air-summary template - environmental protection agency · (raw mill/kiln) volumetric flow 11240000...
TRANSCRIPT
3
AIR-summary template Lic No: P00378-02 Year 2014
Answer all questions and complete all tables where relevant
2
Yes
3Basic air
monitoring
checklist AGN2 Yes
Table A1: Licensed Mass Emissions/Ambient data-periodic monitoring (non-continuous)
Emission
reference no: Parameter/ Substance
Frequency of
Monitoring
ELV in licence or
any revision
therof Licence Compliance criteria Measured value
Unit of
measurement
Compliant with
licence limit Method of analysis
Annual mass
load (kg)
Comments -reason for change in %
mass load from previous year if
applicableA2-01 ESP
Exhaust
(Raw Mill/Kiln)
Dioxins and furans Quarterly 0.1ng/m3 100 % of values < ELV 0.002 ng/Nm3 yes EN 1948-1 to3:20036.3*10-7
Part of Schedule B since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Total heavy metals Quarterly 0.5mg/m3 100 % of values < ELV 0.09 mg/Nm3 yes EN 14385:2004 28.35 Part of Schedule B since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Mercury and compounds
(as Hg)Quarterly 0.05mg/m3 100 % of values < ELV 0.007 mg/Nm3 yes EN 13211:2001 2.2 Part of Schedule B since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Cadmium and
compounds (as Cd)Quarterly
Sum of Cd and TI
0.05mg/m3100 % of values < ELV 0.0011 mg/Nm3 yes EN 14385:2004 0.35 Part of Schedule B since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Thallium compounds QuarterlySum of Cd and TI
0.05mg/m3100 % of values < ELV 0.0012 mg/Nm3 yes EN 14385:2004 0.38 Part of Schedule B since Nov 2014
A2-02 ESP Exhaust
(Grate Cooler)Total Particulates Quarterly 50mg/m3 100 % of values < ELV 18.2 mg/Nm3 yes EN 13284-1 21312.1
A2-03 Bag Filter
Exhaust (Coal Mill)Total Particulates Quarterly 50mg/m3 100 % of values < ELV 22.5 mg/Nm3 yes EN 13284-1 3263.1
A2-04 Bag Filter
Exhaust
(Cement Mill)
Total Particulates Quarterly 50mg/m3 100 % of values < ELV 4.2 mg/Nm3 yes EN 13284-1 830.7
A2-05 Bag Filter
Exhaust SepaxTotal Particulates Quarterly 50mg/m3 100 % of values < ELV 7.7 mg/Nm3 yes EN 13284-1 5314.7
Note 1: Volumetric flow shall be included as a reportable parameter
1
Does your site have licensed air emissions? If yes please complete table A1 and A2 below for the current
reporting year and answer further questions. If you do not have licenced emissions and do not complete a
solvent management plan (table A4 and A5) you do not need to complete the tables
Yes
Additional information
Periodic/Non-Continuous Monitoring
Are there any results in breach of licence requirements? If yes please provide brief details in the comment section of
TableA1 below
Was all monitoring carried out in accordance with EPA guidance
note AG2 and using the basic air monitoring checklist?
4
AIR-summary template Lic No: P00378-02 Year 2014
4Yes
5Yes
6Yes
7Yes
Table A2: Summary of average emissions -continuous monitoring
Emission
reference no:Parameter/ Substance
ELV in licence or any
revision therofAveraging Period Compliance Criteria
Units of
measurementAnnual Emission Annual maximum
Monitoring
Equipment
downtime (hours)
Number of ELV
exceedences in
current
reporting year
Comments
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Sulpher Dioxide 500 mg/m3 Daily Average97 % of 48 hour averages < 110
% of ELVmg/Nm3 265.7 <500mg/m3
22 hours
calibration and
maintenance
0
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Nitrogen Oxides (NO2)<1300mg/m3
<800mg/m3Daily average
97 % of 48 hour averages < 110
% of ELVmg/Nm3 860
<1300mg/m3
<800mg/m3
22 hours planned
maintenance /
calibrations
0
ELV for NO2 <1300mg/m3 until
Nov 2014 <800mg/m3 after Nov
2014 i.e since commencment of
SRF
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Total Particulates 30mg/m3 Daily average97 % of 48 hour averages < 110
% of ELVmg/Nm3 20.3 >30mg/m3 10
3 incidents
reported
Exceedance for dust on A2-01
reported as incident to EPA via
Alder,19/11/2014,28/11/2014,9/12
/2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Hydrogen Fluoride 1mg/m3 Daily average97 % of 48 hour averages < 110
% of ELVmg/Nm3 0.15 <1mg/m3 0 0 Continuous since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Hydrogen Chloride 10 mg/m3 Daily average97 % of 48 hour averages < 110
% of ELVmg/Nm3 2.8 >10 mg/m3 0 1
Exceedance for HCL on A2-01
reported as incident to EPA via
Alder, 9/12/2014 Continuous since
Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Total Organic Carbon (as
C)40 mg/m3 Daily Average
97 % of 48 hour averages < 110
% of ELVmg/Nm3 12.4 >40mg/m3 0 0 Continuous since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
Carbon monoxide 1500mg/m3 Daily average97 % of 48 hour averages < 110
% of ELVmg/Nm3 249.5 <1500mg/m3 0 0 Continuous since Nov 2014
A2-01 ESP
Exhaust
(Raw Mill/Kiln)
volumetric flow 11240000 Nm3 Daily average Daily average < ELV Nm3 443079 <11240000 Nm3 0 1
Continuous since Nov 2014
Exceedence in Q2, technical
amendment requested.
note 1: Volumetric flow shall be included as a reportable parameter.
Did your site experience any abatement system bypasses? If yes please detail them in table A3 below
If yes please review your continuous monitoring data and report the required fields below in Table A2 and compare
it to its relevant Emission Limit Value (ELV)
Did continuous monitoring equipment experience downtime? If yes please record downtime in table A2 below
Do you have a proactive service agreement for each piece of continuous monitoring equipment?
Continuous Monitoring
Does your site carry out continuous air emissions monitoring?
5
AIR-summary template Lic No: P00378-02 Year 2014
Table A3: Abatement system bypass reporting table Bypass protocol
Date* Duration** (hours) Location
30/05/2014 <30mins ESP Trip
21/06/2015 <30mins ESP Trip
8 Do you have a total Emission Limit Value of direct and fugitive emissions on site? if yes please fill out tables A4 and A5
SELECT
Solvent
regulations
Reporting year Total solvent input on
site (kg)
Total VOC emissions
to Air from entire
site (direct and
fugitive)
Total VOC
emissions as %of
solvent input Total Emission Limit Value
(ELV) in licence or any revision
therof
Compliance
SELECT
SELECT
(I) Inputs (kg)
Solvent (I) Inputs (kg)
Organic solvent
emission in waste
gases(kg)
Solvents lost in
water (kg)
Collected waste solvent (kg) Fugitive Organic
Solvent (kg)
Solvent released
in other ways e.g.
by-passes (kg)
Solvents destroyed
onsite through
physical reaction
Total emission of
Solvent to air (kg)
Total
Plant stopped
(O) Outputs (kg)
* this should include all dates that an abatement system bypass occurred
** an accurate record of time bypass beginning and end should be logged on site and maintained for future Agency
inspections please refer to bypass protocol link
Table A4: Solvent Management Plan Summary
Total VOC Emission limit value
Reason for bypass Impact magnitude Corrective action
Table A5: Solvent Mass Balance summary
Fault caused ESP Trip local
Please refer to linked solvent regulations to
complete table 5 and 6
Solvent use and management on site
ESP restarted
High Temperature caused ESP Trip local
6
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P00378-02 Year 2014
2
No
Location
reference
Location
relative to site
activities
PRTR ParameterLicenced
Parameter
Monitoring
date
ELV or trigger
level in licence
or any revision
thereof*
Licence
Compliance
criteria
Measured valueUnit of
measurement
Compliant with
licenceComments
*trigger values may be agreed by the Agency outside of licence conditions
Location
Reference
Date of
inspectionSource of
contamination
3Yes
4
External /Internal
Lab Quality
checklist
Assessment of
results checklist Yes
Additional information
1
Does your site have licensed emissions direct to surface water or direct to sewer? If yes
please complete table W2 and W3 below for the current reporting year and answer
further questions. If you do not have licenced emissions you only need to complete table
W1 and or W2 for storm water analysis and visual inspectionsNo
Was it a requirement of your licence to carry out visual inspections on any surface water
discharges or watercourses on or near your site? If yes please complete table W2 below
summarising only any evidence of contamination noted during visual inspections
Table W1 Storm water monitoring
Table W2 Visual inspections-Please only enter details where contamination was observed.
