al wedad group profilealwedadsa.com/wp-content/uploads/2019/09/alwedad _company...2019/09/22 · al...
TRANSCRIPT
0
COMPANY PROFILE
AL WEDAD
Email : [email protected]
Web: www.alwedadsa.com
Tel. +966 (12) 691 4410 / (11) 288 4155
Fax +966 (12) 662 2515 / (11) 288 3960
1
Table of Contents What we do
Introduction 2
Our mission 2
Our specialties 2
Services
Pre-Construction Services 3
Post Construction Services 3
Facilities management Services 3
Construction Services | Areas of expertise 4
Solutions
Sustainable Solutions 5
Energy Optimization Saving Solutions 5
Value engineering 5
Resources - Work force 6
Projects
On-going Projects | KSA 7
Completed major projects | KSA 11
Completed major projects | Lebanon 22
Completed major projects | Turkmenistan-Africa 41
Significant Installation 51
Plant and Equipment 53
Legal Documents 54
Appreciation letters 65
Key Personnel 70
Contacts 72
2
Introduction
Al Wedad is an electro-mechanical company with over 30 years of experience. Al Wedad and its affiliated
companies Arcode & Tyros Off-shore, operate in the Kingdom of Saudi Arabia, Lebanon, Turkmenistan & Africa with
offices in Riyadh, Jeddah, Beirut, Ashgabat & Cameroon.
What we do
High Rise Towers
Residential Towers
Office Towers
Mixed used Complexes
Industrial
Factories
Data Centers
Power Stations
Hospitality
Luxury Hotels
Catering Services
Restaurants
Government Facilities
Airport & Railroads
Ministries
Military buildings & Infrastructure
Maintenance & Testing Facilities
Specialties
Mission
Our mission is to execute demanding projects in the most efficient manner.
We also seek to form long-term relationships of value and trust with our clients and partners. We are committed to the
utilization of the best resources and latest cutting edge techniques to ensure high quality construction and
engineering solutions.
3
Pre-construction services
1. Estimation : Providing project estimation that is
timely and reliable, in addition to project
quantity surveying and BOQ production.
2. Feasibility Studies : Analyzing life cycle costs for
building system alternatives.
3. Planning : Developing a complete time
schedule.
4. Risk Management : Controlling cost, schedule
and owner objectives to mitigate any risks.
5. Quality Control : Monitoring methods,
procedures and checks from start to finish with
the goal of meeting the established standard
6. Material selection and technical submittals
7. Procurement and material management
Post construction services
1. Commissioning : Ensuring that building systems are
designed, installed and activated according to owner’s
operational needs.
2. O&M manuals : Development of operation andmaintenance instructions
3. Final close-out : Completion of snag listed items
4. Maintenance : Through providing an one-year walk-
through maintenance.
Services
Our services include the entire electro-mechanical process, from design and shop drawing to material
procurement and installation, testing and commissioning, as well as facility management and maintenance.
Facilities management services
1. Construction management & supervision
2. MEP engineering services
3. Health & safety quality
4. Inspection & auditing
5. Equipment site selection & placement
4
Construction services | Areas of expertise
HVAC
• Heating
• Ventilation
• Air-conditioning• Standard and critical environments
Electrical Power
• Medium and low voltage distribution
• Power generation
• Uninterruptible power supplies• Indoor and Outdoor lighting
Plumbing
• Residential
• Industrial
• Process
Low Current Systems
• Fire alarm and security systems
• Access control, CCTV & intrusion alarm
• Building automation & management• Public address and TV distribution
Fire Fighting
• Water sprinklers
• Active gas extinguishing systems
• Smoke control management
Telecommunications
• Structured cabling
• VOIP
• LAN/WAN design
• System integration• Active & Passive components
5
Sustainable solutions
• We are committed to building in a sustainable
and responsible manner during the design stage
followed by monitoring the environmental
impact throughout the construction process and
through the life of building
Solutions
Energy optimization saving solutions
• We have a comprehensive range of methods, tools,
techniques and technologies designed to optimize
the client’s use of energy.
