January 28, 2010 AET 10-0010 ATTN: Document Control Desk Mr. Michael F. Weber Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 American Centrifuge Lead Cascade Facility Docket Number 70-7003; License Number SNM-7003 American Centrifuge Plant Docket Number 70-7004; License Number SNM-2011 Annual Summary Report of Facility Changes Dear Mr. Weber: In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2), USEC Inc. hereby submits a brief summary of the facility changes (made without prior U.S. Nuclear Regulatory Commission approval in accordance with 10 CFR 70.72) to the records required by 10 CFR 70.62(a)(2) for calendar year 2009. Enclosure 1 provides the summary of facility changes for the American Centrifuge Lead Cascade Facility. Enclosure 2 provides the summary of facility changes for the American Centrifuge Plant. If you have any questions regarding this matter, please contact me at (301) 564-3470 or Terry Sensue at (740) 897-2412. Sincewly, Peter J. Mi r Director, Regulatory and Quality Assurance Enclosures: As Stated cc: J. Downs - NRC HQ J. Henson - NRC RII B. Smith - NRC HQ 0. Siurano - NRC HQ USEC Inc. _ 1 t{-k 5O 0 6903 Rockledge Drive, Bethesda, MD 20817-1818 Telephone 301-564-3200 Fax 301-564-3201 http://www.usec.com

Upload: others

Post on 30-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

January 28, 2010AET 10-0010

ATTN: Document Control DeskMr. Michael F. WeberDirector, Office of Nuclear Material Safety and SafeguardsU.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001

American Centrifuge Lead Cascade FacilityDocket Number 70-7003; License Number SNM-7003American Centrifuge PlantDocket Number 70-7004; License Number SNM-2011Annual Summary Report of Facility Changes

Dear Mr. Weber:

In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2), USEC Inc. herebysubmits a brief summary of the facility changes (made without prior U.S. Nuclear RegulatoryCommission approval in accordance with 10 CFR 70.72) to the records required by 10 CFR70.62(a)(2) for calendar year 2009. Enclosure 1 provides the summary of facility changes for theAmerican Centrifuge Lead Cascade Facility. Enclosure 2 provides the summary of facilitychanges for the American Centrifuge Plant.

If you have any questions regarding this matter, please contact me at (301) 564-3470 or TerrySensue at (740) 897-2412.

Sincewly,

Peter J. Mi r

Director, Regulatory and Quality Assurance

Enclosures: As Stated

cc: J. Downs - NRC HQJ. Henson - NRC RIIB. Smith - NRC HQ0. Siurano - NRC HQ

USEC Inc. _1 t{-k 5O 06903 Rockledge Drive, Bethesda, MD 20817-1818

Telephone 301-564-3200 Fax 301-564-3201 http://www.usec.com

Page 2: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

Enclosure 1 to AET 10-0010

Summary of Facility Changes for the American Centrifuge Lead Cascade FacilityCalendar Year 2009

Page 3: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

2009 Brief Summary of Changes for theAmerican Centrifuge Lead Cascade Facility

ISA

Summary Reason NRCFCE Number Rev. Approval Change -. Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 07-0317 2 Title: American Centrifuge Plant Material Disposition 3/4/2009 No ESO-3604-0002 Rev 0 No None of the criteriaSOW-310101 -0001 listed in

Description of Change: Rev 2 10CFR70.72(c) areExtends the period of performance of disposal activities. It also includes met.the material stored in X-7725.

Reason for the Change:It took longer than expected to dispose of the equipment. Thisequipment needs to be removed from the area to allow AmericanCentrifuge Plant refurbishment activities to continue.

FCE 08-0106 1 Title: Replace Existing Lead Cascade Facility Evacuation Vacuum and 6/2/2009 No ESO-2201-0004 Rev 0 No None of the criteriaPurge Vacuum Pumps listed in

Description of Change: 10CFR70.72(c) are

This revision corrected the number of the document being changed. The met.

correct number is ESO-2201-0004 Rev 0. No additional changes wereevaluated.

Reason for the Change:Revision 0 listed an incorrect document number.

FCE 08-0129 1 Title: Modifications to Machine Vacuum System in Centrifuge Training 5/4/2009 No None No None of the criteriaand Testing Facility listed in

Description of Change: 10CFR70.72(c) are

Revision 1 provides descriptive detail that was missing from the met.

responses to questions in the original change evaluation. No additionalchanges were evaluated.

Reason for the Change:Revision 1 corrected an omission in the documentation of this changeevaluation.

FCE 08-0196 1 Title: Cooling Tower Cone Valves Refurbishment 1/13/2009 Yes ESO-310109-0001, No None of the criteriaSOW-310109-0002 listed in

Description of Change: Rev 0, 10CFR70.72(c) areThis revision adds three hot taps in the 48 inch piping header of the X- ECR-310109-0001-02 met.6000 Pump House. The hot taps are used for the installation of plugstoppers.

Reason for the Change:Plug stoppers are necessary to provide positive isolation while replacingleaking butterfly valves while maintaining the necessary cooling towerflow to the process systems.

Wednesday, January 27, 2010 Page 1 of 110

Page 4: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 08-0215 1 Title: Issue Curti ss-Wright's Security Program, CW-SP-01, and 1/9/2009 No CW-SP-01 No None of the criteriaAccompanying Information System Security Plans CW-ADP-01 listed in

CW-ADP-02 100FR70.72(c) areDescription of Change: CW-ADP-03 met.

implementation of changes to security program and Information System All Rev 0 - updated

Security Plans and associated Information System Security Plans for

Curtiss-Wright's Cheswick, Pennsylvania facilities.

Reason for the Change:Documents were updated to address issues identified during Curtiss-Wright internal readiness review and U.S. Department of Energy andU.S. Nuclear Regulatory Commission regulatory reviews.

FCE 08-0227 3 Title: Lead Cascade 3 Machine Build Support 2/27/2009 Yes ESO-2303-0011 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Modify lift fixtures, electrical power, instrumentation, piping systems, met.

handrail, loading dock, monorail and other modification to support Lead

Cascade 3 build.

Reason for the Change:Changes are needed to operate Lead Cascade 3.

FCE 08-0235 1 Title: X-300.I/X-3002 Roof Repairs 4/27/2009 Yes ESO-310109-002, No None of the criteriaSOW-310109-0003 listed in

Description of Change: Rev 0 1 OCFR70.72(c) areRepair X-3001 and X-3002 roof leaks using an improved polyurethane met.foam system and a silicon sealant.

Reason for the Change:Stop leaks during inclement weather using improved methods comparedto original roof construction.

FCE 08-0247 1 Title: New Procedure AC4-AO-001, Machine Assembly, Lead Cascade 6/22/2009 No AC4-AO-001 Chg 0 No None of the criteria3 Build listed in

Description of Change: 10CFR70.72(c)are

Revision 1 is an editorial change to correct a procedure number error in met.

the original change evaluation. No additional changes were evaluated.

Reason for the Change:Correction of a procedure number error.

Wednesday, January 27, 2010 Page 2 of 110

Page 5: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 08-0278 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No AC4-AO-001 Chg 1 No None of the criteriaCascade 3 Build listed in

Description of Change: 1 eCFR70.72(c) are

Revision 1 is an editorial change to correct a procedure revision number met.

error in the original change evaluation. No additional changes wereevaluated.

Reason for the Change:Correction of a procedure revision number error.

FCE 08-0280 1 Title: Static Assembly Stand Demolition 5/4/2009 No CWP #RAFMAA-8001 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areRevision 1 evaluates pen and ink field changes to the work package for met.demolition and removal of selected electrical, piping, and structuralcomponents and debris associated with the static stands used formachine assembly.

Reason for the Change:Work package required correction of drawing revision numbers and titlesand oversight responsibility.

FCE 08-0289 1 Title: Relocate the "At A Position" Limit Trip on X-3001 Rigid Mast 6/11/2009 No None No None of the criteriaCranes listed in

Description of Change: 10CFR70.72(c) areRevision 1 provided information that was missing from the original met.

change evaluation form. No additional changes were evaluated.

Reason for the Change:Management assessment identified the omission of required informationon the original evaluation of the proposed change.

FCE 08-0295 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No AC4-AO-001 Chg 2 No None of the criteriaCascade 3 Build listed in

Description of Change: 10CFR70.72(c) are

Revision 1 is an editorial change to correct a procedure revision number met.

error in the original change evaluation. No additional changes wereevaluated.

Reason for the Change:Correction of a procedure revision number error.

Wednesday, January 27, 2010 Page 3 of 110

Page 6: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 08-0304 1 Title: Dry Air Distribution Foundations 2/20/2009 No CWP #BOPOUT-1 201 No None of the criteriaRev 0 listed in

Description of Change: PIC #1,2,3 1 OCFR70.72(c) areRevision 1 evaluates pen and ink field changes to the work package for met.installation of foundations, piers, grounding, guard posts and rails forsupport structures for above ground branch lines of the dry air distributionsystem. These minor changes did not change the conclusion of theoriginal change evaluation.

Reason for the Change:Work package required minor field corrections.

FCE 08-0304 2 Title: Dry Air Distribution Foundations 6/23/2009 No CWP #BOPOUT-1201 No None of the criteriaRev 0 listed in

Description of Change: PIC #4,5,6,7,8,9,10 10CFR70.72(c) areRevision 2 evaluates additional pen and ink field changes to the work met.package for installation of foundations, piers, grounding, guard posts andrails for support structures for above ground branch lines of the dry airdistribution system. These minor changes did not change the conclusionsof Revision 0 or Revision 1 of the change evaluation.

Reason for the Change:Work package required minor field corrections.

FCE 08-0309 0 Title: Revision to Procedure ACD2-QM-011, Resolving Contractor 1/12/2009 No ACD2-QM-011 Chg 4 No None of the criteriaIssues listed in

Description of Change: 1OCFR70.72(c) are

Add definitions, requirements, and responsible organization, deleted met.

unnecessary reference, clarified instructions, and revised associatedform AC-381 to reflect those changes.

Reason for the Change:Clarify procedure requirements.

FCE 08-0311 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly Lead 6/22/2009 No AC4-AO-001 Chg 3 No None of the criteriaCascade 3 Build listed in

1OCFR7O.72(c) areDescription of Change: met.Revision 1 is an editorial change to correct a procedure revision number met.

error in the original change evaluation. No additional changes wereevaluated.

Reason for the Change:Correction of a procedure revision number error.

Wednesday, January 27, 2010 Page 4 of 110

Page 7: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 08-0312 0 Title: Changes to License Application Chapter 5 1/13/2009 No License Application Ch 5 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Correct the wording used to describe trending of deficiencies related to met.

the nuclear criticality safety program, and correct a reference to Chapter

11.6,

Reason for the Change:Corrective action for Condition Notification 1827 which identified theincorrect trending language and reference.

FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) are

Construction Work Package for proposed fabrication, installation, met.

inspection and testing of structural steel beams, framing, pipe supports

and other miscellaneous structural steel members in building X-3002, inthe area bordered by column lines El to E32.

Reason for the Change:Provide supports for future installation of piping, conduit, cable trays andother types of equipment for the American Centrifuge Plant.

FCE 08-0314 1 Title: Structural Steel Erection 5/22/2009 Yes CWP #PB2SOU-1 201 No None of the criteriaRev 1 listed in.•Description of Change: 10CFR70.72(c) are

Revision 1 addresses changes to the construction work package met.

fabrication, installation, inspection and testing of structural steel beams,

framing, pipe supports and other miscellaneous structural steel membersin building X-3002, in the area bordered by column lines E3 to E32. Theeffort will include bolting, welding, reaming, chipping, cutting, and touch-up painting.

Reason for the Change:Provide additional work package detail regarding supports for futureinstallation of piping, conduit, cable trays and other types of equipmentfor the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 5 of 110

Page 8: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA .

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 08-0315 1 Title: Installation of Boiler Stacks 5/1/2009 No BOPBLR-3003 Rev 0 No None of the criteriaPIC #1 & 2 listed in

Description of Change: 10CFR70.72(c) areRevision 1 evaluates pen and ink field changes to the work package for met.installation of three boiler stacks and associated ladders, platforms, anddavits in the X-6002 Boiler House. The changes update the drawing listand do not change the conclusions reached in the original changeevaluation.

Reason for the Change:Work package required update of referenced drawings.

FCE 08-0315 2 Title: Installation of Boiler Stacks 8/12/2009 No BOPBLR-3003 Rev 1 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRevision 2 evaluates the addition of nine drawings to the work package met.for installation of three boiler stacks and associated ladders, platforms,and davits in the X-6002 Boiler House. The changes do not change theconclusions reached in the original change evaluation.

Reason for the Change:Work package required update of referenced drawings.

FCE 08-0318 0 Title: Revision to Procedure ACD2-SH-024, Traffic Rules and 1/14/2009 No ACD2-SH-024 Chg 1 No None of the criteriaRegulations listed in

100FR7O.72(c) areDescription of Change: met.Allow a running vehicle to be left unattended during inclement weatherwhen specified requirements have been met.

Reason for the Change:Clarify procedure requirements.

FCE 08-0320 0 Title: Revision to Procedure AC4-AR-004, Purge Vacuum System 6/12/2009 No AC4-AR-004 Chg 8 No None of the criteriaAlarms and Responses listed in

10CFR70.72(c) areDescription of Change: met.Add new fault alarms and actions for vacuum pumps and panel.

Reason for the Change:Received further information from engineering.

Wednesday, January 27, 2010 Page 6 of 110

Page 9: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0002 0 Title: Additional Green Zone 10 Plex, Welding Trailer and Support 1/5/2009 Yes CWP #BOPOUT-9102 No None of the criteriaFacilities Rev 0 listed in

Description of Change: 10CFR70.72(c) are

Provide utilities, prepare grounds, and add new trailers in the Green met.

Zone, outside the American Centrifuge Plant's Controlled Access Area, tosupport Fluor's construction activities.

Reason for the Change:Additional office space and construction facilities are needed to supportongoing construction activities.

FCE 09-0003 0 Title: Revision to OA-CS-LC3-09-002, Lead Cascade 3 Centrifuge 10/13/2009 Yes OA-CS-LC3-09-002 No None of the criteriaOperating Parameters (U) Rev 3 listed in 10 CFR

Description of Change: 70.72(c) are met.

Change the Lead Cascade 3 operating parameters.

Reason for the Change:The Cascade Settings is being revised to incorporate changes to thediffusion pump operating limits made to account for a change in thediffusion pump temperature probe position. The probe has beenrepositioned by the diffusion pump manufacturer to provide extended lifeof the probe.

FCE 09-0005 0 Title: New Test Plan TP-2201-0026, Test Plan for Machine Casing 10/29/2009 Yes TP-2201-0026 Rev 0 No None of the criteriaLead Cascade listed in -

Description of Change: 1 eCFR70.72(c) are

Placement of accelerometers on centrifuge casing and record data met.

during operations.

Reason for the Change:The test plan is necessary to obtain vibration data on centrifuge casingduring operations.

FCE 09-0006 0 Title: Revision to Procedure AC4-OP-024, Machine Pumpdown 2/5/2009 No AC4-OP-024 Chg 15 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRevision to address pumpdown termination in relation to leak checking or met.rate of rise.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 7 of 110

Page 10: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0007 0 Title: Revision to Procedure AC4-OP-049, Machine Acceleration & 1/23/2009 No AC4-OP-049 Chg 22 No None of the criteriaDeceleration listed in

10CFR70.72(c) areDescription of Change:

met.

Clarify instructions for connections and bump testing.

Reason for the Change:Clarify procedure requirements based on operational experience.

FCE 09-0008 0 Title: Revision to Procedure ACD2-TP-002, Training Program 2/4/2009 No ACD2-TP-002 Chg 4 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRequire documentation of off-site or vendor training, modify forms, met.update references, and make other editorial changes and clarifications.

Reason for the Change:Clarify procedure requirements for process improvement and correctionaction for a condition notification.

FCE 09-0009 0 Title: Revision to Procedure ACD2-PS-001, Document Control Process 2/9/2009 No ACD2-PS-001 Chg 1 No None of the criterialisted in o"

Description of Change: 1OCFR70.72(c) areProvide guidance on relocating or stopping distribution of controlled met.copies, clarified page numbering and handling of drawing revisions, andother editorial changes.

Reason for the Change:Clarify procedure requirements for process improvement and correctiveactions for a condition notification.

FCE 09-0010 0 Title: Revision to Procedure ACD2-PS-002, Records Management 2/9/2009 No ACD2-PS-002 Chg 1 No None of the criteriaProcess listed in

Description of Change: 10CFR70.72(c) are

Provide guidance on making documents searchable, generation of met.

classified documents, inclusion of retention periods, update of referencesand other editorial clarifications.

Reason for the Change:Clarify procedure requirements for process improvement.

Wednesday, January 27, 2010 Page 8 of 11I0

Page 11: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0011 0 Title: New Procedure ACD4-SH-008, Operation of Extech HT30 Heat 3/19/2009 No ACD4-SH-008 Chg 0 No None of the criteriaStress Meter listed in

Description of Change: 10CFR70.72(c) are

Develop new procedure to provide operating instructions for heat stress met.meters.

Reason for the Change:Provide instructions for industrial hygiene equipment use.

FCE 09-0012 0 Title: Elimination of Monitoring Station #8 5/1/2009 No Emergency Plan No None of the criteriaSection 1 listed in

Description of Change: 10CFR70.72(c) areRemove Monitoring Station #8 from the Emergency Plan text and met.figures. This station, which previously provided monitoring support in theevent of a nuclear criticality accident in the U.S. Department of Energy'sradioactive waste storage and shipping areas in building X-7725, is nolonger needed.

Reason for the Change:Monitoring Station #8 is not needed because nearby building X-7725 nolonger houses fissile material operations.

FCE 09-0013 0 Title: X-6002 Boiler House Fire Protection 1/8/2009 Yes CWP #BOPFIR-4102 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areInstall fire protection sprinkler system and associated equipment met.throughout the X-6002 Boiler House.

Reason for the Change:Provide fire protection for this new facility.

FCE 09-0016 0 Title: Lead Cascade Facility and American Centrifuge Plant 4/30/2009 No License Application No None of the criteriaOrganizational Changes Ch 1 and 2, listed in

Quality Assurance 10CFR70.72(c) areDescription of Change: Program Description met.Appointment of an Integrated Systems Test/Start-Up Manager, and Ch 1addition of this position and Procurement Manager information in theorganization description in the License Application. Add new Senior VicePresident to the list of principle officers.

Reason for the Change:Provide more management attention to integrated systems test and start-up activities, address a reportability deficiency and update principalofficer information in licensing documents.

Wednesday, January 27, 2010 Page 9 of 110

Page 12: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0017 0 Title: Revision to Procedure AC4-OP-064, Valve Positioning Controls 1/12/2009 No AC4-OP-064 Chg 4 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) are -

Clarify re-verification of valves that are cycled and corrects instructions met.for completion of the Valve Lineup Check Sheet form AC-264.

Reason for the Change:Clarify procedure requirements.

FCE 09-0018 0 Title: Revision to Procedure AC4-ON-007, Machine Instrument 1/23/2009 No AC4-ON-007 Chg 7 No None of the criteriaPackage Replacement At An Operating Position listed in

Description of Change: 1 eCFR70.72(c) areIncorporate operation of Lead Cascade 3 machines. met.

Reason for the Change:Revised steps to ensure proper operation of latest machine design.

FCE 09-0019 0 Title: X-6002 Boiler House Mechanical Piping 1/21/2009 Yes CWP #BOPBLR-4001 No None of the criteriaRev 0 listed in

Description of Change: 1 OCFR7.72(c) areInstallation, cleaning and testing of piping and equipment for systems met.located in secondary building X-6002, Boiler House.

Reason for the Change:Continuation of construction activities needed to make the boiler facilityoperational.

FCE 09-0019 1 Title: X-6002 Boiler House Mechanical Piping 6/22/2009 Yes CWP #BOPBLR-4001 No None of the criteriaRev 0 listed in

Description of Change: PIC 1,2,3,4 and Ch 1,2,3 1OCFR70.72(c) areAdministrative and pen and ink changes to the work package for met.installation, cleaning and testing of piping and equipment for systemslocated in secondary building X-6002, Boiler House. The work packagechanges are bounded by the original evaluation.

Reason for the Change:Update of drawings and specifications for the work package.

Wednesday, January 27, 2010 Page 10 of 110

Page 13: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlCommentsi7

FCE 09-0020 0 Title: Install Temporary Welding Power Cables 2/13/2009 Yes CWP #PB2SOU-9101 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areInstallation of temporary power feeder cables and receptacles in building met.X-3002.

Reason for the Change:Power sources are needed for welding units to be used duringconstruction activities in X-3002.

FCE 09-0021 0 Title: Change to Design Documents for Casing Lift Beam 1/13/2009 No ESO-2303-0009 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areChange casing lift fixture drawings to document load test criteria and met.fixture item specifications.

Reason for the Change:Provide additional load test requirements when lifting legs are replaced.

FCE 09-0022 0 Title: Revision to Procedure AC2-RG-071, Nuclear Material Control and 1/14/2009 No AC2-RG-071 Chg 4 No None of the criteriaAccountability (NMC&A) for the American Centrifuge Lead listed inCascade 10CFR70.72(c) are

met.Description of Change:

Define process holdup, describe a measurement method for holdup, andadd a reference to the corrective action process procedure.

Reason for the Change:Clarify procedure requirements.

FCE 09-0024 0 Title: Sublease of X-5000 and Associated Facilities 2/25/2009 No Exhibit A to the No None of the criteriaGas Centrifuge listed in

Description of Change: Enrichment Plant Lease 10CFR70.72(c) areAdd X-5000, electrical power system, and associated facilities (X-5000, X- met.5001, X-5015, X-5001A, X-5001 B, X-2215A, X-2215B, X-2215C, and X-530G to the Gas Centrifuge Enrichment Project Lease, and include thefacilities in the License Application discussion of secondary facilities forthe American.Centrifuge Plant.

Reason for the Change:Provide American Centrifuge Plant control over the electrical distributionsystem to facilitate construction activities.

Wednesday, January 27, 2010 Page 11 of 110

Page 14: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0025 0 Title: Correct Backfill Unit Drawings 1/16/2009 No ESO-2201-0010, No None of the criteriaEngineering Drawings listed in

Description of Change: X-3001-961-Cl, 10CFR70.72(c) areChange drawings to correct the orientation of a pressure relief valve. X-3001-962-Cl met.

Reason for the Change:Correct an inaccuracy in the engineering drawings for backfill units.

FCE 09-0028 0 Title: Refurbishment of X-7725 Elevator 2/11/2009 No ESO-3102-0004, No None of the criteriaSOW-3906-0001 Rev 1 listed in

Description of Change: 10CFR70.72(c) areRefurbish/upgrade Elevator #8 in Building X-7725 to meet the original m et.design requirements and applicable Occupational Safety and HealthAdministration, National Fire Protection Association, and AmericanSociety of Mechanical Engineers codes. Not all of the original designrequirements had been installed when the original U.S. Department ofEnergy installation project was cancelled in the 1980's.

Reason for the Change:Existing elevator controls were obsolete or did not fully meet the intent ofthe original design.

FCE 09-0029 0 Title: New Procedure ACD2-FO-001, Facility Management 2/9/2009 No ACD2-FO-001 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Develop new procedure to establish the responsibilities of the facility met.

custodians.

Reason for the Change:Documentation of responsibilities was needed.

FCE 09-0030 0 Title: Test Plan Service Module Piping / Valve Modifications 1/23/2009 No TP-2201-0020 Rev 0, No None of the criteriaEXO-2202-0008 Rev 0 listed in

Description of Change: 1OCFR70.72(c) arePost-modification leak testing of Lead Cascade 3 Service Module piping. met.

Reason for the Change:Verify the installed piping and valves are functional and will performsatisfactorily in service.

Wednesday, January 27, 2010 Page 12 of 110

Page 15: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0031 0 Title: Revision to Procedure AC4-OP-030, Operation of the Cylinder 1/20/2009 No AC4-OP-030 Chg 6 No None of the criteriaScale listed in

Description of Change: 1OCFR70.72(c) are

Change the scale name from KC300 to F201. met.

Reason for the Change:To match in field markings.

FCE 09-0034 0 Title: Dry Air Distribution Piping Structural Steel 1/26/2009 No CWP #BOPOUT-1 202 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) are

Work Package for the installation of new structural steel piping support met.

structures, connect and test electrical grounding, and touch-up painting

of structures for Dry Air Distribution system piping, in or near buildings X-3001, X-3002, X-3346, X-6000, X-6002, X-7721 and X-7727H.

Reason for the Change:Support restoration of the Dry Air Distribution system to a serviceableand well-maintained condition.

FCE 09-0034 1 Title: Dry Air Distribution Piping Structural Steel 4/7/2009 No None No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Revision 1 expanded the original change evaluation to identify any met.

design criteria or system requirements that might apply to the proposed

change. No additional changes were evaluated.

Reason for the Change:Update change evaluation to document additional documents reviewedfor impact on the proposed change.

FCE 09-0034 2 Title: Dry Air Distribution Piping Structural Steel 5/26/2009 No CWP #BOPOUT-1202 No None of the criteriaRev 1 listed in

Description of Change: 10CFR70.72(c) are

Revision 2 evaluates changes to the Work Package to clearly identify the met.

Quality Level-1 work associated with the installation of new pipe support

on existing steel inside building X-3002. No additional changes wereevaluated.

Reason for the Change:Update change evaluation to document a higher quality level for a portionof the steel work.

Wednesday, January 27, 2010 Page 13of 110

Page 16: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0036 0 Title: Structural Steel Erection in X-3002 South Mezzanine 2/3/2009 Yes CWP #PB2SOU-1203 No None of the criteriaRev 0 listed in

Description of Change: 1OCFR70.72(c) areWork Package to install, inspect, and test structural steel beams, met.framing, pipe supports and other steel members in building X-3002.

Reason for the Change:New supports are required for future installation of piping, conduit, cabletrays, and other types of equipment for the American Centrifuge Plant.

FCE 09-0036 1 Title: Structural Steel Erection in X-3002 South Mezzanine 5/14/2009 Yes CWP #PB2SOU-1203 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areRevision 1 evaluates changes to the Work Package to include work in met.the Valve House to the west of X-3002.

Reason for the Change:Expand work package to cover additional area.

FCE 09-0039 0 Title: Revision to Procedure ACD2-EG-007, Integrated Safety Analysis 1/22/2009 No ACD2-EG-007 Chg 2 No None of the criteriaMethodology and Change Process listed in

Description of Change: 1 eCFR70.72(c) are

Provide additional instruction for development and maintenance of the met.

Integrated Safety Analysis; more clearly define responsibilities andtraining requirements; allow use of e-mail in making comments; updatereferences and forms.

Reason for the Change:Clarify procedure requirements for developing and maintaining theIntegrated Safety Analysis.

FCE 09-0040 0 Title: Revision to Procedure AC4-OP-024, Machine Pumpdown 1/22/2009 No AC4-OP-024 Chg 14 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areClarify operation of the Purge Vacuum System. met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 14 of110

Page 17: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0041 0 Title: Machine Level Pin Adjustment for AC100 Machine Casings 1/22/2009 Yes ESO-2303-0020 No None of the criteria

Description of Change: 10CFR70.72(c) are

Fabrication of pins to be pressed into Secondary Alignment bars for met.

alignment of Lead Cascade 3/AC100 machines when installing them in

the machine mount locations.

Reason for the Change:Aid in alignment of centrifuge machines during installation.

FCE.09-0042 0 Title: Revision of Procedure ACD2-SH-001, Hazard Communication 1/23/2009 No ACD2-SH-001 Chg 2 No None of the criteriaProgram listed in

Description of Change: 1 eCFR70.72(c) are

Correct formatting and update instructions for accessing the Material met.

Safety Data Sheet database on the USEC Inc. intranet.

Reason for the Change:Clarify procedure requirements.

FCE 09-0043 0 Title: Revision of Procedure ACD2-SH-015, Instructions for 4/23/2009 No ACD2-SH-015 Chg 1 No None of the criteriaLockout/Tagout listed in

Description of Change: 1 eCFR70.72(c) are

Clarify responsibilities and actions required for single-source or permit-required lockout/tagout.

Reason for the Change:Clarify procedure requirements.

FCE 09-0044 0 Title: Revision of Procedure AC4-OP-002, Evacuation Vacuum Normal 1/27/2009 No AC4-OP-002 Chg 13 No None of the criteriaOperating Procedure listed in

Description of Change: 1OCFR70.72(c) are

Add instruction for proper shutdown and restart of air ejector, and copies met.

other instructions from the Purge Vacuum procedure.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 15 of110

Page 18: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0045 0 Title: Revision of Procedure ACD2-QM-101, Inspection Program

Description of Change:Change the title; clarify the steps for requesting, performing, anddocumenting the results of inspections, conditional release, anddedication of commercial grade items; delete unnecessary steps andflowcharts; and made other editorial and format changes.

Reason for the Change:Clarify procedure requirements.

1/30/2009 No ACD2-QM-101 Chg 5 No None of the criterialisted in

1OCFR70.72(c) aremet.

FCE 09-0046 0 Title: New Facility Waste Management Plan for Recycle / Assembly and 2/11/2009 No ESH-343-09-003 Rev 0 No None of the criteriaCentrifuge Training and Test Facility listed in

Description of Change: 1 eCFR70.72(c) are

Develop Facility Waste Management Plan to describe waste generation, met.

management, and disposal of waste generated in the Recycle / Assemblyand Centrifuge Training and Test Facility. This includes theresponsibilities, equipment requirements, and oversight needed by eachgenerator to manage their waste in accordance with federal, state, andlocal regulations.

Reason for the Change:Provide strategy for waste management to comply with regulations forwaste recycling and disposal.

FCE 09-0047 0 Title: Revision of Procedure ACD4-HP-001, Radiological Surveys 1/27/2009 No ACD4-HP-001 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Add a radiological survey continuation sheet, Form AC-480. met.

Reason for the Change:Provide additional format for documenting radiological surveys.

FCE 09-0048 0 Title: Centrifuge Training and Test Facility Articulator Controls 1/30/2009 No ESO-2303-0019, No None of the criteriaImprovement SOW-2303-0013 listed in

Description of Change: 1OCFR70.72(c) are

Design, construction, and use of an additional articulator pendant met.

controller to improve accuracy and consistency of casing alignmentduring assembly of Lead Cascade Facility machines.

Reason for the Change:Improve machine building efficiency and reduce costs.

Wednesday, January 27, 2010 Page 16 of 110

Page 19: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0049 0 Title: Revision of Procedure AC4-OP-025, Machine Connections 2/4/2009 No AC4-OP-025 Chg 10 No None of the criteria

Description of Change: 100FR7e.72(c) are

Clarify the machine connection process in the Lead Cascade Facility to met.

ensure proper physical and electrical connections are made.

Reason for the Change:Clarify procedure requirements.

FCE 09-0050 0 Title: Revision of Procedure AC4-OP-055, Machine Disconnect 2/4/2009 No AC4-OP-055 Chg 8 No None of the criteria

Description of Change: 100FR70.72(c) are

Clarify the machine disconnect process in the Lead Cascade Facility to met.

ensure proper physical and electrical machine disconnections arecompleted.

Reason for the Change:Clarify procedure requirements.

FCE 09-0051 0 Title: Gateline Demolition 3/27/2009 Yes CWP #RAMAPR-8001 No None of the criteriaRev 0 listed in

Description of Change: 1OCFR7O.72(c) areWork Package to demolish and remove structural steel and electrical met.conduit and wiring associated with the Gateline structure in building X-7725.

Reason for the Change:The existing structure will not be used for the American CentrifugeProject.

FCE 09-0053 0 Title: Revision of Procedure ACD2-CI-002, Inspection of Rigging and 3/18/2009 No ACD2-CI-002 Chg 4 No None of the criteriaMaterial Handling Equipment listed in

Description of Change: 10CFR70.72(c) are

Change title, clarify requirements and add references. met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 17 of 110

Page 20: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0054 0 Title: Revision of Procedure ACD2-QM-005, Supplier Control Program 2/11/2009 No ACD2-QM-005 Chg 6 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRevise procedure and associated forms AC-399 and AC-032 to provide met.clarification and additional guidance.

Reason for the Change:Clarify procedure requirements.

FCE 09-0055 0 Title: Revision to Procedure AC4-AR-006, Lead Cascade 1 Cascade 2/5/2009 No AC4-AR-006 Chg 7 No None of the criteriaAlarms and Responses listed in

.- 10CFR70.72(c) areDescription of Change:

met.

Add new cascade alarms.

Reason for the Change:To reflect alarms added to the Distributive Control System.

FCE 09-0056 0 Title: Install Service Modules (End and Aisle Frames) 5/29/2009 Yes CWP #SMPB2S-3001 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) are

Work Package to erect, assemble, and install the X-3002 Service met.

Modules product end frames, tail end frames, and aisle frames for trains

5, 6, 7, and 8. Project also includes installation of electrical groundingstraps, painting, test and inspection activities.

Reason for the Change:New Service Modules and associated piping are required for futurecentrifuge operation.

FCE 09-0057 0 Title: Fire Suppression System Modification in Building X-7725 6/1/2009 Yes CWP #BOPFIR-4123 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package to reconfigure a section of the wet pipe sprinkler system met.on the first floor and fifth floor of X-7725.

Reason for the Change:To accommodate construction of the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 18 of 110

Page 21: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0058 0 Title: Refurbish Cranes and Hoists 5/26/2009 No CWP #RAOTHR-3013 No None of the criteriaRev 1 listed in

Description of Change: 1R 1FR7.72(c) areWork Package to refurbish/upgrade mechanical, electrical, and control met.systems on the Recycle/Assembly bridge crane and six underhung bridgecranes in building X-7725.

Reason for the Change:Refurbished cranes are needed to support construction of the AmericanCentrifuge Plant.

FCE 09-0060 0 Title: Revision to ACD2-EC-006, National Pollutant Discharge 2/20/2009 No ACD2-EC-006 Chg 1 No None of the criteriaElimination System Compliance Procedure listed in

Description of Change: 10CFR70.72(c) are

Incorporate recording of flow measurements each day, including met.

weekends and holidays, for American Centrifuge's National PollutantDischarge Elimination System-permitted outfalls, and initiate a new formAC-484, on which the flow measurements will be recorded.

Reason for the Change:To expand flow measurement recording from weekdays to every day, tobe performed by American Centrifuge personnel instead of byenvironmental technicians from the Gaseous Diffusion Plant.

FCE 09-0061 0 Title: Change Portal Staffing Hours and Transport of Mail 6/17/2009 No ACD2-PS-004 Chg 3, No None of the criteriaSP-2605-0005 Rev 9 listed in

Description of Change: 1OCFR70.72(c) areChange Security personnel staffing hours for the Visitor Control portal met.from 0630-1800 to match normal weekday work hours of 0700-1630.Also allow either Q-cleared Security personnel or Q-cleared RecordsManagement & Document Control personnel to transport overnightclassified mail from the portal to a Security Area (closed or restrictedarea). Update procedure ACD2-PS-004, Handling and Processing ofClassified and Safeguards Information Documents for Offsite Deliveriesand Receipts, and SP-2605-0005 American Centrifuge ProgramClassified Matter Protection and Control Manual, to reflect these changes.

Reason for the Change:Permit greater operational flexibility while still providing adequate staffingfor receipt and handling of classified deliveries by Federal Express.

Wednesday, January 27, 2010 Page 19 of 110

Page 22: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE Number Rev. ApprovalDate

Changeto SSC?

Documents ModifiedDue to Change

ISASummary

UpdateRequired?

Reason NRCPreapproval Not

Required/Comments

FCE 09-0063 0 Title: Revision to Procedure ACD2-RG-004, Corrective Action Process 4/22/2009 No ACD2-RG-004 Chg 2 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areAddress assigning issues to Technical Services for disposition, if they met.have the potential to be 10 Code of Federal Regulations Part 21reportable. Other changes were made to clarify and removeunnecessary notification burden from Screening Managers.

