1 Smith, Andrea From: Bill Henshaw <[email protected]> Sent: Tuesday, October 21, 2014 9:59 AM To: Smith, Andrea Subject: Re: Alley 111 - 50' Pogo Weight - Placing Boom Andrea. I just talked with swing America and they said that the in operation and out of operation chart is based on the longest mast they have which is a 59 footer. So you are good to go. Bill Henshaw On Oct 20, 2014, at 5:38 PM, "Smith, Andrea" <[email protected]> wrote: Hi Bill, How does the 50’ pogo change the in-operation and out of operation weights and forces? We were previously provided and in operation weight of 46,300 pounds, and an out-of-operation weight of 36,400 pounds. Thanks- Andrea Smith Senior Project Engineer Skanska USA Building Operations usa.skanska.com 929 109th Ave NE Bellevue, WA 98004, United States Mobile +1 206 327 2765 Fax +1 877 884 6119 Connect With Us: Blog | Facebook | Twitter | LinkedIn | Instagram | YouTube Think twice before you press "print." This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy or deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you.

Upload: others

Post on 08-Apr-2020

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

1

Smith, Andrea

From: Bill Henshaw <[email protected]>Sent: Tuesday, October 21, 2014 9:59 AMTo: Smith, AndreaSubject: Re: Alley 111 - 50' Pogo Weight - Placing Boom

Andrea. I just talked with swing America and they said that the in operation and out of operation chart is based on the

longest mast they have which is a 59 footer. So you are good to go.

Bill Henshaw

On Oct 20, 2014, at 5:38 PM, "Smith, Andrea" <[email protected]> wrote:

Hi Bill,

How does the 50’ pogo change the in-operation and out of operation weights and forces?

We were previously provided and in operation weight of 46,300 pounds, and an out-of-operation weight

of 36,400 pounds.

Thanks-

Andrea Smith Senior Project Engineer

Skanska USA Building Operations usa.skanska.com 929 109th Ave NE Bellevue, WA 98004, United States

Mobile +1 206 327 2765 Fax +1 877 884 6119

Connect With Us: Blog | Facebook | Twitter | LinkedIn | Instagram | YouTube

Think twice before you press "print." This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy or deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you.

Page 2: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

1

Smith, Andrea

From: Smith, AndreaSent: Thursday, September 04, 2014 11:39 AMTo: '[email protected]' ([email protected])Cc: [email protected]; Smith, Dale ([email protected])Subject: FW: Alley 111 - Placing Boom and Pour Strip - Blockout SizeErrorandShoringAttachments: FSK-2 - Placing Boom Shoring.pdf

For your records, see below.

Susan- thank you for your time this morning. I really appreciate it.

From: Mike Braun [mailto:[email protected]] Sent: Thursday, September 04, 2014 11:14 AM To: Smith, Andrea Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout SizeErrorandShoring

Andrea

No exceptions taken to proposed shoring.

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 1420 Fifth Ave, Suite 425 Seattle, WA 98101-4019 206-343-3000 phone 206-948-5974 mobile 206-343-3013 fax [email protected]

From: Smith, Andrea [mailto:[email protected]] Sent: Thursday, September 04, 2014 11:04 AM To: Mike Braun Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout SizeErrorandShoring

Hi Mike,

The attached appears to meet all of your criteria, and we are proceeding to install from SOG (P4) and up.

Let me know if you have any concerns.

Thanks-

From: Mike Braun [mailto:[email protected]] Sent: Thursday, September 04, 2014 10:01 AM To: Smith, Andrea Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout SizeErrorand Shoring

Andrea

The slab supporting the placing boom should be shored down to the slab-on-grade.

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 3: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

2

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 206-343-3000 phone 206-948-5974 mobile 206-343-3013 fax [email protected]

From: Smith, Andrea [mailto:[email protected]] Sent: Thursday, September 04, 2014 9:56 AM To: Mike Braun Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout SizeErrorand Shoring

Just a heads up, they are installing the placing boom today, and utilizing it to pour the level 3 deck.

From: Mike Braun [mailto:[email protected]] Sent: Thursday, September 04, 2014 9:52 AM To: Smith, Andrea Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout Size Errorand Shoring

Andrea

This email is to confirm our phone conversation regarding shoring for the concrete placing boom. The required shoring

capacity is 46,300 lbs “in-operation” (36,400 lbs “out-of-operation”) according to the product information you sent on

2/6/14. The number of shoring posts required depends on the capacity of each post. Round up to an even number and

place equal number each side of the pour strip. The posts should run down to the slab-on-grade as the concrete floor

slabs do not have enough capacity even when summed. Align the posts vertically. Do not offset them more than 4”,

say, to prevent punching through the slab.

