![Page 1: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/1.jpg)
![Page 2: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/2.jpg)
(Amount in Rs.)
Particulars Chilla Tiloth Ramganga Khatima Chibro Khodri Dhakrani Dhalipur Kulhal MB-II
Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304
Land - - - - - - - - - 12,700,532
Building 1,847 1,154 2,539 531 3,078 1,539 433 654 385 1,520
Major civil works - - - - - - - - - 74,904
Plant & Machinery (1,289,391) 52,870 2,056,899 (39,011) 10,351,652 2,478,147 53,560 80,936 47,609 1,483,106
Vehicles (65,687) 63,056 (90,319) (18,885) 66,952 33,476 9,415 14,227 8,369 (26,256)
Furniture & Fixtures 92,469 67,126 830,443 26,585 1,583,182 310,649 94,431 142,695 83,938 117,612
Office Equipment 460,363 211,816 500,670 185,551 1,224,669 265,741 74,740 112,940 66,435 380,800
Total (800,399) 396,022 3,300,232 154,771 13,229,533 3,089,552 232,578 351,452 206,736 14,732,218
2011-12 (LHPs with apportionment)
![Page 3: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/3.jpg)
(Amount in Rs.)
Particulars Chilla Tiloth RamgangaKhatima Chibro Khodri Dhakrani Dhalipur Kulhal MB-II
Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304
Land - - - - - - - - - 68,529,191
Building 139,120 308,083 191,290 39,997 231,867 115,934 32,606 49,272 28,983 4,616,083
Major civil works - - - - - - - - - 20,638,499
Plant & Machinery (33,883) 10,037,879 634,409 (9,741) 452,361 1,953,768 108,823 164,444 96,732 (212,948)
Vehicles 118,269 70,793 155,745 32,565 521,658 260,829 73,358 110,852 65,207 993,159
Furniture & Fixtures 125,410 196,192 172,439 36,055 512,085 122,275 34,390 51,967 30,569 7,471,551
Office Equipment (151,675) (71,397) (208,554) (43,607) 13,149 (6,429) 3,453 5,218 3,070 (110,680)
Total 197,241 10,541,551 945,329 55,269 1,731,121 2,446,377 252,631 381,753 224,561 101,924,854
2012-13 (LHPs with apportionment)
![Page 4: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/4.jpg)
![Page 5: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/5.jpg)
(Amount in Rs.)
Particulars Chilla Tiloth Kalagarh Lohiyahead Chibro Khodri Dhakrani Dhalipur Kulhal MB-II, Dharasu
Capacity(MW) 144 90 198 41.4 240 120 33.75 51 30 304
PAYMENT 2011-12 15993240.50 15689858.56 25288110.44 6445957.62 24631643.17 12086708.58 5196148.98 7851958.47 4618799.10 12609500.10
PAYMENT 2012-13 0.00 0.00 0.00 0.00 200231.55 208992.00 0.00 0.00 0.00 0.00
IMPACT OF ARREAR OF VI TH PAY COMMISSION FOR THE FY 2011-12 AND FY 2012-13 ( LHP with apportionment)
![Page 6: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/6.jpg)
![Page 7: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/7.jpg)
![Page 8: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/8.jpg)
![Page 9: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/9.jpg)
![Page 10: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/10.jpg)
![Page 11: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/11.jpg)
![Page 12: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/12.jpg)
![Page 13: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/13.jpg)
![Page 14: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/14.jpg)
![Page 15: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/15.jpg)
![Page 16: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/16.jpg)
![Page 17: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/17.jpg)
![Page 18: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/18.jpg)
![Page 19: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/19.jpg)
![Page 20: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/20.jpg)
![Page 21: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/21.jpg)
![Page 22: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/22.jpg)
![Page 23: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/23.jpg)
![Page 24: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/24.jpg)
![Page 25: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/25.jpg)
![Page 26: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/26.jpg)
![Page 27: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/27.jpg)
![Page 28: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/28.jpg)
![Page 29: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/29.jpg)
![Page 30: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/30.jpg)
![Page 31: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/31.jpg)
![Page 32: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/32.jpg)
![Page 33: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/33.jpg)
![Page 34: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/34.jpg)
![Page 35: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/35.jpg)
![Page 36: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/36.jpg)
![Page 37: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/37.jpg)
![Page 38: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/38.jpg)
Chilla HEP November 2013 Page 1
Chapter 1. Annual Review of Technical Performance
1.1 Overview
1.1.1 The petitioner in compliance of the Regulations 12 and 13 of UERC (Terms and
Conditions of Tariff) Regulations 2011 is providing information with regard to
the operational performance related to technical parameters of Chilla Power
House.