Reason for the Change:Clarify procedure requirements and provide requirements for reportabilitydetermination so that 10 Code of Federal Regulations Part 21 reportingtime frames can be met.

FCE 09-0065 0 Title: Correction of Integrated Safety Analysis Summary Text 3/23/2009 No Integrated Safety Yes None of the criteriaAnalysis and listed in

Description of Change: Integrated Safety 1OCFR70.72(c) areAdministrative changes to descriptions of the centrifuge machines and Analysis Summary met.the associated acronyms in the Lead Cascade Facility Integrated Safety Acronyms and Ch 3Analysis and Integrated Safety Analysis Summary.

Reason for the Change:Make the Lead Cascade Facility descriptions consistent with those in theAmerican Centrifuge Plant's Integrated Safety Analysis Summary.

FCE 09-0066 0 Title: Revision to Procedure AC4-OP-044, Lead Cascade 1 Operations 2/24/2009 No AC4-OP-044 Chg 6 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areAddress cascade configuration. met.

Reason for the Change:Machine availability will potentially make other cascade stageconfigurations a normal mode of operation.

FCE 09-0067 0 Title: X-7725 Honeywell Maintenance Shop 2/25/2009 Yes ESO-3102-0011 Rev 0, No None of the criteriaDescription of Change: ESO-3102-0012 Rev 0 listed in

Install a wire fence storeroom in Room 124 and welding gas storage just 1 eCFR70.72(c) are

outside the X-7725 to support a permanent weld shop in Room 124. met.

Reason for the Change:Maintenance shop is needed to support production of Lead Cascade 3and commercial plant assembly activities.

Wednesday, January 27, 2010 Page 20 of 110

Page 23: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0068 0 Title: Lead Cascade 3 Machine Design Changes 3/27/2009 Yes ECR/ CR #s No None of the criteria1341 1342 1369 listed in

Description of Change: 1371 1377 1380 1OCFR70.72(c) areMinor changes to the previously evaluated design, involving changes 1391 1395 1399 met.such as dimensional tolerances, cleaning, marking, and packaging 1411 1424 1425requirements, and design improvements that are not contrary to the 1426 1427 1429design or functioning as described in the License Application and 1431 1432 1434supporting documents. 1435 1436 1437

Reason for the Change: 1438 1439 1442

Progression of the design of the centrifuge machines operated in the 1443 1444 1445Lead Cascade Facility towards an AC1 00 Commercial Plant centrifuge 1446 1447 1448machine. 1449 1451 1452

1453 1454 14551456 1457 14581460 1462 14631468 1469 14701471 1473 14741475 1476 1477

1478 1480 14811482 1484 14871488 1492 14961501 1504 15051506 1507 15211524 1527 1531

FCE 09-0069 0 Title: Revision to Procedure ACD2-EG-016, Conditional Release 2/27/2009 No ACD2-EG-016 Chg 2 No None of the criteriaProgram listed in

10CFR70.72(c) areDescription of Change:

met.

Modify inspection and test requirements and provide guidance for

processing Commercial Grade Items to be dedicated for use as a QualityLevel-1 item.

Reason for the Change:Clarify procedure requirements and make broader applicability.

FCE 09-0070 0 Title: Revision to Procedure ACD3-EG-205, Engineering Evaluations 5/15/2009 No ACD3-EG-205 Chg 3 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areClarify actions and documentation required for various nonconformance met.determinations.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 21 of 110

Page 24: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0071 0 Title: Revision to Procedure ACD2-QM-107, Material Condition Report 3/13/2009 No ACD2-QM-107 Chg 3, No None of the criteriaProgram Quality Assurance listed in

Program Description 10CFR70.72(c) areDescription of Change: Ch 7.8 and 15.0 met.Clarify nonconformance program requirements, add references, andexpand the list of dispositions to align with current practices.

Reason for the Change:Clarify procedure requirements.

FCE 09-0072 0 Title: Relocation of X-3002 Crane Stairway Lighting 2/20/2009 No ECR-2101-0041-02, Yes None of the criteriaDescription of Change: ESO-2101-0041 listed inDesciptin o Chage:10OCFR70.72(c) areDesign and relocation of lighting on the crane stairways in X-3002. met.

Reason for the Change:Lowering the light fixtures will allow maintenance access without the useof a lift.

FCE 09-0073 0 Title: Revision to Procedure ACD2-SH-019, Safety and Health Work 6/11/2009 No ACD2-SH-019 Chg 2 No None of the criteriaPermit listed in

Description of Change: 1OCFR70.72(c) are

Clarify determination of need for a Safety and Health Work Permit, added met.new form and guidelines.

Reason for the Change:Clarify procedure requirements.

FCE 09-0074 0 Title: Revision to Procedure AC4-OP-059, Purge Vacuum/Evacuation 3/2/2009 No AC4-OP-059 Chg 4 No None of the criteriaVacuum Chemical Trap Operations listed in

Description of Change: 1 eCFR70.72(c) areReorder some steps that were incorrect or unclear. met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 22 of 110

Page 25: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE Number Rev. ApprovalDate

Changeto SSC?

Documents ModifiedDue to Change

ISASummary

UpdateRequired?

Reason NRCPreapproval Not

Required/Comments

FCE 09-0076 0 Title: New Procedure ACD4-HP-013, Walkdowns of Radiological Areas 2/23/2009 No ACD4-HP-013 Chg 0 No None of the criteria.and Activities listed in

Description of Change: mtCFR70.72(c) areProvide guidance to Health Physics-Industrial Hygiene personnel met.performing and documenting the results of walkdowns of radiologicalareas and activities.

Reason for the Change:Provide tool to ensure compliance with radiological protectionrequirements.

FCE 09-0077 0 Title: Revision to Procedure ACD2-EC-010, Air Compliance Program 2/27/2009 No ACD2-EC-010 Chg 1 No None of the criterialisted in

Description of Change:: 10CFR70.72(c) areAdd guidance for Environmental personnel to initiate required actions to met.obtain Permission to Construct, when required by regulations.

Reason for the Change:Provide information identified as lacking during an Environmental/WasteManagement readiness assessment.

FCE 09-0079 0 Title: Install Prefabricated Fence and-Planner Cage in Building X-7725 2/26/2009 Yes ESO-3911-0002 Rev 0 No None of the criterialisted in

Description of Change: . 10CFR70.72(c) areInstall prefabricated fence sections and a wire mesh fence planner cage met.in the Maintenance Shop in Room 108, Building X-7725.

Reason for the Change: -

Complete Maintenance Shop to support production of Lead Cascade 3and commercial plant assembly activities.

FCE 09-0080 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 2/26/2009 No AC4-AO-001 Chg 7 No None of the criteriaCascade 3 Build listed in

Description of Change: 1 eCFR70.72(c) are

Add or clarify machineassembly steps. met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 23 of 110

Page 26: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0080 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No None No None of the criteriaCascade 3 Build listed in

1OCFR70.72(c) areDescription of Change:

met.

Revision 1 of the change evaluation corrected the revision number of the

procedure addressed by the original evaluation. No additional changeswere evaluated.

Reason for the Change:Correction of reference in Revision 0 of this change evaluation.

FCE 09-0081 0 Title: Revision to Procedure AC4-OP-075, AC100/Lead Cascade 3 3/2/2009 No AC4-OP-075 Chg 1 No None of the criteriaMachine Disassembly listed in

Description of Change: 1 eCFR70.72(c) areUpdate some of the equipment checking and removal steps. met.

Reason for the Change:Correction of steps to match current machine design.

FCE 09-0082 0 Title: Revision to Procedure ACD2-SP-033, Identification and 3/3/2009 No ACD2-SP-033 Chg 3 No None of the criteriaProtection of Safeguards Information (SGI) listed in

Description of Change: 1OCFR70.72(c) are

Replace "Safeguards Information - Modified" with "Safeguards met.

Information" and update shredding requirements.

Reason for the Change:Implementation of requirements from 10 Code of Federal Regulations73.22, Protection of. Safeguards Information.

FCE 09-0084 0 Title: Revision to Procedure AC4-OP-025, Machine Connections 3/9/2009 No AC4-OP-025 Chg 12 No None of the criterialisted in

Description of Change: 1 lCFR70.72(c) are

Clarify electrical connections for Lead Cascade 3 machines, correct met.

formatting, and improve the associated form AC-247.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 24 of .110

Page 27: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

Sumary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0086 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 3/9/2009 No ACD2-RG-003 Chg 3 No None of the criteriaCommunications listed in

Description of Change: 1 eCFR70.72(c) are

Update references and personnel titles, and other editorial corrections. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0087 0 Title: Revision to Procedure ACD2-QM-007, Identification and Control 3/6/2009 No ACD2-QM-007 Chg 3 No None of the criteriaof Items listed in

Description of Change: 10CFR70.72(c) are

Update references and definitions and clarify terminology. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0088 0 Title: Bulk Nitrogen Delivery System 3/5/2009 Yes SOW-3102-0007 Rev 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areInstallation, testing, startup and turnover of a leased bulk nitrogen met.delivery system for the X-7725 facility. The system will consist of storagetank with in-line vaporizers, interconnecting piping, valves andinstrumentation to deliver nitrogen gas to existing distribution systempiping.

Reason for the Change:Nitrogen will be used in the assembly and testing of centrifuge machines.

FCE 09-0089 0 Title: Revision to Procedure ACD2-HP-004, Conduct of Radiological 3/12/2009 No ACD2-HP-004 Chg 3 No None of the criteriaOperations listed in10CFR70.72(c) are

Description of Change: met.

Reflect a program element from the License Application and clarify that

UF6 cylinders are exempt from routine labeling as radioactive materialdue to their size and unique construction.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page, 25 of 11i0

Page 28: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0090 0 Title: Revision to Procedure AC4-OP-049, Machine Acceleration & 3/12/2009 No AC4-OP-049 Chg 25 No None of the criteriaDeceleration listed in

Description of Change: 1 eCFR70.72(c) are

Correct or add steps and clarify wording for accelerating and decelerating met.

centrifuge machines and response to certain error codes.

Reason for the Change:Clarify procedure requirements.

FCE 09-0091 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 5/20/2009 No ACD2-RG-003 Chg 4 No None of the criteriaCommunications listed in

Description of Change: 10CFR70.72(c) are

Clarify instructions, add flow charts, provide additional reporting met.

requirements and other editorial and formatting corrections.

Reason for the Change:Clarify procedure requirements.

FCE 09-0093 0 Title: Implement SP-3605-0003, Lead Cascade Distributed Control 3/25/2009 No SP-3605-0003 Rev 0 No None of the criteriaSystem Information System Security Plan listed in

Description of Change: 1 eCFR70.72(c) are

Update and replace existing plans SP-2605-0015, Stand-alone Special met.

Category Systems, Process Controls and Workstations SupportingProcess Controls Processing Classified Information at ProtectionLevel=l, and SP-2605-0018, Network System Proceeding ClassifiedInformation at PL=I.

Reason for the Change:To comply with new U.S. Department of Energy requirements (in DOE M205.1-4) for cyber security.

FCE 09-0095 0 Title: Lead Cascade 3 Machine Design Change 3/12/2009 No CR 1512, No None of the criteriaDrawings 1000893 and listed in

Description of Change: DWG-00101 10CFR70.72(c) areAdd a tee and second pressure instrument to the existing centrifuge met.casing pressure gauge instrument package.

Reason for the Change:Expand the pressure (vacuum) sensing range to cover the full range ofmachine operation.

Wednesday, January 27, 2010 Page 26 of 110.

Page 29: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0096 0 Title: Revision to Procedure ACD2-MA-001, Control of Measuring and 4/19/2009 No ACD2-MA-001 Chg 2 No None of the criteriaTest Equipment listed in

Description of Change: 1tCFR70.72(c) are

Add completed AC-488 as a Quality Record, address processing of met.

measuring and test equipment for calibration or repair, delete unusedreference, and add definition.

Reason for the Change:Clarify procedure requirements.

FCE 09-0097 0 Title: New Procedure ACD4-HP-011, Operation of Canberra S5XLB 3/19/2009 No ACD4-HP-011 Chg 0 No None of the criteriaTennelec Low Background Counter listed in

Description of Change: 10CFR70.72(c) are

Provide operating instructions for Canberra S5XLB Tennelec Low met.

Background Counter.

Reason for the Change:Need to perform low background alpha and beta counting in support ofHealth Physics activities.

FCE 09-0099 0 Title: New Settings Document OA-CS-LC3-09-001, Lead Cascade 3 3/13/2009 No OA-CS-LC3-09-001 No None of the criteriaCentrifuge Acceleration and Conditioning Parameters (U) Rev 0, listed in

Description of Change: ICD-00005 Rev 1 1OCFR70.72(c) are

Provide operating information and operating setpoints and limits for Lead met.

Cascade 3 centrifuge start-up and conditioning operations.

Reason for the Change:Provide centrifuge operating parameters and settings.

FCE 09-0100 0 Title: Modify Lighting in Conference Room AC-3 6/16/2009 No ESO-2512-0008 No None of the criterialisted in

Description of Change: 10CFR70.72(€) areChange ballasts and bulbs in building X-7725 Conference Room AC-3 to met.allow six of nine existing lights to be on a dimmer.

Reason for the Change:To allow better visibility when using projected displays during meeting ortraining in this conference room.

Wednesday, January 27, 2010- -........................... .. - -11.1-

Page 27 of 110

Page 30: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0101 0 Title: Revision to Procedure ACD2-QM-001, Assessment Program 3/19/2009 No ACD2-QM-001 Chg 10 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areExpand the distribution list for schedule approval and assessment reports. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0102 0 Title: Revision to Procedure ACD3-EG-501, Preparation of Engineering 3/18/2009 No ACD3-EG-501 Chg 3 No None of the criteriaProcurement Specifications listed in

Description of Change: 1 eCFR70.72(c) are

Incorporate commercial grade items, address nuclear criticality safety,revise guidance for selecting and documenting critical designcharacteristics and update technical data sheets and forms.

Reason for the Change:Respond to process improvement recommendations.

FCE 09-0103 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 3/18/2009 No AC4-AO-001 Chg 8 No None of the criteriaCascade 3 Build listed in

Description of Change: 1OCFR70.72(c) are

Add installation of a new pressure gauge and clarified other steps. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0103 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No None No None of the criteriaCascade 3 Build listed in

Description of Change: 1 eCFR70.72(c) are

Revision 1 is an editorial change to correct a procedure revision number met.

in the original change evaluation. No additional changes were evaluated.

Reason for the Change:Correction of a procedure revision number.

Wednesday, January 27, 2010 Page 28 of 110

Page 31: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0104 0 Title: Alternate Column Options 3/24/2009 No ESO-2302-0003, No None of the criteriaTP-2303-0012 listed in

Description of Change: 10CFR70.72(c) areTechnical support for purchase of material, assembling of equipment, met.testing, review of procedures, changes to equipment support and minormodification of build stands.

Reason for the Change:Provide engineering support for Lead Cascade 3 alternate columnoptions.

FCE 09-0105 0 Title: Replacement for Obsolete Casing Pressure Instrument 3/26/2009 No ESO-2201-0012, No None of the criteriaESE-2201-0004 listed in

Description of Change: 10CFR70.72(c) areUpdate a controlled field in the Configuration Item database and setpoint met.documentation to reflect replacement of obsolete pressureinstrumentation.

Reason for the Change:Pressure instrumentation used on Lead Cascade 1-1B has becomeobsolete and all remaining spares have been exhausted.

FCE 09-0106 0 Title: Severe Weather Response Guidelines for the Green Zone 3/31/2009 No None No None of the criteriaComplex listed in 10 CFR

Description of Change: 70.72(c) are met.Provide guidelines for severe weather response in the Green ZoneComplex. These guidelines identify the actions needed before, during,and after a severe weather event (i.e., tornado watch, tornado warning,etc.). These guidelines are applicable to all USEC, Fluor, contractors,sub-contractors, and visitors in the Green Zone Complex.

Reason for the Change:These guidelines clarify the responsibilities and identify the actionsneeded before, during, and after severe weather notices in the GreenZone complex. These guidelines provide guidelines for the mobilizationof personnel and supervision (escorting) of uncleared personnelevacuating the Green Zone and entering the Controlled Access Area(CAA)/Security Area for the purpose of sheltering from a tornado.

Wednesday, January 27, 2010............

Page 29of 110

Page 32: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0107 0 Title: Machine Design Changes 10/20/2009 Yes

Description of Change:The changes include improvements, minor changes to the previouslyevlauated centrifuge machine design such as dimensional changes,material changes, cleaning marking or packaging requirements, andtypographical corrections.

Reason for the Change:This change is being made as the result of the progression of the designof the Lead Cascade 3 centrifuge machine being operated in the LeadCascade Facility towards an AC100 Commercial Plant centrifugemachine.

ECR/CR #1494 1508 15111513 1514 15221525 1526 15301553 1558 15641575 1577 15781579 1580 15811585 1588 15901591 1592 15931597 1598 15991601 1602 16061607 1608 16091612 1613 16141615 1616 16171618 1621 16221623 1624 16251626 1627 16281629 1630 16311634 1637 16401641 1644 16481651 1652 16531655 1656 16571658 1659 16601661 1664 1666

1667 1672

No None of the criterialisted in 10 CFR70.72(c) are met.

FCE 09-0111 0 Title: Revision to Procedure ACD2-QM-101, Inspection Program 4/7/2009 No ACD2-QM-101 Chg 6 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areProvide guidance for reinspection of nonconforming items, clarify met.applicability, and other minor corrections and format changes.

Reason for the Change:Clarify procedure requirements.

FCE 09-0112 0 Title: Revision to Procedure AC4-AR-010, Lead Cascade 3 Machine 4/22/2009 No AC4-AR-01 0 Chg 5 No None of the criteriaAlarms and Responses listed in

10CFR70.72(c) areDescription of Change:

met.

Add new cascade alarms and responses.

Reason for the Change:Reflect alarms that were added to the Distributed Control System.

Wednesday, January 27, 2010 Page 30 of 110

Page 33: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0114 0 Title: Revision to Procedure AC4-OP-055, Machine Disconnect 4/1/2009 No AC4-OP-055 Chg 9 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areGroup steps into sequence for machine disconnects in Lead Cascade 1 met.and Lead Cascade 3.

Reason for the Change:Clarify procedure requirements

FCE 09-0115 0 Title: Convert Lead Cascade 7 Positions to Accept AC100 Machines 4/2/2009 Yes ESO-2201-0011, No None of the criteriaSOW-2201-0006, listed inDescription of Change: TP-2201-0023, 10CFR70.72(c) are

Electrical and instrument and cable assembly changes and testing TP-241-0019, met.

needed to convert seven positions to accept AC100 machines. TP-2415-0020

Reason for the Change:Convert to current centrifuge machine design.

FCE 09-0115 1 Title: Convert Lead Cascade 7 Positions to Accept AC100 Machines 5/6/2009 Yes ESO-2201 -0011, No None of the criteriaSOW-2201-0006, listed in

Description of Change: TP-2201-0023, 10CFR70.72(c) areModify the process telephone system, in addition to the electrical and TP-2415-0019, met.instrument and cable assembly changes and testing needed to convert TP-2415-0020,seven positions to accept AC100 machines. TP-2101-0035

Reason for the Change:Convert to current centrifuge machine design.

FCE 09-0116 0 Title: X-7725 Maintenance Material Storage Area 5/6/2009 No ESO-3102-0005, Yes None of the criteriaIntegrated Safety listed in

Description of Change: Analysis and 10CFR70.72(c) areRemove the X-7725 ground floor centrifuge component storage area Integrated Safety met.from Lead Cascade Facility use, and update licensing documents to Analysis Summaryreflect the change in area usage. Ch 2.2,

Reason for the Change: License ApplicationAllow for future use to store and maintain material for the commercial Section 1.1.1,plant. Decommissioning

Funding PlanTable 3-1

Wednesday, January 27, 2010 Page 31 of 110

Page 34: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0117 0 Title: Revision to Procedure AC4-OP-049, Machine Acceleration & 4/8/2009 No AC4-OP-049 Chg 26 No None of the criteriaDeceleration listed in

Description of Change: 1 OCFR70.72(c) are

-Correct steps to enable and disable casing pressure alarms. met.

Reason for the Change:Changes in programming required change in procedure steps.

FCE 09-0119 0 Title: Revision to Procediure AC4-HP-001, Centrifuge Sampling 4/1/2009 No AC4-HP-001 Chg 1 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areUpdate section, equipment, and laboratory titles to match current usage. met.

Reason for the Change:Clarify procedure requirements during periodic review cycle.

FCE 09-0120 0 Title: Lease/sublease of X-2220D Gas Centrifuge Enrichment Plant 4/29/2009 No Exhibit A to the No None of the criteriaLease Communications Ductbank System Gas Centrifuge listed in

Enrichment Plant Lease 1OCFR70.72(c) areDescription of Change: met.

Add X-2220D to the facilities subleased by the United States Enrichment m

Corporation to USEC Inc. and revise the American Centrifuge PlantIntegrated Safety Analysis Summary to reflect the sublease andrenaming (from Telephone System to Communication Ductbank System)of the facility.

Reason for the Change:These effluent system facilities are required for Lead Cascade Facilityand American Centrifuge Plant operations.

FCE.09-0122 0 Title: Revision to Procedure AC4-OP-074, Lead Cascade 3 Machine 4/9/2009 No AC4-OP-074 Chg 2 No None of the criteriaConditioning, Tails Scoop Verification, and Charging with UF6 listed in

1OCFR70.72(c) areDescription of Change: met.Correct valve tables and remove unused forms as attachments.

Reason for the Change:Make technical corrections to procedure.

Wednesday, January 27, 2010 Page 32 of 110

Page 35: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE Number Rev.

FCE 09-0123 0 Title: Revision to Procedure AC4-PS-102, Surveillance, Test, andInspection of the Feed Cart Cylinder Unit Fire Suppression System

Description of Change:Add identification of parts, clarification on handling of removed parts, andassociated material tags.

Reason for the Change:Clarify procedure requirements in response to a Condition Notification,

ISASummary Reason NRC

Documents Modified Update Preapproval NotDue to Change Required? Required/Comments

7/23/2009 No AC4-PS-102 Chg 4 No None of the criterialisted in 10 CFR70.72(c) are met.

FCE 09-0124 0 Title: Sublease of Grassy/Unimproved Areas West of X-7721 4/9/2009 No Exhibit A to the No None of the criteriaGas Centrifuge listed in

Description of Change: Enrichment Plant Lease 1OCFR70.72(c) areAdd the Grassy/Unimproved Areas and associated sidewalks (Area 2) to met.the facilities subleased by the United States Enrichment Corporation toUSEC Inc.

Reason for the Change:Area needed for upcoming commercial plant activities.

FCE 09-0125 0 Title: Install Fiber Backbone Cabling 5/28/2009 Yes CWP #BOPCOM-5510 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areWork Package for the installation and testing of the complete fiber met.cabling infrastructure serving Unclassified Administrative, UnclassifiedProcess Data, Fire Alarm, Evacuation Alarm, Security, and ClassifiedVoice and Data Systems.

Reason for the Change:To ensure reliability of dedicated communication systems.

FCE 09-0126 0 Title: Debris Screen for Tower Cooling Water 4/15/2009 Yes ESO-2409-0004 No None of the criterialisted in.

Description of Change: 1 lCFR70.72(c) are

Fabricate and install a portable screen system to catch debris in the met.

tower cooling water flume (discharge) prior to entering the X-6000 pump

house well.

Reason for the Change:To catch debris that could restrict cooling water flow and cause shutdownof equipment.

Wednesday, January 27, 2010 Page 33 of 110

Page 36: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

-FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0127 0 Title: Revision to Procedure AC2-RG-071, Nuclear Material Control and 4f16[2009 No AC2-RG-071 Chg 5 No None of the criteriaAccountability (NMC&A) for the American Centrifuge Lead listed inCascade 10CFR70.72(c) are

Description of Change: met.

Clarify taking and recording of measurements and when a sample mustbe taken.

Reason for the Change:Clarify procedure requirements as required during periodic review.

FCE 09-0129 0 Title: Revision to Procedure AC4-ON-004, Loss of Machine Cooling 6/18/2009 No AC4-ON-004 Chg 3 No None of the criteriaWater (MCW) listed in

Description of Change: 1 meFR70.72(c) are

Address emergency filling of the Machine Cooling Water expansion tank met.in the event of a significant loss of tank level.

Reason for the Change:Provide appropriate response for an event involving rapid loss of waterlevel, for the protection of operating machines.

FCE 09-0130 0 Title: Revision to Procedure ACD4-HP-007, Operation of the Ludlum 4/23/2009 No ACD4-HP-007 Chg 3 No None of the criteria2224 listed in

Description of Change: 1tCFR70.72(c) are

Provide a more automated tool for recording radiological surveys with the met.

Ludlum Model 2224 survey instrument.

Reason for the Change:Provide an updated form to perform calculations on an automatedspreadsheet.

FCE 09-0131 0 Title: Revision to Settings Document OA-CS-LC3-09-001, Lead 4/22/2009 No OA-CS-LC3-09-001 No None of the criteriaCascade 3 Centrifuge Acceleration and Conditioning Parameters Rev 1, listed in(U) ICD-00005 Rev 1, 1OCFR70.72(c) are

Description of Change: CR-1547 met.

Increase the bearing temperature operating limits for steady stateoperation of Lead Cascade 3 machines.

Reason for the Change:Incorporate new guidance for centrifuge operating parameters.

Wednesday, January 27, 2010---.... ........ -............. ......................

Page 34 of 110

Page 37: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0132 0 Title: New Procedure ACD2-SH-030, Bloodborne Pathogens - 5/5/2009 No ACD2-SH-030 Chg 0 No None of the criteriaExposure Control Plan listed in .

Description of Change: 10CFR70.72(€) are

Detail protection of workers who are designated as having reasonably met.

anticipated occupational exposure to blood or other potentially infectiousmaterials during performance of duties.

Reason for the Change:Provide a control plan for compliance with 29 Code of FederalRegulations 1910.1030.

FCE 09-0133 0 Title: Revision to Procedure ACD4-OP-071, Centrifuge Machine 4/28/2009 No ACD4-OP-071 Chg 5 No None of the criteriaTransporter (CMT) listed in

1 OCFR7O.72(c) areDescription of Change: met.Allow loading and unloading of the Machine Transporter while it is restingon its wheels.

Reason for the Change:Respond to engineering evaluation that determined lifting the MachineTransporter on its jacks is not required during loading and unloading.

FCE 09-0134 0 Title: Inside Plant Communication System X-6002 4/29/2009 Yes CWP #BOPCOM-7304 No None of the criteriaRev 0 listed in

Description of Change: 1RCFR7O.72(c) areWork Package to install a structured cabling system inside the X-6002 for met.the purpose of transmitting voice and data communications for the X-6002 Boiler House.

Reason for the Change:New Boiler House requires voice and data communications.

FCE 09-0135 0 Title: Cooling Tower Electrical Upgrades 5/1/2009 Yes CWP #BOPELE-5209 No None of the criteriaDescription of Change: Rev 0 listed in

Description~ oChne1OCF R7O.72(c) areWork Package to remove existing control panels and assemble, wire, met.and install new control panels for each of five cells of the X-6001 CoolingTower.

Reason for the Change:Provide necessary electrical upgrades in X-6001.

Wednesday, January 27, 2010 Page 35 of 110

Page 38: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0137 0 Title: Machine Cooling Water Machine Flow Verification Test Plan 4/28/2009 Yes TP-2101-0034 No None of the criterialisted in -

Description of Change: 10CFR70.72(c) are

Test Plan to install flow measuring devices and document Machine met.

Cooling Water flows to various centrifuge machines and their diffusion

pumps in Lead Cascade 3.

Reason for the Change:Testing of devices that would allow maintenance and operationspersonnel to verify that cooling water flow to centrifuge machines anddiffusion pumps is adequate.

FCE 09-0137 1 Title: Machine Cooling Water Machine Flow Verification Test Plan 6/23/2009 Yes TP-2101-0034, No None of the criteriaESO-2201-0016 listed in

Description of Change: 10CFR70.72(c) arePermanently install devices for monitoring Machine Cooling Water flows mFR .to various centrifuge machines and their diffusion pumps in LeadCascade 3.

Reason for the Change:To allow maintenance and operations personnel to verify that coolingwater flow to centrifuge machines and diffusion pumps is adequate.

FCE 09-0138 0 Title: New Procedure ACD3-CC-001, Engineering, Procurement and 4/28/2009 No ACD3-CC-001 Chg 0 No None of the criteriaConstruction Review and Approval of Commercial Plant EPCM listed inConstruction Work Packages 10CFR70.72(c) are

Description of Change: met.

Provide guidance for the review, approval, and close out of AmericanCentrifuge Project Commercial Plant Engineering, Procurement andConstruction Management Construction Work Packages.

Reason for the Change:Support configuration management during construction.

FCE 09-0138 1 Title: New Procedure ACD3-CC-001, Engineering, Procurement and 5/12/2009 No None No None of the criteriaConstruction Review and Approval of Commercial Plant EPCM listed inConstruction Work Packages 10CFR70.72(c) are

met.Description of Change:

Revision 1 makes a correction to the change evaluation to indicate theSafety Review Committee review was not required by the ChangeEvaluation procedure.

Reason for the Change:Incorrect answer was marked in Revision 0 of the change evaluation.

Wednesday, January 27, 2010 Page 36 of 110

Page 39: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

• " .ISA Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0139 0 Title: Revision to Procedure ACD2-MA-002, Work Control Process 7/16/2009 No ACD2-MA-002 Chg 4 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areClarify the review process of work orders and steps related to minor met.maintenance planning and execution, and modification of work controlrelated forms to allow for automated printing.

Reason for the Change:Work control assessment identified opportunities for improvement of theprocedure.

FCE 09-0140 0 Title: Revision to Procedure ACD3-PC-002, Procurement of Items for 4/29/2009 No ACD3-PC-002 Chg 3 No None of the criteriaUse in Quality Level-1 Applications listed in

Description of Change: 1OCFR70.72(c) are

Add definition, remove unnecessary reference, and provide clarification met.

of several sections.

Reason for the Change:Clarify procedure requirements.

FCE 09-0141 0 Title: Lead Cascade 3 Machine Design - Column Design Calculations 4/29/2009 No CR 1555, No None of the criteria.TAR-1 140-0002 Rev 2 listed in

Description of Change: 1OCFR70.72(c) arePerform and document calculations to determine the ability of the column met.design to function as a lower restraint device in the event of a machinewreck.

Reason for the Change:To document adequacy of the current column design to provide adequaterestraint in the event of a machine wreck.

FCE 09-0142 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 4/29/2009 No AC4-AO-001 Chg 9 No None of the criteriaCascade 3 Build listed in

Description of Change: 10OCFR70.72(c) aremet.

Add requirements for storage of casings, clarified casing lift bail use,storage steps, and installation of subject parts. Added requirements forverification of build book serial number records.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 37 of 110

Page 40: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0142 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No None No None of the criteriaCascade 3 Build listed in

Description of Change: mtCFR70.72(c) are

Revision 1 is an editorial change to correct a procedure revision number met.

in the original change evaluation. No additional changes were evaluated.

Reason for the Change:Correction of a procedure revision number.

FCE 09-0143 0 Title: Installation of Temporary Satellite Fuel Systems 5/19/2009 Yes ESO-2518-0004 Rev 0, No None of the criteriaSOW-2518-0011 Rev 0 listed in

Description of Change: 1OCFR70.72(c) areTemporary placement of one fuel storage tank, west of X-7725A. The met.tank consists of two internal 500 gallon tanks, one for diesel and one forgasoline.

Reason for the Change:Provide more cost efficient fueling services to the American CentrifugePlant during the construction phases, and eliminate dependence on theGaseous Diffusion Plant fuel pumps.

FCE 09-0144 0 Title: Revision to Procedure AC4-ON-007, Machine Instrument 5/1/2009 No AC4-ON-007 Chg 9 No None of the criteriaPackage Replacement at an Operating Position listed in

Description of Change: 10CFR70.72(c) areAdd steps for resetting a Lead Cascade 3 Machine InstrumentationPackage.

Reason for the Change:Provide reset instructions.

FCE 09-0145 0 Title: Refurbishment of Equipment at X-6000 Cooling Tower Pump 5/6/2009 Yes TRAV-BOP-07-011 No None of the criteriaHouse and Air Plant Rev 0 listed in

Description of Change: 10CFR70.72(c) are

Revision 1 of the American Centrifuge Plant evaluation documents met.

evaluation of the original change for potential effect on the Lead CascadeFacility. No additional changes are proposed.

Reason for the Change:Revision 0 only addressed the American Centrifuge Plant, and failed toevaluate any effect on the Lead Cascade Facility.

Wednesday, January 27, 2010 Page 38 of 110

Page 41: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlCommentsI

FCE 09-0146 0 Title: Revision to Procedure AC4-OP-055, Machine Disconnect 5/1/2009 No AC4-OP-055 Chg 10 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areClarify steps for disconnecting process lines for sampling. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0148 0 Title: Revision to Procedure ACD2-MM-00,I, Control of Material 5/27/2009 No ACD2-MM-001 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areAlign with recent changes to the commercial grade item processes, met.update references and form.

Reason for the Change:Clarify procedure requirements.

FCE 09-0149 0 Title: Revision to Procedure AC4-OP-025, Machine Connections 5/6/2009 No AC4-OP-025 Chg 15 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areInclude steps to purge air from the Machine Cooling Water lines to the met.diffusion pumps.

Reason for the Change:Operational experience revealed a need to purge lines to prevent air lock.

FCE 09-0150 0 Title: Revision to Procedure AC4-OP-035, Operation of Mettler Toledo 5/7/2009 No AC4-OP-035 Chg 3 No None of the criteriaXS2002S Sample Scale listed in

Description of Change: 1 eCFR70.72(c) areDirect placement of sample tube caps during weighing. met.

Reason for the Change:To ensure accuracy of sample tube weights.

FCE 09-0151 0 Title: X-7725 Controlled Access Area Construction Upgrade 5/7/2009 Yes ECR 3501-0002-18 No None of the criterialisted in

Description of Change: 1 OCFR70.72(c) areInstall conduit, cables, wiring, door sensors, change direction of door met.swing (out to exit), add badge readers, scramble pad, local alarms,telephone, X09 lock, remove raised floor, remove door, move electricalpanel, and add climate control unit and ductwork in building X-7725.

Reason for the Change:Install/upgrade access control.

Wednesday, January 27, 2010 Page 39 of 110

Page 42: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

,FCE 09-0151 1 Title: X-7725 Controlled Access Area Construction Upgrade 6/22/2009 Yes ECR 3501-0002-18 No None of the criteria

Description of Change: 10CFR70.72(c) areInstall two additional doors and a wall partition in third floor of X-7725. met.

Reason for the Change:Install/upgrade access control.

FCE 09-0152 0 Title: Wiring Changes for Lead Cascade 3 5/7/2009 No CR-1 532 Rev 1 No None of the criteria

Description of Change: 10CFR70.72(c) areModify electrical and instrument wires and cables to minimize met.electromagnetic interference, insure grounded connector integrity, andremove unneeded power lead splices.

Reason for the Change:Concurrent design efforts had resulted in wires and cables that were toolong. Coiling of the excess contributed to signal noise.

FCE 09-0153 0 Title: Revision to Procedure AC4-OP-047, Machine Assembly 6/12/2009 No AC4-OP-047 Chg 8 No None of the criteria

Description of Change: 1OCFR70.72(c) areProvided guidance for use of rotor upending device and use of form AC- met.332 Green Machine Tag.

Reason for the Change:Clarify procedure requirements.

FCE 09-0154 0 Title: Revision to Procedure AC4-OP-023, Machine Transport and 6/12/2009 No AC4-OP-023 Chg 6 No None of the criteriaInstallation listed in

Description of Change: 10CFR70.72(c) are

Added direction to use AC-332, Green Machine Tag and addrequirement to ensure correct transporter speeds.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 40 of 110

Page 43: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0156 0 Title: South Mezzanine Piping in X-3002 6/22/2009 No CWP #PB2SOU-4003 No None of the criteriaRev 0 listed in

Description of Change: 100FR70.72(c) are

Work Package for the installation of feed, auxiliary feed, product, and met.tails process header piping in the South Mezzanine of building X-3002. met.

