alberta transportation 8 construc programent of alberta s to jobs, he tion across t government...

47
J A 2 H T im a A m h s a T T P a la T June 12, 2018 | P Alberta 201 Highw The Governm mprove acces and diversifica As part of the more than $6 highways, con safety, suppor agriculture se This documen Major Capita the ne Slide This documen Projects may available fund arger projects The work is de Plann Desig work t Const award Page 1 a Trans 8 Co way & ment of Alberta ss to jobs, he ation across t Government billion in high nnect commu rt major trade ctor and flood nt includes: r capital proje al maintenanc ext three year repair project nt contains pla move in or ou ding. Minor sa s. efined as: ning – plannin gn – project m to complete te truction – the ded and a con sportat onst & Wa a is working to ealth care, edu the province. of Alberta’s $ hway and wat nities, and he e corridors to d mitigation p cts scheduled ce and renew rs (2018-19 to ts scheduled anning, desig ut of the prog afety-related im ng studies and management a ender prepara work that occ ntractor hired tion truc ater M o make life be ucation, hous $26.6-billion B ter manageme elp keep Albe improve trave rotection for A d for the next wal (bridge co o 2020-21); a for the next y gn and constru ram based on mprovements d the prelimin and hiring eng ation); and curs when the to build the p ction Mana etter for all Al sing, and soci Budget 2018 ent infrastruct rtans working el for commer Alberta comm five years (2 nstruction an nd year (2018-19 uction work to n emerging ne s may be add ary analyses gineering con e design of th project. n Pro agem bertans by in al services w Capital Plan, cture to improv g. The project rcial carriers, munities. 018-19 to 202 d highway re 9). o reflect the fu eeds, changin ed as identifi completed fo nsultant(s) to d he project has ogra ment P vesting in cap while supportin Alberta Tran ve safe trave ts will enhanc and provide 22-23); habilitation) p ull life cycle o ng constructio ed, generally or major capit design the pr s been comple am Proje pital projects ng economic g sportation is l on Alberta’s ce transportat irrigation for t projects sched of any given p on schedules in conjunctio tal projects; oject (may inc eted, a tende cts that growth investing tion the dule for project. s, or on with clude er

Upload: others

Post on 27-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

A

2H

Tima

Amhsa

T

TPala

T

June 12, 2018 | P

Alberta

201Highw

The Governmmprove accesand diversifica

As part of the more than $6 highways, consafety, supporagriculture se

This documen

Major

Capitathe ne

Slide

This documenProjects may available fundarger projects

The work is de

Plann

Desigwork t

Constaward

Page 1

a Trans

8 Coway &

ment of Albertass to jobs, heation across t

Government billion in high

nnect commurt major tradector and flood

nt includes:

r capital proje

al maintenancext three year

repair project

nt contains plamove in or ou

ding. Minor sas.

efined as:

ning – plannin

gn – project mto complete te

truction – the ded and a con

sportat

onst& Wa

a is working toealth care, eduthe province.

of Alberta’s $hway and watnities, and he

e corridors to d mitigation p

cts scheduled

ce and renewrs (2018-19 to

ts scheduled

anning, desigut of the progafety-related im

ng studies and

management aender prepara

work that occntractor hired

tion

trucater M

o make life beucation, hous

$26.6-billion Bter managemeelp keep Albeimprove traverotection for A

d for the next

wal (bridge coo 2020-21); a

for the next y

gn and construram based onmprovements

d the prelimin

and hiring engation); and

curs when theto build the p

ctionMana

etter for all Alsing, and soci

Budget 2018 ent infrastructrtans workingel for commerAlberta comm

five years (2

nstruction annd

year (2018-19

uction work ton emerging nes may be add

ary analyses

gineering con

e design of thproject.

n Proagem

bertans by inal services w

Capital Plan, cture to improvg. The projectrcial carriers,

munities.

018-19 to 202

d highway re

9).

o reflect the fueeds, changined as identifi

completed fo

nsultant(s) to d

he project has

ograment P

vesting in capwhile supportin

Alberta Tranve safe travets will enhancand provide

22-23);

habilitation) p

ull life cycle ong constructioed, generally

or major capit

design the pr

s been comple

am Proje

pital projects ng economic g

sportation is l on Alberta’s

ce transportatirrigation for t

projects sched

of any given pon schedules in conjunctio

tal projects;

roject (may inc

eted, a tende

cts

that growth

investing tion the

dule for

project. s, or on with

clude

er

Page 2: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

G

June 12, 2018 | P

Glo@ .....Ave. .Bdry. BF 74CNR CP…CPR .Cr. ....Cty ...E ......EB or ECL .EID ..FN ....G/S ..Hwy. Incl. ..Imp. .Int. ....Interse

Jct. ...LNID LR ....N ......NB orNCL .PAR .Riv. ..Rd. orRepavRge. .S ......SB or SCL .sel. ...Six-laSMRISRA .St. ....SV ....Tr. ....Twp. .UAR .VIS ...W .....WB oWCL WID .

Page 2

ossa.....................................................................

4817 or (74817.......................………………............................................................................................EBL ..............

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................ection Improv

.......................

.......................

.......................

.......................r NBL ...................................................................................r Rds. .............ving ..............................................................SBL ..............

.......................

.......................ning ...............D ............................................................................................................................................................................................................r WBL ..........................................................

ary.....................................................................7-02) .....................................………………...........................................................................................................................................................................................................................................................................................................ements ..........

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

.......................

y ................ At ................ Ave................ Bou................ Brid................ Can

…………... Cap................ Can................ Cree................ Cou................ Eas................ Eas................ Eas................ Eas................ First................ Gra................ High................ Inclu................ Imp................ Inte................ Add

May................ Junc................ Leth................ Loca................ Nort................ Nort................ Nort................ Park................ Rive................ Roa................ Res................ Ran................ Sou................ Sou................ Sou................ Sele................ Add................ St. M................ Safe................ Stre................ Sum................ Trai................ Tow................ Urba................ Veh................ Wes................ Wes................ Wes................ Wes

enue undary dge File Numbnadian Nationapital Project fonadian Pacific ek

unty st stbound or Easst Corporate (ostern Irrigation t Nation de Separationhway udes rovement rsection

ding/extendingy involve lightinction hbridge Northeal Road th thbound or Noth Corporate (k Access Roaer ad or Roads surfacing an exnge uth uthbound or South Corporate ective ding two lanes Mary's River Irety Rest Area eet mmer Village l

wnship an Approach

hicle Inspectionst stbound or West Corporate (ostern Irrigation

ber al Railway

or water managRailway

stbound Lane or City) Limit District

n Structure

g acceleration/ng.

ern Irrigation D

orthbound Lan(or City) Limit

ad

xisting paved

outhbound La(or City) Limit

to a four-lanerrigation Distri

Road n Station

estbound Lanor City) Limit

n District

gement projec

/deceleration t

District

ne

road

ane

e twinned highict

e

cts

tapers or lanes

hway

s.

Page 3: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 3

Proje

TribuRive1, 2 Exsh

HwyInterSeeb

JumpBridgkm sCoch

Bow Hwy(743

Animsyste

WID bridgStrat

BetwHwy901

Hwy1 intewest(759

Bighon HbounCoch

Hwy

Bridgnorthof Co1)

Jura mitig

ect / Locatio

utary to Bow r culvert on Hkm south of haw (74661-1

. 40 over Hwyrchange, at be (76660-1)

pingpound Crge on Hwy. 1,south west of hrane (74355

River culvert. 1, at Canmo64-1)

mal detection ems installatio

irrigation cange on Hwy.1 nthmore (7305

ween 1 km ea. 561 and Hw

. 563 over Hwerchange, 2 kt of Calgary 33-1)

ill Creek BridgHwy. 1A at norndary of hrane (521-1)

. 1A and Hwy

ge on Hwy. 1Ah west boundaochrane (841

Creek flood gation

on Descr

Hwy.

)

Repla

y. 1 BridgeRehab

reek , 16

-2)

BridgeRehab

t on ore

Repla

on WildlifConta

nal near 52-1)

Repla

st of wy.

21 km

wy. km

BridgeRepla

ge rth

)

TwinnBridge

y. 22 InterchGradePaving

A, at ary 51-

InterchBridge

WaterManag

ription

ce Culvert

e Deck bilitation

e Deck bilitation

ce Culvert

fe inment

ce Bridge

m of Repaving

e Deck cement

ing - New e

hange - e, Base, g

hange - e Structure

r gement

Status

Design

Design

Design

Construct

Design

Design

Design

Construct

Design

Design

Design

Construct

Prim

Majo

Majo

Majo

tion Majo

Majoenha

Majoenha

Majo

tion Majoenha

Enha

Enha

Enha

tion Flood

mary Purpose

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corridance public sa

or trade corridance public sa

or trade corrid

or trade corridance public sa

ance public sa

ance public sa

ance public sa

d mitigation

e

dor

dor

dor

dor

dor, afety

dor, afety

dor

dor, afety

afety

afety

afety

Page 4: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 4

Proje

Safeat 5 Hwy

Betwof PA5 (se

Betwof Hwsouth

Northintercintercand Roadroad

Red cable

Betwand

Betwof Hwnorth

Wateon HLedu

Bapt(NC0

HwyAnimsyste

Animsyste(HwyPeacto SaHwyand Spiri

Betwof Hw49

Betw1 km505

ect / Locatio

ety improvemelocations on . 2 and Hwy.

ween 14 km soAR 136 and Helective)

ween 1 km nowy. 509 and 2h of Hwy. 511

h Innisfail change upgrachange rampBluebird/Rand 283 services

Deer and Lede barrier

ween Hwy. 13Hwy. 39

ween 1 km nowy. 616 and 9h of Hwy. 616

ercourse culvHwy. 2 near uc

tiste Creek sli090)

. 2 and Hwy. mal detection ems

mal detection ems installatioy. 2 west of ce River, Hwyaddle Hills are. 43 at Hwy. 5Hwy. 49 westt River)

ween 14 km nwy. 49 and Hw

ween Hwy. 5 am north of Hwy

on Descr

ents

642

InterseImprov

outh Hwy.

25 km

rth 2 km 1

17 km

ade: ps, ge

e

Repav

duc Cable Install

3 35 km

rth 9 km 6

8 km o

ert Repla

de Slide R

33 WildlifConta

on

y. 2 ea, 59 t of

WildlifConta

orth wy.

15 km

and y.

