al waha marine construction llc - bava … dredging, laying of rcc of 1000 mm dia 600 mtrs in the...
TRANSCRIPT
COMPANY PROFILE (GENERAL) COMPANY PROFILE (GENERAL)
DISCOVER THE
PROFESSIONALS
OF UNDER
WATER WORKS
UAE :
E-mail: [email protected], www.bavaengineering.com
HSE Quote: Safety is our #1 priority on all our operations and will not be compromised
QATAR : INDIA :
38/18, 1st floor, Devodoss street Vedhachalam Nagar chengelpet, Kancheepuram Dt. Tamilnadu, India Tel. :+91 44 67472148 Fax :+91 44 27428910
Flat No. 101, Salmeen building Al Ma’areedh, Ras Al Khaimah United Arab Emirates. Mobile No. :+971 55 3414414 :+971 50 7858104 :+971 55 9282645 :+971 50 3413314
AL WAHA MARINE CONSTRUCTION LLC
1.1 Company Profile
1.2 Organization Chart
1.3 Safety Policy Statement
1.4 Capabilities
2.1 Underwater civil construction
2.2 Underwater Ship repair
3.1 Civil works
3.2 Marine works
TABLE OF CONTENTS
SECTION: 1.0 : COMPANY INFORMATION
SECTION: 2.0 : BROUCHER
SECTION: 3.0 : TRACK RECORDS
SECTION: 4.0 : SITE ORGANOGRAM
AL WAHA MARINE CONSTRUCTION LLC QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-010
1.1 Company Profile
1.2 Organization Chart
1.3 Safety Policy Statement
1.4 Capabilities
COMPANY INFORMATION
SECTION: 1.0
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-006
COMPANY PROFILE
AL WAHA MARINE CONSTRUCTION LLC is an Indian origin based in UAE at RAK,
The company is located in 38/18, 1st floor, Devodoss street, Vedhachalam Nagar,
Chengelpet, Kancheepuram Dt., Tamilnadu, India, providing specialized underwa-
ter services to civil engineering and construction contractors, oil companies, ship
owner & government departments to the marine industries, oil & gas sectors through-
out internationally.
AL WAHA MARINE has extensive experience in civil construction such as SEA
WATER INTAKE PIPELINE(S), break water construction, jetty construction, underwa-
ter piling work, underwater debris removal, quality wall inspection and mainte-
nance, underwater welding and cutting and dam repairing etc.
AL WAHA MARINE is equipped to carry out wide variety of underwater inspection,
(NDT) Non Destructive surface and surface, cleaning and maintenance works to all
types of vessels both in Arabian Gulf waters internationally.
AL WAHA MARINE heads a team of experienced personnel over 35 years of under-
water and we are available for service to our clients round the clock globally.
AL WAHA MARINE operates under strict compliance of current HSE legislation
where we conduct our business. Safety is our #1 priority on all our operations and
will not be compromised. We believe all accidents and incidents may occur but can
be controlled or minimized thro-out an effective safety management system.
For further information please contact:
UAE :
E-mail: [email protected], www.bavaengineering.com
AL WAHA MARINE CONSTRUCTION LLC
QATAR : INDIA :
38/18, 1st floor, Devodoss street Vedhachalam Nagar Chengelpet, Kancheepuram Dt. Tamilnadu, India Tel. :+91 44 67472148 Fax :+91 44 27428910
Flat No. 101, Salmeen building Al Ma’areedh, Ras Al Khaimah United Arab Emirates. Mobile No. :+971 55 3414414 :+971 50 7858104 :+971 55 9282645 :+971 50 3413314
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-006
SAFETY, HEALTH AND ENVIRONMENTAL POLICY STATEMENT
AL WAHA MARINE CONSTRUCTION LLC in fulfilling its legal obligation and its
responsibility to provide a place of employment which is free from recognized haz-
ards has set forth this statement of policy reinforcing its commitment to maintaining
a safe environment at the work site. This statement of policy is the cornerstone of the
company’s Safety Management System (S.M.S.)