Reason for the Change:Process piping headers are required for installation of new AmericanCentrifuge Plant Service Modules and associated gas centrifugemachines.

FCE 09-0157 0 Title: Static Assembly Stand Refurbishment 6/17/2009 No CWP #RAFMAA-3001 No None of the criteria

Description of Change: Rev 0 listed in -

Refurbish or replace equipment on the existing Static Assembly Stands in *met.X-7725.

Reason for the Change:Use refurbished Static Assembly Stands to support a complete centrifugeassembly in one location for the American Centrifuge Plant.

FCE 09-0158 0 Title: X-3012/X-3001/X-3002 Substation Refurbishment 6/2/2009 No CWP #OOOPSB-5202 No None of the criteria• . Rev 0 listed in

Description of Change: 100FR70.72(c) are

Work Package for the refurbishment and preventive maintenance on the met.

X-3012/X-3001/X-3002 electrical substations.

Reason for the Change:To assure the substations are in good operating condition.

FCE 09-0159 0 Title: Cooling Tower Stair Foundations 6/15/2009 No CWP #BOPRPC-1101 No None of the criteriaRev 0, listed inDescription of Change: CWP #BOPRPC-1101 10OCFR70.72(c) are

Work Package to demolish existing and install new foundations for stairs Rev 0 Chg 1 met.to the north and south sides of the X-6001 Cooling Tower.

Reason for the Change:Upgrade of an existing secondary facility.

FCE 09-0160 0 Title: X-6002 Fire Alarm System 5/13/2009 Yes CWP #BOPCOM-7204 No None of the criteria

Description of Change: Rev 0 listed in

Work Package for the installation of a Fire and Supervisory Alarm 10CFR7O.72(c) areSystem in the X-6002 Boiler House. met.

Reason for the Change:Continuation of activities required to provide an operational boiler facility.

Wednesday, January 27, 2010 Page 41 of 110

Page 44: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0161 0 Title: Lead Cascade 3 Machine Design - Additional Instruments 5/12/2009 No CR 1562 Rev 0, No None of the criteriaCR 1563 Rev 0, listed in

Description of Change: ECR-2202-0007-40 1OCFR70.72(c) areInstallation, testing, verification, and data collection from instruments Rev 0, met.installed for additional in-process monitoring of machine parameters. TP-2201-0024 Rev 0

Reason for the Change:Additional data collection is necessary.

FCE 09-0162 0 Title: Installation of X-7725 Exterior Lighting 5/19/2009 Yes ESO-2501-0007, No None of the criteriaJFI-2301-0012 Rev 0 listed in

Description of Change: 1OCFR70.72(c) areDesign and install exterior lights above exterior pedestrian doors for met.building X-7725.

Reason for the Change:Provide adequate lighting for doors that do not currently have exteriorlight fixtures.

FCE 09-0163 0 Title: Critical Commercial Plant Surge Protection 5/14/2009 Yes ESO-310402-0001, No None of the criteriaSOW-2414-0003 listed in 10 CFRDescription of Change: 70.72(c) are met.

Add 13.8KV surge arresters to substations and associated work.

Reason for the Change:This change is being implemented to prevent overvoltage conditions fromdamaging electronic equipment, including machine motor drives in theprocess buildings.

FCE 09-0164 0 Title: Revision to CMP-3603-0001, Graded Approach to Configuration 5/14/2009 No CMP-3601-0001 No None of the criteriaManagement and Quality Assurance Rev 2 Chg B listed in

Description of Change: 1 eCFR70.72(c) are

Revise CMP-3603-0001 to clarify the responsible person, and to clarify met.

disposition instructions for nonconforming items that affect design and forcertain supplier-identified discrepant conditions.

Reason for the Change:Clarify procedure requirements and make consistent with the MaterialCondition Report Program.

Wednesday, January 27, 2010 Page 42 of 110

Page 45: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0166 0 Title: Revision to Procedure AC4-AR-010, Lead Cascade 3 Machine 5/15/2009 No AC4-AR-010 Chg 6 No None of the criteriaAlarms and Responses listed in

Description of Change: 10CFR70.72(c) are

Reflect new alarms added to the Distributive Control System. met.

Reason for the Change:Identify the appropriate response for a new alarm.

FCE 09-0167 0 Title: Revision to Settings Document OA-CS-LC3-09-001, Lead 5/15/2009 No OA-CS-LC3-09-001 No None of the criteriaCascade 3 Centrifuge Acceleration and Conditioning Parameters Rev 2, listed in(U) ICD-00005 Rev 2 1OCFR70.72(c) are

Description of Change:

Provide guidance to monitor additional instrumentation installed oncentrifuge Lead Cascade 3-18 and provides additional guidance formonitoring during conditioning and operation of all Lead Cascade 3machines.

Reason for the Change:Incorporate new guidance for centrifuge operating parameters.

FCE 09-0168 0 Title: Revision to Procedure ACD2-PC-001 Procurement of Quality 5/18/2009 No ACD2-PC-001 Chg 3 No None of the criteriaLevel-1 Services and Items for Use in Quality Level-1 Applications listed in

Description of Change: 10CFR70.72(c)areClarify title, purpose, scope, add definition, and remove a reference. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0169 0 Title: Structural Steel for X-7725 Monorail System 6/16/2009 Yes CWP #RAMONO-1201 No None of the criteriaRev 0 listed in

Description~ oChne1OCFR7O.72(c) areWork Package for the assembly and erection of structural steel and met.activities associated with the installation of electric system and serviceplatform for the X-7725 Monorail System.

Reason for the Change:A monorail system is required for the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 43 of 110

Page 46: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

*FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0169 1 Title: Structural Steel for X-7725 Monorail System 7/24/2009 No CWP #RAMONO-1201 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areRevision 1 evaluates the addition of two revised electrical specifications met.for the monorail system modifications.

Reason for the Change:Clarify applicable codes, standards, and regulatory guidance.

FCE 09-0170 0 Title: Revision to Procedure AC4-OP-055, Machine Disconnect 5/20/2009 No AC4-OP-055 Chg 11 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide enhanced electrical disconnect instructions and clarify met.disconnect sequencing.

Reason for the Change:Clarify procedure requirements to reflect operational experience.

FCE 09-0171 0 Title: Revision to AC4-OP-061, Transport Trailer Loading/Unloading 5/19/2009 No AC4-OP-061 Chg 1 No None of the criteriaProcedures listed in

Description of Change: 1 eCFR70.72(c) are

Provide instruction to implement the use of rotor cradle dollies. met.

Reason for the Change:Allow improved handling of containers when unloading parts.

FCE 09-0171 1 Title: Revision to AC4-OP-061, Transport Trailer Loading/Unloading 6/22/2009 No None No None of the criteriaProcedures listed in

Description of Change: 10CFR70.72(c) are

Revision 1 is an editorial change to correct a procedure revision number met.

error in the original change evaluation. No additional changes wereevaluated.

Reason for the Change:Correction of a procedure revision number error.

Wednesday, January 27, 2010I ................ -.1--- l....

Page 44of 110

Page 47: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0172 0 Title: X-7725 Area C and C1 Fire Sprinkler Modifications 5/27/2009 Yes ESO-3102-0005, No None of the criteriaSOW-3102-0009 Rev 0 listed in

Description of Change: 100CFR70.72(c) areDesign and construct or modify fire water sprinkler systems for new met.offices and new storage rack areas in Area C and C1 in building X-7725.

Reason for the Change:Modify sprinkler system to accommodate code requirements for thechange of use from normal occupancy to storage occupancy.

FCE 09-0172 1 Title: X-7725 Area C and C1 Fire Sprinkler Modifications 7/27/2009 Yes ESO-3102-0005, No None of the criteriaSOW-3102-0009 Rev 1 listed inDescription of Change:

10CFR7O.72(c) are

Design and construct or modify fire water sprinkler systems for new met.

offices, restrQom, and new storage rack areas in Area C, C1, and C1

Annex in building X-7725.

Reason for the Change:Modify sprinkler system to accommodate code requirements for thechange of use from normal occupancy to storage occupancy.

FCE 09-0173 0 Title: Revision to Procedure ACD2-EC-007, Waste Management 6/9/2009 No ACD2-EC-007 Chg 2 No None of the criteria

Description of Change: 10CFR7O.72(c) are

Update titles, forms, and references, add or clarify steps to ensure met.p

regulatory compliance for handling of hazardous and non-hazardous

waste, and other editorial and format changes.

Reason for the Change:Clarify procedure requirements.

FCE 09-0174 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 5/26/2009 No AC4-AO-001 Chg 11 No None of the criteriaCascade 3 Build listed in

Description of Change: 1 eCFR70.72(c) are

Remove an unnecessary step following pressure testing of the cooling met.system.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010-.........................

Page 45 of 110

Page 48: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

~ISA .Summary Reason NRCFCE'Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0174 1 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/22/2009 No None No None of the criteriaCascade 3 Build listed in

1OCFR7O.72(c) areDescription of Change: met.Revision 1 is an editorial change to correct a procedure revision numbererror in the original change evaluation. No additional changes wereevaluated.

Reason for the Change:Correction of a procedure revision number error.

FCE 09-0175 0 Title: Modifications to Lead Cascade Service Module Supply Air Duct 6/23/2009 Yes ECR-2202-0008-12 No None of the criteriaRev 0, listed in

Description of Change: License Application 1OCFR70.72(c) areInstall new service module supply air ventilation ductwork on old Ch 10, met.Cascades 4 and 6 to direct air flow away from Lead Cascade 3. Decommissioning

Reason for the Change: Funding Plan Ch 3Previous ventilation system modifications created airflow patterns thatare disruptive to Cascade operations.

FCE 09-0176 0 Title: Lead Cascade 3 Machine Design Changes 5/29/2009 No CR #s No None of the criteria1398 1414 listed in

Description of Change: 1450 1483 1 OCFR7O.72(c) ireCentrifuge machine design improvements and minor changes such as 1489 1491 met.dimensions, materials, cleaning, marking, and packaging. 1493 1498

Reason for the Change: 1515 1520Progression of design towards an AC100 commercial plant centrifuge 1536 1537machine. 1539 1540

1542 15431545 15461549 15561559 15611566 15681572 15731574 1576

FCE 09-0178 0 Title: Revision to Procedure AC4-OP-001, Purge Vacuum Normal 6/1/2009 No AC4-OP-001 Chg 14 No None of the criteriaOperating Procedure listed in

Description of Change: 1 eCFR70.72(c) are

Provide instructions to increase seal air pressure on the pumps. met.

Reason for the Change:To ensure the purge vacuum system is properly operated.

Wednesday, January 27, 2010 Page 46 of 110

Page 49: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0179 0 Title: Revision to Procedure AC4-OP-002, Evacuation Vacuum Normal 6/1/2009 No AC4-OP-002 Chg 15 No None of the criteriaOperating Procedure listed in

Description of Change: 10CFR70.72(c) are

Provide instruction to increase seal air pressure on the pumps. met.

Reason for the Change:To ensure the evacuation vacuum system is properly operated.

FCE 09-0180 0 Title: Lease/Sublease of X-2230C Storm Sewers 6/2/2009 No Exhibit A to the No None of the criteriaGas Centrifuge listed in

Description of Change: Enrichment Plant Lease 10CFR70.72(c) areAdd X-2230 storm sewers to the Gas Centrifuge Enrichment Project met.Lease.

Reason for the Change:The storm sewers are located within the American Centrifuge Plantfootprint and should be included in the sublease, along with the roads,buildings, and land that are already included in the sublease.

FCE 09-0181 0 Title: Relocate Intermediate Bay Cranes' Disconnect 5/29/2009 Yes ESO-2303-0015 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRelocate the disconnect for intermediate bay cranes from the fourth floor met.to the first floor of the Centrifuge Training and Testing Facility.

Reason for the Change:Make the disconnect readily accessible to crane operators andmaintenance personnel.

FCE 09-0182 0 Title: Public Address and Evacuation Alarm System - Phase 1 6/22/2009 Yes ESO-310409-0005, No None of the criteriaSOW-310409-0002, listed in

Description of Change: SOW-310409-0003, 10CFR70.72(c) are

Design, fabrication, installation, and onsite testing of a stand-alone Public TP-310409-0001 met.

Address and Evacuation Alarm System in buildings X-3000, X-3001, X- TP-310409-0001 met.

3012, and X-7725, and upgrade of wiring for existing X-3002 Fire Alarm& Fire Protection Systems.

Reason for the Change:Provide a Public Address and Evacuation Alarm System that will allowAmerican Centrifuge Operations to notify project personnel in the eventof an emergency, and replace temporary wiring for Government Services'fire alarm system.

...................... ..... ...... ý -.1....- -1-1.Page 47of 110Wednesday, January 27, 2010

Page 50: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASUMmary Reason NRC .

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0183 0 Title: Revision to Procedure ACD4-HP-011, Operation of Canberra 6/3/2009 No ACD4-HP-011 Chg 1 No None of the criteriaS5XLB Tennelec Low Background Counter listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed procedure to reflect operating instructions for the CanberraS5XLB Tennelec Low Background Counter.

Reason for the Change:The Canberra S5XLB Tennelec Low Background Counder provides lowbackground alpha and beta counting of smears and air samples fordetermination of radiological activity. Typographical errors werecorrected and detailed sequential steps were added to make theprocedure consistent with the upgraded software package for theCanberra S5XLB Tennelec Low Background Counter. Operation of theTennelec Low Background Counter is necessary to implementrequirements outlined in Sections 4.7.5 and 4.8.4 of the LicenseApplication for the American Centrifuge Lead Cascade Facility andAmerican Centrifuge Plant.

FCE 09-0184 0 Title: Concrete Foundations - Interplant Process Piping 1 and 2 6/8/2009 Yes CWP-FWIPPS-1101 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areWork Package to install concrete foundations, anchor bolts, sanitary met.sewer piping, electrical grounding, storm water piping and manholesassociated with Interplant Process Piping 1 and 2, and refurbish existingfoundations and replace anchor bolts for Interplant Process Piping 1.

Reason for the Change:Existing Interplant Process Piping foundations are in need ofrefurbishment.

FCE 09-0184 1 Title: Concrete Foundations - Interplant Process Piping 1 and 2 8/7/2009 No None No None of the criteria

Description of Change: 10CFR70.72(c) are

Revision 1 expanded the evaluation to address impact from or upon met.

previously approved but unimplemented changes. No new changes were

evaluated.

Reason for the Change:Additional review in response to Condition Notification.

Wednesday, January 27, 2010 Page 48 of 110

Page 51: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0185 0 Title: Lease/Sublease of X-6002 Boiler System, X-6002A Oil Storage 6/19/2009 No Exhibit A to the No None of the criteriaFacility, and X-2230T2 Recirculating Heating Water System (Less Gas Centrifuge listed inValve Pits A and B) Enrichment Plant Lease 1 OCFR70.72(c) are

Description of Change: met.

Add X-6002 Boiler System, X-6002A Oil Storage Facility, and X-2230T2Recirculating Heating Water System (less Valve Pits A and B) to the GasCentrifuge Enrichment Project Lease.

Reason for the Change:To allow the American Centrifuge project to have full control of thesefacilities.

FCE 09-0185 1 Title: Lease/Sublease of X-6002 Boiler System, X-6002A Oil Storage 7/10/2009 No Exhibit A to the No None of the criteriaFacility, and X-2230T2 Recirculating Heating Water System Gas Centrifuge listed in

Description of Change: Enrichment Plant Lease 10CFR70.72(c) are

Added X-2230T2 Recirculating Heating Water System Valve Pits A and B met.

to the Gas Centrifuge Enrichment Plant Lease.

Reason for the Change:To allow the American Centrifuge project to have full control of thesefacilities.

FCE 09-0186 0 Title: Concrete Foundations - X-3346A Shipping/Receiving 6/5/2009 Yes CWP #SRBLDG-1101 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areWork Package for the installation of foundations, piers, grounding, utility met.piping, fire protection piping and duct bank associated with the newShipping and Receiving building, X-3346A.

Reason for the Change:Support construction of a new building to house shipping and receiving,and cylinder staging area for the American Centrifuge Plant.

FCE 09-0187 0 Title: Refurbishment of Heating, Ventilation, and Air Conditioning 6/16/2009 No CWP #RAOTHR-2102 No None of the criteriaComponents in X-7725 Rev 0 listed in

Description of Change: 10CFR70.72(c) are

Work Package for the refurbishment, relocation, or replacement ofHeating, Ventilation, and Air Conditioning equipment, ductwork,insulation, and other components in building X-7725.

Reason for the Change:Refurbish or modify to meet original specifications and AmericanCentrifuge project requirements.

Wednesday, January 27, 2010 Page 49 of 110

Page 52: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0187 1 Title: Refurbishment of Heating, Ventilation, and Air Conditioning 7/20/2009 No CWP #RAOTHR-2102 No None of the criteriaComponents in X-7725 Rev 1 listed in-

Description of Change: 1 eCFR70.72(c) are

Revision 1 of the Work Package added a step for inspection and testing met.

of existing Heating, Ventilation, and Air Conditioning system local controlpanels.

Reason for the Change:Refurbish or modify to meet original specifications and AmericanCentrifuge project requirements.

FCE 09-0188 0 Title: X-7725 Areas C and C1 Modifications 6/16/2009 Yes ESO-3102-0005, No None of the criteriaSOW-3102-0010 Rev 1, listed in

Description of Change: SOW-3102-0011 Rev 0, 1OCFR70.72(c) areDesign and construction of a maintenance storage area, including SOW-3102-0012 Rev 0 met.shelving, loading dock, office areas with rest room and break room, in theC and C1 area of building X-7725.

Reason for the Change:Allow maintenance personnel to use the area for storage and handling ofmaterials in support of American Centrifuge project operations.

FCE 09-0190 0 Title: Revision to Procedure AC4-OP-024, Machine Pumpdown 6/5/2009 No AC4-OP-024 Chg 17 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Change machine pumpdown criteria, introduce a separate pumpdown met.

termination form, and revise another form to better match work flow.

Reason for the Change:Clarify procedure requirements.

FCE 09-0191 0 Title: New Procedure ACD4-ON-203, Loss of 13.8 KV Bus or Feeder 6/15/2009 No ACD4-ON-203 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Provide instructions for safe operating practices involving the loss of a met.

13.8 kV bus or feed in the X-5000 switchyard.

Reason for the Change:Adapt an existing Gaseous Diffusion Plant procedure for use byAmerican Centrifuge project personnel.

Wednesday, January 27, 2010 Page 50 of 110

Page 53: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0192 0 Title: New Procedure ACD4-UW-015, Operation of the X-6000/X-6001 6/11/2009 No ACD4-UW-015 Chg 0 No None of the criteriaTower Water Cooling System and Associated Equipment listed in

10OCFR7O.72(c) areDescription of Change: met.Provide instructions for operating the X-6000 Cooling Water System andassociated equipment.

Reason for the Change:Adapt an existing Gaseous Diffusion Plant procedure for use byAmerican Centrifuge project personnel.

FCE 09-0193 0 Title: New Procedure ACD2-OP-001, Equipment Status Control 6/17/2009 No ACD2-OP-001 Chg 0 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areProvide boundary definitions and turnover communications requirements met.necessary to maintain control of equipment status.

Reason for the Change:Support orderly coordination among Construction, Engineering, andOperations to prevent unauthorized activities or manipulation of installedequipment.

FCE 09-0194 0 Title: New Procedure ACD4-UW-002, Chemical Treatment for the 6/17/2009 No ACD4-UW-002 Chg 0 No None of the criteriaBoilers listed in

Description of Change: 1OCFR70.72(c) are

Provide instructions for monitoring and chemical treatment of the met.

Recirculating Heating Water boilers.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0195 0 Title: New Procedure ACD4-ON-209, Recirculating Heating Water Off 6/11/2009 No ACD4-ON-209 Chg 0 No None of the criteriaNormal Operations listed in

Description of Change: 10CFR70.72(c) are

Provide instructions for the off-normal operation of the Recirculating met.

Heating Water system in X-3002 and X-6002.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010 Page 51 of 110

Page 54: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Commentsý

FCE 09-0197 0 Title: New Procedure ACD4-UW-003, Recirculating Heating Water 6/11/2009 No ACD4-UW-003 Chg 0 No None of the criteriaOperations listed in

Description of Change: 1 mCFR70.72(c) are

Provide instructions and the forms to be filled out for the normal met.

operation of the Recirculating Heating Water system in the X-3002 and X-6002.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0198 0 Title: New Procedure ACD4-UA-004, X-6000 Dew Point Monitoring 6/29/2009 No ACD4-UA-004 Chg 0 No None of the criteriaSystem Operation listed in

Description of Change: 10CFR70.72(c)'are

Provide instructions for operating the fixed Dew Point Monitoring System met.

that is associated with dry-air plant operations.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0199 0 Title: X-3012 and X-7725 Buffer Storage Construction 6/8/2009 Yes ECR 3501-0002-19 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRemove existing and install new doors, install new or move existing met.access control and intrusion detection system components, install newclimate control unit and smoke/fire detectors, replace radiotransmitter/receivers for large doors, and modify fencing.

Reason for the Change:Upgrade controlled access areas in X-3012 and X-7725.

FCE 09-0200 0 Title: Revision to Procedure ACD2-EG-005, Preparation of Statements 6/5/2009 No ACD2-EG-005 Chg 4 No None of the criteriaof Work listed in

Description of Change: 1 eCFR70.72(c) are

Update references and add/delete or clarify steps to flow down fromprevious changes to associated procedures.

Reason for the Change:Process improvement and clarify procedure requirements.

Wednesday, January 27, 2010

...............

Page 52 of 110

Page 55: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0201 0 Title: New Procedure ACD4-ON-212, Response to Loss of 6/15/2009 No ACD4-ON-212 Chg 0 No None of the criteriaRecirculating Heating Water listed in

Description of Change: met.Provide instructions for responding to a loss of Recirculating HeatingWater.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0203 0 Title: New Procedure ACD4-UP-007, Removing and Restoring 6/23/2009 No ACD4-UP-007 Chg 0 No None of the criteriaOutlying Substations listed in

Description of Change: 1 eCFR70.72(c) are

Provide instructions for the removal and restoration of 13.8 kV primarybreakers, 13.8 kV secondary breakers, and operating 13.8 kV disconnectswitches in outlying substations (X-7725, X-3001, X-3002, X-1 000, and X-3000).

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0204 0 Title: New Procedure ACD4-ON-204, Loss of 345/13.8 kV X-5000 6/24/2009 No ACD4-ON-204 Chg 0 No None of the criteriaPower Transformer listed in

Description of Change: 10CFR70.72(c) are

Provide immediate and supplementary actions for response to loss of met.

power from a 345/13.8 kV Main Power Transformer in the X-5000switchyard.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0205 0 Title: New Procedure ACD4-UP-031, Communication Manhole Sump 6/17/2009 No ACD4-UP-031 Chg 0 No None of the criteriaPump Systems listed in

Description of Change: 1OCFR70.72(c) are

Provide instructions for the normal operation of the Communication met.

Manhole Sump Pump Systems which includes control panels and pumpslocated at 32 locations surrounding the American Centrifuge Plant.

Reason for the Change:Provide instructions to monitor and operate sump pump system followingturnover from Fluor.

Wednesday, January 27, 2010 Page 53 of 110

Page 56: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0206 0 Title: New Settings Document OA-CS-LC3-09-002, Lead Cascade 3 6/10/2009 No OA-CS-LC3-09-002 No None of the criteriaCentrifuge Operating Parameters Rev 0 listed in

Description of Change: 1 eCFR70.72(c) are

Provide operating information and limits for Lead Cascade 3 centrifuge met.

startup, conditioning, and tails scoop testing.

Reason for the Change:Incorporate new guidance for centrifuge operating parameters.

FCE 09-0207 0 Title: Revision to Procedure AC4-OP-026, Machine Connections Leak 6/16/2009 No AC4-OP-026 Chg 2 No None of the criteriaChecking listed in

Description of Change: 1 eCFR70.72(c) areProvide guidance on use of form AC-332, Green Machine Tag. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0208 0 Title: Revision to Procedure AC4-OP-053, Machine Venting With the 6/18/2009 No AC4-OP-053 Chg 7 No None of the criteriaBackfill Unit listed in

Description of Change: 1 eCFR70.72(c) are

Provide guidance on use of form AC-332, Green Machine Tag after met.

machine backfill.

Reason for the Change:Clarify procedure requirements.

FCE 09-0209 0 Title: Revision to Procedure AC4-OP-049, Machine Acceleration & 6/18/2009 No AC4-OP-049 Chg 27 No None of the criteriaDeceleration listed in

D i o 1OCFR70.72(c) areDescription of Change: met.Provide guidance on use of form AC-332, Green Machine Tag beforemachine acceleration.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 54 of 110

Page 57: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0210 0 Title: Revision to Procedure AC4-OP-070, Machine Leveling 6/16/2009 No AC4-OP-070 Chg 3 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Provide guidance on use of form AC-332, Green Machine Tag when final met.

level is complete.

Reason for the Change:Clarify procedure requirements.

FCE 09-0211 0 Title: New Procedure ACD4-ON-215, Boiler Off-Normal Operations 6/17/2009 No ACD4-ON-215 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Provide immediate and supplementary actions for response to off-normal met.

boiler conditions.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0212 0 Title: Revision to Procedure AC4-OP-001, Purge Vacuum Normal 6/15/2009 No AC4-OP-001 Chg 15 No None of the criteriaOperating Procedure listed in

Description of Change: 1 eCFR70.72(c) areDelete steps and references to previous vacuum pumps and incorporates met.

operation of replacement vacuum pumps for Lead Cascade 1.

Reason for the Change:Match procedure to new pump brand.

Wednesday, January 27, 2010 Page 55 of 110

Page 58: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0213 0 Title: Revision to Classified Distributive Information Plan SP-2605- 6/11/2009 No SP-2605-0029 Rev 1 No None of the criteria0029, Classified Distributive Information Networks Plan For The SP-2605-0030 Rev 1 listed inDistributed Control System Located in the X-3012 and X-3001; SP-2605-0031 Rev 2 1 OCFR70.72(c) areSP-2605-0030, Classified Distributive Information Networks Plan SP-2605-0032 Rev 2 met.For The Process Telephone System (PTS) Located In The X-3012 and X-3001;SP-2605-0031, Classified Distributive Information Networks PlanFor The Data Processing System Located In The X-3012;SP-2605-0032, Classified Distributive Information Networks PlanFor The Data Processing System Located In The X-7725 and X-7726

Description of Change:Removing the drawings from Classified Distributive Information NetworkPlans SP-2605-0029, SP-2605-0030, SP-2605-0031, and SP-2605-0032to relocate them to one central area.

Reason for the Change:Due to the number of changes to these drawings, they are beingremoved from each individual Classified Distributive Informationdocument and placed in a central location.

FCE 09-0215 0 Title: Revision to Procedure AC4-OP-025, Machine Connections 11/3/2009 No AC4-OP-024 Chg. 19 No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met:

Steps were added to ensure the pressure instrument is programmed with

set points enabled, deleted post connection leveling, and added asignature block for completion on the machine connection checklist.

Reason for the Change:Cycling the Machine Instrument Package during electrical connectionswill prompt the desired response from the upper assembly to place thegap adjustment controller in the correct position. Post ConnectionLeveling was deleted as this evolution is covered in AC4-OP-070,Machine Leveling and execution of this is prompted in the MachineAcceleration and Deceleration procedure.

FCE 09-0216 0 Title: Revision to Procedure AC4-OP-050, Machine Conditioning, Tails 6/23/2009 No AC4-OP-050 Chg 20 No None of the criteriaScoop Verification, and Charging with UF6 listed in

Description of Change: 1OCFR70.72(c) are

Include an independent verification for determining feed cart settings, met.

clarify machine tagging and when a particular valve is to be open.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 56 of 110

Page 59: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0217 0 Title: Revision to Procedure ACD2-SH-015, Instructions for 7/17/2009 No ACD2-SH-015 Chg 2 No None of the criteriaLockout/Tagout listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified System Isofation Verification requirements for vottage test andassociated independent verification when required. Minor correction andclarifications for ease of form completion. Added requirement for allpermit holders to release permit prior to testing and a System IsolationVerification be performed when tag is missing from a energy isolatingpoint not locked by a Lockout/Tagout tag lock.

Reason for the Change:Clarified System Isolation Verification requirements for voltage test toensure system is in a safe configuration and activities meet OccupationalSafety and Health Administration requirements.

FCE 09-0218 0 Title: Revision to Procedure ACD2-SH-014, Electrical Safety Guidelines 6/18/2009 No ACD2-SH-014 Chg 2 No None of the criterialisted in

Description of Change: 100FR70.72(c) are

Clarify guidance on battery voltage testing and preventive maintenance, met.

and how personnel protective equipment requirements are to be

documented.

Reason for the Change:Clarify procedure requirements.

FCE 09-0219 0 Title: Additional Green Zone 10 Plex, Welding Trailer and Support 6/18/2009 Yes CWP #BOPOUT-9102 No None of the criteriaFacilities Rev 1 listed in

Description of Change: 10CFR70.72(c) are

Provide utilities, prepare grounds, and add ten more trailers in the Green met.

Zone, outside the American Centrifuge Plant's Controlled Access Area, tosupport Fluor's construction activities.

Reason for the Change:Additional office space and construction facilities are needed to supportongoing construction activities.

FCE 09-0220 0 Title: New Procedure ACD4-UP-030, Isolating Breakers and Switchgear 6/24/2009 No ACD4-UP-030 Chg 0 No None of the criteriaAfter a Fault listed in

Description of Change: 10CFR70.72(c) areProvide instructions for isolating breakers and switchgear after a fault. met.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010 Page 57 of 110

Page 60: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0221 0 Title: Revision to Procedure ACD2-SH-001, Hazard Communication 6/23/2009 No ACD2-SH-001 Chg 3 No None of the criteriaProgram listed in 10 CFR

Description of Change: 70.72(c) are met.

Add requirements to use the Material Safety Data Sheet Database andassociated requirements.

Reason for the Change:The procedure change is necessary to ensure the new Material SafetyData Sheet Database is used and provides instructions for accessingmaterial safety data sheets.

FCE 09-0223 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 6/18/2009 No AC4-AO-001 Chg 12 No None of the criteriaCascade 3 Build listed in

Description of Change: 10CFR70.72(c) are

Reorder steps, record part numbers, address machine tagging, and met.

clarify other details.

Reason for the Change:Clarify procedure requirements.

FCE 09-0224 0 Title: New Procedure ACD4-UP-002, Removing and Restoring 345 kV 7/8/2009 No ACD4-UP-002 Chg 0 No None of the criteriaLines 501, 502, and 503 listed in

Description of Change: 10CFR70.72(c) are

Provide instructions and precautions for removing and restoring 345 kV met.

underground transmission lines 501, 502, and 503 to the X-5000switchyard.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0225 0 Title: New Procedure ACD4-UW-001, Boiler Operations 7/8/2009 No ACD4-UW-001 Chg 0 No None of the criteria

Description of Change: 10CFR70.72(c) are

Provide instructions for the operation of the boiler system on fuel oil or met.natural gas.

mt

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010 Page 58of 110

Page 61: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

,SA R

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0226 0 Title: Revision to Settings Document OA-CS-LC3-09-002, Lead 6/22/2009 No OA-CS-LC3-09-002 No None of the criteriaCascade 3 Centrifuge Operating Parameters Rev 1, listed in

Description of Change: ICD-00005 Rev 3 1OCFR70.72(c) are

Provide operating information and limits for AC1 00 Modification 0 met.

centrifuge startup, conditioning, and tails scoop testing, and off-lineoperation with inventory.

Reason for the Change:Incorporate operating parameters for AC100 machines.

FCE 09-0227 0 Title: Rigid Mast Crane Service Cable Protection 6/19/2009 Yes ESO-2201-0015 No None of the criteria

Description of Change: 1OCFR70.72(c) areRemove or relocate a conduit support to remove interference with a met.service conductor for the Rigid Mast Crane.

Reason for the Change:Conduit support is rubbing against the service conductor during rotatingmovements and damaging the outside jacket.

FCE 09-0229 0 Title: New Procedure ACD4-UP-029, Operation of the X-5000 Battery 6/29/2009 No ACD4-UP-029 Chg 0 No None of the criteriaRoom and Direct Current Power Distribution listed in

Description of Change: met.

Provide instructions for entry and performing routine checks of the

battery rooms and describe the distribution of the Direct Current powerfrom these rooms.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0230 0 Title: Revision to Procedure AC2-OP-057, Machine Position Re- 6/23/2009 No AC2-OP-057 Chg 3 No None of the criteriaqualification listed in

Description of Change: met.Clarify inspection steps for re-qualification, and revise associated checksheet.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 59 of 110

Page 62: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0231 0 Title: Revision to Procedure ACD1-MP-001, Lead Cascade and 7/13/2009 No ACD1-MP-001 Chg 4 No None of the criteriaAmerican Centrifuge Plant Operations Policy Manual listed in

Description of Change: 1 eCFR70.72(c) are

Specify frequency of assessment of the Safety Conscious Work met.

Environment program, and remove an unnecessary reference.

Reason for the Change:Clarify procedure requirements.

FCE 09-0232 0 Title: Revision to Procedure ACD2-MM-001, Control of Material 7/2712009 No ACD2-MM-001 Chg 3 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRequire uploading of completed AC-30 forms into the Electronic Data met.Management System.

Reason for the Change:Not all receipt inspection personnel had easy access to the ORACLEdatabase where the forms were previously stored.

FCE 09-0233 0 Title: Revision to Procedure AC4-OP-074, Lead Cascade 3 Machine 6/25/2009 No AC4-OP-074 Chg 3 No None of the criteriaConditioning, Tails Scoop Verification, and Charging with UF6 listed in

Description of Change: 10CFR70.72(c) are

Add valve locations in tables, remove a reference, and make flow met.improvements.

Reason for the Change:Clarify procedure requirements.

FCE 09-0234 0 Title: New Procedure ACD4-ON-214, Power Loss to X-530G Pump 7/26/2009 No ACD4-ON-214 Chg 0 No None of the criteriaHouse listed in

Description of Change: 10CFR70.72(c) are

Provide instructions for response to a loss of power to the X-530G Pump met.House.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010.- I..........1.11. ý I ----....................Page 60 of 110

Page 63: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0235 0 Title: X-7725 Solid Waste Balers 6/24/2009 Yes ESO-310207-0001, No None of the criteriaDescription of Change: SOW-3102-0014 Rev 0 listed in

Design, install, and operate solid waste balers in room 114 of Building X- 1 eCFR70.72(c) are

7725 for consolidation of used cardboard and plastic film that is not met.

contaminated with hazardous material.

Reason for the Change:Support the Recycle/Assembly and Centrifuge Training and Test FacilityWaste Management Plan for disposal of cardboard and plastic film.

FCE 09-0236 0 Title: New Procedure ACD4-UP-015, Power Transformer Load Limits 7/16/2009 No ACD4-UP-015 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide guidance from American National Standards Institute/Institute of met.Electrical and Electronics Engineers C-57.92-1981 and transformermanufacturers for safely loading transformers.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0237 0 Title: Boiler House Heating, Ventilation, and Air Conditioning System 8/3/2009 Yes CWP #BOPBLR-2102 No None of the criteriaRefurbishment listed in

Description of Change: 1 eCFR70.72(c) are

Relocation, assessment, refurbishment and re-installation of two existing met.

make-up air units from the boiler room in the X-3002 to the X-6002 BoilerHouse.

Reason for the Change:Reuse existing support equipment in new boiler house.

FCE 09-0238 0 Title: Install New Transformers 6/26/2009 Yes CWP #RAOTHR-5202 No None of the criteriaRev 0 listed in

Description of Change: 1OCFR70.72(c) areWork Package to install electrical transformers and pipe bollards at met.required locations throughout X-7725, and perform acceptance test forthe electrical installations.

