CENTRAL PLATEAU CLEANUP CONTRACT FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1 2 The purpose of this amendment is to amend Solicitation No. 89303318REM000008 as described below, and incorporate the changes in the conformed copy of the solicitation. All other sections of the Final RFP remain unchanged. Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section B, Table of Contents

Upload: others

Post on 26-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

2

The purpose of this amendment is to amend Solicitation No. 89303318REM000008 as described below, and incorporate the changes in the conformed copy of the solicitation. All other sections of the Final RFP remain unchanged.

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section B, Table of Contents

Page 2: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

3

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.1 Contract Transition

Paragraph (d)(5)

Page 3: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

4

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.1 Contract Transition

Paragraph (d)(11)

Section C.2.1 Facility/Waste

Site Safe and Compliant Base

Operations

Paragraph (d)

Page 4: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

5

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.3.1.1 Remediation

Activities and

Section C.3.1.2.1 Groundwater

and Vadose Zone Remediation

Integration

Page 5: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

6

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.3.1.3 Hanford

Environmental Data

Management

Page 6: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

7

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.6.1.3.1 Performance

Measurement Baseline

Submittals

Paragraph (d)

Page 7: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

8

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section C.6.2 Project

Performance Reporting

Paragraph (b)

Section J, Attachment J-2

Requirements Sources and

Implementing Documents

Section J, Attachment J-12

Central Plateau Cleanup

Contract Structure

Responsibility Assignment

Matrix

Section J, Attachment J-13

Central Plateau Cleanup

Contract Waste Site

Responsibility Assignment

Matrix

Page 8: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

9

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Section C.2 Scope of Work

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Section C.2.1 Subtask 1 -

Facility/Waste Site Safe and

Compliant Base Operations

Paragraph (d)

Page 9: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

10

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Section C.2.2.1 Remediation

Activities and

C.2.2.1 Groundwater and

Vadose Zone Remediation

Integration

Page 10: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

11

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Section C.2.2.3 Hanford

Environmental Data

Management

Page 11: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

12

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Section J-10 Contract

Deliverables

Page 12: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

13

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Appendix B, Paragraph (a)

Section J, Attachment J-15

Task Order 4 – Safe and

Compliant Base Operations

Appendix B, Paragraph (h)(i)

Section J, Attachment J-17

CPCC Crosswalk

Page 13: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

14

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section J, Attachment J-17

CPCC Crosswalk

Section L.1 FAR 52.252-1

Solicitation Provisions

Incorporated by Reference (Feb

1998)

Section L.9 DOE-L-2002

Proposal Preparation

Instructions, Volume I – Offer

and Other Documents –

Alternate II, Alternate III,

Alternate IV, Alternate V, and

Alternate VI (Oct. 2015)

Paragraph (k)(4)

Section L.11 DOE-L-2003

Proposal Preparation

Instructions, Volume II –

Technical and Management

Proposal – General (Oct 2015)

(Revised)

Paragraph (c)

(c) The Technical and Management Proposal shall comply with the requirements contained in the provision at

DOE-L-2001 entitled, Proposal Preparation Instructions, general and other applicable provisions of the

solicitation, including any required format and page limitations. Offerors shall be specific and complete in

addressing the information required to be included in the Technical and Management Proposal. Offerors shall not

simply offer to perform work in accordance with the PWS stated in Task Order 1 – Transition; Task Order 2 –

End States Cleanup Work; and Task Order 3 – Core Functions; rather, Offerors shall provide their specific

approach and capabilities to perform Task Order 1, Task Order 2, and Task Order 3. Moreover, Offeror shall not

merely restate the work scope and/or other solicitation requirements in its technical and management proposal.

(c) The Technical and Management Proposal shall comply with the requirements contained in the provision at

DOE-L-2001 entitled, Proposal Preparation Instructions, general and other applicable provisions of the

solicitation, including any required format and page limitations. Offerors shall be specific and complete in

addressing the information required to be included in the Technical and Management Proposal. Offerors shall not

simply offer to perform work in accordance with the PWS stated in Task Order 1 – Transition (Attachment L-11);

Task Order 2 – End States Cleanup Work (Attachment L-12); and Task Order 3 – Core Functions (Attachment L-

13); rather, Offerors shall provide their specific approach and capabilities to perform Task Order 1, Task Order 2,

and Task Order 3. Moreover, Offeror shall not merely restate the work scope and/or other solicitation requirements

in its technical and management proposal.

Section L.12 Proposal

Preparation Instructions,

Volume II – Key Personnel

Paragraph (b)(1)(i)

(i) Relevant experience in performing work similar to the work to be performed in their proposed position,

including leadership and other accomplishments, with emphasis on project and completion type work.

Additionally, the Offeror shall provide information for the Key Personnel team that addresses the following

nine elements: (i) Experienced in promoting and enabling change within an organization; (ii) Demonstrated

professional career progression within the last five (5) years; (iii) Recent experience in direct project

execution in the field; (iv) Experienced at partnering with client(s) that achieved measurable performance

improvements; (v) Experienced in developing innovative approaches and their implementation; (vi)

Experienced in incentive-based contracting; (vii) Experienced in employee incentive program design and

implementation; (viii) Experienced in commercial and public projects; and (ix) Experienced in successful

regulatory interactions and reform. While each key person may not necessarily possess each of the nine

elements, the key personnel team as a whole shall demonstrate each of the elements.

