MPCA Air Dispersion Modeling Guidance to determine if the Baseline Modeling (the most recent refined modeling demonstration) is outdated. If the Baseline Modeling is outdated, the Permittee shall update the Baseline Modeling to be consistent with the current version of the MPCA Air Dispersion Modeling Guidance. The updated modeling will become the new Baseline Modeling.  This requirement does not require the Permittee to complete a new refined modeling demonstration using the revisions made for the EBD demonstration. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.49    EBD Modeling Results for PM2.5: The dispersion characteristics due to the revisions of the information in Appendix B must be equivalent to or better than the dispersion characteristics modeled April 2015. The Permittee shall demonstrate this equivalency in the proposal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.50    Computer Dispersion Modeling Triggers for PM2.5: The Permittee shall conduct a refined remodeling analysis in accordance with the Computer Dispersion Modeling requirements of this permit and the current version of the MPCA Air Dispersion Modeling Guidance if: (1) the results of the EBD modeling analysis do not demonstrate equivalent or better dispersion characteristics; (2) a conclusion cannot readily be made about the dispersion, or (3) the criteria in the EBD Modeling Triggers requirement are met and the Permittee has previously conducted three successive EBD analyses using the same Baseline Modeling. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.51    Computer Dispersion Modeling Protocol: due 180 days after receipt of written MPCA request for PM2.5 refined modeling. The Permittee shall submit a Computer Dispersion Modeling Protocol that is complete and approvable by MPCA by the deadline in this requirement. This protocol will describe the proposed modeling methodology and input data, in accordance with the current version of the MPCA Air Dispersion Modeling Guidance. The protocol must be based on projected operating conditions under the next permit term. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.52    Computer Dispersion Modeling Protocol: due 60 days after receipt of written MPCA request for revisions to the submitted protocol for PM2.5 modeling. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.53    Computer Dispersion Modeling Results: due 180 days after receipt of written MPCA approval of Computer Dispersion Modeling Protocol for PM2.5. The Permittee shall submit a 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 27 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation final Computer Dispersion Modeling Report that is complete and approvable by MPCA by the deadline in this requirement. The submittal shall adhere to the current version of the MPCA Air Dispersion Modeling Guidance and the approved Computer Dispersion Modeling Protocol. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9] 

