    SR.NO. PARTICULARS REMARKS

    FOR ANTENNA

    1 Pole mount should be installed as per plan.

    2 Pole mount should be installed at correct height.

    3 The pole mount should be tight with tower body in proper way.

    4 Apply the force on pole mount there is no shake out .

    5 Antenna must be tight with the pole mount.

    6 Antenna should not be shake out when apply the force.

    7 mechanical and electrical tilt should be as per plan.

    8 Antenna should be as per plan.

    9 Labelling should be done in back side of antenna.

    FOR O/D JUMPER CABLE

    10 O/D Jumper cable should be as per requirement.

    11 Jumper cable connector connect with antenna port.

    12 O/D jumper cable should be tight with antenna port.

    13 weather proofing should be apply over the connection of jumper and antenna port.

    14 Black colour cable ties should be applied on the weather proofing.

    15 O/D jumper cable loop should be tight with black colour cable ties.

    16 Cable ties should be cut poperly.

    17 Lablelling should be done over the O/D jumper cable.

    FOR FEEDER CABLE

    18 Fedder cable should be as per requirement.

    19 Feeder cable connector should be connect with O/D jumper cable.

    20 Connection of the feeder cable and jumper cable should be tight.

    21 Weather proofing should be done over the feeder cable and O/D Jumper cable.

    22 Over the connection black colour cable ties should be done properly.

    23 Cable ties should be cut poperly.

    24 Banding should be more then 300mm at VCT and HCT.

    25 Dummy clamp should be apply at the banding.

    26 Dummy clamp is used to lay the feeder cable in proper way.

    27 At banding dummy clamp should be free from the cable tray.

    28 RF Clamp should be properly tight with the cable tray.

    29 6-way RF Clamp should be use during the installation of feeder cable.

    30 Feeder cable should be properly tight with RF Clamp.

    31 RF Clamp should be apply at proper distance.

    32 Two horizontal strip RF Clamp should be 0.9m.33 Two vertical strip RF Clamp should be 1.5m.

    34 S-band should be properly applied at feeder enter into shelter.

    35 Feeder cable should be insert inside shelter through roxtec.

    36 There should not be any vertical or horizontal bend of feeder.

    37 lablelling should be done over each and every sector of feeder cable.

    FOR GROUNDING OF FEEDER CABLE

    38 At earthing connection outer insulation of the feeder cable should be properly removed.

    PUNCH POINT FOR BTS SITE

    SITE NAME: SHAKTINAGAR AKASH RAY OPERATOR NAME- AIRTEL

    SITE ID- SH4488 DATE- 28TH FEB 2012

  • 8/2/2019 Akash Ray-punch Point

    2/6

    39 Earthing kit should be properly tight with feeder cable.

    40 weather proofing should be properly applied over earthig kit.

    41 Cable ties should be properly tight over weather proofing.

    42 All 6-grounding connection should be done at same place.

    43 Connect all grounding connection below 1 to 1.5m of jumper and feeder connection.

    44 grounding cable should be straightly route along with the fedder cable.

    45 Black colour Cable ties should be properly applied over grounding cable.

    46 Tower body paint shoud be properly removed at where we tight the c-clamp.

    47 C-clamp should be properly connect with tower body.

    48 Grounding cable properly connect with the c-clamp or EGB.

    49 connect grounding cable with c-clamp through ring types lugs.

    50 size of the lugs should be same as a grounding cable.

    51 there should be no gape between lugs and outer insulation of cable

    52 lugs should be properly crimped over grounding cable.

    53 Pvc tape should be provide and wrap properly at lugs connections.

    54 EGB must be installed just below the cable tray on outside of shelter wall.

    55roun ng a e mus e g w o ee er ca e.

    56 Grounding cable should be connect with ring type lugs.

    57 Another side of grounding cable should be connect with earthing kit.

    58 Remove outer insulation of all six feeder cable should be proper way.

    59 Earthing kit should be properly tight with feeder cable.

    60 weather proofing should be properly applied over earthig kit.