(i) Relevant experience in performing work similar to the work to be performed in their proposed position,

including leadership and other accomplishments, with emphasis on project and completion type work.

Additionally, the Offeror shall provide information for the Key Personnel team that addresses the following

nine elements: (i) Experienced in promoting and enabling change within an organization; (ii) Demonstrated

professional career progression within the last five (5) years; (iii) Recent experience in direct project execution

in the field; (iv) Experienced at partnering with client(s) that achieved measurable performance improvements;

(v) Experienced in developing innovative approaches and their implementation; (vi) Experienced in incentive-

based contracting; (vii) Experienced in employee incentive program design and implementation; (viii) Mixture

of Eexperienced in commercial and public projects; and (ix) Experienced in successful regulatory interactions

and reform. While each key person may not necessarily possess each of the nine elements, the key personnel

team as a whole shall demonstrate each of the elements.

Section L.13 DOE-L-2004

Proposal Preparation

Instructions, Volume II –

Factor 2: Technical and Management Approach (The Technical and Management Approach shall be

submitted in response to the PWS within Task Order 1 – Transition, Task Order 2 – End State Cleanup Work, and

Factor 2: Technical and Management Approach (The Technical and Management Approach shall be submitted

in response to the PWS within Task Order 1 – Transition, Task Order 2 – End State Cleanup Work, and Task

(4) Proposed small business goals shall be the percent of total subcontracted work specified in each

Task Order in compliance with the Offeror’s Master Small Business Subcontracting Plan. For

proposal preparation purposes, the Offeror shall submit separate subcontracting goals for each

Task Order for small business participation, and they shall comply with the goals in Table L-3,

the requirements of the Section H clause entitled, Subcontracted Work, and FAR 52.219-9.

Page 14: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

15

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Technical and Management

Approach (Oct 2015) (Revised)

Task Order 3 – Core Functions (Attachments L-11, L-12, and L-13) and shall not exceed 25 pages total (inclusive

of all Task Orders), exclusive of the integrated schedule.)

Order 3 – Core Functions (Attachments L-11, L-12, and L-13) and shall not exceed 25 pages total (inclusive of all

Task Ordersinstructions below), exclusive of the integrated schedule.)

Section L.15 Task Order

Proposal Preparation

Instructions, Volume III – Task

Order Cost and Fee Proposal

Paragraph (i)(1)(ii)

Section L.15 Task Order

Proposal Preparation

Instructions, Volume III – Task

Order Cost and Fee Proposal

Paragraph (j)(1)

Section L.15 Task Order

Proposal Preparation

Instructions, Volume III – Task

Order Cost and Fee Proposal

Paragraph (l)(4)(iii)(C)(I)

Page 15: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

16

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L.15 Task Order

Proposal Preparation

Instructions, Volume III – Task

Order Cost and Fee Proposal

Paragraph (k)(2)

Section L, Attachment L-2 Key

Personnel Standard Resume

Format

Relevant Experience: (Starting with current position and working backwards: Identify name and address of

employer, contract title, dates of employment, position titles, specified duties and responsibilities, and name, title

and phone number of supervisor. Address specific information on the relevant experience in performing work

scope similar to the work to be performed in their proposed position, including leadership and other

accomplishments, with emphasis on project and completion type work. Describe how work experience relates to

the solicitation and capability to function effectively in the proposed position. Describe record of past success and

accomplishments in performing work similar to that required for the proposed position, with emphasis on project

and completion type work. Additionally, the following elements may be described: (i) Experienced in promoting

and enabling change within an organization; (ii) Demonstrated professional career progression within the last five

(5) years; (iii) Recent experience in direct project execution in the field; (iv) Experienced at partnering with

client(s) that achieved measurable performance improvements; (v) Experienced in developing innovative

approaches and their implementation; (vi) Experienced in incentive-based contracting; (vii) Experienced in

employee incentive program design and implementation; (viii) Experienced in commercial and public projects;

and (ix) Experienced in successful regulatory interactions and reform.

Relevant Experience: (Starting with current position and working backwards: Identify name and address of

employer, contract title, dates of employment, position titles, specified duties and responsibilities, and name, title

and phone number of supervisor. Address specific information on the relevant experience in performing work

scope similar to the work to be performed in their proposed position, including leadership and other

accomplishments, with emphasis on project and completion type work. Describe how work experience relates to

the solicitation and capability to function effectively in the proposed position. Describe record of past success and

accomplishments in performing work similar to that required for the proposed position, with emphasis on project

and completion type work. Additionally, the following elements may be described: (i) Experienced in promoting

and enabling change within an organization; (ii) Demonstrated professional career progression within the last five

(5) years; (iii) Recent experience in direct project execution in the field; (iv) Experienced at partnering with

client(s) that achieved measurable performance improvements; (v) Experienced in developing innovative

approaches and their implementation; (vi) Experienced in incentive-based contracting; (vii) Experienced in

employee incentive program design and implementation; (viii) Mixture of eExperienced in commercial and public

projects; and (ix) Experienced in successful regulatory interactions and reform.

