1
Decision Making
A General Overview
10th ed.
2
Why study decision making?
-It is the most fundamental task performed by managers.
-It is the underlying theme of the course. The techniques and tools employed in the text are intended to improve our decision making skills as managers.
-It is assumed that a better understanding of decision making will lead to better decision by managers.
3
The Decision Process (Descriptive Model)
Identify the Problem
Specify objectives and the criteria for choosing a solution
Develop alternatives
Analyze and compare alternativesSelect the best
alternative
Implement the chosen alternative
Monitor the results
4
Some Key Elements which Managers Must Cope with in Their Decision Environment
Uncertainty/Risk (and even luck)Complexity
Change (including technological change)
Behavioral/Political Considerations
5
Pareto Phenomenon
• A vital few things are important for reachingan objective or solving a problem.
• 80/20 Rule - 80% of problems are caused by20% of the activities.
How do we identify the vital few?
6
Models
• A model is an abstraction of reality.– Physical– Schematic– Mathematical
What are the pros and cons of models?
7
8
9
10
Systems Approach
“The whole is greater than the sum of the parts.”
SuboptimizationSuboptimization
11
Causes of Poor Decisions (Cont’d)
Suboptimization
The result of different departments each attempting to reach a solution that is optimum for that department
12
Causes of Poor Decisions
Bounded Rationality
The limitations on decision making caused by costs, human abilities, time, technology, and availability of information
13
Some Very Basic Approaches to
Decision Making
Based on
Decision Theory
14
Decision Theory
Decision Theory represents a general approach to decision making which is suitable for a wide range of operations management decisions, including:
capacity planning
product andservice design
product andservice design
equipment selection
location planning
15
Decision Making Conditions
Certainty – Condition in which relevant parameters have known values
Uncertainty – Condition in which it is impossible to assess the likelihood of various future events
Risk – Condition in which certain future events have probable outcomes
16
Decision Making Under Certainty
Examples of a criterion:
Break Even Analysis:
Decide to produce items if they lead to a profit
17
Example BE analysis
18
Decision Making under Uncertainty
Maximin - Choose the alternative with the best of the worst possible payoffs
Maximax - Choose the alternative with the best possible payoff
Laplace - Choose the alternative with the best average payoff of any of the alternatives
Examples of three criteria:
19
Try to do homework problem 1(a,b,c) on page 229 in the textbook
20
Decision Making under Risk
•Expected monetary value: calculate the expected value (average or mean) of each alternative, choosing the alternative with the best expected value
•Expected value of perfect information: calculate the difference between the expected payoff under certainty and the expected payoff under risk
Examples of two criteria:
21
Format of a Decision Tree
State of nature 1
B
Payoff 1
State of nature 2
Payoff 2
Payoff 3
2
Choose A’1
Choose A’2
Payoff 6State of nature 2
2
Payoff 4
Payoff 5
Choose A’3
Choose A’4
State of nature 1
Choose A
’
Choose A’2
1
Decision PointChance Event
22
Try to do homework problems 2(b,a,c), 10, and 11 on pp. 229-232.
23
Solutions to Homework
Partial solutions are on the slides that
follow. Be sure to try the problems before
you look at the solutions.
24
1. a. Maximax: Expand [$80 is the highest payoff]
b.
Maximin: Worst payoffs:
Do Nothing:
$50 [best of the worst payoffs]
Expand: $20
Subcontract: $40
c. Laplace: Average Payoff
Do Nothing
$55 [Indifferent between Do Nothing
Expand $50 And Subcontract]
Subcontract $55
Comments on the above: Part (a) is simply the highest return of all possibilities in the table. Part (b) shows 50, 20, and 40 as the worst return for each of the three alternatives. Hence,the best of the worst is 50, and the answer is “Do Nothing.” Note that Part (c) simply finds the average for each alternative, l. Leading to a tie between Do Nothing and Subcontract. In a sentence or two, could you find a method to break the tie?
1.
25
2.
2 b.
act
EV(Do Nothing) = EVDN = (.3) (50) + (.7) (60) = 57 EV(Expand) = EVEXP = (.3) (20) + (.7) (80) = 62 EV(Sub-Contract) = EVSC = (.3) (40) + (.7) (70) = 61Since EVEXP is the largest, we cut the branches for Do Nothing and Subcontract, and oursolution is to “EXPAND.” Note that EVEXP is also our Expected Value (EVr) under conditions of risk, which we will use in the problem for finding the EV of perfect information.
Now that we have probabilities for High (.7) and Low (.3) demand, our problem changes from decision making under uncertainty (as in Problem 1) to decision making under risk (which allows us to build a decision tree as shown below).
2a. The following gives the Expected Values (or Expected Payoffs) of the three alternatives for the above decision tree (this allows us to solve the above decision tree):
High
High
High
Low
Low
Low
26
2.
2 b.
act
Note that we had three probability distributions on the tree in the previous slide, and replaced each distribution with its expected value (or average), allowing us to simplify the tree as shown above. Hence, as stated in the previous slide, our solution to the tree was to Expand since its payoff of $62 is larger than the payoffs of the other two alternatives. Note the cuts that we made on the above tree used the symbol “║”.
27
We draw the above tree which represents what we would do if we knew for certain that demand was to be Low (upper branch) or High (lower branch). The EV of the above tree would have to be our Expected Value under conditions of certainty. Hence,
EVPI = EVc - EVr = 71 - 62 = 9,
Or: Expected Value under conditions of certainty = EVc = (.3) (50) + (.7) (80) = $71 Expected Value under conditions of risk = EVr = -$62 EVPI (Expected Value of Perfect Information) = $ 9
.3
.7
Do Nothing
Low
High
Expand
50
80
2c
EVc = (.3) (50) + (.7) (80) = 71
28
10.
.70 high
29
11.
=EV5
30
In-Class Assignment (You will be asked in class how this problem could be solved. However, you need NOT solve this problem for class. We will do it together during the lecture. All you should do, at the minimum, is to read this problem carefully, and go to the next slide.) It is suggested that you make a hardcopy of this slide and the next slide, and bring the hardcopy to the next class.
31
(a) This is the structure of the decisiontree for the problem above. Try to complete this tree (i.e., print out this slide and add the payoffs and the probabilities).
(b) For a greater challenge, try to solve this tree using the monetaryexpected value criterion, and writea brief statement on what Joe shoulddo.
(c) Based on your answer in part (b),What is the probability that Joe could go bankrupt if bankruptcy occurs from a loss of $75,000? What is the probabilityof bankruptcy for a loss of $150,000?
For even a greater challenge, and assuming that you were able to answer the above questions, write a sentenceor two on how Joe could do something unethical in order to get a better return, if he later foundthe market test to be unfavorable.
32
Discussion Problem: Do not try to solve this problem. Simply read through it afew times. This problem will be solved in class as a computer application. Please make a hardcopy of this slide, and bring it to class. .
33
End of Session. See you during our next class meeting.