• Al Wedad is highly experienced in implementing
energy audits equipment selection & placement on
existing buildings. The purpose and focal point being
long term operational cost savings and plant
optimization engineering.
Value Engineering
• Our extensive expertise allows us to offer value
engineering that is both cost effective and
energy sufficient
6
Workforce
Management Professionals Technicians Tradesman Total
20 30 85 150 285
Resources
7
Ongoing projects | Saudi Arabia
Luna Project- Al-kharj - (2015-2019)………….….…………………18,000,000$
Client: MIC Corporation
Main contractor: Arabian Gulf Co.
Consultant: DORSCH International Consultants / KHATIB & ALAMI
Total electro-mechanical works
8
Ongoing projects | Saudi Arabia
Helicopter Facilities at (KFNB) –Jeddah (2015-2019) …………………..10,000,000$
Client: Royal Saudi Naval Force (RSNF)
Main contractor: Arabian Gulf Co.
Consultant: HAZIM Consulting Co. and designed by Zouheir Fayez
Total electro-mechanical works
9
Ongoing projects | Saudi Arabia
Fuel Farm Office & Technical Building @ KAIA Jeddah- (2015-19)……….…4,000,000$
Client: General Authority of Civil Aviation (GACA)
Main contractor: SAUDI BIN LADIN GROUP
Consultant: Dar Al Handasah
Total electro-mechanical works
10
Completed projects | Saudi Arabia
Hotel 5 Stars-Parcel 5.06@King Abdullah Financial District (KAFD) - (January - July 2019)
Dilapidation Survey of MEP Works including engineering studies & Tests...588,000$
Client: Public Investment Fund (PIF)/KAFD Co.
Operator: JLL.
Main contractor: Saudi Constructioneers Co. (Saudico)
11
Completed projects | Saudi Arabia
Wellcome Lounges in Terminal 1 & 2 @ KKIA Riyadh - (2016-2017)……..5,500,000$
Client: Saudia Catering (SACC)
Main contractor: UNIDECOR.
Total electro-mechanical works
12
Completed major projects | Saudi Arabia
Multi-Story Car Park in K.A.I.A Jeddah - (2012-13)………….….…………22,000,000$
Client: General Authority of Civil Aviation (GACA)
Main contractor: SAUDI BIN LADIN GROUP
Consultant: Dar Al Handasah
Total electro-mechanical works
13
Completed major projects | Saudi Arabia
MODA – Prince office and Hotel- (2012-2015)………….….…………………7,000,000$
Client: Ministry of defense
Main contractor: Saudi Constructioneers
Consultant: Zouheir Fayez
Total electro-mechanical works
14
Completed major projects | Saudi Arabia
Engine Test Facility at King Abdul Aziz Air Base - (2011-2012)………….……4,000,000$
Client: Royal Saudi Air Force (RSAF)
Main contractor: British Aerospace / Rolls Royce
Building & Process contractor: Techspace Aero
Consultant: Davis Langdon
Total electro-mechanical works
15
Completed major projects | Saudi Arabia
RSNF Riyadh / Support and Training Center - (2009-2010)…………………..8,000,000$
Client: Royal Saudi Naval Force (RSNF)
Main contractor: Arabian Gulf Co.
Total electro-mechanical works
U.S. Consulate Jeddah / New Consulate Compound - (2009-2010).……..5,000,000$
Client: U.S. Consulate
Main contractor: First Kuwaiti Tr. & Co.
Partial electro-mechanical works
16
Completed major projects | Saudi Arabia
Air Defense Head Quarters Building - (1999-2004)……….…….……………….18,600,000$
Client: MODA/Air Defense Forces
Main contractor: Direct contract
Total electro-mechanical works
Air Defense Head Quarters Building
17
Completed major projects | Saudi Arabia
The Equestrian Club of Jeddah / Park Hyatt - (Phase 2, 2006-2008)…….14,670,000$
Client: Al Muntazah
Main contractor: Bouygues
Total electro-mechanical works
18
Completed major projects | Saudi Arabia
The Equestrian Club of Jeddah - (Phase 1, 1998-2000)……………………………1,000,000$
Client: Al Muntazah
Main contractor: Bouygues
Total electro-mechanical works
Lobby
SalonEntrance to the Gentlemen Social club
19
Completed major projects | Saudi Arabia
King Abdullah Mosque / Kingdom Center - 77th Floor - (2004)….………………130,000$
Client: Kingdom Holding & Investment Co.