17 km

ription

ection vement

m of Repaving

m of Repaving

ving

Barrier ation

m of Repaving

of Repaving

ce Culvert

Repair

fe inment

fe inment

m of Repaving

m of Repaving

Status

Design

Design

Design

Design

Design

Design

Design

Design

Design

Design

Design

Design

Construct

Prim

Indusdimeenha

Imprbetw

Imprbetw

Majo

Majoenha

Majo

Majo

Majo

Enha

Majoenha

Majoenha

Imprbetw

tion Imprbetw

mary Purpose

strial/over-ensional corridance public sa

ove connectioween commun

ove connectioween commun

or trade corrid

or trade corridance public sa

or trade corrid

or trade corrid

or trade corrid

ance public sa

or trade corridance public sa

or trade corridance public sa

ove connectioween commun

ove connectioween commun

e

dor, afety

ons nities

ons nities

dor

dor, afety

dor

dor

dor

afety

dor, afety

dor, afety

ons nities

ons nities

Page 5: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 5

Proje

LethIrrigastruckm sGran

Willoon Hof Gr

LittleBridgkm sRivelane)

LittleBridgkm sRivelane)

212 AintercGate

212 AintercGate

Betw2 kmBowd

HwyRoad

Hwy5 km(756

Hwy5 km(756

BetwEdmbounnorth

ect / Locatio

bridge Northeation District ccture on Hwy.south west of num (72535-2

ow Creek BridHwy. 2, 8 km sranum (72533

e Bow River ge on Hwy. 2,southeast of Hr (northbound)

e Bow River ge on Hwy. 2,southeast of Hr (southbound)

Avenue southchange (Cran

e) Deerfoot Tr

Avenue southchange Crans

e) Deerfoot Tr

ween Hwy. 27m north of Tow

den

. 2 and Mcked

. 53 interchanm west of Pono

51-1)

. 53 interchanm west of Pono

51-2)

ween City of onton south

ndary and 1 kh of Hwy. 216

on Desc

ern canal 2, 8

2)

BridgeReha

dge south 3-2)

BridgeReha

, 5 High d

BridgeReha

, 5 High d

BridgeReha

heast nston rail

IntercGradePavin

heast ston rail

ConstBridge

7 and wn of

18 km

nzie IntersImpro

nge, oka

BridgeReha

nge, oka

BridgeReha

m 6

4 km

ription

e Deck bilitation

e Deck bilitation

e Deck bilitation

e Deck bilitation

change - e, Base,

ng

truct New e

m of Repaving

section ovement

e Deck bilitation

e Deck bilitation

of Repaving

Status

Design

Design

Design

Design

Construct

Construct

g Design

Design

Design

Design

Construct

Prim

Majo

Majo

Majo

Majo

tion Majoenha

tion Majoenha

Majo

Majoenha

Majo

Majo

tion Majo

mary Purpose

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corridance public sa

or trade corridance public sa

or trade corrid

or trade corridance public sa

or trade corrid

or trade corrid

or trade corrid

e

dor

dor

dor

dor

dor, afety

dor, afety

dor

dor, afety

dor

dor

dor

Page 6: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 6

Proje

Betwof HwHwy(incluinterc

Betwand 2Hwy

BetwHwy55 (A

Interimpro2 witAtha

NineBridgkm sWide

Betwof HwTown(sele

BetwNamJct H

Dunv

Betwof Hwnorth(Nan

Betw(AirdHwy

Betwand (upginterc

Gaetmainstruc2A, R(753

GaetMainstruc2A, R(753

ect / Locatio

ween 3 km nowy. 633 and . 37 (selectiveuding Hwy. 37change)

ween Hwy. 372 km north of. 642

ween south of . 663 and HwAthabasca)

rsection ovement at Hthin the Town

abasca

e Mile Creek ge on Hwy. 2,southeast of ewater (75752

ween 6 km sowy. 688 and n of Peace R

ective)

ween north of mpa and southHwy. 688

vegan (PH037

ween 2 km nowy. 527 and 1h of Hwy. 533nton)

ween Hwy. 56drie) and north. 2A (Crossfie

ween Hwy. 2AHwy. 72 rade diamondchange)

tz - Hwy. 2 nline northboucture over HwRed Deer 32-N5)

tz - Hwy. 2 nline southboucture over HwRed Deer 32-S6)

on Descr

rth

e) 7

8 km o

7 f

12 km

fwy.

31 km

Hwy. of

InterseImprov

, 3

2- 1)

BridgeRehab

uth

iver

15 km

h of 2 km o

7-1) Slide R

rth 1 km 3

23 km

67 h of eld)

26 kmGrade

A

d

InterchUpgra

und wy.

Repla

und wy.

Repla

ription

of Repaving

m of Repaving

m of Repaving

ection vement

e Deck bilitation

m of Repaving

of Repaving

Repair

m of Repaving

m of 6 Laning -e, Base, Pave

hange ading

ce Bridge

ce Bridge

Status

Design

Design

Construct

Construct

Design

Design

Design

Design

Construct

- e

Construct

Construct

Construct

Construct

Prim

Indusdime

Indusdime

tion Indusdime

tion Enha

Imprbetw

Majo

Majo

Enha

tion Majo

tion Majoenha

tion Majoenha

tion Majoenha

tion Majoenha

mary Purpose

strial/over-ensional corrid

strial/over-ensional corrid

strial/over-ensional corrid

ance public sa

ove connectioween commun

or trade corrid

or trade corrid

ance public sa

or trade corrid

or trade corridance public sa

or trade corridance public sa

or trade corridance public sa

or trade corridance public sa

e

dor

dor

dor

afety

ons nities

dor

dor

afety

dor

dor, afety

dor, afety

dor, afety

dor, afety

Page 7: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 7

Proje

Local intercbound(7533

Hwy. upgraAvenu(Road

BetweHwy. km so

Betwe4 km sRoad

Betweof Hweast o

PeaceProjec2 ovetwinniPeaceProjec2 oveintercreplac

PeaceProjecrecon

PeaceProjec2 oveCN Ra(7606PeaceProjec2 ovetwinni

Southstation

Betwe587 a

Betwenorth Road

ct / Location

road over Hwhange, at soudary of Red D31-1)

2 interchangeades: Gaetz ue/Taylor Drivdwork)

een 1 km nort2A (south) an

outh of Hwy. 5

een Hwy. 19 asouth of Eller

een 25 km nowy. 812 and 1 of Hwy. 44

e River Bridgect - stage 1 - r CN Rail, ng (76060W-e River Bridgect - stage 1 - r 98 Street pahange, cement (7605

e River Bridgect – road struction

e River Bridgect - stage 1 - r Hwy. 684 anail, replaceme

61-2) e River Bridgect - stage 1 - r Peace Riveng (75946W-

h Dunvegan n (PH035-1)

een east of Hwnd Hwy. 587

een Red Deerof Central Pa

n Desc

wy. 2 uth

Deer

IntercBridge

e

ve

14 kmBase,

th of nd 4 53

14 km

and rslie

6 km Base,

orth km

32 km

e Hwy.

-1)

ConstBridge

e Hwy. artial

59-2)

Repla

e 2 km ReconRealig

e Hwy. nd ent

Repla

e Hwy. r, -1)

ConstBridge

Slide

wy. Repav

r and ark

3 km GradeStage

ription

change - e Structure

m of Grading, , Full Paving

m of Repaving

of Grading, , Full Paving

m of Repaving

truct New e

ace Bridge

of nstruction/ gnment

ace Bridge

truct New e

Repair

ving

of Twinning -e, Base, e Paving

Status

Constructi

Constructi

g Constructi

Constructi

g Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Design

- Design

Prim

ion Majoenha

ion Majoenha

ion Majo

ion Majo

ion Imprbetw

ion Enha

ion Majoenha

ion Majoenha

ion Majoenha

ion Majoenha

ion Enha

Imprbetw

Enha

mary Purpose

or trade corridance public sa

or trade corridance public sa

or trade corrid

or trade corrid

rove connectioween commun

ance public sa

or trade corridance public sa

or trade corridance public sa

or trade corridance public sa

or trade corridance public sa

ance public sa

rove connectioween commun

ance public sa

e

dor, afety

dor, afety

dor

dor

ons nities

afety

dor, afety

dor, afety

dor, afety

dor, afety

afety

ons nities

afety

Page 8: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 8

Proje

BetweHwy. Grims

CollecRoad Red DNCD3

CollecRoad Red DSCD4

Wildlif(fenci

BetweHwy. of Hw

Signaand H

BetweGrassof Hw

Brock

PedesstructLethb

Oldmaon HwLethb

BetweHwy. (selec

BetweTown Hwy.

BetweHwy. west o

ct / Location

een 2 km nort2 and Town o

shaw

ctor/Distributoover Hwy. 2A

Deer (75332-3)

ctor/Distributoover Hwy. 2A

Deer (75332-4)

fe containmenng)

een 1 km wes3A and 1 km

wy. 36 (selectiv

alization at HwHwy. 864 (Tab

een east of sy Lake and w

wy. 885

ket slides (S03

strian bridge ure in the Cityridge

an River Bridgwy. 3, at ridge (1074-1

een 5 km sou512 and Hwy

ctive)

een 2 km nortof Milk River 36

een 2 km wes820 and 3 kmof Hwy. 62

n Desc

th of of

9 km

or A,

IntercBridge

or A,

IntercBridge

nt WildlifConta

st of east ve)

15 km

wy. 3 ber)

Signa

west 30 km

39-1) Slide

y of ConstBridge

ge

1) MajorRepaBridge

th of y. 3

10 km

th of r and

13 km

st of m

19 km

ription

of Repaving

change - e Structure

change - e Structure

fe ainment

m of Repaving

alization

m of Repaving

Repair

truct New e

r Girder irs on es

m of Repaving

m of Repaving

m of Repaving

Status

Constructi

Constructi

Constructi

Design

g Design

Constructi

g Design

Design

ConstructiMunicipali

Constructi

g Design

g Constructi

g Design

Prim

ion Imprbetw

ion Enha

ion Enha

Majoenha

Majo

ion Majoenha

Majo

Majoenha

ion by ity

Enha

ion Majoenha

Majo

ion Majo

Imprbetw

mary Purpose

rove connectioween commun

ance public sa

ance public sa

or trade corridance public sa

or trade corrid

or trade corridance public sa

or trade corrid

or trade corridance public sa

ance public sa

or trade corridance public sa

or trade corrid

or trade corrid

rove connectioween commun

e

ons nities

afety

afety

dor, afety

dor

dor, afety

dor

dor, afety

afety

dor, afety

dor

dor

ons nities

Page 9: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 9

Proje

WaterHwy.6(7367

Red Don Hwbound(6615

BetweHwy.

Rosebon Hwsouth (7051

Gonikon Hwsouth (7348

Wateron HwCondo

Cline Hwy. Norde

BetweDeer a

Medicon Hwnorth 1)

ct / Location

rcourse culve6 near Twin B72-1)

Deer River Brwy. 9, at southdary of Drumh5-1)

een 1 km eas884 and Hwy

bud River Bridwy. 10X, 3 km

of Rosedale 2-1)

ka Creek culvewy. 11, 16 km

west of Nord89-1)

rcourse Culvewy. 11 near or (8616-1)

River Bridge 11, 45 km we

egg (73429-1)

een City of Reand Hwy. 2A

cine River Bridwy. 12, 14 kmof Eckville (1

n Desc

ert on Butte

Repla

idge h heller

BridgeReha

t of y. 41

54 km

dge m

Repla

ert

degg

Repla

ert Repla

on est of )

MajorRepaBridge

ed 2 km GradeStage

dge 140-

BridgeReha

ription

ace Culvert

e Deck bilitation

m of Repaving

ace Bridge

ace Culvert

ace Culvert

r Girder irs on es

of Twinning -e, Base, e Paving

e Deck bilitation

Status

Design

Design

g Design

Design

Design

Design

Constructi

- Planning

Design

Prim

Imprbetw

Imprbetw

Imprbetw

Enha

Imprbetw

Imprbetw

ion Enha

Enha

Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

e

ons nities

ons nities

ons nities

afety

ons nities

ons nities

afety

afety

ons nities

Page 10: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 10

Proje

BetweHwy.

BetweHwy.

