Route CR-18 Project Description RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD) Type of Work RESURFACING Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100067620 STPMN 5118 () PRELIMINARY ENGINEERING RESURFACING 2019 $4 $1 $5 100067621 STPMN 5118 () CONSTRUCTION RESURFACING 2019 $751 $188 $939 TOTAL COST: $755 $189 $944 12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023 1 of 28 HIGHWAY PROJECTS - MONTGOMERY FIVE YEAR PLAN: 2019 - Original FIVE YEAR PLAN FOR PLAN 2019

Upload: leque

Post on 03-Dec-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Route CR-18 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-18 (SNOWDOUN CHAMBERS ROAD) FROM CR-61 (HOBBIE ROAD) TO CR-39 (WOODLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 5.380 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067620 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $4 $1 $5

100067621 STPMN 5118 () CONSTRUCTION

RESURFACING

2019 $751 $188 $939

TOTAL COST: $755 $189 $944

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

1 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-2120 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067622 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2020 $4 $1 $5

TOTAL COST: $4 $1 $5

Route CR-2120 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON CR-2120 (ALABAMA RIVER PARKWAY) FROM JACKSON FERRY ROAD TO THE MONTGOMERY CITY LIMITS

Type of Work RESURFACING

Project Length in Miles 1.890 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067623 STPMN 5118 () CONSTRUCTION

RESURFACING

2020 $446 $111 $557

TOTAL COST: $446 $111 $557

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

2 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-234 ProjectDescription

RESURFACE AND WIDEN RYAN ROAD (CR-234) FROM VAUGHN ROAD TO CHANTILLY PARKWAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.820 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064673 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $286 $71 $357

100064674 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $170 $42 $212

100064675 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $2,400 $600 $3,000

TOTAL COST: $2,855 $714 $3,569

Route CR-236 ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, TRAFFIC STRIPING AND SIDEWALKS ON FEDERAL DRIVE FROM ATLANTA HIGHWAY TO CSX RAILROAD CROSSING.

Type of Work RESURFACING

Project Length in Miles 2.130 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059831 STPMN 5116 () CONSTRUCTION

RESURFACING

2020 $2,400 $600 $3,000

TOTAL COST: $2,400 $600 $3,000

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

3 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-24 ProjectDescription

RESURFACE CR-24 (CLOVERFIELD/FEDERAL ROAD) FROM THE LOWNDES COUNTY LINE TO SR-3 (US-31) - MCP 51-82-17

Type of Work RESURFACING

Project Length in Miles 2.960 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067616 STPAA 5117 (252) CONSTRUCTION

RESURFACING

2019 $572 $143 $715

TOTAL COST: $572 $143 $715

Route CR-33 ProjectDescription

BRIDGE REPLACEMENT ON CR-33 (NARROW LANE ROAD) AT HANNON SLOUGH (BIN # 003250 AND # 003249)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060092 STPMN 7702 (601) RIGHT OF WAY

BRIDGE REPLACEMENT

2020 $60 $15 $75

100060091 STPMN 7702 (601) UTILITIES

BRIDGE REPLACEMENT

2020 $160 $40 $200

100055807 STPMN 7702 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,600 $400 $2,000

TOTAL COST: $1,820 $455 $2,275

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

4 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-39 ProjectDescription

BRIDGE REPLACEMENT ON CR-39 (WOODLEY ROAD)ATWHITES SLOUGH AND TRIBUTARY (BIN # 003047 AND 003048)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060096 STPAA 7701 (602) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $60 $15 $75

100060095 STPMN 7701 (602) UTILITIES

BRIDGE REPLACEMENT

2020 $160 $40 $200

100055809 STPMN 7701 (602) CONSTRUCTION

BRIDGE REPLACEMENT

2021 $2,340 $585 $2,925

TOTAL COST: $2,560 $640 $3,200

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

5 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-42 ProjectDescription

RESURFACE AND TRAFFIC STRIPE HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331) TO INCLUDE AN AT-GRADE RAILROAD CROSSING WITH CSX TRANSPORTATION

Type of Work RESURFACING

Project Length in Miles 2.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064378 STPMN 5118 (251) CONSTRUCTION