Main contractor: Direct contract
Total electro-mechanical works
King Abdullah Mosque at Kingdom Center’s 77th Floor
20
Completed major projects | Saudi Arabia
National Guard First Battalion Facilities in Riyadh, Jeddah and Taif - (1986-1989)… 6,267,000$– Client : SANG– Main contractor : SANG– Total electrical works
Saudi Airlines Rolls Royce RB-211 Engines, Overhaul, testing and repair facilities in Jeddah -(1983-1984)……………………………………………………………………………………..……………….……..5,000,000$– Client : Saudi Arabian Airlines – Main contractor : ROLACO– Total electro-mechanical works
NAJRAN Airport - (1978-1981).………………………………………………………………………………25,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works
GASSIM Airport - (1976-1979).…………………………………………………………….…………..……36,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works
21
Completed major projects | Saudi Arabia
Saudi Airlines Catering Facilities - (1993-1995)………..........................................…..…11,520,000$– Client: Saudi Arabian Airlines – Main contractor: ARCODE-SA– Total works – General contractor
SAWARY1, Helicopter simulator building - (1992-1993)……………….……………..……..…..2,934,000$– Client: RSNF– Main contractor: Thales– Total electrical works
Naval Forces Ship Repair Facilities (SRF) - (1991-1992) ………………….……....................4,854,000$– Client: MODA– Main contractor: SAE-Al Mabani – Bouygues– Total electrical works
Air Defense Dattier Project, Training Facilities - (1990-1991)……………….…..………….…4,200,000$– Client: MODA/Air Defense Forces– Main contractor: Direct contract– Total electro-mechanical works
22
Completed major projects | Saudi Arabia
King Abdul Aziz Base, Uninstalled Engine Test Facility “UETF” - (2010-2011)….………4,000,000$– Client: Rolls Royce (R.R)– Main contractor: Techspace-Aero – Cenco (Belgium)– Total electro-mechanical works
SAWARY2, Specialized training school - (2000-2001)……………………….…..….…..….…….6,134,000$– Client : RSNF– Main contractor : Thales– Total electro-mechanical works
SAWARY1, Helicopter landing facilities - (1996-1997)………………………….……………..…..1,800,000$– Client: RSNF– Main contractor: Thales– Total electrical works
IFFA Project, Ammunition testing facilities - (1994-1996)……………………………….....… 3,867,000$– Client: MODA/Armament and ammunitions– Main contractor: SNPEI-BOUYGUES– Total electrical works
King Abdullah Palace Khurais Road Riyadh - (1998-1999)……………………………….....… 2,000,000$– Client: Royal Diwan– Main contractor: Saudi Oger– Total Mechanical works
23
Completed major projects | Lebanon
Vision 1793 High-End Residential Bldg., Spears – (2015-2017) …….……….1,500,000$
Client: Statumen
Main contractor: NATCON
Consultant: CHA / Georges Chamoun
Mechanical Works
24
Completed major projects | Lebanon
The Backyard, Restaurants – Hazmieh (2015-2016)…………………….………1,300,000$
Client: Platinum Management
Main contractor: HAT
Consultant: Naji Geha & Rabih KhairAllah
Electro-Mechanical Works
25
Completed major projects | Lebanon
Spears 1858 High-End Residential Bldg., Spears – (2014-2016)….…….2,500,000$
Client: Trusthold Development Group
Main contractor: EBCO Bitar.