BetweHwy. east o

Modeon Hwof Win

Betwe6 km w

WaterHwy. Winfie

Betwewest

BetweHwy. Camro

BetweMitiskroad aProvo

BetweHwy. east o

Betweand HBetweand H

Safetyupgra15/MeHwy.

ct / Location

een Hwy. 76620 (selective)

een Hwy. 872884

een 1 km eas855 and 1 km

of Hwy. 36

ste Creek culwy. 13, 5 km wnfield (77652-

een Hwy. 20 awest of Hwy.

rcourse bridge13, 4 km weseld (9875-1)

een Hwy. 22 aof Hwy. 761

een 1 km eas21 and City oose

een 12 km eakow Approachand Town of ost

een 9 km eas870 and 4 km

of Hwy. 883

een EdmontoHwy. 37 een EdmontoHwy. 37

y improvemenades to Hwy. eridian Street 15/Hwy 28A

n Desc

6 and )

20 km

2 and 23 km

t of m

23 km

lvert west -1)

Repla

and . 771

18 km

e on st of

Repla

and 20 km

t of of

2 km

ast of h

15 km

t of m

31 km

n 4 km 2nd S

n 4 km GradeStage

nt

and

Signa

ription

m of Repaving

m of Repaving

m of Repaving

ace Culvert

m of Repaving

ace Bridge

m of Repaving

of Repaving

m of Repaving

m of Repaving

of Twinning -Stage Paving

of Twinning -e, Base, e Paving

alization

Status

g Design

g Design

g Constructi

Design

g Design

Design

g Design

Design

g Constructi

g Design

- Design

- Design

Design

Prim

Imprbetw

Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

Enha

Imprbetw

Imprbetw

ion Imprbetw

Imprbetw

Enha

Enha

Enha

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

ance public sa

e

ons nities

ons nities

ons nities

ons nities

ons nities

afety

ons nities

ons nities

ons nities

ons nities

afety

afety

afety

Page 11: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 11

Proje

Betwe216 aEdmocorpo(selec

North River 15, at Saska1)

CNR onear FSaska1)

Betwewest o

BridgeextensHwy.

WaterHwy. northw(7083

Hwy. interseimpro

Hwy. km no(7519

Hwy. km no(7519

Over flyovebound(EBL)

Over flyovebound(WBL

ct / Locationeen south of Hnd City of

onton east rate limit

ctive)

SaskatchewaBridge on HwFort

atchewan (74

over Hwy. 15Fort atchewan (76

een Hwy. 37 aof Hwy. 21

e culvert sion as part o15 twinning

rcourse culve15, 4 km west of Chipm39-1) 16/830 ection vement

43 Interchangorth of Carvel 95-2)

43 interchangorth of Carvel 95-1)

Mine haul roaer at north dary of Waba) (74978-1)

Mine haul roaer at north dary of Waba) (74978-2)

n DescHwy.

21 km

an wy.

452-

TwinnBridge

5

701-

TwinnBridge

and 5 km GradeStage

of MisceBridge

ert on

man

Repla

IntersImpro

ge, 2 BridgeReha

ge, 2 BridgeReha

ad

mun

Bridge

ad

mun

Bridge

ription

m of Repaving

ning - New e

ning - New e

of Twinning -e, Base, e Paving

ellaneous e Work

ace Culvert

section ovement

e Deck bilitation

e Deck bilitation

e Removal

e Removal

Status

g Design

Design

Design

- Design

Design

Design

Planning

Design

Design

Design

Design

Prim

Imprbetw

Enha

Enha

Enha

Imprbetw

Imprbetw

Majoenha

Majo

Majo

Majo

Majo

mary Purpose

rove connectioween commun

ance public sa

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

or trade corridance public sa

or trade corrid

or trade corrid

or trade corrid

or trade corrid

e

ons nities

afety

afety

afety

ons nities

ons nities

dor, afety

dor

dor

dor

dor

Page 12: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 12

Proje

BetweHwy. east o

Maskuon Hwbound(8435

BetweHwy. of Hw

WaterHwy. Lake

Betwe16 an(selec

WaterHwy.1(7188

WaterHwy. Waba

BetweTown 1 km e

Betwe753 a

BetweHwy. of Hw

BetweHwy. (selecWaterHwy.1Plain

Betweto Edm

ct / Location

een 4 km wes897 and 5 km

of Hwy. 897

uta Creek Briwy. 16, at soudary of Hinton5-1)

een 21 km we47 and 3 km

wy. 47

rcourse culve16 near Chip (71886-1)

een south of Hd Hwy. 16

ctive)

rcourse culve16 near Grana85-1)

rcourse culve16 near

amun (7408-1

een 7 km wesof Mundare a

east of Hwy.

een west of Hnd Hwy. 753

een 8 km eas32 and 4 km

wy. 751

een 1 km wes857 and Hwy

ctive) rcourse culve16A near Ston(71097-1)

een Spruce Gmonton

n Desc

st of m

9 km

dge th

n

BridgeReha

est of west

18 km

ert on Repla

Hwy. IntersImpro

ert on ada

Repla

ert on

)

Repla

st of and 15

9 km

Hwy. 1 km

t of west

14 km

st of y. 16

1 km

ert on ny

Repla

Grove 9 km Barrie

ription

of Repaving

e Deck bilitation

m of Repaving

ace Culvert

section ovement

ace Culvert

ace Culvert

of Repaving

of Repaving

m of Repaving

of Repaving

ace Culvert

of Cable er Installation

Status

Design

Design

g Design

Design

Design

Design

Design

Design

Constructi

g Constructi

Design

Constructi

Constructi

Prim

Majo

Majo

Majo

Majo

Majoenha

Majo

Majo

Majo

ion Majo

ion Majo

Imprbetw

ion Imprbetw

ion Enha

mary Purpose

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corridance public sa

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corrid

rove connectioween commun

rove connectioween commun

ance public sa

e

dor

dor

dor

dor

dor, afety

dor

dor

dor

dor

dor

ons nities

ons nities

afety

Page 13: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 13

Proje

IntersHwy. of Bar

Betwe60 an

BetweHwy.

StructCreekTributSaskaculverkm ea(8958

West lane r3.5 kmupgraservic

BetweHwy.

BetweHwy. Appro

Betwekm no

WaterHwy. Rocky

Betwekm noCPR o21, 4 Carbo

ct / Location

ection upgrad18/Hwy. 33 nrrhead

een east of Hwd west of Hw

een 2 km wes2 and Hwy. 2

ture: Whitemuk Devon (8503tary to North atchewan Rivrt on Hwy. 19ast of Devon 8-1)

end at Hwy. 6realignment fom on Hwy. 19ades on Hwy. ce road)

een 2 km wes2 and Hwy. 2

een 1 km nort27 and Huxle

oach Road

een Hwy. 1 anorth of Rockyf

rcourse culve21 near yford (75493-

een Hwy.13 aorth of Hwy. 6overpass on Hkm west of

on (457-1)

n Desc

de north Inters

Impro

wy. y. 2

7 km GradeStage

st of 2

2 km 2nd S

ud 36-1)

Twinn

er , 2

Repla

60 (4 or , 60,

4 km GradeStage

st of 2

2 km GradePave

th of ey

13 km

nd 9 ford

30 km

ert on

1)

Repla

and 2 616

15 km

Hwy. BridgeReha

ription

section ovement

of Twinning -e, Base, e Paving

of Twinning -Stage Paving

ning - Bridge

ace Culvert

of Twinning -e, Base, e Paving

of 6 Laning -e, Base,

m of Repaving

m of Repaving

ace Culvert

m of Repaving

e Deck bilitation

Status

Planning

- Design

- Design

Design

Design

- Design

Constructi

g Design

g Design

Design

g Design

Constructi

Prim

Enha

Enha

Enha

Enha

Imprbetw

Enha

ion Enha

Imprbetw

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

mary Purpose

ance public sa

ance public sa

ance public sa

ance public sa

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

afety

afety

afety

afety

ons nities

afety

afety

ons nities

ons nities

ons nities

ons nities

ons nities

Page 14: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 14

Project

BetweeHwy. 62of Hwy.lane) BetweeHwy. 62of Hwy.lane) Pond rewest of of Drayt

BetweeHwy. 43

BetweeHwy. 64south oBetweeHwy. 52

Wildlife (fencing

2 km ea

CPR ov22, at wCochra

BetweeDrayton16 BetweePark Ackm soutBetweeHwy. 53

Betweekm sout

Betweesouth o

Little Boon Hwyof CarmBetweeHwy. 52

t/Location en 2 km north 24 and 5 km n 624 (northbo

en 2 km north 24 and 5 km n 624 (southbo

emoval betweHwy. 22 to ston Valley

en 2 km north 3 and Hwy. 18

en 16 km sout47 and 3 km f Hwy. 647

en 13 km sout20 and Hwy. 5

containment g)

ast of Hwy. 54

verpass on Hwwest boundaryne (77466-1)

en north of n Valley and H

en Chain Lakeccess Road ath of Hwy. 54

en 1 km north 3 and Hwy. 13

en Hwy. 13 anth of Hwy. 61

en Hwy. 16 anf Hwy. 647

ow River Bridy. 23, 1 km wemangay (7363en 8 km north 29 and Hwy. 5

Descof

north ound

2 km PassiLane

of north ound

2 km PassiLane

een outh

8 km MisceRoad

of 8

5 km

th of 13 km

th of 533

39 km

WildlifConta

46 ReconalignmDama

wy. y of

Repla

Hwy. 38 km

es and 5 40

20 km

of 3

26 km

nd 5 16

15 km

nd 17 km

ge est 37-1)

BridgeReha

of 542

30 km

ription

of ng/Climbing

of ng/Climbing

of ellaneous

Work

of Repaving

m of Repaving

m of Repaving

fe ainment

nstruction/Rement (Flood age)

ace Bridge

m of Repaving

m of Repaving

m of Repaving

m of Repaving

m of Repaving

e Deck bilitation

m of Repaving

Status

Design

Design

Design

Design

g Design

g Design

Design

e Design

Design

g Design

g Constructi

g Constructi

g Constructi

g Constructi

Design

g Design

Prim

Inducorrisafet

Inducorrisafet

Inducorri

Imprbetw

Imprbetw

Imprbetw

Enha

Floo

Inducorrisafet

Inducorri

ion Imprbetw

ion Inducorri

ion Inducorri

ion Imprbetw

Imprbetw

Imprbetw

mary Purpose

strial/over-dimdor, enhancety

strial/over-dimdor, enhancety

strial/over-dimdor

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

d mitigation

strial/over-dimdor, enhancety

strial/over-dimdor

rove connectioween commun

strial/over-dimdor

strial/over-dimdor

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

mensional e public

mensional e public

mensional

ons nities

ons nities

ons nities

afety

mensional e public

mensional

ons nities

mensional

mensional

ons nities

ons nities

ons nities

Page 15: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 15

Projec

Upgradand TwCoalhuarea cointerse

BetweeHwy. 8west oWatercHwy.26(1800-

Betweeand ea

Red Dnear Malignmrepairs

Red Don Hwsouthw(9551-

Interseimprov28/For28/892Hwy. 2

WatercHwy. 2(74277

Whitfoon HwChipm

Januaron Hw(75779

ct /Location

des to Hwy. 2wp. Rd 92 andurst southeasollector road

ection

en 6 km west855 and 3 kmof Hwy. 857 course culver6 near Camro-1)

en west of Hwast of Hwy. 2

eer River BridMorrin, road rement and eross

eer River Bridy. 27, 12 km

west of Morrin-1) ection vements at Hwrt Kent and Hw2 28 and Hwy. 3

course culver29 near Willin7-1)

rd Creek Bridy.29 near an (75220-1)

ry Creek culvy. 32 near Pe9-1)

Desc

25 d

st

IntersImpro

t of

16 km

rt on ose

Repla

wy. 2 1 km

dge, e-ion

2 km Reconalignm

dge

n

Repla

wy. wy.

IntersImpro

37 IntersImpro

rt on gdon

Repla

dge

)

Repla

ert eers

Repla

ription

section ovement

m of Repaving

ace Culvert

of Repaving

of nstruction/Rement

ace Bridge

section ovement

section ovement

ace Culvert

ace Bridge

ace Culvert

Status

Constructi

g Constructi

Constructi

Design

eConstructi

Constructi

Planning

Design

Design

Design

Design

Prim

ion Enha

ion Imprbetw

ion Imprbetw

Imprbetw

ion Enha

ion Enha

Inducorrisafet

Inducorrisafet

Imprbetw

Enha

Inducorri

mary Purpose

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

strial/over-dimdor, enhancety

strial/over-dimdor, enhancety

rove connectioween commun

ance public sa

strial/over-dimdor

e

afety

ons nities

ons nities

ons nities

afety

afety

mensional e public

mensional e public

ons nities

afety

mensional

Page 16: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 16

Proje

Hwy. lanes north (southVariouimpro32 an

Betwe4 km

Betweof CarProvinRoad of Tow

Intersimprolocatioand H

Betwe9 km s

MorseHwy. southe(7507

WaterHwy.