RESURFACING

2019 $1,279 $320 $1,599

TOTAL COST: $1,279 $320 $1,599

Route CR-42 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON HYUNDAI BOULEVARD (CR-42) FROM SR-3 (US-31) TO SR-9 (US-331)

Type of Work RESURFACING

Project Length in Miles 2.737 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064377 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $4 $1 $5

TOTAL COST: $4 $1 $5

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

6 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-43 ProjectDescription

WIDEN, RESURFACE AND ADD TURN LANES CR-43(BELL RD) FROM NORTH END I-85 BRIDGE TO SR-8 (US-80, ATLANTA HWY), TURN LANESATBELL GABLES, BELL ROAD MANOR, BELL ROAD COURT, OLIVER DRIVE AND HENLEY WAY

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044515 STPMN 7707 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $888 $222 $1,110

TOTAL COST: $888 $222 $1,110

Route CR-54 ProjectDescription

RESURFACING ON CR-54 (HUNTER LOOP ROAD) FROM OLD SELMA ROAD TO SR-3 (US-31)

Type of Work RESURFACING

Project Length in Miles 3.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067638 STPMN 5118 () PRELIMINARY ENGINEERING

RESURFACING

2019 $64 $16 $80

100067639 STPMN 5118 () CONSTRUCTION

RESURFACING

2022 $2,800 $700 $3,500

TOTAL COST: $2,864 $716 $3,580

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

7 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-74 ProjectDescription

RESURFACING AND TRAFFIC STRIPE ON ANDERSON ROAD/LOWER WETUMPKA ROAD (CR-74) FROM ALABAMA RIVER PARKWAY TO SR-9 (US-231) - MCP 51-83-17

Type of Work RESURFACING

Project Length in Miles 5.230 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064380 STPAA 5117 (253) CONSTRUCTION

RESURFACING

2019 $1,006 $252 $1,258

TOTAL COST: $1,006 $252 $1,258

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ATLANTA HIGHWAY FROM MOUNTAINVIEW DRIVE TO SR-9 (US-231:EAST BLVD)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040822 STPMN 7771 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $692 $173 $865

TOTAL COST: $692 $173 $865

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

8 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE PERRY HILL ROAD FROM HARRISON ROAD TO CR-235 (ATLANTA HIGHWAY)

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.710 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044273 STPMN 7724 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $1,052 $263 $1,315

100044272 STPMN 7724 () UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $1,642 $411 $2,053

100007740 STPMN 7724 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $4,737 $1,184 $5,921

TOTAL COST: $7,431 $1,858 $9,289

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT PERRY HILL ROAD AND ATLANTA HIGHWAY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064161 STPMN 5115 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $800 $200 $1,000

100064162 STPMN 5115 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $5,600 $1,400 $7,000

TOTAL COST: $6,400 $1,600 $8,000

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

9 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ANN STREET FROM HIGHLAND AVENUE TO BREWTON STREET (PHASE2)

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053061 STPAA 7733 (602) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2019 $973 $243 $1,217

100045392 STPMN 7733 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,474 $368 $1,842

100053059 STPAA 7733 (601) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2021 $1,898 $474 $2,372

TOTAL COST: $4,345 $1,086 $5,431

Route CR-NA ProjectDescription

RESURFACE AND SIDEWALK BEAUTIFICATION SOUTH COURT STREET FROM CR-233 (FAIRVIEW AVENUE) TO SR-6 (US-331,SOUTH BOULEVARD)

Type of Work RESURFACING

Project Length in Miles 1.720 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054277 STPAA 7729 (600) CONSTRUCTION

RESURFACING

2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

10 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE ADAMS AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURT STREET, AND WASHINGTON AVE FROM CR-232 (DECATUR STREET) TO SOUTH COURTATLEE STREET

Type of Work RESURFACING

Project Length in Miles 0.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054280 STPMN CN10 () CONSTRUCTION

RESURFACING

2020 $1,316 $329 $1,645

TOTAL COST: $1,316 $329 $1,645

Route CR-NA ProjectDescription

RESURFACE SOUTH PERRY STREET FROM CR-233 (FAIRVIEW AVENUE) TO ARBA STREET

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054282 STPMN 7716 () CONSTRUCTION