Its the Policy of AL WAHA MARINE CONSTRUCTION LLC that the conduct of its
Operations, to ensuring:
A. THE SAFETY HEALTH OF ALL PERSONNEL INVOLVED IN ITS ACTIVITIES.
B. DAMAGE TO PROPERTY AND EQUIPMENT IS AVOIDED.
C. HARM TO ENVIRONMENT FROM COMPANY ACTIVITIES IS MINIMIZED.
Its the intention of AL WAHA MARINE management that NO operation is so impor-
tant that i cannot be carried out safety and with due care and attention to prevent
damage to property and the environment. In carrying out this intention, the follow-
ing principles should be applied.
Accident can be minimized by proper management, training of personnel and implementation of appropriate safety standards Personnel should be educated and committed to maintaining high standards of HSE awareness. HSE implementation is line management (supervisor) responsibility which emanates directly. Proper planing at the work site will prevent accidents to personnel, damage property and environment. Employees should be actively participate in the establishment and follow of HSE procedures. Employees need to be kept informed of conditions which may cause them harm.
1.
2.
3.
4.
5.
6.
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-006
SAFETY, HEALTH AND ENVIRONMENTAL POLICY STATEMENT
All personnel have an equal hand in responsibility for maintaining HSE stan-dards. Good operating practices will safeguard all employees and result in a more effi-cient operation. Equipment is fundamental to safe operations and should be maintained to company, class and industry standards. Commitment to team work. This policy is communicated openly and at every opportunity to EVERONE and has a equal status with other primary business objective. This will be reviewed and updated annually. Director
7.
8.
9.
10.
Safety is our #1 priority on all our operations and will not be compromised
AL WAHA MARINE CONSTRUCTION LLC
QU
ALIT
Y C
ON
TR
OL/Q
UA
LT
IY A
SSU
RA
NC
E D
OC
UM
EN
TA
TIO
N
SM
S-D
US-Q
A-0
07
SA
FET
Y,
HEA
LT
H A
ND
EN
VIR
ON
MEN
TA
L P
OLIC
Y S
TA
TEM
EN
T
DIR
EC
TO
R
HSE M
AN
AG
ER
SEC
RET
AR
YO
PER
AT
ION
MA
NA
GER
MA
NA
GER
(FIN
AN
CE
MA
RIN
E SA
FET
Y O
FFIC
ERV
ESSEL C
AP
TA
INA
DM
IN O
FFIC
ER
DIV
ER
S
DIV
ING
SU
PER
VIS
OR
MA
RIN
CR
EW
OFFIC
E S
TA
FF
AL
WA
HA
MA
RIN
E C
ON
STR
UC
TIO
N L
LC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-003
SAFETY, HEALTH AND ENVIRONMENTAL POLICY STATEMENT
SPECIALIZED FIELD
m Sea water intake Pipe Line
Works
m Underwater welding &
Cutting, Ship repairs and all
types welding, cutting works
m Underwater Block placing
& Jetty Construction Works
m Underwater Concreting
Works
m Underwater Armouring
For Break Water System
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-003
m Underwater Drilling &
Plastering
m Underwater Rock Placing
m Underwater Core Loc Fixing
& Rock Foundation Core
Rock Filling
m Underwater gravity Retaining
Walls for Bubble Barrier
m Underwater Sheet Piles
Maintenance
m Underwater Debris Clearance
AL WAHA MARINE CONSTRUCTION LLC
3.1 Underwater Civil Construction
3.2 Underwaer Ship Repair & Maintenance
TRACK RECORDS
SECTION: 3.0
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
UNDERWATER SHIP CLEANING, REPAIR AND MAINTENANCE
UNDERWATER SERVICES
AL WAHA MARINE has some of the most experienced staff in the region. We offer
comprehensive services from the smallest to largest operation.