I just saw your email to Ceco Concrete and agree with the information provided. It is my understanding that you will not

install the placing boom until you reach the 4th

Floor.

Please contact me if you have additional questions.

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 206-343-3000 phone 206-948-5974 mobile 206-343-3013 fax [email protected]

From: Smith, Andrea [mailto:[email protected]] Sent: Thursday, September 04, 2014 8:51 AM To: Mike Braun Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout Size Errorand Shoring Importance: High

Sorry for the communication overload, but I just found out we need this shoring layout by noon. So it’s a little hotter

than I thought.

From: Smith, Andrea Sent: Thursday, September 04, 2014 8:41 AM To: 'Mike Braun' Cc: Smith, Dale ([email protected]) Subject: RE: Alley 111 - Placing Boom and Pour Strip - Blockout Size Error and Shoring

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 4: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

3

Hi Mike,

I left a voicemail on your cell this AM. We had a couple of issues with the placing boom I was hoping to get some help

with:

1. The Placing Boom opening was supposed to 41”x41” versus 3’-6”x3’-6”. I had not noticed this previously when

reviewing the drawing, and right now we don’t need anything regarding this item. Just for an FYI.

2. We had some correspondence over the phone back in March about reshoring requirements for the placing

boom. Can you send me the reshoring comments in email, so I can pass along to Ceco?

Thanks-

From: Mike Braun [mailto:[email protected]] Sent: Thursday, March 20, 2014 11:51 AM To: Smith, Andrea Cc: Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip

Andrea

Preliminary sketches for the concrete placing boom openings are attached. Please review and let me know if you have

any questions or comments. If everything is OK, I will sign/seal.

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 206-343-3000 phone 206-948-5974 mobile [email protected]

From: Smith, Andrea [mailto:[email protected]] Sent: Wednesday, March 19, 2014 2:56 PM To: Mike Braun Subject: RE: Alley 111 - Placing Boom and Pour Strip

Hi Mike-

Any chance to review?

From: Mike Braun [mailto:[email protected]] Sent: Wednesday, March 12, 2014 8:35 AM To: Smith, Andrea Subject: RE: Alley 111 - Placing Boom and Pour Strip

Andrea

Ok, I’ll take a look at it.

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 206-343-3000 phone 206-948-5974 mobile

From: Smith, Andrea [mailto:[email protected]] Sent: Wednesday, March 12, 2014 8:14 AM To: Mike Braun Subject: FW: Alley 111 - Placing Boom and Pour Strip

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 5: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

4

Hi Mike-

Finally swinging back to this-

See Schwing responses below in red about the placing boom and let me know how this impacts the design.

The slab edges are currently being designed via RFI to be self-supporting cantilevers. We do not yet have the response,

but they will just be made to support the live loads they would carry per S1.0a.

Thanks-

From: Bill Henshaw [mailto:[email protected]] Sent: Wednesday, February 12, 2014 4:58 PM To: Smith, Andrea Cc: 'Brett Young' Subject: FW: Alley 111 - Placing Boom and Pour Strip

Andrea, Did you see the response from Schwing below?

Bill Henshaw

Brundage-Bone Concrete Pumping Inc.

1055 4th

AVE N.

Kent, WA. 98032

253-859-4444

206-510-3299 (cell)

From: Mehl, Jason [mailto:[email protected]]

Sent: Tuesday, February 11, 2014 2:28 PM

To: Bill Henshaw

Cc: 'Brett Young'

Subject: RE: Alley 111 - Placing Boom and Pour Strip

Hi Bill,

My red colored comments to the yellow highlighted items are stated below.

Have a good night.

Jason Mehl, IIW IWE

Structural Engineering Manager

SCHWING America, Inc.

Subsidiary of SCHWING GmbH

St. Paul, Minnesota | USA

+1.888.724.9464 | www.schwing.com

From: Bill Henshaw [mailto:[email protected]] Sent: Tuesday, February 11, 2014 12:52 PM To: Mehl, Jason Cc: 'Brett Young' Subject: FW: Alley 111 - Placing Boom and Pour Strip

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 6: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

5

Jason,

Please take a look at the questions BBCP has been asked Regarding putting a Placing Boom in a pour strip of a upcoming

job. Could you please respond ASAP with your thoughts?

