1
Baggage Handling Security IT PBB Realog Consulting GmbH 2016/2017
Airport Systems Services
Airport Systems Introduction to Realog Consulting GmbH
Company Name: Realog Consulting GmbH
Short Description: Realog is an international consulting company specializing in airport systems, operations, planning, strategies, forecasts, and analytics..
Offices: Germany, UAE, Canada, and Russia
Business Areas Realog delivers technical precision and business-oriented solutions in the analysis, design, tender, and site supervision of logistics, cargo, baggage, information technology, and security systems. Realog provides strategic planning, operations analysis, benchmark studies, quantitative analytics, deep data mining, throughput assessments, capacity modeling, annual/peak-time forecasts, government regulation compliance, concept design, detailed design, dynamic simulation, concession negotiations, financial structuring, tender management, contract formation, quantity surveying, ORAT, and site supervision. Realog represents airports, air carriers, handlers, governments, institutional investors, investment banks, commercial banks, contractors, and airport facility developers.
Realog Consulting GmbH
Realog is one of the leading on-airport logistics, process and engineering consultants in the world with a vast resume of experience in on-airport automation.
Development Consulting Technology Consulting Forecast Consulting Operations Consulting
Logistics Material Handling Systems Planning and Design Quantitative Analysis
Strategic Planning
Business Modeling
Process and Flow
Baggage Handling Systems
Simulation
Systems Engineering
Site Supervision
Finance and Contracts
Project Management
Market Research
Feasibility Studies
Benchmark Analysis
Master Planning IT Specification
Tender Management
Peak Time Specifications
Realog Consulting GmbH
Realog is an independent analytic, planning and engineering firm specializing in airport systems, operations, planning, design, forecasts, and strategies.
Key Trends
1
2
3
4
5
Experienced Specialists
Technical Precision
Business Solutions
Global Reach
Independent Representation
Our team has extensive airport systems experience, seniority and expert know-how
Realog provides technical precision in in analytics, design, tender management, and site supervision.
Realog focuses on business oriented solutions to meet stakeholder operational and financial expectations.
Realog has designed airport systems of all sizes and complexity at airports worldwide.
Realog Consulting GmbH
Realog is an independent consulting firm that offers outside and impartial assessments and representation
Realog Consulting GmbH
Development*Projects**Consul2ng*and*Planning*Projects*
Anchorage*
New*York*
Cincinna2*
Miami*
Brisbane*
Sydney*
Hanoi*
Moscow*
Stockholm*
Gothenbourg*
Hannover*
Frankfurt*
Munich*
Leipzig*
Amsterdam*
Zurich*
Paris*
Dubai*
Abu*Dhabi*
Bahrain*
Jeddah*
Muscat*
*
Khartoum*
Lagos* Entebbe*
Rio*de*Janeiro**
Singapore*
Shanghai*
Airport Systems Specializations
Baggage Handling Systems
The scope of services includes the design and site supervision of the installation of screening equipment and CCTV systems
The Baggage Handling System will include: • Number of check-in counter for economy class passenger, business class passenger, VIP • Hold baggage screening system and procedures (in close cooperation with the Client and the
Police) • Sorting system (a tilt tray sorter system could be considered for this size of the Airport) • Number of make-up positions (sorting chutes, make-up carousels, laterals) • Size respectively capacity of an Early baggage storage (EBS)
• Number of input positions (loading belts) for transfer baggage
• Number of reclaim carousels and feed lines
• Customs screening system for arrival baggage (if required)
• Handling of oversize baggage
• Baggage reconciliation system
Security Systems
The scope of services includes the design and site supervision of the installation of screening equipment and CCTV systems
• Screening equipment • Passenger and Carry-on Bag Screening • Employee Screening
• CCTV Video Surveillance Hardware and Software for the Passenger Terminal
• Platform based scalability via open architecture and protocol.