1.1.2 The information provided in this chapter relates to actual and expected
performance in 2011-12, 2012-13, 2013-14 and 2014-15. The operational
parameters considered are:
(a) Gross generation
(b) Auxiliary consumption and Transformation losses
(c) Plant Availability factor (PAF)
1.2 Power Station Description
1.2.1 Chilla Hydro Power Station with an installed capacity of 144 MW (4x36 MW) is a
run of river scheme constructed on river Ganga 5 Km upstream of holy town
Hardwar and situated in District Pauri Garhwal of Uttarakhand state. The scheme
consists of a 312 m long, 11.5 m high gated diversion barrage at Pashulok, about
4 Km downstream of holy town Rishikesh. The river inflows are diverted via head
regulator with silt ejector constructed 500 m downstream in the bed of lined
power channel and 14.3 km long and 565 cumecs capacity power channel, which
ends at fore bay of Chilla Power Station where the water is fed to the generating
units through 4 nos. 6 m dia. steel lined penstocks.
1.2.2 There are four generating units having vertical Kaplan turbines directly coupled
with synchronous generator. The turbine output is 36 MW for a rated net head
of 32.5 m. The generators are designed for a nominal output of 36 MW with
lagging power factor of 0.9 and class “B” insulation.
1.2.3 This Power Station was commissioned in the year 1980-81. Due to operations of
machines for past 32 years in highly abrasive silt laden water, efficiency of
![Page 39: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/39.jpg)
Chilla HEP November 2013 Page 2
machines has substantially decreased and availability of machines has been
adversely affected even in spite of best and timely maintenance.
1.3 Energy Generation
1.3.1 The actual Gross and Net Energy generated in FY12 and FY13 as given in True
Up for FY 12 and FY 13 is given in the table below:
Table…..: Energy Generated
Particulars Norms 2011-12 2012-13
Design Energy
/Actual
Generation (MU)
671.29
909.86
861.98
Auxiliary Cons. 0.5% 0.14 0.42
Transformation/
other losses and
consumption
losses (%)
0.5 % 0.42 1.56
Net Saleable
Energy (MU)
664.58
904.74
844.97
The Projected Gross and Net Energy generated in FY14 and FY15 is given in the table
below:
Particulars Norms 2013-14 (P) 2014-15 (P)
Design Energy /
Actual Generation
(MU)
671.29
731.88 772.00
![Page 40: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/40.jpg)
Chilla HEP November 2013 Page 3
Auxiliary Cons.
and
Transformation
losses (%)
1% 1.87 1.87
Net Saleable
Energy (MU)
664.58 (pl. Calculate)
(pl. Calculate)
1.3.2 From the above table it is evident that gross generation in each of the years
under consideration is expected to be more than the design energy of the
plant.
1.3.3 The auxiliary and transformation losses in years 2013-14 and 2014-15 are
expected to be more than the normative level. The steps are being taken to
reduce the auxiliary and transformation losses and it is expected that these
losses are likely to be contained within the norms prescribed by the Hon’ble
Commission.
1.3.4 Chilla Power Project is likely to generate secondary energy in all the years
under consideration.
1.4 Plant Availability factor
1.4.1 The recovery of the Annual Fixed Charges is dependent on the Plant
Availability achieved by the plant. The principle for recovery of fixed charges
on the basis of the availability achieved by the plant has been introduced by
the Hon’ble Commission by its regulations UERC (Terms and Conditions of
tariff), 2011 from the year 2013-14. The petitioner has started computing this
factor as per the provisions of the above regulations from the current year ie.
2013-14.
