ALEXANDRIAAUTHORITYPORT
ALEXANDRIA PORT AUTHORITY
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
2/64
Location Of Alexandria Port
Main International Trade Route
Alexandria Port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
3/64
Alexandria port is one of the oldest ports in the world (5000 yearsold ). Alexander the great built a bridge between the coast andpharos island creating two ports: the Eastern port used for militarypurposes and the Western port used for commercial purposes which
is the current location of Alexandria port .
Ancient Alexandria Port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
4/64
Alexandria and Eldekhiela ports in the new era
Alexandria portElDekhiela port
Cruise terminal
Shipyard
Radar tower
Alexandria Container
TerminalGrain terminal
Oil terminal
Live stock terminal
coal terminal
Liquid bulk terminal
Container terminal
Petrochemicalsterminal
Grain terminal
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
5/64
General Data for Alexandria and El-Dekheila ports
Item Alexandria El Dekhiela
Water surface area km2 6.8 2.74
Land surface area km2 1.6 3.5
Total number of berths 67 14
Total berths length/Meter 10600 4400m
Depth/Meter 8.5 - 14 10 - 20
Hinter land m21650000 m2
Including managementbuildings & warehouses
3500000 m
2
Includingmanagementbuildings &outer area
Terminals 20 6
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
6/64
The main gate
The bridgeLandscape
ParkingBerths
Cruise terminal
Gift shops
Fountain The toursticstreet
The Tourist train station
to
The cruise terminal
and tourist area
Total Area is 70,000 m2
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
7/64
Tourist st.
Gifts shops
Main gates
The berths
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
8/64
Cruise Terminal
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
9/64
Cruise Terminal
Total surface area = 8725 m2
107 shops , 5 restaurants& 3 cafes
Total invested area = 6370 m2
In addition to the open area = 2400 m2
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
10/64
The Terminalfrom inside
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
11/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
12/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
13/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
14/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
15/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
16/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
17/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
18/64
Tourist Train station
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
19/64
InfrastructureReorganization ofthe port gates Roads
Buildings yards berthsEnvironment
protection
Cargo Terminals-Total area is 300,000 m2. 20 terminals
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
20/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
21/64
Road:Total length of main and back roads is 150 km
Main road
After
development
Before
development
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
22/64
Before
development
After
development
Back roads
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
23/64
Berths
Beforedevelopment
After
development
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
24/64
yardsTotal area 360000 m2
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
25/64
Port MuseumAs Alexandria is one of the oldest ports, we established the port museum
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
26/64
(40) 1
The new buildingfor business offices , banks , shipping agentsetc.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
27/64
Applying security and safety systems
ISPS code : In May 2004 an assessment forAlexandria port was done, the port security plan wasready and started in June 2004 .
CSI and Mega-ports systems : Alexandria portauthority started negotiations with USA customs toapply CSI and Mega-ports systems in the port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
28/64
A DVC systemwith 264 fixed and mobile cameras isbeing installed to monitor all the port areas including the
water surface, the anchorage area and the port entrance.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
29/64
Data center
Operations planning
Operations control
Observation
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
30/64
One stop shop
Decreasing Required
Permits
Submit One set ofdocuments
Logistic centers
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
31/64
electronic centers-sub
Facilitate Inspectionprocedures with
customs and GOIEC
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
32/64
radar tower , VTMIS and AIS systems
Control Vessels
Direct the Ingress and EgressOf Vessels
Locating Vessels
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
33/64
Weighing bridges
Calculate overweightfor the roads fees
Calculate overweight
for customs
(12 in Alexandria 8 in ElDekhiela)
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
34/64
Automated gates
Reducing traffic congestionin the port
Admission trucks onlyWhen it is time for loading
Forbid the Egress ofUnreleased Cargo
Directing trucks to yards byRouting Ticket
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
35/64
Port control system 264 videocameras
Water surface control
Land surface control
Network and infrastructure control
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
36/64
AfterBeforeDepartment
SignaturesProceduresSignaturesprocedures
-12838customs1
--1720Imports2
--1211Exports3
--1616Lab.4
--610Certificates oforigins dep.