Bill Henshaw

Brundage-Bone Concrete Pumping Inc.

1055 4th

AVE N.

Kent, WA. 98032

253-859-4444

206-510-3299 (cell)

From: Bill Henshaw [mailto:[email protected]]

Sent: Tuesday, February 11, 2014 10:26 AM

To: 'Smith, Andrea'

Cc: 'Brett Young'

Subject: RE: Alley 111 - Placing Boom and Pour Strip

Hello Andrea,

I do know that the floor frames must be supported by all four sides. The other statement that the upper support only

accounts for horizontal HO only, I have to defer that to the Manufacture engineers. My first thought is no, taking into

consideration what the term Moment means. I do believe moment is more than just a horizontal force. I will run this by

Schwing and get back to you.

Bill Henshaw

Brundage-Bone Concrete Pumping Inc.

1055 4th

AVE N.

Kent, WA. 98032

253-859-4444

206-510-3299 (cell)

From: Smith, Andrea [mailto:[email protected]]

Sent: Monday, February 10, 2014 4:59 PM

To: Bill Henshaw ([email protected])

Subject: FW: Alley 111 - Placing Boom and Pour Strip

Hi Bill,

Can you look at the two highlighted items below and respond?

Thanks-

From: Mike Braun [mailto:[email protected]] Sent: Monday, February 10, 2014 2:12 PM To: Smith, Andrea Cc: Smith, Dale; Martin, Albert; Bradford, Jim; Howard Burton Subject: RE: Alley 111 - Placing Boom and Pour Strip

Andrea

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 7: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

6

This email is to summarize our recent phone conversations.

The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation weight of

the equipment, concrete, and impact is 46,300 lbs according to the information you sent. It is my understanding that

the vertical load, the skewing torsion, and horizontal force Hu is supported at the lower floor frame. The upper floor

frame supports the horizontal force Ho only. Please confirm this with Brundage-Bone. True, plus wind [W] at the upper

floor frame. Summary: Ho & W loads on upper floor frame; Hu, V, & Md loads on lower floor frame.

The floor slabs must be shored to support the concrete placing boom. The worst case scenario is that the slabs are

shored all the way down to Level P4. You mentioned that Swenson Say Faget said the slab adjacent to the pour strip

was not designed as a cantilever to support construction loading. If the slab is reinforced with rebar so it can support

load as a cantilever, the number of levels of shoring could be reduced.

We envision shoring posts with a total capacity of 48,000 lbs at each level. The shoring posts must be aligned vertically

so they do not punch through the slab.

A preliminary sketch is attached showing the concrete placing boom floor frame supported by the slab edges of the pour

strip. The floor frame shown is not supported in the pour strip. We could add a steel beam on these 2 sides. Please ask

Brundage-Bone whether the floor frame may be supported on 2 sides only. I strongly advise 4 sides are constrained for

the floor frames. Independent of the project pour plan, the SPB operator could slew the boom in any 360° slewing

position.

Mike Braun, P.E., S.E. Seattle Structural PS Inc. 1420 Fifth Ave, Suite 425 Seattle, WA 98101-4019 206-343-3000 phone 206-948-5974 mobile 206-343-3013 fax [email protected]

From: Smith, Andrea [mailto:[email protected]] Sent: Thursday, February 06, 2014 8:18 PM To: Mike Braun Cc: Smith, Dale; Martin, Albert; Bradford, Jim Subject: Alley 111 - Placing Boom and Pour Strip

Hi Mike,

We are ready to start getting some engineering and design for our placing boom supports and penetrations. Below is a

description of what we are thinking about doing.

A placing boom will be utilized to pour from Level 2 through the roof deck. The placing boom weighs 18,500 lbs (see

attached Placing Boom Specifications), it imposes loads on the surrounding floor slabs per the attached Load Table, and

it requires a 41"x41" opening per the attached Floor Frame Diagram. The attached Floor Frame Diagram also shows a

10"x10" pipe line hole within 16" of the placing boom opening.

We want to put the placing boom in the pour strip between GL-G and H in the center of the building. It would require

the pour strip to be widened at the location of the mast. We would also want to keep the 10”x10” pipe line blockout out

of the pour strip.

Once you have a chance to get oriented, give me a call and let’s go through before you start designing. I would like to get

this design 100% dialed in by 2/19 so we can get it incorporated in the shop drawings for reinforcing steel and deck

formwork. Let me know how this target works for you.

