    M/S. Akar Technical Services Co. (L.L.C) Date: 03-07-2011

    Dubai, U.A.E

    Kind Attn: Mr. Juzer Eski Senior Project Manager.

    Sub: Quotation for Air Conditioning Chilled Water Piping & Unit Installation with

    Valve Package on Labor Charge Basis

    Dear Sir,

    Pursuant to your request for the quotation of the above-mentioned subject, we thank you giving us an opportunity to

    quote on your requirements. We are now pleased to submit our best competitive offer for your kind consideration

    and approval

    Description of work:

    1. Shifting F.C.U from the store area to the tower floor location and Installation of F.C.U with

    hanging bush and necessary threading rod, nut and bolts as per the drawings.

    2. Installation of Valve Package with necessary fittings, by pass, flexible.2 way valve, test points,

    drainage lines per the Approved drawings. Do the 150 PSI Hydrostat Pressure Test. After getting

    the approval to do the proper insulation and handover the main contractor.

    3. Installation of Chilled Water Piping with proper Supports as per the Approval drawings. 150 PSI

    Hydrostat Pressure Test. After getting the approval to do the proper insulation and handover the

    main contractor.

    1

  • 7/27/2019 AKAR TECHANICAL SERVICES 03-07-2011.doc

    2/3

    Price for shifting, unit installation of F.C.U with necessary support per unit =200 AED

    Price for Installation Valve Package piping Connection with Main line (Approximate 1 meter)

    Sl NOSize of Valve Package with Unit

    Installation Dhs/Valve Package

    1 1/2 Valve Package 300

    2 3/4 Valve Package 300

    3 1 Valve Package 300

    Price for Chilled Water Piping Works.Pressure Test and piping Insulation / Running meter

    Sl NO Size of Chilled water pipe Dhs/Valve Package

    1 1/2 " 25

    2 3/4" 30

    3 1" 40

    4 1 1/2 50

    5 2" 60

    6 2 1/2" 100

    2

  • 7/27/2019 AKAR TECHANICAL SERVICES 03-07-2011.doc

    3/3

    Note:

    1. All the air conditioning equipments necessary fitting, 3Way Valves, and accessories

    Supply by Main contractor

    2. The main contractor should provide the Proper Materials in time.

    3. The main contractor provides Wall Opening for chilled water piping as per the drawings.

    4. The main contractor provides Store Area, Power Supply and Water during the workingHours.

    5. After work completion, if any changes have to be made, charges will be extra.

    Excluded Work

    All the electrical wiring and drainage connection are not included.

    Start up and commissioning, not in our scope.

    Flushing up and Chemical treatment works are excluded.

    Terms of Payment

    Invoice to be Submit as per progress of work. Payment shall be made in 30 days from the date of submission

    invoice.

    We hope our offer will be inline with your requirements. Assuring our best services at all times. Waiting for a

    favorable reply and with best regards.

    Its always ADYMs pleasure to work with you.

    Thanking you,

    Yours faithfully,

    ForADYM Mechanical and Air conditioning Works LLC

    Over fifteen years of experience in Air-conditioning works

    Rajan V Valathe

    Managing Director

    Mob: 0506257340

    3