Consultant: ASYA / Associated Mech. Engineers
Total electro-mechanical works
BCD Waterfront Infrastructure - Beirut Central District – (2015-2016)
Client: Solidere
Main contractor: ARACO
Consultant: LACECO
Total electro-mechanical works
26
Completed major projects | Lebanon
Kantari Residences High-End Residential Bldg., Kantari – (2013-2015)…………………… ……………………..………………………………………………………………………………………….3,000,000$
Client: DALFA - Dalloul
Main contractor: EBCO Bitar
Consultant: Hassib Ibrahim
Electro-Mechanical Works
27
Completed major projects | Lebanon
1200 Mina El Hosn High-End Residential Bldg., Clemenceau – (2010-2014)……………. ……………………..………………………………………………………………………………………….2,000,000$
Client: Masharih Construction & Development
Main contractor: Masharih Construction & Development
Consultant: SERT
Electro-Mechanical Works
28
Completed major projects | Lebanon
Intra Bank HQ, Hamra – (2012-2013)
Client: Intra Investment Company
Main contractor: Fadi Barakat
Consultant: SDT
Electrical Works
29
Completed major projects | Lebanon
Oman Embassy, Beirut– (2010-2012)….………………………………………………….1,400,000$
Client: Oman Embassy
Main contractor: Mahmoud Assaad
Consultant: Khatib & Alami
Electrical Works
30
Completed major projects | Lebanon
Beirut Cardiac Institute, Beirut– (2008-2010)………..……………………………….2,000,000$
Client: Al Rassoul al Aatham Hospital
Main contractor: Meamar
Consultant: ARCH
Electrical Works
31
Completed major projects | Lebanon
Hatab 2612 High-End Residential Bldg., Hamra– (2006-2008)
Client: Key Stone Group
Main contractor: Key Stone Group
Consultant: Adnan Olayan
Electro-Mechanical Works
32
Completed major projects | Lebanon
Al Waha Gardens 5061 High-End Residential Bldg., Ramlet el Bayda– (2005-2007) ……………………..…………………………………………………………………………………………….620,000$
Client: Key Stone Group
Main contractor: Key Stone Group
Consultant: Adnan Olayan
Electro-Mechanical Works
33
Completed major projects | Lebanon
Lebanese Swiss Bank, Hamra HQ, Dora, Tyre, Nabatiyeh, & Haret Horeik (2005-07)
Client: Lebanese Swiss Bank
Main contractor: Hussein Jomaa
Consultant: N/A, Design & Build
Electro-Mechanical Works
34
Completed major projects | Lebanon
Bella Riva Suite Hotel, Raoucheh - (1998-2001)…………………………………......1,500,000$
Client: Bella Riva Group
Main contractor: Hussein Jomaa
Consultant: Wadih Chouhaiber
Electro-Mechanical Works
35
Completed major projects | Lebanon
Sports Café, Borj al Ghazal- (1998-2000)…………………………………………………….450,000$
Client: Paramount
Main contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
Arcadio Commercial & Residential Bldg. Beirut - (1997-2000)……………………750,000$
Client: Paramount
Main contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
36
Completed major projects | Lebanon
Verdun 732 building and mall, Verdun- (1997-2000)…………………….......… 3,200,000$
Client: AAA Group
Main contractor: IDC
Consultant: Pierre Dammous & Partners
Electro-Mechanical Works
37
Completed major projects | Lebanon
Verdun 730 building and mall, Verdun - (1996-1999)………....…………………3,025,000$
Client: AAA Group
Main contractor: Said Chaddad
Consultant: Pierre Dammous & Partners
Electro-Mechanical Works
38
Completed major projects | Lebanon
Zkak el Blat 24, Beirut Central District- (1997-1998)……..………………..………………………….650,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants / Gilbert Tambourgi
Electro-Mechanical Works
Maarad 168, Beirut Central District - (1996-1998)………………………..………………..………….600,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
39
Completed major projects | Lebanon
Foch 230/231 Mandaloun, Beirut Central District- (1996-1998)……..………..……………….850,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultant
Electro-Mechanical Works
Evergreen Villas, Chemlan - (1994-1998)……………………………………………………..………….550,000$
Client: Evergreen
Main Contractor: Root Engineering Company S.A.L.