![Page 41: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/41.jpg)
Chilla HEP November 2013 Page 4
Table 1: Plant Availability Factor
Particulars Norms 2011-12 2012-13 2013-14
(E)
2014-15
(P)
NAPAF / PAFM
(%)
74
NA
NA
75.65
75
Planned Outages
(Hrs)
NA 3395 3717 1029* -
Forced Outages
(Hrs)
NA 413 804 1003* -
*Upto September 2013
1.4.2 The Chilla Power Station is likely to achieve the normative plant availability
factor determined by the Hon’ble Commission for the year 2013-14 and 2014-
15 as well. The Power Station has consistently maintained machine availability
but because of ageing and low efficiency due to this plant availability factor
has been lower.
1.4.3 The plant suffered planned and forced outages in 2013-14 due to increased
flushing and enhanced discharge at Pashulok Barrage due to flood in
Alaknanda river, replacement of MooG value of unit no.4, fault in Governor
Battery, leakage from gland seal of Units no. 4 &5, maintenance work in u#1,
lowering problem in TGB intake gate of unit no.2, fault in LT supply, TGB
problem in Unit no. 1 and leakage in D/T Window Concrete of Unit-2. The
Petitioner for the year 20014-15 would lay emphasis on preventive and
planned outages for better power station availability.
![Page 42: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/42.jpg)
![Page 43: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/43.jpg)
(1)
Sl.
No.
Head Description of Work Additional
Capitalization for
F. Y. 2013-14 (In
Rs. Crores
Additional
Capitalization for
F. Y. 2014-15 (In
Rs. Crores
Need/ Urgency of Capex How the Capex will have
improvement in performance of
plant/ life enhancement
Justification
of cost/ rate
1 Land - - - - - -
2 Building - - - - - -
3 Major Civil
Works- - - - - -
1) Procurement of D. G. Set 0.50
-
For urgent supply of Power
House.
Without DG Set it is not possible
to start the Power House during
grid fail & it will directly effect the
generation of Power House.
Current
market
survey.
2) Up gradation of governing system of
machines.
1.50
-
To improve the performance &
reduce the downtime of
machines.
By this loss on account of
governing system failer is
minimize.
Current
market
survey.
3) Installation of 132/11 KV, 5 MVA
Transformer Alongwith its Associated
Circuit Breaker, Isolators etc.
1.80
-
For unintrupted station supply Availability of station supply
during grid failer is must and it will
directly effect the generation of
Power Station.
Current
market
survey.
4) Procurement of complete runner
assembly and three set runner blade.
2.80 0.00 To reduce the downtime
invalved in the major repair of
machine.
In past tehri scenario
maintenance time available for
machines is very short. So by this
generation of Power House
incrases.
Current
market
survey.
5 Vehicles Procurement of 2 nos. Vehicles. 0.15 Vehicles in use are very old. For better working replacement of
existing vehicles is very
important.
Current
market
survey.
6 Furniture &
Fixtures
Procurement of Furniture. 0.10
-
Existing furniture is very old &
beyond economic repair.
For better working replacement of
existing furniture & renovation of
Office is very important.
Current
market
survey.
7 Office
Equipment &
Others
Procurement of various IT equipments 0.05
-
Some of the available IT
equipments are old &
damaged, beyond economic
repair.
For better working replacement of
old & damage IT equipment is
very important. Some new IT
equipments are also required.
Current
market
survey.
Total 6.75 0.15
Additional Capitalization Data for F. Y. 2013-14 and 2014-15
Name of Project: Chilla Power House
4 Planr &
Machinery
![Page 44: (Amount in Rs.) · ends at fore bay of Chilla Power Station where the water is fed to the generating units through 4 nos. 6 m dia. steel lined penstocks. 1.2.2 There are four generating](https://reader033.vdocument.in/reader033/viewer/2022042000/5e6d37b98cb8ac55466f0818/html5/thumbnails/44.jpg)
25 lac.
10 lac.
Total 35 lac.
a) Restoration of 33 KV Bhupatwala-Chilla line.
b) Procurement of one no. of drainage pump & spares.
Increase in O&M expenses due to floods/heavy rainfall in the month of June 2013 (2)