    61 Use black colour cable tie to tight the weather proofing.

    62 Cable ties should be cut poperly.

    63 Lugs should be proper tight with EGB.

    64 Lugs size should be same as the grounding cable.

    65 Grounding cable should be properly route with feeder cable.

    66 There are no any loose connection at EGB.

    67 Labelling should be done each sector grounding cable.

    FOR EARTHING PIT

    68 There should be 3 earthing pits

    69 Distance between two earth pits should be 3m.

    70 Distance between earth pits and any equipments should be 2m.

    71 Earthing pit-1 should be connect with shelter EGB.

    72Earthing pits-2 strip should be diagnollly connect along with tower body,D.G body.,and

    shelter wall on proper way.

    73 Earthing pits-3strip should be connect D.G. Netural point.

    74 Must be connect CU Strip to shelter wall, D.G, and Tower body by welding.

    75 Must be remove the paint where we connect grounding cable with tower body.

    FOR ROXTEC

    76 Roxtec should be properly tight with shelter wall.

    77 silicon gel is used to seal the gap between roxtec and shelter wall.

    78 Without feeder cable holes should be covered with pieces of feeder cable.

    79 There should be not be any cross routing.

    80 Feeder cable should be enter sector wise through roxtec.

    81 The Roxtec should be 4-way or 6-way.

    82 Roxtec rubber boot should be properly tight.

    83 Labelling should be done at feeder entery of roxtec with sector wise.

    FOR FEEDER CABLE WITH SURGE ARRESTOR

    84 The surge arrester should be as per requirement.

  • 8/2/2019 Akash Ray-punch Point

    3/6

    85 The surge arrester connector should be properly connect with feeder connector.

    86 Connection should be properly tight with feeder cable.

    87 Feeder connector should be tight along with feeder cable.

    88 Apply pvc tape and wrap on the connection og feeder and SA connector.

    89 Use hot airgun to shrink the weather proofing.

    90 Cable ties should be apply over the weather proofing.

    91 Cable ties should be cut poperly.

    92 Direction of the knot of the cable tie should be same for all.

    93 labelling should be done every sector of SA.

    GROUNDING CONNECTION FOR S.A TO IGB

    94 Grounding cable should be properly cut as per requirement for all SA to IGB.

    95 Lugs should be properly crimped.

    96 Grounding cables and Lugs should be tight in proper way.

    97 size of the Lugs should be same as a cable.

    98 Lugs should be properly grip.

    99 There should not be any gap between lugs and outer insulation of cable.

    100 pvc tape should be provide and wrap both end of grounding cable properly.

    101 Lugs should be properly tight with SA.

    102 Lugs should be properly tight with IGB.

    103 Grounding cable should be properly route with feeder cable.

    104 There should not be any cross routing.

    105 Grounding cable should be tight with feeder cable by cable ties.

    106 Cable ties should be cut poperly.

    107 Direction of the knot of the cable tie should be same for all.

    FOR CONNECTION BETWEEN I/D JUMPER CABLE WITH S.A.

    108 The I/D jumper cable should be as per requirement.

    109 I/D Jumper cable connector should be properly connect with SA connector.

    110 Weather proofing should be properly applied over connection.

    111 Hot air gun should be properly apply.

    112 Cable ties should be applied to tight the weather proofing.

    113 Cable ties should be cut properly.

    114 labelling should be done over jumper cable.

    FOR I/D JUMPER CABLE TO BTS

    115 I/D Jumper cable connector should be properly Tight with BTS port.

    116 weather proofing should be properly done over the connection of jumper and BTS port.

    117 Hot air gun should be properly apply.

    118 Cable ties should be applied to tight the weather proofing.

    119 Cable ties should be cut properly.

    120 labelling should be done at BTS port.

    FOR INSTALLATION OF BTS CABINET

    121 BTS cabinet should be installed as per floor plan.

    122 accuracy of mesurement should be proper.