RESURFACING

2020 $1,125 $281 $1,406

TOTAL COST: $1,125 $281 $1,406

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

11 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

DRAINAGE, WIDENING, RESURFACING, SIGNALS AND LANDSCAPING FAIRVIEW AVENUE (CR-233) FROM I-65 TO SOUTH COURT STREET

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.810 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054285 STPMN 7730 (600) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $3,360 $840 $4,200

TOTAL COST: $3,360 $840 $4,200

Route CR-NA ProjectDescription

BRIDGE PAINTING ON AIRBASE BOULEVARD (BIN#011513, #011514), MAXWELL AFB ENTRANCE (#006013), UPPER WETUMPKA ROAD (#008715 AND 008716), MADISON AVENUE (#011480)

Type of Work BRIDGE PAINTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060098 STPMN 5113 () CONSTRUCTION

BRIDGE PAINTING

2020 $200 $50 $250

TOTAL COST: $200 $50 $250

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

12 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040817 STPMN 5116 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2020 $1,248 $312 $1,560

TOTAL COST: $1,248 $312 $1,560

Route CR-NA ProjectDescription

WIDEN AND RESURFACE ZELDA ROAD FROM ANN STREET TO CARTER HILL ROAD

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064606 STPAA 5116 (250) RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2019 $200 $50 $250

100064607 STPMN 5116 (250) UTILITIES

WIDENING AND RESURFACING (RDWY)

2020 $40 $10 $50

TOTAL COST: $240 $60 $300

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

13 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE, CURB AND GUTTER, INLET CONVERSION, STRIPING, SIDEWALKS AND CONVERSION FROM 4 LANE TO 3 LANE WITH PEDESTRIAN FACILITIES ON FAIRVIEW FROM SOUTH COURT STREET TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059726 STPMN 5115 (251) UTILITIES

RESURFACING

2020 $80 $20 $100

100063695 STPMN 5115 () CONSTRUCTION

RESURFACING

2020 $3,200 $800 $4,000

TOTAL COST: $3,280 $820 $4,100

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM NOBLE AVE. TO HIGH ST.

Type of Work RESURFACING

Project Length in Miles 0.600 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063696 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $87 $22 $108

100063697 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $997 $249 $1,247

TOTAL COST: $1,084 $271 $1,355

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

14 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON PERRY STREET FROM JEFFERSON ST. TO POLLARD ST.

Type of Work RESURFACING

Project Length in Miles 0.200 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063698 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $35 $9 $43

100063699 STPMN 5115 () CONSTRUCTION

RESURFACING

2022 $398 $99 $497

TOTAL COST: $433 $108 $541

Route CR-NA ProjectDescription

RESURFACE, OPERATIONAL IMPROVEMENTS, HANDICAP RAMPS AND SIDEWALKS ON FEDERAL DRIVE FROM SOUTH OF THE RR TO ATLANTA HWY.

Type of Work RESURFACING

Project Length in Miles 2.100 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063731 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $342 $86 $428

100063732 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $3,939 $985 $4,923

TOTAL COST: $4,281 $1,070 $5,351

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

15 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON DAILRAIDA ROAD FROM ATLANTA HWY TO GUNTER AFB

Type of Work RESURFACING

Project Length in Miles 1.400 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064163 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $232 $58 $290

100064164 STPMN 5115 () CONSTRUCTION

RESURFACING

2022 $2,085 $521 $2,606

TOTAL COST: $2,316 $579 $2,896

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON LOWER WETUMPKA ROAD FROM TOLVERT STREET TO THE BYPASS

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064165 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $257 $64 $321

100064166 STPMN 5115 () CONSTRUCTION

RESURFACING

2021 $2,314 $579 $2,893

TOTAL COST: $2,571 $643 $3,214

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

16 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON DAY STREET BRIDGE BIN # 016848

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064167 STPMN 5115 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2020 $824 $206 $1,030

100064168 STPMN 5115 () CONSTRUCTION

BRIDGE REPLACEMENT

2021 $7,416 $1,854 $9,270

TOTAL COST: $8,240 $2,060 $10,300

Route CR-NA ProjectDescription

WIDEN MARLER ROAD TO 3-LANE FROM SR-8 (US-80) TO OKFUSKI TRAIL

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 2.500 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064169 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $800 $200 $1,000