Section L, Attachment L-3 Past

Performance Reference

Information Form

Page 16: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

17

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-3 Past

Performance Reference

Information Form

Section L, Attachment L-8 Cost

Assumptions

Section L, Attachment L-11

Task Order 1 – Transition

Section B.2 DOE-B-2004 Cost-

No-Fee Task Order: Total

Estimated Cost (OCT 2014)

Paragraph (c)

(c) CLIN Description:

CLIN 00001 – Transition:

The Transition Period begins with the start date provided within the issuance of the initial Notice to Proceed

(NTP). The Incoming Transition Period dates are set forth in Section F Clause, DOE-F-2003, Period of

Performance – Alternate I and Alternate II. Costs are reimbursed based on allowable actual costs billed to

the Contract. There is no fee for the incoming contract Transition Period.

(c) CLIN Description:

CLIN 00001 – Transition:

The Transition Period begins with the start date provided within the issuance of the initial Notice to Proceed

(NTP). The Incoming Transition Period dates are set forth in Section F Clause, DOE-F-2003, Period of

Performance – Alternate I and Alternate II. Costs are reimbursed based on allowable actual costs billed to the

Contract. There is no fee for the incoming contract Transition Period.

Page 17: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

18

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-11

Task Order 1 – Transition

Section J, Attachment J-6

Separate Small Business

Subcontracting Goals

Section L, Attachment L-11

Task Order 1 – Transition

Section J, Attachment J-10

Contract Deliverables

Page 18: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

19

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-12

Task Order 2 – End States

Cleanup Work

Section C.4 Additional

Supplemental Scope

Information, Table C-3,

Subtask 2.

Page 19: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

20

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-12

Task Order 2 – End States

Cleanup Work

Section C.4 Additional

Supplemental Scope

Information, Table C-3,

Subtask 3.

Page 20: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

21

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-12

Task Order 2 – End States

Cleanup Work

Section C.4 Additional

Supplemental Scope

Information, Table C-3,

Subtask 5.

Section L, Attachment L-12

Task Order 2 – End States

Cleanup Work

Section C.4 Additional

Supplemental Scope

Information, Table C-5,

Subtask 5.

Page 21: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

22

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-12

Task Order 2 – End States

Cleanup Work

Section J-10 Contract

Deliverables

Page 22: Amendment 000001 to Solicitation No. 89303318REM000008€¦ · Amendment 000001 to Solicitation No. 89303318REM000008 RFP Section Reference Final RFP Posting Amendment 1 Posting Section

CENTRAL PLATEAU CLEANUP CONTRACT – FINAL RFP SOLICITATION NO. 89303318REM000008, AMENDMENT 1

23

Amendment 000001 to Solicitation No. 89303318REM000008

RFP Section Reference Final RFP Posting Amendment 1 Posting

Section L, Attachment L-13

Task Order 3 – Core Functions

Section J-6 Separate Small

Business Subcontracting Goals

Section M.2 Evaluation Factor

– Key Personnel

Paragraph (b)(1)

(1) Experience. The key personnel will be evaluated on their relevant experience in performing work similar to

the work to be performed in their proposed position, including leadership and other accomplishments, with

emphasis on project and completion type work. Additionally, the SEB will consider the following nine

elements for the overall key personnel team collectively: (i) Experienced in promoting and enabling change

within an organization; (ii) Demonstrated professional career progression within the last five (5) years; (iii)

Recent experience in direct project execution in the field; (iv) Experienced at partnering with client(s) that

achieved measurable performance improvements; (v) Experienced in developing innovative approaches and

their implementation; (vi) Experienced in incentive-based contracting; (vii) Experienced in employee

incentive program design and implementation; (viii) Experienced in commercial and public projects; and (ix)

Experienced in successful regulatory interactions and reform. While each key person may not necessarily

possess each of the nine elements, the key personnel team as a whole shall demonstrate each of the elements.

(1) Experience. The key personnel will be evaluated on their relevant experience in performing work similar to

the work to be performed in their proposed position, including leadership and other accomplishments, with

emphasis on project and completion type work. Additionally, the SEB will consider the following nine

elements for the overall key personnel team collectively: (i) Experienced in promoting and enabling change

within an organization; (ii) Demonstrated professional career progression within the last five (5) years; (iii)

Recent experience in direct project execution in the field; (iv) Experienced at partnering with client(s) that

achieved measurable performance improvements; (v) Experienced in developing innovative approaches and

their implementation; (vi) Experienced in incentive-based contracting; (vii) Experienced in employee

incentive program design and implementation; (viii) Mixture of eExperienced in commercial and public

projects; and (ix) Experienced in successful regulatory interactions and reform. While each key person may

not necessarily possess each of the nine elements, the key personnel team as a whole shall demonstrate each of

the elements.