Description of contamination Corrective action Comments
Licensed Emissions to water and /or wastewater(sewer)-periodic monitoring (non-continuous)
Was there any result in breach of licence requirements? If yes please provide brief details in the
comment section of Table W3 below Additional information
Was all monitoring carried out in accordance with EPA
guidance and checklists for Quality of Aqueous Monitoring
Data Reported to the EPA? If no please detail what areas
require improvement in additional information box
7
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P00378-02 Year 2014
Additional informationTable W3: Licensed Emissions to water and /or wastewater (sewer)-periodic monitoring (non-continuous)
Emission
reference no:
Emission
released toParameter/
SubstanceNote 1Type of sample
Frequency of
monitoringAveraging period
ELV or trigger
values in licence or
any revision
therofNote 2
Licence Compliance criteria Measured valueUnit of
measurement
Compliant with
licenceMethod of analysis
Procedural
reference source
Procedural
reference
standard
number
Annual mass load
(kg)Comments
SW1 Water Temperature composite Weekly Weekly 25 No temperature value shall
exceed the limit value.11.85 degrees C yes INSTRUMENTAL METHODS I.S. (Irish Standard) N/A
SW1 Water pH composite Weekly Weekly 06-09.No pH value shall deviate from
the specified range.7.62 pH units pH Meter (Electrode) I.S. (Irish Standard)
SW1 Water COD composite Weekly Weekly 10.6 mg/L yes Other (please describe) I.S. (Irish Standard)
SW1 Water Suspended Solids composite Weekly Weekly 35 All values < ELV 11.47 mg/L yes Gravimetric analysis I.S. (Irish Standard) 3116.10
SW1 Water Total Dissolved Solids composite Weekly Weekly 191 mg/L yes Gravimetric analysis I.S. (Irish Standard) 51900.35
SW1 Water Ammonia (as N) composite Weekly Weekly 0.053 mg/L yes Spectrophotometry (Colorimetry) EW094 14.33closed reflux
coloimetry
SW1 Water BOD composite Weekly Weekly 10 All values < ELV <1 mg/L yes Other (please describe) EW001 271.78 BOD 5 day test
SW1 WaterChromium and
compounds (as Cr)composite Monthly Monthly 0.03 All values < ELV 0.022 mg/L yes Spectrophotometry (Colorimetry) EW084 5.86
Chromium VI
HACH method
SW1 Water Aluminium composite Monthly Monthly 0.02 All values < ELV 0.007 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130 1.97
SW1 Water Mineral oils composite Monthly Monthly 2 All values < ELV 0.01 mg/L yesTotal Petroleum Hydrocarbons by GC-
FIDEO063 2.72
SW1 WaterNickel and compounds
(as Ni)composite Quarterly Monthly 0.8415 mg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Chlorides (as Cl) composite Quarterly Monthly 17.85 mg/L yes Spectrophotometry (Colorimetry) EW154
SW1 Water Total phosphorus composite Quarterly Monthly 0.0235 mg/L yes Spectrophotometry (Colorimetry) EW146
SW1 Water PAHs composite Quarterly Monthly <LOQ mg/L yesGCMS (Gas Chromatography Mass
Spectroscopy)EO129
SW1 Water Aluminium composite Annually Monthly <5 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Barium composite Annually Monthly 36.6 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterCadmium and
compounds (as Cd)composite Annually Monthly <0.1 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Cobalt composite Annually Monthly <1 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterCopper and compounds
(as Cu)composite Annually Monthly 0.008 mg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Iron composite Annually Monthly <20 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterLead and compounds (as
Pb)composite Annually Monthly <0.3 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Magnesium composite Annually Monthly 4.7 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Manganese (as Mn) composite Annually Monthly 2.5 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterMercury and compounds
(as Hg)composite Annually Monthly <0.02 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterNickel and compounds
(as Ni)composite Annually Monthly 0.9 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterZinc and compounds (as
Zn)composite Annually Monthly 7.1 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterArsenic and compounds
(as As)composite Annually Monthly 0.2 µg/L yes
ICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Antimony (as Sb) composite Annually Monthly <0.1 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Selenium composite Annually Monthly 0.5 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Boron composite Annually Monthly <0.2 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Tin composite Annually Monthly <1 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Molybdenum composite Annually Monthly <1 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Calcium composite Annually Monthly 51.1 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Potassium composite Annually Monthly 3.4 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 Water Vanadium composite Annually Monthly 0.1 µg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SW1 WaterChromium and
compounds (as Cr)composite Annually Monthly <1 µg/L yes Spectrophotometry (Colorimetry) EW084
SW1 Water Sodium composite Annually Monthly 11.2 mg/L yesICP / ICPMS (Inductively Coupled
Plasma - Mass Spectrometry)EM130
SewerWastewater/Se
werBOD N/A N/A Yearly N/A N/A N/A mg/L yes Other (please describe)
Other (please
specify)
Estimate
(based on 473.04 N/A
Note 1: Volumetric flow shall be included as a reportable parameter
Note 2: Where Emission Limit Values (ELV) do not apply to your licence please compare results against EQS for Surface water or relevant receptor quality standards
8
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P00378-02 Year 2014
Additional information
Yes
5
No
6Yes
7No
8 Table W4: Summary of average emissions -continuous monitoring
Emission
reference no:
Emission
released to Parameter/ Substance
ELV or trigger
values in licence or
any revision
thereof
Averaging
Period
Compliance
Criteria
Units of
measurement
Annual Emission for current
reporting year (kg)
% change +/- from
previous reporting
year
Monitoring
Equipment
downtime (hours)
Number of ELV
exceedences in
reporting year
SW1 Water volumetric flow 3000 1 hour All values < ELV m3/day Avg 31.03 m3/hour 2 0
SW1 Water pH 6 to 9 30 minutes All values < ELV pH units Avg 7.61 7 0
note 1: Volumetric flow shall be included as a reportable parameter.
Table W5: Abatement system bypass reporting tableDate Duration (hours) Location Resultant
emissions
Reason for
bypass
Corrective
action*
Was a report
submitted to the
EPA?
When was this report submitted?
*Measures taken or proposed to reduce or limit bypass frequency
Continuous monitoring Additional Information
Does your site carry out continuous emissions to water/sewer monitoring?
If yes please summarise your continuous monitoring data below in Table W4 and compare it to
its relevant Emission Limit Value (ELV)
downtime cleaning and calibration
Did continuous monitoring equipment experience downtime? If yes please record downtime in
table W4 below
Do you have a proactive service contract for each piece of continuous monitoring equipment on
site?
