Population of the Area
1971 2001 2011 2020
31,667 28,531 63,195 100,000
Total Land Extant – 32.39 Sq.km.
Density – 20 person per Hectare (P.S. Area)
90 person per Hectare (City Limits)
Identified main Problems
1. Over-flow of Piga Oya
2. No properParking Facility availablewithin the city
3. Malfunctioning of Existing CommercialBuilding at City centre
4. Current problem regarding to availability ofSite of solid waste disposal.
2.Clearing canal and canal bed improvement
PROPOSAL 1. Short Term Solution
•Already initiated•Removal Soil deposit for Smooth water flow
1. Widening of stream (where can do )
Long Term Solution
Demarcation of National Disaster Management Organization
PROPOSAL 2.
3. Physical Character of the City
• The city located between hills and river• Limitation of developable land
Causes 2
2. Available of Public Land is Very Limited
•Most of land has Private Ownership
Causes 2
• Development activity has Controlled
1.On- Street parking lots
PROPOSAL 1. Short Term Solution
• Providing parking spaces on one site of roads
PROPOSAL 2.
Long Term Solution
1. Identification of land for Off-Road Parking Spaces
• Considering rapid growth of the city parking will be major problem of the area.
•It is crucial to identify land from near by the city for long hour parking :shop owners and Banks etc.
Option I
Existing Situation
• Constructed during in 1980• Most of shops are used for stores or closed• Badly damaged
3. Malfunctioning of Existing CommercialBuilding at City centre
Option I
PROPOSAL
Renovate of the Building
• Interior and Exterior renovation of the building
• Facade development
• Providing Parking in ground floor
Total Area - 20,000.Sq.ft
Estimated cost - Rs.150m
Number of floor – 4 floors with parking facilities
PROPOSALOption II
Proposed Commercial Complex
4. Current Issue: Solid Waste Disposal
•Collection: 9 trucks Per day
•Available site : Yalugama
The site has undergone landslide and damaged near by village the on last rainy days.
Issues
PROPOSAL 1.
Short Term Solution
• Construct of a Retaining wall to the existing site
Estimated Cost – Rs. 1.0m
Long Term SolutionPROPOSAL 2.
• Promoting Compose production in domestic
• Regularize a system to deposal solid waste
• Fining