• Modular application design providing flexible system configuration
• Single point of management and control • Sophisticated Interoperability • Web-based management and communication • System interworking scenario with user defined
rules
Airport IT Systems
The scope of services includes the design and site supervision of the installation of airport IT systems
The airport IT system will include: • CUTE/CUSS/BRS including hardware and software • IT Backbone Hardware including cables, panels and
IT management system • AIMS including hardware, work stations, software
(BIS, FIDS, ARMS) and interfaces
Water Supply
Car Park Fuel Supply
HVAC
Kitchen & Cold
Equipment
Power Distribution
Time Distribution
Lifts-Elevators-Moving Walks & Automatic Doors (PAX & Dollies)
Heated and Chilled Water Distribution
BMS
Mast Lighting (Stand
Position
400 Hz
PBB (Passenger
Boarding Bridge)
VGDS (Visual Docking
Guidance System)
CAMM (Central Airport
Management System
IT Backbone Middle ware
IT Backbone Middle ware
IT Backbone Middle ware
IT Virtual LANs
IT Physical Backbones
Office PCs
NFTMS
Car Park
TV System (Advertising)
PABX Radio
Accounting
Doc. Mgmt. GIS (Geographical
Information System)
Interface of EDS
(Tomograph)
BOCS
BIS
CCTV Video Surveillance of
BHS
Interface DCS BIS
CUTE AODB
ARMS
Statistics
FIDS
ACS (Access Control System)
CCTV Video Surveillance
PAS (Public
Address System)
Fire Protection
System
FADS (Fire Alarm Detection System)
Terminal
EXTERNAL SYSTEMS
AIRPORT INFORMATION SYSTEMS PACKAGES
SITA
Internet
ATC DCSs of each Airline
DCS
BHS PACKAGES
SECURITY & SPECIAL PACKAGES
TECHNIQUE AND ELECTROMECHANICAL PACKAGES
LEGEND
Proposal Packages by Realog
Finance
Baggage Reclama-
tion
Facilities Manage-
ment
Security
FIDS
Common Use
Equipment
Local Departure
Control
Wireless Communi-
cations
AODB
Airport Information
Management System
External Networks
Airport Authority
CREWS
CUSS
CUTE
Eqts at Check-in Counters
AIMS Terminal
AODB
MIS
DIS
BRS
BOCS of BHS SCADA + SAC + PLCs + ARS + MRS + EBS + EDS + BIDS + CCTV BAGs
Airlines DCS’s
WORLD TRACER BIS
AHM ARM
APV
Connection to Public Internet
Provider Business Services
EXTERNAL SYSTEMS CONNECTED TO THE TERMINAL SYSTEMS CONNECTED MANAGED BY AIRPORT AUTHORITY
WIFI MANAGED BY AIRPORT AUTHRITY
BOCS MANAGED BY OPERATIONAL TEAM OF AIRPORT
IT PACKAGES AT TERMINAL: MAIN FUNCTIONAL INTERFACES
Airport Passenger Boarding Bridges
The scope of services includes the design and site supervision of the installation of the passenger boarding bridge (“PBB”) systems
The PBB design will be based upon the apron plan and its related aircraft and the operational requirements. The airport PBB system will be tailored to the specifications of the airport and include as appropriate: • Telescopic PBBs • 400 Hz converters • Pre-Conditioned air units, • Potable Water and • Baggage chute systems. • A preventive maintenance
and inspection services
Airport Systems Methodology
Realog provides services in all three phases of airport system development: Planning, Project Management, and Defects Liability.
Planning Phase I Project Management Phase II
Data Collection Initial Design
Modeling
DL Phase III
Inception Stage 1
Concept Design Stage
2 Schematic
Design Stage
3 Cost
Estimation Stage
4 Bid Process Management
Stage 5
Pre-Construction
Stage 6 Construction
Stage 7 Post-
Construction Stage
8 Defects Liability
Stage 9
Concept Design
Final Design Specifications
Cost Estimation
Tender Docs
Tender Mgmt..
Design Review
Coordination
Installation Commissioning
Testing
Trial Operation
Defects Liability
Phases and Stages
Realog collects data through quantitative analysis, documentation and forecast review, design assessment, questionnaires, meetings, interviews, workshops, and on-site visits.
DATA COLLECTION
• Inbound/Outbound Big Data • Fleet Plan • Weight and Balance • Flight Schedules • Immigration Schedules • Passenger Forecasts • Movement Forecasts
Phase 1 - Inception Stage - Data Collection and Validation
Quantitative Analysis Realog provides a deep data analysis of time sequence data. This deep data analysis allows for upstream and downstream data mining for a complete picture of the airport operation capacity and utilization as expressed in movements, dwell time, and peak time on an hourly, daily, weekly, monthly, and annual basis. Data sources include:
3,730,000%
16,630,000%
0"
2,000,000"
4,000,000"
6,000,000"
8,000,000"
10,000,000"
12,000,000"
14,000,000"
16,000,000"
18,000,000"
1997" 1998" 1999" 2000" 2001" 2002" 2003" 2004" 2005" 2006" 2007" 2008" 2009" 2010" 2011" 2012" 2013"
Nr%of%Departures%
CAGR%=%9.8%%
Indian Nationals Departures 1997-2013
Documentation and Forecast Review Realog collects, reviews, and validates relevant documentation regarding the intended project. These documents include, but are not limited to: • Master/sub-concession agreement, ground leases, and tenant leases • Airport ALP (ICAO Standard) • Master plans (including expansion area plans) • Terminal facility plans • Handling manuals • Service level agreements • Forecasts • Marketing studies • Business case studies • Organization charts • Accompanying explanations and reports • Applicable studies • Other pertinent project information
Design Assessment Realog will collect, assess, and validate any existent relevant design drawings
Phase 1 - Inception Stage - Data Collection and Validation
Questionnaires, Meetings, Interviews, and Workshops Realog collects and validates information relating to operational objectives, limitations, requirements, and criteria in a dialog with all relevant stakeholders through questionnaires, meetings, interviews, and workshops. Realog believes strongly that airport planning and design must reflect an understanding the expectations of the stakeholders
Phase 1 - Inception Stage - Data Collection and Validation
Stakeholders
Authorities Forwarders
Regulators Employees
Airports
Manufacturers Integrators
Airlines
Realog frames the conversation with stakeholders with suggested elements in order to arrive at consensus and uses this input to acts as a guide in this process to consolidate different contextual perspectives: Site Inspection Realog conducts site inspections to understand and verify assumptions as to operations and facilities. The site inspections can be visual only, but also can include actual measurement of performance and space.