Did abatement system bypass occur during the reporting year? If yes please complete table W5
below
Comments
downtime cleaning and calibration
9
Bund/Pipeline testing template Lic No: P00378-02 Year 2014
Bund testing Additional information
1 Yes
2 Please provide integrity testing frequency period 3 years
3 Yes
4 How many bunds are on site? 32
5 How many of these bunds have been tested within the required test schedule? 32
6 How many mobile bunds are on site? 26
7 Are the mobile bunds included in the bund test schedule? Yes
8 How many of these mobile bunds have been tested within the required test schedule? 26
9 1
10 1
Please list any sump integrity failures in table B1
11 No
12 SELECT
13 Is the Fire Water Retention Pond included in your integrity test programme? No
Bund/Containment
structure IDType Specify Other type Product containment Actual capacity Capacity required* Type of integrity test Other test type Test date
Integrity reports
maintained on site?Results of test
Integrity test failure
explanation <50 wordsCorrective action taken
Scheduled date
for retest
Results of
retest(if in
current
reporting year)Gas Oil Bund reinforced concrete Gas Oil 121.43m3 25% Hydraulic test 16/07/2014 Yes Pass 2017
Grinding Aid Bund reinforced concrete Grinding Aid 82.75m3 25% Hydraulic test 31/07/2014 Yes Pass 2017
Waste Oil Storage reinforced concrete Waste Oil 17m3 25% Hydraulic test 17/06/2014 Yes Pass 2017
Raw Mill Hydraulic Pump Sump reinforced concrete Oil 46m3 25% Hydraulic test 31/07/2014 Yes Pass 2017
Ammonia Bund reinforced concrete Ammonia 250m3 25% Hydraulic test 17/09/2014 Yes Pass 2017
IBC Store other (please specify) Steel Various 2.5m3 25% Hydraulic test 14/05/2013 Yes Pass 2016
Oil S 2 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 3 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 4 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 5 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 6 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 7 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S10 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 1 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 8 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
Oil S 9 other (please specify) Steel Various 0.17m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
15 prefabricated Various 0.19m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
SK4 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK5 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
10 prefabricated Various 1.1m3 25% or 110% Hydraulic test 14/05/2013 Yes Failed Bund replaced -
21 prefabricated Various 1.1m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
14 prefabricated Various 0.19m3 25% or 110% Hydraulic test 17/06/2014 Yes Failed Bund to be replaced -
13 prefabricated Various 0.25m3 25% or 110% Hydraulic test 17/06/2014 Yes Pass 2017
SK7 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK1 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK9 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
16 prefabricated Various 0.25m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK10 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
31 prefabricated Various 0.25m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
33 prefabricated Various 0.25m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
11 prefabricated Various 1.1m3 25% or 110% Hydraulic test new bund Yes Pass 2016
12 prefabricated Various 0.25m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK6 other (please specify) Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
SK2 prefabricated Steel Various 0.2m3 25% or 110% Hydraulic test 14/05/2013 Yes Pass 2016
* Capacity required should comply with 25% or 110% containment rule as detailed in your licence Commentary
15 bunding and storage guidelines Yes
16 Are channels/transfer systems to remote containment systems tested? No Correspondance with EPA
17 Are channels/transfer systems compliant in both integrity and available volume? No Correspondance with EPA
1 Yes No underground structures onsite
2 Please provide integrity testing frequency period Other (please specify) N/A
*please note integrity testing means water tightness testing for process and foul pipelines (as required under your licence)
Structure ID Type system Material of construction:
Does this structure have
Secondary containment?
Type of secondary
containmentType integrity testing
Integrity reports
maintained on site? Results of test
Integrity test failure
explanation <50
words
Corrective action
taken
Scheduled date
for retest
Results of retest(if in current
reporting year)
Table B1: Summary details of bund /containment structure integrity test
dropdown menu click to see options
Are you required by your licence to undertake integrity testing on bunds and containment structures ? if yes please fill out table B1 below listing all new bunds and
containment structures on site, in addition to all bunds which failed the integrity test-all bunding structures which failed including mobile bunds must be listed in the table
below, please include all bunds outside the licenced testing period (mobile bunds and chemstore included)
Please use commentary for additional details not answered by tables/ questions above
Does the site maintain a register of bunds, underground pipelines (including stormwater and foul), Tanks, sumps and containers? (containers refers to "Chemstore" type units
and mobile bunds)
Has integrity testing been carried out in accordance with licence requirements and are all structures tested in line with
BS8007/EPA Guidance?
Do all sumps and chambers have high level liquid alarms?
If yes to Q11 are these failsafe systems included in a maintenance and testing programme?
Pipeline/underground structure testing
Are you required by your licence to undertake integrity testing* on underground structures e.g. pipelines or sumps etc ? if yes please fill out table 2 below listing all
underground structures and pipelines on site which failed the integrity test and all which have not been tested withing the integrity test period as specified
Table B2: Summary details of pipeline/underground structures integrity test
How many sumps on site are included in the integrity test schedule?
How many of these sumps are integrity tested within the test schedule?
10
Groundwater/Soil monitoring template Lic No: P00378-02 Year 2014
Comments
1yes
2 yes IED Directive
3yes
4
Groundwater
monitoring
template no
5N/A
6
7 N/A8 yes
9yes
Condition of 6.17 of the
licence
10yes
Condition of 6.17 of the
licence11 N/A
12 no
Table 1: Upgradient Groundwater monitoring results
Date of
sampling
Sample
location
reference
Parameter/
SubstanceMethodology
Monitoring
frequency
Maximum
Concentration++
Average
Concentration+unit GTV's* SELECT**
Upward trend in
pollutant
concentration over
last 5 years of
monitoring data
.+ where average indicates arithmetic mean
.++ maximum concentration indicates the maximum measured concentration from all monitoring results produced during the reporting year
Table 2: Downgradient Groundwater monitoring results
Date of
sampling
Sample
location
reference
Parameter/
SubstanceMethodology
Monitoring
frequency
Maximum
Concentration
Average
Concentrationunit GTV's* SELECT**
Upward trend in
yearly average
pollutant
concentration over
last 5 years of
monitoring data
June&Augus
t 2014GW1 pH pH Meter (Electrode) Biannually 8.11 7.97 pH units N/A N/A no
June&Augus
t 2014GW1 TOC
TOC by oxidation
combustionBiannually <3.0 <3.0 mg/l N/A N/A no
June&Augus
t 2014GW1 Conductivity pH Meter (Electrode) Biannually 381 373.00 uS/cm N/A N/A no
June&Augus
t 2014GW1 Ammonia
Spectrophotometry
(Colorimetry) Biannually <0.1 0.1 mg/l N/A N/A no
June&Augus
t 2014GW1 Total Nitrogen Biannually 2.76 2.535 mg/l N/A N/A no
June&Augus
t 2014GW1 Chromium (Cr VI)
ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannually <0.03 <0.03 mg/l N/A N/A no
June&Augus
t 2014GW1 Aluminium
ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannually <0.0029 <0.0029 mg/l N/A N/A no
June&Augus
t 2014GW1 Chloride
Spectrophotometry
(Colorimetry) Biannually 12.9 12.8 mg/l N/A N/A no
June&Augus
t 2014GW1 PAHs
GCMS (Gas
Chromatography Mass
Spectroscopy)
Biannually Below LOQ Below LOQ ug/l N/A N/A no
Surface
water EQS
Groundwater
regulations
GTV's
Drinking water
(private supply)
standards
Drinking water (public
supply) standards
Table 3: Soil results
Date of
sampling
Sample
location
reference
Parameter/
Substance Methodology
Monitoring
frequency
Maximum
Concentration
Average
Concentration unit
Please specify the proposed time frame for the remediation strategy
Is there a licence condition to carry out/update ELRA for the site?
Is there evidence that contamination is migrating offsite?
Has any type of risk assesment been carried out for the site?
Has a Conceptual Site Model been developed for the site?
Groundwater monitoring template*please note exceedance of generic assessment criteria (GAC) such as a Groundwater Threshold Value (GTV) or an Interim Guideline Value (IGV) or an upward trend in
results for a substance indicates that further interpretation of monitoring results is required. In addition to completing the above table, please complete the
Groundwater Monitoring Guideline Template Report at the link provided and submit separately through ALDER as a licensee return or as otherwise instructed by the EPA.