AL WAHA MARINE has the experienced high skilled manpower and techincians to
perform any types of sophisticated jobs to the highest standards within the allotted
time frame. We also posses equipments to cary out the works.
m Hull Survey
m Hull Cleaning
m Propeller Cleaning
m Propeller Polishing
m Propeller Straightening
and Balancing
m Underwater Photography
m Underwater Inspection
m Video Survey
m Underwater Welding
m General Survey
m Intake & Outlet valve
Inspection or Sealing
m Sea Intake Clearance
m Patching/Blanking Using
Doubler Plate
m Epoxy Repairs
m Gratings Cleaning
m Underwater Anode Retrofit
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
Name of the
ProjectLocation Client
Year of
constructionScope of Works
Project future
spare line for
sewage treated
water outlet
Al-Khabji
K S A
Arabian Oil
Company
1983-1984 Laying of 1500 mm dia fibre rein-
forced pipes for intake water pipe
line of 850 mtrs, placement into the
seabed complete, dredging, laying
sub contract works (material
supplied by the client)
Water & Sewage
Treatment Plant
Al-Khobar
K S A
Nasser
Marine Civil
Construction
1984-1986 Dredging, laying of RCC of 1000
mm dia 600 mtrs in the sea for future
water pipe line intake.
Jebel Ali
Power Station
Jebel Ali
Dubai
UAE
Six
Construction
& Aqua Diving
1991-1992 Laying of 2000 mm dia RCC spigot
and coupler system (6M. long pipes)
approx: 1000 mtrs into the sea,
dredging laying, backfilling copm-
plete.
Taweela &
Marfa Power
Station
Taweela &
Marfa
Abu Dhabi
UAE
MSCM/
ADWEA
2004 Laying of 2000 mm dia RCC spigot
and coupler system (6M. long pipes)
approx: 1000 mtrs into the sea,
dredging laying, backfilling copm-
plete.
Baba Atomic
Research Centre
Chembur
Mumbai
India
1998-1990 Salvage, structure cleaning using
with jet water system.
SEA WATER INTAKE PIPE LINE(S)
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2008Underwater inspection, dredging, cutting and
shiffting of sheet piles using Seaflex lift bags and
debris clearance at the Vehicular tunnel project
near the crescent.
TAISEI
CORPORATION
PALM
JUMEIRAH
Water Depth
Vessel
7-12 m
N/A
2008Clearance of Seabed and debris removal to
include construction debris, heavy rock of vary-
ing weights 1ton and more for marine vessel
movement.
GULF MARINAS
FZC
AL SEEF
ABRA
STATION
Water Depth
Project Site
5-7 m
Al seef abra station
2008Recovery of deployed oceanographic instur-
ments from seabed, offshore. HALCROW
INTERNATIONAL
PARTNERSHIP
DUBAL
FIELD
Water Depth
Project Site Dubal offshore
2008underwater inspection, dredging, cuting and
shiffting of sheet piles using Seaflex lift bags and
debris clearance at Vehicular tunnel project near
the cresecent. Underwater photography, video--
graphy etc.
TAISEI
CORPORATION
PALM
JUMEIRAH
Water Depth
Project Site
7-12 m
N/A
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2008Underwater tying down system installation for
the floating bridge connecting the land to both
banks to include seabed clearance, lifting of
mud’s debris removal photography and video--
graphy.
CLEMENT
SYSTEMS GULF
FZCO
FLOATING
BRIDGE-
BURDUBAI
Water Depth
Project Site
5-7 m
Floating Bridge
2008Underwater inspection, dredging, cutting and
shifting of sheet piles using lifting equipments for
the vehicular tunnel project.