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 8: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

7

Thanks,

Andrea Smith Senior Project Engineer

Skanska USA Building Operations usa.skanska.com 929 109th Ave NE Bellevue, WA 98004, United States Mobile +1 206 327 2765 Fax +1 877 884 6119 Connect With Us: Blog | Facebook | Twitter | LinkedIn | Instagram | YouTube

Think twice before you press "print." This message, including any attachments hereto, may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s). If you are not an intended addressee, you may neither use this message nor copy or deliver it to anyone. In such case, you should immediately destroy this message and kindly notify the sender by reply email. Thank you.

No virus found in this message.

Checked by AVG - www.avg.com

Version: 2014.0.4765 / Virus Database: 4015/8145 - Release Date: 09/02/14

No virus found in this message.

Checked by AVG - www.avg.com

Version: 2014.0.4765 / Virus Database: 4015/8145 - Release Date: 09/02/14

No virus found in this message.

Checked by AVG - www.avg.com

Version: 2014.0.4765 / Virus Database: 4015/8145 - Release Date: 09/02/14

andrea.smith
Text Box
Post-RFI issuance Correspondence.
Page 9: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

G H

4

53"

2' -

6"

2' -

6"

3"

8" 3' - 6" 8"

1' - 4"

6 EACH EFCO L2 SHORES(CAPACITY 8500# EA.)PER LEVEL AS SHOWNALIGNED VERTICALLYTHROUGH STRUCTUREFROM LVL P4 UP

6' - 1"6' - 1"6' -

0 1

/2"

6' -

0 1

/2"

CECO CONCRETE

CONSTRUCTION, LLC

CONTRACT NUMBER:

SCALE:DRAWN BY: DATE:

SHEET:

1/4" = 1'-0"Alley 111

50-69-14041 Placing Boom ShoringFSK-2

09/04/14SRT

1/4" = 1'-0"1

Placing Boom Shoring Plan

andrea.smith
Text Box
Post-RFI issuance Correspondence.
andrea.smith
Callout
9/5/2014: This dimension has been revised to 3'- 5 1/2"
Page 10: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

From: Sean Williams <[email protected]>

Sent: Friday, May 09, 2014 4:59 PM

To: al titus; Martin, Albert; Smith, Andrea; Andy Rasmussen; Antonio Corona;

Bhaumik Shah; Cammy Hunter; Cara Hattrick; Smith, Dale; Daniel McCartt;

Dennis Elbert; Eric Mittet; Gary Byrne; Gregg Robinson; Harold Paulson;

James Johnston; Jenae Goldfinch; Smith, Jenny; Bradford, Jim; Joe

Chevalier; Joe Goldfinch; Jon Bryant; Josh Dickerson; Justin Schmidt; Kalin

Wate; Louis Mark; Mark Glidewell; Mark Rosas; Santeford, Matt; Randy

Dana; Rene Fabros; Rod Imamura; Rod Rippin; Samantha Wallish; Scot

Love; Sean Setterberg; Williams, Sean; Ssuan Timmons; Steve Murphy;

Steve Otis; Steve Vaaga; Leptich, Tom; trevor Miller

Subject: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049-000 -

Alley 111 Apartments]

Attachments: RFI-171 Placing Boom Blockout.pdf; Alley 111 Conc Placing Boom

SKETCHES 2014-04-18.pdf; RFI 0171.pdf; Transmittal.pdf; PMATH1.txt

****** Request For Information: 0171 - Placing Boom Blockout ****** RFI ID:

112577

Number:

0171

Subject:

Placing Boom Blockout

Is Official:

1

Is Closed:

1

Date Created:

5/6/2014

Date Required:

5/13/2014

Date Responded:

5/9/2014

Question:

Reference: "Sketches for Placing Boom Blockout", S2.5-S2.13

Please see the attached "Sketches for Placing Boom Blockout", which show structural details for a

concrete placing boom blockout. This blockout will be located between GLs G/H (in the pour strip) and

centered on GL 4.5. The blockouts will start on Level P1/C1 and continue upwards through the rooftop,

shown from S2.5-S2.13.

Page 11: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

The structural engineering for the blockout has already been provided from Seattle Structural. However,

please verify if the attached means and methods modifications to the existing design are acceptable.

Answer:

Response (Answered) from: Bart Blans (Swenson Say Faget)

Remarks:

Acceptable.

Response (Answered) from: Kevin Reed (GGLO)

Remarks:

Per Bart Blans (SSF) on 5/8/2014, this is acceptable.