Reason for the Change:Project assessment identified the need for modification.

Wednesday, January 27, 2010 Page 61 of 110

Page 64: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0240 0 Title: New Procedure ACD4-ON-213, X-5001B/X-530G Pump House 7/26/2009 No ACD4-ON-213 Chg 0 No None of the criteriaLoss of Oil Pressure listed in

Description of Change: 1 eCFR70.72(c) are

Provide guidance for response to loss of oil pressure in Pump House X- met.

5001 and X-530G.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0241 0 Title: New Procedure ACD4-ON-210, Response to Off Normal X-6000 7/26/2009 No ACD4-ON-210 Chg 0 No None of the criteriaDry Air Plant Operation listed in

Description of Change: 10CFR70.72(c) are

Provide instructions for operator response to X-6000 Dry Air Plant met.

conditions outside the normal limits.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0242 0 Title: New Procedure ACD4-UP-003, Removing and Restoring an X- 7/13/2009 No ACD4-UP-003 Chg 0 No None of the criteria5000 345 kV Power Transformer listed in

Description of Change: 10CFR70.72(c) are

Provide instructions for monitoring bus operating voltage levels and met.

removing from or restoring to service the 345 kV power transformers inthe X-5000 switchyard.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0243 0 Title: Revision to IHS-2601-0001, Health and Safety Plan for 8/27/2009 No IHS-2601-0001 Chg 6 No None of the criteriaConstruction listed in

Description of Change: 1 eCFR70.72(c) are

Clarify requirements for when permits or plans are required and how they met.

are to be documented, added, deleted or revised other requirements,and made grammar and format changes.

Reason for the Change:Clarify plan requirements.

Wednesday, January 27, 2010...........................................................

Page 62 of 110

Page 65: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

•FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0244 0 Title: Revision to Procedure ACD2-SH-017, Accident 8/20/2009 No ACD2-SH-017 Chg 1 No None of the criteriaPrevention/Equipment Tags listed in

Description of Change: 1 eCFR70.72(c) are

Add acronyms and references, revise a form, and provide clarification. met.

Reason for the Change:Clarify procedure requirements.

FCE 09-0246 0 Title: Temporary Construction Warehouse Modification 8/4/2009 Yes CWP #BOPOUT-9105 No None of the criteriaRev 0 listed in .

Description of Change: 10CFR70.72(c) areWork Package to create temporary office space and break area for the met.warehouse facility at X-7725A, provide electrical power and refurbishlighting, install a temporary fence to provide controlled storage, andestablish a compressed gas storage area.

Reason for the Change:Support American Centrifuge Plant construction.

FCE 09-0247 0 Title: Revision to Procedure ACD2-HP-006, Dosimetry Program 6/26/2009 No ACD2-HP-006 Chg 3 No None of the criteriaStandards listed in

Description of Change: 1 eCFR70.72(c) are

Describe new personal nuclear accident dosimetry that will replace the met.

indium foil that had previously been integral to employee security badges.

Reason for the Change:Reflect mandatory replacement of employee badges with new HSPD-1 2badges that cannot accommodate the integral dosimetry.

FCE 09-0248 0 Title: Revision to Procedure ACD2-HP-008, Distribution of Dosimetry 6/26/2009 No ACD2-HP-008 Chg 2 No None of the criterialisted in

SDescription of Change: 1OCFR70.72(c) areDescribe new personal nuclear accident dosimetry that will replace the met.indium foil that had previously been integral to employee security badges

Reason for the Change:Reflect mandatory replacement of employee badges with new HSPD-12badges that cannot accommodate the integral dosimetry.

Wednesday, January 27, 2010 Page 63 of 110

Page 66: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0250 0 Title: Revision to Procedure ACD2-RG-001, Change Evaluation 7/7/2009 No ACD2-RG-001 Chg 6 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areImprove the flow of the associated Change Evaluation form (AC-001), met.clarify instructions, and delete an unused reference.

Reason for the Change:Clarify procedure requirements.

FCE 09-0251 0 Title: New Procedure ACD4-ON-202, Loss of Any 345 kV American 7/13/2009 No ACD4-ON-202 Chg 0 No None of the criteriaCentrifuge Plant Line listed in

Description of Change: 1OCFR70.72(c) are

Provide actions to be taken upon loss of any 345 kilovolt line serving the met.American Centrifuge Plant.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0252 0 Title: X-7725 Chillers Tower Cooling Water Bypass Valves 6/30/2009 Yes ESO-3102-0013 No None of the criteriaSOW-3102-0013 listed in

Description of Change: 10CFR70.72(c) areReplace Tower Cooling Water bypass gate valves in five X-7725 Tower met.

Cooling Water chillers with new ball valves and flexible couplings.

Reason for the Change:Allow maintenance personnel to perform repairs to the system moresafely and effectively without having to shut down the Tower CoolingWater system.

FCE 09-0253 0 Title: Conduit Removal in the X-3012 Area Control Room 2 6/30/2009 Yes ESO-310107-0001, No None of the criteriaSOW-310107-0002 listed in

Description of Change: Rev 0 1OCFR70.72(c) areRemove unused conduits, abandoned electrical enclosures, and old met.console support frames in X-3012 Area Control Room 2.

Reason for the Change:Remove interference with the installation of new conduits that will berequired to support commercial plant activities.

Wednesday, January 27, 2010 Page 64 of 110

Page 67: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0254 0 Title: Install Temporary Welding Power Cables 8/7/2009 Yes CWP-PB2SOU-9101 No None of the criteriaD Rev 2 listed inDescription of Change: 10CFR70.72(c) areWork Package to install and connect temporary electrical feeder met.cables/receptacles in the Xý3002 for connecting portable welding carts,provide portable welding power carts, and provide temporary powersupply for generators in storage.

Reason for the Change:Planned refurbishment and construction activities require temporarypower be established to support welding activities and to maintain theinternal environment of stored generators until they are permanentlyinstalled.

FCE 09-0254 1 Title: Install Temporary Welding Power Cables 9/11/2009 No None No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRevision 1 provided the expiration date for this temporary modification, met.No additional changes were reviewed.

Reason for the Change:Required information was missing from the original change evaluation.

FCE 09-0255 0 Title: Pressure Test For Existing Nitrogen Line 7/22/2009 No CWP #RAOTHR-9201 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package to remove a small portion of the nitrogen supply line in the met.X-7725, install three valves at pipeline terminations to allow for isolation,and pressure test the nitrogen line.

Reason for the Change:The nitrogen line needs to be refurbished and pressure tested for theAmerican Centrifuge project.

FCE 09-0256 0 Title: New Procedure ACD4-ON-201, Containing Oil Spills in X 5000/X- 7/13/2009 No ACD4-ON-201 Chg 0 No None of the criteria5001 listed in

Description of Change: 1OCFR70.72(c) are

Develop new procedure to provide instructions for responding to a spill of met.

oil from the X-5000/X-5001 that has the potential to pollute the groundwater and/or flow to the holding pond.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010 Page 65 of 110

Page 68: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0257 0 Title: New Procedure ACD4-ON-211, Response to Loss of Tower Water 7/27/2009 No ACD4-ON-211 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide actions required upon X-6000 Tower Water Cooling pump failure met.or ruptured pipe on east or west main Tower Water Cooling loop.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0258 0 Title: Revision to Settings Document OA-CS-LC3-09-002, Lead 7/8/2009 No OA-CS-LC3-09-002 No None of the criteriaCascade 3 Centrifuge Operating Parameters (U) Rev 2, listed in

Description of Change: ICD-00005 Rev 4 10CFR70.72(c) are

Provide operating information and limits for Lead Cascade 3 centrifuge met.

startup, conditioning, and tails scoop positioning, and off-line operationwith inventory.

Reason for the Change:Incorporate updates to operating parameters for AC100 Modification 0machines.

.FCE 09-0259 0 Title: New Procedure ACD4-AR-203, X-6002A Fuel Oil Alarm 7/16/2009 No ACD4-AR-203 Chg 0 No None of the criteriaResponses listed in

Description of Change: 1 eCFR70.72(c) are

Provide responses for fuel oil tank, pump, strainer, or other alarms at the met.

X-6002A fuel oil storage facility.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0260 0 Title: New Procedure ACD4-UW-005, X-6002A Fuel Oil Delivery, 8/10/2009 No ACD4-UW-005 Chg 0 No None of the criteriaStorage, and Transfer listed in

Description of Change: 1OCFR70.72(c) are

Provide instructions for off-loading, storage, circulating, transferring fuel met.

oil between tanks, and shutdown and off-normal operations for the fueloil system at the Boiler Fuel Oil Tank Farm.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

Wednesday, January 27, 2010 Page 66 of 110

Page 69: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0261 0 Title: OA-CS-LC3-09-003, Lead Cascade 3 Cascade Operating 7/10/2009 No OA-CS-LC3-09-003 No None of the criteriaParameters (U) Rev 0 listed in 10 CFR

Description of Change: 70.72(c) are met.

Provide operating settings information and guidance required for LeadCascade 3 operation.

Reason for the Change:The document provides operations with the settings and informationrequired for operation of the centrifuges as a cascade.

FCE 09-0262 0 Title: New Procedure ACD4-UP-006, Operation of 345 kV Underground 7/16/2009 No ACD4-UP-006 Chg 0 No None of the criteriaOil Pumping Plant listed in

Description of Change: 1 eCFR70.72(c) are

Provide instructions for the operation of the 345 kV underground oil met.

pumping plant to maintain proper oil pressure on the 345 kV undergroundcable system, in order to prevent formation of gas bubbles in the oil, toprevent entrance of contaminants into the cable system, and to maintaindielectric strength in the electric cable potheads.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0263 0 Title: Lead Cascade Facility Mass Spectrometer Pump Down Cart 7/16/2009 Yes ESO-2201-0013 No None of the criteriat olisted in

Description of Change: 1OCFR70.72(c) areProvide a pump down cart for the Lead Cascade Facility mass met.spectrometers in the X-3001.

Reason for the Change:To expedite the removal of moist air from a mass spectrometer manifoldafter maintenance, reducing down time.

FCE 09-0264 0 Title: Centrifuge Machine Cooling Water Tube and Fittings Redesign 7/21/2009 Yes None No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areChange Machine Cooling Water tubing and fittings design from met.polypropylene Tube and Swagelok compression fittings to insertion lockfittings and polyethylene tubing.

Reason for the Change:The current design and installation process is over engineered, laborintensive, and not cost effective. The change provides additional waterflow to the diffusion pump. Reduction in parts and connection pointswhich reduces the statistical risk of component failure (leakage).

Wednesday, January 27, 2010 Page 67 of 110

Page 70: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0265 0 Title: Revision to Procedure AC4-ON-007, Machine Instrument 7/10/2009 No AC4-ON-007 Chg 13 No None of the criteria ,Package Replacement at an Operating Position listed in

Description of Change: 1 eCFR70.72(c) are

Add instructions for manual valve operation if automatic action fails to met.

occur.

Reason for the Change:Provide steps that were lacking in procedure.

FCE 09-0266 0 Title: New Procedure ACD4-ON-208, Impoundment of a Pollutant Spill 8/14/2009 No ACD4-ON-208 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide instructions for responding to a release of pollutants due to a met.mechanical failure of containment vessels or water lines.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0268 0 Title: Revision to Procedure ACD2-PS-004, Handling and Processing of 7/26/2009 No ACD2-PS-004 Chg 4 No None of the criteriaClassified and Safeguards Information Documents for Offsite listed in 10 CFRDeliveries and Receipts 70.72(c) are met.

Description of Change:Procedure was revised to allow handling of classified material in Closedor Restricted Areas and to correct references.

Reason for the Change:The procedure was revised to reflect combining of the Lead CascadeFacility and American Centrifuge Plant Security Programs.

FCE 09-0269 0 Title: Revision to Procedure ACD2-SH-014, Electrical Safety Guidelines 8/6/2009 No ACD2-SH-014 Chg 3 No None of the criteria

Description of Change: 1 lCFR70.72(c) are

Reflect National Fire Protection Association 70 E code changes, establish met. a

requirements for areas where electrical hazards may be present when

performing work on electrical equipment, and other minor clarificationsand editorial changes.

Reason for the Change:Clarify and update procedure requirements.

Wednesday, January 27, 2010 Page 68 of 110

Page 71: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval Not.Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0270 0 Title: New Procedure ACD4-UP-008, Operation of the X-6000 480 Volt 7/27/2009 No ACD4-UP-008 Chg 0 No None of the criteriaSwitchgear listed in

Description of Change: 1 eCFR70.72(c) are.

Provide instructions for de-energizing/re-energizing the X-6000 480-voltdouble-ended substation, transformer, secondary breaker, and tiebreaker under normal conditions.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0271 0 Title: Revision to Procedure ACD2-QM-01 1, Resolving Contractor 7/22/2009 No ACD2-QM-01 1 Chg 5 No None of the criteriaIssues listed in

Description of Change: 10CFR70.72(c) are

Add acronym and steps for evaluation approval of contractor responses met.

to "use as is" and "repair". Clarified signature requirements and when"extent of condition" is needed.

Reason for the Change:Clarify procedure requirements.

FCE 09-0272 0 Title: Piping and Equipment Insulation 7/24/2009 Yes CWP #BOPBLR-6201 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areWork Package for insulating piping and equipment that has been met.installed in the new X-6002 Boiler House.

Reason for the Change:Insulation of hot water piping and equipment.

FCE 09-0273 0 Title: Relocation of Monitoring Station #4 7/27/2009 No Amedcan Centrifuge No None of the criteriaPlant listed in

Description of Change: Emergency Action Plans 1OCFR70.72(c) arePortsmouth Gaseous Diffusion Plant Emergency Plan (which also serves (X-3000, X-3001, met.the Lead Cascade Facility) is being changed to reflect the relocation of a X-3002, X-3012,monitoring station from X-533H to a trailer near X-640-1. X-3346, X-5000,

Reason for the Change: X-6000, X-7721,Reflect a change by USEC Government Services to prepare for de- X-7725/7726)leasing the area near X-533H back to the U.S. Department of Energy.

Wednesday, January 27, 2010 Page 69 of 110

Page 72: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0274 0 Title: Revision to Procedure ACD2-TP-001, Procedure Process, and 8/27/2009 No ACD2-TP-001 Chg 4 No None of the criteriaAssociated Forms listed in

Description of Change: 10CFR70.72(c) are

Revised definitions, steps and notes, and clarify instructions. Revised met.

wording, deleted unnecessary information, and clarified instructions forProcedure Development/Change, Review/Comment,Verification/Validation, and Intent/Non-Intent Determination forms.

Reason for the Change:Clarify procedure requirements and respond to Process Improvementrecommendations.

FCE 09-0275 0 Title: New Procedure ACD4-UP-001, Removing and Restoring 13.8 a 7/27/2009 No ACD4-UP-001 Chg 0 No None of the criteriakV X-5000 Bus listed in

Description of Change: 10CFR70.72(c) are

Provide safe operating instructions for removing and restoring a 13.8 kV met.

X-5000 bus.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE09-0276 0 Title: New Procedure ACD4-UP-009, X-6000 Routine Substation 8/10/2009 No ACD4-UP-009 Chg 0 No None of the criteriaChecks listed in

Description of Change: 1 eCFR70.72(c) are

Provide steps to take when performing routine checks on the 480 Volt met.

and 2400 Volt X-6000 substations during normal operations.

Reason for the Change:Adapt existing procedure for use by American Centrifuge projectpersonnel.

FCE 09-0277 0 Title: New Procedure ACD4-UP-019, Testing Pressure Relays of 345 07/28/2009 No ACD4-UP-019 Chg 0 No None of the criteriakV Power Transformers listed in

Description of Change: mtCFR70.72(c) are

Provide instructions for operations of the X-5000 Switch Yard testing met.

Pressure Relay on 345 kV Power Transformers.

Reason for the Change:To ensure Pressure Relay on 345 kV Power Transformers operate asdesigned.

Wednesday, January 27, 2010 Page 70 of 110

Page 73: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0278 0 Title: X-3001 Lead Cascade 3 Instrumentation and Controls Upgrade 7/21/2009 Yes ECR-2202-0007-041, No None of the criteriaECR-2202-0007-042,

listed in

Description of Change: ECR-2202-0007-043, 10CFR70.72(c)lareModify cabling, casing pressure alarms and automatic isolation, and add CR-20599, meR .CR-i1599, met.a thermocouple connection cable to allow for testing and isolation. CR 1602

Reason for the Change:Changes to machine operation and monitoring necessary for the machineto operate properly.

FCE 09-0278 1 Title: X-3001 Lead Cascade 3 Instrumentation and Controls Upgrade 8/12/2009 Yes ECR-2202-0007-041, No None of the criteriaECR-2202-0007-042, listed in

Description of Change: ECR-2202-0007-043, 10CFR70.72(c) areRemove the Varian/MKS/connecting tee and replace it with a single ECR-2202-0007-044, met.

transducer. CR-1 599,

Reason for the Change: CR 1602,For improved operation and monitoring of machines. CR 1609

FCE 09-0278 2 Title: X-3001 Lead Cascade 3 Instrumentation and Controls Upgrades 9/22/2009 Yes ECR-2202-0007-041, No None of the criteriaECR-2202-0007-042, listed in 10 CFRDescription of Change: ECR-2202-0007-043, 70.72(c) are met.

Replace chopper board cable harness and inverter board harness inside ECR-2202-0007-044,each Machine Drive Unit, as well as other software enhancements to the CR-12599,Machine Drive Unit. Restore the casing pressure signal to the Machine CR 1602,Instrument Package along with hardware and software improvements to CR 1609,the Machine Instrument Package. ECR-2202-0007-47,

Reason for the Change: CR-1607,For improved operation and monitoring of machines. ECR-2202-0007-45

FCE 09-0279 0 Title: New Procedure ACD4-AR-201, X-6000/X-6001 Tower Water 8/10/2009 No ACD4-AR-201 Chg 0 No None of the criteriaCooling System and Associated Equipment Alarm Response listed in

Description of Change: 1OCFR70.72(c) are

Provide instruction for response to the alarms on the X-6000/X-6001 met..

alarm panels.

Reason for the Change:Adapt information from Gaseous Diffusion Plant procedures for use byAmerican Centrifuge project personnel.

Wednesday, January 27, 2010

.................... ---- ......... ..

Page 71 of .110

Page 74: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0280 0 Title: Revision to Procedure ACD2-HP-010, Measurement of Airborne 8/7/2009 No ACD2-HP-010 Chg 1 No None of the criteriaRadioactivity listed in

Description of Change: 10CFR70.72(c) are

Clarify requirements for recording air sample information, management met.

review, and processing samples through the American Centrifuge PlantCounting Laboratory.

Reason for the Change:Clarify procedure requirements.

FCE 09-0281 0 Title: New Procedure ACD4-HP-005, Operation of the RO-20 Survey 8/17/2009 No ACD4-HP-005 Chg 0 No None of the criteriaMeter listed in

Description of Change: 1 mOCFR7.72(c) are

Provide instructions to Health Physics technicians in use of the new ion-chamber type survey instrument.

Reason for the Change:Adapt Gaseous Diffusion Plant procedure for use by American Centrifugeproject personnel.

FCE 09-0285 0 Title: New Procedure ACD4-AR-204, Alarm Response to Boiler Control 8/9/2009 No ACD4-AR-204 Chg 0 No None of the criteriaPanel and Natural Gas Alarm Panel listed in

Description of Change: 10CFR70.72(c) are

Provide immediate and supplemental responses to alarms involving the met.

boiler or natural gas supply.

Reason for the Change:Adapt Gaseous Diffusion Plant procedure for use by American Centrifugeproject personnel.

FCE 09-0287 0 Title: Revision to Procedure ACD2-QM-101, Inspection Program 8/3/2009 No ACD2-QM-101 Chg 7 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide additional guidance for peer review and hold points and add or met.revise step and notes to provide program clarification.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 72 of 110

Page 75: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE Number Rev.

FCE 09-0288 0 Title: Revision to Procedure AC4-OP-024, Machine Pumpdown

Description of Change:Clarify steps for multiple backfills and evacuations used for purgingcentrifuge machines prior to removal, and provide new form to trackmultiple purge cycles.

ISASummary Reason NRC

Documents Modified Update Preapproval NotDue to Change Required? RequiredlComments

8/12/2009 No AC4-OP-024 Chg 19 No None of the criterialisted in

10CFR70.72(c) aremet.

Reason for the Change:Clarify procedure requirements.

FCE 09-0289 0 Title: Revision to Procedure AC4-OP-053, Machine Venting with the 8/11/2009 No AC4-OP-053 Chg 8 No None of the criteriaBackfill Unit listed in

1 OCFR7O.72(c) areDescription of Change: met.Clarify steps for multiple backfills and evacuations used for purgingcentrifuge machines prior to removal, and provide new form to trackmultiple backfill cycles on a single form.

Reason for the Change:Clarify procedure requirements.

FCE 09-0290 0 Title: Revision to Procedure ACD2-MA-001, Control of Measuring and 8/3/2009 No ACD2-MA-001 Chg 3 No None of the criteriaTest Equipment listed in

Description of Change: 10CFR70.72(c) are

Clarify information to be retained from the calibration process, clarify met.

license requirement when selecting measurement and test equipment foruse in the field, and clarify documentation requirements if a piece ofequipment fails calibration.

Reason for the Change:Clarify procedure requirements.

FCE 09-0291 0 Title: New Procedure ACD4-UT-001, Monthly Dike Inspections 8/10/2009 No ACD4-UT-001 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide guidance for the monthly inspection of oil and fuel oil met.containment dikes.

Reason for the Change:Adapt Gaseous Diffusion Plant procedure for use by American Centrifugeproject personnel.

Wednesday, January 27, 2010 Page 73 of 110

Page 76: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0292 0 Title: New Procedure ACD3-EO-018, Use of Switching Orders 8/10/2009 No ACD3-EO-018 Chg 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide actions or switching to be accomplished in "switching out" or met."switching in" electrical equipment and authorizing its performance.

Reason for the Change:Adapt Gaseous Diffusion Plant procedure for use by American Centrifugeproject personnel.

FCE 09-0293 0 Title: New Procedure ACD4-AR-202, X-6000 Dry Air System Alarms 8/10/2009 No ACD4-AR-202 Chg 0 No None of the criteriaand Responses listed in

Description of Change: 1 eCFR70.72(c) are

Provide immediate and supplemental actions to be taken in response to met.

alarms in the X-6000 Dry Air Systems.

Reason for the Change:Adapt Gaseous Diffusion Plant procedure for use by American Centrifugeproject personnel.

FCE 09-0294 0 Title: Revision to Procedure AC4-AR-010, Lead Cascade 3 Machine 8/18/2009 No AC4-AR-010 Chg 7 No None of the criteriaAlarms and Responses listed in

Description of Change: 1 eCFR70.72(c) are

Add three new alarms (for Internal Temperature High, High-High, and met.

Accelerator Temperature Rate of Change) and modify responses to twoexisting alarms.

Reason for the Change:Increase awareness and identify issues earlier during machine operation.

FCE 09-0295 0 Title: Boiler Building Network Cabling 8/4/2009 Yes CWP #BOPBLR-5501 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package to install Ethernet and general network cabling from the met.Fiber Optic Backbone Patch Panel to the Programmable Logic Controllerin Boiler Building X-6002.

Reason for the Change:The network cabling is required to support the American Centrifugeproject.

Wednesday, January 27, 2010 Page 74 of 110

Page 77: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0296 0 Title: Revision to Procedure ACD2-QM-107, Material Condition Report 8/11/2009 No ACD2-QM-107 Chg 4 No None of the criteriaProgram listed in

Description of Change: 1 eCFR70.72(c) are

Provide additional guidance and clarification of when a Material Condition met.

Report should be initiated, how to select the disposition authority, issuinga conditional release, justify use-as-is or repair dispositions and how toreturn nonconforming items.

Reason for the Change:Clarify procedure requirements.

FCE 09-0298 0 Title: Revision to Procedure AC4-OP-074, Lead Cascade 3 Machine 8/6/2009 No AC4-OP-074 Chg 5 No None of the criteria.Conditioning, Tails Scoop Verification, and Charging with UF6 listed in

Description of Change: 10CFR70.72(c) areProvide instructions to open a bypass valve to create an alternate flowpath for testing, and specify when to place the cascade in recycle mode.

Reason for the Change:Clarify procedure requirements.

FCE 09-0299 0 Title: Revision to procedure AC4-AR-009, Lead Cascade 3 Cascade 10/27/2009 No AC4-AR-009 Chg 3 No None of the criteria -

Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added response requirements for product assay high and high-highalarm.

Reason for the Change:To provide guidance in the event assay levels were to exceed expectedlimits and to assure levels would not reach the license application limit.

FCE 09-0300 0 Title: Revision to Procedure AC4-OP-055, Machine Disconnect 8/9/2009 No AC4-OP-055 Chg 12 No None of the criteria

Description of Change: 1CFR70.72(c) are

Add instructions for placing a Red Machine Tag on a machine after it is met.~disconnected.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 75 of 110

Page 78: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0301 0 Title: Lead Cascade Facility Fossil Fueled Vehicle Use Outside of X- 9/23/2009 No Integrated Safety Yes None of the criteria3001 Analysis Summary listed in

Description of Change: Ch 6, 1OCFR70.72(c) are

The Integrated Safety Analysis Summary hazard identification was Appendix B, C and F met.

expanded to consider the presence of fossil fueled vehicles in the X-7726Centrifuge Training and Test Facility, X-7727H Transfer Corridor, and theX-7725 Recycle/Assembly Building.

Reason for the Change:Document the "Low" consequences of a fire in facilities other than the X-3001 Process Building and to demonstrate that restrictions on fossilfueled vehicles in the X-7726, X-7727, and X-7725 facilities areunnecessary..

FCE 09-0302 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 8/11/2009 No ACD2-RG-003 Chg 5 No None of the criteriaCommunications listed in

Description of Change: 1 eCFR70.72(c) are

Remove an unnecessary reference, update lists of required reports, add met.

or update references for background information.

Reason for the Change:Clarify procedure requirements.

FCE 09-0303 0 Title: Add Docket Number to Quality Assurance Program Description 8/20/2009 No Quality Assurance No None of the criteriaProgram Description listed in

Description of Change: Title Page 1OCFR70.72(c) areRevise Quality Assurance Program Description document to include met.Docket No. 70-7003 for the Lead Cascade Facility on the cover page.The cover page already lists Docket No. 70-7004 for the AmericanCentrifuge Plant.

Reason for the Change:The Lead Cascade Facility docket number was inadvertently omittedwhen the program was made applicable to both the Lead CascadeFacility and the American Centrifuge Plant.

FCE 09-0304 0 Title: Revision to Procedure ACD2-RG-044, Nuclear Regulatory Event 8/11/2009 No ACD2-RG-044 Chg 5 No None of the criteriaReporting listed in

Description of Change: 1 eCFR70.72(c) are

Remove an unnecessary reference, add definitions, update lists of met.required reports, and make minor editorial changes.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 76 of 110

Page 79: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0305 0 Title: Revision to Procedure ACD2-SP-014, Limiting Access to 12/10/2009 No ACD2-SP-014 Chg 3 No None of the criteriaClassified Information and Escorting listed in 10 CFR

Description of Change: 70.72(c) are met.

Change escorting requirements/protocols.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

FCE 09-0306 0 Title: Revision to Procedure ACD2-SP-006, Electronic Equipment and 12/10/2009 No ACD2-SP-006 Chg 3 No None of the criteriaDevices listed in 10 CFR

Description of Change: 70.72(c) are met.'

Removed the reference to the Lead Cascade Facility Security Program.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

FCE 09-0307 0 Title: Revision to Procedure ACD2-SP-022, Accountable Classified 12/10/2009 No ACD2-SP-022 Chg 1 No None of the criteriaRemovable Electronic Media listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed the reference to the Lead Cascade Facility Security Program.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and American Centrifuge Plant.

FCE 09-0308 0 Title: Revision to Procedure ACD4-SP-025, Security Alarm Response 12/10/2009 No ACD4-SP-025 Chg 2 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Revised definitions to match Security Program definitions, correctedreference, and editorial changes.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

Wednesday, January 27, 2010....................................................... ... --- .........................

Page 77 of 110

Page 80: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

• • ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE'09-0309 0 Title: Revision to Procedure ACD2-SP-026, Security Access Control 12/10[2009 No ACD2-SP-026 Chg 5 No None of the criteriaand Alarm System listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised definitions to match Security Program definitions, correctedreference, and editorial changes.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

FCE 09-0310 0 Title: Revision to Procedure AC4-OP-020, Machine Mount Hardware 8/12/2009 No AC4-OP-020 Chg 3 No None of the criteriaInstallation/Removal listed in

Description of Change: 1OCFR70.72(c) areAllow use of this procedure for installation of machines in the Centrifuge met.Training and Test Facility.

Reason for the Change:Expand locations for which the procedure is applicable.

FCE 09-0311 0 Title: Revision to Procedure ACD2-EG-009, Processing Modification 8/17/2009 No ACD2-EG-009 Chg 2 No None of the criteriaand Project Changes listed in

Description of Change: 1 eCFR70.72(c) are

Add new step to flowchart, clarify requirements, and correct references. met.

Reason for the Change:Clarify procedure requirements in response to a process improvementrecommendation.

FCE 09-0312 0 Title: Revision to Procedure ACD2-SH-019, Safety and Health Work 9/1/2009 No ACD2-SH-019 Chg 4 No None of the criteriaPermit listed in

Description of Change: 1 eCFR70.72(c) are

Clarify factors in determining need for a Safety and Health Work Permit, met.

correct or add references, update forms, and minor format andgrammatical changes.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 78 of 110

Page 81: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE.Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0313 0 Title: New Procedure ACD2-QM-002, Quality Assurance Independent 8/31/2009 No ACD2-QM-002 Chg 0 No None of the criteriaAudit Program listed in

Description of Change: 10CFR70.72(c) are

Replace existing procedure ACD3-QM-001 to provide direction for met.

conducting Quality Assurance internal independent audits on areasassociated with the American Centrifuge Program.

Reason for the Change:Reflect actions required by audited management and emphasize theindependent nature of audits performed, as corrective action to aCondition Notification.

FCE 09-0314 0 Title: Install Dry Air Supply Flow Meter 8/19/2009 Yes ESO-2409-0005 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areInstall/refurbish a flow metering system on the dry air supply header from met.the Gaseous Diffusion Plant.

Reason for the Change:Replace obsolete equipment so total air usage can be measured whenthe Gaseous Diffusion Plant supply is used as backup to the X-6000 dryair system.

FCE 09-0315 0 Title: Revision to Procedure ACD2-PM-001, Preventive Maintenance 9/8/2009 No ACD2-PM-001 Chg 2 No None of the criteriaProgram listed in

Description of Change: 10CFR70.72(c) are

Add a checklist, update associated forms, and clarify responsibilities for met.

form completion.

Reason for the Change:Clarify procedure requirements.

FCE 09-0316 0 Title: Revision to Procedure ACD2-SH-015, Instructions for 8/20/2009 No ACD2-SH-015 Chg 4 No None of the criteriaLockout/Tagout listed in

Description of Change: 10CFR70.72(c) are

Clarify when an authorized employee is to remove a personal lock after met.performing a System Isolation Verification voltage test.

Reason for the Change:Clarify procedure requirements as corrective action for a ConditionNotification.

Wednesday, January 27, 2010 Page 79 of 110

Page 82: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0317 0 Title: B-25 Box Security Plan 8/20/2009 No B-25 Box Security Plan No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met.

Relocating B-25 boxes from the X-7726 Centrifuge Training and Test

Facility to the X-3001 Train 3 area.

Reason for the Change:The B-25 boxes must be moved to create space for Lead CascadeFacility assembly and disassembly operations.

FCE 09-0318 0 Title: Revision to Procedure AC4-OP-051, Inventory Removal 9/14/2008 No AC4-OP-051 Chg 11 No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met.

Added section for performing a controlled dump of Lead Cascade 3.

Removed requirement to stop at certain speeds when decelerating amachine for removal and revised steps to allow machine coast withinventory at certain speeds.

Included steps from Lead Cascade 1 and Lead Cascade 3 CascadeOperations procedures to reduce cross-use of procedures duringevolutions.

Added applicable precautions and limitations and prerequisites fromCascade Operations and Machine Acceleration and Decelerationprocedures.

Reason for the Change:Clarify procedure requirements.

FCE 09-0319 0 Title: Revision to Procedure ACD4-OP-071, Centrifuge Machine 8/27/2009 No ACD4-OP-071 Chg 6 No None of the criteriaTransporter (CMT) listed in

Description of Change: 1 eCFR70.72(c) are

Add or clarify steps for synchronizing and inspecting machine clamps, met.

minimize the use of brakes, and allow Maintenance personnel to ridealong with the operator when troubleshooting issues with the transporter.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 80 of 110"

Page 83: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0322 0 Title: Lead Cascade 3 Evacuation Vacuum/Purge Vacuum and Process 8/31/2009 No TP-2101-0037 Rev 0 No None of the criteriaVacuum Leak Rate Test Plan listed in

Description of Change: 1 eCFR70.72(c) are

Test plan for leak rate testing of process piping and associated met.

equipment for Lead Cascade 3 before it is returned to service and after ithas been opened to atmosphere to facilitate inspection and cleaning.

Reason for the Change:To prove the integrity of the process piping and associated equipment.

FCE 09-0323 0 Title: Revision to Procedure AC4-OP-001, Purge Vacuum Normal 9/14/2009 No AC4-OP-001 Chg 17 No None of the criteriaOperating Procedure listed in 10 CFR

Description of Change: 70.72(c) are met.

Identification of PV1-P and PV2-P as Machine Cooling Water "main" and"spare" purge vacuum pumps was removed throughout the procedure.Use of the Machine Cooling Water supply regulator was removed.Sections involving pump pressurization were removed. The two pumpstartup sections were consolidated down to one section. Procedure wasupdated with new Instrument Air valve and regulator identifications, andthe Instrument Air seal purge operating range was changed.

Reason for the Change:Purge Vacuum pumps are identified as PV1-P and PV2-P on drawing X-3001-0102.40-ME and labeled as such in the process building.Removing "main" and "spare" from the procedure eliminates confusionwhen operating the Purge Vacuum system.

Use of the Machine Cooling Water supply regulator 13-MWS-CV1 RV isno longer required as the new vacuum pumps will regulate the pressureand flow of cooling water through an internal thermostatic valve.

Procedure operating sections involving pump pressurization wasunnecessary since the pumps are backfilled from the discharge line assoon as the pump stops. Additionally, both pump startup proceduresections were essentially the same so they were consolidated down toone section for use with both pumps.

Instrument Air valve numbers were changed to agree with drawings.

Wednesday, January 27, 2010 Page 81 of 1-10

Page 84: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0324 0 Title: Revision to Procedure AC4-OP-002, Evacuation Vacuum Normal 9/14/2009 No AC4-OP-002 Chg 16 No None of the criteriaOperating Procedure listed in 10 CFR

Description of Change: 70.72(c) are met.

Identification of EV1-P and EV2-P as "main" and "spare" evacuationvacuum pumps was removed throughout the procedure. Use of theMachine Cooling Water supply regulator was removed. Sectionsinvolving pump pressurization were removed. The two pump startupsections were consolidated down to one section. Procedure was updatedwith new Instrument Air valve and regulator identifications and theInstrument Air seal purge operating range was changed.

Reason for the Change:Evacuation Vacuum pumps are identified as EV1-P and EV2-P ondrawing X-3001-0102.30-ME and labeled as such in the processbuilding. Removing "main" and "spare" from the procedure eliminatesconfusion when operating the Evacuation Vacuum system.

Use of the Machine Cooling Water supply regulator 13-MWS-CV1 RV isno longer required as the new vacuum pumps will regulate the pressureand flow of cooling water through an internal thermostatic valve.

Procedure operating sections involving pump pressurization wasunnecessary since the pumps are backfilled from the discharge line assoon as the pumps stop. Additionally, both pump startup proceduresections were essentially the same so they were consolidated down toone section for use with both pumps.