      5.1.54    Modeled Parameters for PM10: The parameters used in PM10 modeling dated April 2015 for permit number 14300014‐011 are listed in Appendix B of this permit. The parameters describe the operation of the facility at maximum permitted capacity. The purpose of listing the parameters in the appendix is to provide a benchmark for future changes. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.55    Equivalent or Better Dispersion (EBD) Modeling Triggers (Modeling Not Required) for PM10: Changes that do not require a permit amendment or require an administrative permit amendment do not trigger the EBD Modeling Submittal requirement. The Permittee shall keep updated records on site of all modeled PM10 parameters and emission rates listed in Appendix B. The Permittee shall submit any changes to modeled PM10 parameters and emission rates with the next required modeling submittal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.56    EBD Modeling Triggers (Modeling Required) for PM10: Changes that require, or would require, a minor, moderate, or major permit amendment due to an increase in PM10 emissions and affect any modeled PM10 parameter or emission rate listed in Appendix B, or an addition to the information documented in Appendix B, trigger the EBD Remodeling Submittal requirement. The Permittee shall include previously made changes to modeled PM10 parameters and emission rates listed in Appendix B that did not previously trigger the EBD Modeling Submittal requirement with this modeling submittal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.57    EBD Modeling at Reissuance for PM10: The Permittee shall submit an EBD Modeling Submittal with the permit reissuance application (due as stated elsewhere in this permit) that addresses any changes made during the permit term that did not require a permit amendment but that affected any modeled PM10 parameter or emission rate documented in 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 28 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation Appendix B, or an addition to the information documented in Appendix B and that did not trigger the EBD Modeling Triggers (Modeling Required) requirement. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.58    EBD Modeling Submittal for PM10: For changes meeting the criteria in the EBD Modeling Triggers (Modeling Required) requirement, the Permittee shall submit an EBD modeling submittal in accordance with the current version of the MPCA Air Dispersion Modeling Guidance and shall wait for written approval (for major amendments, in the form of an issued permit amendment; for moderate amendments, in the form of a construction authorization letter) before making such changes. For minor amendments, written approval of the EBD modeling may be given before permit issuance; however, this approval applies only to the EBD modeling and not to any other changes. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 4, Minn. R. 7007.0800, subps. 1‐2, Minn. R. 7009.0010‐7009.0080, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.59    EBD Modeling Submittal Content for PM10: The information submitted must include, for stack and vent sources, source emission rate, location, height, diameters, exit velocity, exit temperature, discharge direction, use of rain caps or rain hats, and, if applicable, locations and dimensions of nearby buildings. For non‐stack/vent sources, this includes the source emission rate, location, size and shape, release height, and, if applicable, any emission rate scalars, and the initial lateral dimensions and initial vertical dimensions and adjacent building heights. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.60    Outdated EBD Baseline Modeling for PM10: Prior to conducting the EBD analysis, the Permittee shall use the current version of the MPCA Air Dispersion Modeling Guidance to determine if the Baseline Modeling (the most recent refined modeling demonstration) is outdated. If the Baseline Modeling is outdated, the Permittee shall update the Baseline Modeling to be consistent with the current version of the MPCA Air Dispersion Modeling Guidance. The updated modeling will become the new Baseline Modeling.    This requirement does not require the Permittee to complete a new refined modeling demonstration using the revisions made for the EBD demonstration. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.61    EBD Modeling Results for PM10: The dispersion characteristics 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 29 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation due to the revisions of the information in Appendix B must be equivalent to or better than the dispersion characteristics modeled April 2015. The Permittee shall demonstrate this equivalency in the proposal. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.62    Computer Dispersion Modeling Triggers for PM10: The Permittee shall conduct a refined remodeling analysis in accordance with the Computer Dispersion Modeling requirements of this permit and the current version of the MPCA Air Dispersion Modeling Guidance if: (1) the results of the EBD modeling analysis do not demonstrate equivalent or better dispersion characteristics; (2) a conclusion cannot readily be made about the dispersion, or (3) the criteria in the EBD Modeling Triggers requirement are met and the Permittee has previously conducted three successive EBD analyses using the same Baseline Modeling. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.63    Computer Dispersion Modeling Protocol: due 180 days after receipt of written MPCA request for PM10 refined modeling. The Permittee shall submit a Computer Dispersion Modeling Protocol that is complete and approvable by MPCA by the deadline in this requirement. This protocol will describe the proposed modeling methodology and input data, in accordance with the current version of the MPCA Air Dispersion Modeling Guidance. The protocol must be based on projected operating conditions under the next permit term. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.64    Computer Dispersion Modeling Protocol: due 60 days after receipt of written MPCA request for revisions to the submitted protocol for PM10 modeling. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

      5.1.65    Computer Dispersion Modeling Results: due 180 days after receipt of written MPCA approval of Computer Dispersion Modeling Protocol for PM10. The Permittee shall submit a final Computer Dispersion Modeling Report that is complete and approvable by MPCA by the deadline in this requirement. The submittal shall adhere to the current version of the MPCA Air Dispersion Modeling Guidance and the approved Computer Dispersion Modeling Protocol. [Minn. R. 7007.0100, subp. 7(A), 7(L), & 7(M), Minn. R. 7007.0800, subp. 2, Minn. Stat. 116.07, subd. 4a, Minn. Stat. 116.07, subd. 9, Title I Condition: 40 CFR 52.21(k)(1)(i) & Minn. R. 7007.3000] 

           COMG 3  GP006  Natural Gas   

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 30 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation Usage Recordkeeping 

      5.2.1    Recordkeeping ‐ Daily Fuel Usage: Once each day, record the total cubic feet of natural gas combusted by all COMG 3 units during the previous calendar day. [Minn. R. 7011.7000, Title I Condition: Avoid major source under 40 CFR 63.2] 

      5.2.2    Recordkeeping ‐ Monthly Fuel Usage: By the 15th day of each month, calculate and record the total cubic feet of natural gas combusted by all COMG 3 units during the previous calendar month. [Minn. R. 7007.0800, subp. 5] 

           COMG 4  GP008  HAP Limits, 

    Monitoring, and Recordkeeping 

     

