Americas Region Update. C.M. Ginsburg (Fermilab) S0 Meeting - WebEx January 11, 2011. JLab : TB9NR001 summary. Eremeev. The first 9-cell cavity assembled by the cavity production group’s technicians In pi mode the cavity was limited at 17 MV/m by a quench in the center cell - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Americas Region Update

Fermilab

Americas Region Update

C.M. Ginsburg (Fermilab)

S0 Meeting - WebEx

January 11, 2011

Page 2: Americas Region Update

Fermilab

• The first 9-cell cavity assembled by the cavity production group’s technicians

• In pi mode the cavity was limited at 17 MV/m by a quench in the center cell• Field emission was observed from 15 MV/m in pi mode• The quench location was determined by the thermometry system• Preheating was observed at the quench location• Quench limitation was reached in every passband mode• Quench limits were reached in four distinct cells during passband

measurements, as suggested by four distinct signals from 2nd sound detectors

0 10 20 30 40 501E9

1E10

1E11

Q0

Eacc

, MV/m

TB9NR001: Q vs. Eacc

at 2 K

0 5 10 15 20 25 30 35 40 45 501E-4

1E-3

0.01

0.1

1

10

100

1000

10000

Q0

Eacc

, MV/m

Rad [mR/hr]

JLab: TB9NR001 summary

Eremeev

11 Jan 2011 2CM Ginsburg S0 Mtg

Page 3: Americas Region Update

Cornell ILC ProgramUpdate 8.Jan.2011

Cornell SRF

– Vertical EP+repair techniques R&D• TB9AES005:

• being prepared for rf test• high pressure rinse 8.Jan • bake this week

Crawford

Page 4: Americas Region Update

FermilabFermilab Items

• 9-cell cavity tests:– TB9ACC015: tumbling– TB9RI024: production process– TB9RI027: processed/tested at JLab; remaining FE improved at FNAL

• 1-cell cavity tests:– TE1CAT002: New vendor, tumbling– TE1ACC006: ECS defect cavity, treatment variations

CM Ginsburg S0 Mtg 411 Jan 2011

4CM Ginsburg S0 Mtg

Page 5: Americas Region Update

Fermilab

4th testQuench limited to 36MV/m. Initially FE appeared at 12-22 MV/m, then processed away – no FE thereafter. Both low and high field Q0’s were reasonably good. Mode mixing observed at E ≥ 25MV/m. Cavity meets specification and is promoted to dressing.

0 5 10 15 20 25 30 35 40 451E+08

1E+09

1E+10

1E+11

1E-02

1E-01

1E+00

1E+01

1E+02

1E+03

1E+04

ILC- TB9RI024 - Q vs E

Gradient (MV/m)

Q0

Rad

iatio

n (m

R/h

r)

Tested 12/14/10 - HPR/Assy @ ANL, 120°C bake at IB1

J. Ozelis

Quench

J. Ozelis

11 Jan 2011 5CM Ginsburg S0 Mtg

Page 6: Americas Region Update

Red/Blue=JLab resultGreen squares = FNAL result. FE greatly reduced, lower Eacc, max compared to 1.8K. Cavity meets ILC-spec and is promoted to dressing.

0 10 20 30 40 501E+09

1E+10

1E+11

ILC- TB9RI027 - Q vs E

Gradient (MV/m)

Q0

Tested 12/7/10 - HPR/Assy @ ANL Tested 12/7/10 - HPR/Assy @ ANL TB9RI027

11 Jan 2011 6CM Ginsburg S0 Mtg

Page 7: Americas Region Update

FermilabFermilab Items

• Tumbling of 9-cell cavities [details from Charlie…]– JLab-2

• Complete: tumbling, field flatness measurement, rough HPR, 10 um light-EP, optical insp, 800C HT (FNAL furnace), tuning, light-EP+VTS prep, 120C bake and VT

– TB9ACC015• Complete: tumbling, limiting (19 MV/m) feature in cell 3 HAZ molded, optical inspection,

field flatness measurement, molded silicone sample analyzed; optical inspection shows very mirror-like surface, 800C HT (FNAL furnace), tuning, light-EP+VTS prep, 120C bake and VT

• Achieved 35 MV/m, good Q0

• High-temperature furnace (before Dec. all hydrogen degassing was at JLab)– Installed and commissioned in FNAL/IB4– In regular operation

• Six cavity order from Niowave-Roark [new vendor qualification]• TB9NR001: JLab standard process/test path – 17 MV/m in first pass• TB9NR002: FNAL/ANL standard process/test path – 29 MV/m in first pass• NR was given the go-ahead to fabricate the remaining 4 cavities

• Six cavity order from AES [experienced vendor; cavities partially for S0]– All six have been received at Fermilab and are partially through quality control – (At least) one cavity will be tumbled

CM Ginsburg S0 Mtg 711 Jan 2011

7CM Ginsburg S0 Mtg

Page 8: Americas Region Update

11 Jan 2011 CM Ginsburg S0 Mtg 8

Production Cavities for CM2

• Majority of cavities vertically qualified at JLab• TB9RI020, TB9RI024, and TB9RI029 were processed/tested at FNAL/ANL• TB9RI027 received final HPR and test at FNAL/ANL

• Now on 10th HT of 1.3 GHz cavities for CM2: FE an outstanding issue• TB9AES007 HT: field emission limits to 33 MV/m; re-rinse and re-test evtl.• Coupler conditioning/QC studies underway• Correlations VT/HT ongoing – including field emission• We will not pass on any cavities with substantial field emission for dressing

Cavity ID CM2 candidate Vertical Test He vessel? Horizontal Test cryomodule ready?TB9AES009 1 36 MV/m dressed 35 MV/m yesTB9AES010 2 38 MV/m dressed >35 MV/m yes TB9AES008 3 41 MV/m dressed >35 MV/m yes TB9RI018 4 39 MV/m dressed next  TB9RI019 5 38 MV/m dressedTB9RI028 6 39 MV/m dressed    TB9RI020 7 36 MV/mTB9RI027 8 40 MV/m    ACCEL8 backup 31 MV/m dressed 31 MV/m yesTB9ACC013 backup 38 MV/m dressed FE limit  TB9ACC016 backup 39 MV/m dressed FE limitTB9RI029 backup 35 MV/m dressed 29 MV/m

TB9AES007 backup 42 MV/m dressed FE limitTB9RI024 backup 36 MV/m

Cryomodule 2