Phase 1 - Inception Stage - Data Collection and Validation
Strategic Alignment
! Investment planning and evaluation ! Allocation and validation of process cost ! Application of process-benchmarks
Financial Assessment
! Innovative equipment ! IT-System (Software, Hardware) ! Security Technology
Design and Technology
! Optimized processes ! Interface with ground handling ! System prioritization
Operation
! Business model ! Trends/future developments ! Future Flexibility
Airport System Solutions
Realog provides a comprehensive and detailed profile of current and future air traffic and its key drivers. DATA
ANALYSIS
Depending upon the project, topics that may be covered include: • World and Regional Trends. • Region Profile. • Airport Profile. • Carriers/Handlers Profile • Commercial Key Performance Indicators (KPIs) • Key Drivers including but not limited to • Middle Class Consumerism Shift • Possible PAX and Trade Flows. • Competition. • Carrier Specific PAX and FTR Development. • OAL PAX and FTR Development. • Flow Analysis. • Airport/Hub Selection. • Passenger and/or Cargo specific Key Drivers
Phase 1 - Inception Stage - Data Analysis
!"!!!!
!500!!
!1,000!!
!1,500!!
!2,000!!
!2,500!!
!3,000!!
!3,500!!
!4,000!!
!4,500!!
0!
10,000!
20,000!
30,000!
40,000!
50,000!
60,000!
70,000!
2004"2005! 2005"2006! 2006"2007! 2007"2008! 2008"2009! 2009"2010! 2010"2011! 2011"2012! 2012"2013!
Crore%%(Billions)%Crore%%
GDP! GDP/Capita!
Tamil Nadu GDP/Capita
United'States'
China'
Japan'Germany'
Hong'Kong''
Korea,'Rep.'
United'Arab'Emirates'
France'
India'
Singapore'
Brazil'
Netherlands'
Qatar'
Thailand' Canada'
Indonesia'
Belgium'
Malaysia' Australia'
Italy'Saudi'Arabia'
Vietnam'
Luxembourg'
Switzerland'
Kenya'
Finland' Norway'Sweden'
Macao'
Zimbabwe'
Slovenia'
Burundi'Swaziland'
R²#=#0.341527#
0.000#
0.001#
0.010#
0.100#
1.000#
10.000#
0# 20,000# 40,000# 60,000# 80,000# 100,000# 120,000#
Seats&per&Capita&Log&
GDP&per&Capita&
Seats per Capita / GDP per Capita
India Middle Class 2001-2050
0%#
10%#
20%#
30%#
40%#
50%#
60%#
70%#
80%#
90%#
100%#
2000#
2001#
2002#
2003#
2004#
2005#
2006#
2007#
2008#
2009#
2010#
2011#
2012#
2013#
2014#
2015#
2016#
2017#
2018#
2019#
2020#
2021#
2022#
2023#
2024#
2025#
2026#
2027#
2028#
2029#
2030#
2031#
2032#
2033#
2034#
2035#
2036#
2037#
2038#
2039#
2040#
2041#
2042#
2043#
2044#
2045#
2046#
2047#
2048#
2049#
2050#
Middle#Class# Not#Middle#Class#
Realog conducts a benchmark survey of the findings from its data analysis and operations analysis in the context of comparable airports worldwide and other competitive airports.
GAC Fleet Composition India Fleet Composition
Phase 1 - Inception Stage - Data Analysis
Emirates)E"had&Qatar%Airways%
Gulf%Air%
Kuwait'Airways'
Oman%Air%flydubai(Air$Arabia$flynas&Med$East$Jet$Saudia&
Narrow&BodyWide&Body
In#Service
On#Order
Number#of#Aircraft
!366!!
!62!!
Narrow!Body!
Wide!Body!
!506!!
!20!!
Narrow!Body!
Wide!Body!
Realog analyzes throughput and capacity of facilities in terms of flow and processes. OPERATIONS
ANALYSIS
Realog will provide a capacity assessment to determine peak and annual flow and process capacities of facilities.
Phase 1 - Concept Design Stage - Operations Analysis
Sort Put in storage
Screening
• From and for what flight? • Whose is it?
• Where is it? • What is its status?
Ditto processing for OOG Bags
Embarking
Remove
Check-in
Re-routing
Departure
Unload
Screening
Ditto processing for OOG Bags
Reclaim
Label
• From and for what flight? • Whose is it?
• Where is it? • What is its status?
X
Arrival
Sort Put in storage
Screening
Ditto processing for OOG Bags
Embarking
Remove
Re-routing
• From and for what flight? • Whose is it?
• Where is it? • What is its status?
Transfer Transfer Departure
Arrival
Realog uses the collected data to re-state flows (Departures, Arrivals, Transfers) into processes and storage (Arrivals, Inbound, Outbound, Departures plus storage or “AOID+S”).
AOID+S is a process-measuring tool that allows for greater granularity in analyzing the impact of flows on facility and labor resources.
Phase 1 - Concept Design Stage - Operations Analysis
S
D A
I O
A R R I V A L
D E P A R T U R E
T R A N S F E R
Realog provides a peak time analysis as it relates to stress on the various processes over the life of the facility.
The peak time analysis is tied to a peak time capacity model that finds the required capacity at various time nodes to determine the ability of the terminal to meet performance requirements.
