2G BTS Installation Guide Line
Outdoor/Indoor
200214-ed1
-
8/12/2019 ALU 2G BTS Installation Guide Line
2/43
-
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All othertrademarks are the property of their respective oners.
!he information presented is su"#ect to change ithout notice. Alcatel-Lucent assumes no responsi"ility for
inaccuracies contained herein.
$opyright % 201&Alcatel-Lucent
'dition 1.0
(tatus) *eleased
. .
All rights reserved
+assing on and copying of this document,
se and communication of its contents is not permitted
Without ritten authoriation from Alcatel-Lucent
All rights reserved.
+assing on and copying of this document,
use and communication of its contents is not permitted
ithout ritten authoriation from Alcatel-Lucent.
-
8/12/2019 ALU 2G BTS Installation Guide Line
3/43
!a"le f $ontents
1.Preliminary Information .....52.Scope ....53.Reference ....54.Document Change History ....6
5 General Information
5.1 Hardware Description .75.1.1 Rack Configuration 75.1.2 Weight and Dimensions 8
5.2 Final State 96 Installing the Rack
6.1 Rack Unpacking 106.2 Reversing the Rack Door (If Necessary On Site) .106.3 Positioning the Rack ..116.4 OPTION: Fixin on Concrete Floor..11
&$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.
AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
6.4.1 Drilling the Concrete .11
6.4.2 Fixing to the Concrete Floor 126.5 OPTION : Fixing to the Raised Floor .12
5.5.1 Drilling the Raised Floor 125.5.2 Fixing to the Raised Floor .13
6.6 OPTION : Fixing to the Wall .135.6.1 Wall Drilling .135.6.2 Fixing to the Wall 14
6.7 Preparing the Site Cable Tray and the Metal Sheath ...147 Installing the Power Supply Cables
7.1 General Cabling View 15
7.2 Installing the Cables in the Cable Tray 167.3 Protective Earth Cable ...167.4 Rack Side Power Cable Connections .177.5 Site Side Power Cable Connections (48 V) ..187.6 Power Supply Testing 19
-
8/12/2019 ALU 2G BTS Installation Guide Line
4/43
8 Installing the PCM Cables8.1 Installing Cable in Cable Tray ..20
8.2 Rack Side Connection .208.2.1 Prepare the PCM Cables ...208.2.2 Connect the Cables to the Rack ..218.2.3 L907/ 4 120 - Ohm Cable (Alcatel-Lucent Kits) .218.2.4 FLEX3 / 4 - 75 Ohm Coaxial Cable (Alcatel-Lucent Kits) ....22
9 Installing the Antenna Jumpers9.1 Antenna General Scheme ..23
9.2 Connection to the Feeder Termination ..249.3 Connection to the BTS Rack ..24
10 Installing the Alarm Cables (Options)10.1 Installing the Cables (Option) ...2510.2 Rack Side Connection ..26
4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.
AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
11.1 Configuration of Cabling ...28
11.2 Installation 2912 Finishing Installation
12.1 Finishing Installation of the Metallic Sheath .2912.2 Finishing 31
Appendix: Installation Pictures ..32Appendix : Abbreviations 37
-
8/12/2019 ALU 2G BTS Installation Guide Line
5/43
-
1. Preliminary Information
General information
The product specification and/or performance levels contained in this document are for
information purposes only and are subject to change without notice. They do not
represent any obligation on the part of Alcatel-Lucent.
Service Personnel Skill
Service Personnel must have an adequate technical background on telecommunications
and in particular on the equipment subject of this handbook.
An adequate background is required to properly install, operate and maintain
equipment. The fact of merely reading this handbook is considered as not enough.
Safety recommendation
The safety recommendations here below must be considered to avoid injuries on persons
and/or damage to the equipment:
Service Personnel
Installation and service must be carried out by authorized persons having appropriate
technical training and experience necessary to be aware of hazardous operations during
installation and service, so as to prevent any personal injury or danger to
other persons, as well as prevent damaging the equipment.
Access to the Equipment
Access to the Equipment in use must be restricted to Service Personnel only.
. .
All rights reserved
+assing on and copying of this document,
se and communication of its contents is not permitted
Without ritten authoriation from Alcatel-Lucent
aey ues
Recommended safety rules are indicated in part (5-Safety , EMC, EMF, ESD Norms
and Equipment Labelling). Local safety regulations must be used if mandatory. Safety
instructions in this handbook should be used in addition to the local safety
regulations. In case of conflict between safety instructions stated in this manual and
those indicated in local regulations, mandatory local norms will prevail. Should not
local regulations be mandatory, then safety rules stated in this manual will prevail.
2. Scope
This Document aims to describe the hardware of 2G (9100 BTS DC Indoor Evolution)
3. Reference
Alcatel -Lucent 9100 BTS Evolution installation manual in MBO cabinet
8
-
8/12/2019 ALU 2G BTS Installation Guide Line
6/43
-
4. Document Change History
Edition Number Reason and description of change Affected Page Effective date
0.1 Draft edition All 02-02-2014
1.0 First edition of document formally revised All 20-02-2014
. .