    123 Measurement should be proper from back side wall to BTS cabinet.

    124 Measurement should be proper at front side.

    125 marking should be proper for base installation.

    126 hole should be properly drilled.

    127 Fastener should be properly installed at hole.

    128 Base leveling should be proper.

    129 Base should be properly tight by bolt.

  • 8/2/2019 Akash Ray-punch Point

    4/6

    130 No continuity from fasterner to base body.

    131 BTS cabinet should be installed properly over base.

    132 BTS cabinet should be properly tight by bolt.

    133 BTS cabinet will not shake out when we apply the force.

    FOR GROUNDING CONNECTION OF BTS

    134 Grounding cable should be tight with grounding port of BTS.

    135 size of the Lugs should be same as a cable.

    136 Lugs should be properly crimped.

    137 There should no any gap between Lugs & outer insulation of cable.

    138 pvc tape should be provide and wrap properly.

    139 Lugs should be proper tight with IGB.

    140 Pvc channel should be connected with shelter wall in vertical position.

    141 Grounding cable should be properly route with cable tray.

    142 There should be no cross routing of grounding cable.

    143 Cable ties should be applied each and every strip of cable tray.

    144 Tie should be provided with double cross with single cable tie.

    145 All cable tie should be cut in proper way.

    146 Direction of the knot of the cable tie should be same for all.

    147 labelling should be done over grounding cable.

    FOR POWER CABLE CONNECTION OF BTS

    148 Power cable should be properly tight with BTS port.

    149 power cable should be straightly route with cable tary.

    150 There should be no cross routing of power cable.

    151 Cable ties should be applied each and every strip of cable tray.

    152 Tie should be provided with double cross with single cable tie.

    153 All cable tie should be cut in proper way.

    154 Direction of the knot of the cable tie should be same for all.

    155 labelling should be properly done over power cable.

    FOR INSTALLATION OF TRSM RACK

    156 TRSM Rack should be installed as per floor plan.

    157 accuracy of mesurement should be proper.

    158 Measurement should be proper from back side wall to TRSM Rack.

    159 Measurement should be proper at front side.

    160 marking should be proper for base installation.

    161 hole should be properly drilled.

    162 Fastener should be properly installed at hole.

    163 Base leveling should be proper.

    164 Base should be properly tight by bolt.

    165 No continuity from fasterner to base body.

    166 TRSM Rack should be installed properly over base.

    167 TRSM Rack should be properly tight by bolt.

    168 TRSM Rack will not shake out when we apply the force.FOR GROUNDING CONNECTION OF TRSM RACK

    169 Grounding cable should be tight with grounding port of TRSM Rack.

    170 size of the Lugs should be same as a cable.

    171 Lugs should be properly crimped.

    172 There should no any gap between Lugs & outer insulation of cable.

    173 pvc tape should be provide and wrap properly.

    174 Lugs should be proper tight with IGB.

    175 Pvc channel should be connected with shelter wall in vertical position.

  • 8/2/2019 Akash Ray-punch Point

    5/6

    176 Grounding cable should be properly route with cable tray.

    177 There should be no cross routing of grounding cable.

    178 Cable ties should be applied each and every strip of cable tray.

    179 Tie should be provided with double cross with single cable tie.

    180 All cable tie should be cut in proper way.

    181 Direction of the knot of the cable tie should be same for all.

    182 labelling should be done over grounding cable.

    FOR POWER CABLE CONNECTION OF TRSM RACK

    183 Power cable should be properly tight with TRSM Rack port.

    184 power cable should be straightly route with cable tary.

    185 There should be no cross routing of power cable.

    186 Cable ties should be applied each and every strip of cable tray.

    187 Tie should be provided with double cross with single cable tie.

    188 All cable tie should be cut in proper way.

    189 Direction of the knot of the cable tie should be same for all.

    190 labelling should be properly done over power cable.

    FOR INSTALLATION OF BATTERY BANK

    191 Battery bank should be installed as per floor plan.

    192 accuracy of mesurement should be proper.