Total Freighter PAX/Belly Truck3RFS Total Freighter PAX/Belly Truck3RFS
Tonnes TonnesULDs ULDs AWB Pieces IHP ULDsEAP in to EAP in toEAP in ULD EAP in ULDEY in to EY in toEY in ULD EY in ULDOAL IN TO OAL IN TOOAL IN ULD OAL IN ULD
Tonnes TonnesULD ULD
In- and Outbound ULD Type 5ftincBulk 10ft 15ft 20ftULD Size ULD Tonnes Pallets ULD Size ULD Tonnes
Container SUM5ft Inhouse Units/Bulk Total 5ft Inhouse Units/BulkLD 05ft LD 05ftLD10ft LD10ftLD15ft LD15ftMD10ft MD10ftMD15ft MD15ftMD20ft QRT Facility MD20ft
QRT:3ULD3LevelULDs Tonnes ULDs Tonnes
Inbound ULDs Tonnes AWB Pax TRS (EY/EP) ULDs Tonnes AWB OutboundTotal EY, EP & OAL TSG Mixed Units (with other cargo) Total EY, EP & OALTotal EY&EP Total EY&EPFTR FTRPAX Standard PAXRFS RFSTotal OAL Total OALFTR TOTAL FTRPAX PAXRFS QRT: Shipment Level RFSQRT Total SPL Tonnes AWB Tonnes AWB QRT Total
AVIDGR
ECT Total GC ECT TotalECT 20FT HEA ECT 20FTECT BIG NOT 20FT HUM ECT BIG NOT 20FTECT STANDARD TRU Pharma ECT STANDARD TRUECT STANDARD WH TSG ECT STANDARD WHECT TSG TRU VAL ECT TSG TRUECT TSG WH VUN ECT TSG WHECT FAST ECT FAST
TOTAL
ECT (w/o AVI and VAL) ECT (w/o AVI and VAL)PCHS3Interface Inhouse Storage PCHS3Interface
ULDs Tonnes ASRS Tonnes AWB IHP ULDs TonnesDolly Interface (Pax & 20ft Units) Transit Dolly Interface (Pax & 20ft Units)Aero Bridge (FRTR minus 20ft) Standard (w/O Special Rooms Cargo and below ASRS SPL)) Aero Bridge (FRTR)MTD /RFS Trucks (with 20ft) TSG (w/o Pharma above 1C-8C)(PEM PES) MTD /RFS Trucks)TOTAL TSG (w/o Pharma above 1-8C) TOTAL
Pharma (1-8C)PCHS3Storage3ULD3Level3(converted3in310ft) Pharma (15-25C) PCHS3Storage3ULD3Level3(conveted3in310ft)
ULDs Tonnes DGR ULDs TonnesECT 20FT VUN ECT 20FTECT BIG NOT 20FT Mail/Courier ECT BIG NOT 20FTECT STANDARD TRU Export ECT STANDARD TRUECT STANDARD WH Standard (w/O Special Rooms Cargo and below ASRS SPL)) ECT STANDARD WHECT TSG TRU TSG (w/o Pharma above 1C-8C)(PEM PES) ECT TSG TRUECT TSG WH TSG (w/o Pharma above 1-8C) ECT TSG WHECT FAST Pharma (1-8C) ECT FASTTOTAL Pharma (15-25C) TOTAL
DGRVUN to Buildup
W/S3and3Input3ASRS3 Mail/Courier Output3ASRS3&3WSImport
Cool Standard (w/O Special Rooms Cargo and below ASRS SPL)) CoolFast TSG (w/o Pharma above 1C-8C)(PEM PES) FastStandard (w/o US Outbound in B/U) TSG (w/o Pharma above 1-8C) Standard (w/o US Outbound in B/U)US Outbound in B/U) Pharma (1-8C) US Outbound in B/U)Mail/Courier Import Only Pharma (15-25C) Mail/Courier Export only
DGRVUNMail/Courier
TOTAL SUBTOTAL SUM SUM TOTAL
Landside Tonnes IHP Special Storage: Tonnes IHP LandsideImport Transit SUM SUM ExportStandard (w/o TSG and BIG) DGR Standard (w/o TSG and BIG)TSG Radioactive TSGBIG/Oversized Cargo Exlosives BIG/Oversized Cargo
TSG Sea Air CargoTOTAL Freezer SUM SUM TOTAL
HUMInbound RFS Tonnes ULDs BIG Tonnes ULD Outbound RFSInbound ULDs BIG Not 20Ft Outbound ULDs
Tonnes IHP BIG on 20ft Tonnes IHPInbound GCC Bulk BIG on Racks Outbound GCC BulkTOTAL SUBTOTAL SUM SUM TOTAL
ExportDGR
RadioactiveExlosives
TSG FreezerHUM
BIGBIG Not 20FtBIG on 20ft BIG on Racks
SUBTOTALImport
DGRRadioactiveExlosives
TSG FreezerHUM
BIGBIG Not 20FtBIG on 20ft BIG on Racks
SUBTOTALGRAND TOTAL STORAGE
from BreakdownTonnes IHP Tonnes IHPs
Inbound Outbound
Inbound Outbound
Inbound Inbound
Inbound Outbound
Inbound Outbound
Total3VolumeTonnes
Phase 1 - Concept Design Stage - Operations Analysis
Realog reviews any existing forecast or provide an annual air forecast for 5 – 30 years. FORECAST
REVIEW
Realog will convert the annual forest into a peak time forecast and tie this into a peak-time capacity model.
Phase 1 - Concept Design Stage – Forecast Review
Annual Forecast
Peak Forecast
Capacity
Demand
AOID Processes • Arrival • Outbound • Inbound • Departure
Externalities
Internalities
Personal Income
National Economy
Location
Routes
Infrastructure
Fuel Prices
High Scenario Forecast
Low Scenario Forecast
Baseline Scenario Forecast
Competition
Fleet Composition
Realog develops a concept design to serve as an overview of the required equipment, buildings, and/or apron with sizing, capacities, and possibilities of future expansion.