Instrument Air valve numbers were changed to agree with drawings.

FCE 09-0325 0 Title: Revision to Procedure AC4-OP-003, Machine Cooling Water 10/1/2009 No AC4-OP-003 Chg 10 No None of the criteriaNormal Operations listed in 10 CFR

Description of Change: 70.72(c) are met.Use of the Machine Cooling Water supply regulator was removed. Thevalve lineup was changed to isolate the pressure relief valve set at 50psig and to isolate and bypass the Evacuation Vacuum/Purge Vacuumsupply regulator 13-MWS-CV1 RV. Additionally, formatting was changedthroughout the procedure.

Reason for the Change:Use of the Machine Cooling Water supply regulator 13-MWS-CV1 RV isno longer required as the new vacuum pumps in the Evacuation Vacuumand Purge Vacuum systems will regulate pressure and flow of coolingwater through an internal thermostatic valve.

Wednesday, January 27, 2010 Page 82 .of 110

Page 85: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

. ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0326 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 9/2/2009 No AC4-AO-001 Chg 13 No None of the criteriaCascade 3 Build listed in

Description of Change: e are

Convert from Reference Use to In Hand; add hold points for verificationof steps; revise part inspection requirements; add build-book initiationsection; update to reflect latest assembly drawing revision; and add detailfor manual rotor rotation.

Reason for the Change:Update to reflect latest assembly drawing revisions and to address qualityassessment recommendations.

FCE 09-0327 0 Title: X1107 D Pedestrian Portal Activation 9/9/2009 No None No' None of the criteria

Description of Change: 1OCFR70.72(c) areActivate an existing pedestrian access portal, X-1107 D. met.

Reason for the Change:Improve pedestrian safety by separating pedestrian access from vehicleaccess at this portal.

FCE 09-0327 1 Title: X1107 D Pedestrian Portal Activation 11/02/2009 No ECR-3501-0002-02 No None of the criteria

Description of Change: 10CFR70.72(c) areActivate an existing pedestrian access portal, X-1107 D. met.

Reason for the Change:Improve pedestrian safety by separating pedestrian access from vehicleaccess at this portal. Revision 1 corrected problems with Revision 0 ofthe Change Evaluation.

FCE 09-0328 0 Title: Revision to Procedure AC2-OP-057, Machine Position Re- 9/2/2009 No AC2-OP-057 Chg 4 No None of the criteriaqualification listed in

Description of Change: met.Allow inspection of some items in a non-specific order.

Reason for the Change:Allow flexibility when the sequence of inspection does not affect theconclusion of the position re-qualification.

Wednesday, January 27, 2010 Page 83 of 110

Page 86: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0329 0 Title: Revision to Document CMP-3603-0001, Graded Approach to 9/3/2009 No CMP-3603-0001 No None of the criteriaConfiguration Management and Quality Assurance Rev 2, Chg C listed in

Description of Change: 1OCFR70.72(c) are

Clarified applicability, corrected a form title, and made definitions met.

consistent with other documents.

Reason for the Change:Clarify program requirements.

FCE 09-0330 0 Title: New Procedures:ACD4-ON-206, Operating During Make-up Water FailureACD4-ON-207, Response to Loss of Cooling Water at the Dry AirPlantACD4-UA-001, Operation of the X-6000 Dry Air SystemACD4-UP-01 0, Routine Switchyard Station Checks at the X-5000ACD4-UP-01 1, Changing Compressed Gas Nitrogen Cylinders onX-5000 Switchyard EquipmentACD4-UP-028, X-6000 Underground Storage Tank Monitoring

9/14/2009 No ACD4-ON-026 Chg 0,ACD4-ON-207 Chg 0,ACD4-UA-001 Chg 0,ACD4-UP-010 Chg 0,ACD4-UP-01 1 Chg 0,ACD4-UP-028 Chg 0

No None of the criterialisted in

1OCFR70.72(c) aremet.

Description of Change:These are new procedures to provide instructions for the operation of theX-5000 and X-6000.

Reason for the Change:Provide action or steps to be taken when operating equipment in the X-5000 and X-6000 areas.

FCE 09-0331 0 Title: Revision to Procedure ACD3-EG-501, Preparation of Engineering 9/8/2009 No ACD3-EG-501 Chg 4 No None of the criteriaProcurement Specifications listed in

Description of Change: 1 eCFR70.72(c) are

Corrected title of form and editorial changes. met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 84 of 110

Page 87: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0334 0 Title: Revision to Procedure AC4-OP-075, AC100/Lead Cascade 3 9/15/2009 No AC4-OP-075 Chg 2 No None of the criteriaMachine Disassembly listed in 10 CFR

Description of Change: 70.72(c) are met.

Section 7.13 Post Disassembly Transport was added to the procedureproviding a means to remove a disassembled machine from theassembly stand and placing it in a storage location. The procedurechange allows for movement and storage of the casing per supervision.

Reason for the Change:In the past, once machines were disassembled, they were then re-assembled or stored in the assembly stand for use at a later date. Thisprocedure change allows for the removal of disassembled machines fromthe assembly stand to free up positions for future use.

FCE 09-0335 0 Title: Revision to Procedure AC4-AR-002, Machine Cooling Water 10/1/2009 No AC4-AR-002 Chg 11 No None of the criteriaAlarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Use of the Machine Cooling Water supply regulator 13-MWS-CV1RVwas removed. Supplementary Actions for alarm MCW-006 EvacuationVacuum/Purge Vacuum Pumps Pressure Low were changed, removingthe reference to the Machine Cooling Water regulator and directing theoperator to investigate the cause of the low pressure alarm and torespond to a Pump Outlet Pressure Low alarm if received. Additionally,"failure of PCV-716" and "valve line up problem" were deleted asPossible Causes for the alarm.

Reason for the Change:Use of the Machine Cooling Water supply regulator 13-MWC-CV1 RV isno longer required as the new Leybold pumps in the Evacuation Vacuumand Purge Vacuum systems will regulate pressure and flow of coolingwater through an internal thermostatic valve.

FCE 09-0336 0 Title: Revision to Procedure ACD2-EG-001, Request for Engineering 9/17/2009 No ACD2-EG-001 Chg 3 No None of the criteriaServices listed in 10 CFR

Description of Change: 70.72(c) are met.Deleted requirement for System Requirements Document and providedguidance on the Engineering Service Order. Also made editorialchanges and corrected references.

Reason for the Change:The change was made to resolve concerns identified in a ConditionNotification and clarify procedure requirements.

Wednesday, January 27, 2010 Page 85 of 11,0

Page 88: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0337 0 Title: Revision to Procedure IHS-2601-0001, Health and Safety Plan for 9/17/2009 No IHS-2601-0001 Chg 7 No None of the criteriaConstruction listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted the requirement that all urinalysis samples shall be submitted atthe X-101 Facility. Clarified requirements for Personal Nuclear AccidentDosimetry. Deleted references to the X-101 Hospital Facility as thelocation for contractors to submit urinalysis specimens.

Reason for the Change:Deleted references to submittal of urinalysis samples at the X-101 Facilityas urinalysis samples are no longer required to be submitted at the X-101. Samples are submitted at American Centrifuge facilities. Changesregarding Personal Nuclear Accident Dosimetry to agree with changesmade to the License Application.

FCE 09-0338 0 Title: Revision to Procedure AC4-AR-005, Instrument Air and Vent 9/21/2009 No AC4-AR-005 Chg 6 No None of the criteriaMonitor Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added locations of applicable instruments and improved format.

Reason for the Change:Added locations of instruments to improve response time and clarifyprocedure requirements.

FCE 09-0339 0 Title: HS-2 Diffusion Pump Cleaning and Rework 9/23/2009 Yes None No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Cleaning and rework of Varian HS-2 diffusion pumps in Lead Cascade 3.

Reason for the Change:As a result of oil migration concerns, the original diffusion pumps will becleaned and reworked per Varian design drawings and specifications.The diffusion pumps will be reworked to meet the latest design drawing.Rework of the diffusion pumps will consist of new pump heaters, newthermocouples, and replacement of any items that are damaged.

Wednesday, January 27, 2010 Page 86 of 110

Page 89: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0340 0 Title: Transition a Portion of Protective Personnel Related Duties from 10/14/2009 No None No None of the criteriaContracted Service to a Self Performed Function listed in 10 CFR

Description of Change: 70.72(c) are met.

Allow the Security Staff to perform safe checks, seal checks andinspections that were previously performed by armed contract personnel.

Reason for the Change:Due to demobilization, management has determined that it is more costeffective for the Security Staff to perform the task listed above than tocontract the work. Performing safe checks, seal checks and inspectionsare activities that are considered administrative tasks and do not requirethe person to be armed to perform these activities.

FCE 09-0341 0 Title: Develop Relay Settings for X-5000 9/29/2009 No ESO-310402-0003, No None of the criteriaDAC-2413-0003 listed in 10 CFRDescription of Change: 70.72(c) are met.-

Establish Configuration Item Database requirements for protective relays

in the X-5000.

Reason for the Change:13.8kv feeder overcurrent relays, and estabalishing settings in theConfiguration Item Database.

Operations and Maintenance of the X-5000 switch yard was recentlyturned over from Government Services. The requirements for the relayswere not contained in the Configuration Item Database. Therequirements for the relays is required before maintenance can performwork on the system.

FCE 09-0342 0 Title: Installation of a 24VDC Cooling Fan for Centrifuge Machine 9/25/2009 Yes None No None of the criteriaTransporter Power Supplies listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 24VDC cooling fan in a cabinet that houses two power supplies(PSCOM1 and PSCOM2) on the Centrifuge Machine Transporter, ME-0032.

Reason for the Change:This change is to remedy an overheating problem.

Wednesday, January 27, 2010 Page 87 of 110--"

Page 90: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0343 0 Title: Revision to Procedure AC3-OP-001, Operation of the V-1218 10/1/2009 No AC3-OP-001 Chg 1 No None of the criteriaBridge and W-2 Trolley listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to allow parking crane at the catwalk. Added steps to allowprecise positioning of crane throughout procedure. Deleted Appendix Aand Appendix B. Changed V-1226 Trolley to W-2 Trolley. Updatedformatting and clarified wording throughout procedure.

Reason for the Change:Clarify procedure requirements.

FCE 09-0344 0 Title: Revision to Procedure AC3-OP-002, V-1218 Bridge and W-2 10/1/2009 No AC3-OP-002 Chg 2 No None of the criteriaTrolley Routine Checks listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed to allow visual inspection steps to be performed in any order.Added steps to perform operational inspection of hoist as part of routinechecks. Updated AC-238 Form to reflect changes to the procedure.Changed V-1226 Trolley to W-2 Trolley. Updated formatting throughoutthe procedure.

Reason for the Change:Clarify procedure requirements.

FCE 09-0345 0 Title: Replace existing Lead Cascade Facility Evacuation Vacuum and 9/25/2009 Yes ESO-2201-0001 Rev 0 No None of the criteriaPurge Vacuum Pumps listed in 10 CFR

Description of Change: 70.72(c) are met.

Replace the Evacuation Vacuum and Purge Vacuum Pumps withCommercial Plant vacuum pumps. The existing Evacuation Vacuum andPurge Vacuum Pumps will be removed and replaced with the samemanufacturer's screw vacuum pumps that replaced the hydrocarbon oilwith a non-hydrocarbon, Fomblin (fluorinated) type oil.

Reason for the Change:The pump replacements are necessary to improve reliability for the LeadCascade Facility.

Wednesday, January 27, 2010.......................... -- --1 ý

P a g e 8 8 of 110

Page 91: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE09-0346 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 1012/2009 No AC4-AO-001 Chg 14 No None of the criteria.

Cascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted rotor handling and steps concerning cleaning as these activitiesare controlled by other documents and procedure. Revised applicabilityto allow exceptions for select repair/rebuilds. Corrected procedurereferences.

Reason for the Change:Various changes to the drawing and other specifications require theassembly procedure to be changed. These changes also improve theflow and reduce the time required to assemble a machine.

FCE 09-0347 0 Title: Revision to Procedure ACD2-EG-002, Configuration Management 10/6/2009 No ACD2-EG-002 Chg 2 No None of the criteriaProgram Description listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised definitions, added guidance on System RequirementsDocuments, and corrected format and editorial errors.

Reason for the Change:The changes to the procedure corrects concerns identified in a ConditionNotification and clarifies procedure requirements.

FCE09-0348 0 Title: Revision to Procedure AC4-OP-061, Transport Trailer 10/2/2009 No AC4-OP-061 Chg 2 No None of the criteriaLoading/Unloading Procedures listed in 10 CFR

Description of Change: 70.72(c) are met.

Added section on rotor handling, made allowance for use of cradle dolliesor cradle caster wheels, and made minor clarifications.

Reason for the Change:Rotor handling was removed from procedure AC4-AO-001 and placed inthis procedure because it was similar to the other activities in thisprocedure. Other changes were made to clarify procedure requirements.

FCE 09-0349 0 Title: Revision to Procedure AC4-OP-014, Operations of the Lead 9/30/2009 No AC4-OP-014 Chg 3 No None of the criteriaCascade Uninterruptible Power Supply listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided clarification and additional detail in steps to ensure operatorunderstanding. Provided consistency in use of equipment identifiers.Changed sequence of some steps to improve procedure flow.

Reason for the Change:The procedure lacked the necessary detail and clarity to effectively use inperforming what is an infrequently performed task.

Wednesday, January 27, 2010I ........ ...... I ................ I ..............

Page 89of 110

Page 92: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0350 0 Title: Revision to Procedure AC4-OP-025, Machine Connections 10/612009 No AC4-OP-025 Chg 17 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Procedure steps were added to direct wiring and cable routing formachine power and instrumentation. Pictures were also added in theappendix to show the correct wire routing.

An additional step was added to ensure the grounding strap is tightagainst the service module.

Reason for the Change:Steps were added to segregate the digital, analog, and power cables toreduce the interference among the signals. Ensuring the grounding strapis tight against the service module will reduce the resistance of electricalcomponents on the machine.

FCE 09-0351 0 Title: Revision to Procedure AC4-AR-010, Lead Cascade 3 Machine 10/8/2009 No AC4-AR-010 Chg 8 No None of the criteriaAlarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Remove the Varian controller to monitor machine casing pressure inLead Cascade 3 and to change the casing pressure alarm priority to High.

Reason for the Change:The Varian controller is no longer being used to monitor casing pressuredue to fluctuations and inconsistencies in values reported to theDistributed Control System. Issues with the controller are thought to havebeen caused by inadequate grounding and interference from surroundingelectrical noise producing erroneous casing pressures and initiatingmachine isolation. Casing pressure will now only be monitored by thePirani MKS 979 instruments and the alarm will be managed by theDistributed Control System. The Casing Pressure Fault error will nolonger initiate a machine isolation through the Machine InstrumentPackage but will alarm and be logged as an event in the DistributedControl System.

FCE 09-0352 0 Title: Revision to Procedure AC4-OP-023, Machine Transport and 10/2/2009 No AC4-OP-023 Chg 7 No None of the criteriaInstallation listed in 10 CFR

70.72(c) are met.Description of Change:Changed the procedure to direct the operator to perform transport andinstallation using the V-1218 Bridge and W-2 Crane per procedure AC3-OP-001, Operation of the V-1218 Bridge and W-2 Trolley. Changedsteps regarding speed of transporter.

Reason for the Change:Deleted steps for V-1 218 Bridge and W-2 crane operations and directeduser to new procedure AC3-OP-001, as this procedure was developedspecifically for operation of these cranes.

Wednesday, January 27, 2010 Page 90 of 110

Page 93: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0354 0 Title: Revision of Procedure ACD2-QM-001, Assessment Program 10/16/2009 No ACD2-QM-001 Chg 12 No None of the criterialisted in 10 CFR

.. .Description of Change: 70.72(c) are met.

Added Appendix B, Minimum Required Management Assessments, and

provided additional information to clarify Appendix B lists onlyassessments that are explicitly committed to by procedure.

Reason for the Change:Adding Appendix B to the procedure will ensure that managementidentifies their assessment needs (i.e., NCS, management, andindependent) and that procedure and regulatory commitments are met.

FCE 09-(355 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 10/6/2009 No AC4-AO-001 Chg 15 No None of the criteriaCascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Incorporate the use of heat tracing on the casing and to add verificationsteps.

Reason for the Change:Changes were required to incorporate the use of heat tracing on thecasing. Several verification and hold points were added to further assurecomplete and proper machine assembly.

FCE 09-0356 0 Title: Revision to Procedure ACD2-EG-003, Nuclear and Commercial 10/15/2009 No ACD2-EG-003 Chg 3 No None of the criteriaModification Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised/added definitions, deleted System Requirement Document fromthis procedure and added Modification Scoping Checklist, revised forms,and made formatting and editorial changes.

Reason for the Change:The changes to the procedure were as a result of a Condition Notificationand clarify procedure requirements.

FCE 09-0358 0 Title: Revision to Procedure AC4-OP-075, AC100/Lead Cascade 3 10/9/2009 No AC4-OP-075 Chg 3 No None of the criteriaMachine Disassembly listed in 10 CFR

Description of Change: 70.72(c) are met.

Procedure changed to include instructions for non-conforming parts,updating of references, and adding the requirement to check kickstandposition prior to bump test.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 91 of 110

Page 94: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/CommentS

FCE 09-0359 0 Title: Feeder 22 Test Plan 10/8/2009 No TP-310402, No None of the criteriaTAC-310402-0002 listed in 10 CFRDescription of Change:702c)aeet

Test Plan for testing Feeder 22. 70.72(c) are met.

Reason for the Change:This test plan will verify that Feeder 22, installed for commercial plantoperation, has been installed properly and that the 13.8kv breakersupplying it is-also operating properly.

FCE 09-0360 0 Title: Revision to Procedure ACD2-QM-005, Supplier Control Program 10/15/2009 No ACD2-QM-005 Chg 8 No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met.

Corrected procedure reference, expanded on elements that are

contained in audit plans and audit results, andprovided guidance if a periodic follow-up audit or supplier annualevaluation is delayed.

Reason for the Change:Clarify procedure requirements.

FCE 09-0361 0 Title: Revision to Procedure AC4-AR-004, Purge Vacuum System 10/19/2009 No AC4-AR-004 Chg 9 No None of the criteriaAlarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

References to removed HV-247 were taken out of the procedure, clarifiedsome supplemental actions, added gauge locations, minor font changesthroughout the procedure, and added a scope of change attachment.

Reason for the Change:During the periodic review, it was noted HV-247 had been removed whenthe pumps were changed, so references to it were taken out. Also, someof the gauges are not routinely checked, so their locations were added toimprove response time. Since the procedure is rather lengthy, a scope ofchange was added for ease of review.

Wednesday, January 27, 2010 Page 92 of 110

Page 95: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0362 0 Title: Revision to Procedure AC4-AR-003, Evacuation Vacuum Alarms 10/19/2009 No AC4-AR-003 Chg 9 No None of the criteriaand Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

References to removed HV-347 were taken out of the procedure, clarifiedsome supplemental actions, minor font changes throughout theprocedure, and added a scope of change attachment.

Reason for the Change:During the periodic review, it was noted HV-347 had been removed whenthe pumps were changed, so references to it were taken out. Since theprocedure is rather lengthy, a scope of change was added for ease ofreview. This Periodic Review does not affect the Integrated SafetyAnalysis/Integrated Safety Analysis Summary system descriptions andhas no impact on their intended functions.

FCE 09-0366 0 Title: Revision to Procedure AC2-SP-032, Transport of Classified 11/6/2009 No AC2-SP-032 Chg 3 No None of the criteriaMatter by Contracted Carrier listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarify use of the Facility Address Report to verify classified mailingaddress and define cleared commercial carrier. Also references wereupdated and editorial changes were made.

Reason for the Change:Incorporate changes in accordance with the Confirmatory Order EA-08-280 and merged Security Programs for the Lead Cascade Facility andAmerican Centrifuge Plant.

FCE 09-0368 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 10/22/2009 No AC4-AO-001 Chg 16 No None of the criteriaCascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Added an exemption for action steps from In Hand use requirements dueto need for flexibility in these preparatory steps; Added note to allowperformance of column verification activities prior to assembly; Addeddetail to clarify column wiring connections; Moved three non-assemblysteps to Post Work Performance Activities; Added note to allowconcurrent performance of support installation and machine backfilling;Made various minor changes and clarifications based on assemblyexperience.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010.111.1 ................................. ...... --Page 93 of 110

Page 96: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0369 0 Title: Revision to Procedure ACD2-EC-006, National Pollutant 10/28/2009 No ACD2-EC-006 Chg 2 No None of the criteriaDischarge Elimination System Compliance Procedure listed in 10 CFR

Description of Change: 70.72(c) are met.

The procedure was changed to include inspections required by a StormWater Pollution Prevention Plan during times of construction activities.

Reason for the Change:The procedure was changed to incorporate inspections that werepreviously performed by Fluor, as co-permit on the Storm Water PollutionPrevention Plan. These inspections will now be performed by USEC Inc.personnel.

FCE 09-0370 0 Title: Revision to Procedure ACP2-EG-024, Dedication of Commercial 10/21/2009 No ACP2-EG-024 Chg 1 No None of the criteriaGrade Items listed in 10CFR

Description of Change: 70.72(c) are met.

Revised procedure to address acceptance of Engineering, Procurement,and Construction Contractor procured commercial grade items to bededicated; Corrected References; Corrected format and editorial errors;and Added Appendix A commercial grade items Dedication ProcessFlowchart.

Reason for the Change:The changes to the procedure were as a result of the demobilizationactivity and user comments.

FCE 09-0372 0 Title: Revision to Security Program to include Lead Cascade Facility 11/2/2009 No NR-3605-0004, Security No None of the criteriaDocket Number Program for the listed in 10 CFR

Description of Change: American Centrifuge 70.72(c) are met.

Add the Lead Cascade Facility Docket Number to the Security Program. Plant

Reason for the Change:The Security Program is applicable to both the Lead Cascade Facilityand the American Centrifuge Plant; however, only American CentrifugePlant Docket Number was on the Security Program. Therefore, the LeadCascade Facility Docket Number was added to the Security Program.

FCE 09-0373 0 Title: Revision to Procedure ACD3-SP-036, Post Orders 10/27/2009 No ACD3-SP-036 Chg 5 No None of the criteria

Description of Change: 70.72(c) are met.Desciptin o Chage:listed in 10 CFR

Update forms to incorporate Protective Personnel and remove specific

building information.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 94 of 110

Page 97: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISAF Summary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0374 0 Title: Revision to Procedure AC4-OP-064, Valve Positioning Controls 10/27/2009 No AC4-OP-064 Chg 5 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Procedure was revised to direct the Shift Supervisor to sign and date theValve Position 1 Lineup Log when the valve lineup has been reviewed forcompletion. Other changes include editorial and formatting changes.

Reason for the Change:An assessment identified a deficiency in the valving order process whenentering the completion date on Valve Position 1 Lineup Log. ValvePositioning Controls did not direct the reviewing Supervisor to sign theLog for completion.

FCE 09-0375 0 Title: Revision to Procedure AC4-OP-049, Machine Acceleration & 10/23/2009 No AC4-OP-049 Chg 28 No None of the criteriaDeceleration listed in 10 CFR

Description of Change: 70.72(c) are met.Procedure steps were modified to check the casing pressure fault alarmset point. Casing pressure controller programming was deleted.

Reason for the Change:Lead Cascade Facility Operations will no longer be expected to programset points for the casing pressure controllers. Therefore, step 7.3.13 wasdeleted which outlined the process of programming the pressure trippoints and enabling the alarms. Additionally, procedure steps werechanged to only check the status of the controller.

FCE 09-0376 0 Title: X-3012 Hot Water Valve Installation 10/26/2009 Yes ESO-2400-0010 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Install new hot water valves in the X-3012 office areas. The new valvesoperate slightly different and will require a few minor modifications.

Reason for the Change:The current valves have been removed from service due to failures.

Wednesday, January 27, 2010 Page 95 of 110

Page 98: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval.Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0377 0 Title: Centrifuge Assembly, Disassembly, and Select Repair Activities 12/22/2009 No Integrated Safety Yes None of the criteriaAnalysis Summary listed in 10 CFRDescription of Change: Oh 2 and 3 70.72(c) are met.

Revised the Integrated Safety Analysis Summary to remove flow

diagrams about centrifuge assembly, disassembly, and select repairactivities; indicate use of procedures for centrifuge assembly,disassembly, select repair, and monitoring and examination activities;provide some discussion about the use of the X-7725 buffer storage areafor centrifuge assembly, disassembly, select repair, and monitoring andexamination activities in addition to the X-3001 Process Building and X-7726 Centrifuge Test and Training Facility; and clarify that use of the X-3001 Process Building for centrifuge assembly, disassembly, selectrepair, and monitoring and examination activities means the X-3001 Train3 or X-3001 transfer aisleway.

Reason for the Change:The Lead Cascade Facility Integrated Safety Analysis Summary wasoriginally written with the assumption they would be textbooks for the U.S.Nuclear Regulatory Commission to use in developing their knowledgebase for oversight of the American Centrifuge Program. More detail wasprovided than was really necessary to establish that the Lead CascadeFacility would be a safe and reliable operation. Detail about centrifugeassembly, disassembly, and select repair activities was provided to assistthe U.S. Nuclear Regulatory Commission in understanding the AmericanCentrifuge Program in its entirety. Centrifuge assembly, disassembly, andselect repair activities do not present any credible accident sequencesthat could exceed the performance requirements per 10 Code of FederalRegulations 70.61. Other changes were made to clarify where activitiesare preformed and that activities are performed in accordance withprocedures.

FCE 09-0378 0 Title: Revision to Procedure AC4-OP-055, Machine Disconnect 11/13/2009 No AC4-OP-055 Chg 13 No None of the criterialisted in 10 CFR

Description of Change: listed in met.

Changes include allowing the reuse of o-rings in machine connection 70.72(c) are met.

fittings, adding torque requirements for KF clamps using hex nuts, andclarifying steps taken if the casings samples do not pass. MachineDisconnect Check Sheet was changed to include the machine serialnumber and initial for transport. Also, editorial changes were made.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 96 of 110

Page 99: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0379 0 Title: Revision to Procedure AC3-OP-018, Rigid Mast Crane Routine 10/29/2009 No AC4-OP-019 Chg 3 No None of the criteriaChecks listed in 10 CFR

Description of Change: 70.72(c) are met.

Change procedure to verify the proper sequential illumination of theclamp disengage light. Editorial changes were made.

Reason for the Change:Ensure the clamp disengage lamp illuminates properly so the craneoperator can tell when/if the clamps disengage or release the machinefrom the Rigid Mast Crane. Editorial changes were made to clarifyprocdure requirements.

FCE 09-0380 0 Title: Revision to Procedure AC4-OP-019, Operation of the Rigid Mast 10/2912009 No AC4-OP-019 Chg 5 No None of the criteriaCrane listed in 10 CFR

Description of Change: 70.72(c) are met.

Changes made to the procedure to verify the proper sequentialillumination of the clamp disengage light. Editorial changes were alsomade.

Reason for the Change:Changes to procedure to ensure the clamp disengage lamp illuminatesproperly so the crane operator can tell when/if the clamps disengage orrelease the machine from the Rigid Mast Crane. Editorial changes weremade to clarify procedure requirements.

FCE 09-0381 0 Title: Revision to Procedure AC4-OP-053, Machine Venting with the 11/6/2009 No AC4-OP-053 Chg 9 No None of the criteriaBackfill Unit listed in 10 CFR

Description of Change: 70.72(c) are met.

Changes made to the procedure to add steps to support sampling at thetest port.

Reason for the Change:The previous version of the procedure did not have a clear path totransition from backfilling to sampling and to subsequent purges asneeded.

Wednesday, January 27, 2010 Page 97 of, 110

Page 100: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0382 0 Title: Revision to Procedure ACD2-EG-016, Conditional Release 11/3/2009 No ACD2-EG-016 Chg 3 No None of the criteriaProgram listed in 10 CFR

Description of Change:Added Quality Assurance as being responsible for assigning and

recording Conditional Release numbers; Added the option to allow use ofthe Request for Quality Assurance Services form instead of theEngineering Specification Data sheet form; and editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 09-0384 0 Title: Use of Temporary Heat in Lead Cascade Facility and American 11/3/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10.CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:The electric heaters are necessary to ensure appropriate temperaturelevels can be maintained while Recirculating Hot Water System is beingrepaired.

FCE 09-0384 1 Title: Use of Temporary Heat in Lead Cascade Facility and American 11/6/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:Revision 1 to the Change Evaluation was to make corrections to theChange Evaluation.

FCE 09-0384 2 Title: Use of Temporary Heat in Lead Cascade Facility and American 12/29/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:The work to repair the Recirculating Hot Water System has not beencompleted; therefore, Revision 2 to the Change Evaluation is to extendthe time the electric heaters will be needed.

-- - --.1- 1.1'... .................................

Page 98of 110Wednesday, January 27, 2010

Page 101: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0385 0 Title: Repair Recirculating Hot Water System 11/3/2009 No ESO-2518-0006 No None of the criteria

Description of Change: listed in 10 CFR

Repair the Recirculating Hot Water System at the X-3001 Process 70.72(c) are met.

Building and the X-7721 Maintenance, Stores, and Training Building.The change includes repairing leaks and replacing 24" valve with a spoolpiece.

Reason for the Change:The repair of the Recirculating Hot Water System is necessary inpreventing pipe freezing that may affect the Lead Cascade Facility.

FCE 09-0386 0 Title: X-5000 Battery Charger Replacement 11/3/2009 Yes ESO-2412-0002 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Replace battery charger in the X-5000 Switch Yard.

Reason for the Change:The battery charger in the X-5000 Switch Yard failed; therefore, thebattery had to be replaced.

FCE 09-0388 0 Title: Install Limit Switch Signals Into Logic for Rigid Mast Crane 3/6 11/6/2009 No ESO-3201-0017, No None of the criteriaClamp Operation ECR-2101-0017-03 listed in 10 CFR

Description of Change: Rev 0 70.72(c) are met.

Add the outputs of the clamp limit switches to the hoist run permissiveoperation sequence.

Reason for the Change:Recently, an operator failed to note that the clamps were notOPEN/DISENGAGED and the status light was burned out, so an attemptto lower a machine with the clamps still closed resulted in cocking themachine to one side. By adding the output of the clamp limit switches tothe hoist run permissive operation sequence, the hoist will not receive theRUN signal until all limits are made (clamps fully OPEN/DISENGAGED).This will eliminate some potential human interface errors.

Wednesday, January 27, 2010.11.1 111 ........... .. --- 111 1 ........... I -Pa ge 99 of 110

Page 102: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC.

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0389 0 Title: Revision to Procedure ACD2-PS-004, Handling and Processing of 11/19/2009 No ACD2-PS-004 Chg 5 No None of the criteriaClassified and Safeguards Information Documents for Offsite listed in 10CFRDeliveries and Receipts 70.72(c) are met.

Description of Change:Implement requirements of Confirmatory Order EA-08-280 and editorialchanges.

Reason for the Change:In order to implement requirements of Confirmatory Order EA-08-280,the procedure was modified. Also changes were made to clarify stepsand improve the execution of the procedure for the user.

FCE 09-0390 0 Title: Revision to Procedure AC4-ON-001, Post Wreck Machine 11/13/2009 No AC4-ON-001 Chg 2 No None of the criteriaOperations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to establish the Train 3 area as Q cleared personnel onlyand to set up a boundary around the wrecked machine.

Reason for the Change:This change incorporates deficiencies identified in a ConditionNotification.

FCE 09-0391 0 Title: Revision to Procedure AC4-OP-023, Machine Transport and 12/28/2009 No AC4-OP-023 Chg 9 No None of the criteriaInstallation listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed sections addresing operation of the Centrifuge MachineTransporter V1218 crane and W-2 cranes in the X-7725. Also, changedthe term machine leveling to rough leveling.

Reason for the Change:The sections addressing operation of the Centrifuge Machine TransporterV1 218 crane and W-2 cranes in the X-7725 were removed since they arecovered by other procedures. The term machine leveling was changedto rough leveling to be consistent with other procedures.

Wednesday, January 27, 2010 Page 100 of 110

Page 103: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0392 0 Title: Revision to Procedure AC4-AR-002, Machine Cooling Water 11/30/2009 No AC4-AR-002 Chg 13 No None of the criteriaAlarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Corrected references and changed some references to action steps.

Reason for the Change:References were replaced with action steps where appropriate inresponse to an assessment which identified the need to reduce theoccurrence of referencing other procedures when responding to systemalarms.

FCE 09-0393 0 Title: Revision to Procedure AC4-AR-003, Evacuation Vacuum Alarms 11/30/2009 No AC4-AR-003 Chg 10 No None of the criteriaand Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Alarm responses were changed to identify valves closing as an automaticaction. Changed procedure to direct the operator to close the handvalves for a pump with a valve position error that will not clear. Changedprocedure references with action steps to minimize branching into andout of different procedures when responding to an alarm. Also, editorialchanges were made.

Reason for the Change:This change incorporates deficiencies identified in an assessment.

FCE 09-0394 0 Title: Revision to Procedure AC4-ON-004, Loss of Machine Cooling 11/20/2009 No AC4-ON-004 Chg 4 No None of the criteriaWater (MCW) listed in 10 CFR

Description of Change: 70.72(c) are met.

Procedure references were deleted and replaced with action steps. Also,editorial changes were made.

Reason for the Change:This change incorporates deficiencies identified in a ConditionNotification.

FCE 09-0396 0 Title: Revision to Procedure AC4-OP-038, Cascade Pumpdown 11/30/2009 No AC4-OP-038 Chg 4 No None of the criteria

Description of Change: listed in 10 CFR

Added valves 135-HV-106A, 135-HV-106B, and 135-HV-106C to the list 70.72(c) are met.

of valves in Attachment B.

Reason for the Change:The valves were added to the procedure to allow sampling.

Wednesday, January 27, 2010 Page 101 of 110

Page 104: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0397 0 Title: Revision to Procedure AC4-OP-073, Lead Cascade 3 Operations 12/1/2009 No AC4-OP-073 Chg 3 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Valves for sample cart connection were added to valve line ups. Also,editorial changes were made.

Reason for the Change:Valves for the sample cart connection were needed in line ups to ensureproper positioning of those valves. The other changes were made toclarify procedure requirements.

FCE 09-0398 0 Title: Revision to Procedure AC4-OP-074, Lead Cascade 3 Machine 11/30/2009 No AC4-OP-074 Chg 6 No None of the criteriaConditioning, Tails Scoop Verification, and Charging with UF6 listed in 10 CFR

Description of Change: 70.72(c) are met.

Valves for sample cart connection were added to valve line ups.

Reason for the Change:Valves for the sample cart connection were needed in line ups to ensureproper positioning of those valves.

FCE 09-0399 0 Title: X-7725 Sidewalk Expansion 11/20/2009 No ESO-2518-0005 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.The change evaluated in this document consists of modifying an existingsidewalk structure by adding another curb ramp for means of entering orexiting the sidewalk and also making the sidewalk wider. The sidewalk islocated north of the X-7726.

Reason for the Change:Adding another entrance/exit curb ramp on the sidewalk will help preventpersonnel from slips and trips hazards, as well as preventing personnelfrom walking in the roadway.

FCE 09-0400 0 Title: Revision to Procedure ACD2-EG-407, Test Plans 11/16/2009 No ACD2-EG-407 Chg 4 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Added words to clarify the development and implementation of TestPlans, clarified Change Evaluation applicability and requirementsassociated with initial issue and for editorial and/or minor changes.

Reason for the Change:Clarify procedure requirements.

y........... Jg............ ...............Wednesday, January 27, 2010 Page 102 of 110

Page 105: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0401 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 11/17/2009 No AC4-AO-001 Chg 17 No None of the criteriaCascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Provide clarification and minor changes to multiple steps of theprocedure, as well to remove the use of alcohol as a cleaning agent forthe painted surfaces of the casing.