100064170 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2021 $1,600 $400 $2,000

100064171 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2022 $13,040 $3,260 $16,300

TOTAL COST: $15,440 $3,860 $19,300

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

17 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

CONVERT SOUTH COURT STREET FROM FAIRVIEW AVENUE TO ARBA STREET FROM ONE-WAY TO TWO-WAY

Type of Work RESURFACING

Project Length in Miles 1.064 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064180 STPMN 5115 () PRELIMINARY ENGINEERING

RESURFACING

2020 $8 $2 $10

100064156 STPMN 5115 () CONSTRUCTION

RESURFACING

2020 $1,680 $420 $2,100

TOTAL COST: $1,688 $422 $2,110

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON RAY THORINGTON ROAD FROM PARK CROSSING TO PIKE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066880 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $200 $50 $250

100066881 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $2,800 $700 $3,500

TOTAL COST: $3,000 $750 $3,750

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

18 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON MCGEHEE ROAD FROM WOODLEY ROAD TO SOUTHERN BLVD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066882 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $160 $40 $200

100066883 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $3,376 $844 $4,220

TOTAL COST: $3,536 $884 $4,420

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON VIRGINIA LOOP ROAD FROM SR-6 (US-231) TO WOODLEY ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066884 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $200 $50 $250

100066885 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $976 $244 $1,220

TOTAL COST: $1,176 $294 $1,470

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

19 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACE AND OPERATIONAL IMPROVEMENTS ON ATLANTA HIGHWAY FROM ANN STREET TO PERRY HILL ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066886 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $200 $50 $250

100066887 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $4,000 $1,000 $5,000

TOTAL COST: $4,200 $1,050 $5,250

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT VAUGHN ROAD AND RYAN ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067611 STPAA 5117 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $32 $8 $40

100067613 STPAA 5117 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $80 $20 $100

100067614 STPMN 5117 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $400 $100 $500

TOTAL COST: $512 $128 $640

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

20 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route CR-NA ProjectDescription

RESURFACING ON MCINNIS ROAD FROM WOODLEY ROAD TO NARROW LANE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067636 STPMN 5117 () PRELIMINARY ENGINEERING

RESURFACING

2019 $80 $20 $100

100067637 STPMN 5117 () CONSTRUCTION

RESURFACING

2022 $2,400 $600 $3,000

TOTAL COST: $2,480 $620 $3,100

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

21 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -65 ProjectDescription

RESURFACE I-65 FROM CATOMA CREEK TO NORTH OF FAIRVIEW AVENUE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.420 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066453 IM I065 (494) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $2,685 $298 $2,984

TOTAL COST: $2,685 $298 $2,984

Route I -65 ProjectDescription

RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 2.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066459 IM I065 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2020 $2,061 $229 $2,290

TOTAL COST: $2,061 $229 $2,290

Route I -85 ProjectDescription

SIGN REHABILITATION ALONG I-85 FROM I-65 THROUGH MONTGOMERY AND MACON COUNTY TO LEE COUNTY LINE

Type of Work SIGN REHABILITATION

Project Length in Miles 47.460 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054302 IM I085 (333) CONSTRUCTION

SIGN REHABILITATION

2019 $2,510 $279 $2,789

TOTAL COST: $2,510 $279 $2,789

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

22 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route I -85 ProjectDescription

BRIDGE REPLACEMENT ON I-85 NB AND SB OVER LINE CREEK (INCLUDING TWO RELIEF BRIDGES) BIN # 7554, 7555, 7556, 7557, 7566, 7567

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.480 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059252 IM I085 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $2,430 $270 $2,700

100059253 IM I085 () CONSTRUCTION

BRIDGE REPLACEMENT

2022 $3,555 $395 $3,950

TOTAL COST: $5,985 $665 $6,650

Route I -85 ProjectDescription

PAVEMENT REHAB AND SLAB REPAIRS ON I-85 FROM I-65 TO JUST NORTH OF THE HALL STREET OVERPASS

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 1.842 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062472 IM I085 (357) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $2,536 $282 $2,818