DESIGN
STEPS
• Formulation of design of the proposed equipment or facilities.
• Formulation as to the level of automation.
• Evaluation the mode of operation • Capacity and throughput analysis • Definition of the infrastructure/
building/equipment parameters • Analysis of operational capacity for
the main installations and systems.
Realog uses the feedback from the concept design to produce a schematic design and technical specifications of the equipment and/or buildings in a form suitable for inclusion of the tender documents with a bill of quantities and estimated costs. Realog provides the following concept design or schematic design main functions, as appropriate:
Phase 1 - Concept and Final Design Stages - Considerations
Algorithm Results
Layout # Speed # Frequency
# Speed # Unknown Bags
% Reliability % Conveyable % Non-Conveyable
# Organization # Communication # Tracking # Statistics # History
# Flight Make-up Lines # No. of Storage Tote (Bins)
% Availability % Reliability
Perf
orm
ance
OBJECTIVES
# PAX/Hour # Vol/Hour
Procedures Operating Rules
Ergonomic PAX M.C.I Screening Identification
# Max Weight # Max Size of Bags (Dimensions)
D.C.S. (Real Time)
# Flights Open (H-2/H-20 Min) # Early Bags (H-4/H-2)
Maintenance
Human Resources
Assistance PAX
METHODS Reactive Processing Handling
COMPETENCE Training
# Multi Profile Team # Reactivity
Quantity per Resource
H-20 min Facilities
Customs Feasibility No.
Operating Staff Number per Profile
Airport (AND/O) Airlines
Number per Profiles O
pera
ting
Cos
ts
Means BHS # X-Ray Machines # Unknown Bag Lines
Reading # Auto # Manual
Weighing Measures
# Supervision # Computations # PLC
Sorting System Storage System
Components and sub-system spare parts
In particular, and as needed, Realog will perform the following:
• Capture design requirements through joint discussions/review; • Provide throughput calculations and simulations (including a 3D animation, if requested) per areas,
sections, systems and processes. • Define existing and future processes and functionality and apply this definition to formulate size and
capacity • Develop a capacity and operation concept. • Identify appropriate equipment, level of automation, and configuration of the operational mode. • Incorporates new, proven technologies and software in the undertaking with the intent to maximize
performance and reduce investment and operating costs. • Prepare functional design layout drawings (PDF and AutoCAD); • List types of equipment and corresponding numbers; • Generate facilities sizing based on projected volumes / traffic • Size operation area, office, storage and purpose areas. • Describe buildings within the area • Prepare designs of equipment and systems, as appropriate • Liaise with stakeholders with regard to Equipment/Building/Apron interfaces • Transfer the design layouts in appropriate formats • Interpret size and capacity in terms of equipment or building within alternative systems at various
price points reflecting cost-benefit options. • Develop a development program with a detailed schedule • Provide a comprehensive design report.
Phase 1 - Concept and Final Design Stages - Considerations
Realog conducts a series of meetings to gather requirements, review of drawings and corrections, formulate design layout, propose equipment options, and identify the best fit for the layout in terms of the most efficient operation with an emphasis on coping with the forecast and operational requirements.
Phase 1 - Concept and Final Design Stages - Considerations
EB
S S
tora
ge
2nd
Sor
ting
per F
light
Flig
ht O
utbo
und
Flig
ht
Prim
ary
Sor
ting C
heck
-in
Che
ck-in
EB
S S
tora
ge
2nd
Sor
ting
per F
light
Flig
ht O
utbo
und
Flig
ht
Prim
ary
Sor
ting C
heck
-in
Che
ck-in
Baggage Claim Area
Baggage Claim Area
Long
Dur
atio
n S
tora
ge
Transfer Inbound Lines
Transfer Inbound Lines
Long
Dur
atio
n S
tora
ge
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Long
Dur
atio
n S
tora
ge
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Flig
ht O
utbo
und
Line
s
Concourse 1 Terminal Concourse 2
Long
Dur
atio
n S
tora
ge
Sor
ting
per F
light
Flig
ht O
utbo
und
Flig
ht
Che
ck-in
C
heck
-in
Long
Dur
atio
n S
tora
ge
Sor
ting
per F
light
Flig
ht O
utbo
und
Flig
ht
Che
ck-in
C
heck
-in
Long
Dur
atio
n S
tora
ge
Tran
sfer
Pro
cess
ing
Flig
ht O
utbo
und
Line
s
Transfer Inbound Lines
Transfer Inbound Lines
Concourse
Terminal
Claim Carrousels
Claim Carrousels
Che
ck-
in
Che
ck-
in
Che
ck-
in
Che
ck-
in
Tran
sfer
Bag
P
roce
ssin
g
Sor
ting
on F
light
M
akeu
p C
arro
usel
s S
ortin
g on
Flig
ht
Mak
eup
Car
rous
els
Transfer Bag Processing
Transfer Bag Processing
Concourse
Terminal
VALUR
MANAGEMENT
Phase 1 - Concept and Final Design Stages – Value Management
Realog utilizes Value Management in the Concept Design Phase.
Value Management is a powerful and proven project management decision-making tool. Synonymous with Value Engineering or Value Analysis, Value Management is a conscious and explicit set of disciplined procedures designed to seek out optimum value for money.