TAISEI
CORPORATION
PALM
JUMEIRAH
Water Depth
Project Site
7-12 m
N/A
2008Sea bed survey GULF MARINAS
FZC
AL SEEF
ABRA
STATION
Water Depth
Vessel
4 m
N/A
2008Installation of dewatering piplines 30m onshore
to offshore. ETA STAR
DEWATERING
PALM
JUMEIRAH
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2008Cleaning of the debris, silt and mud under the
water along the canal pathway. DUBAI
FESTIVAL CITY
FESTIVAL
CITY
DUBAI
Water Depth
Vessel
5-6 m
N/A
2008Oceanographic instrument deployment for
DUBAL at depths varying from 12-18 mtrs HALCROW
INTERNATIONAL
PARTNERSHIP
ABUDHABI
UAE
Water Depth
Project Site
12-18 m
Jebel Ali offshore
2007Debris removal, seabed cleaning, geomat plac-
ing, rock placing, photography for the construc-
tion of Al Reem Island.
NASSER
MARINE (AL
AREEF MARINE)
ABUDHABI
UAE
Water Depth
Vessel
7-12 m
N/A
2007Underwater inspection, dredging and cutting of
sheet piles for the vehicular tunnel project. TAISEI
CORPORATION
PALM
JUMEIRAH
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2007Debris removal, seabed cleaning, geomat plac-
ing, rock placing, photography for the construc-
tion of Al Reef Island.
NASSER
MARINE (AL
AREEF MARINE)
ABUDHABI
UAE
Water Depth
Vessel
4-6 m
Barge (Al Jabar)
2007Underwater installation of dewatering pipe at
Jumierah Palm quay walls with photography and
video clips.
NSCC SBF
JOINT VENTURE
PALM
JUMEIRAH
Water Depth
Project Site
5-7 m
N/A
Water Depth
Vessel
5-7 m
N/A
2007Seabed survey AL KHALEEJ AL
ARABI-MARINE
JABEL ALI
PORT
Water Depth
Vessel
5-6 m
N/A
2007Clearing and cleaning of the debris, silt and mud
under the water along the canal pathway. AL FUTTAM
CARILLION
DUBAI
FESTIVAL
CITY
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2007Seabed clearing, aggregate placing, geomat plac-
ing and rock placing. AL AREEF PRIVATE
BEACH
2007Debris removal, seabed cleaning, geomat plac-
ing, frame setting, aggregate, bedding and block
placing photography.
BARADY
MARINE
SERVICES
DUBAI
FESTIVAL
CITY
Water Depth
Vessel
4-6 m
Barge Bob 12
Water Depth
Vessel
4-6 m
Barge (Al Jabar)
2007Debris removal, seabed cleaning, goemat plac-
ing, rock placing, photography. NASSER
MARINE (AL
JABAR GROUP)
ABU DHABI
UAE
Water Depth
Vessel
8 m
N/A
2007Seabed cleaning, geomat placing and diving
support. BARADA
DIVING
DUBAI
MARITIME
CITY
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2007Underwater inspection, cutting and flange tight-
ening. TAISEI
CORPORATION
PALM
JUMAIRAH
2007Marine buoy installation, connecting shackle,
debris removal, seabed cleaning, geomat plac-
ing, rock placing, photography.
DUTCO
BALFOUR
BEATY
QUAFFAY
ISLAND,
ABU DHABI
Water Depth
Vessel
8-15 m
N/A
Water Depth
Vessel
6 m
N/A
Water Depth
Vessel
4-6 m
N/A
2007Underwater pile cutting and mud removal. SEASPRAY
MARINE
DUBAI
MARINA
Water Depth
Vessel
4-6 m
Barge (Al Jabar)
2007Debris removal, seabed cleaning, geomat plac-
ing, rock placing, photography. NASSER
MARINE (AL
JABAR GROUP)
ABU DHABI
UAE
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Debris removal, seabed cleaning, geomat plac-
ing, rock placing, photography. NASSER
MARINE (AL
JABAR GROUP)
ABU DHABI
UAE
2006Cleaning of the training pool. DUABI BRITISH
SCHOOL
JUMEIRAH
Water Depth
Vessel
2-3 m
N/A
Water Depth
Vessel
4-6 m
Barge (Al Jabar)
Water Depth
Vessel
6 m
N/A
2006Barge inspection, recovery of sheet pile from the
sea bed. KHALEEL
MUGARBAN
DUABI
FESTIVAL
CITY, UAE
Water Depth
Vessel
7 m
Barge (Al Jabar)
2006Underwater seabed survey, dredging, sounding,
fram settion, core rock placing etc. DUTCO
BALFOUR
BEATTY LLC
DUABI
FESTIVAL
CITY, UAE
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Underwater seabed survey, dredging, sounding,
removal of scraps from the sea bed, underwater
cutting of pipes and fixing new ones.