Kevin Reed (GGLO) 5/9/2014

Importance:

Normal

Name:

Skanska USA Building Inc.

Author Contact ID:

SEAWIL

Author RFI Number:

Name - Answer Company:

GGLO

Answer Contact ID:

KEVREE

Discipline:

Architectural

Page 12: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

Detailed, RFIs Grouped by RFI Number

Request for Information 0171

Alley 111 Apartments Skanska USA Building Inc.Project # 4212049-000

Tel: Fax:

RFI #: 0171 Date Created: 5/6/2014

Author Company Authored ByAnswer Company Answered By

GGLO Kevin Reed Skanska USA Building Inc. Sean Williams

1301 First Avenue Suite 301

Seattle, WA 98101

221 Yale Ave. N., Suite 400

Seattle, WA 98109

Co-Respondent Author RFI Number

DisciplineSubject Category

ArchitecturalPlacing Boom Blockout

Company Name Contact Name Copies NotesCc:

Question Date Required: 5/13/2014

Reference: "Sketches for Placing Boom Blockout", S2.5-S2.13

Please see the attached "Sketches for Placing Boom Blockout", which show structural details for a concrete placing boom

blockout. This blockout will be located between GLs G/H (in the pour strip) and centered on GL 4.5. The blockouts will start

on Level P1/C1 and continue upwards through the rooftop, shown from S2.5-S2.13.

The structural engineering for the blockout has already been provided from Seattle Structural. However, please verify if the

attached means and methods modifications to the existing design are acceptable.

Suggestion

Answer Date Answered: 5/9/2014

Response (Answered) from: Bart Blans (Swenson Say Faget)

Remarks:

Acceptable.

Response (Answered) from: Kevin Reed (GGLO)

Remarks:

Per Bart Blans (SSF) on 5/8/2014, this is acceptable.

Kevin Reed (GGLO) 5/9/2014

Prolog Manager Printed on: 5/9/2014 6West Page 1 of 1

Page 13: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 14: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 15: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
andrea.smith
Callout
9/5/2014: This dimension has been revised to 3'- 5 1/2"
andrea.smith
Callout
9/5/2014: This dimension has been revised to 5'-5 1/2"
Page 16: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 17: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 18: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
andrea.smith
Callout
9/5/2014: This dimension has been revised to 3'- 5 1/2"
Page 19: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
andrea.smith
Callout
9/5/2014: This dimension has been revised to 3'- 5 1/2"
Page 20: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 21: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

Detailed, RFIs Grouped by RFI Number

Request for Information 0171

Alley 111 Apartments Skanska USA Building Inc.Project # 4212049-000

Tel: Fax:

RFI #: 0171 Date Created: 5/6/2014

Author Company Authored ByAnswer Company Answered By

GGLO Kevin Reed Skanska USA Building Inc. Sean Williams

1301 First Avenue Suite 301

Seattle, WA 98101

221 Yale Ave. N., Suite 400

Seattle, WA 98109

Co-Respondent Author RFI Number

DisciplineSubject Category

ArchitecturalPlacing Boom Blockout

Company Name Contact Name Copies NotesCc:

Question Date Required: 5/13/2014

Reference: "Sketches for Placing Boom Blockout", S2.5-S2.13

Please see the attached "Sketches for Placing Boom Blockout", which show structural details for a concrete placing boom

blockout. This blockout will be located between GLs G/H (in the pour strip) and centered on GL 4.5. The blockouts will start

on Level P1/C1 and continue upwards through the rooftop, shown from S2.5-S2.13.

The structural engineering for the blockout has already been provided from Seattle Structural. However, please verify if the

attached means and methods modifications to the existing design are acceptable.

Suggestion

Answer Date Answered: 5/9/2014

Response (Answered) from: Bart Blans (Swenson Say Faget)

Remarks:

Acceptable.

Response (Answered) from: Kevin Reed (GGLO)

Remarks:

Per Bart Blans (SSF) on 5/8/2014, this is acceptable.