Value Management involves the intensive analysis of all facets of the proposed design with a view to reducing initial capital and long-term operational costs without abridging utility, function or performance. Put simply, the objective is to determine project improvement opportunities in the scope, function, design, material selection, construction techniques and capital and life cycle costs of the key components of the facility.
Pre-Study Activities
Development Phase
Presentation Phase
Function Analysis Phase
Creative Phase
Evaluation Phase
Information Phase
Implementation Phase
Follow-up Activities
Results OK?
Results OK?
Stage 1: Pre-workshop/study
Stage 2: Workshop
Stage 3: Post-workshop/study
NO
NO
YES
YES
SIMULATION
Phase 1 - Concept and Final Design Stages – Simulation Option
As an option, Realog offers to provide 3D simulation that can be used to compare different terminal layout options and workflow strategies.
Phase 1 - Cost Estimation Stage - Technical Specs and Cost Estimation
Realog provides tailored and expansive technical specification and cost estimation in order to allow for the widest possible choices.
Steps: • Realog will formulate a list of
quantities. • Realog will prepare technical
specifications that encapsulates the design
• Realog will canvass Equipment Providers to provide an expectant field of bidders and confirm the feasibility of the equipment.
• Realog will conduct workshops with the Equipment Providers to provide an expectant field of bidders and confirm the feasibility of the equipment
COST
ESTMIATION
Design Stages Unit Price Design StagesModules A B C D Total A B C D Total ModulesPCHS (Lift and Run Solution) PCHS (Lift and Run Solution)ULD storage GEN positions incl. Storage decks ULD storage GEN positions incl. Storage decks ULD storage Cooler positions incl. Storage decks ULD storage Cooler positions incl. Storage decks20ft Storage Locations Module A 20ft Storage Locations Module AULD Hoists ULD Hoists15ft PCHS TVs 15ft PCHS TVs20ft TV 20ft TV10ft Pallet Funnel Stack System GF 10ft Pallet Funnel Stack System GF10ft Pallet Funnel manual Stack System 1st Floor 10ft Pallet Funnel manual Stack System 1st FloorTransfer lanes to apron (outside) Transfer lanes to apron (outside)Sectional Doors (outside) Sectional Doors (outside)Transfer(Lanes(inside(Terminal( Transfer(Lanes(inside(Terminal(Sectional Doors (inside) Sectional Doors (inside)Workstation Systems Workstation SystemsLower-able Workstations 10 ft Lower-able Workstations 10 ftFixed Workstations (served by TV) Fixed Workstations (served by TV)Lower-able Workstations 20 ft Lower-able Workstations 20 ftTransfer Vehicle for Workstations (15 ft) Transfer Vehicle for Workstations (15 ft)Mobile Workstations (Slave Pallets) Mobile Workstations (Slave Pallets)Slave pallet mover incl. Charger Slave pallet mover incl. ChargerRoller Deck Scale for ULDs from Slave Pallets Roller Deck Scale for ULDs from Slave PalletsTransfer Lane Scale 20 ft Transfer Lane Scale 20 ftSorting System for Mail, Courier Sorting System for Mail, CourierPiece Counting System Piece Counting SystemASRS (Stacker Crane Solution) ASRS (Stacker Crane Solution)Standard Storage Positions ASRS Standard Storage Positions ASRS Cool Storage Positions ASRS Cool Storage Positions ASRSAutomatic Storage and Retrieval Machines (ASRS) Automatic Storage and Retrieval Machines (ASRS)ASRS Hoist ASRS HoistGF and 1st Floor IHP Conveyor (lenght 2.3 meter) GF and 1st Floor IHP Conveyor (lenght 2.3 meter)GF and 1st Floor IHP RA Decks GF and 1st Floor IHP RA DecksT-Car Level IHP Conveyor (lenght 2.3 meter) T-Car Level IHP Conveyor (lenght 2.3 meter)T-Car Level IHP RA Decks (lenght 2.3 meter) T-Car Level IHP RA Decks (lenght 2.3 meter)ASRS: For transfer of IHP's between hoist and ASRM 16x2x6 "hand-over conveyors" ASRS: For transfer of IHP's between hoist and ASRM 16x2x6 "hand-over conveyors"Transfer Cars for ASRS Transfer Cars for ASRSIHP (1,70m x 1,70m) (30% with a wall stack system) IHP (1,70m x 1,70m) (30% with a wall stack system)IHP Volume Scanner IHP Volume ScannerTruck Dock Truck DockULD Truck Dock 20 ft incl. Roller Shutters ULD Truck Dock 20 ft incl. Roller Shutters20ft TV 20ft TV Transfer lanes ULD truck dock to TV (10 ft roller decks) Module A Transfer lanes ULD truck dock to TV (10 ft roller decks) Module ABulk Truck Dock (Dock Leveller inluding Roller Shutters) Bulk Truck Dock (Dock Leveller inluding Roller Shutters)Turntables Module (Module A) Turntables Module (Module A)Specials Rooms Specials RoomsRack system special cargo in Module C and Module D in positions Rack system special cargo in Module C and Module D in positionsHeavy Rack System in positions Heavy Rack System in positionsCastor Mats in Module in sqm Castor Mats in Module in sqmSecurity and other Systems Security and other SystemsExport and Import Bulk X-ray Systems to ASRS Export and Import Bulk X-ray Systems to ASRSTransit Bulk X-ray Systems to ASRS/T-Car Level Transit Bulk X-ray Systems to ASRS/T-Car LevelULD X-Ray Systems Export Screening ULD X-Ray Systems Export ScreeningULD X-Ray Frame Systems Import Screening ULD X-Ray Frame Systems Import ScreeningCrane for battery charger room Crane for battery charger roomMHS Ram Protection in meter MHS Ram Protection in meterDocument Transportation System Document Transportation SystemForklift ForkliftIHP Transport Mover IHP Transport Mover
Units Price
Phase 1 - Bid Process Management Stage - Tender Process
Realog provides comprehensive representation throughout the bid management stage
• Realog will provide clear and legally sufficient tender documents that encapsulate the tender specifications, lists the requirements expected of contractors submittals, and provides a legal framework for the contractors engagement.