5
5 hours2 daysTime
Procedures and total no. of signatures
before/ after applying IT systems
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
37/64
Container
managementsystem
General cargo
managementsystem
Portmanagement
system
Massages
Automated
gates
SPARCSSPS
Smart portsolution
Stevedoringcontainers
Passengers
Applications
General cargo
stevedoringsystem
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
38/64
The Great InvestmentProjects In Alexandria Port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
39/64
Establishing Multi purpose Terminal ( ContainersGeneral
cargo ) in Alexandria port with a length of 2140 m. and a depth
of 14 m. and a back area of 375 thousand m2.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
40/64
Operating andmanaging the Cruise
terminal
Operating andmanaging Tourist
train station
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
41/64
Developing the old area of Alexandria port (El Gona) by
Establishing an International Marina that will has a capacity to
receive 500 yacht (an integrated touristic project which will
include a commercial center and 5 stars Hotel).
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
42/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
43/64
Establishing a new terminal ( green Terminal) on berth
65 , 66 with a length of 284 m. and a depth of 10m. by
developing the current fridge with a capacity of 6000 tons,
and establishing new 2 fridges on 7500 m. The project will
include a shipping line between Alexandria and EU Ports.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
44/64
Warehouses Central Refrigerator
A detailed feasibility study includes the way of transfering
the warehouses of berths 65, 66 to refrigerators and the way
of developing the existing refrigerators , and time plan forthat.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
45/64
Investment Projects inAlexandria and El-Dekhiela ports
withLand Lord System
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
46/64
1- Executed Projects in
El-Dekhiela port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
47/64
1- Petrochemical Production Handling Terminal
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
48/64
2- International cont. terminal in El Dekhiela port
Area 180 thousand m2
Capacity 220 thousandTEU/year
Length of the berth 300 m.
Depth of the berth 12 m.
RoRo berth with a depth of 10 m.
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
49/64
3- New Silos with a capacity of 260 thousandtons (Added to the old silos which had a
capacity of 800 thousand tons).
Silos of productivity 260.000 tons
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
50/64
2- Investment Projects which
are under construction inEl-Dekhiela port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
51/64
New Facilities for producing and Handling petrochemical Materials
1- First phase: Establishing a factory for producing Polystyrene
2- Second phase : Establishing a factory for producing styrene and
developing facilities for importing and exporting
Current Investment Projects in El-Dekhiela Port
Developing the grain area by constructing grains silos with total area100.000 m2
Current working on Silos of productivity 390.000 tons
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
52/64
The Future Investment Projects In El-Dekhiela Port
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
53/64
COKE
CLINKER
BULK CEMENT
CONVEYOR BELT
1- Establishing and operating the coal and dry bulk terminal on the area
beside berth 90/2 for exporting ( coal clinker cement fertilizers
etc.(
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
54/64
2- The extension of thebreak-water
2
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
55/64
3- To connect the port with the high way by
Establishing high bridge
3
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
56/64
4- Developing and
extension of the
grain terminal witha length of 600m.
(B.O.T. contract).
4
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
57/64
5- Establishing new berth (no.
100) with a length of 1000
m. and an area of 280
thousand m2.
5
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
58/64
6- The Integrated
project to construct
Multi Purpose
Terminal with alength of 700 m. and
an area of 262
thousand m2
( B.O.T. contract) .
6
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
59/64
Throughput
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
60/64
Statement 2005 2006 2007
Total no. ofcruises
103 141 155
Passengers 111.971 154.685 193.634
Tourists traffic
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
61/64
Year 2005 2006 2007
Total 4849 5004 5288
Total no. of shipsfor Alexandria and Dekhiela Ports
Total no. of Ships
Total no. of Ships
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
62/64
Total Weight for Cargoes
Year 2005 2006 2007
Weight of cargoes 37.170.116 41.269.616 42.615.961
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
63/64
-
8/2/2019 Alexandria Port Authority Djibouti 2008 (2)
64/64