Reason for the Change:Clarify procedure requirements.

FCE 09-0402 0 Title: Casing Paint Cure Test Plan 11/17/2009 No TP-2302-0003 Rev 0 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.The test plan is to perform various tests to determine the best means tocure the interior paint coating of the machine casings. The goal of thistest plan is to determine acceptable Lead Cascade Facility paint curingand/or out gassing requirements. The casings have not seen UF6 serviceand are not UF6 contaminated.

Reason for the Change:An insufficiently cured paint coating may lead to operational problems.

FCE 09-0403 0 Title: Converting Procedure ACP4-UP-032, Specific Safety-Related 11/30/2009 No ACD4-UP-032 Chg 0 No None of the criteriaOperations Involving Site Electrical Equipment listed in 10 CFR

Description of Change: 70.72(c) are met.

Make procedure ACP4-UP-032, Specific Safety Related Operations,applicable to both the Lead Cascade Facility and the AmericanCentrifuge Plant.

Reason for the Change:The Safety Review Committee determined that all Balance of Plantprocedures should be dual-use.

FCE 09-0404 0 Title: Converting Procedure ACP4-UP-005, Operation of Transformer 11/30/2009 No ACD4-UP-005 Chg 0 No None of the criteriaDeluge System listed in 10 CFR

Description of Change: 70.72(c) are met.

Make procedure ACP4-UP-005, Operation of Transformer DelugeSystem, applicable to both the Lead Cascade Facility and the AmericanCentrifuge Plant.

Reason for the Change:The Safety Review Committee determined that all Balance of Plantprocedures should be dual-use.

Wednesday, January 27, 2010 Page 103 of 11i0

Page 106: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

"" ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 09-0405 0 Title: New Test Plan TP-2101-0027, X-3001 Test and Startup Plan for 11(24/2009 No TP-2101-0027 Rev 0 No None of the criteriathe Evacuation Vacuum System, Lead Cascade listed in 10 CFR

Description of Change: 70.72(c) are met.

The test plan is to sample and analyze gas samples from an evacuatedmachine casing.

Reason for the Change:This Test Plan is to assure the interior paint coating of the machinecasings has cured, or other similar purposes.

FCE 09-0406 0 Title: Installation of Electric Heater in X-7721 Maintenance Stores and 11/18/2009 No ESO-310407-0003 No None of the criteriaTraining Building listed in 10 CFR

Description of Change: 70.72(c) are met.

Install an electric heater in south stairwell of X-7721 Building.

Reason for the Change:The original means of heating the south stairwell was with anRecirculating Hot Water radiant type heater. The lines supplying thisheater are clogged. The current heater will be abandoned in place andan electric heater installed. The stairwell needs to be heated to preventthe fire water pipes from freezing.

F CE 09-0407 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 11/19/2009 No AC4-AO-001 Chg 18 No None of the criteriaCascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Switched order of steps, incorporated the use of scoop protectors tosteps, and editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 09-0408 0 Title: Correct the Reference Version of National Fire Protection 12/22/2009 No License Application No None of the criteriaAssociation 30 Ch 1 and 7 listed in 10 CFR

Description of Change: 70.72(c) are met.

Correct the year of the National Fire Protection Association 30 referencedin the License Application.

Reason for the Change:The License Application was not consistent as to which year of NationalFire Protection Association 30 should be used.

Wednesday, January 27, 2010 Page 104 of 110

Page 107: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0409 0 Title: Revision to Procedure ACD1-MP-001, Lead Cascade and 11/24/2009 No ACD1-MP-001 Chg 5 No None of the criteriaAmerican Centrifuge Plant Operations Policy Manual listed in 10 CFR

Description of Change: 70.72(c) are met.

Added Fire Safety Policy.

Reason for the Change:Fire Safety Policy was added because the procedure did not addressemployee's authority and responsibility pertaining to fire protection.

FCE 09-0412 0 Title: Revision to Procedure AC4-OP-019, Operation of Rigid Mast 11/30/2009 No AC4-OP-019 Chg 6 No None of the criteriaCrane listed in 10 CFR

Description of Change: 70.72(c) are met.Added steps to ensure the Rigid Mast Crane clamps are cycled prior topicking up a machine from the transporter or cascade position andcaution notes to explain interlocks for the hoist.

Reason for the Change:This change will reduce the possibility of bumping or rubbing a machinecasing against a clamp that has drifted closed during movement.

FCE 09-0413 0 Title: Revision to Procedure ACD4-UP-009, X-6000 Routine Substation 12/11/2009 No ACD4-UP-009 Chg 1 No None of the criteriaChecks listed in 10 CFR

Description of Change: 70.72(c) are met.

Added battery checks and changed the current levels to greater than 0amps and voltage to greater than 52 volts. Also, the round sheets weremodified.

Reason for the Change:Battery checks are better suited in the substation rounds and procedure.The current range has been changed to greater than 0, since 0 indicatesno battery charging is occurring. Battery voltage minimum has beenincreased to greater than 52 volts to match the number of cells. Theround sheet has been updated to show relevant checks and better layoutfor the technician performing the rounds.

Wednesday, January 27, 2010 Page 105 of 110

Page 108: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCFCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 09-0414 0 Title: Revision to Procedure ACD2-TP-002, Training Program 12/1/2009 No ACD2-TP-002 Chg 5 No None of the criteria

Description of Change: listed in 10 CFR

Revised to clarify which reviews are required for a change or a revision to 70.72(c) are met.

a training module. Revised references. Clarification added to note aboutworker's ability to read and understand training exams. Assessmentfrequency changed to yearly. Also editorial changes were made.

Reason for the Change:Changes were made in response to Condition Notification and to clarifyprocedure requirements.

FCE 09-0415 0 Title: Revision to Procedure AC4-AO-001, Machine Assembly, Lead 12/2/2009 No AC4-AO-001 Chg 19 No None of the criteriaCascade 3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed procedure to allow Machine Leak Check portion of theprocedure to be performed on machines contianing Upper SuspensionAssemblies that are contaminated but have been cleaned. Several stepswere moved and/or allowed to be performed concurrently with othersteps.

Reason for the Change:Clarify procedure requirements.

FCE 09-0416 0 Title: Revision to Procedure AC4-OP-012, Operation of the Lead 12/01/2009 No AC4-OP-012 Chg 8 No None of the criteriaCascade Auxiliary Standby Generator (ASG) listed in 10 CFR

Description of Change: 70.72(c) are met.

Change was made to remove the section on Load Testing and added aLoad Transfer Section. Also made editorial changes.

Reason for the Change:The procedure needed clarification on the configuration of variousUninterruptible Power Supply breaker alignments, and made textchanges in the procedure to match the in field labeling.

FCE 09-0417 0 Title: Revision to Procedure XP2-EP-EP1 037, Emergency Operations 12/9/2009 No XP2-EP-EP1037 No None of the criteriaCenter Concept of Operations Rev 10, Chg C listed in 10 CFR

Description of Change: 70.72(c) are met.

Change the roles and responsibilities of the Pike County Liaison, titlechange on a form, and add a requirement for the Regulatory Liaison.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 106 of 110

Page 109: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 09-0418 0 Title: Revision to Procedure XP2-EP-PU1031, Public Warning System 12/16/2009 No XP2-EP-PU1031 Rev 2 No None of the criteriaActivation listed in 10 CFR

Description of Change: 70.72(c) are met.

Add the capability for activation of the Public Waming System using theCentrAlert Guardian Encoder.

Reason for the Change:Activation of the Public Warning System using CentrAlert GuardianEncoder will provide additional assurance that the system will function asdesigned to provide notification to the public in the event of an incidentrequiring evacuation or sheltering of the public.

FCE 09-0419 0 Title: Revision to Procedure XP2-EP-EP4001, Test and Inspection of 12/16/2009 No XP2-EP-EP4001 Rev 4 No None of the criteriathe Public Warning System listed in 10 CFR

Description of Change: 70.72(c) are met.Add the capability for testing and inspection of the Public WarningSystem using the CentrAlert Guardian Encoder.

Reason for the Change:Activation of the Public Warning System using CentrAlert GuardianEncoder will provide additional assurance that the system will function asdesigned to provide notification to the public in the event of an incidentrequiring evacuation or sheltering of the public.

FCE 09-0420 0 Title: Functional Location Numbering of the Electrical Power 12/2/2009 No ESO-2413-0004 No None of the criteriaDistribution System and Associated Facilities/Systems listed in 10 CFR

Description of Change: 70.72(c) are met.Track and document the renumbering of the electrical equipmentcomponents, systems, and facilities associated with the existing electricalpower distribution system to comply with the Functional LocationNumbering System Guidelines.

Reason for the Change:This activity is to ensure electrical equipment components, systems andfacilities associated with the existing electrical power distribution systemare numbered in accordance with Functional Location Numbering SystemGuidelines.

FCE 09-0421 0 Title: Revision to Procedure ACD2-EG-022, Setpoint/Tolerance Controls 12/3/2009 No ACD2-EG-022 Chg 2 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Added recommendation and requirements for Setpoint/ToleranceCalculations.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 107 of 110

Page 110: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0422 0 Title: X-5000 Switch Yard 125VDC System Upgrade 12/22/2009 Yes ESO-2412-0003, No None of the criteriaSOW-2412-0003 listed in 10 CFR

Description of Change: 70.72(c) are met.Work activities associated with installing a redundant 125vdc battery and125vdc distribution panel in the X-5000 125vdc System.

Reason for the Change:Installing a redundant 125vdc battery and 125vdc distribution panel in theX-5000 125vdc System will increase reliability of the X-5000 125vdcSystem.

FCE 09-0424 0 Title: Lead Cascade 3 Casing Curing Activities in the X-7725 12/22/2009 Yes None No None of the criteriaTransporter and Battery Maintenance Area and Buffer Storage listed in 10 CFRArea 70.72(c) are met.

Description of Change:Use the X-7725 Transporter Battery Maintenance Room for curing thepaint on the centrifuge casing interiors. This is a temporary assemblyactivity that could involve up to 50 casings. The curing effort requires theuse of supplemental heat to provide forced air through the casings at aminimum of 120 degrees Fahrenheit. The temperature in the casing isnot expected to exceed 200 degrees Fahrenheit. Insulating blanketsdraped over the casings are used to help maintain temperatures insidethe casing. The blankets are made of noncombustible material. Portable30 kW electric heaters will be used to create the necessary temperatureconditions. The proposed activities meet National Fire ProtectionAssociation requirements. The room tempearture will be monitored toensure ceiling temperature does not approach levels that might impactthe sprinkler heads. The room temperature is not expected to exceed160 degrees Fahrenheit.

Reason for the Change:The initial start up of Lead Cascade 3 has indicated a problem associatedwith the casing interior paint. The coating was not allowed to fully cureprior to Lead Cascade 3 operation resulting in unexpected centrifugeoperating conditions. To support Lead Cascade 3 installation andoperation, some of the casings that have been previously installed andconditioned need to be cured to ensure the interior painted surface iscured. The coating is dry to touch when received; however, the curingprocess must be complete.

Wednesday, January 27, 2010 Page 108 of 110

Page 111: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

FCE 09-0425 0 Title: Revision to Procedure ACD4-UW-015, Operation of the X-6000/X- 12/11/2009 No ACD4-UW-015 Chg 1 No None of the criteria6001 Tower Water Cooling System and Associated Equipment listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a new section to cover the Tower Water Cooling distributionsystem. Also made editorial changes.

Reason for the Change:Tower Water Cooling distribution system was not previously coveredunder a procedure. Other changes were made to clarify procedurerequirements.

FCE 09-0432 0 Title: Install New Isolation Gate Valves in the Recirculation Hot WaterSystem

Description of Change:Install 3" gate valve (supply) and 6" gate valve (return) along withreplacing necessary piping in the Recirculation Hot Water systembranching from the 36" line to the X-6000 Cooling Tower Pump House.The change includes modifications to the existing piping lines andinstallation of new gate valves and lines at a slightly higher elevation.

12/16/2009 Yes ECR-2518-0006-01 No None of the criterialisted in 10 CFR70.72(c) are met.

Reason for the Change:The change is being made to fix leaks in Recirculation Hot WaterSystem. The installation activity of the new valves is required to maintainthe integrity of the Recirculation Hot Water System and to providecomplete flow isolation when closed.

FCE 09-0433 0 Title: Modify Rail S13 Disconnects 12/22/2009 Yes JFI-2301-0016 Rev 0 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.There are two disconnects for crane rail S13, one on the ground"operating" floor and one on the maintenance platform. The twodisconnects should be wired in series so that either of them disconnectthe rail from its power supply. The purpose of this change is to put thedisconnects in series.

Reason for the Change:The current configuration introduces a safety concern if personnelworking on the crane think they have isolated the crane from its powersupply by locking out the disconnect on the maintenance platform, whenin reality, a portion of the rail is still energized.

Wednesday, January 27, 2010 Page 109 of 110

Page 112: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

FCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 09-0435 0 Title: Develop Calibration Criteria for the X-6000 Cooling Tower Pump 12/22/2009 No ESO-2409-0006 No None of the criteriaHouse Instrumentation Requiring Preventive Maintenance listed in 10 CFR

Description of Change: 70.72(c) are met.

Establish Configuration Item Database requirements for instrumentationin the X-6000, including protective relaying.

Reason for the Change:Provide criteria needed when performing calibrations.

FCE 09-0436 0 Title: Revision to Procedure AC4-ON-009, Response to Loss of Power 12/31/2009 No AC4-ON-009 Chg 8 No None of the criteria

listed in 10 CFRDescription of Change: 70.72(c) are met.

Added the breaker number for the Machine Instrument Package

Emergency Power and editorial changes.

Reason for the Change:The Machine Instrument Package has multiple power supplies.Information for the breaker from which the Machine Instrument Packageemergency power supply comes from is helpful when tracing back theMachine Instrument Package power system to locate and correct an offnormal condition. Other changes were to clarify procedure requirements.

Wednesday, January 27, 2010 Page 110 of 110

Page 113: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

Enclosure 2 to AET 10-0010

Summary of Facility Changes for the American Centrifuge PlantCalendar Year 2009

Page 114: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

2009 Brief Summary of Changes for theAmerican Centrifuge Plant

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 07-0255 2 Title: American Centrifuge Plant Material Disposition 3/4/2009 No ESO-3604-0002 Rev 0, No None of the criteriaSOW-310101-0001 listed in

Description of Change: Rev 2 10CFR70.72(c) areExtends the period of performance of disposal activities. It also met.includes the material stored in X-7725.

Reason for the Change:It took longer than expected to dispose of the equipment. Thisequipment needs to be removed from the area to allow AmericanCentrifuge Plant refurbishment activities to continue.

PCE 08-0032 1 Title: Feed and Withdrawal Building (X-3346) Fire Water Sprinkler 6/1/2009 No None No None of the criteriaSystem Isolation and Modifications listed in

Description of Change: 10CFR70.72(c) areDesciptin o Chage:met.Revision 1 provides required justification that was missing from the

responses to questions in the original change evaluation. No additionalchanges were evaluated.

Reason for the Change:Revision 1 corrected an omission in the documentation of this changeevaluation.

PCE 08-0142 1 Title: Cooling Tower Cone Valves Refurbishment 1/13/2009 Yes ESO-310109-0001, No None of the criteriaDescription of Change: SOW-310109-0002 listed in

Rev 0, 10CFR70.72(c) areThis revision adds three hot taps in the 48 inch piping header of the X- ECR-310109-0001-02 met.6000 Pump House. The hot taps are used for the installation of plugstoppers.

Reason for the Change:Plug stoppers are necessary to provide positive isolation whilereplacing leaking butterfly valves while maintaining the necessarycooling tower flow to the process systems.

PCE 08-0152 1 Title: Issue Curtiss-Wright's Security Program, CW-SP-01, and 1/9/2009 No CW-SP-01 No None of the criteriaAccompanying Information System Security Plans CW-ADP-01 listed in

CW-ADP-02 100FR7O.72(c) areDescription of Change: CW-ADP-03 met.

Implementation of changes to security program and Information System AllARev 0 mudt

Security Plans and associated Information System Security Plans for All Rev 0 - updated

Curtiss-Wright's Cheswick, Pennsylvania facilities. "

Reason for the Change:Documents were updated to address issues identified during Curtiss-Wright internal readiness review and U.S. Department of Energy andU.S. Nuclear Regulatory Commission regulatory reviews.

Wednesday, January 27, 2010 Page 1 of 47

Page 115: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 08-0159 1 Title: X-3001/X-3002 Roof Repairs 4/27/2009 Yes ESO-310109-002, No None of the criteriaSOW-310109-0003 listed in

Description of Change: Rev 0 10CFR70.72(c) areRepair X-3001 and X-3002 roof leaks using an improved polyurethane met.foam system and a silicon sealant.

Reason for the Change:Stop leaks during inclement weather using improved methodscompared to original roof construction.

PCE 08-0176 1 Title: Static Assembly Stand Demolition 5/4/2009 No CWP #RAFMAA-8001 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areRevision 1 evaluates pen and ink field changes to the work package for met.demolition and removal of selected electrical, piping, and structuralcomponents and debris associated with the static stands used formachine assembly.

Reason for the Change:Work package required correction of drawing revision numbers andtitles and oversight responsibility.

PCE 08-0184 1 Title: Relocate the "At A Position" Limit Trip on X-3001 Rigid Mast 6/11/2009 No None No None of the criteriaCranes listed in

Description of Change: 10CFR70.72(c) are

Revision 1 provided information that was missing from the original met.

change evaluation form. No additional changes were evaluated.

Reason for the Change:Management assessment identified the omission of requiredinformation on the original evaluation of the proposed change.

PCE 08-0193 1 Title: Dry Air Distribution Foundations 2/20/2009 No CWP #BOPOUT-1201 No None of the criteriaRev 0 listed in

Description of Change: PIC #1,2,3 10CFR70.72(c) areRevision 1 evaluates pen and ink field changes to the work package for met.installation of foundations, piers, grounding, guard posts and rails forsupport structures for above ground branch lines of the dry airdistribution system. These minor changes did not change theconclusion of the original change evaluation.

Reason for the Change:Work package required minor field corrections.

Wednesday, January 27, 2010 Page 2 of 47

Page 116: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

PCE 08-0193 2 Title: Dry Air Distribution Foundations 6/23/2009 No CWP #BOPOUT-1201 No None of the criteriaRev 0 listed in

Description of Change: Rev 0 listed in

Revision 2 evaluates additional pen and ink field changes to the work PIC #4,5,6,7,8,9,10 10CFR70.72(c) are

package for installation of foundations, piers, grounding, guard posts

and rails for support structures for above ground branch lines of the dryair distribution system. These minor changes did not change theconclusions of Revision 0 or Revision 1 of the change evaluation.

Reason for the Change:Work package required minor field corrections.

PCE 08-0198 0 Title: Revision to Procedure ACD2-QM-011, Resolving Contractor 1/12/2009 No ACD2-QM-011 Chg 4 No None of the criteriaIssues , listed in

Description of Change: 1 eCFR70.72(c) are

Add definitions, requirements, and responsible organization, deleted met.

unnecessary reference, clarified instructions, and revised associatedform AC-381 to reflect those changes.

Reason for the Change:Clarify procedure requirements.

PCE 08-0200 0 Title: Changes to License Application Chapter 5 1/13/2009 No License Application Ch 5 No None of the cdterialisted in

Description of Change: 10CFR70.72(c) areCorrect the wording used to describe trending of deficiencies related to met.the nuclear criticality safety program, and correct a reference toChapter 11.6.

Reason for the Change:Corrective action for Condition Notification 1827 which identified theincorrect trending language and reference.

PCE 08-0202 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areConstruction Work Package for proposed fabrication, installation, met.inspection and testing of structural steel beams, framing, pipe supportsand other miscellaneous structural steel members in building X-3002, inthe area bordered by column lines El to E32.

Reason for the Change:Provide supports for future installation of piping, conduit, cable traysand other types of equipment for the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 3 of 47

Page 117: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PcE 08-0202 1 Title: Structural Steel Erection 5/22/2009 Yes CWP #PB2SOU-1201 No None of the criteriaRev I listed in

Description of Change: 10CFR70.72(c) areRevision 1 addresses changes to the construction work package met.fabrication, installation, inspection and testing of structural steel beams,framing, pipe supports and other miscellaneous structural steelmembers in building X-3002, in the area bordered by column lines E3 toE32. The effort will include bolting, welding, reaming, chipping, cutting,and touch-up painting.

Reason for the Change:Provide additional work package detail regarding supports for futureinstallation of piping, conduit, cable trays and other types of equipmentfor the American Centrifuge Plant.

PCE 08-0203 1 Title: Installation of Boiler Stacks 5/1/2009 No BOPBLR-3003 No None of the criteriaRev 0 listed inDescription of Change: PlC #1 & 2 10CFR70.72(c) are

Revision 1 evaluates pen and ink field changes to the work package for met.

installation of three boiler stacks and associated ladders, platforms, and

davits in the X-6002 Boiler House. The changes update the drawing listand do not change the conclusions reached in the original changeevaluation.

Reason for the Change:Work package required update of referenced drawings.

PCE 08-0203 2 Title: Installation of Boiler Stacks 8/12/2009 No BOPBLR-3003 Rev 1 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Revision 2 evaluates the addition of nine drawings to the work package met.

for installation of three boiler stacks and associated ladders, platforms,

and davits in the X-6002 Boiler House. The changes do not change theconclusions reached in the original change evaluation.

Reason for the Change:Work package required update of referenced drawings.

PCE 08-0205 0 Title: Revision to Procedure ACD2-SH-024, Traffic Rules and 1/14/2009 No ACD2-SH-024 Chg 1 No None of the criteriaRegulations listed in

Description ofChange: 10CFR70.72(c) are

Allow a running vehicle to be left unattended during inclement weather met.when specified requirements have been met.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 4 of 47

Page 118: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0002 0 Title: Additional Green Zone 10 Plex, Welding Trailer and Support 1/5/2009 Yes CWP #BOPOUT-9102 No None of the crteriaFacilities Rev 0 listed in

Description of Change: 10CFR70.72(c) are

Provide utilities, prepare grounds, and add new trailers in the Green met.

Zone, outside the American Centrifuge Plant's Controlled Access Area,to support Fluor's construction activities.

Reason for the Change:Additional office space and construction facilities are needed to supportongoing construction activities.

PCE 09-0003 0 Title: Revision to Procedure ACD2-TP-002, Training Program 2/4/2009 No ACD2-TP-002 Chg 4 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRequire documentation of off-site or vendor training, modify forms, met.update references, and make other editorial changes and clarifications.

Reason for the Change:Clarify procedure requirements for process improvement and correctionaction for a condition notification.

PCE 09-0004 0 Title: Revision to Procedure ACD2-PS-001, Document Control 2/9/2009 No ACD2-PS-001 Chg 1 No None of the criteriaProcess listed in

Description of Change: 1 eCFR70.72(c) are

Provide guidance on relocating or stopping distribution of controlled met.

copies, clarified page numbering and handling of drawing revisions, andother editorial changes.

Reason for the Change:Clarify procedure requirements for process improvement and correctiveactions for a condition notification.

PCE 09-0005 0 Title: Revision to Procedure ACD2-PS-002, Records Management 2/9/2009 No ACD2-PS-002 Chg 1 No None of the criteriaProcess listed in

Description of Change: 10CFR70.72(c) aremet.Provide guidance on making documents searchable, generation of

classified documents, inclusion of retention periods, update ofreferences and other editorial clarifications.

Reason for the Change:Clarify procedure requirements for process improvement.

Wednesday, January 27, 2010 Page 5 of 47

Page 119: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0007 0 Title: Elimination of Monitoring Station #8 5/1/2009 No Emergency Plan No None of the criteriaSection 5.4.1.1 listed in

Description of Change: 100CFR70.72(c) areRemove Monitoring Station #8 from the Emergency Plan text and met.figures. This station, which previously provided monitoring support inthe event of a nuclear criticality accident in the U.S. Department ofEnergy's radioactive waste storage and shipping areas in building X-7725, is no longer needed.

Reason for the Change:Monitoring Station #8 is not needed because nearby building X-7725 nolonger houses fissile material operations.

PCE 09-0008 0 Title: X-6002 Boiler House Fire Protection 1/8/2009 Yes CWP #BOPFIR-4102 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areInstall fire protection sprinkler system and associated equipment met.throughout the X-6002 Boiler House.

Reason for the Change:Provide fire protection for this new facility.

PCE 09-0011 0 Title: Lead Cascade Facility and American Centrifuge Plant 4/30/2009 No License Application No None of the criteriaOrganizational Changes Ch 1, 2, and 11 listed in

Quality Assurance 1 OCFR70.72(c) areDescription of Change: met.Appointment of an Integrated Systems Test/Start-Up Manager, and Program Description

addition of this position and Procurement Manager information in the Ch 1

organization description in the License Application. Add new SeniorVice President to the list of principle officers.

Reason for the Change:Provide more management attention to integrated systems test andstart-up activities, address a reportability deficiency and updateprincipal officer information in licensing documents.

PCE 09-0012 0 Title: X-6002 Boiler House Mechanical Piping 1/21/2009 Yes CWP #BOPBLR-4001 No None of the criteria

Description of Change: Rev 0 listed in

Installation, cleaning and testing of piping and equipment for systems 10CFR70.72(c) are

located in secondary building X-6002, Boiler House. met.

Reason for the Change:Continuation of construction activities needed to make the boiler facilityoperational.

Wednesday, January 27, 2010 Page 6 of 47

Page 120: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0012 1 Title: X-6002 Boiler House Mechanical Piping 6/22/2009 Yes CWP #BOPBLR-4001 No None of the criteriaRev 0 listed in

Description of Change: PIC 1,2,3,4 and Ch 1,2,3 10CFR70.72(c) areAdministrative and pen and ink changes to the work package for met.installation, cleaning and testing of piping and equipment for systemslocated in secondary building X-6002, Boiler House. The work packagechanges are bounded by the original evaluation.

Reason for the Change:Update of drawings and specifications for the work package.

PCE 09-0013 0 Title: Install Temporary Welding Power Cables 2/13/2009 Yes CWP #PB2SOU-9101 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areInstallation of temporary power feeder cables and receptacles in met.building X-3002.

Reason for the Change:Power sources are needed for welding units to be used duringconstruction activities in X-3002.

PCE 09-0015 0 Title: Sublease of X-5000 and Associated Facilities 2/25/2009 No Exhibit A to the Gas Yes None of the criteriaCentrifuge Enrichment listed in

Description of Change: Plant Lease, 10CFR70.72(c) areAdd X-5000, electrical power system, and associated facilities (X-5000, License Application Ch met.X-5001, X-5015, X-5001A, X-5001B, X-2215A , X-2215B, X-2215C, 1,and X-530G to the Gas Centrifuge Enrichment Project Lease, and Integrated Safetyinclude the facilities in the License Application discussion of secondary Analysis Summary Ch 2facilities for the American Centrifuge Plant.

Reason for the Change:Provide American Centrifuge Plant control over the electricaldistribution system to facilitate construction activities.

PCE 09-0016 0 Title: Correct Backfill Unit Drawings 1/16/2009 No ESO-2201-0010, No None of the criteriaEngineering Drawings listed in

Description of Change: X-3001-961 -C0, 10CFR70.72(c) areChange drawings to correct the orientation of a pressure relief valve. X-3001-962-Cl met.

Reason for the Change:Correct an inaccuracy in the engineering drawings for backfill units.

PCE 09-0019 0 Title: Miscellaneous Updates to American Centrifuge Plant Licensing 7/26/2009 No License Application Yes None of the criteriaApplication and Supporting Documents Ch 1 and 3, listed in

Environmental Report 10CFR70.72(c) are.Description ofChange: Oh 3.10, met.

Administrative changes to make minor updates, correct omissions, Integrated Safety

grammatical errors, and inconsistent descriptions present since the first Analysis Summary

revision of the Integrated Safety Analysis Summary. Ch 1,2, 4, 7,

Reason for the Change: App B,C,E,F,I,KTo improve clarity, accuracy, and consistency between documents.

Wednesday, January 27, 2010 Page 7 of 47,

Page 121: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA ,

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0021 0 Title: Refurbishment ofX-7725 Elevator 2/11/2009 No ESO-3102-0004, No None of the criteriaSOW-3906-0001 listed in

Description of Change: Rev 1 10CFR70.72(c) areRefurbish/upgrade Elevator #8 in Building X-7725 to meet the original met.design requirements and applicable Occupational Safety and HealthAdministration, National Fire Protection Association, and AmericanSociety of Mechanical Engineers codes. Not all of the original designrequirements had been installed when the original U.S. Department ofEnergy installation project was cancelled in the 1980's.

Reason for the Change:Existing elevator controls were obsolete or did not fully meet the intentof the original design.

PCE 09-0024 0 Title: Dry Air Distribution Piping Structural Steel 1/26/2009 No CWP #BOPOUT-1202 No None of the criteriaRev 0 listed in

Description of Change: 10CFR7O.72(c) areWork Package for the installation of new structural steel piping support met.structures, connect and test electrical grounding, and touch-up paintingof structures for Dry Air Distribution system piping, in or near buildingsX-3001, X-3002, X-3346, X-6000, X-6002, X-7721 and X-7727H.

Reason for the Change:Support restoration of the Dry Air Distribution system to a serviceableand well-maintained condition.

PCE 09-0024 1 Title: Dry Air Distribution Piping Structural Steel 4/7/2009 No None No None of the criteria

Description of Change: 10CFR70.72(c) are

Revision 1 expanded the original change evaluation to identify any met.

design criteria or system requirements that might apply to the proposed

change. No additional changes were evaluated.

Reason for the Change:Update change evaluation to document additional documents reviewedfor impact on the proposed change.

PCE 09-0024 2 Title: Dry Air Distribution Piping Structural Steel 5/26/2009 No CWP #BOPOUT-1202 No None of the criteria

Description of Change: 10CFR70.72(c) are

Revision 2 evaluates changes to the Work Package to clearly identify met.

the Quality Level-1 work associated with the installation of new pipe

support on existing steel inside building X-3002. No additionalchanges were evaluated.

Reason for the Change:Update change evaluation to document a higher quality level for aportion of the steel work.

Wednesday, January 27, 2010 Page 8 of 47

Page 122: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

PCE 09-0026 0 Title: Structural Steel Erection in X-3002 South Mezzanine 2/3/2009 Yes CWP #PB2SOU-1203 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package to install, inspect, and test structural steel beams, met.framing, pipe supports and other steel members in building X-3002.

Reason for the Change:New supports are required for future installation of piping, conduit,cable trays, and other types of equipment for the American CentrifugePlant.

PCE 09-0026 1 Title: Structural Steel Erection in X-3002 South Mezzanine 5/14/2009 Yes CWP #PB2SOU-1203 No None of the criteriaRev 1 listed in

Description of Change: 10CFR70.72(c) are

Revision 1 evaluates changes to the Work Package to include work in met.

the Valve House to the west of X-3002.

Reason for the Change:Expand work package to cover additional area.

PCE 09-0029 0 Title: Revision to Procedure ACD2-EG-007, Integrated Safety 1/22/2009 No ACD2-EG-007 Chg 2 No None of the criteriaAnalysis Methodology and Change Process listed in

Description of Change: 1 eCFR70.72(c) are

Provide additional instruction for development and maintenance of the met.

Integrated Safety Analysis; more clearly define responsibilities andtraining requirements; allow use of e-mail in making comments; updatereferences and forms.

Reason for the Change:Clarify procedure requirements for developing and maintaining theIntegrated Safety Analysis.

PCE 09-0030 0 Title: Machine Level Pin Adjustment for AC100 Machine Casings 1/22/2009 Yes ESO-2303-0020 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areFabrication of pins to be pressed into Secondary Alignment bars for met.alignment of LC3/AC100 machines when installing them in the machinemount locations.

Reason for the Change:Aid in alignment of centrifuge machines during installation.

PCE 09-0031 0 Title: Revision of Procedure ACD2-SH-001, Hazard Communication 1/23/2009 No ACD2-SH-001 Chg 2 No None of the criteriaProgram listed in

Description of Change: 10CFR70.72(c) are

Correct formatting and update instructions for accessing the Material met.

Safety Data Sheet database on the USEC Inc. intranet.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 9 of 47

Page 123: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

POE 09-0032 0 Title: Revision of Procedure ACD2-SH-015, instructions for 4/23/2009 No ACD2-SH-015 Chg I No None of the criteriaLockout/Tagout listed in

10CFR70.72(c) areDescription of Change: met.Clarify responsibilities and actions required for single-source or permit-required Iockout/tagout.

Reason for the Change:Clarify procedure requirements.

PCE 09-0033 0 Title: Revision of Procedure ACD2-QM-101, Inspection Program 1/30/2009 No ACD2-QM-101 Chg 5 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areChange the title; clarify the steps for requesting, performing, and met.documenting the results of inspections, conditional release, anddedication of commercial grade items; delete unnecessary steps andflowcharts; and made other editorial and format changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0034 0 Title: New Facility Waste Management Plan for Recycle / Assembly 2/11/2009 No ESH-343-09-003 Rev 0 No None of the criteriaand Centrifuge Training and Test Facility listed in

Description of Change: 1CeFR70.72(c) are

Develop Facility Waste Management Plan to describe wastegeneration, management, and disposal of waste generated in theRecycle / Assembly and Centrifuge Training and Test Facility. Thisincludes the responsibilities, equipment requirements, and oversightneeded by each generator to manage their waste in accordance withfederal, state, and local regulations.

Reason for the Change:Provide strategy for waste management to comply with regulations forwaste recyclinq and disposal.

PCE 09-0035 0 Title: Revision of Procedure ACD4-HP-001, Radiological Surveys 1/27/2009 No ACD4-HP-001 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areAdd a radiological survey continuation sheet, Form AC-480. met.

Reason for the Change:Provide additional format for documenting radiological surveys.

Wednesday, January 27, 2010 Page 10 of 47

Page 124: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0036 0 Title: Centrifuge Training and Test Facility Articulator Controls 1/30/2009 No ESO-2303-0019, No None of the criteriaImprovement SOW-2303-0013 listed in

10CFR70.72(c) areDescription of Change: met.Design, construction, and use of an additional articulator pendantcontroller to improve accuracy and consistency of casing alignmentduring assembly of Lead Cascade Facility machines.

Reason for the Change:Improve machine building efficiency and reduce costs.

PCE 09-0039 0 Title: Revision of Procedure ACD2-CI-002, Inspection of Rigging and 3/18/2009 No ACD2-CI-002 Chg 4 No None of the criteriaMaterial Handling Equipment listed in

Description of Change: 1 eCFR70.72(c) are

Change title, clarify requirements and add references. met.

Reason for the Change:Clarify procedure requirements.

PCE 09-0040 0 Title: Revision of Procedure ACD2-QM-005, Supplier Control Program 2/11/2009 No ACD2-QM-005 Chg 6 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Revise procedure and associated forms AC-399 and AC-032 to met.

provide clarification and additional guidance.

Reason for the Change:Clarify procedure requirements.

PCE 09-0041 0 Title: Install Service Modules (End and Aisle Frames) 5/29/2009 Yes CWP #SMPB2S-3001 No None of the criteria

Description of Change: Rev 0 listed in

Work Package to erect, assemble, and install the X-3002 Service met.Modules product end frames, tail end frames, and aisle frames fortrains 5, 6, 7, and 8. Project also includes installation of electricalgrounding straps, painting, test and inspection activities.

Reason for the Change:New Service Modules and associated piping are required for futurecentrifuge operation.

PCE 09-0042 0 Title: Fire Suppression System Modification in Building X-7725 6/1/2009 Yes CWP #BOPFIR-4123 No None of the criteriaRev 0 listed in

Description of Change: 1 OCFR7.72(c) areWork Package to reconfigure a section of the wet pipe sprinkler system met.on the first floor and fifth floor of X-7725.