• Realog will assist in tender review by providing tender clarifications, raking submittals, and assisting in cost and contract negotiations.
• Realog will provide detailed ranking criteria and commentary on submittals with clear conclusions as to price and performance
TENDER
PROCESS
3.00$$$$$$$$$$$$$$4.00$$$$$$$$$$$$$$5.00$$$$$$$$$$$$$$6.00$$$$$$$$$$$$$$7.00$$$$$$$$$$$$$$
550#
570#
590#
610#
630#
650#
670#
690#
710#
730#
750#
#$300###$320###$340###$360###$380###$400###$420###$440###$460###$480###$500##
Bags%
Cost%
BHS#Tender#4#
BHS#Tender#1#
BHS#Tender#2#
BHS#Tender#7#
BHS#Tender#3#
BHS#Tender#6#BHS#Tender#5#
#5####
#0.10##
#0.20##
#0.30##
#0.40##
#0.50##
#0.60##
#0.70##
BHS#Tender#1#BHS#Tender#2#BHS#Tender#3#BHS#Tender#4#BHS#Tender#5#BHS#Tender#6#BHS#Tender#7#
Cost%
Phase 2 - Pre-Construction Stage - Review of Submittals
The methodology to be implemented by Realog in the review of submittals can best be described as “Care.” REVIEW OF
SUBMITTALS
Realog will take great care to assure the client realizes a system that meets its current and future needs. Realog will assure an optimized equipment/building/architectural solution with value engineering and an emphasis on utilization of green technology. Realog will review the detailed design of the Equipment Provider and review all material submittals, shop drawing, method statements, and other documents relating to the equipment,
Phase 2 – Construction Stage - Site Supervision
Realog supervises and administers the contract executed by the client and the contractor. SITE
SUPERVISION
Site Supervision
Site Meeting and Record Keeping
Construction Method
Survey Check/MHS
Quality Control
Review Contractor's Site Organzation
Review Contractor's Programme
Claims and Disputes
Completion of Work/Taking over
The prime objective of the Site Supervision is to obtain quality production as specified and set by the contract within the time frame and budget allocation. Realog will focus on:
Phase 2 – Construction Stage - Site Supervision
Realog will carry out the following tasks. • Ensure the equipment and building meets operational standards by careful scrutiny of each
and every installation. • Ensure contractors meet budget and schedule by monitoring project expenditures; identifying
variances; implementing corrective actions. • Accomplish project results by defining project purpose and scope; calculating resources
required; establishing standards and protocols; allocating resources; scheduling and coordinating staff and sub-contractors; evaluating milestone assumptions and conclusions; resolving design problems; evaluating and implementing change orders.
• Safeguard projects by conducting inspections at critical phases • Prevent interruptions by complying with, and enforcing, codes. • Maintain safe, secure, and healthy work environment by following and enforcing standards
and procedures; complying with legal regulations. • Enhance the client’s reputation by exploring opportunities to add value. • Schedule delivery of needed materials and labor requests. • Trouble-shoot and identify problems; offer timely and safe solutions. • Manage tool and materials to the degree advisable. • Focus on training to enable a smooth startup of operations.
ORAT: An Integrated Approach
• Operational Readiness and Airport Transfer
(ORAT) is a programme designed to interface
with construction, systems suppliers and
operational stakeholders in an airport
development project
• The objective is to assist all stakeholders in
preparing their operational readiness
• Realog ORAT provides a proactive and
structured approach to dealing with the end-
users’ challenge of adjusting their modus
operandi to the new work environment and
managing the risks involved in the transition.
The Realog ORAT team constantly plans, acts, checks and revises the stakeholder readiness activities along the
commissioning timeline to achieve safe, secure, smooth and sustainable airport operations from day one.