Kevin Reed (GGLO) 5/9/2014

Prolog Manager Printed on: 5/9/2014 6West Page 1 of 1

Page 22: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

Detailed, RFIs Grouped by RFI Number

Request for Information 0171

Alley 111 Apartments Skanska USA Building Inc.Project # 4212049-000

Tel: Fax:

RFI #: 0171 Date Created: 5/6/2014

Author Company Authored ByAnswer Company Answered By

GGLO Kevin Reed Skanska USA Building Inc. Sean Williams

1301 First Avenue Suite 301

Seattle, WA 98101

221 Yale Ave. N., Suite 400

Seattle, WA 98109

Co-Respondent Author RFI Number

DisciplineSubject Category

ArchitecturalPlacing Boom Blockout

Company Name Contact Name Copies NotesCc:

Question Date Required: 5/13/2014

Reference: "Sketches for Placing Boom Blockout", S2.5-S2.13

Please see the attached "Sketches for Placing Boom Blockout", which show structural details for a concrete placing boom

blockout. This blockout will be located between GLs G/H (in the pour strip) and centered on GL 4.5. The blockouts will

start on Level P1/C1 and continue upwards through the rooftop, shown from S2.5-S2.13.

The structural engineering for the blockout has already been provided from Seattle Structural. However, please verify if the

attached means and methods modifications to the existing design are acceptable.

Suggestion

Answer Date Answered:

Prolog Manager Printed on: 5/6/2014 6West Page 1 of 1

kevinr
Typewritten Text
Per Bart Blans (SSF) on 5/8/2014, this is acceptable. Kevin Reed (GGLO) 5/9/2014
Page 23: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 24: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 25: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 26: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 27: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 28: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 29: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 30: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation
Page 31: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

RFI TransmittalGGLO | 1301 First Ave. Suite 301 Seattle WA 98101 United States

Page 1 of 3

PROJECT Skanska: Alley 1112012033.00

DATE SENT 5/9/2014

SUBJECT Placing Boom Blockout RFI ID 0171

TYPE RFI TRANSMITTAL ID 00784

PURPOSE Answered VIA Info Exchange

QUESTION: ****** Request For Information: 0171 - Placing Boom Blockout ******RFI ID:112577

Number:0171

Subject:Placing Boom Blockout

Is Official:1

Is Closed:0

Date Created:5/6/2014

Date Required:5/13/2014

Date Responded:

Question:Reference: "Sketches for Placing Boom Blockout", S2.5-S2.13

Please see the attached "Sketches for Placing Boom Blockout", which showstructural details for a concrete placing boom blockout. This blockout willbe located between GLs G/H (in the pour strip) and centered on GL 4.5. Theblockouts will start on Level P1/C1 and continue upwards through therooftop, shown from S2.5-S2.13.

The structural engineering for the blockout has already been provided fromSeattle Structural. However, please verify if the attached means andmethods modifications to the existing design are acceptable.

Answer:

Page 32: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

RFI TransmittalDATE: 5/9/2014

ID: 00784

Page 2 of 3

Importance:Normal

Name:Skanska USA Building Inc.

Author Contact ID:SEAWIL

Author RFI Number:

Name - Answer Company:GGLO

Answer Contact ID:KEVREE

Discipline:Architectural

SUGGESTION:

ANSWER:Response (Answered) from: Bart Blans (Swenson Say Faget)Remarks:

Acceptable.

Response (Answered) from: Kevin Reed (GGLO)Remarks:Per Bart Blans (SSF) on 5/8/2014, this is acceptable. Kevin Reed (GGLO) 5/9/2014

FROM

NAME COMPANY EMAIL PHONE

Kevin Reed GGLO [email protected] 206-902-5420

TO

NAME COMPANY EMAIL PHONE

Sean Williams Skanska USA [email protected] (206) 498-

Page 33: Alley 111- RFI-0171 - Placing Boom Blockout [ Skanska 4212049 … · 2015-12-04 · The proposed concrete placing boom location is dead center between Grids G-H/4-5. The total in-operation

RFI TransmittalDATE: 5/9/2014

ID: 00784

Page 3 of 3

NAME COMPANY EMAIL PHONE

Building om 0107

DESCRIPTION OF CONTENTS

QTY DATED TITLE NUMBER SCALE SIZE NOTES

1 5/9/2014 RFI 0171 response.pdf

COPIES:

Albert Martin (Skanska USA Building Inc.) Andrea Smith (Skanska USA Building) Anuja Mohare (GGLO) Christian Gunter (SKANSKA USA Commercial) Dale Smith (Skanska USA Building) Jim Bradford (Skanska USA Building) Kevin Reed (GGLO) Sean Williams (Skanska USA Building) Stewart Germain (SKANSKA USA Commercial) Terry Bendrick (SKANSKA USA Commercial) Tom Leptich (Skanska USA Building) William Castillo