DUTCO
BALFOUR
BEATTY LLC
DUBAI
MARINA
2006Armou rock placing DUTCO
BALFOUR
BEATTY LLC
AL FIQQAT-
DIBBA
Water Depth
Vessel
5 m
N/A
Water Depth
Vessel
5-7 m
Barge (Al Jabar)
Water Depth
Vessel
7 m
N/A
2006Underwater seabed survey, rock placing, sheet
pile removal and seabed clearance. DUTCO
BALFOUR
BEATTY LLC
AL QUAFFAY
ISLAND
Water Depth
Vessel
7 m
N/A
2006Underwater seabed survey and counting the
plumb readings. DUTCO
BALFOUR
BEATTY LLC
DUABI
FESTIVAL
CITY, UAE
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Underwater installation of dewatering pipe at
Jumierah plam quay walls. ETA STAR
DEWATERING
ABU DHABI
2006Construction of perch beach and mini breakwa-
ter. NASSER
MARINE
SURVEY (AL
JABAR GROUP)
ABU DHABI
Water Depth
Vessel
5-7 m
N/A
Water Depth
Vessel
5 m
N/A
Water Depth
Vessel
5 m
N/A
2006Underwater installation of dewatering pipe at
Jumierah plam quay walls with photography and
video clips.
NSCC SBF JV PALM
JUMEIRAH,
UAE
Water Depth
Vessel
5-7 m
N/A
2006Construction of beach and mini breakwater. NASSER
MARIN
SURVEY (AL
JABAR GROUP)
ABU DHABI
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Underwater salvage operations like removal of
sheet pile, scaffoldings etc. and clearing the sea
bed.
AL FUTTAIM
CARILLION
DUBAI
FESTIVAL
CITY
2006Underwater installation of dewatering pipe at
Jumierah palm quay walls with photography and
video clips.
NSCC SBF JV PALM
JUMEIRAH,
UAE
Water Depth
Vessel
5 m
N/A
Water Depth
Vessel
5-7 m
N/A
Water Depth
Project Site
9 m
Dubai aluminium co.
2006Underwater salvage operations such as sheet pile
removal, and inspection of seabed. EMAS DUBAI,
JEBEL ALI
UAE
Water Depth
Vessel
m
N/A
2006Underwater rock placing, debris clearance,
aggregate filling and screeding, frame setting,
block placing and inspection.
DUTCO
BALFOUR
BEATTY LLC
DUBAI
FESTIVAL
CITY, UAE
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Construction of perch beach and mini breakwa-
ter. NASSER
MARINE
SURVEY (AL
JABAR GROUP)
ABU DHABI
2006Underwater rock placing, debris clearance and
inspection. DUTCO
BALFOUR
BEATTY LLC
DIBBA, UAE
Water Depth
Vessel
7 m
N/A
Water Depth
Vessel
5-7 m
N/A
Water Depth
Project Site
5-7 m
N/A
2006Construction of perch beach and mini breakwa-
ter. NASSER
MARINE
SURVEY (AL
JABAR GROUP)
ABU DHABI
Water Depth
Vessel
2-4 m
N/A
2006Underwater inspection, debris removal, clean-
ing, maintenance, and video-graphy of GRP
screens between the lakes.