Installon Hwavenu

Buchaculvernear N(7143

Betweof Hw691

BetweHwy. south

BetweHwy. north

WaterHwy. Level

BetweSlaveSteen

ct / Location32 - climbing 11 and 15 kmof Hwy. 16

hbound lane) us intersectiovements on Hd Hwy. 16

een Hwy. 16 anorth of Hwy.

een 11 km norson- Pegasuncial Park Accand 22 km so

wn of Swan H

ection vements at sons on Hwy. 3

Hwy. 43

een Hwy. 43 asouth of Hwy

e River culver33, 30 km east of Swan

73-1)

rcourse culve33 (86266-1)

lation of signawy. 33 (50th ue in Barrhead

anan Creek rt on Hwy. 35 North Star 34-1)

een 10 km nowy. 689 and Hw

een 9 km nort695 and 5 kmof Hwy. 697

een 8 km nort697 and 15 kof Hwy. 697

rcourse culve35 near High (73448-1)

een north of y Creek and

n River

n Desc

m 4 km PassiLane

ns Hwy.

IntersImpro

and . 748

21 km

orth us cess outh

Hills

22 km

ix 32

IntersImpro

and . 651

19 km

rt on

Hills

Repla

ert on Repla

als

d)

Signa

Repla

orth wy.

33 km

th of m

19 km

th of km

7 km

ert on Repla

37 km

ription

of ng/Climbing

section ovement

m of Repaving

m of Repaving

section ovement

m of Repaving

ace Culvert

ace Culvert

alization

ace Culvert

m of Repaving

m of Repaving

of Repaving

ace Culvert

m of Repaving

Status

Constructi

Constructi

g Constructi

g Constructi

Constructi

g Design

Design

Constructi

Constructi

Design

g Design

g Design

Design

Design

g Constructi

Prim

ion Inducorrisafet

ion Inducorrisafet

ion Inducorri

ion Imprbetw

ion Enha

Imprbetw

Floo

ion Imprbetw

ion Imprbetw

Majo

Majo

Majo

Majo

Majo

ion Majo

mary Purpose

strial/over-dimdor, enhancety

strial/over-dimdor, enhancety

strial/over-dimdor

rove connectioween commun

ance public sa

rove connectioween commun

d mitigation

rove connectioween commun

rove connectioween commun

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corrid

or trade corrid

e

mensional e public

mensional e public

mensional

ons nities

afety

ons nities

ons nities

ons nities

dor

dor

dor

dor

dor

dor

Page 17: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 17

Proje

Drainaon HwWarne

SMRIon Hwof Tab

BetweTown (selec

BetweHwy. south

Betwe16 an

BetweHwy.

Trucknorth Hwy.

Interimimprobetweand H

IntersimproHwy.

Betwe779 a44

Majorimpront at H(west Saska

BetweHwy.

North River 38, 13Redw

ct / Location

age ditch culvwy. 36 near er (79197-1)

D canal site 4wy. 36, 6 km sber (76410-1)

een Hwy. 3 anof Taber

ctive)

een 5 km sou12 and 2 km of Hwy. 12

een south of Hd Hwy. 16

een 7 km sou577 and Hwy

staging areaof junction wi28 (near Vilna

m intersectionvements,

een Jct Hwy. 2Hwy. 37

ection vements, Jct 37 and Hwy.

een east of Hwnd east of Hw

r intersection vement/realig

Hwy. 37/825/1of Fort

atchewan)

een 1.7 km ea830 and Hwy

Saskatchewabridge on Hw

3 km south eawater (74233-1

n Desc

vert Repla

44A south )

BridgeReha

nd Repav

th of 4 km

Hwy. 19 km

th of y. 9

20 km

a, ith a)

Safety

n

28A

IntersImpro

779

IntersImpro

wy. wy.

11 km

gnme15

IntersImpro

ast of y. 45

5 km

an wy. ast of 1)

Repla

ription

ace Culvert

e Deck bilitation

ving

of Repaving

m of Repaving

m of Repaving

y Rest Area

section ovement

section ovement

m of Repaving

section ovement

of Repaving

ace Bridge

Status

Design

Design

Design

Design

g Constructi

g Constructi

Constructi

Design

Constructi

g Constructi

Constructi

Constructi

Planning

Prim

Inducorri

Inducorri

Imprbetw

Inducorri

ion Inducorri

ion Inducorri

ion Enha

Enha

ion Enha

ion Imprbetw

ion Enha

ion Imprbetw

Inducorrisafet

mary Purpose

strial/over-dimdor

strial/over-dimdor

rove connectioween commun

strial/over-dimdor

strial/over-dimdor

strial/over-dimdor

ance public sa

ance public sa

ance public sa

rove connectioween commun

ance public sa

rove connectioween commun

strial/over-dimdor, Enhancety

e

mensional

mensional

ons nities

mensional

mensional

mensional

afety

afety

afety

ons nities

afety

ons nities

mensional e Public

Page 18: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 18

Projec

Modeson Hwof Dray(74678

WatercHwy. 3(75629

Hwy. 3(round

Slide rHwy. 3

Chancon Hwsouthw(81758

Betwesouth o

Betweand soCache

Peter LaccessVillage

Betweand W(BF76

Structu(BF76Entran

Orchanorthw(85171

Peppenear E1)

Watercnorthw(85172

BetweJarvis

BetweCreek Berlan(BF77

ct / Location

ste Creek Bridwy. 39, 25 km

yton Valley 8- 1)

course culver39 near Warb9-1)

39/60 dabout)

repair (site NC39/Twp. Rd 49

ce Creek culvewy. 40, 6 km west of Robb 8-2)

en Hwy. 16 aof Grande Ca

en Grande Pouth of Grande

Lougheed pas - Kananaske access

en Jarvis LakWildhay River

797)

ure: Jarvis Cr797) near

nce

rd Creek, 9 kwest of Entran1-1)

ers Creek culvEntrance (767

course, 9 km west of Entran2-1)

en Hwy. 16 aLake

en south of Pand south of

nd River 175, 77194)

Desc

dge east

BridgeReha

rt on burg

Repla

IntersImpro

C 86) 91A

Slide

ert Repla

and ache

WildlifConta

rairie e

WildlifConta

rk is

26 km

ke 18 kmand R

reek Repla

m nce

Widen

vert 783-

Widen

nce Widen

and 18 kmand R

Pinto 13 kmand R

ription

e Deck bilitation

ace Culvert

section ovement

Repair

ace Culvert

fe ainment

fe ainment

m of Repaving

m of WideningRepaving

ace Culvert

n Bridge

n Bridge

n Bridge

m of WideningRepaving

m of WideningRepaving

Status

Design

Design

Design

Constructi

Design

Design

Design

g Constructi

g Design

Design

Design

Design

Design

g Design

g Design

Prim

Imprbetw

Imprbetw

Enha

ion Enha

Imprbetw

Enha

Enha

ion Imprbetw

Enha

Imprbetw

Enha

Enha

Enha

Enha

Enha

mary Purpose

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

ance public sa

rove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

e

ons nities

ons nities

afety

afety

ons nities

afety

afety

ons nities

afety

ons nities

afety

afety

afety

afety

afety

Page 19: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 19

Proje

Shanon HMusk(772

BetwRiveRive

InterimproTeddArch

Climlanesof GrsouthCach

Betwof Hwnorth(sele

BetwBerlanorthRive77197727

Berlaon Hnorth(747

BetwRivePinto

BetwCabiGran(sele

Climlanes

BetwForeand eRive

Susaon Heast Cach

ect / Locatio

nd Creek culvHwy.40 near keg River 78-1)

ween Kakwa r and Cutbanr

rsection ovements at dy Lane and ie Way/Husky

bing/passing s between norande Cache h of Grande he

ween 1 km nowy. 666 and 2h of Hwy. 668ective)

ween south of and River andh of Berland r (BF75050,

95, 77196, 77)

and River BridHwy. 40, 62 kmh of Entrance 10-1)

ween Wildhayr and south o

o Creek

ween Muskeg ns and east o

nde Cache ective)

bing/passing s on Hwy. 40

ween west of estry Trunk Roeast of Musker

a Creek culveHwy. 40, 11 km

of Grande he

on Descr

vert Repla

k 55 km

y

InterseImprov

orth and

27 kmPassinLane

rth 2 km 8

6 km o

fd

16 kmand R

dge m

Repla

of 18 kmand R

of 21 kmand R

4 km oPassinLane

oad eg

3 km o

ert m

Major Repai

ription

ce Culvert

m of Repaving

ection vement

m of ng/Climbing

of Repaving

m of Widening Repaving

ce Bridge

m of Widening Repaving

m of Widening Repaving

of ng/Climbing

of Repaving

Culvert rs

Status

Design

Design

Design

Design

Construct

Design

Design

Design

Construct

Construct

Construct

Construct

Prim

Imprbetw

Imprbetw

Enha

Enha

tion Imprbetw

Enha

Enha

Enha

tion Enha

tion Enha

tion Imprbetw

tion Flood

mary Purpose

ove connectioween commun

ove connectioween commun

ance public sa

ance public sa

ove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

ove connectioween commun

d mitigation

e

ons nities

ons nities

afety

afety

ons nities

afety

afety

afety

afety

afety

ons nities

Page 20: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 20

Proje

Smoon HnorthCach

NorthCree1)

Betwand Hwy

Beavon Hsouth(819

Betw19 km9

Betwand CanaBase

Betwand

Betwof Hwnorth

Betwof Hwkm wTown(sele

Betwof HwwestWhit

Betwand (sele

Betwof Hwkm w

ect / Locatio

oky River BridHwy. 40, 1 km h of Grande he (76474-1)

h Little Prairieek slide (GP03

ween Hwy. 141 km south of. 883

ver River BridHwy. 41, 6 km h of La Corey6-1)

ween Hwy. 9 am north of Hw

ween Hwy. 13north boundaadian Forces e Wainwright

ween Hwy. 57Hwy. 9

ween 1 km sowy. 883 and 3h of Hwy. 619

ween 34 km ewy. 665 and 1west from the n of Fox Cree

ective)

ween 11 km wwy. 32 and 2 t of Town of ecourt

ween Hwy. 32Mayerthorpe

ective)

ween 23 km ewy. 947 and 1west of Hwy.

on Descr

ge Repla

e 38-

Slide R

f

19 km

dge

y

BridgeRehab

and wy.