**Depending on location of the site and proximity to other sensitive receptors alternative Receptor based Water Quality standards should be used in addition to the GTV
e.g. if the site is close to surface water compare to Surface Water Environmental Quality Standards (SWEQS), If the site is close to a drinking water supply compare results
to the Drinking Water Standards (DWS)
Guidance on the Management of Contaminated Land and Groundwater at EPA Licensed Sites (EPA 2013).More information on the use of soil and groundwater standards/ generic assessment criteria
(GAC) and risk assessment tools is available in the EPA published guidance (see the link in G31)
Where additional detail is required please enter it here in 200 words or less
Please provide an interpretation of groundwater monitoring data in the
interpretation box below or if you require additional space please include
a groundwater/contaminated land monitoring results interpretaion as an
additional section in this AER
Please enter interpretation of data here
Are you required to carry out groundwater monitoring as part of your licence requirements?
Are you required to carry out soil monitoring as part of your licence requirements?
Have actions been taken to address contamination issues?If yes please summarise remediation
strategies proposed/undertaken for the site
Do monitoring results show that groundwater generic assessment criteria
such as GTVs or IGVs are exceeded or is there an upward trend in results for
a substance? If yes, please complete the Groundwater Monitoring Guideline
Template Report (link in cell G8) and submit separately through ALDER as a
licensee return AND answer questions 5-12 below.
Do you extract groundwater for use on site? If yes please specify use in comment section
Is the contamination related to operations at the facility (either current and/or historic)
Have potential receptors been identified on and off site?
N/A
11
Environmental Liabilities template Lic No: P00378-02 Year 2014
Commentary
1 Submitted and agreed by EPA submitted 2014
2
Review required and completed
3277,497
4Submitted and agreed by EPA
55,000,000
6Environmental Impairment Liability insurance
731/12/2015
8Closure plan submitted and agreed by EPA submitted 2014
9 Review required and completed
10 Submitted and agreed by EPA
11 1,502,910
12Other please specify Parent Company Guarantee
13 TBC
Click here to access EPA guidance on Environmental Liabilities and Financial
provision
Financial provision for ELRA expiry date
Closure plan initial agreement status
Closure plan review status
Financial provision for Closure expiry date
Financial Provision for Closure - type
ELRA initial agreement status
ELRA review status
Amount of Financial Provision cover required as determined by the latest ELRA
Financial Provision for ELRA status
Financial Provision for ELRA - amount of cover
Financial Provision for ELRA - type
Financial Provision for Closure status
Financial Provision for Closure - amount of cover
12
Environmental Management Programme/Continuous Improvement Programme template Lic No: P00378-02 Year 2014
Additional Information
1Yes
2 Yes
3 Yes
4 Yes
Environmental Management Programme (EMP) reportObjective Category Target Status (% completed) How target was progressed Responsibility Intermediate outcomes
Minimise noise emission from the site
Keep Noise Emissions to
within IPPC Licence Limits 100
Noise Survey 2014 showed exceedences in night time levels at some
noise sensitive locations. Assessment carried out improvements made. Section Head
Improved Environmental
Management Practices
Further reduction of emissions to Air
Greenhouse Gas Emissions -
Substitute 45% of coal use
with Solid Recovered Fuel
(SRF) to reduce CO2 emissions 80
SRF infrastructure upgrade completed. Continue progress required in
2015 with test programme.Increase Section Head Reduced CO2 emissions
Energy Efficiency/Utility conservation
Achieve ISO 50001
accrediation for the site 40 Further development of system to ISO standard, interatcion with SEAI Energy Team
Improved Environmental
Management Practices
Waste reduction/Raw material usage efficiency
Waste Management - Achiece
Process waste and site waste
reduction 90
Process- Assessment of the use of raw material used in process has
been completed, scope to minimise waste generated. Additional
infrastructure to be evalulated in 2015.
Waste collected from site - Decrease in landfilled waste in 2014 in
comparison to 2013. Section Head Installation of infrastructure
Reduction of emissions to Air
Reduction in Sox emissions-To
consider lime dosing in
accordance with Plant
upgrades 70
Temporary lime dosing carried out in 2014. Assessment required to
see if longterm lime dosing is required in order to achieve compliance
with BATC. Section Head Installation of infrastructure
Energy Efficiency/Utility conservation
Carry out Energy Audit for the
site and assess and inforce
recommendations found. 20
Extension granted until after installation of SRF, too be completed in
2015 Energy Team
Energy Efficiency/Utility conservation
Water - Assess the potential
for water collection and reuse
and determine feasibility with
any infrasture upgrades to the
site. 100
Assessed during SRF frastructure upgrade and determined as not
feasible. Section Head
Reduction of emissions to Water
Comply with the
recommendations of the
Golder Associates report,
management of Aluminium
and Chromium at SW1 100
All samples taken in accordance with the recommendations of the
Golder Associates report. Section Head
Increased compliance with
licence conditions
Additional improvements
Maintain certification for BES
6001
ISO 14001
100 Quinn Cement maintained certification in BES6001&ISO14001 in 2013 Section Head
Increased compliance with
licence conditions
Minimise any nuissance from fugitive emissions
Continue practices to reduce
fugitive dust. 100 All ambient dust monitoring with limit values for 2014 Section Head
Improved Environmental
Management Practices
Materials Handling/Storage/Bunding
Minimise spillages through the
use of mobile bunds, maintain
bund register. 100No major spillages reported in 2014.Bund registered maintained
Section Head
Improved Environmental
Management Practices
Accredited to ISO14001
Do you maintain an environmental documentation/communication system to inform the public on
environmental performance of the facility, as required by the licence
Highlighted cells contain dropdown menu click to view
Does the EMS reference the most significant environmental aspects and associated impacts on-site
Does the EMS maintain an Environmental Management Programme (EMP) as required in accordance
with the licence requirements
Do you maintain an Environmental Mangement System (EMS) for the site. If yes, please detail in
additional information
13
Lic No: P00378-02 Year 2014
1 Yes
2
Noise
Guidance
note NG4
Yes
3 No
4 Enter date
5 No
Date of
monitoring
Time periodNoise location
(on site)
Noise sensitive
location -NSL
(if applicable)
LAeq LA90 LA10 LAmaxTonal or Impulsive
noise* (Y/N)
If tonal /impulsive noise was
identified was 5dB penalty
applied?
Comments (ex. main
noise sources on site, &
extraneous noise ex.
road traffic)
Is site compliant with
noise limits
(day/evening/night)?
2nd Dec'14 Day Residence 45.6 44.8 36.8 No No
2nd Dec'14 Night NSL 36.2 36.8 31.1 No No
2nd Dec'14 Day Doon Heights 49.3 53.2 40.8 No No
2nd Dec'14Night
NSL 49.3 53.2 40.8No No
Notified to Agency
2/2/2015No
2nd Dec'14 DaySlieve Russell
House 51.7 51.1 48.2 No No
2nd Dec'14 Night 50.5 50.6 47.6 No No
2nd Dec'14 Day Residence 54.4 56.5 51.2 No No
2nd Dec'14Night
NSL 49.2 51.8 44.8No No
Notified to Agency
2/2/2015No
2nd Dec'14 Day Site Centre 61.3 62.5 59.2 No No
2nd Dec'14 Night 60.3 61.5 58.2 No No
2nd Dec'14 Day Residence 48.4 62.5 59.2 No No
2nd Dec'14Night
NSL 47.4 48.7 46.2No No
Notified to Agency
2/2/2015No
*Please ensure that a tonal analysis has been carried out as per guidance note NG4. These records must be maintained onsite for future inspection
noise reduction plan
Noise monitoring summary report
Have there been changes relevant to site noise emissions (e.g. plant or operational changes) since the last noise
survey?
