Algae Event
June 1, 2012
Lorne Park Water
Treatment Plant
![Page 2: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/2.jpg)
Overview
The Storm and the Algae
The Equipment Damage
The Recovery
The Repairs
The Impact on the Membranes
![Page 3: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/3.jpg)
Water Treatment Capacity
Lakeview WTP
1150 ML/d (800 ML/d membranes)
Lorne Park WTP
500 ML/d (380 ML/d membranes)
![Page 4: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/4.jpg)
Lorne Park Treatment Processes
GAC Filters
Intake Coagulation Flocculation Sedimentation
Coagulant Low Lift
Pumping Station
GAC contactors
(retrofitted filters)
New Low Lift Pumps
and Fine Screens
Membrane
Equalization Tanks
(ex. flocculation
Tanks)
New Membrane Filtration
(retrofitted Sedimentation
tanks)
Conventional / UV Plant (120 ML/d)
Membrane/ UVAOP/ GAC Plant (380 ML/d)
Reservoir
High Lift PS UV
Sodium
Hypochlorite
UV
Zone 1
Zone 2
![Page 5: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/5.jpg)
Membranes
380 ML/d capacity
16 trains
7800 individual modules
Warranty based on:
influent 1mm screening,
coagulant type (among other conditions)
![Page 6: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/6.jpg)
The Storm
June 1st, 2012
Rain: 37.4 mm
Wind: 59 km/h (East)
Turbidity
1 to 60 NTU is common
during storms
Long-stringy Algae
30 ntu
Raw Water Turbidity Trend
![Page 7: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/7.jpg)
Standard Methods:
Filter-clogging
algae
![Page 8: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/8.jpg)
Algae Coating
![Page 9: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/9.jpg)
Travelling Screen Damage
1 mm travelling screens
Large differential caused damage of baskets
Screens couldn’t rotate
algae passed around bent screens
![Page 10: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/10.jpg)
Low Lift Pump Basket Damage
Basket coated in
algae
Pump taken out of
service
11 p.m. to fully
understand extent of
damage
![Page 11: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/11.jpg)
The Solution
Several attempts to
get 1 mm screened
water to membranes
Conventional and
membrane plants are
hydraulically
separated by 1.5 m
![Page 12: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/12.jpg)
Lorne Park Treatment Processes
GAC Filters
Intake Coagulation Flocculation Sedimentation
Coagulant Low Lift
Pumping Station
GAC contactors
(retrofitted filters)
New Low Lift Pumps
and Fine Screens
Membrane
Equalization Tanks
(ex. flocculation
Tanks)
New Membrane Filtration
(retrofitted Sedimentation
tanks)
Conventional / UV Plant (120 ML/d)
Membrane/ UVAOP/ GAC Plant (380 ML/d)
Reservoir
High Lift PS UV
Sodium
Hypochlorite
UV
Zone 1
Zone 2
X
![Page 13: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/13.jpg)
Fixing the Flow Rate Interconnect
valve approx. 30% open
Reprogram SCADA
60 ML/d using 4 Membrane Trains
Switch from 1 mm to 10 mm screens
June 1
![Page 14: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/14.jpg)
The Repairs
Repair crew consolidated undamaged baskets into one screen
7 days for one screen
8 weeks to repair second screen
27 damaged baskets in total
![Page 15: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/15.jpg)
The Membranes
3240 modules
exposed to the
unscreened algae for
several hours
2160 modules
exposed to 10 mm
screened water with
coagulant for 7 days
![Page 16: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/16.jpg)
Impact on the Membranes
Algae
Event Chlorine
Clean
Citric
Clean
![Page 17: Algae Event June 1, 2012 - Credit Valley Conservation · 2014-11-13 · Long-stringy Algae 30 ntu Raw Water Turbidity Trend . Standard Methods: Filter-clogging algae . Algae Coating](https://reader034.vdocument.in/reader034/viewer/2022050309/5f710056c723da50b16845d6/html5/thumbnails/17.jpg)
Acknowledgements
Ontario Clean Water Agency
Consultants
AECOM, GENIVAR
Contractors
Kenaidan, Maple Reinders
Equipment Suppliers
GE Water & Process Technologies
(membranes)
Siemens (travelling screens)