19 km

3 ary

23 km

70 25 km

uth 3 km 9

22 km

ast 14

ek

24 km

west km

15 km

31 km

ast 11 32

18 km

ription

ce Bridge

Repair

m of Repaving

e Deck bilitation

m of Repaving

m of Repaving

m of Repaving

m of Repaving

m of Repaving

m of Repaving

m of Repaving

m of Repaving

Status

Construct

Construct

Design

Design

Design

Construct

Construct

Construct

Design

Design

Design

Design

Prim

tion Enha

tion Enha

Imprbetw

Imprbetw

Imprbetw

tion Imprbetw

tion Imprbetw

tion Imprbetw

Majo

Majo

Majo

Majo

mary Purpose

ance public sa

ance public sa

ove connectioween commun

ove connectioween commun

ove connectioween commun

ove connectioween commun

ove connectioween commun

ove connectioween commun

or trade corrid

or trade corrid

or trade corrid

or trade corrid

e

afety

afety

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

dor

dor

dor

dor

Page 21: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 21

Projec

McLeoon HwWhitec

BetweHwy. 6east of

BetweHwy. 4(eastbwestbo

SturgeNationto east

West oFirst NSturgeNationValleyv

BetweAthabaeast of(southwestbo

BetweRiver a32 (solane)

Whitec(NC00

BetweRochfoRoad aHwy. 7

InterseimprovHwy. 4

BetweHwy. 2of RocAccess

BetweHwy. 6

Varioubetweesouth o

ct / Location

od River Bridgwy. 43, at court (73809-

en 7 km east670 and 2 kmf Hwy. 736

en 5 km west49 and Hwy. 4ound lane & ound lane)

eon Lake Firstn (west boundt boundary)

of Sturgeon LNation and easeon Lake Firstn (west of view)

en north of asca River anf Hwy. 32 bound lane aound lane)

en Athabascaand east of Huth) (eastbou

court East Hil01-1)

en 1 km eastort Bridge Accand 3 km eas757

ection vement at Jct 43/22

en 1 km east22 and 3 km echfort Bridge s Road

en 2 km north633 and Hwy.

us locations en Hwy. 16 aof Onoway

Descr

ge

1)

BridgeRehab

of

19 km

t of 49

10 km

t dary

23 km- 2nd S

Lake st of t

16 km

nd

and

4 km o

a wy.

und

3 km o

l Slide R

of cess st of

13 km

InterseImprov

of east

10 km

h of . 16

12 km

nd InterseImprov

ription

e Deck bilitation

m of Repaving

m of Repaving

m of Twinning Stage Paving

m of Repaving

of Repaving

of Repaving

Repair

m of Repaving

ection vement

m of Repaving

m of Repaving

ection vement

Status

Design

Constructi

Constructi

g Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Prim

Majo

ion Majo

ion Majo

ion Majoenha

ion Majo

ion Majo

ion Majo

ion Majoenha

ion Majo

ion Majoenha

ion Majo

ion Majo

ion Majoenha

mary Purpose

or trade corrid

or trade corrid

or trade corrid

or trade corridance public sa

or trade corrid

or trade corrid

or trade corrid

or trade corridance public sa

or trade corrid

or trade corridance public sa

or trade corrid

or trade corrid

or trade corridance public sa

e

dor

dor

dor

dor, afety

dor

dor

dor

dor, afety

dor

dor, afety

dor

dor

dor, afety

Page 22: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 22

Projec

Betwe(Hwy. street Grand

InterseimprovRoad 5Road 5

Interseimprov44 (copark)

Betwe594 an18

Betwe5 km sAccess

Interseimprov44

BetweHwy. 6Westlo

Bear CHwy.4(9454-

WatercHwy. 4Bruder

Waterclocatedkm eas(83179

Betwekm eas(select

ct / Location

en Richmond43) and 116t(range road 6e Prairie bypa

ection vements at TW564 and TWP571

ection vement at Hwunty industria

en TWP Roand south of Hw

en Hwy. 661 south of Faucs Road

ection vement at Hw

en 1 km north642 and Townock

Creek culvert 4 near Jarvis-1)

course culver45 near rheim (2054-1

course culverd on Hwy. 45st of Marwayn9-1)

en Hwy. 36 ast of Hwy. 87tive)

Desc

d Hill h 63) ass

12 km- GradStage

WP P

IntersImpro

wy. al

IntersImpro

d wy.

2 km

and ett

22 km

wy. IntersImpro

h of n of

35 km

on

Repla

rt on

1)

Repla

rt , 0.5 ne

Repla

and 2 0

21 km

ription

m of Twinning de, Base, e Paving

section ovement

section ovement

of Repaving

m of Repaving

section ovement

m of Repaving

ace Culvert

ace Culvert

ace Culvert

m of Repaving

Status

Constructi

Design

Design

Design

g Design

Constructi

g Constructi

Constructi

Design

Design

g Constructi

Prim

ion Enha

Enha

Enha

Imprbetw

Imprbetw

ion Enha

ion Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

mary Purpose

ance public sa

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

afety

afety

afety

ons nities

ons nities

afety

ons nities

ons nities

ons nities

ons nities

ons nities

Page 23: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 23

Projec

BetweHwy. 7west o

WatercHwy.4Gordo

BetweHwy. 2(selectTributaCreek 49, 22Tree (7

WatercHwy.4(74652

BetweHwy. 7of Hwy

Betwekm eas

Betwe3 km w

BetweHwy. 2Innisfa

ct / Location

en 18 km wes725 and 2 kmof Hwy. 727

course culver9 near ndale (72877

en 7 km west2 and Hwy. 2 tive) ary to Henderculvert on Hw km east of B78868-1)

course bridge9 near Donne2-1)

en 13 km wes719 and 9 kmy. 719

en Hwy. 5 anst of Hwy. 84

en Hwy. 792 west of Hwy. 7

en 5 km west2 and Town oail

Desc

st of m

32 km

rt on

7-1)

Repla

t of 7 km

rson wy.

Bay

Repla

e on elly

Repla

st of east

23 km

nd 2 4

8 km

and 795

12 km

t of of

5 km

ription

m of Repaving

ace Culvert

of Repaving

ace Culvert

ace Bridge

m of Repaving

of Repaving

m of Repaving

of Repaving

Status

g Design

Design

Design

Design

Design

g Constructi

Design

g Design

Design

Prim

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Majoenha

ion Imprbetw

Imprbetw

Imprbetw

Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

or trade corridance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

dor, afety

ons nities

ons nities

ons nities

ons nities

Page 24: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 24

Projec

BetweHwy. 8

WatercHwy. 5Biche

Betwekm eas

BetweCity of

WatercHwy.5Biche

BetweHwy. 5south o

WatercHwy. 5(146-1

Driedmon Hwnorth e(444-1

CNR o56, at (76886

BetweHwy. 3

Hwy. 3improv58 reaHwy. 3the ea

WatercHwy.5Centre

CulverHwy. 6

North River B60, noof Dev

ct / Location

en 3 km east827 and Hwy.

course culver55 near Lac L(76878-1)

en Hwy. 36 ast of Hwy. 86

en Hwy. 892 f Cold Lake

course culver5 near Lac La(85324-1)

en 1 km sout561 and 1 kmof Hwy. 564

course culver56 near Stettle)

meat Creek Bwy. 56, 14 km east of Eckvil)

overpass on HMeeting Cree6-1)

en 27 km eas35 and Hwy. 8

35 intersectiovement and Halignment betw35 and 1.5 kmst

course culver9 near Valha

e (13343-1)

rt extension o60

SaskatchewaBridge on Hwrth west boun

von (73694-1)

Desc

of . 63

31 km

rt on La

Repla

and 1 6

19 km

and 17 km

rt on a

Repla

h of

18 km

rt on er

Repla

ridge

le

BridgeReha

Hwy. ek

BridgeReha

st of 88

31 km

n Hwy. ween m to

2 km ReconRealig

rt on lla

Repla

on Repla

an wy. ndary )

BridgeReha

ription

m of Repaving

ace Culvert

m of Repaving

m of Repaving

ace Culvert

m of Repaving

ace Culvert

e Deck bilitation

e Deck bilitation

m of Repaving

of nstruction/ gnment

ace Culvert

ace Culvert

e Deck bilitation

Status

g Design

Constructi

g Design

g Design

Constructi

g Design

Design

Constructi

Constructi

g Design

Constructi

Constructi

Design

Design

Prim

Imprbetw

ion Inducorri

Imprbetw

Imprbetw

ion Inducorri

Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

ion Enha

ion Imprbetw

Imprbetw

Imprbetw

mary Purpose

rove connectioween commun

strial/over-dimdor

rove connectioween commun

rove connectioween commun

strial/over-dimdor

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

mensional

ons nities

ons nities

mensional

ons nities

ons nities

ons nities

ons nities

ons nities

afety

ons nities

ons nities

ons nities

Page 25: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 25

Projec

North River B60, noof Dev

Interseat HwyproposPet Fo

BetweEtzikoOrion

BetweEtzikoEtziko

Wildlife(fencin

BetweMarianof San

Betwe1 km s(select

BetweHwy. 6north o

CoffeyHwy.6(85035

BetweHwy. 6

Hanginkm sou(75907

PrairieHwy. 6Fort M1)

Culvercarryinwaterceast of

ct / Location SaskatchewaBridge on Hwrth west boun

von (73694-2)

ection treatmey. 60 and sed Champiooods

en east of m to west of

en west of m and east om

e containmenng)

en north of na Lake and snd Tiger Lodg

en Hwy. 881 south of Hwy. tive)

en 1 km north686 and 20 kmof Hwy. 686

y Creek culve3 near Newb5-1)

en 1 km sout663 and Hwy.

ngstone Riveuth of Hwy. 87-3)

e Creek culve63, 9 km sout

McMurray (760

rt liner - BF79ng Hwy. 63 ovcourse, 7km nf Fort McKay

Descan wy. ndary )

BridgeReha

ent

n

IntersImpro

15 kmand R

f 15 kmand R

nt WildlifConta

south e

16 km

and 686

32 km

h of m

19 km

rt on rook

Repla

h of . 55

49 km

r, 15 81

Repla

rt on h of

001-

Repla

9444, ver north

MajorRepa

ription

e Deck bilitation

section ovement

m of WideningRepaving

m of WideningRepaving

fe ainment

m of Repaving

m of Repaving

m of Repaving

ace Culvert

m of Repaving

ace Bridge

ace Culvert

r Culvert irs

Status

Design

ConstructiMunicipali

g Design

g Constructi

Design

g Design

g Design

g Design

Constructi

g Design

Design

Design

Design

Prim

Imprbetw

ion by ity

Enha

Enha

ion Enha

Enha

Inducorri

Inducorri

Inducorri

ion Inducorri

Inducorri

Inducorrisafet

Inducorri

Inducorri

mary Purpose

rove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

strial/over-dimdor

strial/over-dimdor

strial/over-dimdor

strial/over-dimdor

strial/over-dimdor

strial/over-dimdor, enhancety

strial/over-dimdor

strial/over-dimdor

e

ons nities

afety

afety

afety

afety

mensional

mensional

mensional

mensional

mensional

mensional e public

mensional

mensional

Page 26: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 26

Projec

BetweHwy. 5the Lainclude

Envirocomperestoraregulamade twinnin

BetweMarianof Mar

BetweCreek Hwy. 8

BetweHwy. 7of Hwy

Montaculvertkm noCreek

Seconto Elboon HwsouthwCreek

PeaceHwy. 8west o(74227

Betwe750 an

ct / Location

en north of Jc55 and south Biche River es VIS at km

onmental ensation and ation work fortory commitmas a conditionng Hwy. 63

en south of na Lake and nriana Lake

en south of Hand south of

881

en 12 km wes717 and 6 kmy. 717

gneuse Rivert on Hwy. 64, rth west of Hi(71824-1) d Order Tribu

ow River culvwy. 66, 14 km west of Bragg(79156-1)

e River Bridge88, 8 km northof Fort Vermili7-1)

en south of Hnd Hwy. 750

Desc

ct of

4.5)

13 km- 2nd Pavin

r ments n of

EnviroWork

north 27 km- 2nd Pavin

Horse Jct.