TOTAL COST: $2,536 $282 $2,818

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

23 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route NA- ProjectDescription

RETROFITTING OF HANDICAP RAMPS ON VARIOUS STREETS IN THE CITY OF MONTGOMERY DOWNTOWN CENTRAL BUSINESS DISTRICT

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060100 STPMN 5113 () CONSTRUCTION

SIDEWALK 2020 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

STREET LIGHT CONVERSION TO LED IN CENTRAL BUSINESS DISTRICT (CITY OF MONTGOMERY)

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063693 STPMN 5115 () CONSTRUCTION

LIGHTING 2019 $1,653 $413 $2,066

TOTAL COST: $1,653 $413 $2,066

Route NA- ProjectDescription

DAY STREET/MAXWELL AIR FORCE BASE FEASIBILITY STUDY

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063733 STPMN 5115 () SPECIAL

CORRIDOR STUDY

2020 $240 $60 $300

TOTAL COST: $240 $60 $300

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

24 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CHANTILLY PKWY TO CR-294 (BRIDLEBROOK BLVD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.030 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043877 STPAA 0110 (501) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $687 $172 $859

100050187 STPAA 0110 (501) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2021 $2,917 $729 $3,647

TOTAL COST: $3,604 $901 $4,505

Route SR-110 ProjectDescription

ADDITIONAL LANES ON SR-110 FROM CR-294 (BRIDLEBROOK BLVD) TO THE OUTER LOOP

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.450 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067733 STPAA 0110 (502) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $687 $172 $859

TOTAL COST: $687 $172 $859

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

25 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-271 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-271 (EXIT 9) ONTO I-85 SOUTHBOUND

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067646 STPAA 0271 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $2,040 $510 $2,550

TOTAL COST: $2,040 $510 $2,550

Route SR-6 ProjectDescription

BRIDGE REPLACEMENT ON SR-6 (US-231) AT JENKINS CREEK BIN #000735 STR #6-51-17.5

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.010 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100038170 BR 0006 (563) UTILITIES

BRIDGES AND APPROACHES

2019 $242 $61 $303

100004312 BR 0006 () CONSTRUCTION

BRIDGES AND APPROACHES

2020 $3,981 $995 $4,976

TOTAL COST: $4,223 $1,056 $5,279

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

26 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-8 ProjectDescription

WIDEN AND RESURFACE SR-8 (US-80) FROM THE WAUGH INTERSECTION TO THE MARLER ROAD INTERSECTION

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064153 STPMN 5115 () PRELIMINARY ENGINEERING

WIDENING AND RESURFACING (RDWY)

2020 $203 $51 $254

100064154 STPMN 5115 () RIGHT OF WAY

WIDENING AND RESURFACING (RDWY)

2020 $160 $40 $200

100064155 STPMN 5115 () CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2021 $1,669 $417 $2,086

TOTAL COST: $2,032 $508 $2,540

Route SR-8 ProjectDescription

TRAFFIC STUDY ON SR-8 (US-80) FROM WAUGH TO MARLER ROAD

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064157 STPMN 5115 () SPECIAL

CORRIDOR STUDY

2020 $96 $24 $120

TOTAL COST: $96 $24 $120

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

27 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019

Route SR-9 ProjectDescription

EXTEND SEVICE ROAD ALONG SR-9 (NOTHERN BLVD) NORTH BOUND FROM HACKEL DRIVE TO PLANTATION WAY AND SOUTHBOUND FROM LAGOON PARK DRIVE TO THE EXISTING SERVICE ROAD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.760 Urban Area MONTGOMERY COST IN THOUSANDS

Project Reference Nbr FA Number

Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063744 NH 0009 (533) PRELIMINARY ENGINEERING

GRADE, DRAIN, BASE AND PAVE

2023 $69 $17 $87

TOTAL COST: $69 $17 $87

12/2/2018 ALABAMA DEPARTMENT OF TRANSPORTATION

FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023

28 of 28

HIGHWAY PROJECTS - MONTGOMERY

FIVE YEAR PLAN: 2019 - Original

FIVE YEAR PLAN FOR PLAN 2019