Consultant: Mahmoud Barazi
Electrical Works
Al Serail 1374, Beirut Central District - (1994-1995)………………………………………..………….450,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electrical-Mechanical works
40
Completed major projects | Lebanon
Concorde Galleria, Verdun - (1994-1996)…………….……………….......…………………..........1,200,000$
Client: Concord Group
Main contractor: Direct contract
Consultant: Farid Abou Fadel
Electro-Mechanical works
41
Completed major projects | Lebanon
Engineering, procurement, and logistics works for the following projects in Turkmenistan (2004-2013)
Museum of Fine Arts (2004)
Cable Car Building (2005)
School of Fine Arts (2005)
Ministry of Textile (2005)
Palais des Glaces (2005)
Ashgabat University I (2006)
Military Academy (2006)
National Press Offices (2006)
Ashgabat University 2 (2007)
Ministry of Commerce (2008)
Ministry of Agriculture (2008)
Ministry of Telecommunications (2009)
Presidential Reception Palace (2009)
Sofitel Oguzkent Luxury Hotel (2009)
Halk Bank (2010)
Convention Center (2010)
Parliament’s Extension (2011)
Radar Ground Control Station (2012-2013)
42
Completed major projects | Turkmenistan
Presidential Reception Palace - (2009-2010)………....………………………...… 18,500,000$
Main contractor: Bouygues Construction
Total electrical works
43
Completed major projects | Turkmenistan
Sofitel Oguzkent Luxury Hotel - (2009-2010)………....…………………..…….… 34,000,000$
Main contractor: Bouygues Construction
Total electrical works
44
Completed major projects | Turkmenistan
Convention Center - (2010-2011)……….………………………….……………………. 5,800,000$
Main contractor: Bouygues Construction
Total electrical works
Parliament's Extension - (2010-2011)……………………................................ 2,800,000$
Main contractor: Bouygues Construction
Total electro-mechanical works
45
Completed major projects | Turkmenistan
Ground Control Station- (2012-2013)………………………………………................. 135,000$
Main contractor: Thales-Alienas
Design of electro-mechanical works
Ministry of Telecommunication - (2009-2010)......................................... 2,100,000$
Main contractor: Bouygues Construction
Total electrical works
46
Ministry of Commerce - (2008)………....……………….…………………………………. 3,550,000$
Main contractor: Bouygues Construction
Total electrical works
Ministry of Agriculture - (2008)…………………….........................................… 4,200,000$
Main contractor: Bouygues Construction
Total electrical works
Completed major projects | Turkmenistan
47
Completed major projects | Turkmenistan
Halk Bank - (2010-2011)………....……………….………………………….………………... 3,600,000$
Main contractor: Bouygues Construction
Total electrical works
University Phase II - (2007)……………………………………...............................….2,600,000$
Main contractor: Bouygues Construction
Total electrical works
48
Other projects
- University I (2006)...................................... 1,930,000$
Total electrical works
- Military Academy (2006)………………………....1,610,000$
Total electrical works
- National Press Offices (2006)…………………..1,246,000$
Total electrical works
Completed major projects | Turkmenistan
University I
Military AcademyNational Press Offices
49
Other projects
- Palais des Glaces (2005)…………………………1,540,000$
Total electrical works
- Ministry of Textile (2005)………………………..2,270,000$
Total electrical works
- School of Fine Arts (2005)……………………...2,265,000$
Total electrical works
Ministry of Textile School of Fine Arts
Completed major projects | Turkmenistan
Palais des Glaces
50
Other projects
- Cable Car (2005)………………………………………………….. 1,057,000$
Total electrical works
- Museum of Fine Arts (2004).....................................3,050,000$
Total electrical works
Completed major projects | Turkmenistan
Cable Car Museum of Fine Arts
51
Completed major projects | Africa
Palacio Bata / Presidential Palace, Equatorial Guinea - (2003-2004)…….1,700,000$