37 km- 2nd Pavin

st of east

18 km

r 15 nes

Repla

utary ert

Repla

e on h on

BridgeReha

Hwy. 29 km

ription

m of Twinning Stage

ng

onmental

m of Twinning Stage

ng

m of Twinning Stage

ng

m of Repaving

ace Culvert

ace Culvert

e Deck bilitation

m of Repaving

Status

Constructi

Constructi

Constructi

Constructi

g Design

Constructi

Design

Design

g Constructi

Prim

ion Inducorrisafet

ion Inducorri

ion Inducorrisafet

ion Inducorrisafet

Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

mary Purpose

strial/over-dimdor, enhancety

strial/over-dimdor

strial/over-dimdor, enhancety

strial/over-dimdor, enhancety

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

mensional e public

mensional

mensional e public

mensional e public

ons nities

ons nities

ons nities

ons nities

ons nities

Page 27: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 27

Project

Betwee1 km of(selecti

Betweeand Sc

BetweeHwy. 2 Hwy. 2

Calgary(BetweHwy 1)

Stoney River awork (7

Stoney Crowch(southb

New brAcres LBouleva

CalgaryRoad (BTrail an

SouthwHendayimprove

High tebarrier northeaHenday

Robinson HwyCardsto

BetweeHwy. 4

Between25

t / Location

en Hwy. 22X af Nose Hill Drve)

en City of Calgenic Acres Li

en 2 km west and 1 km we(eastbound l

y West Ring Ren Hwy 8 and

Trail over Boand related roa78812-2)

Trail at hild Trail bound)

ridge over SceLink/Tuscany ard (79097-2

y Southwest RBetween Macnd Hwy. 8)

west Anthony y Drive ements

ension cable installation on

ast Anthony y Drive

on Coulee cuy. 501 near on (800-1)

en 12 km wesand Hwy. 4

n Hwy. 23 and

Desc

and rive

6 km

gary nk

2 km

of est of ane)

Repav

Road d

9 km Base

ow ad

ConstBridge

IntercUpgra

enic

)

ConstBridge

Ring cleod

31 kmBase,

18 km– GraPavin

n 21 kmBarrie

ulvert Repla

st of 12 km

Hwy. 17 km

ription

of Repaving

of Repaving

ving

of Grading, Full Paving

truct New e

change ading

truct New e

m of Grading, , Full Pave

m of 6 Laning ade, Base, ng

m of Cable er Installation

ace Culvert

m of Repaving

of Repaving

Status

Design

Design

Design

Design

Design

Design

Design

Constructi

Design

Design

Design

g Constructi

Constructio

Prim

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

Enha

Enha

Imprbetw

ion Imprbetw

on Improcomm

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

ove connectionmunities

e

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

afety

afety

ons nities

ons nities

ns between

Page 28: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 28

Projec

BetweeLakes PAccessNanton

Betweeast of

Betwefrom thLongv

WatercHwy.5(74328

Betwe5 km e

Little Sculvertnear P

BetweHwy. 8

Betwe12 km 901

Springon HwOkotok

ct / Location

en east of ChaiProvincial Parks Road and wesn

en Hwy. 873 f Hwy. 873

en 10 km eashe Village of iew and Hwy.

course culver43 near Harte8-1)

en Hwy. 873 east of Hwy. 8

Sandhill Creekt on Hwy.544

Patricia (72027

en 15 km wes884 and Hwy.

en Hwy. 24 asouth of Hw

g Coulee Bridgwy.549 near

ks (1006-1)

Desc

n k st of

18 km

and 5 km Stage

st

. 2

19 kmGraveStage

rt on ell

Repla

and 876

21 km

k 7-1)

Repla

st of . 884

15 km

and wy.

17 km

ge Repla

ription

of Repaving

of Base, e Paving

m of Pave el Road - 2nde Paving

ace Culvert

m of Repaving

ace Culvert

m of Repaving

m of Repaving

ace Bridge

Status

Design

Constructi

Design

Design

g Constructi

Constructi

g Constructi

g Design

Constructi

Prim

Improcomm

ion Imprbetw

Enha

Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

ion Enha

mary Purpose

ove connectionmunities

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

e

ns between

ons nities

afety

ons nities

ons nities

ons nities

ons nities

ons nities

afety

Page 29: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 29

Projec

BetweHwy. 8

WID irbridgenear L1)

WID caHwy. 5bound(873-1

BetweHwy. 5

Crossfon HwIrrican

BetweHamle

Kneehon Hwsouth o(6581-

WatercHwy. 5Drumh

ct / Location

en Hwy. 36 a873

rrigation cana on Hwy. 560

Langdon (7633

anal site 16 o560, at east ary of Calgar)

en Hwy. 1 an56

field Creek Brwy. 567 near

a (8677-1)

en Hwy. 772 et of Madden

hills Creek Briwy. 575, 14 km

of Swalwell - 1)

course culver575 near heller (83181-

Desc

and 4 km

l 0 35-

Repla

on

ry

BridgeReha

nd 30 km

ridge Repla

and 2 km

dge m

BridgeReha

rt on

-1)

Repla

ription

of Repaving

ace Bridge

e Deck bilitation

m of Repaving

ace Bridge

of Repaving

e Deck bilitation

ace Culvert

Status

Constructi

Design

Design

g Design

Design

Constructi

Design

Constructi

Prim

ion Imprbetw

Enha

Imprbetw

Imprbetw

Enha

ion Imprbetw

Imprbetw

ion Imprbetw

mary Purpose

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

afety

ons nities

ons nities

afety

ons nities

ons nities

ons nities

Page 30: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 30

Projec

Sheepon Hwof Cars

BetweTown o

Rosebon HwDidsbu

Rosebon HwDidsbu

WaltonHwy. 5(70034

BetweHwy. 7west o

BetweHwy. 7Bowde

BetweTown o(select

BetweHwy. 7

ct / Location

p Coulee culvewy. 581, 4 km

stairs (721-1)

en Hwy. 22 aof Didsbury

bud River Bridwy. 582 near ury (13977-1)

bud River Bridwy. 582 near ury (1012-1)

n Creek Bridg584 near Sun4-1)

en 8 km east734 and 8 kmof Hwy. 22

en Hwy. 2 an791 (includingen to Hwy. 2A

en Hwy. 2A aof Innisfail tive)

en Hwy. 11A 761 (selective

Desc

ert east )

Repla

and 26 km

dge

)

Repla

dge Repla

ge on dre

Repla

of

26 km

nd g A)

15 km

and 1 km

and e)

23 km

ription

ace Culvert

m of Repaving

ace Bridge

ace Bridge

ace Bridge

m of Repaving

m of Repaving

of Repaving

m of Repaving

Status

Design

g Design

Constructi

Design

Planning

g Design

g Design

Design

g Constructi

Prim

Imprbetw

Imprbetw

ion Enha

Enha

Enha

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

ons nities

afety

afety

afety

ons nities

ons nities

ons nities

ons nities

Page 31: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 31

Projec

WatercHwy. 5

WatercHwy. 5

WatercHwy. 5

WatercHwy. 5

WatercHwy. 5

WatercHwy. 5

BetweHwy. 3

BetweHwy. 7west oBreton

WatercHwy. 6(1868-

BetweHwy. 8

Weed Hwy. 6(74292

BetweHwy. 2

Variouimprov625 (band Hw

BetweHwy. 2

Betwe(north)(south

ct / Location

course culver599 (9172-6)

course culver599 (9172-2)

course culver599 (9172-4)

course culver599 (9172-5)

course culver599 (9172-3)

course culver599 (9172-1)

en 14 km eas36 and Hwy. 8

en 6 km east761 and 2 kmof Village of n

course culver616 near Mille-1)

en 3 km east822 and Hwy.

Creek culver616 near Tho2-1)

en Hwy. 753 22

us intersectionvements on Hbetween Niskuwy. 21)

en 3 km east2 and Hwy. 21

en Hwy. 834 ) and Hwy. 83)

Desc

rt on Repla

rt on Repla

rt on Repla

rt on Repla

rt on Repla

rt on Repla

st of 872

15 km

of

9 km

rt on et

Repla

of . 21

14 km

rt on rsby

Repla

and 30 km

n Hwy. u

IntersImpro

of 1

17 km

34 2 km

ription

ace Culvert

ace Culvert

ace Culvert

ace Culvert

ace Culvert

ace Culvert

m of Repaving

of Repaving

ace Culvert

m of Repaving

ace Culvert

m of Repaving

section ovement

m of Repaving

of Repaving

Status

Design

Design

Design

Design

Design

Design

g Design

Design

Design

g Design

Design

g Design

Constructi

g Constructi

Design

Prim

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Inducorri

ion Enha

ion Imprbetw

Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

strial/over-dimdor

ance public sa

rove connectioween commun

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

mensional

afety

ons nities

ons nities

Page 32: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 32

Projec

BetweHwy. 7

Betwe14 and

Betweeast of

Betwe6 km e

Interseimprov628, band 6 779

WatercHwy. 6west o1)

BetweHwy. 8

Redwaon Hwbound(8495-

Betwekm eas

BetweHwy. 4

ct / Location

en 6 km west770 and Hwy.

en east of Hwd Hwy. 21

en AHD and f AHD (select

en Hwy. 779 east of Hwy. 7

ection vements on Hetween Hwy.km east of Hw

course culver633, 10 km soof Darwell (19

en Hwy. 38 to829

ater River Bridwy. 644, at eas

ary of Redwa-1)

en Hwy. 33 ast of Hwy. 33

en 19 km eas41 and Hwy. 6

Desc

t of . 770

6 km

wy. 4 km

3 km tive)

4 km

and 779

6 km

Hwy. 779 wy.

IntersImpro

rt on outh 24-

Repla

o 5 km and R

dge st ater

Repla

and 6 6 km

st of 659

20 km

ription

of Repaving

of Repaving

of Repaving

of Repaving

section ovement

ace Culvert

of Widening Repaving

ace Bridge

of Repaving

m of Repaving

Status

Constructi

Design

Constructi

Constructi

Constructi

Design

Planning

Planning

Design

g Constructi

Prim

ion Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

ion Enha

Imprbetw

Inducorrisafet

Inducorrisafet

Imprbetw

ion Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

strial/over-dimdor, Enhancety

strial/over-dimdor, Enhancety

rove connectioween commun

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

afety

ons nities

mensional e public

mensional e public

ons nities

ons nities

Page 33: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 33

Projec

Blue RCulver

BetweHwy. 7

BetweHwy. 4

BetweHwy. 8

Little SBridgekm souValleyv

Betwekm weGrand

BetwePrairieof Hwy

WatercHwy.6(79252

ct / Location

Ridge Bull Crert (NC076-1)

en 5 km west769 and Hwy.

en 5 km west44 and Hwy. 4

en 3 km west827 and Hwy.