    193 Measurement should be proper from back side wall to battery bank.

    194 Measurement should be proper at front side.

    195 marking should be proper for base installation.

    196 hole should be properly drilled.

    197 Fastener should be properly installed at hole.

    198 No continuity from B.B body to anchor fasterner.

    199 Battery bank cabinet should be properly tight with bolt.

    200 Battery bank rack should be properly installed over iron peding with rubber.

    201 Each and every strips should be connect with cell in proper way.

    202 Each bolt should be tight in proper way.

    203 Apply labelling steaker each and every cell should be in proper way.

    204 Petroleum Jelly must be applied each and every connections.

    205 B.B cover should be install in proper way.

    FOR GROUNDING CONNECTION OF BATTERY BANK

    206 Grounding cable should be tight with grounding port of battery bank.

    207 size of the Lugs should be same as a cable.

    208 Lugs should be properly crimped.

    209 There should no any gap between Lugs & outer insulation of cable.

    210 pvc tape should be provide and wrap properly.

    211 Lugs should be proper tight with IGB.

    212 Pvc channel should be connected with shelter wall in vertical position.

    213 Grounding cable should be properly route with cable tray.

    214 There should be no cross routing of grounding cable.215 Cable ties should be applied each and every strip of cable tray.

    216 Tie should be provided with double cross with single cable tie.

    217 All cable tie should be cut in proper way.

    218 Direction of the knot of the cable tie should be same for all.

    219 labelling should be done over grounding cable.

    FOR INSTALLATION OF POWER PLANT

    220 Power plant should be installed above the battery bank.

    221 Power plant should be tight along with battery bank.

  • 8/2/2019 Akash Ray-punch Point

    6/6

    222 Place of the power plant should be exact as per the floor plan.

    223 Power plant will not shake out when we apply the force.

    FOR GROUNDING CONNECTION OF POWER PLANT

    224 Remove the paint where we connect grounding cable with power plant.

    225 Grounding cable should be tight with grounding port and busbar of power plant.

    226 size of the Lugs should be same as a cable.

    227 Lugs should be properly crimped.

    228 There should no any gap between Lugs & outer insulation of cable.

    229 pvc tape should be provide and wrap properly.

    230 Lugs should be proper tight with IGB.

    231 Pvc channel should be connected with shelter wall in vertical position.

    232 Grounding cable should be properly route with cable tray.

    233 There should be no cross routing of grounding cable.

    234 Cable ties should be applied each and every strip of cable tray.

    235 Tie should be provided with double cross with single cable tie.

    236 All cable tie should be cut in proper way.

    237 Direction of the knot of the cable tie should be same for all.

    238 labelling should be done over grounding cable.

    FOR GROUNDING CONNECTON OF IGB TO EGB

    239 Grounding cable should be properly route in pvc channel through roxtec.

    240 labelling should be at both end of grounding cable.

    241 Nut-bolt should be properly tight.

    FOR INSTALLATION OF DDF

    242 DDF should be install as per floor plan.

    243 DDF must be proper tight on shelter wall.

    244 Drill pit should be as per the size of hole.

    245 Screw should be tight properly.

    246 DDF should not be shake out when we apply force.

    247 Horizontal level of DDF should be proper.

    FOR GROUNDING CONNECTION OF DDF

    248 Grounding connection should be top portion of DDF.

    249 Grounding connection should be tight properly.

    250 size of the Lugs should be same as a cable.

    251 Lugs should be properly crimped.

    252 There should no any gap between Lugs & outer insulation of cable.

    253 pvc tape should be provide and wrap properly.

    254 Lugs should be proper tight with IGB.

    255 Pvc channel should be connected with shelter wall in vertical position.

    256 Grounding cable should be properly route with cable tray.

    257 There should be no cross routing of grounding cable.

    258 Cable ties should be applied each and every strip of cable tray.

    259 Tie should be provided with double cross with single cable tie.

    260 All cable tie should be cut in proper way.

    261 Direction of the knot of the cable tie should be same for all.

    262 labelling should be done over grounding cable.