alan d souza overview

15
alan d’souza resume overview april 2009 work experience technical qualifications projects representative projects list of representative healthcare projects sustainable design LEEDTM performance design education other relevant experience volunteer work overview

Upload: dsouzalan

Post on 25-Jun-2015

1.045 views

Category:

Design


0 download

DESCRIPTION

Alan D\'Souza resume overview

TRANSCRIPT

Page 1: Alan D Souza Overview

alan d’souza resume overview april 2009

• work experience

• technical qualifications

• projects• representative projects• list of representative healthcare

projects

• sustainable design• LEEDTM

• performance design

• education• other relevant experience• volunteer work

overv

iew

Page 2: Alan D Souza Overview

alan d’souza resume overview april 2009

BWBR Architects Project Architect/ Project Manager

Saint Paul, MN, 2004-08 Education and WorshipHealth-care

Sustainability

KKE Architects, Inc. Project Architect/ Project CoordinatorMinneapolis, MN, 2001-2003 Commercial-Retail

Education

Miller-Dunwiddie-Assoc. Project ArchitectMinneapolis, MN, 1994-2001 Industrial

CommercialRestoration

Multi-fly. housing 

H. G. Malkani, Architects Architect , Code reviewBombay, India, 1990-1991 Hospitality

Schematic designMulti-fly. housing, planning and

development 

Chandrashekhar & Bhagat ArchitectBombay, India, 1989-1990 Commercial

Schematic design, Construction documents

Multi-fly. housing 

The Planning Group Intern ArchitectBombay, India, 1989 Single and Multi-fly. housing

Industrial

work

exp

eri

en

ce

Page 3: Alan D Souza Overview

alan d’souza resume overview april 2009

tech

nic

al

qu

alifi

cati

on

s

summary of technical skills

• over 15 years of professional work experience

• experienced in delivering complete, accurate and coordinated construction documents

• over 4 years in BWBR Architects, a firm that specializes in Healthcare design

• professionally registered in MN

• trained in Revit

• over 15 years AutoCAD proficiency

• advanced Xcel skills• basic Wordprocessing skills• advanced Powerpoint skills

• basic knowledge of 3D computer modeling and graphic design

Page 4: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/

bw

br

mon

ticello

can

cer

cen

ter,

m

on

ticello,

mn

Project cost: $2 million in two phases. Lower level of a MOB under separate contract.

Responsibilities: Project Architect

Contractor: RJM ConstructionDevelopers: Frauenshuh

Permit drawings: Early issuePhase I: Radiation Oncology VaultPhase II: Interior Build-out

Medical Oncology/ ChemotherapyRadiation Oncology/ Radiation therapy 

Opened on time (Sep ’08) and within budget.Very favorable owner reviews. Mech Enggr: Dunham EngineeringElectrical Enggr: Dunham Engineering Structural Enggr: Meyer, Borgman & Johnson

Page 5: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/

bw

br

mon

ticello

can

cer

cen

ter,

m

on

ticello,

mn

Page 6: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/ b

wb

r m

em

ori

al

blo

od

cen

ter,

w

ood

bu

ry,

mn

Page 7: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/ b

wb

r st.

josep

h’s

ed

ucati

on

cen

ter,

ro

sem

ou

nt,

mn

Project cost: $6 million construction

Responsibilities: PA/PM

Project scope: 46,000SF, 2 levels in two phases.K-8 10 classrooms, Social hallGeo-Exchange system, Fabcon panel exterior wall system

Phase I: Site, structure (building envelope), October 2008Phase II: Building Interior buildout, interior finishes

Projected completion/ occupancy: Aug/Sep 2009

Contractor: Greystone ConstructionMech Enggr: Mechanical systems design ,

Harris/ Trak Electrical Enggr: Wunderlich- MalecStructural Enggr: Meyer, Borgman & JohnsonCivil Enggr: Kimley-HornFood Service: Robert Rippe

Page 8: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/ b

wb

rlu

men

ch

risti

cath

olic c

hu

rch

, sain

t p

au

l, m

n

The Church was reopened on Holy Saturday March 26, 2005 under the parish’s new name “Lumen Christi.” The new parish center for Lumen Christi was formally opened on February 11, 2006. It was dedicated by Archbishop Harry J. Flynn on April 23, 2006. All parish activities now take place at the Lumen Christi site.