Reason for the Change:To accommodate construction of the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 11 of 47

Page 125: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0043 0 Title: Refurbish Cranes and Hoists 5/26/2009 No CWP #RAOTHR-3013 No None of the criteriaRev 1 listed in

Description of Change: 1OCFR70.72(c) areWork Package to refurbish/upgrade mechanical, electrical, and control met.systems on the Recycle/Assembly bridge crane and six underhungbridge cranes in building X-7725.

Reason for the Change:Refurbished cranes are needed to support construction of the AmericanCentrifuge Plant.

PCE 09-0045 0 Title: Revision to ACD2-EC-006, National Pollutant Discharge 2/20/2009 No ACD2-EC-006 Chg 1 No None of the criteriaElimination System Compliance Procedure listed in

Description of Change: 10CFR70.72(c) are

Incorporate recording of flow measurements each day, including met.

weekends and holidays, for American Centrifuge's National PollutantDischarge Elimination System-permitted outfalls, and initiate a new formAC-484, on which the flow measurements will be recorded.

Reason for the Change:To expand flow measurement recording from weekdays to every day, tobe performed by American Centrifuge personnel instead of byenvironmental technicians from the Gaseous Diffusion Plant.

PCE 09-0046 0 Title: Change Portal Staffing Hours and Transport of Mail 6/17/2009 No ACD2-PS-004 Chg 3, No None of the criteriaSP-2605-0005 Rev 9 listed inDescription of Change: 10CFR70.72(c) are

Change Security personnel staffing hours for the Visitor Control portal met.

from 0630-1800 to match normal weekday work hours of 0700-1630.

Also allow either Q-cleared Security personnel or Q-cleared RecordsManagement & Document Control personnel to transport overnightclassified mail from the portal to a Security Area (closed or restrictedarea). Update procedure ACD2-PS-004, Handling and Processing ofClassified and Safeguards Information Documents for Offsite Deliveriesand Receipts, and SP-2605-0005 American Centrifuge ProgramClassified Matter Protection and Control Manual, to reflect thesechanges.

Reason for the Change:Permit greater operational flexibility while still providing adequatestaffing for receipt and handling of classified deliveries by FederalExpress.

PCE 09-0047 0 Title: Revision to Procedure ACP2-EG-021, Evaluating and Reporting 2/6/2009 No ACP2-EG-021 Chg 3 No None of the criteriaDefects and Noncompliances per 10 CFR Part 21 listed in

Description of Change: 10CFR70.72(c) are

Include dedicated items, make title and definitions consistent, and met.

clarify actions to be taken concerning reporting.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 12 of 47

Page 126: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0048 0 Title: Revision to Procedure ACD2-RG-004, Corrective Action Process 4/22/2009 No ACD2-RG-004 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areAddress assigning issues to Technical Services for disposition, if they met.have the potential to be 10 Code of Federal Regulations Part 21reportable. Other changes were made to clarify and removeunnecessary notification burden from Screening Managers.

Reason for the Change:Clarify procedure requirements and provide requirements forreportability determination so that 10 Code of Federal Regulations Part21 reporting time frames can be met.

PCE 09-0050 0 Title: X-7725 Honeywell Maintenance Shop 2/25/2009 Yes ESO-3102-0011 Rev 0, No None of the criteriaESO-3102-0012 Rev 0 listed in

Description of Change: 1OCFR70.72(c) areInstall a wire fence storeroom in Room 124 and welding gas storage met.just outside the X-7725 to support a permanent weld shop in Room 124.

Reason for the Change:Maintenance shop is needed to support production of Lead Cascade 3and commercial plant assembly activities.

PCE 09-0051 0 Title: Revision to Procedure ACD2-EG-016, Conditional Release 2/27/2009 No ACD2-EG-016 Chg 2 No None of the criteriaProgram listed in

Description of Change: 10CFR70.72(c) are

Modify inspection and test requirements and provide guidance for met.

processing Commercial Grade Items to be dedicated for use as aQuality Level-i item.

Reason for the Change:Clarify procedure requirements and make broader applicability.

PCE 09-0052 0 Title: Revision to Procedure ACD3-EG-205, Engineering Evaluations 5/15/2009 No ACD3-EG-205 Chg 3 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areClarify actions and documentation required for various nonconformance met.determinations.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page .13 of 47

Page 127: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0053 0 Title: Remove Changes Previously Made to the American Centrifuge 3/25/2009 No Environmental Report No None of the criteriaPlant Environmental Report Rev 9 through 13 listed in

lOCFR7O.72(c) areDescription of Change: met.Remove non-significant changes that have been made to theEnvironmental Report since receiving the material license andenvironmental impact statement.

Reason for the Change:License Application, Chapter 9, is the living document for environmentalissues and is maintained current. Per 10 Code of Federal Regulations51.60, the Environmental Report is not required to be revised ifchanges are not expected to result in significant environmental impact.

PCE 09-0053 1 Title: Rescind Proposed Removal of Changes Previously Made to the 9/11/2009 No None No None of the criteriaAmerican Centrifuge Plant Environmental Report listed in

Description of Change: 1 mCFR70.72(c) are

Rescind the change proposed in Revision 0 of the change evaluation met.

(but not yet implemented), and do not remove previous changes to theEnvironmental Report.

Reason for the Change:Management decision to maintain the report current. 10 Code ofFederal Regulations 51.60 does not require Environmental Report to berevised if changes are not expected to result in significantenvironmental impact, but it does not prohibit such changes to theReport.

PCE 09-0054 0 Title: Revision to Procedure ACD2-QM-107, Material Condition 3/13/2009 No ACD2-QM-107 Chg 3, No None of the criteriaReport Program Quality Assurance listed in

Description of Change: Program Description 10CFR70.72(c) are

Clarify nonconformance program requirements, add references, and Ch 7.8 and 15.0 met.

expand the list of dispositions to align with current practices.

Reason for the Change:Clarify procedure requirements.

PCE 09-0055 0 Title: Relocation of X-3002 Crane Stairway Lighting 2/20/2009 No ECR-2101-0041-02, No None of the criteria.ESO-2101-0041 listed inDescription of Change: 10CFR70.72(c) are

Design and relocation of lighting on the crane stairways in X-3002. met.

Reason for the Change:Lowering the light fixtures will allow maintenance access without the useof a lift.

Wednesday, January 27, 2010 Page 14 of 47

Page 128: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0056 0 Title: Revision to Procedure ACD2-SH-019, Safety and Health Work 6/11/2009 No ACD2-SH-019 Chg 2 No None of the criteriaPermit listed in

1OCFR70.72(c) areDescription of Change:

met.

Clarify determination of need for a Safety and Health Work Permit,

added new form and guidelines.

Reason for the Change:Clarify procedure requirements.

PCE 09-0059 0 Title: Revision to Procedure ACD2-EC-010, Air Compliance Program 2/27/2009 No ACD2-EC-010 Chg 1 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areAdd guidance for Environmental personnel to initiate required actions to met.obtain Permission to Construct, when required by regulations.

Reason for the Change:Provide information identified as lacking during anEnvironmental/Waste Management readiness assessment.

PCE 09-0061 0 Title: Install Prefabricated Fence and Planner Cage in Building X-7725 2/26/2009 Yes ESO-3911-0002 Rev 0 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Install prefabricated fence sections and a wire mesh fence planner cage met.

in the Maintenance Shop in Room 108, Building X-7725.

Reason for the Change:Complete Maintenance Shop to support production of Lead Cascade 3and commercial plant assembly activities.

PCE 09-0062 0 Title: Corrections to the American Centrifuge Plant Integrated Safety 8/10/2009 No License Application Yes None of the criteriaAnalysis Summary' Ch 1, listed in

Integrated Safety 10CFR70.72(c) areDescription of Change: Analysis Summary met.

Miscellaneous editorial corrections and updates of the Integrated Safety Ch 2,34,r7 and

Analysis Summary to correct typographical errors, delete unneeded Ch 2,3,4,6,7,K

references or descriptions, and add consistent descriptions to accident App A,C,E,F,J,K

events. Also correct reference errors and omissions in the LicenseApplication.

Reason for the Change:Minor updates and correction of omissions, grammatical errors, orinconsistent descriptions.

PCE 09-0063 0 Title: Revision to Procedure ACD2-SP-033, Identification and 3/3/2009 No ACD2-SP-033 Chg 3' No None of the criteriaProtection of Safeguards Information (SGI) listed in

Description of Change: 10CFR70.72(c)are

Replace "Safeguards Information - Modified" with "Safeguards met.

Information" and update shredding requirements.

Reason for the Change:Implementation of requirements from 10 Code of Federal Regulations73.22, Protection of Safeguards Information.

Wednesday, January 27, 2010 Page 15 of 47

Page 129: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0067 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 3/9/2009 No ACD2-RG-003 Chg 3 No None of the criteriaCommunications listed in

Description of Change: 10CFR70.72(c) areUpdate references and personnel titles, and other editorial corrections.

Reason for the Change:Clarify procedure requirements.

PCE 09-0068 0 Title: Revision to Procedure ACD2-QM-007, Identification and Control 3/6/2009 No ACD2-QM-007 Chg 3 No None of the criteriaof Items listed in

1 OCFR7O.72(c) areDescription of Change: met.Update references and definitions and clarify terminology.

Reason for the Change:Clarify procedure requirements.

PCE 09-0070 0 Title: Revision to Procedure ACD2-HP-004, Conduct of Radiological 3/12/2009 No ACD2-HP-004 Chg 3 No None of the criteriaOperations listed in I "

Description of Change: 10CFR70.72(c) are

Reflect a program element from the License Application and clarify that met.

UF6 cylinders are exempt from routine labeling as radioactive materialdue to their size and unique construction.

Reason for the Change:Clarify procedure requirements.

PCE 09-0071 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 5/20/2009 No ACD2-RG-003 Chg 4 No None of the criteriaCommunications listed in

Description of Change: 1OCFR70.72(c) are

Clarify instructions, add flow charts, provide additional reporting met.

requirements and other editorial and formatting corrections.

Reason for the Change:Clarify procedure requirements.

PCE 09-0073 0 Title: Implement SP-3605-0003, Lead Cascade Distributed Control 3/25/2009 No SP-3605-0003 Rev 0 No None of the criteriaSystem Information System Security Plan listed in

Description of Change: 1 eCFR70.72(c) are

Update and replace existing plans SP-2605-0015, Stand-alone SpecialCategory Systems, Process Controls and Workstations SupportingProcess Controls Processing Classified Information at ProtectionLevel=l, and SP-2605-0018, Network System Proceeding ClassifiedInformation at PL=1.

Reason for the Change:To comply with new U.S. Department of Energy requirements (in DOEM 205.1-4) for cyber security.

Page 16 of 47Wednesday, January 27, 2010

Page 130: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0075 0 Title: Revision to Procedure ACD2-MA-001, Control of Measuring and 4/19/2009 No ACD2-MA-001 Chg 2 No None of the criteriaTest Equipment listed in

Description of Change: 1 mCFR70.72(c) are

Add completed AC-488 as a Quality Record, address processing of met.

measuring and test equipment for calibration or repair, delete unusedreference, and add definition.

Reason for the Change:Clarify procedure requirements.

PCE 09-0076 0 Title: New Procedure ACD4-HP-011, Operation of Canberra S5XLB 3/19/2009 No ACD4-HP-011 Chg 0 No None of the criteriaTennelec Low Background Counter listed in

Description of Change: 1 eCFR70.72(c) are

Provide operating instructions for Canberra S5XLB Tennelec Low met.

Background Counter.

Reason for the Change:Need to perform low background alpha and beta counting in support ofHealth Physics activities.

PCE 09-0078 0 Title: Modify Lighting in Conference Room AC-3 6/16/2009 No ESO-2512-0008 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areChange ballasts and bulbs in building X-7725 Conference Room AC-3 met.to allow six of nine existing lights to be on a dimmer.

Reason for the Change:To allow better visibility When using projected displays during meetingsor training in this conference room.

PCE 09-0079 0 Title: Revision to Procedure ACD2-QM-001, Assessment Program 3/19/2009 No ACD2-QM-001 Chg 10 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areExpand the distribution list for schedule approval and assessment met.reports.

Reason for the Change:Clarify procedure requirements.

PCE 09-0080 0 Title: Revision to Procedure ACD3-EG-501, Preparation of 3/18/2009 No ACD3-EG-501 Chg 3 No None of the criteriaEngineering Procurement Specifications listed in

Description of Change: 1OCFR7O.72(c)are

Incorporate commercial grade items, address nuclear criticality safety, met.

revise guidance for selecting and documenting critical designcharacteristics and update technical data sheets and forms.

Reason for the Change:Respond to process improvement recommendations.

Wednesday, January 27, 2010 Page 17 of 47

Page 131: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0081 0 Title: Severe Weather Response Guidelines for the Green Zone 3f31/2009 No None No None of the criteriaComplex listed in 10 CFR

Description of Change: 70.72(c) are met.

Provide guidelines for severe weather response in the Green ZoneComplex. These guidelines identify the actions needed before, during,and after a severe weather event (i.e., tornado watch, tornado warning,etc.). These guidelines are applicable to all USEC, Fluor, contractors,sub-contractors, and visitors in the Green Zone Complex.

Reason for the Change:These guidelines clarify the responsibilities and identify the actionsneeded before, during, and after severe weather notices in the GreenZone complex. These guidelines provide guidelines for the mobilizationof personnel and supervision (escorting) of uncleared personnelevacuating the Green Zone and entering the Controlled Access Area(CAA)/Security Area for the purpose of sheltering from a tornado.

PCE 09-0082 0 Title: Transport Radioactive Material through American Centrifuge 4/3/2009 No None No None of the criteriaPlant Space listed in 10 CFR

Description of Change: 70.72(c) are met.

Transport radioactive material from Lead Cascade Facility spacethrough American Centrifuge Plant space utilizing American Centrifugeprocedures.

Reason for the Change:The material was located in an area where there was no other way toremove the material but through the American Centrifuge Plant space.

Wednesday, January 27, 2010 Page 18 of 47

Page 132: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0083 0 Title: Machine Design Changes 10/20/2009 Yes ECR/CR # No None of the criteria1494 1508 1511 listed in 10 CFR

Description of Change: 1513 1514 1522 70.72(c) are met.The changes include improvements, minor changes to the previously 1525 1526 1530evaluated centrifuge machine design such as dimensional changes, 1553 1558 1564material changes, cleaning marking or packaging requirements, and 1575 1577 1578typographical corrections. 1579 1580 1581

Reason for the Change: 1585 1588 1590This change is being made as the result of the progression of the 1591 1592 1593design of the Lead Cascade 3 centrifuge machine being operated in the 1597 1598 1599Lead Cascade Facility towards an AC100 Commercial Plant centrifuge 1601 1602 1606machine. 1607 1608 1609

1612 1613 16141615 1616 16171618 1621 16221623 1624 16251626 1627 16281629 1630 16311634 1637 16401641 1644 16481651 1652 16531655 1656 16571658 1659 16601661 1664 1666

1667 1672

PCE 09-0087 0 Title: Revision to Procedure ACD2-QM-101, Inspection Program 4/7/2009 No ACD2-QM-101 Chg 6 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areProvide guidance for reinspection of nonconforming items, clarify met.applicability, and other minor corrections and format changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0089 0 Title: X-7725 Maintenance.Material Storage Area 5/6/2009 No ESO-3102-0005 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areRemove the X-7725 ground floor centrifuge component storage area met.from Lead Cascade Facility use, and update licensing documents toreflect the change in area usage.

Reason for the Change:Allow for future use to store and maintain material for the commercialplant.

Wednesday, January 27, 2010 Page 19 of 47

Page 133: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0092 0 Title: Lease/sublease of X-2220D Gas Centrifuge Enrichment PlantCommunications Ductbank System

Description of Change:Add X-2220D to the facilities subleased by the United StatesEnrichment Corporation to USEC Inc. and revise the AmericanCentrifuge Plant Integrated Safety Analysis Summary to reflect thesublease and renaming (from Telephone System to CommunicationDuctbank System) of the facility.

4/29/2009 No Exhibit A to the GasCentrifuge Enrichment

Plant LeaseIntegrated Safety

Analysis SummaryTable of Contents,Section 2.3.5, and

Table 2.0.1

Yes None of the criterialisted in

10CFR70.72(c) aremet.

Reason for the Change:These effluent system facilities are required for Lead Cascade Facilityand American Centrifuge Plant operations.

PCE 09-0098 0 Title: Sublease of Grassy/Unimproved Areas West of X-7721 4/9/2009 No Exhibit A to the Gas No None of the criteriaCentrifuge Enrichment listed in

Description of Change: Plant Lease 10CFR70.72(c) areAdd the Grassy/Unimproved Areas and associated sidewalks (Area 2) met.to the facilities subleased by the United States Enrichment Corporationto USEC Inc.

Reason for the Change:Area needed for upcoming commercial plant activities.

PCE 09-0101 0 Title: Debris Screen for Tower Cooling Water 4/15/2009 Yes ESO-2409-0004 No None of the criterialisted in

Description of Change: 1 lCFR7d.72(c) are

Fabricate and install a portable screen system to catch debris in the met.

tower cooling water flume (discharge) prior to entering the X-6000pump house well.

Reason for the Change:To catch debris that could restrict cooling water flow and causeshutdown of equipment.

PCE 09-0104 0 Title: Revision to Procedure ACD4-HP-007, Operation of the Ludlum 4/23/2009 No ACD4-HP-007 Chg 3 No None of the criteria2224 listed in

Description of Change: 10CFR70.72(c) are

Provide a more automated tool for recording radiological surveys with met.

the Ludlum Model 2224 survey instrument.

Reason for the Change:Provide an updated form to perform calculations on an automatedspreadsheet.

Wednesday, January 27, 2010 Page 20 of 47

Page 134: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0106 0 Title: Revision to Procedure ACD4-OP-071, Centrifuge Machine 4/28/2009 No ACD4-OP-071 Chg 5 No None of the criteriaTransporter (CMT) listed in

Description of Change: eCtFR70.72(c) are

Allow loading and unloading of the Machine Transporter while it is met.

resting on its wheels.

Reason for the Change:Respond to engineering evaluation that determined lifting the MachineTransporter on its jacks is not required during loading and unloading.

PCE 09-0111 0 Title: Revision to Procedure ACD3-PC-002, Procurement of Items for 4/29/2009 No ACD3-PC-002 Chg 3 No None of the criteriaUse in Quality Level-1 Applications listed in

Description of Change: 10CFR70.72(c) are

Add definition, remove unnecessary reference, and provide clarification met.of several sections.

Reason for the Change:Clarify procedure requirements.

PCE 09-0112 0 Title: Installation of Temporary Satellite Fuel Systems 5/19/2009 Yes ESO-2518-0004 Rev 0, No None of the criteriaSOW-2518-0011 Rev 0 listed in

Description of Change: 1OCFR7O.72(c) areTemporary placement of one fuel storage tank, west of X-7725A. The met.tank consists of two internal 500 gallon tanks, one for diesel and one forgasoline.

Reason for the Change:Provide more cost efficient fueling services to the American CentrifugePlant during the construction phases, and eliminate dependence on theGaseous Diffusion Plant fuel pumps.

PCE 09-0115 0 Title: Revision to Procedure ACD2-MM-001, Control of Material 5/27/2009 No ACD2-MM-001 Chg 2 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areAlign with recent changes to the commercial grade item processes, met.update references and form.

Reason for the Change:Clarify procedure requirements.

PCE 09-0116 0 Title: X-7725 Controlled Access Area Construction Upgrade 5/7/2009 Yes ECR 3501-0002-18 No None of the criterialisted in ;

Description of Change: 10CFR70.72(c) areInstall conduit, cables, wiring, door sensors, change direction of door met.swing (out to exit), add badge readers, scramble pad, local alarms,telephone, X09 lock, remove raised floor, remove door, move electricalpanel, and add climate control unit and ductwork in building X-7725.

Reason for the Change:Install/upgrade access control.

Wednesday, January 27, 2010 Page 21 of 47

Page 135: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0116 1 Title: X-7725 Controlled Access Area Construction Upgrade 6/22/2009 Yes ECR 3501-0002-18 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areInstall two additional doors and a wall partition in third floor of X-7725. met.

Reason for the Change:Install/upgrade access control.

PCE 09-0122 0 Title: X-6002 Fire Alarm System 5/13/2009 Yes CWP #BOPCOM-7204 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package for the installation of a Fire and Supervisory Alarm met.System in the X-6002 Boiler House.

Reason for the Change:Continuation of activities required to provide an operational boilerfacility.

PCE 09-0123 0 Title: Installation of X-7725 Exterior Lighting 5/19/2009 Yes ESO-2501-0007, No None of the criteriaJFI-2301-0012 Rev 0 listed in

Description of Change: 10CFR70.72(c) areDesign and install exterior lights above exterior pedestrian doors for met.building X-7725.

Reason for the Change:Provide adequate lighting for doors that do not currently have exteriorlight fixtures.

PCE 09-0124 0 Title: Critical Commercial Plant Surge Protection 5/14/2009 Yes ESO-310402-0001, No None of the criteriaSOW-2414-0003 listed in

Description of Change: 1OCFR70.72(c) areAdd 13.8KV surge arresters to substations and associated work. met.

Reason for the Change:This change is being implemented to prevent overvoltage conditionsfrom damaging electronic equipment, including machine motor drives inthe process buildings.

PCE 09-0125 0 Title: Revision to CMP-3603-0001, Graded Approach to Configuration 5/14/2009 No CMP-3601-0001 Rev 2 No None of the criteriaManagement and Quality Assurance Chg B listed in

Description of Change: 1 eCFR70.72(c) are

Revise CMP-3603-0001 to clarify the responsible person, and to clarifydisposition instructions for nonconforming items that affect design andfor certain supplier-identified discrepant conditions.

Reason for the Change:Clarify procedure requirements and make consistent with the MaterialCondition Report Program.

Wednesday, January 27, 2010 Page 22 of 47

Page 136: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 019-0127 0 Title: Revision to Procedure ACD2-PC-001, Procurement of Quality 5/18/2009 No ACD2-PC-001 Chg 3 No None of the criteriaLevel-1 Services and Items for Use in Quality Level-1 listed inApplications 1OCFR70.72(c) are

met.Description of Change:Clarify title, purpose, scope, add definition, and remove a reference.

Reason for the Change:Clarify procedure requirements.

PCE 09-0133 0 Title: X-7725 Area C and C1 Fire Sprinkler Modifications 5/27/2009 Yes ESO-3102-0005, No None of the criteriaSOW-3102-0009 Rev 0 listed in

Description of Change: 10CFR70.72(c) areDesign and construct or modify fire water sprinkler systems for new met.offices and new storage rack areas in Area C and Cl in building X-7725.

Reason for the Change:Modify sprinkler system to accommodate code requirements for thechange of use from normal occupancy to storage occupancy.

PCE 09-0133 1 Title: X-7725 (Area C and C1) Fire Sprinkler Modifications 7/27/2009 Yes ESO-3102-0005, No None of the criteriaD SOW-3102-0009 Rev 1 listed inDescription of Change: 10CFR70.72(c) areDesign and construct or modify fire water sprinkler systems for new met.offices, restroom, and new storage rack areas in Area C, C1, and C1Annex in building X-7725.

Reason for the Change:Modify sprinkler system to accommodate code requirements for thechange of use from normal occupancy to storage occupancy.

PCE 09-0134 0 Title: Revision to Procedure ACD2-EC-007, Waste Management 6/9/2009 No ACD2-EC-007 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areUpdate titles, forms, and references, add or clarify steps to ensure met.regulatory compliance for handling of hazardous and non-hazardouswaste, and other editorial and format changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0137 0 Title: Lease/Sublease of X-2230C Storm Sewers 6/2/2009 No Exhibit A to the Gas No None of the criteriaDescription of Change: Centrifuge Enrichment listed in

Decito fCag:Plant Lease 100FR7O.72(c) areAdd X-2230 storm sewers to the Gas Centrifuge Enrichment Project met.Lease.

Reason for the Change:The storm sewers are located within the American Centrifuge Plantfootprint and should be included in the sublease, along with the roads,buildings, and land that are already included in the sublease.

Wednesday, January 27, 2010 Page 23 of 47

Page 137: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0138 0 Title: Addition of References to American Centrifuge Plant License 6/23/2009 No License Application No None of the criteriaApplication and Security Program Section 1.4, listed in

Security Program 10CFR70.72(c) areDescription of Change: Section 3.14 met.Add Regulatory Guide 5.15, Tamper Indicating Seals for the Protectionand Control of Special Nuclear Material, to the references listed in theLicense Application and Security Program.

Reason for the Change:This reference was inadvertently omitted from reference lists.

PCE 09-0139 0 Title: Relocate Intermediate Bay Cranes' Disconnect 5/29/2009 Yes ESO-2302-0015 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areRelocate the disconnect for intermediate bay cranes from the fourth met.floor to the first floor of the Centrifuge Training and Testing Facility.

Reason for the Change:Make the disconnect readily accessible to crane operators andmaintenance personnel.

PCE 09-0140 0 Title: Public Address and Evacuation Alarm System - Phase 1 6/22/2009 Yes ESO-310409-0005, No None of the criteriaSOW-310409-0002, listed in

Description of Change: SOW-310409-0003, 10CFR70;72(c) areDesign, fabrication, installation, and onsite testing of a stand-alone met.Public Address and Evacuation Alarm System in buildings X-3000, X- TP-310409-00013001, X-3012, and X-7725, and upgrade of wiring for existing X-3002Fire Alarm & Fire Protection Systems.

Reason for the Change:Provide a Public Address and Evacuation Alarm System that will allowAmerican Centrifuge Operations to notify project personnel in the eventof an emergency, and replace temporary wiring for GovernmentServices' fire alarm system.

PCE 09-0141 0 Title: Revision to Procedure ACD4-HP-011, Operation of Canberra 6/3/2009 No ACD4-HP-01 1 Chg 1 No None of the criteriaS5XLB Tennelec Low Background Counter listed in

Description of Change: 1 OCFR70.72(c) are

Changed procedure to reflect operating instructions for the Canberra met.

S5XLB Tennelec Low Background Counter.

Reason for the Change:The Canberra S5XLB Tennelec Low Background Counter provides lowbackground alpha and beta counting of smears and air samples fordetermination of radiological activity. Typographical errors werecorrected and detailed sequential steps were added to make theprocedure consistent with the upgraded software package for theCanberra S5XLB Tennelec Low Background Counter. Operation of theTennelec Low Background Counter is necessary to implementrequirements outlined in Sections 4.7.5 and 4.8.4 of the LicenseApplication for the American Centrifuge Lead Cascade Facility andAmerican Centrifuge Plant.

Wednesday, January 27, 2010 Page 24 of 47

Page 138: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0144 0 Title: Lease/Sublease of X-6002 Boiler System, X-6002A Oil Storage 6/19/2009 Yes Exhibit A to the Gas No None of the criteriaFacility, and X-2230T2 Recirculating Heating Water System Centrifuge Enrichment listed in(Less Valve Pits A and B) Plant Lease 10CFR70.72(c) are

Description of Change: met.

Add X-6002 Boiler System, X-6002A Oil Storage Facility, and X-2230T2Recirculating Heating Water System (less Valve Pits A and B) to theGas Centrifuge Enrichment Project Lease.

Reason for the Change:To allow the American Centrifuge project to have full control of thesefacilities.

PCE 09-0144 1 Title: Lease/Sublease of X-6002 Boiler System, X-6002A Oil Storage 7/10/2009 No Exhibit A to the Gas No None of the criteriaFacility, and X-2230T2 Recirculating Heating Water System Centrifuge Enrichment listed in

Description of Change: Plant Lease 10CFR70.72(c) are

Added X-2230T2 Recirculating Heating Water System Valve Pits A and met.

B to the Gas Centrifuge Enrichment Plant Lease.

Reason for the Change:To allow the American Centrifuge project to have full control of thesefacilities.

PCE 09-0146 0 Title: Refurbishment of Heating, Ventilation, and Air Conditioning 6/16/2009 No CWP #RAOTHR-2102 No None of the criteriaComponents in X-7725 Rev 0 listed in

Description of Change: 10CFR70.72(c) are

Work Package for the refurbishment, relocation, or replacement ofHeating, Ventilation, and Air Conditioning equipment, ductwork,insulation, and other components in building X-7725.

Reason for the Change:Refurbish or modify to meet original specifications and AmericanCentrifuge project requirements.

PCE 09-0146 1 Title: Refurbishment of Heating, Ventilation, and Air Conditioning 7/20/2009 No CWP #RAOTHR-2102 No None of the criteriaComponents in X-7725 Rev 1 listed in

Description of Change: 10CFR70.72(c) are

Revision 1 of the Work Package added a step for inspection and testing met.

of existing Heating, Ventilation, and Air Conditioning system localcontrol panels.

Reason for the Change:Refurbish or modify to meet original specifications and AmericanCentrifuge project requirements.

Wednesday, January 27, 2010 Page 25 of 47

Page 139: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0147 0 Title: X-7725 Areas C and C1 Modifications 6f16f2009 Yes ESO-3102-0005, No None of the criteriaSOW-3102-0010 listed in

Description of Change: Rev 1, 10CFR70.72(c) areDesign and construction of a maintenance storage area, including SOW-3102-0011 met.shelving, loading dock, office areas with rest room and break room, in Rev 0,the C and C1 area of building X-7725. SOW-3102-0012 Rev 0

Reason for the Change:Allow maintenance personnel to use the area for storage and handlingof materials in support of American Centrifuge project operations.

PCE 09-0155 0 Title: X-3012 and X-7725 Buffer Storage Construction 6/8/2009 Yes ECR 3501-0002-19 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Remove existing and install new doors, install new or move existing met.

access control and intrusion detection system components, install new

climate control unit and smoke/fire detectors, replace radiotransmitter/receivers for large doors, and modify fencing.

Reason for the Change:Upgrade controlled access areas in X-3012 and X-7725.

PCE 09-0156 0 Title: Revision to Procedure ACD2-EG-005, Preparation of 6/5/2009 No ACD2-EG-005 Chg 4 No None of the criteriaStatements of Work listed in

1OCFR7O.72(c) areDescription of Change: met.Update references and add/delete or clarify steps to flow down fromprevious changes to associated procedures.

Reason for the Change:Process improvement and clarify procedure requirements.

PCE 09-0163 0 Title: Revision to Classified Distributive Information Plan SP-2605- 6/11/2009 No SP-2605-0029 Rev 1, No None of the criteria0029, Classified Distributive Information Networks Plan For The SP-2605-0030 Rev 1, listed inDistributed Control System Located In The X-3012 and X-3001; SP-2605-0031 Rev 2, 10CFR70.72(c) areSP-2605-0030, Classified Distributive Information Networks Plan SP-2605-0032 Rev 2 met.For The Process Telephone System (PTS) Located In The X-3012 and X-3001;SP-2605-0031, Classified Distributive Information Networks PlanFor The Data Processing System Located In The X-3012;SP-2605-0032, Classified Distributive Information Networks PlanFor The Data Processing System Located In The X-7725 and X-7726

Description of Change:Removing the drawings from Classified Distributive Information Networkplans SP-2605-0029, SP-2605-0030, SP-2605-0031, and SP-2605-0032 to relocate them to one central area.

Reason for the Change:Due to the number of changes to these drawings, they are beingremoved from each individual Classified Distributive Informationdocument and placed in a central location.

Wednesday, January 27, 2010 Page 26 of 47

Page 140: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0167 0 Title: Revision to Procedure ACD2-SH-015, Instructions for 7/17/2009 No ACD2-SH-015 Chg 2 No None of the criteriaLockout/Tagout listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified System Isolation Verification requirements for voltage test andassociated independent verification when required. Minor correctionand clarifications for ease of form completion. Added requirement forall permit holders to release permit prior to testing and a SystemIsolation Verification be performed when tag is missing from a energyisolating point not locked by a Lockout/Tagout tag lock.

Reason for the Change:Clarified System Isolation Verification requirements for voltage test toensure system is in a safe configuration and activities meetOccupational Safety and Health Administration requirements.

PCE 09-0168 0 Title: Revision.to Procedure ACD2-SH-014, Electrical Safety 6/18/2009 No ACD2-SH-014 Chg 2 No None of the criteriaGuidelines listed in.

Description of Change: 10CFR70.72(c) are

Clarify guidance on battery voltage testing and preventive maintenance, met.

and how personnel protective equipment requirements are to bedocumented.

Reason for the Change:Clarify procedure requirements.

PCE 09-0169 0 Title: Additional Green Zone 10 Plex, Welding Trailer and Support 6/18/2009 Yes CWP #BOPOUT-9102 No None of the criteriaFacilities Rev 1 listed in

Description of Change: 10CFR70.72(c) are

Provide utilities, prepare grounds, and add ten more trailers in the met.

Green Zone, outside the American Centrifuge Plant's Controlled AccessArea, to support Fluor's construction activities.

Reason for the Change:Additional office space and construction facilities are needed to supportongoing construction activities.

PCE 09-0171 0 Title: Revision to Procedure ACD2-SH-001, Hazard Communication 6/23/2009 No ACD2-SH-001 Chg 3 No None of the criteriaProgram listed in

Description of Change: 10CFR70.72(c) are

Add requirements to use the Material Safety Data Sheet Database and met.

associated requirements.

Reason for the Change:The procedure change is necessary to ensure the new Material SafetyData Sheet Database is used and provides instructions for accessingmaterial safety data sheets.

Wednesday, January 27, 2010.......... I- -.............. -.. -1.1

Page 27 of 47

Page 141: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0175 0 Title: Rigid Mast Crane Service Cable Protection 6/19/2009 Yes ESO-2201-0015 No None of the criterialisted in

Description of Change: 1 lCFR7d.72(c) are

Remove or relocate a conduit support to remove interference with a met.

service conductor for the Rigid Mast Crane.

Reason for the Change:Conduit support is rubbing against the service conductor during rotatingmovements and damaging the outside jacket.

PCE 09-0179 0 Title: Revision to Procedure ACD1-MP-001, Lead Cascade and 7/13/2009 No ACD1-MP-001 Chg 4 No None of the criteriaAmerican Centrifuge Plant Operations Policy Manual listed in

Description of Change: 1OCFR70.72(c) are

Specify frequency of assessment of the Safety Conscious Work met.

Environment program, and remove an unnecessary reference.

Reason for the Change:Clarify procedure requirements.

PCE 09-0180 0 Title: Revision to Procedure ACD2-MM-001, Control of Material 7/27/2009 No ACD2-MM-001 Chg 3 No None of the criteria

Description of Change: listed in

Require uploading of completed AC-30 forms into the Electronic Data 1 mCFR70.72(c) are

Management System. met.

Reason for the Change:Not all receipt inspection personnel had easy access to the ORACLEdatabase where the forms were previously stored.

PCE 09-0183 0 Title: X-7725 Solid Waste Balers 6/24/2009 Yes ESO-310207-0001, No None of the criteria

DSOW-3102-0014 Rev 0 listed inDescription of Change: 10CFR70.72(c) are

Design, install, and operate solid waste balers in room 114 of Building X- met.

7725 for consolidation of used cardboard and plastic film that is not met.

contaminated With hazardous material.

Reason for the Change:Support the Recycle/Assembly and Centrifuge Training and TestFacility Waste Management Plan for disposal of cardboard and plasticfilm.

PCE 09-0191 0 Title: Revision to IHS-2601-0001, Health and Safety Plan for 8/27/2009 No IHS-2601-0001 Chg 6 No None of the criteriaConstruction listed in

Description of Change: 10CFR70.72(c) are

Clarify requirements for when permits or plans are required and how met.

they are to be documented. Added, deleted, or revised otherrequirements and made grammar and format changes.

Reason for the Change:Clarify plan requirements.

Wednesday, January 27, 2010 Page 28 of 47

Page 142: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA

Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

PCE 09-0192 0 Title: Revision to Procedure ACD2-SH-017, Accident 8/20/2009 No ACD2-SH-017 Chg 1 No None of the criteriaPrevention/Equipment Tags listed in

Description of Change: 10CFR70.72(c) areAdd acronyms and references, revise a form, and provide clarification. met.

Reason for the Change:Clarify procedure requirements.