Table N1: Noise monitoring summary
If noise limits exceeded as a result of noise attributed to site activities, please choose the corrective action from the following options?
NSL 5
NSL 1
NSL 2
NSL 3
NSL 4
NSL 6
Any additional comments? (less than 200 words)
Was noise monitoring a licence requirement for the AER period?
If yes please fill in table N1 noise summary below
Was noise monitoring carried out using the EPA Guidance note, including completion of the
"Checklist for noise measurement report" included in the guidance note as table 6?
Does your site have a noise reduction plan
When was the noise reduction plan last updated?
It is important to note in terms of plant noise that the report concluded that the night time limit of 45 dBA was within the night-limit at all NSL’s except NSL6
where the limit was marginally exceeded. Acoustic panels have been replaced which which should reduce plant noise levels contributing to results observed
in the 2014 noise report.
14
Resource Usage/Energy efficiency summary Lic No: P00378-02 Year 2014
Additional information
1
2
SEAI - Large Industry
Energy Network
(LIEN) yes
SEAI - Energy
Agreements
Programme
3 Yes
Energy Use Previous year Current year
Production +/- %
compared to
previous reporting
year**
Energy
Consumption +/- %
vs overall site
production*
Total Energy Used (MWHrs) 530362.41 795338.56
increase in
production in 2014
from 2013
Total Energy Generated (MWHrs) N/A N/A N/A N/A
Total Renewable Energy Generated
(MWHrs)N/A N/A N/A N/A
Electricity Consumption (MWHrs) 63640.743 82542.22
increase in
production in 2014
from 2013
Fossil Fuels Consumption:
Heavy Fuel Oil (m3) 443.882 377.268 N/A
Light Fuel Oil (m3) 8.3 4.3 N/A
Natural gas (m3) N/A N/A N/A N/A
Coal/Solid fuel (metric tonnes) 66325.52 97113.73
increase in
production in 2014
from 2013
Peat (metric tonnes) N/A N/A N/A N/A
Renewable Biomass
Renewable energy generated on site N/A N/A N/A N/A
* where consumption of energy can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year
Commerically sensitive. Available onsite is required
When did the site carry out the most recent energy efficiency audit? Please list the recommendations in table 3 below
Is the site a member of any accredited programmes for reducing energy usage/water conservation such
as the SEAI programme linked to the right? If yes please list them in additional information
Where Fuel Oil is used in boilers on site is the sulphur content compliant with licence conditions? Please state percentage in
additional information
Table R1 Energy usage on site
due 2015/after SRF installation
15
Resource Usage/Energy efficiency summary Lic No: P00378-02 Year 2014
Water Emissions Water Consumption
Water useWater extracted
Previous year m3/yr.
Water extracted
Current year m3/yr.
Production +/- %
compared to
previous reporting
year**
Energy
Consumption +/- %
vs overall site
production*
Volume Discharged
back to
environment(m3yr):
Volume used i.e not
discharged to
environment e.g.
released as steam
m3/yr
Unaccounted for Water:
Groundwater 107600 169760
increase in
production in 2014
from 2013
Looped System Looped System Looped System
Surface water N/A N/A N/A N/A N/A N/A N/A
Public supply 9040 7144 N/A N/A N/A
Recycled water N/A N/A N/A N/A N/A N/A N/A
Total 116640.00 176904.00
* where consumption of water can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year
Total Landfill Incineration Recycled Other
Hazardous (Tonnes) 4.74 N/A 1.36 3.38
Non-Hazardous (Tonnes) 356.41 123.02 N/A 233.39
Date of audit RecommendationsDescription of
Measures proposedOrigin of measures
Predicted energy
savings %Implementation date Responsibility Completion date
Status and
comments
Table R5: Power Generation: Where power is generated onsite (e.g. power generation facilities/food and drink industry)please complete the following information
Unit ID Unit ID Unit ID Unit ID Station Total
Technology
Primary Fuel
Thermal Efficiency
Unit Date of Commission
Total Starts for year
Total Running Time
Total Electricity Generated (GWH)
House Load (GWH)
KWH per Litre of Process Water
KWH per Litre of Total Water used on Site
Table R2 Water usage on site
Table R4: Energy Audit finding recommendations
Table R3 Waste Stream Summary
16
Complaints and Incidents summary template Lic No: P00378-02 Year 2014
Additional information
Yes
Date Category Other type (please specify)
Resolution
status Resolution date
10/02/2014 Dust Complete 10/02/2014
06/03/2014 Dust Complete 06/03/2014
12/03/2014 Dust Complete 13/03/2014 Available onsite
21/03/2014 Dust Complete 13/03/2014
26/05/2014 Dust Complete 27/05/2014
26/05/2014 Dust Complete 27/05/2014
26/05/2014 Dust Complete 27/05/2014
08/09/2014 Dust Complete 09/09/2014
08/09/2014 Dust Complaint of dust NC297, Record stored on site Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
08/09/2014 Dust Complaint of dust NC297, Record stored on site Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
08/09/2014 Dust Complaint of dust NC297, Record stored on site Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
08/09/2014 Dust Complaint of dust NC297, Record stored on site Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
11/09/2014 Dust Complaint of dust NC297, Record stored on site,Delayed Complaint Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
20/09/2014 Dust Complaint of dust NC297, Record stored on site,Delayed Complaint Filter bag rupture at minor emission point. records stored on site Complete 09/09/2014
22/09/2014 Dust Complete 22/09/2014
11/10/2014 Dust Complaint of dust NC304 NC305, Record stored on site Fugitve emission from rutured feed pipe Complete 11/10/2014
11/10/2014 Dust Complaint of dust NC304 NC305, Record stored on site Fugitve emission from rutured feed pipe Complete 11/10/2014
11/10/2014 Dust Complete 11/10/2014
11/10/2014 Dust Complete 11/10/2014
15/10/2014 Dust Complete 11/10/2014
03/11/2014 Noise Complete 03/11/2014
05/11/2014 Water Complete 06/11/2014
18/11/2014 Dust Complete 20/11/2014
01/12/2014 Dust Complete 03/12/2014
Total complaints
open at start of
reporting year
0
Total new
complaints received
during reporting
year
24
Total complaints
closed during
reporting year
24
Balance of
complaints end of
reporting year
0
investigated no findings. Record stored on site No incident experienced at time on complaint, production continued to be monitored.
Available onsite
Available onsite
Available onsite
Available onsite
Corrective action< 20 words
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Further informationAvailable onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Available onsite
Partial blockage cleared
Filter bag rupture at minor emission point. records stored on site
Available onsite
Fugitve emission from rutured feed pipe
Fugitve emission from rutured feed pipe
Fugitve emission from rutured feed pipe
No incident experienced at time of complaint, production continued to be monitored.
Available onsite
Available onsite
No incident experienced at time on complaint at SW1, SW1 continued to be monitored.
Complaint of noise record stored on site
Complaint received by Cavan CC redarding discharge
investigated no findings. Record stored on site
investigated no findings. Record stored on site
No incident experienced at time on complaint, production continued to be monitored.
No incident experienced at time on complaint, production continued to be monitored.
Maintenance on fan drive, production continued to be monitored.
Maintenance on fan drive
Partial blockage cleared
Partial blockage cleared
No incident experienced at time on complaint, production continued to be monitored.
Related to complaint of dust NC284, Record stored on site
Complaint of dust NC284, Record stored on site
Complaint of dust NC292, Record stored on site
Complaint of dust NC292, Record stored on site
Complaint of dust NC292, Record stored on site
Complaint of dust NC297, Record stored on site
Complaint of dust NC304 NC305, Record stored on site
Complaint of dust NC304 NC305, Record stored on site
Complaint of dust NC304 NC305, Record stored on site,Delayed complaint
No incident experienced at time on complaint, production continued to be monitored.