      5.3.1    Air pollution control equipment requirements for COMG 4 HAP emitting sources (that use HAP air pollution control equipment) are found under the following subject items in this permit: 1. STRU 79 and TREA 30 (East Plant Fermentation Equipment and Scrubber) 2. STRU 69 and TREA 31 (East Plant Distillation Equipment and Scrubber) 3. STRU 87 and TREA 45 (East Plant DDGS Dryers and Valveless Regenerative Thermal Oxidizer) 4. STRU 68 and TREA 34 (West Plant Fermentation/Distillation Equipment and CO2 Scrubber) 5. STRU 70 and TREA 29 (West Plant DDGS Dryer and Cooler, and Valveless Regenerative Thermal Oxidizer) 6. STRU 9 and TREA 11 (East Plant DDGS Dryers and new Valveless Regenerative Thermal Oxidizer) HAP emissions from all other COMG 4 subject items are uncontrolled. [Minn. R. 7007.0800, subp. 2] 

      5.3.2    HAPs ‐ Total 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 31 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation  Step 1) Monthly acetaldehyde, acrolein, formaldehyde, and methanol emissions from EQUI 179, STRU 9, 68‐70, 79 and 87 during the previous calendar month using Equation 1.  Equation 1: Hp = [(A1c x B1) + (A1u x B1/(1‐CE)) + (A2c x B2) +  (A2u x B2/(1‐CE))...etc.]/2000     Where:     Hp = Individual acetaldehyde, acrolein, formaldehyde, and methanol process emissions; tons/month  A#c = Controlled HAP source (STRU or EQUI) operating hours (recorded under subject items STRU 9, 68‐70, 79 & 87) during the previous month when all applicable control equipment operating parameters were at or above the required minimum; for EQUI 179 this value is the operating hours recorded under EQUI 179; hrs/month  B# = HAP controlled emission rate; lb/hr  A#u = Controlled HAP source operating hours during the previous month when any applicable control equipment operating parameter was below the required minimum (recorded under subject items STRU 9, 68‐70, 79 & 87; hrs/month  CE = decimal equivalent of control device percent control efficiency for the specific pollutant as defined below  The Permittee shall use the following values for TREA in Equation 1:    TREA 30 East Fermentation Scrubber and TREA 31 East Distillation Scrubber   (both w/no additive):  Acetaldehyde:  32.5%  Acrolein:           32.5%  Formaldehyde: 32.5%  Methanol:         95%    TREA 34 West Scrubber   (w/acetaldehyde control additive)  Acetaldehyde:  85%  Acrolein:           32.5%  Formaldehyde: 85%  Methanol:         95%    TREA 11 East VRTO and TREA 29 West VRTO  Acetaldehyde:  95%  Acrolein:           95%  Formaldehyde: 95%  Methanol:         95%    For EQUI 179 (which is uncontrolled for HAPs), A#c is monthly operating hours and B# is the (uncontrolled) lb/hr emission rate determined by stack testing. In no instance shall a value be established for A#u for EQUI 179 because the unit does not have HAP emission control equipment. 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 32 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation    The Permittee shall establish and re‐confirm emission factors for these pollutants based on site‐specific performance test data and use the factors to calculate actual emissions of these individual HAPs.    Step 2) The natural gas combustion formaldehyde and hexane emissions (lb/month), for the previous calendar month using Equation 2.    Equation 2: Hc = (NG * EF)/2000    Where:    Hc = Individual formaldehyde and hexane combustion emissions, tons/month  NG = COMG 3 monthly natural gas usage, mmcf/month  EF = AP‐42 Table 1.4‐3 emission factor (7.5E‐02 lb/mmcf; 1.8E+00 lb/mmcf, formaldehyde and hexane, respectively)    Step 3) The natural gas combustion total HAP (minus formaldehyde and hexane) emissions for the previous calendar month using Equation 3.    Equation 3: Hct = (NG * 1.3E‐02)/2000    Where:    Hct = monthly total HAP (minus formaldehyde and hexane) natural gas combustion emissions, tons/month  NG = COMG 3 monthly natural gas usage, mmcf/month  1.3E‐02 =  composite total HAP emission factor (minus formaldehyde and hexane based on AP‐42 Tables 1.4‐3 and 1.4‐4)    Step 4) The total monthly formaldehyde emissions (lb/month) by summing the monthly formaldehyde emissions determined by Equations 1 and 2.    Step 5) The monthly total HAP emissions for the previous month by summing the acetaldehyde, acrolein, and methanol monthly emissions determined in Step 1 above, the formaldehyde monthly emissions determined in Step 4 above, the hexane monthly emissions determined in Step 2 above, and the total combustion HAP minus formaldehyde and hexane monthly emissions determined in Step 3 above.    (continued below). [Minn. R. 7007.0800, subps. 4‐5, Minn. R. 7011.7000, Title I Condition: Avoid major source under 40 CFR 63.2] 