Smoky River e on Hwy. 665utheast of view (75538-

en Hwy. 40 aest of City of e Prairie

en City of Grae and 14 km wy. 43

course culver71 near Good2-1)

Desc

eek Slide

t of . 769

5 km

t of 44

5 km

t of . 63

23 km

5, 9

1)

BridgeReha

and 2 3 km

ande west

12 km

rt on dfare

Repla

ription

Repair

of Repaving

of Repaving

m of Repaving

e Deck bilitation

of Repaving

m of Repaving

ace Culvert

Status

Constructi

Design

Design

g Constructi

Constructi

Constructi

g Design

Design

Prim

ion Enha

Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

mary Purpose

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

afety

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

Page 34: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 34

Projec

WatercHwy.6(13896

BetweHwy. 7

WatercHwy.6Creek

WatercHwy. 6(76959

WatercHwy. 6(76015

Betwethe ToRiver

Brick's(PH00

BetweHwy. 8of Hwy

Peerleon HwLake (

ct / Location

course bridge71 near Good6-1)

en Hwy. 59 a733

course culver74 near Teep(70017-1)

course culver677 near Wok9-1)

course culver681 near Bon5-1)

en Hwy. 740 own of Peace

s Hill landslid09A-1)

en 62 km eas88 and 87 kmy. 88

ess Creek Bridwy. 686 near T

78321-1)

Desc

e on dfare

Repla

and 24 km

rt on pee

Repla

rt on king

Repla

rt on anza

Repla

and 20 km

e Slide

st of east

25 km

dge Trout

Repla

ription

ace Bridge

m of Repaving

ace Culvert

ace Culvert

ace Culvert

m of Repaving

Repair

m of Grading

ace Bridge

Status

Design

g Design

Design

Constructi

Constructi

g Design

Constructi

Design

Design

Prim

Enha

Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

ion Enha

Imprbetw

Imprbetw

mary Purpose

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

e

afety

ons nities

ons nities

ons nities

ons nities

ons nities

afety

ons nities

ons nities

Page 35: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 35

Projec

Betwekm eas

McKinrepair on Hw

InterseimprovIsidore

BetweHwy. 9

Interseimprovon curIsidore

BetweHwy. 6

BeatonHwy. 6Dixonv

BeatonHwy. 6Dixonv

La CreFerry -currencapaciindustrefficien

DiamoBridgenear E

WatercHwy.7Beave

BetweHwy. 5

ct / Location

en Hwy. 2 anst of Hwy. 2

ney Creek sliand stabilizat

wy. 688

ection vement at St. e access

en Hwy. 2 an986

ection vement at accrve (east of Ste)

en Hwy. 986 688

n Creek Bridg689 near ville (13892-1

n Creek Bridg689 near ville (13891-1

ete (Tompkins- replacementt ferry to increity and increarial traffic ncy

ond Dick Creee on Hwy. 722Elmworth (990

course culver22, 2 km sou

erlodge (77057

en Hwy. 43 a59

Desc

nd 3 3 km

de tion

Slide

IntersImpro

nd 21 kmand R

cess t

IntersImpro

and IntersImpro

ge on

)

Repla

ge on

)

Repla

s) t of ease

ase

Ferry Repla

ek 2 08-1)

Repla

rt on th of 7-1)

Repla

and 24 km

ription

of Repaving

Repair

section ovement

m of WideningRepaving

section ovement

section ovement

ace Bridge

ace Bridge

acement

ace Bridge

ace Culvert

m of Repaving

Status

Design

Design

Constructi

g Constructi

Constructi

Constructi

Design

Design

Planning

Design

Constructi

g Constructi

Prim

Imprbetw

Enha

ion Enha

ion Enha

ion Enha

ion Enha

Enha

Enha

Imprbetw

Enha

ion Imprbetw

ion Imprbetw

mary Purpose

rove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

e

ons nities

afety

afety

afety

afety

afety

afety

afety

ons nities

afety

ons nities

ons nities

Page 36: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 36

Projec

Josephon Hwnorth wRiver

BetweHwy. 6south o

Betwe10 km 674

WatercHwy.7Creek

Bridge734 ne(77779

CrippleHwy. 7(77593

Betwe10 km

Shafte(GP03

North Drainaon HwManni

ct / Location hine Creek cu

wy. 725, 23 kmwest of Spirit (76664-1)

en 10 km nor674 and 7 kmof Hwy. 677

en Hwy. 43 anorth of Hwy

course culver33 near Teep(75252-1)

e culvert on Hear Sundre 9-1)

e Creek culve734 near Nord3-1)

en Hwy. 49 anorth of Hwy

esbury slide 31-1)

Manning age Creek cul

wy. 741 near ng (86171-1)

Desculvert m

Repla

rth of

10 km

and y.

26 km

rt on pee

Repla

wy. Repla

ert on degg

Repla

and y. 49

10 km

Slide

vert Repla

ription

ace Culvert

m of Repaving

m of Repaving

ace Culvert

ace Culvert

ace Culvert

m of Repaving

Repair

ace Culvert

Status

Design

g Design

g Design

Constructi

Design

Design

g Design

Constructi

Constructi

Prim

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

Imprbetw

ion Enha

ion Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

afety

ons nities

Page 37: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 37

Projec

Three flood mwithin Parkw

WatercHwy. 7River (

BetweVillageand inttreatm

EdsonHwy. 7northe(7836-

Betwekm easProvin(select

Betwenorth o

BetweHwy. 6

ct / Location

Sisters Creekmitigation woron Three Sisay (Hwy. 742

course culver743 near Pea(8889-1)

en Hwy. 49 toe of Girouxvilltersection ent at Watino

River Bridge748, 13 km east of Edson -1)

en Hwy. 2 anst of Hilliard Bcial Park Acctive)

en Hwy. 43 aof Hwy.

en 3 km sout627 and Hwy.

Desc

k rks ters

2)

Flood

rt on ce

Repla

o e

o

4 km and R

e on BridgeReha

nd 3 Bay cess

2 km

and 1 km Pavin

h of . 31

14 km

ription

d Mitigation

ace Culvert

of Widening Repaving

e Deck bilitation

of Repaving

of 2nd Stage ng

m of Repaving

Status

Constructi

Design

Constructi

Constructi

Constructi

Constructi

g Design

Prim

ion Floo

Imprbetw

ion Enha

ion Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

mary Purpose

d mitigation

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

afety

ons nities

ons nities

ons nities

ons nities

Page 38: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 38

Projec

BetweHwy. 2

InterseimprovHwy. 71A)

BetweHwy. 7Road 2

BetweHwy. 5

BridgeBF934over B

BetweHwy. 5south o

North River B770, 6Genes

Variouimprov770 (bHwy. 6

Betwe627 an

West NBridgeBalzac

BetweHwy. 5

ct / Location

en Hwy. 549 22

ection vements along766 (north of

en intersectio766 and Twp 262

en Hwy. 1A a567

e replacement4 on Hwy. 766Beaverdam Cr

en 8 km sout587 and 3 kmof Hwy. 587 SaskatchewaBridge on Hw km northeas

sse (74232-1)

us intersectionvements on Hbetween north627 and Hwy.

en north of Hnd Hwy. 16

Nose Creek e on Hwy.772 c (1295-1)

en Hwy. 567 574

Desc

and 22 km

g Hwy.

IntersImpro

on of IntersImpro

and 11 km

t for 6 reek

Repla

h of

5 km

an wy. st of )

BridgeReha

n Hwy. h of . 16)

IntersImpro

wy. 13 km

near Repla

and 20 km

ription

m of Repaving

section ovement

section ovement

m of Repaving

ace Bridge

of Repaving

e Deck bilitation

section ovement

m of Repaving

ace Bridge

m of Repaving

Status

g Constructi

Design

Design

g Design

Constructi

Constructi

Constructi

Constructi

g Constructi

Constructi

g Constructi

Prim

ion Imprbetw

Enha

Enha

Imprbetw

ion Enha

ion Imprbetw

ion Imprbetw

ion Enha

ion Imprbetw

ion Enha

ion Imprbetw

mary Purpose

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

ance public sa

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

ance public sa

rove connectioween commun

e

ons nities

afety

afety

ons nities

afety

ons nities

ons nities

afety

ons nities

afety

ons nities

Page 39: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 39

Projec

Castleto sout

BetweHwy. 6

Weed Hwy. 7(70071

Betwe628 anof Ston

Pipeston HwMulhu

Betwekm no

Realig813 in bridge

Athabaon HwAthaba

ct / Location

e Mountain Reth of Castle R

en Hwy. 18 a661

Creek culver778 near Tho1-1)

en south of Hnd 47th Ave (Tny Plain)

one Creek Brwy.795 near

rst Bay (7312

en Hwy. 28 arth of Hwy. 28

nment of Hwyconjunction w replacement

asca River Brwy. 813, at asca (9905-1

Desc

esort River

11 kmStage

and 19 km

rt on rsby

Repla

Hwy. Town

3 km ReconRealig

ridge

24-1)

Repla

and 2 8

2 km

y. with t

1 km ReconRealig

ridge

)

Repla

ription

m of Base, e Paving

m of Repaving

ace Culvert

of nstruction/ gnment

ace Bridge

of Repaving

of nstruction/ gnment

ace Bridge

Status

Constructi

g Design

Design

Constructi

Design

Design

Design

Design

Prim

ion Imprbetw

Imprbetw

Imprbetw

ion Enha

Enha

Imprbetw

Inducorrisafet

Inducorrisafet

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

rove connectioween commun

strial/over-dimdor, enhancety

strial/over-dimdor, enhancety

e

ons nities

ons nities

ons nities

afety

afety

ons nities

mensional e public

mensional e public

Page 40: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 40

Project

BetweeHwy. 62

Sturgeoon Hwysouthea(2301-1

Betweeroad an

BetweeBoysdaintersecimprove

Watercounder HFort Sas(85149-

WatercoHwy.82Saskatc

BetweeHwy. 55

Betweenorth ofof Lamo

BetweeHwy. 63

BetweeLamont

BetweeHwy. 62

t / Location

n Hwy. 623 a25

on River Bridg. 825, 9 km

ast of Gibbons)

n Boysdale d Hwy. 643

n Hwy. 37 anle Rd (include

ction ement)

ourse culvert Hwy. 825 nearskatchewan -1)

ourse culvert 5 near Fort chewan (559-

n Hwy. 663 a5

n Hwy. 15 anf Hwy. 15 (Towont)

n Hwy. 661 a3

n south of and Hwy. 15

n 3 km north 26 to Hwy. 16

Descrip

and 10 km o

ge

s

Bridge DRehabil

8 km ofand Re

nd es

5 km ofand Re

r Replace

on

1)

Widen B

and 11 km o

nd wn

1 km of

and 30 km o

5 5 km of

of 6

19 km oand Re

ption

of Repaving

Deck litation

f Widening paving

f Widening paving

e Culvert

Bridge

of Repaving

f Repaving

of Repaving

f Repaving

of Widening paving

Status

Constructi

Design

Design

Design

Design

Design

Constructi

Design

Design

Constructi

Planning

Prim

ion Imprbetw

Enha

Enha

Enha

Enha

Enha

ion Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

Inducorrisafet

mary Purpose

rove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

strial/over-dimdor, Enhancety

e

ons nities

afety

afety

afety

afety

afety

ons nities

ons nities

ons nities

ons nities

mensional e public

Page 41: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 41

Project

Tofield alignme

BetweeTown o

BetweeHwy. 26

BetweeHwy. 56

Betweethe Tow

Betweeof Hwy.south o

BetweeHwy. 66663

BetweeHwy. 66south o

Betweeand Hw

WatercoHwy. 85Vegrev

Vermilioon Hwybounda(102-1)

Betwee626 and

t / Location

bypass re-ent

en Hwy. 14 anof

en Hwy. 13 an6

en Hwy. 561 a64

en Hwy. 52 anwn of Raymon

en 16 km nort. 28 and 7 km

of Hwy. 663

en 5 km south63 and Hwy.

en 7 km south63 and 5 km

of Hwy. 663

en Forestburgwy. 13

ourse culvert 57 near ille (9953-1)

on River Bridgy. 857, at soutary of Vegrevi

en south of Hwd Hwy.16

Descrip

8 km of Reconsgnment

nd 5 km of

nd 4 km of

and 19 km o

nd nd

1 km of Base, F

h m

36 km o

h of 5 km of

h of 2 km of

25 km o

on Replace

ge th lle

Replace

wy. 19 km o

ption

struction/Realt

Repaving

Repaving

of Repaving

Grading, Full Paving

of Repaving

Repaving

Repaving

of Repaving

e Culvert

e Bridge

of Repaving

Status

iDesign

Design

Constructi

Design

Design

Constructi

Constructi

Constructi

Constructi

Design

Design

Design

Prim

Enha

Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

Imprbetw

Enha

Imprbetw

mary Purpose

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

rove connectioween commun

e

afety

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

afety

ons nities

Page 42: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 42

Project

BetweePoplar River

BetweeHwy. 3

BetweeHwy. 87Island)

BetweeHwy. 1

BetweeHwy. 1

BetweeHwy. 54

WatercoHwy.88(13864-

BetweeHwy. 41

Betwee5 km so555

Red Deon Hwynorth of1)

t / Location

en west of Point and Ow

en 6 km north and Hwy. 52

en Hwy. 36 an73 (Kinbrook

en 1 km north and Hwy. 550

en 5 km southand Hwy. 1

en Hwy. 1 and44

ourse culvert 81 near Myrna-1)

en Hwy. 14 an1

en Hwy. 544 aouth of Hwy.