All rights reserved
+assing on and copying of this document,
se and communication of its contents is not permitted
Without ritten authoriation from Alcatel-Lucent
9
-
8/12/2019 ALU 2G BTS Installation Guide Line
7/43
5.1 Hardware Description
5.1.1 Rack on!i"uration
:$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.
AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
Figure 1: Example of Mini DC Indoor 9100 BTS (Left and Medi DC 9100 BTS (!ig"t
-
8/12/2019 ALU 2G BTS Installation Guide Line
8/43
5.1.2 #ei"$t and Di%ensions
;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.
AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
9/43
5.2 &inal State
!he rack is ready for commissioning
!he rack is not poered up.
1? at the
top of the rack.
1
4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
'.3 )reparin" t$e Site a4le Tra and t$e etal S$eat$
)rocedure* 7ake a cut-out in the ca"le ay for the ca"les ith metal sheath >(ee @igure 1'?
7ake a cut-out in the ca"le ay for the antenna #umpers
'dge the cut-outs ith edge protection
@i provisory the metal sheath to the ca"le ay >(ee @igure 1?.
-
8/12/2019 ALU 2G BTS Installation Guide Line
15/43
3 Installin" t$e )ower Suppl a4les
3.1 General a4lin" 6iew
1
8$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
16/43
3.2 Installin" t$e a4les in t$e a4le Tra
nstall yelloD green ca"le
nstall poer ca"le
Attach ca"le
$ut the ca"le at good length
$rimp a ire terminal)Ter%inals on t$e rack side)
35 ) ; mm
CA! A ) 9 mm
CA! C ) 9 mm
CA!*'! ) 9 mm
Ter%inals on t$e power 4o )
depending on site
1
9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
3.0 )rotecti+e 7art$ a4le onnection
$rimp an adapted ire terminal at site etremity
$onnect the protective earth ca"le to the site earth plate
+ass the ca"les to the metal sheath
$onnect earth ca"le at rackBs top$rimp a ; mm ire terminal at C!( etremity of earth ca"le
$onnect the 35 ca"le to the stud top rack on the rack >7;?
-
8/12/2019 ALU 2G BTS Installation Guide Line
17/43
+ass the 35 ca"le through the metal sheath
$rimp an 7; ire terminal on the 35 ca"le
@it a ru""er sleeve on the ire terminal
$onnect the 35 ca"le to the stud of the C!( >(ee (tep 2?
At the site side, cut the ca"le and crimp a ire terminal on the 35 ca"le >diameter depending
on site? >(ee (tep &?
@it a ru""er sleeve on the ire terminal
$onnect the 35 ca"le to the site earth plate >(ee (tep 9?.
3. Rack Side )ower a4le onnections
1
:$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
18/43
)rocedure* +ass the 4; poer ca"les through the metal sheath
*emove the ru""er caps from the poer supply terminals on the rack
+ass the ca"les into the ru""er caps >(ee Steps 1 to ?
$rimp 79 terminals on the ca"les
@it a ru""er sleeve on the ire terminal
$onnect the 4; ca"les to the studs of the C!()
Clack insulated conductor to the 0 terminal
Clue insulated conductor to the - 4; terminal
@it the ru""er caps on the poer terminals.
3.5 Site Side )ower a4le onnections ,8 6
1
;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
)rocedure* n the site side, cut the 4; ca"les and crimp on a lug >diameter depending on site?
@it a ru""er sleeve on the terminal lug
$onnect the 4; ca"le to the site "reakers
La"el the 4; ca"les and the site poer "o.
-
8/12/2019 ALU 2G BTS Installation Guide Line
19/43
3.' )ower Suppl Testin"
)rocedure* $heck that all the rack "reakers are sitched off
At the rack, test for short circuit "eteen 0 and - 4;
1
(ee @igure #0?
At the poer "o, sitch off the fuse "reakers
-
8/12/2019 ALU 2G BTS Installation Guide Line
20/43
8.1 Installin" a4le in a4le Tra
nstall ca"les in +$7 compartment of ca"le tray
Attach ca"les ith plastic ca"le ties
La"el the ca"les ith la"els supplied
+ass the +$7 ca"les through the metal sheath.
)rocedure* Se)tion 1*& for
the num"er of +$7 ca"les
to install
+erform ste s 1 to 4.
2
0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
8.2 Rack Side onnection
8.2.1 )repare t$e ) a4les
)rocedure* *emove 2 cm of outer insulation near the metal sheath fiing point on each +$7 ca"le >(ee
@igure #1?
+repare the ca"le termination
@it a ru""er sleeve >4? >(ee @igure ##?
La"el the ca"les >(ee @igure ##?.