      5.3.6    (continued from above) Step 6) The 12‐month rolling sum emissions of each single HAP species for the previous 12‐month period by individually 

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 33 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation summing the monthly emissions data for acetaldehyde, acrolein, and methanol for the previous 12 months determined in Step 1, by summing the monthly formaldehyde emissions data determined in Step 4, and by summing the hexane emissions data determined in Step 2.  Step 7) The 12‐month rolling sum total HAP emissions by summing the monthly total HAPs emissions data determined in Step 5 above, for the previous 12 months. [Minn. R. 7007.0800, subps. 4‐5, Minn. R. 7011.7000, Title I Condition: Avoid major source under 40 CFR 63.2] 

           COMG 6  GP007  Leaks From 

    Equipment In VOC Service ‐ subp. VV 

     

      5.4.1    The requirements of NSPS subp. VV remain effective until construction commences on EQUI 161 (West Plant Fermenter #6) triggering the requirements of NSPS subp. VVa for FUGI 6 and 7. When construction commences on EQUI 161, the requirements of NSPS subp. VVa located at COMG 9 will become effective and the requirements of NSPS subp. VV at COMG 6 will expire. [Minn. R. 7007.0800, subp. 2] 

      5.4.2    The requirements of COMG 6 apply separately to FUGI 6 and 7. [Minn. R. 7007.0800, subp. 2] 

      5.4.3    The Permittee shall meet the requirements of 40 CFR pt. 60, subp. VV (until the affected facility becomes subject to 40 CFR pt. 60, subp. VVa) for the control of VOC emissions from leaks from equipment in VOC service. [Title I Condition: 40 CFR 52.21(j)(BACT) & Minn. R. 7007.3000] 

      5.4.4    Pumps in light liquid service:  (a)(1) Each pump in light liquid service shall be monitored monthly to detect leaks by the methods specified in 40 CFR Section 60.485(b), except as provided in 40 CFR Section 60.482‐1(c) and paragraphs (d), (e), and (f).  (2) Each pump in light liquid service shall be checked by visual inspection each calendar week for indications of liquids dripping from the seal. [40 CFR 60.482‐2(a), Minn. R. 7011.2900] 

      5.4.5    (b)(1) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.  (2) If there are indications of liquids dripping from the pump seal, a leak is detected.  (c)(1) When a leak is detected, it shall be repaired as soon as practicable, but not later than 15 calendar days after it is detected, except as proved in 40 CFR Section 60.482‐9 (Delay of Repair).  

  • Permit issued:  March 23, 2016  14300014‐ 011 Permit expires:  March 6, 2019  Page 34 of 230  

     

    Subject Item  Sec.SI.Reqt  SI des:SI desc  Requirement & Citation (2) A first attempt at repair shall be made no later than 5 calendar days after each leak is detected. [40 CFR 60.482‐2(b)&(c), Minn. R. 7011.2900] 

      5.4.6    (a) Each compressor shall be equipped with a seal system that includes a barrier fluid system and that prevents leakage of VOC to the atmosphere, except as provided in 40 CFR Section 60.482‐1(c) and 40 CFR Section 60.482‐3(h) and (i). [40 CFR 60.482‐3(a), Minn. R. 7011.2900] 

      5.4.7    (b) Each compressor seal system shall be:  (1) Operated with the barrier fluid at a pressure that is greater than the compressor stuffing box pressure; or  (2) Equipped with a barrier fluid system that is connected by a closed vent system to a control device that complies with the requirements of 40 CFR Section 60.482‐10; or  (3) Equipped with a system that purges the barrier fluid into a process stream with zero VOC emissions to the atmosphere. [40 CFR 60.482‐3(b), Minn. R. 7011.2900] 

      5.4.8    (c) The barrier fluid system shall be in heavy liquid service or shall not be in VOC service.  (d) Each barrier fluid system shall be equipped with a sensor that will detect failure of the seal system, barrier fluid system, or both. [40 CFR 60.482‐3(c)&(d), Minn. R. 7011.2900] 

      5.4.9    (e)(1) Each sensor shall be checked daily or shall be equipped with an audible alarm.  (2) The owner or operator shall determine, based on design considerations and operating experience, a criterion that indicates failure of the seal system, the barrier fluid system, or both. [40 CFR 60.482‐3(e), Minn. R. 7011.2900] 

      5.4.10    (f) If the sensor indicates failure of the seal system, the barrier system, or both based on the criterion determined under p