Airport Operator
State Authorities
Airlines
Ground Handlers
ATC
Service Providers
Facilities
Airport Systems
Human Resources
Information ORAT
Operational Elements
Phase 3 – Defects Liability Stage - Defects Liability Containment
Realog provides representation during the defects liability period. DEFECTS
LIABILITY
The methodology necessary in a defects liability phase is to be proactive in review and inspection. Realog will proactively and regularly check the system for defects that have or will occur. It then will enforce compliance by the contractor to repair or replace defective parts or systems. Realog will oversee the complete implementation of the snag list and the system is working smoothly under stable and sustainable conditions. Realog will provide support in monitoring, in regular site inspection, and in particular, the following:
• Implementation of snag list • Performance and availability of the
equipment • Regular preventive and other maintenance • Spare part availability • Detailed inspection of the equipment
before end of defects liability period
VaR
Labor
Services
Product
Materials
Equipment
Investment
Airport Systems Selected References
Dresden Int. Airport Germany Dresden International Airport Services: BHS Planning and Design
Innsbruck Airport Austria Innsbruck International Airport Services: BHS Planning and Design
Luxembourg Int. Airport Luxembourg Luxembourg International Airport Services: BHS Planning and Design
Vienna Int. Airport Austria Vienna International Airport Services: BHS Planning and Design of
Extension
Dubai Int. Airport Conc. B/C UAE Dubai International Airport Services: BHS Tender Management
Dubai Int. Airport Terminal 3 UAE Dubai International Airport Services: BHS Tender Management
Dubai Int. Airport Terminal 1 UAE Dubai International Airport Services: BHS Planning and Design
Rio de Janeiro Int. Airport Brazil Rio de Janeiro International Airport
Services: BHS ORAT and redesign of
system
Realog – International Business Experience
Realog – International Business Experience
Dubai Int. Airport UAE Emirates Cargo Mega-Terminal Services: MHS Planning, Design,
Specification, Site Supervision
Salalah Airport Oman Oman Airport Services Services: BHS Review of Detail Design and
Site Supervision
Muscat Int. Airport Oman Oman Airport Services Services: BHS Review of Detail Design and
Site Supervision
Sydney Int. Airport Australia Sydney International Airport Services: BHS Planning and Design
Brisbane Int. Airport Terminal 3 Australia Brisbane International Airport Services: BHS Planning and Design
Paris CDG Int. Airport France ADP
Services: BHS Assessment
Abu Dhabi Int. Airport UAE Etihad Cargo Terminal (New) Services: MHS Planning, Design, and
Specification
Sheremetyevo Int. Airport Russian Federation TPS/Moscow Cargo Services: MHS Planning, Design, and
Specification
Realog – International Business Experience
Entebbe Int. Airport Uganda New Cargo Terminal Services: Cargo Terminal Design
Dubai Int. Airport UAE Flower Center Services: MHS Planning, Design,
Specification, Site Supervision
Dubai Int. Airport UAE Dubai Duty Free Services: MHS Planning, Design,
Specification, Site Supervision
Dubai South Int. Airport UAE Al Maktoum and Dubai Logistics City Services: Cargo Master Plan
Abu Dhabi Int. Airport UAE
Etihad Cargo Terminal Expansion
Services: MHS Planning, Design and
Supervision of Existing Cargo Terminal
Munich Int. Airport Germany Munich Airport
Services: Development of a Cargo Security
Concept in accordance with EU Regulations
Frankfurt Int. Airport Germany Lufthansa Cargo
Services: Price Benchmark and Revenue
Model
Munich Int. Airport Germany
Munich Airport
Services: Cargo processes benchmark
analysis and recommendations
Realog – International Business Experience
Dubai Int. Airport UAE Dubai Airports, Emirates, and dnata
Services: Strategic Analysis and Forecast to
2050
Dubai Int. Airport UAE Dubai Airports
Services: Strategic Analysis and Forecast to
2040
Stockholm Arlanda Int. Airport Sweden Nordic Airport Properties Services: Financial Analysis and Forecast to
2030
Al Maktoum Int. Airport UAE Dubai Airports
Services: Strategic Analysis and Forecast to
2040
Dubai South Int. Airport UAE Dubai Airports, Emirates, and dnata
Services: Strategic Analysis and Forecast to
2050
Abu Dhabi Int. Airport UAE Etihad Cargo
Services: Strategic Analysis and Forecast to
2040
Malmö Sturup Airport Sweden Nordic Airport Properties Services: Financial Analysis and Forecast to
2030
Göteborg Landvetter Airport Sweden Nordic Airport Properties Services: Financial Analysis and Forecast to
2030
Realog – International Business Experience
Zurich Int. Airport Switzerland Swissport Services: Concession Optimization of
Swissport Station Global Network
Frankfurt Int. Airport Germany Lufthansa Cargo Services: Development of the Cargo
Terminal Hub Concept
Stockholm Arlanda Int. Airport Sweden Nordic Airport Properties Services: PPP Assessment, Concession
Negotiations, Financial Structuring
Göteborg Landvetter Airport Sweden Nordic Airport Properties (PPP) Services: Quantitative Analysis, Concession
Negotiations, Financial Structuring
JFK Int. Airport United States Airis JFK (BOT) Services: Quantitative Analysis, Concession
Negotiations, Financial Structuring
Miami Int. Airport United States Airis Miami (BOT) Services: Quantitative Analysis, Concession
Negotiations, Financial Structuring
Leipzig Int. Airport Germany Airis ODG (BOT) Services: Quantitative Analysis,
Development Assessment and Negotiations
Frankfurt Int. Airport Germany Airis ODG (BOT) Services: Quantitative Analysis,
Development Assessment and Negotiations
2
Lage und Architektur des neuen Verwaltungsgebäudes
Vogelperspektive
Vorderansicht am Airportring
Rückansicht / Campusbereich Grundriss / Regelgeschoss
Lageplan
Bestandsgebäude 451
Grundstück MUSA 3
Airport Systems Contact Information
Contact Information
Realog Consulting GmbH Fremersbergtrasse 111 76530 Baden-Baden Germany
Mr. Oliver Schaaf Managing Director Phone: +49 7221 9207666 Email: [email protected]
Contact Information