SERCO
INNOVATION FZ
LLC
JUMAIRAH
ISLAND
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Firewater intake pumps removal and reinstalla-
tion, visual inspection of pipe and video-graphy. TAISEI
CORPORATION
JEBEL ALI
PALM
2006Underwater survey, inspection, debris removal,
geomat placing and rock placing for the construc-
tion of breakwater.
DUTCO
BALFOUR
BEATTY LLC
DIBBA, UAE
Water Depth
Vessel
5-8 m
N/A
Water Depth
Project Site
7-11 m
N/A
2006Seabed survey and clearance of aggregate spill-
age, underwater debris, mud light, using air light
technique, underwater cutting of piles about
1mtr dia and armour rock placing.
KHORFAKKAN
QUARRY
COMPANY
KHORFAKK
AN
QUARRY
JETTY
Water Depth
Vessel
5-7 m
N/A
2006Construction of perh beach and mini breakwater. NASSER
MARINE
SURVEY (AL
JABAR GROUP)
ABU DHABI
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Underwater inspection, survey and sounding. DUTCO
BALFOUR
BEATTY LLC
DUBAI
MARINA
2006Underwater installation of blocks.UNION GLOBAL
LLC
DUBAI
MARINA
Water Depth
Vessel
5-7 m
N/A
Water Depth
Vessel
5 m
N/A
Water Depth
Project Site
5 m
N/A
2006Placing core rocks filter rocks, aggregate level-
ling, placing slabs etc. for the construction of
boat jetty.
DUTCO
BALFOUR
BEATTY LLC
SHEIKH
PALACE
JUMEIRAH
Water Depth
Vessel
5-7 m
N/A
2006Underwater survey, inspection, debris removal,
geomat placing and rock placing for the construc-
tion of Jumeirah open beach breakwaters.
OVERSEAS
AST
INTERBETON JV
JUMEIRAH
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2006Inspection, cleaning and maintenance oil pollu-
tion control booms near trash racks inside
Taweela Power Station.
EMINENT
TECHNICAL
SERVICES LLC
TAWEELA
POWER
STATION
ABU DHABI
2006Underwater installation of dewatering pipe and
levelling of blocks placed. UNION
GLOBAL LLC
FUJAIRAH
Water Depth
Vessel
8 m
N/A
Water Depth
Project Site
5-7 m
Jumeirah Palm Island
2005Underwater inspection of piles at the palm Jumeirah
vehicular tunnel. Project of include general inspec-
tion, gap filling, reading, distance of pile gap, plac-
ing of rock for the protection of pilesheets, photog-
raphy, underwater welding, epoxy blanking etc.
TAISEI
CORPORATION
JAPAN
JUMEIRAH
PALM
ISLAND
UAE
Water Depth
Project Site
3-5 m
Hamriya Break Water
2005Underwater salvage assistance of sunken barge.
Project include seabed clearing, survey, inspec-
tion, Debris, removal, air lift and lifting of Derbis.
DOLPHIN
DIVING
SERVICES
HAMRIYA FREE
ZONE DUBAI
UAE
HAMRIYA
BREAK
WATER
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2005Underwater construction of slippery way for boat
landing. Project include seabed clearing, survey,
inspection, debris removal, air lift, aggregate
levelling. Core rock filling, block placing etc.
WAAGNER
BIRO GULF LLC
JADDAF
DUBAI, UAE
2005Underwater salvaging assistance of drowned
showel from sea at plam Jumeirah Crescent. EMIRATES
TRADING
AGENCY (ETA)
PALM
JUMEIRAH
UAE
Water Depth
Project Site
3-5 m
Jeddaf Dubai
Water Depth
Vessel
4 m
N/A
Water Depth
Vessel
2-4 m
N/A
2005Underwater video recording, seabed clearing using
airlift technique, Debris removal & placing geotec
mat.