PCE 09-0194 0 Title: Temporary Construction Warehouse Modification 8/4/2009 Yes CWP #BOPOUT-9105 No None of the criteriaRev 0 listed in

Description of Change: 10CFR70.72(c) areWork Package to create temporary office space and break area for the met.warehouse facility at X-7725A, provide electrical power and refurbishlighting, install a temporary fence to provide controlled storage, andestablish a compressed gas storage area.

Reason for the Change:Support American Centrifuge Plant construction.

PCE 09-0195 0 Title: Revision to Procedure ACD2-HP-006, Dosimetry Program 6/26/2009 No ACD2-HP-006 Chg 3 No None of the criteriaStandards listed in

Description of Change: 10CFR70.72(c) are

Describe new personal nuclear accident dosimetry that will replace theindium foil that had previously been integral to employee securitybadges.

Reason for the Change:Reflect mandatory replacement of employee badges with new HSPD-1 2badges that cannot accommodate the integral dosimetry.

PCE 09-0196 0 Title: Revision to Procedure ACD2-HP-008, Distribution of Dosimetry 6/26/2009 No ACD2-HP-008 Chg 2 No None of the criterialisted in

Description of Change: 10CFR70.72(c) areDescribe new personal nuclear accident dosimetry that will replace the met.indium foil that~had previously been integral to employee securitybadges.

Reason for the Change:Reflect mandatory replacement of employee badges with new HSPD-1 2badges that cannot accommodate the integral dosimetry.

PCE 09-0198 0 Title: Revision to Procedure ACD2-RG-001, Change Evaluation 7/7/2009 No ACD2-RG-001 Chg 6 No None of the criterialisted in

Description of Change: 1 OCFR70.72(c) areImprove the flow of the associated Change Evaluation form (AC-001), met.clarify instructions, and delete an unused reference.

Reason for the Change:Clarify procedure requirements to reflect lessons learned during amanagement self assessment.

Wednesday, January 27, 2010..... ..........

Page 29 of 47

Page 143: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0200 0 Title: X-7725 Chillers Tower Cooling Water Bypass Valves 6/30/2009 Yes ESO-3102-0013, No None of the criteriaSOW-3102-0013 listed in

Description of Change: 100CFR7O.72(c) areReplace Tower Cooling Water bypass gate valves in five X-7725 Tower met.Cooling Water chillers with new ball valves and flexible couplings.

Reason for the Change:Allow maintenance personnel to perform repairs to the system moresafely and effectively without having to shut down the Tower CoolingWater system.

PCE 09-0209 0 Title: Centrifuge Machine Cooling Water Tube and Fitting Redesign 7/21/2009 Yes None No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areChange Machine Cooling Water tubing and fittings design from met.polypropylene Tube and Swagelok compression fittings to insertion lockfittings and polyethylene tubing.

Reason for the Change:The current design and installation process is over engineered, laborintensive, and not cost effective. The change provides additional waterflow to the diffusion pump. Reduction in parts and connection pointswhich reduces the statistical risk of component failure (leakage).

PCE 09-0211 0 Title: Revision to Procedure ACD2-PS-004, Handling and Processing 7/26/2009 No ACD2-PS-004 Chg 4 No None of the criteriaof Classified and Safeguards Information Documents for Offsite listed in .10 CFRDeliveries and Receipts 70.72(c) are met.

Description of Change:Procedure was revised to allow handling of classified material in Closedor Restricted Areas and to correct references.

Reason for the Change:The procedure was revised to reflect combining of the Lead CascadeFacility and American Centrifuge Plant Security Programs.

PCE 09-0213 0 Title: Revision to Procedure ACD2-SH-014, Electrical Safety 8/6/2009 No ACD2-SH-014 Chg 3 No None of the criteriaGuidelines listed in

Description of Change: 1 OCFR70.72(c) are

Reflect National Fire Protection Association 70 E code changes, met.

establish requirements for areas where electrical hazards may bepresent when performing work on electrical equipment, and other minorclarifications and editorial changes.

Reason for the Change:Clarify and update procedure requirements.

Wednesday, January 27, 2010 Page 30 of 47

Page 144: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0215 0 Title: Revision to Procedure ACD2-QM-011, Resolving Contractor 7/22/2009 No ACD2-QM-011 Chg 5 No None of the criteriaIssues listed in

Description of Change: 1 mCFR7O.72(c) are

Add acronym and steps for evaluation approval of contractor responses

to "use as is" and "repair". Clarified signature requirements and when"extent of condition" is needed.

Reason for the Change:Clarify procedure requirements.

PCE 09-0218 0 Title: Revision to Procedure ACD2-MA-002, Work Control Process 7/16/2009 No ACD2-MA-002 Chg 4 No None of the criteriat olisted in

Description of Change: 10CFR70.72(c) areClarify the review process of work orders and steps related to minor met.maintenance planning and execution, and modification of work controlrelated forms to. allow for automated printing.

Reason for the Change:Work control assessment identified opportunities for improvement ofthe procedure.

PCE 09-0219 0 Title: Relocation of Monitoring Station #4 7/27/2009 No American Centrifuge No None of the criteriaPlant listed in

Description of Change: Emergency Action 10CFR70.72(c) arePortsmouth Gaseous Diffusion Plant Emergency Plan (which also Plans met.serves the Lead Cascade Facility) is being changed to reflect the (X-3000, X-3001,relocation of a monitoring station from X-533H to a trailer near X-640-1. X-3002, X-3012,

Reason for the Change: X-3346, X-5000,Reflect a change by USEC Government Services to prepare for de- X-6000, X-7721,leasing the area near X-533H back to the U.S. Deoartment of Enerav. X-7725/7726)

PCE 09-0220 0 Title: Revision to Procedure ACD2-TP-001, Procedure Process, and 8/27/2009 No ACD2-TP-001 Chg 4 No None of the criteriaAssociated Forms listed in

Description of Change: 10CFR70.72(c) are

Revised definitions, steps and notes, and clarify instructions. Revised met.

wording, deleted unnecessary information, and clarified instructions forProcedure Development/Change, Review/Comment,Verification/Validation, and Intent/Non-Intent Determination forms.

Reason for the Change:Clarify procedure requirements and respond to Process Improvementrecommendations.

Wednesday, January 27, 2010 Page 31 of 47

Page 145: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0226 0 Title: Revision to Procedure ACD2-HP-010, Measurement of Airborne 8/7/2009 No ACD2-HP-010 Chg 1 No None of the criteriaRadioactivity listed in: 10CFR70.72(c) are

Description of Change: met.

Clarify requirements for recording air sample information, management

review, and processing samples through the American Centrifuge PlantCounting Laboratory.

Reason for the Change:Clarify procedure requirements.

PCE 09-0234 0 Title: Revision to Procedure ACD2-QM-101, Inspection Program 8/3/2009 No ACD2-QM-101 Chg-7 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areProvide additional guidance for peer review and hold points and add or met.revise step and notes to provide program clarification.

Reason for the Change:Clarify procedure requirements.

PCE 09-0237 0 Title: Revision to Procedure ACD2-MA-001, Control of Measuring and 8/3/2009 No ACD2-MA-001 Chg 3 No None of the criteriaTest Equipment listed in

Description of Change: 10CFR70.72(c) are

Clarify information to be retained from the calibration process, clarify met.

license requirement when selecting measurement and test equipmentfor use in the field, and clarify documentation requirements if a piece ofequipment fails calibration.

Reason for the Change:Clarify procedure requirements.

PCE 09-0242 0 Title: Revision to Procedure ACD2-QM-107, Material Condition 8/11/2009 No ACD2-QM-107 Chg 4 No None of the criteriaReport Program listed in

Description of Change: 10CFR70.72(c) are

Provide additional guidance and clarification of when a Material met.

Condition Report should be initiated, how to select the dispositionauthority, issuing a conditional release, justify use-as-is or repairdispositions and how to return nonconforming items.

Reason for the Change:Clarify procedure requirements.

PCE 09-0243 0 Title: Revision to Procedure ACD2-RG-003, Regulatory 8/11/2009 No ACD2-RG-003 Chg 5 No None of the criteriaCommunications listed in

1OCFR7O.72(c) areDescription of Change: met.Remove an unnecessary reference, update lists of required reports,add or update references for background information.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 32 of 47

Page 146: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0244 0 Title: Add Docket Number to Quality Assurance Program Description 8/20/2009 No Quality Assurance No None of the criteriaProgram Description listed inDescription of Change: Title Page 100FR70.72(c) are

Revise Quality Assurance Program Description document to include met.

Docket No. 70-7003 for the Lead Cascade Facility on the cover page.

The cover page already lists Docket No. 70-7004 for the AmericanCentrifuge Plant.

Reason for the Change:The Lead Cascade Facility docket number was inadvertently omittedwhen the program was made applicable to both the Lead CascadeFacility and the American Centrifuge Plant.

PCE 09-0245 0 Title: Revision to Procedure ACD2-RG-044, Nuclear Regulatory 8/11/2009 No ACD2-RG-044 Chg 5 No None of the criteriaEvent Reporting listed in

Description of Change: 10CFR70.72(c) are

Remove an unnecessary reference, add definitions, update lists of met.

required reports, and make minor editorial changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0246 0 Title: Revision to Procedure ACD2-SP-014, Limiting Access to 12/10/2009 No ACD2-SP-014 Chg 3 No None of the criteriaClassified Information and Escorting listed in

Description of Change: 10CFR70.72(c) are

Change escorting requirements/protocols. met.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

PCE 09-0247 0 Title: Revision to Procedure ACD2-SP-006, Electronic Equipment and 12/10/2009 No ACD2-SP-006 Chg 3 No None of the criteriaDevices listed in10CFR70.72(c) are

Description of Change: met.

Removed the reference to the Lead Cascade Facility Security Program.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

PCE 09-0248 0 Title: Revision to Procedure ACD2-SP-022, Accountable Classified 12/10/2009 No ACD2-SP-022 Chg 1 No None of the criteriaRemovable Electronic Media listed in

Description of Change: 10CFR70.72(c) areRemoved the reference to the Lead Cascade Facility Security Program.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

Wednesday, January 27, 2010 Page 33 of 47

Page 147: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0249 0 Title: Revision to Procedure ACD4-SP-025, Security Alarm Response 12/10/2009 No ACD4-SP-025 Chg 2 No None of the criterialisted in

Description of Change: 1 lCFR70.72(c) are

Revised definitions to match Security Program definitions, corrected met ....

reference, and editorial changes.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

PCE 09-0250 0 Title: Revision to Procedure ACD2-SP-026, Security Access Control 12/10/2009 No ACD2-SP-026 Chg 5 No None of the criteriaand Alarm System listed in

Description of Change: 10CFR70.72(c) are

Revised definitions to match Security Program definitions, corrected met.

reference, and editorial changes.

Reason for the Change:Incorporate changes in accordance with merged Security Programs forthe Lead Cascade Facility and the American Centrifuge Plant.

PCE 09-0251 0 Title: Revision to Procedure ACD2-EG-009, Processing Modification 8/17/2009 No ACD2-EG-009 Chg 2 No None of the criteriaand Project Changes listed in

Description of Change: 10CFR70.72(c) are

Add new step to flowchart, clarify requirements, and correct references. met.

Reason for the Change:Clarify procedure requirements in response to a process improvementrecommendation.

PCE 09-0253 0 Title: Revision to Procedure ACD2-SH-019, Safety and Health Work 9/1/2009 No ACD2-SH-019 Chg 4 No None of the criteriaPermit listed in

Description of Change: mtCFR70.72(c) are

Clarify factors in determining need for a Safety and Health Work Permit, met.

correct or add references, update forms, and minor format andgrammatical changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0255 0 Title: Install Dry Air Supply Flow Meter 8/19/2009 Yes ESO-2409-0005 No None of the criterialisted in

Description of Change: 10CFR70.72(c) are

Install/refurbish a flow metering system on the dry air supply header met.

from the Gaseous Diffusion Plant.

Reason for the Change:Replace obsolete equipment so total air usage can be measured whenthe Gaseous Diffusion Plant supply is used as backup to the X-6000 dryair system.

Wednesday, January 27, 2010 Page 34 of 47

Page 148: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0256 0 Title: Revision to Procedure ACD2-PM-001, Preventive Maintenance 9/8/2009 No ACD2-PM-001 Chg 2 No None of the criteriaProgram listed in

Description of Change: 1 eCFR70.72(c) are

Add a checklist, update associated forms, and clarify responsibilities for met.

form completion.

Reason for the Change:Clarify procedure requirements.

PCE 09-0257 0 Title: Revision to Procedure ACD2-SH-015, Instructions for 8/20/2009 No ACD2-SH-015 Chg 4 No None of the criteriaLockout/Tagout listed in

Description of Change: 10CFR70.72(c) are

Clarify when an authorized employee is to remove a personal lock after met.performing a System Isolation Verification voltage test.

Reason for the Change:Clarify procedure requirements as corrective action for a ConditionNotification.

PCE 09-0258 0 Title: B-25 Box Security Plan 8/20/2009 No B-25 Box Security Plan No None of the criterialisted in

Description of Change: 10CFR70.72(c) areRelocating B-25 boxes from the X-7726 CTTF to the X-3001 Train 3 met.area.

Reason for the Change:The B-25 boxes must be moved to create space for Lead CascadeFacility assembly and disassembly operations.

PCE 09-0259 0 Title: Revision to Procedure ACD4-OP-071, Centrifuge Machine 8/27/2009 No ACD4-OP-071 Chg 6 No None of the criteriaTransporter (CMT) listed in

I 00FR7O.72(c) areDescription of Change: met.Add or clarify steps for synchronizing and inspecting machine clamps,minimize the use of brakes, and allow Maintenance personnel to ridealong with the operator when troubleshooting issues with thetransporter.

Reason for the Change:Clarify procedure requirements.

PCE 09-0260 0 Title: X-6002 Boiler Building Main Power Substation Test Plan 8/26/2009 No TP-310402-0002 Rev 0 No None of the criterialisted in

Description of Change: 1OCFR70.72(c) areTest plan to verify breaker operation, load transfer on loss of one of the met.incoming feeds, and phasing of the two buses for the X-6002 substation.

Reason for the Change:Verify proper installation and operation of substation components.

Wednesday, January 27, 2010 Page 35 of 47

Page 149: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0263 0 Title: X-1107 D Pedestrian Portal Activation 9/9/2009 No None No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Activate an existing pedestrian access portal, X-1107 D.

Reason for the Change:Improve pedestrian safety by separating pedestrian access fromvehicle access at this portal.

PCE 09-0263 1 Title: X-1107 D Pedestrian Portal Activation 11/02/2009 No ECR-3501-0002-02 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Activate an existing pedestrian access portal, X-1 107 D.

Reason for the Change:Improve pedestrian safety by separating pedestrian access fromvehicle access at this portal. Revision 1 corrected problems withRevision 0 of the Change Evaluation.

PCE 09-0265 0 Title: Revision to Document CMP-3603-0001, Graded Approach to 9/3/2009 No CMP-3603-0001 No None of the criteriaConfiguration Management and Quality Assurance Rev 2, Chg C listed in

Description of Change: 1 eCFR70.72(c) are

Clarified applicability, corrected a form title, and made definitions met.

consistent with other documents.

Reason for the Change:Clarify program requirements.

PCE 09-0267 0 Title: Revision to Procedure ACD3-EG-501, Preparation of 9/8/2009 No ACD3-EG-501 Chg 4 No None of the criteriaEngineering Procurement Specifications listed in

Description of Change: 10CFR70.72(c) are

Corrected title of form and editorial changes. met.

Reason for the Change:Clarify procedure requirements.

PCE 09-0269 0 Title: Revision to Procedure ACD2-EG-001, Request for Engineering 9/17/2009 No ACD2-EG-001 Chg 3 No None of the criteriaServices listed in

Description of Change: 1 mCFR70.72(c) are

Deleted requirement for System Requirements Document and provided met.

guidance on the Engineering Service Order. Also made editorialchanges and corrected references.

Reason for the Change:.The change was made to resolve concerns identified in a ConditionNotification and clarify procedure requirements.

Wednesday, January 27, 2010 Page 36 of 47,

Page 150: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0270 0 TJtJe: Revision to Procedure IHS-2601-0001, Health and Safety Plan 9/17/2009 No IHS-2601-0001 Chg 7 No None of the criteriafor Construction listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted the requirement that all urinalysis samples shall be submittedat the X-101 Facility. Clarified requirements for Personal NuclearAccident Dosimetry. Deleted references to the X-101 Hospital Facilityas the location for contractors to submit urinalysis specimens.

Reason for the Change:Deleted references to submittal of urinalysis samples at the X-101Facility as urinalysis samples are no longer required to be submitted atthe X-101. Samples are submitted at American Centrifuge facilities.Changes regarding Personal Nuclear Accident Dosimetry to agree withchanges made to the License Application.

PCE 09-0271 0 Title: Transition a Portion of Protective Personnel Related Duties from 10/14/2009 No None No None of the criteriaContracted Service to a Self Performed Function listed in 10 CFR

Description of Change: 70.72(c) are met.

Allow the Security Staff to perform safe checks, seal checks andinspections that were previously performed by armed contractpersonnel.

Reason for the Change:Due to demobilization, management has determined that it is more costeffective for the Security Staff to perform the task listed above than tocontract the work. Performing safe checks, seal checks and inspectionsare activities that are considered administrative tasks and do notrequire the person to be armed to perform these activities.

PCE 09-0272 0 Title: Develop Relay Settings for X-5000 9/29/2009 No ESO-310402-0003, No None of the criteriaDescription of Change: DAC-2413-0003 listed in 10 CFR

Establish Configuration Item Database requirements for protective 70.72(c) are met.

relays in the X-5000.

Reason for the Change:13.8kv feeder overcurrent relays, and establishing settings in theConfiguration Item Database.

Operations and Maintenance of the X-5000 switch yard was recentlyturned over from Government Services. The requirements for therelays were not contained in the Configuration Item Database. Therequirements for the relays is required before maintenance can performwork on the system.

Wednesday, January 27, 2010 Page 37 of 47

Page 151: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0273 0 Title: Installation of a 24VDC Cooling Fan for Centrifuge Machine 9/25/2009 Yes None NoTransporter Power Supplies

Description of Change:Install 24VDC cooling fan in a cabinet that houses two power supplies(PSCOM1 and PSCOM2) on the Centrifuge Machine Transporter, ME-0032.

None of the criterialisted in 10 CFR70.72(c) are met.

Reason for the Change:This change is to remedy an overheating problem.

PCE 09-0274 0 Title: Revision to Procedure ACD2-EG-002, Configuration 10/6/2009 No ACD2-EG-002 Chg 2 No None of the criteriaManagement Program Description listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised definitions, added guidance on System RequirementsDocuments, and corrected format and editorial errors.

Reason for the Change:The changes to the procedure corrects concerns identified in aCondition Notification and clarifies procedure requirements.

PCE 09-0277 0 Title: Revision to Procedure ACD2-QM-001, Assessment Program 10/16/2009 No ACD2-QM-001 Chg 12 No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met. •:

Added Appendix B, Minimum Required Management Assessments, and

provided additional information to clarify Appendix B lists onlyassessments that are explicitly committed to by procedure.

Reason for the Change:Adding Appendix B to the procedure will ensure that managementidenifies their assessment needs (i.e., NCS, management, andindependent) and that procedure and regulatory commitments are met.

PCE 09-0278 0 Title: Revision to Procedure ACD2-EG-003, Nuclear and Commerical 10/15/2009 No ACD2-EG-003 Chg 3 No None of the criteriaModification Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised/added definitions, deleted System Requirement Documentfrom this procedure and added Modification Scoping Checklist, revisedforms, and made formatting and editorial changes.

Reason for the Change:The changes to the procedure were as a result of a ConditionNotification and clarify procedure requirements.

Wednesday, January 27, 2010 Page 38.of47

Page 152: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISA .... RPCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0280 0 Title: Feeder 22 Test Plan 10/8/2009 No TP-310402, No None of the criteria -TAC-310402-0002 listed in 10 CFR

Description of Change: 70.72(c) are met.Test Plan for testing Feeder 22.

TC300-02lse n1 F

Reason for the Change:This test plan will verify that Feeder 22, installed for commercial plantoperation, has been installed properly and that the 13.8kv breakersupplying it is also operating properly.

PCE 09-0281 0 Title: Revision to Procedure ACD2-QM-005, Supplier Control Program 10/15/2009 No ACD2-QM-005 Chg 8 No None of the criteria

Description of Change: 70.72(c) are met.

Corrected procedure reference, expanded on elements that are listed in met.

contained in audit plans and audit results, and provided guidance if aperiodic follow-up audit or supplier annual evaluation is delayed.

Reason for the Change:Clarify procedure requirements.

PCE 09-0282 0 Title: Revision to Procedure AC2-SP-032, Transport of Classified 11/6/2009 No AC2-SP-032 Chg 3 No None of the criteriaMatter by Contracted Carrier listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarify use of the Facility Address Report to verify classified mailingaddress and define cleared commercial carrier. Also references wereupdated and editorial changes were made.

Reason for the Change:Incorporate changes in accordance with the Confirmatory Order EA-08-280 and merged Security Programs for the Lead Cascade Facility andAmerican Centrifuge Plant.

PCE 09-0284 0 Title: Revision to Procedure ACD2-EC-006, National Pollutant 10/28/2009 No ACD2-EC-006 Chg 2 No None of the criteriaDischarge Elimination System Compliance Procedure listed in 10 CFR

Description of Change: 70.72(c) are met.

The procedure was changed to include inspections required by a StormWater Pollution Prevention Plan during times of construction activities.

Reason for the Change:The procedure was changed to incorporate inspections that werepreviously performed by Fluor, as co-permit on the Storm WaterPollution Prevention. These inspections will now be performed byUSEC Inc. personnel.

Wednesday, January 27, 2010 Page 39 of 47

Page 153: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCEO9-0285 0 Title: Revision to Procedure ACP2-EG-024, Dedication of Commercial 10/21/2009 No ACP2-EG-024 Chg 1 No None of the criteriaGrade Items listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised procedure to address acceptance of Engineering,Procurement, and Construction Contractor procured commercial gradeitems to be dedicated; Corrected References; Corrected format andeditorial errors; and Added Appendix A commercial grade itemsDedication Process Flowchart.

Reason for the Change:The changes to the procedure were as a result of the demobilizationactivity and user comments.

PCE 09-0286 0 Title: Revision to Security Program to include Lead Cascade Facility 11/2/2009 No Security Program for No None of the criteriaDocket Number the American listed in 10 CFR

Description of Change: Centrifuge Plant 70.72(c) are met.

Add the Lead Cascade Facility Docket Number to the Security Program.

Reason for the Change:The Security Program is applicable to both the Lead Cascade Facilityand the American Centrifuge Plant; however, only American CentrifugePlant Docket Number was on the Security Program. Therefore, theLead Cascade Facility Docket Number was added to the SecurityProgram.

PCE 09-0287 0 Title: Revision to Procedure ACD3-SP-036, Post Orders 10/27/2009 No ACD3-SP-036 Chg 5 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Update forms to incorporate Protective Personnel and remove specificbuilding information.

Reason for the Change:Clarify procedure requirements.

PCE 09-0288 0 Title: X-3012 Hot Water Valve Installation 10/26/2009 Yes ESO-2400-0010 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Install new hot water valves in the X-3012 office areas. The new valvesoperate slightly different and will require a few minor modifications.

Reason for the Change:The current valves have been removed from service due to failures.

Wednesday, January 27, 2010 Page 40 of 47

Page 154: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0289 0 Title: Revision to Procedure ACD2-EG-016, Condition Release 11/3/2009 No ACD2-EG-016 Chg 3 No None of the criteriaProgram listed in 10 CFR

Description of Change: 70.72(c) are met.

Added Quality Assurance as being responsible for assigning andrecording Conditional Release numbers; Added the option to allow useof the Request for Quality Assurance Services form instead of theEngineeirng Specification Data Sheet form; and editorial changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0291 0 Title: Use of Temporary Heat in Lead Cascade Facility and American 11/3/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:The electric heaters are necessary to ensure appropriate temperaturelevels can be maintained while Recirculating Hot Water System is beingrepaired.

PCE 09-0291 1 Title: Use of Temporary Heat in Lead Cascade Facility and American 11/6/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:Revision 1 to the Change Evaluation was to make corrections to theChange Evaluation.

PCE 09-0291 2 Title: Use of Temporary Heat in Lead Cascade Facility and American 12/29/2009 Yes None No None of the criteriaCentrifuge Plant Facilities listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 10 30kW electric heaters in the X-3001, X-7725, and X-7727Hfacilities.

Reason for the Change:The work to repair the Recirculating Hot Water System has not beencompleted; therefore, Revision 2 to the Change Evaluation is to extendthe time the electric heaters will be needed.

Wednesday, January 27, 2010 Page 41 of 47

Page 155: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

PCE 09-0292 0 Title: Repair Recirculating Hot Water System 11/3/2009 No ESO-2518-0006 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Repair the Recirculating Hot Water System at the X-3001 ProcessBuilding and the X-7721 Maintenance Stores, and Training Building.The change includes repairing leaks and replacing 24" valve with aspool piece.

Reason for the Change:The repair of the Recirculating Hot Water System is necessary inpreventing pipe freezing that may affect the Lead Cascade Facility.

PCE 09-0293 0 Title: X-5000 Battery Charger Replacement 11/3/2009 Yes ESO-2412-0002 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.Replace batter charger in the X-5000 Switch Yard.

Reason for the Change:The battery charger in the X-5000 Switch Yard failed; therefore, thebattery had to be replaced.

PCE 09-0295 0 Title: Revision to Procedure ACD2-PS-004, Handling and Processing 11/19/2009 No ACD2-PS-004 Chg 5 No None of the criteriaof Classified and Safeguards Information Documents for Offsite listed in 10 CFRDeliveries and Receipts 70.72(c) are met.

Description of Change:Implement requirements of Confirmatory Order EA-08-280 and editorialchanges.

Reason for the Change:In order to implement requirements of Confirmatory Order EA-08-280,the procedure was modified. Also changes were made to clarify steps-and improve the execution of the procedure for the user.

PCE 09-0297 0 Title: X-7725 Sidewalk Expansion 11/20/2009 No ESO-2518-0005 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.

The change evaluated in this document consists of modifying an

existing sidewalk structure by adding another curb ramp for means ofentering or exiting the sidewalk and also making the sidewalk wider.The sidewalk is located north of the X-7726.

Reason for the Change:Adding another entrance/exit curb ramp on the sidewalk will helpprevent personnel from slips and trips hazards, as well as preventingpersonnel from walking in the roadway.

Wednesday, January 27, 2010 PPage 42 of 47

Page 156: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0298 0 Title: Revision to Procedure ACD2-EG-407, Test Plans 11/16/2009 No ACD2-EG-407 Chg 4 No None of the criterialisted in 10 CFRDescription of Change: 70.72(c) are met.

Added words to clarify the development and implementation of Test

Plans, clarified Change Evaluation applicability and requirementsassociated with initial isue and for editorial and/or minor changes.

Reason for the Change:Clarify procedure requirements.

PCE 09-0299 0 Title: Converting Procedure ACP4-UP-032, Specific Safety-Related 11/30/2009 No ACD4-UP-032 Chg 0 No None of the criteriaOperations Involving Site Electrical Equipment listed in 10 CFR

Description of Change: 70.72(c) are met.

Make procedure ACP4-UP-032, Specific Safety Related Operations,applicable to both the Lead Cascade Facility and the AmericanCentrifuge Plant.

Reason for the. Change:The Safety Review Committee determined that all Balance of Plantprocedures should be dual-use.

PCE 09-0300 0 Title: Converting procedure ACP4-UP-005, Operation of Transformer 11/30/2009 No ACD4-UP-005 Chg 0 No None of the criteriaDeluge System listed in 10 CFR

Description of Change: 70.72(c) are met.

Make procedure ACP4-UP-005, Operation of Transformer DelugeSystem, applicable to both the Lead Cascade Facility and the AmericanCentrifuge Plant.

Reason for the Change:The Safety Review Committee determined that all Balance of Plantprocedures should be dual-use.

PCE 09-0301 0 Title: Installation of Electric Heater in X-7721 Maintenance Stores and 11/18/2009 No ESO-310407-0003 No None of the criteriaTraining Building listed in 10 CFR

Description of Change: 70.72(c) are met.

Install an electric heater in south stairwell of X-7721 Building.

Reason for the Change:The original means of heating the south stairwell was with anRecirculating Hot Water radiant type heater. The lines supplying thisheater are clogged. The current heater will be abandoned in place andan electric heater installed. The stairwell needs to be heated to preventthe fire water pipes from freezing.

Wednesday, January 27, 2010 Page 43 of 47

Page 157: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0302 0 Title: Revision to Procedure ACD1-MP-001, Lead Cascade and 11/24/2009 No ACD1-MP-001 Chg 5 No None of the criteriaAmerican Centrifuge Plant Operations Policy Manual listed in 10 CFR

Description of Change: 70.72(c) are met.Added Fire Safety Policy.

Reason for the Change:Fire Safety Policy was added because the procedure did not addressemployee's authority and responsibility pertaining to fire protection.

PCE 09-0305 0 Title: Revision to Procedure ACD4-UP-009, X-6000 Routine 12/11/2009 No ACD4-UP-009 Chg 1 No None of the criteriaSubstation Checks listed in 10 CFR

Description of Change: 70.72(c) are met.

Added battery checks and changed the current levels to greater than 0amps and voltage to greater than 52 volts. Also, the round sheets weremodified.

Reason for the Change:Battery checks are better suited in the substation rounds andprocedure. The current range has been changed to greater than 0,since 0 indicates no battery charging is occurring. Battery voltageminimum has been increased to greater than 52 volts to match thenumber of cells. The round sheet has been updated to show relevantchecks and better layout for the technician performing the rounds.

PCE 09-0306 0 Title: Revision to Procedure ACD2-TP-002, Training Program 12/1/2009 No ACD2-TP-002 Chg 5 No None of the criteria

Description of Change: listed in 10 CFR

Revised to clarify which reviews are required for a change or a revision 70.72(c) are met.

to a training module. Revised references. Clarification added to noteabout worker's ability to read and understand training exams.Assessment frequency changed to yearly. Also editorial changes weremade.

Reason for the Change:Changes were made in response to Condition Notification and to clarifyprocedure requirements.

PCE 09-0307 0 Title: Revision to Procedure XP2-EP-EP1037, Emergency Operations 12/9/2009 No XP2-EP-EP1037 No None of the criteriaCenter Concept of Operations Rev 10, Chg C listed in 10 CFR

Description of Change: 70.72(c) are met.

Change the roles and responsibilities of the Pike County Liaison, titlechange on a form, and add a requirement for the Regulatory Liaison.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 44 of 47

Page 158: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

PCE 09-0308 0 Title: Revision to Procedure XP2-EP-PU1031, Public Warning System 12/16/2009 No XP2-EP-PU1031 Rev2 No None of the criteriaActivation listed in 10 CFR

Description of Change: 70.72(c) are met.

Add the capability for activation of the Public Warning System using theCentrAlert Guardian Encoder.

Reason for the Change:Activation of the Public Warning System using CentrAlert GuardianEncoder will provide additional assurance that the system will functionas designed to provide notification to the public in the event of anincident requiring evacuation or sheltering of the public.

PCE 09-0309 0 Title: Revision to Procedure XP2-EP-EP4001, Test and Inspection of 12/16/2009 No XP2-EP-EP4001 Rev 4 No None of the criteriathe Public Warning System listed in 10 CFR

Description of Change: 70.72(c) are met.

Add the capability for testing and inspection of the Public WarningSystem using the CentrAlert Guardian Encoder.

Reason for the Change:Activation of the Public Warning System using CentrAlert GuardianEncoder will provide additional assurance that the system will functionas designed to provide notification to the public in the event of anincident requiring evacuation or sheltering of the public.

PCE 09-0310 0 Title: Functional Location Numbering of the Electrical Power 12/2/2009 No ESO-2413-0004 No None of the criteriaDistribution System and Associated Facilities/Systems listed in 10 CFR

Description of Change: 70.72(c) are met.

Track and document the renumbering of the electrical equipmentcomponents, systems, and facilities associated with the existingelectrical power distribution system to comply with the FunctionalLocation Numbering System Guidelines.

Reason for the Change:This activity is to ensure electrical equipment components, systems andfacilities associated with the existing electrical power distribution systemare numbered in accordance with Functional Location NumberingSystem Guidelines.

PCE 09-0311 0 Title: Revision to Procedure ACD2-EG-022, Setpoint/Tolerance 12/3/2009 No ACD2-EG-022 Chg 2 No None of the criteriaControls listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a recommendation and requirements for Setpoint/ToleranceCalculations.

Reason for the Change:Clarify procedure requirements.

Wednesday, January 27, 2010 Page 45 of 47

Page 159: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

*PCE 09-0312 0 Title: X-5000 Switch Yard 125VDC System Upgrade 12/22/2009 Yes ESO-2412-0003, No None of the criteriaSOW-2412-0003 listed in 10 CFR

Description of Change: 70.72(c) are met.Work activities associated with installing a redundant 125vdc batteryand 125vdc distribution panel in the X-5000 125vdc System.

Reason for the Change:Installing a redundant 125vdc battery charger and 125vdc distributionpanel in the X-5000 125vdc System will increase reliability of the X-5000 125vdc System.

PCE 09-0313 0 Title: Revision to Procedure ACD4-UW-015, Operation of the X- 12/11/2009 No ACD4-UW-015 Chg 1 No None of the cdteria6000/X-6001 Tower Water Cooling System and Associated listed in 10 CFREquipment 70.72(c) are met.

Description of Change:Added a new section to cover the Tower Water Cooling distributionsystem. Also made editorial changes.

Reason for the Change:Tower Water Cooling distribution system was not previously coveredunder a procedure. Other changes were made to clarify procedurereq uirements.

PCE 09-0318 0 Title: Install New Isolation Gate Valves in the Recirculation Hot Water 12/16/2009 Yes ECR-2518-0006-01 No None of the criteriaSystem listed in 10 CFR

Description of Change: 70.72(c) are met.

Install 3" gate valve (supply) and 6" gate valve (return) along withreplacing necessary piping in the Recirculation Hot Water systembranching from the 36" line to the X-6000 Cooling Tower Pump House.This change includes modifications to the existing piping lines andinstallation of new gate valves and lines at a slightly higher elevation.

Reason for the Change:The change is being made to fix leaks in Recirculation Hot WaterSystem. The installation activity of the new valves is required tomaintain the integrity of the Recirculation Hot Water System and toprovide complete flow isolation when closed.

PCE 09-0319 0 Title: Modify Rail S13 Disconnects 12/22/2009 Yes JFI-2301-0016 Rev 0 No None of the criterialisted in 10 CFR

Description of Change: 70.72(c) are met.There are two disconnects for crane rail S13, one on the ground"operating" floor and one on the maintenance platform. The twodisconnects should be wired in series so that either of them disconnectthe rail from its power supply. The purpose of this change is to put thedisconnects in series.

Reason for the Change:The current configuration introduces a safety concern if personnelworking on the crane think they have isolated the crane from its powersupply by locking out the disconnect on the maintenance platform,when in reality, a portion of the rail is still energized.

Wednesday, January 27, 2010 Page 46 of 47

Page 160: American Centrifuge Lead Cascade Facility and Plant ...FCE 08-0314 0 Title: Structural Steel Erection 1/9/2009 Yes CWP #PB2SOU-1201 Rev 0 No None of listed the incriteria Description

ISASummary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

PCE 09-0321 0 Title: Develop Calibration Criteria for the X-6000 Cooling Tower Pump 12/22/2009 No ESO-2409-0006 No None of the criteriaHouse Instrumentation Requiring Preventive Maintenance listed in 10 CFR

Description of Change: 70.72(c) are met.

Establish Configuration Item Database requirements for instrumentationin the X-6000, including protective relaying.

Reason for the Change:Provide criteria needed when performing calibrations.

Wednesday, January 27, 2010 Page 47 of 47