-
8/12/2019 ALU 2G BTS Installation Guide Line
21/43
8.2.2 onnect t$e a4les to t$e Rack
2
1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
8.2.0 L9:3/ 12: ; O$% a4le ,
-
8/12/2019 ALU 2G BTS Installation Guide Line
22/43
2
2$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
)rocedure* *emove the lightning protection "lock >2 in @igure 22?
nsert the ires in the terminal "lock >1 in @igure 22?>to avoid cutting pro"lems os short
circuits, take the ire ith the first hand and insert it ith the other hand?
@it the lightning protection "lock
!ie the ca"les to the rack >ith adhesive tie "locks?.
8.2. &L7>0 / ; 35 O$% oaial a4le ,1 in @igure 22?
@it the lightning protection "lock
!ie the ca"les to the rack >ith adhesive tie "locks?.
@it (+27 :8 - ohm adapters to su" - 5 connectors >positions 4 and 8 in @igure 22?
-
8/12/2019 ALU 2G BTS Installation Guide Line
23/43
9 Installin" t$e
-
8/12/2019 ALU 2G BTS Installation Guide Line
24/43
9.2 onnection to t$e &eeder Ter%ination
f the feeders are not la"eled)
nform the customer
5o not connect the #umpers
$omplete the $$L
2
4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
)rocedure* *efer to Information !e+uired (Se)tion 1*&1 for ca"le connections
La"el the antenna #umpers at each end >(ee @igure #,?
$onnect the antenna #umpers to the feeders >(ee @igure #&?.
9.0 onnection to t$e BTS Rack
)rocedure* Lead the #umpers through the cut-outs in the ca"le tray
'nsure that hte "ending radius of each ca"le is at least & cm
se the plastic ties to "undle the ca"les together
!ighten ith special tightening tool >(ee !ools catalogue?.
-
8/12/2019 ALU 2G BTS Installation Guide Line
25/43
1: Installin" t$e
-
8/12/2019 ALU 2G BTS Installation Guide Line
26/43
1:.2 Rack Side onnection
2
9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
27/43
)rocedure* *efer to Information !e+uired (Se)tion 1*& in )"apter 1 for t"e )a-le connections
and the =uantity of alarms to "e connected.
@rom the end of the sheathing, "undle the ca"les together and attach them ith
ca"le ties.
@it a ru""er sleeve on ire terminations
nsert the ires into the connectors)
E
2
:$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
$onnector >2? E input alarms < to 19
$onnector >&? E input alarms 1: to 24$onnector >4? E output alarms >not used?
!ie the ca"les to the rack
-
8/12/2019 ALU 2G BTS Installation Guide Line
28/43
11 Installin" t$e Snc$roni@ation a4les ,Option
11 .1 on!i"uration o! a4lin"
2
;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
29/43
11.2 Installation
)rocedure* $hoose the right configuration >(ee @igures .' to .,
*un the synchroniation ca"les in the site ca"le tray
+ass the ca"les through the metal sheath
La"el the ca"les ith la"els supplied
2
-
8/12/2019 ALU 2G BTS Installation Guide Line
30/43
&
0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
)rocedure* (tretch the metallic sheath "eteen the vertical cutout in the ca"le trayand the C!( rack >(ee @igure .9*
@i the metallic sheath to the ca"le tray ith one stove scre >(ee @igure .9*
$ut the metallic sheath to the right length >F1?.
@i a lug to the metallic sheath if necessary.
$onnect the metallic sheath tot he rack >(ee @igure '0*
!ighten the stripped +$7 ca"le shielding to the sheath using the metallic tie.
rap provided in the kit >(ee @igure '0**
-
8/12/2019 ALU 2G BTS Installation Guide Line
31/43
12.2 &inis$in"
&
1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
)rocedure* Affi the G C!( (!A!3 G and G 3 G la"els to the door of the C!(
$lear aay packagingLeave the site tidy
Leave the C!( door key
$lean the site.
-
8/12/2019 ALU 2G BTS Installation Guide Line
32/43
Pictorial Elaboration:
&
2$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
33/43
&
&$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
34/43
&
4$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
35/43
&
8$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
36/43
&
9$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
37/43
&
:$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
38/43
&
;$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
39/43
&
-
8/12/2019 ALU 2G BTS Installation Guide Line
40/43
4
0$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
41/43
4
1$+/*! % 2012 AL$A!'L-L$'3!. ALL *!( *'('*'5.AL$A!'L-L$'3! 6 3!'*3AL +*+*'!A*/ 6 (' +*(A3! ! $7+A3/ 3(!*$!3
-
8/12/2019 ALU 2G BTS Installation Guide Line
42/43
-
8/12/2019 ALU 2G BTS Installation Guide Line
43/43
-. .
All rights reserved
+assing on and copying of this document,
se and communication of its contents is not permitted
Without ritten authoriation from Alcatel-Lucent