akha

14
REGIONAL INVESTMENT POTENTIAL EXHIBITION SOUTHEAST SULAWESI REGIONAL INVESTMENT BOARD OF SOUTHEAST SULAWESI JL. MAYJEN S.PARMAN NO. 02 PHONE: (0401) 3126053 FAX. (0401) 3126182 KENDARI 93121

Upload: tawakal-tando

Post on 15-Jan-2015

893 views

Category:

Lifestyle


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: akha

REGIONAL INVESTMENT POTENTIAL EXHIBITION

SOUTHEAST SULAWESI

REGIONAL INVESTMENT BOARD OF SOUTHEAST SULAWESI

JL. MAYJEN S.PARMAN NO. 02 PHONE: (0401) 3126053 FAX. (0401) 3126182 KENDARI 93121

Page 2: akha

2

SOUTHEAST SULAWESICAPITAL CITY : KENDARI.

3 ° LS – 6 ° LS AND 120 °45’ BT-124° 6’ BT.

Page 3: akha

PROFILE OF SOUTHEAST SULAWESI

I. GENERAL INFORMATION:A. Area : 153.018,93 Km2.

a. Land Area : 38.139,98 Km2 b. Sea Area: 114.879 Km2.

B. Consist of 10 Regencies and 2 Municipalities.C. Population: 2. 031.532 People.D. Economic Condition:

a. Economic Growth: 7,96% (2007).b. GRDP : Rp. 17.953.07 Billion Rupiah. (2007).c. Per Capita income: Rp. 8.837.209.76 .

E. Man Power:a. Number of Employee is 9769.256 from total

number of working age (2008).

b. Number of Unemployed: is 407.094, from total number of working age (2008).

Page 4: akha

II. InfrastructureA. Airport :

a Haluoleo Airport (Kendari City)b. Matahora Airport (Wakatobi Regency)c. Saniban Airport (Kolaka Regency).d. Sugimanuru Airport (Muna Regency).e. Betoambari Airport (Bau-Bau City).

B. Seaport: a. 3rd class seaport: Kendari and Bau-Bau Seaport,b. 4th class seaport: Pomalaa seaport, Kolaka Regency.c. 5th class seaport: Kolaka , Raha, and Langara seaport.

C. Length of Road: 8.422.77 Km. a. National Road : 1.328.92 Km,

b. Province Road : 489 Km.c. Regencies Road : 8.422.77 Km.

D. Power supply:Instaled Capacuty : 480.375.318 KW.

PROFILE OF SOUTHEAST SULAWESI

Page 5: akha

INVESTMENT POTENTIAL IN SOUTHEAST SULAWESI

N I C K E L

G O L D

A S P H A L T

POWER PLAN

Page 6: akha

LOCATED IN BOMBANA REGENCY, KOLAKA REGENCY, BUTON REGENCY, NORTH KOLAKA REGENCY, NORTH KONAWE REGENCY, SOUTH KONAWE REGENCY , KONAWE REGENCY .

NICKLE DEPOSITE = 97,4 BILLION TONS

Page 7: akha

LOCATED IN NORTH KOLAKA REGENCY, KOLAKA REGENCY, KONAWE REGENCY, SOUTH KONAWE REGENCY, AND BOMBANA REGENCY.

GOLD DEPOSITE = 1,125 MILLION TONS

Page 8: akha

LOCATED IN BUTON ISLAND INCLUDE NORTH BUTON REGENCY, BUTON REGENCY, AND BAU-BAU MUNICIPALITY.

ASPHALT DEPOSITE = 680.747.000 TONS.

Page 9: akha

ASPHALT BUTON UTILIZATION IN OTHER PROVINCES IN INDONESIA

MAJALENGKA-WEST JAVA

TOMO-WEST JAVA

GORONTALO

SOURCE : Drs. Madi Hermadi, Ssi, MMRoad and river Research and Development Centre.

Page 10: akha

QUARTZ : 5 BILLION TONS

MARMBLE : 206 BILLIOM M3

CLAY : 884 BILLION M3

ONIX : 547 THOUSAND

M3

GAMPING STONE : 1,6 BILLION M3

MANGANESSE : 6.000 HA IN BUTON

REGENCY

IRON SAND : IN BUTON REGENCY,

NORTH KONAWE, KONAWE

AND BOMBANA REGENCIES

PHOSPAT : IN BUTON

REGENCY

CRHOMITES : 2.000 – 2.500 HA IN

BUTON REGENCY.

MAGNESITE : NORTH KOLAKA,

KOLAKA, KONAWE AND

BOMBANA REGENCIES.

MINING POTENTIAL FOUND IN SOUTHEAST SULAWESI

Page 11: akha

THE POTENTIAL OF ELECTRICITY ENERGY RESOURCES

HYDRO POWER POTENTIAL

LASOLO RIVER 90 MW

KONAWEHA RIVER24 MW

TAMBOLI RIVER25,8 MW

LALINDU RIVER100 MW

GEO THERMAL POTENTIAL

LAINEA60 MWE

MANGOLO50 MWE

Prediction of electricity demand in southeast sulawesi in order to be a centre of mining industries indonesia : For smelter dan refinery is 640 MG. For stainles steel fabrique is 230 MW.

Page 12: akha

NO RIVER REGENCYDEBIT

(M3/DET)

CAPACITY

(KW)

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Lasolo.

Lalindu.

Mosolo.

Lampeapi.

Lawei Roraya.

Ngari-ngari.

Winto wining.

Lakalawa.

Ronta

Towor

Lantowu.

Alawatu.

Tamboli.

Mangolo.

Oko-oko

North Konawe

North Konawe

Konawe

Konawe

Konawe

South Konawe

Buton

Buton

North Buton

North Buton

Muna

North Kolaka

North Kolaka

North Kolaka

Kolaka

124,000

413,000

5,300

13,890

12,300.

0,350

12,300

0,280

0,230

8,000

3,270

26,290

7,000

1,480

2,530

100.000,00

200.000,00

7.950,00

10.420,00

1.412,0

10.500,00

1.600,00

13.050,00

520,00

489,00

3.677,00

2.953,00

788,00

222,00

1,00

Source : Dinas Energi dan Sumber Daya Mineral Prov. sultra 2008

SOME OF AREAS IN SOUTHEAST SULAWESI POTENTIAL TO BE ELECTRICITY RESOURCES

Page 13: akha

Electricity

Condition

Company : PT. PLN (Persero).Installed Capacity : 89,17 MW.Peak Load : 69,52 MWCustomer : 141.774 (415.043 Family).Customer Development : 10,19 % a year.Ratio of electrification : 34,14 %.Installed Villages : 1.348 Villages among 2.000 Villages (67,4 %).

Page 14: akha

SOUTH EAST SULAWESI EXPLORE THE HIDDEN

MIRACLE

THANK YOU