Complaints
Have you received any environmental complaints in the current reporting year? If yes please complete
summary details of complaints received on site in table 1 below
Table 1 Complaints summary
Brief description of complaint (Free txt <20 words)
investigated no findings. Record stored on site
investigated no findings. Record stored on site
17
Complaints and Incidents summary template Lic No: P00378-02 Year 2014
Complaints
Additional information
Yes
What is an incident
Table 2 Incidents summary
Date of occurrence Incident nature Location of occurrence Incident category Receptor Cause of incident
Other
cause(please
specify)
Activity in
progress at time
of incident
Communication OccurrenceCorrective action<20
words
Preventative
action <20
words
Resolution statusResolution
date
Likelihood of
reoccurence
19/02/2014 Breach of ELV High SS in SW weekly NC181
SW1 1. Minor Water Adverse weather Normal activities EPA NewFollowing results
were within ELV.Complete Low
25/05/2014 Uncontrolled release NC291
1. Minor AirPlant or
equipment issues
partial blockage
causing kiln
backspill
Normal activities EPA NewPartial blockage
cleared itselfOngoing
Retest in Q1
2014Low
30/05/2014 Uncontrolled release NC 293
A2-01 1. Minor AirPlant or
equipment issuesESP Trip Normal activities EPA New
production stopped.
Maintenace on ESPComplete 29/10/2013 Low
21/06/2014 Uncontrolled release NC 294
A2-01 1. Minor AirPlant or
equipment issuesESP Trip Normal activities EPA New
production stopped.
Maintenace on ESPComplete 23/10/2013 Low
08/09/2014Volume/hr excedence on main
stack in Q2 Emission report
A2-01 1. Minor Air OtherClerical error in
licenceNormal activities EPA New
Technical amendment
required to licenceOngoing Low
08/09/2014 Uncontrolled release NC 298
A3-11 1. Minor AirPlant or
equipment issues
tear in bag filter
of dust plant on
clinker shed
Normal activities EPA New
production stopped.
Maintenace on dust
plant
Complete 08/09/2014 Low
11/10/2014 Uncontrolled release-
1. Minor AirPlant or
equipment issues
fugitive Emission
Raw meal rupture
feed pipe to
preheater
Normal activities EPA NewAppropriate welding
repairsComplete 04/10/2014 Low
16/11/2014Breech of ELV for 2 half periods on
main stack particulates
A2-01 1. Minor AirOperational
controls
restart of rawmill
and coal mill after
unplanned
stoppage
Normal activities EPA NewFollowing results
were within ELV.Complete 19/10/2014 Low
26/11/2014Breech of ELV for 2 half periods on
main stack particulates
A2-01 1. Minor AirOperational
controls
Comissioning on
section of new
infrastructure
Normal activities EPA NewFollowing results
were within ELV.Complete 07/10/2013 Low
20/11/2014Breech of ELV for 2 half periods on
main stack particulates and HCL
A2-01 1. Minor AirOperational
controls
Failure in starting
rawmill causing
process
disruption
Normal activities EPA NewFollowing results
were within ELV.Complete 14/10/2013 Low
Total number of
incidents current
year
10
Total number of
incidents previous
year
10
% reduction/
increase0% increase
Have any incidents occurred on site in the current reporting year? Please list all incidents for current reporting
year in Table 2 below
*For information on how to report and what constitutes
an incident
Incidents
18
WASTE SUMMARY Lic No: P00378-02 Year 2014
PRTR facility logon
Additional Information
1 Yes
2 No
3 Yes
Table 1 Details of waste accepted onto your site for recovery, disposal or treatment (do not include wastes generated at your site, as these will have been reported in your PRTR workbook)EWC code Description of waste
accepted
Please enter an accurate
and detailed description -
which applies to
relevant EWC code
Quantity of waste
accepted in current
reporting year (tonnes)
Reason for
reduction/ increase
from previous
reporting year
Packaging Content (%)-
only applies if the waste
has a packaging
component
European Waste Catalogue EWC codes European Waste
Catalogue EWC codes
127,875 19 12 10
19- WASTES FROM WASTE
MANAGEMENT FACILITIES, OFF-
SITE WASTE WATER
TREATMENT PLANTS AND THE
PREPARATION OF WATER
INTENDED FOR HUMAN
CONSUMPTION AND WATER
FOR INDUSTRIAL USE
combustible waste
(refuse derived fuel)
Commerically sensitive.
Available onsite is
required new fuel to site R1-Use principally as a fuel or other means to generate energy
4 Yes
5 Yes
6 Yes
7 Do you have an odour management system in place for your facility? If no why? N/A
8 Do you maintain a sludge register on site? N/A
Does your facility have relevant nuisance controls in place?
SECTION C-TO BE COMPLETED BY ALL WASTE FACILITIES (waste transfer stations, Composters, Material recovery facilities etc) EXCEPT LANDFILL SITES
Is all waste processing infrastructure as required by your licence and approved by the Agency in place? If no please list waste processing infrastructure required onsite
Is all waste storage infrastructure as required by your licence and approved by the Agency in place? If no please list waste storage infrastructure required on site
Did your site have any rejected consignments of waste in the current reporting year? If yes please give a brief explanation in the additional information
Was waste accepted onto your site that was generated outside the Republic of Ireland? If yes please state the quantity in tonnes in additional information
Disposal/Recovery or treatment
operation carried out at your
site and the description of this
operation
Quantity of
waste remaining
on site at the
end of reporting
year (tonnes)
Comments - Licenced annual
tonnage limit for your
site (total
tonnes/annum)
Source of waste accepted Quantity of waste accepted in previous
reporting year (tonnes)
Reduction/
Increase over
previous year +/ -
%
SECTION A-PRTR ON SITE WASTE TREATMENT AND WASTE TRANSFERS TAB- TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES Refer to PRTR upload
SECTION B- WASTE ACCEPTED ONTO SITE-TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES
Were any wastes accepted onto your site for recovery or disposal or treatment prior to recovery or disposal within the boundaries of your facility ?; (waste generated within your boundaries is
to be captured through PRTR reporting)
If yes please enter details in table 1 below
19
WASTE SUMMARY Lic No: P00378-02 Year 2014
SECTION A-PRTR ON SITE WASTE TREATMENT AND WASTE TRANSFERS TAB- TO BE COMPLETED BY ALL IPPC AND WASTE FACILITIES Refer to PRTR upload
Table 2 Waste type and tonnage-landfill only
Waste types permitted
for disposal
Authorised/licenced annual intake for
disposal (tpa)
Actual intake for disposal in
reporting year (tpa)
Remaining licensed
capacity at end of
reporting year (m3) Comments
Table 3 General information-Landfill only
Total disposal
area occupied by
waste
Lined disposal
area occupied by
waste
Unlined area
SELECT UNIT SELECT UNIT SELECT UNIT
Cell 8
Table 4 Environmental monitoring-landfill only Landfill Manual-Monitoring Standards
Was meterological
monitoring in
compliance with Landfill
Directive (LD) standard
in reporting year +
Was leachate monitored in compliance
with LD standard in reporting year
Was Landfill Gas monitored in
compliance with LD standard in
reporting year
Was SW monitored in
compliance with LD
standard in reporting
year
Have GW trigger levels
been established
Were emission limit values agreed with
the Agency (ELVs)
Was topography
of the site
surveyed in
reporting year
Has the statement
under S53(A)(5) of
WMA been
submitted in
reporting year Comments
.+ please refer to Landfill Manual linked above for relevant Landfill Directive monitoring standards
Table 5 Capping-Landfill only
Area uncapped* Area with temporary cap
SELECT UNIT SELECT UNIT
*please note this includes daily cover area
Table 6 Leachate-Landfill only9 Is leachate from your site treated in a Waste Water Treatment Plant?
