airport cdm
TRANSCRIPT
![Page 1: Airport Cdm](https://reader034.vdocument.in/reader034/viewer/2022042508/5573bb2ad8b42a6d618b49ae/html5/thumbnails/1.jpg)
Airport CDM
ACDM involves a culture change, the handling of sensitive data, procedural changes and building confidence and understanding of each partner’ s operational processes and requirements.
13/04/23 1prepared by [email protected]
![Page 6: Airport Cdm](https://reader034.vdocument.in/reader034/viewer/2022042508/5573bb2ad8b42a6d618b49ae/html5/thumbnails/6.jpg)
ACD Results in..
Increase by up to 4% in sectors declared capacity
1 ‘ Taxi-Time saved in major airports ( equals 145.000 Tons of fuel/annum)
13/04/23 6prepared by [email protected]
![Page 7: Airport Cdm](https://reader034.vdocument.in/reader034/viewer/2022042508/5573bb2ad8b42a6d618b49ae/html5/thumbnails/7.jpg)
More information
– “Airport CDM and the ground handling industry”, Elisabeth Lagios, www.Internationalairportreview.com
– “Sared data boosts capacity”, Bernie fitzimons, www.jar.janes.com
– www.euro-cdm.org
13/04/23 7prepared by [email protected]