Main contractor: PAC International
Total electro-mechanical works
52
Significant Installations
Generators IP Telephone System -PABX
MV/LV Transformers MV Switchgear
53
Significant Installations
Chillers Plant Pump Room Plant
FM-200 SYSTEMMEP Networks
54
• Mobile manually operated sheet metal workshop 1
• Mechanical workshop consisting of fixed machine 2
• Electrical power plant 2
• Welding Machines (200A & 400A) 8
• Threading machines 6
• Vacuum pumps 2
• Ladders 45
• Measurement instruments 4
• Thickness Testing Meter 3
• Duct leak-test machines (high/low) 8
• Oxygen & Estelline set (for cutting & welding) 3
• Clipping tools 8
• Sound Level D.B Meter 4
• Ultra-sonic flow meter 4
• Cable laying trolley 4
• Jack hammers & hoses 75
• Freon fill units 5
• Meggers, AVO meters 20
• Water unit pressure test 4
• Cable cutters 8
• Hydraulic cable crimping toll set 4
• Scaffolding 1500 m2
Plant and Equipment
55
Legal Documents
56
Legal Documents
57
Legal Documents
58
Legal Documents
59
Legal Documents
60
Legal Documents
61
Legal Documents
62
Legal Documents
63
Legal Documents
64
Legal Documents
65
Legal Documents
66
Legal Documents
67
Legal Documents
68
Legal Documents
69
Appreciation Letters
70
Appreciation Letters
71
Appreciation Letters
72
Appreciation Letters
73
Appreciation Letters
74
Key Personnel(Name| Current Postion | Years of Experience | Graduation)
Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
Hisham M Dawalibi | Managing Partner | 40+ Years | M.S. C.S from Stanford University, USA.
Talal N. Al Maghamsi | Managing Partner | 40+ Years | King Fahd University of Petroleum & Minerals, KSA.
Jean Vedel | Technical Director | 40+ Years |B.S. Refrigeration Engineering from I.F.F.I , France.
Ali Al Zein | Chief Operating Officer | 10+ Years |B.S Business Administration, Lebanon.
Ahmed A. Aziz | Chief Financial Officer | 30+ Years | B.S Finance and Account, Egypt.
M. H. A. Quraishi | Program Manager | 30+ Years | B.S. Electrical Engineering, India.
Mario Brucal | Senior Electrical Engineer | 30+ Years | B.S. Electrical Engineering, Philippines.
Fadi Layous | Senior Mechanical Engineer | 20+ Years | B.S. Mechanical Engineering, Syria.
Jamil Kanj| Electrical Design Engineer| 10+ Years | B.S. Electrical Engineering, Lebanon.
Abdul Azeez Kiliya | Projects Control Manager | 25+ Years | Diploma in Computer Science, India.
Al Wedad - Saudi Arabia
75
Key Personnel(Name| Current Postion | Years of Experience | Graduation)
Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
Hassan Osseily| Technical Manager | 25+ Years | PHD in Electrical Engineering, Lebanon.
Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.
Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.
Arcode - Lebanon
Hassan M. Khalil | Managing Partner| 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
Hussein Youness| Regional Manager| 25+ Years | PHD in Electrical Engineering, Lebanon.
Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.
Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.
Tyros OS – Lebanon, Turkmenistan & Cameron
76
Contacts www.alwedadsa.com
Tyros Cameroon
T. .
email: [email protected]
Tyros Lebanon
Verdun St.
Verdun 732 Bldg, 6th Floor
P.O.Box- 135434,Beirut
T. 00961 1 804 997/8
F. 00961 1 804 996
email: [email protected]
Al Wedad Jeddah
Sari Street, Engg. R/A.
Al Rabwa Dist.
P.O.Box- 2385, Zip 21451
T. 00966 12 6914410
F. 00966 12 6622 515
email: [email protected]
Al Wedad Riyadh
Prince Sultan Bin A. Aziz St.
Sulaimaniya Dist.
P.O.Box- 88916, Zip 11672
T. 00966 11 288 41 55
F. 00966 11 288 39 60
email: [email protected]
Arcode - Liban
Verdun Street
Verdun 732 Bldg,6th Floor
P.O.Box- 135434,Beirut
T. 00961 1 804 997/8
F. 00961 1 804 996
email: [email protected]
Tyros Turkmenistan
33, 1939 Street, Artchabil
Avenue, 744036, Ashgabat.
T. 00993 12 235783 / 8
email: [email protected]