10 Is leachate released to surface water? If yes please complete leachate mass load information below
Volume of leachate in
reporting year(m3) Leachate (BOD) mass load (kg/annum)
Leachate (COD) mass load
(kg/annum)
Leachate (NH4) mass
load (kg/annum)
Leachate (Chloride)
mass load kg/annum Leachate treatment on-site
Specify type of
leachate
treatment Comments
Table 7 Landfill Gas-Landfill only
Gas Captured&Treated
by LFG System m3 Power generated (MW / KWh) Used on-site or to national grid
Was surface emissions
monitoring performed
during the reporting
year? Comments
Please ensure that all information reported in the landfill gas section is consistent with the Landfill Gas Survey submitted in conjunction with PRTR returns
Is there a separate cell
for asbestos?
Accepted asbestos in reporting
year
Area with final cap to LD
Standard m2 ha, a Area capped other
Area with waste that
should be permanently
capped to date under
licence What materials are used in the cap Comments
Private or Public
OperatedInert or non-hazardous
Predicted date to
cease landfilling
Licence permits
asbestos Area ID Date landfilling commenced Date landfilling ceased Currently landfilling
SECTION D-TO BE COMPLETED BY LANDFILL SITES ONLY
| PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx |
Return Year : 2014 | 4159 31/03/2015 09:57
Guidance to completing the PRTR workbook
Version 1.1.18
REFERENCE YEAR 2014
1. FACILITY IDENTIFICATION
Parent Company Name Quinn Cement Limited
Facility Name Quinn Cement Limited
PRTR Identification Number P0378
Licence Number P0378-02
Classes of Activity
No. class_name
- Refer to PRTR class activities below
Address 1 Cement Works
Address 2 Scotchtown
Address 3 Ballyconnell
Address 4
Cavan
Country Ireland
Coordinates of Location -7.579210822 54.13127395
River Basin District GBNIIENW
NACE Code 2351
Main Economic Activity Manufacture of cement
AER Returns Contact Name Michelle Cass
AER Returns Contact Email Address [email protected]
AER Returns Contact Position Environmental Advisor
AER Returns Contact Telephone Number 0499525200
AER Returns Contact Mobile Phone Number
AER Returns Contact Fax Number 0499525201
Production Volume 0.0
Production Volume Units
Number of Installations 0
Number of Operating Hours in Year 0
Number of Employees 72
User Feedback/Comments Releases to water increase from 2013 due to increase in mass flow
in 2014. Increase in releases to air due to increase in production from
2013. NOTE new parameters added to releases to air section, these
are applicable after the co-missioning of alternatives fuels (Nov Web Address
2. PRTR CLASS ACTIVITIES
Activity Number Activity Name
3(c)(i) Cement clinker in rotary kilns
3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)
Is it applicable? No
Have you been granted an exemption ? No
If applicable which activity class applies (as per
Schedule 2 of the regulations) ?
Is the reduction scheme compliance route being
used ?
4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site
Do you import/accept waste onto your site for on-
site treatment (either recovery or disposal
activities) ? Yes
This question is only applicable if you are an IPPC or Quarry site
AER Returns Workbook
4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx | Return Year : 2014 | 31/03/2015 09:57
8 22 30 31 39 45 6 10 6 6 6 11 40
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
A2-01 A2-02 A2-03 A2-04 A2-05
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 Emission Point 4 Emission Point 5 T (Total) KG/Year
A (Accidental)
KG/Year
F (Fugitive)
KG/Year
17 Arsenic and compounds (as As) M EN 14385:2004 0.378 0.0 0.0 0.0 0.0 0.378 0.0 0.0
18 Cadmium and compounds (as Cd) M EN 14385:2004 0.347 0.0 0.0 0.0 0.0 0.347 0.0 0.0
03 Carbon dioxide (CO2) C ETS 605618000.0 0.0 0.0 0.0 0.0 605618000.0 0.0 0.0
02 Carbon monoxide (CO) M ALT On-line Analyser 78598.55 0.0 0.0 0.0 0.0 78598.55 0.0 0.0
80 Chlorine and inorganic compounds (as HCl) M ALT On-line Analyser 882.07 0.0 0.0 0.0 0.0 882.07 0.0 0.0
19 Chromium and compounds (as Cr) M EN 14385:2004 1.8 0.0 0.0 0.0 0.0 1.8 0.0 0.0
23 Lead and compounds (as Pb) M EN 14385:2004 6.17 0.0 0.0 0.0 0.0 6.17 0.0 0.0
21 Mercury and compounds (as Hg) M EN 13211:2001 2.2 0.0 0.0 0.0 0.0 2.2 0.0 0.0
22 Nickel and compounds (as Ni) M EN 14385:2004 1.73 0.0 0.0 0.0 0.0 1.73 0.0 0.0
08 Nitrogen oxides (NOx/NO2) M ALT On-line Analyser 1761277.3 0.0 0.0 0.0 0.0 1761277.3 0.0 0.0
47 PCDD + PCDF (dioxins + furans)(as Teq) M EN 1948-1 to3:2003 0.00000063 0.0 0.0 0.0 0.0 0.00000063 0.0 0.0
11 Sulphur oxides (SOx/SO2) M ALT On-line Analyser 544247.4 0.0 0.0 0.0 0.0 544247.4 0.0 0.0
20 Copper and compounds (as Cu) M EN 14385:2004 1.8 0.0 0.0 0.0 0.0 1.8 0.0 0.0
84 Fluorine and inorganic compounds (as HF) M ALT On-line Analyser 307.2 0.0 0.0 0.0 0.0 307.2 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
A2-01 A2-02 A2-03 A2-04 A2-05
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 Emission Point 4 Emission Point 5 Emission Point 6 T (Total) KG/Year
A (Accidental)
KG/Year
F (Fugitive)
KG/Year
205 Antimony (as Sb) M EN 14385:2004 0.38 0.0 0.0 0.0 0.0 0.0 0.38 0.0 0.0
356 Cobalt M EN 14385:2004 0.022 0.0 0.0 0.0 0.0 0.0 0.022 0.0 0.0
210 Dust M ALT On-line Analyser 41611.6 21312.1 3263.1 830.7 5314.7 0.0 72332.2 0.0 0.0
237 Volatile organic compounds (as TOC) M ALT On-line Analyser 3906.3 0.0 0.0 0.0 0.0 0.0 3906.3 0.0 0.0
236 Vanadium (as V) M EN 14385:2004 0.35 0.0 0.0 0.0 0.0 0.0 0.35 0.0 0.0
233 Thallium compounds M EN 14385:2004 0.38 0.0 0.0 0.0 0.0 0.0 0.38 0.0 0.0
321 Manganese (as Mn) M EN 14385:2004 15.59 0.0 0.0 0.0 0.0 0.0 15.59 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Additional Data Requested from Landfill operators
Landfill: Quinn Cement Limited
Please enter summary data on the
quantities of methane flared and / or utilised
additional_pollutant_no T (Total) kg/Year M/C/E Method Code
Designation or
Description
Facility Total Capacity m3
per hour
Total estimated methane generation (as per site
model) 0.0 N/A
Methane flared 0.0 0.0 (Total Flaring Capacity)
Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)
Net methane emission (as reported in Section A
above) 0.0 N/A
RELEASES TO AIR
POLLUTANT METHOD
Method Used
POLLUTANT
RELEASES TO AIR
RELEASES TO AIR
METHOD
POLLUTANT METHOD
Method Used
For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane)
flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4)
emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:
Method Used
Method Used