In the Fall of 1997, Highland Catholic School began a capital campaign that was successful in raising over$1.6 million. The funds were used to renovate the school building, making it safer, more accessible, and better adapted to new directions in education. The school also added a third kindergarten class that year, reflecting the increasing demand for qualityCatholic education.

Page 9: Alan D Souza Overview

alan d’souza resume overview april 2009

pro

jects

/

kke

sh

op

pes o

f arb

or

lakes,

map

le g

rove,

mn

Page 10: Alan D Souza Overview

alan d’souza resume overview april 2009

rep

resen

tati

ve p

roje

cts

/ h

ealt

hcare

•   Monticello Cancer CenterMonticello, MN

• BWBR Architects• Regina Medical Center

Endoscopy/ Emergency Department/ Medical Surgery Addition & RemodelHastings, MN

• BWBR Architects• Memorial Blood Center

Woodbury, MN• BWBR Architects

• Gillette Children’s Central FabricationNew Brighton, MN

• BWBR Architects• Regions Hospital ED Triage

Saint Paul, MN• BWBR Architects

• Regions Hospital Morgue RemodelSaint Paul, MN

• BWBR Architects• Fairview University Medical Clinic

PharmacyMinneapolis, MN

• Miller-Dunwiddie Architects

Page 11: Alan D Souza Overview

alan d’souza resume overview april 2009

su

sta

inab

le d

esig

n

•Project Administrator for two projects attempting LEED-EB, OM certification

•successfully marketed clients interested in LEED certification

•organized and ran the Green Design Forum: an in-house education and knowledge- dissemination forum that invited speakers from within the office and experts from outside to focus on sustainable efforts.

•member of Performance Design Group

•designed and executed the Performance Design checklist to be used on every project

•USGBC national and regional liaison for BWBR

•LEED- EB and LEED-EBOM resource within office

Page 12: Alan D Souza Overview

alan d’souza resume overview april 2009

LEED

TM

LEED Project Administrator

• Allan L. Schuman Corporate Campus, Eagan• LEED services marketed successfully• 220,000SF• 70,000 Lab, rest Office• LEED-EB• submitted for 57 Points (Gold)• November 2008

• Lawson Commons, Saint Paul• LEED services marketed successfully• 200,000 SF• Office• LEED-EBOM

• Saint Mary’s Regional Health Center, Detroit Lakes

• Marketed• LEED-CI

LEED-EB Technical Review workshopUSGBC, Saint Paul, 2007

Page 13: Alan D Souza Overview

alan d’souza resume overview april 2009

 Master of Architecture June 2000 University of Minnesota, MN

Thesis: A search for a relevant and evocative architecture for urban India. 

Bachelor of ArchitectureJune 1989 University of Bombay, India

Thesis: A cultural center for Ambernath, a satellite town of Bombay.

ed

ucati

on

Page 14: Alan D Souza Overview

alan d’souza resume overview april 2009

•  Idea Box• conceived• digital interactive feedback to further the

aim of Continuous Improvement• chaired the Idea Box Committee for 2 yrs

• Visiting critic for undergraduate design juries

University of MN, College of Design

• Guest Lecturer‘Resource efficiency’, University of Minnesota, March 2009

• Teaching Assistant computer workshops, drawing and pre-thesis

programming classes University of MN, College of Design

• Research Assistant Mary Guzowski, Director, Daylighting Center, University of MN

oth

er

rele

van

t exp

eri

en

ce

Page 15: Alan D Souza Overview

alan d’souza resume overview april 2009

•  Center for Victims of Torture• direct client contact• speaker’s bureau• keynote speaker (scheduled) for the Cultural

Diversity Committee, Mankato State University

• story-gathering group• moderator of speaker panels

• African Food Distribution• collection, packing of food, registration of and

distribution to clients• Brooklyn Center, MN

• Independent Futures Project• programming, space-planning

• Habitat for Humanity• two projects in Minneapolis

• KKE-Bannecker School Partnership• work directly with 6th grade inner-city

students• Search for Shelter design charette• “Science house”: Child care facility,

St. Paul, MN

volu

nte

er

work