eer River Bridy. 884, 10 km f Jenner (917

Descrip

wl 13 km o

of 1

25 km o

nd 17 km oStage P

of 0

14 km o

h of 5 km of

d 22 km oStage P

on am

Replace

nd 20 km o

and 5 km of

ge

79-

Bridge DRehabil

ption

of Repaving

of Repaving

of Base, Paving

of Repaving

Repaving

of Base, Paving

e Culvert

of Repaving

Repaving

Deck litation

Status

Constructi

Design

Constructi

Constructi

Constructi

Constructi

Design

Constructi

Constructi

Constructi

Prim

ion Imprbetw

Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

ion Imprbetw

Inducorri

ion Imprbetw

ion Imprbetw

ion Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

strial/over-dimdor

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

mensional

ons nities

ons nities

ons nities

Page 43: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

H

June 12, 2018 | P

Highway

Page 43

Project

Betwee4 km so

Betwee10 km n

Betwee10 km sof Dewb

North SRiver B893, at (75315-

BetweeHwy. 64

BetweeHwy. 45

Betwee16 km n646

Culvert Cadotte986 norPeace R

WatercoHwy. 98Buffalo

BetweeHwy. 68

Betweeeast of

Hwy. 98turnout lane) ea

Hwy. 98turnout lane) w688

Diashowwater wwall and(PH042

BetweeHwy. 68east of

t / Location

en Hwy. 28 anouth of Hwy. 5

en Hwy. 55 annorth of Hwy.

en Hwy. 16 ansouth of Villagberry

Saskatchewanridge on HwyHeinsburg -1)

en Hwy. 45 an46

en Hwy. 16 an5

en Hwy. 646 anorth of Hwy.

on Tributary e River on Hwrtheast of River (86227-

ourse culvert 86 near Little (81163-1)

en Hwy. 743 a88 (selective)

en Hwy. 688 aHwy. 688

86 roadside (eastbound

ast of Hwy. 74

86 roadside westbound est of Hwy.

wa east hill well retaining d erosion 2-1, PH043-1)

en 13 km east88 and 32 kmHwy. 688

Descrip

nd 55

10 km o

nd 55

10 km o

nd ge

29 km o

n y.

Bridge P

nd 22 km o

nd 21 km o

and 16 km o

to wy.

-1)

Replace

on Replace

and )

18 km o

and 14 km oand Rep

43

Safety R

Safety R

)

Slide Re

t of m

18 km o

ption

of Repaving

of Repaving

of Repaving

Painting

of Repaving

of Repaving

of Repaving

e Culvert

e Culvert

of Repaving

of Widening paving

Rest Area

Rest Area

epair

of Repaving

Status

Design

Design

Design

Design

Constructi

Design

Design

Design

Design

Constructi

Constructi

Constructi

Constructi

Constructi

Constructi

Prim

Imprbetw

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

ion Imprbetw

ion Enha

ion Enha

ion Enha

ion Enha

ion Imprbetw

mary Purpose

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

ance public sa

ance public sa

ance public sa

ance public sa

rove connectioween commun

e

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

afety

afety

afety

afety

ons nities

Page 44: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

O

June 12, 2018 | P

Other Work

Various

UAR 68

UAR 73

UAR 81

UAR 96

UAR 115

UAR 133

UAR 165

Page 44

Project

Provincarea rev

Vermilionear Br

Variousimprovethe prov

Sheep local roValley (

Smith DTrail, at(repair s

TributarCreek CRoad, abounda(78862-

Spray L(S030-1

Installattension southerincludin

Rangeron ElboStation Kanana

Betwee1 km no

Betwee1 km ea

Betwee2 km ea

Betwee3 km ea

BetweeHwy. 16

Betwee8 km ea

Betwee2 km ea

t / Location

cial safety resview

on River Bridgruce (2206-1)

s safety ements acrosvince

River culvert ad near Turn(79501-1)

Dorrien Sprayt Rummel Crescoured area

ry to BlackmuCulvert on Locat north ary of Leduc -1)

Lakes gabions1)

tion of high cable barrier

rn region ng Stoney Tra

r Creek Bridgeow River Rangservice road,

askis (84044-

en Hwy. 43 anorth of Hwy. 4

en Hwy. 44 anast of Hwy. 44

en Hwy. 44 anast of Hwy. 44

en Hwy. 28 anast of Hwy. 28

en Hwy. 16 an6A

en Hwy. 21 anast of Hwy. 21

en Hwy. 20 anast of Hwy. 20

Descrip

t Plannin

ge Replace

s IntersecImproveLightingWork

on er

Replace

y eek )

Reconsgnment

ud cal

Replace

s Slide Re

r in

ail

Cable BInstallat

e ger , at 1)

Replace

nd 43

1 km of

nd 4

1 km of

nd 4

2 km of

nd 8

3 km of

nd 1 km of

nd 1

8 km of

nd 0

2 km of

ption

g study

e Bridge

ction ements, g and Other

e Culvert

struction/Realt

e Culvert

epair

Barrier tion

e Bridge

Repaving

Repaving

Repaving

Repaving

Repaving

Repaving

Repaving

Status

Planning

Planning

Planning

Design

i Design

Design

Constructi

Design

Constructi

Constructi

Design

Design

Design

Design

Design

Design

Prim

Majoenha

Enha

Enha

Imprbetw

Floo

Imprbetw

ion Enha

Enha

ion Enha

ion Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

Imprbetw

mary Purpose

or trade corridance public sa

ance public sa

ance public sa

rove connectioween commun

d mitigation

rove connectioween commun

ance public sa

ance public sa

ance public sa

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

rove connectioween commun

e

dor, afety

afety

afety

ons nities

ons nities

afety

afety

afety

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

ons nities

Page 45: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

O

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

June 12, 2018 | P

Other Work

CP 2008-000

CP 2006-000

CP 2006-000

CP 2006-000

CP 2006-000

CP 2004-000

CP 2006-000

CP 2016-000

CP 2010-000

CP 2007-000

CP 2007-000

CP 2004-000

CP 2010-000

CP 2006-000

CP 2006-000

Page 45

Project

010 Bens Lastructur

022 Buffalo pump hupgrade

021 Carselaheadwosystem

007 Carselaheadworeach 1upgrade

017 Deadfissystem upgrade

060 Dicksonenhancphase 3spillway

028 Kleskuncontrol

027 McGregshorelinprogram

007 Pine Coelectricaupgrade

007 RehabiAmbrosreservo

002 RehabiGranlea

013 St. Marrepairs

006 Twin Vaelectricasystem

020 Watertoirrigatiosuperviand dat(SCADA

002 Watertoaquifer rehabili

t / Location

ake diversionre rehabilitatio

Lake systemhouse control e

and Bow Riveorks control upgrade

and Bow Riveorks system pond 1 es

sh water suppcontrols

e

n Dam capaccement projec3 – emergency upgrades

n Hills flood

gor reservoir ne erosion m

oulee – al and controe

litation of se Flats oir dam

litation of a Dam

y’s Dam – to riprap

alley dam al and controupgrade

on Dam on outlet – sory control ta acquisition A) upgrades

on reservoir relief system tation

Descrip

on

Water M

- Water M

er Water M

er Water M

ply Water M

ity ct - cy

Water M

Water M

Water M

ls Water M

Water M

Water M

Water M

l Water M

Water M

Water M

ption

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Status

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Planning

Prim

Agricmitig

Recr

Agric

Agric

Agric

Flooregu

Agric

Agric

Agric

Agric

Agric

Agric

Agric

Agric

Agric

mary Purpose

culture, flood gation

reation

culture, water

culture

culture, water

d mitigation, flation

culture

culture

culture

culture

culture

culture

culture

culture

culture

e

r supply

r supply

flow

Page 46: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

O

June 12, 2018 | P

Other Work

CP 2008-000

CP 2003-000

CP 2004-000

CP 2005-000

CP 2008-000

CP 2004-000

CP 2006-000

CP 2010-000

CP 2007-000

CP 2017-000

Dickson Da

CP 2003-000

Page 46

Project

048 WatertoheadwoBelly Rrehabili

07 Watertoheadworeach 1Dam – replacehandlin

015 Watertoheadworeach 1replace

002 Watertoheadworeach 1control acquisiupgrad

047 Watertoheadworeach 9diversiocontrol acquisi

011 Watertoheadworeach 1reservostructur

032 Bolloqustabilizarehabili

010 Buffalo sands fberm

016 Buffalo manage

001 Deadfissystemrehabili(WoodrDams)

m Dicksonconcret

003 Lethbridheadwoweir anrehabili

t / Location

on St. Mary’s orks system –

River diversionitation

on St. Mary’s orks system 12 – Jensen spillway

ement and floong upgrades

on St. Mary’s orks system 12 – structureement

on St. Mary’s orks system 12 – supervisoand data tion (SCADAes

on St. Mary’s orks system 9 – Belly Riveon supervisorand data tion

on St. Mary’s orks system 12 – Jensen oir – inlet re replaceme

ue Lake ation – outlet itation

Lake – Rochflood protectio

Lake water ement projec

sh water supp canal itation row and Jane

n Dam spillwate repair

dge northern orks – division

nd fish ladder itation

Descrip

– n

Water M

od

Water M

e

Water M

ory

)

Water M

r ry

Water M

nt

Water M

Water M

hon on

Water M

t Water M

ply

et

Water M

ay Water M

n Water M

ption

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Management

Status

Planning

Planning

Planning

Planning

Planning

Planning

Design

Design

Constructi

Design

Constructi

Design

Prim

Agric

Floopubli

Agric

Agric

Agric

Agric

Flow

Floo

ion Agricmitig

Agric

ion Enha

Agric

mary Purpose

culture

d mitigation, eic safety

culture

culture

culture

culture

w regulation

d mitigation

culture, envirogation

culture, water

ance public sa

culture

e

enhance

onmental

r supply

afety

Page 47: Alberta Transportation 8 Construc Programent of Alberta s to jobs, he tion across t Government billion in high nect commu t major trade ctor and flood t includes: capital proje l maintenanc

J

O

C

C

C

C

C

C

C

June 12, 2018 | P

Other Work

CP 2006-000

CP 2004-000

CP 2016-000

CP 2003-000

CP 2004-000

CP 2011-000

CP 2004-000

SpringbankReservoir

Page 47

Project

016 Oldmanseepagsystem

045 Chain Lhandlin

001 Deadfisreplaceconstru

001 Dicksonspillway

010 River d(HighwoCanal) Coulee

001 St. Marlevel oureplacebarrier

St. Marlevel oureplaceinstallat

010 Womenrehabilisystem diversio

k SpringbReservo

t / Location

n River dam e collection

Lakes flood g

sh pipeline ement – ction

n dam servicey gate coating

iversion strucood River to at Women’s (50111-1)

y’s Dam – lowutlet (LLO) vaement – isolat

y’s Dam – lowutlet (LLO) vaement – valve tion

n’s Coulee catation, controand river

on

bank Off-streaoir (SR1)

Desc

Water

Water

Water

e g

Water

cture Water

w lue ion

Water

w lue

Water

nal ol

Water

am Purch

ription

r Managemen

r Managemen

r Managemen

r Managemen

r Managemen

r Managemen

r Managemen

r Managemen

hasing Land

Stat

nt Des

nt Con

nt Con

nt Con

nt Con

nt Con

nt Con

nt Con

LandAcqu

tus

ign A

struction

struction As

struction

struction

struction A

struction

struction As

d uisition

Primary Purp

Agriculture

Flood mitigatenhance pub

Agriculture, wsupply

Enhance pub

Flood mitigat

Agriculture

Enhance pub

Agriculture, wsupply

Flood mitigat

pose

ion, blic safety

water

blic safety

ion

blic safety

water

ion