4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx | Return Year : 2014 | 31/03/2015 09:57
8 9 17 17 25 32 6 7 6 6 6 6 32
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility
Please enter all quantities in this section in KGs
QUANTITY
SW1
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/Year
A (Accidental)
KG/Year
F
(Fugitive)
KG/Year
0.0 0.0 0.0 0.0 0.0
19 Chromium and compounds (as Cr) M ALT
Spectrophotometry
(Colorimetry) 5.86 0.0 5.86 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
SW1
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
355 Aluminium M ALT
ICP / ICPMS (Inductively
Coupled Plasma - Mass
Spectrometry) 1.97 1.97 0.0 0.0
303 BOD M ALT ISO 17025 271.78 271.78 0.0 0.0
306 COD M ALT ISO 17025 2882.48 2882.48 0.0 0.0
238 Ammonia (as N) M ALT
Spectrophotometry
(Colorimetry) 14.33 14.33 0.0 0.0
324 Mineral oils M ALT
Total Petroleum
Hydrocarbons by GC-FID 2.72 2.72 0.0 0.0
240 Suspended Solids M ALT Gravimetric analysis 3116.1 3116.1 0.0 0.0
363 Total Dissolved Solids M ALT Gravimetric analysis 51900.35 51900.35 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
RELEASES TO WATERS
Method Used
RELEASES TO WATERS
RELEASES TO WATERS
Method Used
POLLUTANT
Method Used
POLLUTANT
POLLUTANT
4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx | Return Year : 2014 | 31/03/2015 09:57
8 9 17 17 6 6 6 6 17
SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
303 BOD E ESTIMATE 473.04 473.04 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
Method Used
Method Used
POLLUTANT METHOD
POLLUTANT METHOD
4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx | Return Year : 2014 | 31/03/2015 09:57
8 8 16 16 6 6 6 6
SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
POLLUTANT METHOD
Method Used
RELEASES TO LAND
RELEASES TO LAND
POLLUTANT METHOD
Method Used
5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0378 | Facility Name : Quinn Cement Limited | Filename : March 2015.xlsx | Return Year : 2014 | 31/03/2015 09:57
5 19 Please enter all quantities on this sheet in Tonnes 3
Quantity
(Tonnes per
Year)
Haz Waste : Name and
Licence/Permit No of Next Destination
Facility Non Haz Waste:
Name and Licence/Permit No of
Recover/Disposer
Haz Waste : Address of Next
Destination Facility
Non Haz Waste: Address of
Recover/Disposer
Name and License / Permit No. and
Address of Final Recoverer /
Disposer (HAZARDOUS WASTE
ONLY)
Actual Address of Final Destination
i.e. Final Recovery / Disposal Site
(HAZARDOUS WASTE ONLY)
Transfer Destination
European Waste
Code Hazardous Quantity T/Year Description of Waste
Waste
Treatment
Operation M/C/E Method Used
Location of
Treatment Name and Licence / Permit No. of Recoverer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY) Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS WASTE ONLY)
Within the Country 13 02 08 Yes 0.88 other engine, gear and lubricating oils R9 M Weighed Offsite in Ireland ENVA Ireland,WL184-1
Clonminam Ind. Est. ,
Portlaoise ,Co.
Laois,.,Ireland
Enva Ireland,WL184-1
,Clonminam Industrial Estate
,Portlaoise ,Co.
Laois,.,Ireland
Clonminam Industrial Estate
,Portlaoise ,Co.
Laois,.,Ireland
Within the Country 15 01 06 No 7.99 mixed packaging R5 M Weighed Offsite in Ireland
Wilton Waste Recycling
Ltd.,WFP-CN-09-0005-01
.,Ballyjamesduff,Cavan,.,Irela
nd
Within the Country 15 01 06 No 0.0 mixed packaging R4 M Weighed Offsite in Ireland
Envirogreen Recycling,WCP-
MH-10/0008-01
227 Battleford Road,.,BT71
7NN,.,United Kingdom
Within the Country 15 01 10 Yes 0.0
packaging containing residues of or
contaminated by dangerous substances R4 M Weighed Offsite in Ireland
RILTA Environmental
Limited,WCP-DC-09-1192-
01
Greenogue Business
Park,.,Rathcoole,Dublin,Irela
nd
A1 Metal
Recycling,WMP007d,.,.,Mou
ntmellick,Laois,Ireland .,.,.,.,Ireland
To Other Countries 15 02 02 Yes 1.36
absorbents, filter materials (including oil
filters not otherwise specified), wiping cloths,
protective clothing contaminated by
dangerous substances R13 M Weighed Abroad ENVA Ireland,WL184-1
Clonminam Ind. Est. ,
Portlaoise ,Co.
Laois,.,Ireland
Lindenschmidt ,Reg.no.
E97095037,Kreuztal,.,.,.,Ger
many Kreuztal,.,.,.,Germany
To Other Countries 16 01 07 Yes 0.24 oil filters R4 M Weighed Abroad ENVA Ireland,WL184-1
Clonminam Ind. Est. ,
Portlaoise ,Co.
Laois,.,Ireland
RD
Recycling,51727/1/KD,.,.,.,.,B
elgium .,.,.,.,Belgium
To Other Countries 16 05 04 Yes 0.325
gases in pressure containers (including
halons) containing dangerous substances R4 M Weighed Abroad ENVA Ireland,WL184-1
Clonminam Ind. Est. ,
Portlaoise ,Co.
Laois,.,Ireland
Remondis,H09037950,Austra
ße 5 ,Portlaoise
,Krautheim,D-74238
,Germany .,.,.,.,Germany
Within the Country 17 01 07 No 0.0
mixture of concrete, bricks, tiles and
ceramics other than those mentioned in 17
01 06 D1 M Weighed Offsite in Ireland
McElvaney's Waste &
Recycling,WCP/MH/11/0006-
01
Castleblayney,.,Co
Monaghan,.,Ireland
Within the Country 17 09 04 No 0.0
mixed construction and demolition wastes
other than those mentioned in 17 09 01, 17
09 02 and 17 09 03 R5 M Weighed Offsite in Ireland
Wilton Waste Recycling
Ltd.,WFP-CN-09-0005-01
.,Ballyjamesduff,Cavan,.,Irela
nd
To Other Countries 20 01 21 Yes 0.447
fluorescent tubes and other mercury-
containing waste R4 M Weighed Abroad
Irish Lamp
Recycling,WL02/2000B
Woodstock Industrial Estate
,Kilkenny Road ,Athy ,Co.
Kildare,Ireland
Claushuis Metaals for
recycling. Permit
,MB/00.091030/A,3899AH
Zeewolde ,.,.,.,Netherlands
3899AH Zeewolde
,.,.,.,Netherlands
Within the Country 20 01 35 Yes 1.73
discarded electrical and electronic
equipment other than those mentioned in 20
01 21 and and 20 01 23 containing
hazardous components R4 M Weighed Offsite in Ireland
Irish Lamp
Recycling,WL02/2000B
Woodstock Industrial Estate
,Kilkenny Road ,Athy ,Co.
Kildare,Ireland
KMK,WO113-
03,.,.,offaly,.,Ireland .,.,.,.,Ireland
Within the Country 20 01 38 No 22.94 wood other than that mentioned in 20 01 37 R5 M Weighed Offsite in Ireland
Wilton Waste Recycling
Ltd.,WFP-CN-09-0005-01
.,Ballyjamesduff,Cavan,.,Irela
nd
Within the Country 20 01 40 No 202.46 metals R4 M Weighed Offsite in Ireland
Wilton Waste Recycling
Ltd.,WFP-CN-09-0005-01
.,Ballyjamesduff,Cavan,.,Irela
nd
Within the Country 20 03 01 No 123.02 mixed municipal waste D13 M Weighed Offsite in Ireland
Wilton Waste Recycling
Ltd.,WFP-CN-09-0005-01
.,Ballyjamesduff,Cavan,.,Irela
nd
* Select a row by double-clicking the Description of Waste then click the delete button
Link to previous years waste data
Link to previous years waste summary data & percentage change
Link to Waste Guidance
Method Used