DUTCO
BALFOUR
BEATTY LLC
DUBAI
MARINA
Water Depth
Vessel
2-4 m
N/A
2005Placing of jumbo sand bags and pollution control
boom. DUTCO
BALFOUR
BEATTY LLC
DUBAI
MARINA
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
2005Underwater installation of GRP (safety screens)
screens at jumeirah Islands lakes in various loca-
tions.
WADE ADAMS
CONTRACTIG
CO LLC
JUMEIRAH
LAKE
ISLAND
2005Underwater video-graphy and emergency repair. MSCM/ADWEA JUMEIRAH
POWER
STATION
Water Depth
Vessel
2-4 m
N/A
Water Depth
Vessel
4 m
N/A
2005Installation of pollution control boom and geomat
placing to the seabed. DUTCO DUBAI
MARINA
Water Depth
Vessel
4 m
MV UCO XIV
July
2006
ongoing
Underwater rock placing, geomat placing etc. DUTCO
BALFOUR
BEATTY LLC
DIBBA
BREAKWATER
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
June
2006
ongoing
Underwater inspection, debris removal, photog-
raphy, video graphy, seabed clearance, gemat
placing rock placing.
NASSER MARINE
ABU DHABI
AL JABAR
SITE ABU
DHABI, UAE
ongoing
from
January
2006
Underwater cleaning, inspection, photography,
videography, survey, maintenance, welding,
anode replacement, debris removal tec.
STANFORD
MARINE
SERVICES
DUBAI
UAE
Water Depth
Vessel
4 m
MV UCO XIV
Water Depth
Vessel
5-7 m
Various
Water Depth
Vessel
5 m
N/A
ongoing
from
March
2005
Underwater installation of dewatering pipe at
Jumeirah plam quay walls with photography and
video clips.
NSCC SBF
JOINT VENTURE
JUMEIRA
PALM
Water Depth
Vessel
8 m
N/A
ongoing
from
November
2005
Inspection, cleaning and maintenance oil pollu-
tion control booms near trash Racks for Tapco. EMINENT
TECHNICAL
SERVICES LLC
TAWEELA
POWER
STATION
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
ongoing
from
January
2006
Underwater installation of dewatering pipe for
Jumeirah Palm quay walls with photography and
video clips.
PEREMBA
CONSTRUCTIONS
SDN BHD
JUMEIRAH
PALM
2005Construction of boat landing jetty at the Abu
Dhabi Sila Island to Qatar boarder-Personnel
cross hire.
DUTCO
BALFOUR
BEATTY LLC
AL QAFFEY
ISLAND
SILA
BOARDER
Water Depth
Vessel
4 m
N/A
Water Depth
Vessel
4 m
N/A
Water Depth
Location
Vessel
5-8 m
Taweela-Abu Dhabi, UAE
N/A
2004Back filling and joint pointing of the bubble barrier
retaining wall including video survey. MSCM TAWEELA
POWER
STATION
Water Depth
Location
Vessel
4 m
Jebel Ali, UAE
N/A
2004Conductor cleaning and inspection. AL SAMMAK JABEL ALI
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC
QUALITY CONTROL/QUALTIY ASSURANCE DOCUMENTATION
SMS-DUS-QA-004
CIVIL CONSTRUCTION AND SALVAGE WORKS
ongoing
from
January
2006
Construction of 4 bubble barrier retaining walls to the west and east of Taweela power station break water. The project to include general survey of the seabed, video-graphy, stills debris clearance, air lift to remove soft mud, frame setting,core rock placing, aggregate bedding and underwater block setting.
MSCM/ADWEA TAWEELA
POWER
STATION
Water Depth
Location
Vessel/Barge
5-8 m
Taweela-Abu Dhabi, UAE
Bab Ann
LOCATIONCLIENT DESCRIPTION OF WORK YEAR
AL WAHA MARINE CONSTRUCTION LLC