1Directorate General for Energy and Transport
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
THE instrument for non-technological THE instrument for non-technological Community support activity in the energy fieldCommunity support activity in the energy field
Information day28 November 2003
2Directorate General for Energy and Transport
Info day - morningInfo day - morning
9:00 Welcome (Karl Kellner)9:15 - 9:45
Introduction to the EIE programme and the work programme (Gonzalo Molina)
9:45 -11:10
The work programme and priorities for 2003 in more detailQ+A
Coffee break
11:30-12:00
Administrative and financial arrangementsQ+A
12:15 Closing of the general part (Karl Kellner)
3Directorate General for Energy and Transport
Info day - afternoonInfo day - afternoon
14:00 Meeting place, Discussion amongst participants
14:45-17:15
20 min 45 min
20 min
20 min20 min
Question and answer (Q+A) session
Questions regarding creation of new energy management agencies (target area 2 of HORIZONTAL KEY ACTION 2)
General questions (regarding administrative and financial arrangements and relevant to all/several fields)
Questions regarding SAVE, ALTENER and STEER priorities 2003
Questions regarding COOPENER priorities 2003 Questions regarding the other HORIZONTAL KEY
ACTIONS priorities 2003
4Directorate General for Energy and Transport
Chat in parallel to morning and afternoon session. One „chatter“ on podium, others in the back.
The Q+A session of the afternoon will take part in room S1 and S4. It will be transmitted from room S1.
The Q+A session of the afternoon will also include questions from the chat.
All questions and answers will be recorded and will be put on the website of the EIE Programme under “FAQ”.
5Directorate General for Energy and Transport
Call for proposals 2003Call for proposals 2003
Publication on website of DG TREN, EIE programme website and website of managenergy in a few days
also publication in Official Journal in December 2003
Deadline 31 March 2004 (except for events)
Budget of 41.5 M€ plus contributions from EEA and participating candidate countries
only for restricted number of priorities
6Directorate General for Energy and Transport
IntroductionIntroduction
Gonzalo MolinaHead of Unit “Demand Management”
Information day
28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
7Directorate General for Energy and Transport
The relation of EIE and FP6The relation of EIE and FP6
Research Policy:Research Policy:Develop new TechnologiesDevelop new TechnologiesResearch Policy:Research Policy:Develop new TechnologiesDevelop new Technologies
Energy Policy:Energy Policy:Solve Needs of SocietySolve Needs of Society
Energy Policy:Energy Policy:Solve Needs of SocietySolve Needs of Society
Precompetitive
EIEEIE
ResearchResearchResearchResearchDemonstrationDemonstrationDemonstrationDemonstration
Long termLong termLong termLong termShort termShort termShort termShort term
FP6 boundariesFP6 boundaries
Market
CONCERTOCONCERTO
Dissemination
8Directorate General for Energy and Transport
RTDinputs
Legislationinputs
BestIntegration ofInstruments
Retrofittingof socialhousingSAVE (+3)
RES electricityALTENER (+3)
Alternativevehicle propulsion
STEER (+2)
Strengthening local energy
expertise in DC
COOPENER (+1)
EIE
EIE Key actions
EIE - a facilitating programmeEIE - a facilitating programme
New Instrumentscreated by EIE- Awareness- Behaviour- Monitoring- Training- Financing
9Directorate General for Energy and Transport
The 4 fields of EIEThe 4 fields of EIE
SAVE – Energy efficiency (RUE) 69.8 M€
ALTENER – Renewable Energies (RES) 80.0 M€
STEER – Energy aspects of transport 32.6 M€
COOPENER - Promotion of RES & RUE in developing countries 17.6 M€
Total 200 M€*
* Not yet including contributions from enlargement in 2004, nor from EEA and participating candidate countries
10Directorate General for Energy and Transport
Vertical Key Actions (VKA)Vertical Key Actions (VKA)
SAVE ALTENER STEER COOPENER
RES-Electricity
RES-Heat
Small Scale RES Applications
Alternative vehicle propulsion
Alternative vehicle propulsion
Policy measures for an efficient use of energy in transport
Strengthening the knowledge of local management agencies in the transport field
Multiplying success in buildings
Retrofitting of social houses
Innovative approaches in industry
Energy Efficient Equipment and Products
Energy policies, legislation and market conditions for enabling pover-ty alleviation in developing countries*
Strengthening local energy expertise in developing countries*
* Focus 2003: Sub-Saharan Africa
11Directorate General for Energy and Transport
Horizontal Key Actions (HKA)Horizontal Key Actions (HKA)
Horizontal = for transsectoral issues
2 types of Horizontal Key Actions
covering more sectors quite equally (HKA1+2)
complementing activities of vertical Key Actions (HKA 3-5)
12Directorate General for Energy and Transport
Horizontal Key Actions (HKA)Horizontal Key Actions (HKA)
Sustainable Energy Communities
Think globally, act locally
Financing mechanisms & Incentives
Dissemination & Promotion
Monitoring & Evaluation
13Directorate General for Energy and Transport
Work programme 2003-2006Work programme 2003-2006
Guidelines for each of the specific fields and key actions (chapter 2)
Implementation arrangements (chapter 3)
Evaluation process and criteria (chapter 4)
Indicative timetable for the implementation of the WP (chapter 5)
14Directorate General for Energy and Transport
EIE - Philosophy, principlesEIE - Philosophy, principles
Principle of integration
of RUE and RES support combined promotion of demand
management and supply from renewables wherever possible
of instruments combining legislation, technology, information,
training, etc. and make tailored packages
of actors involving all relevant key actors on the
appropriate level(s)
15Directorate General for Energy and Transport
What’s new? What’s new? (compared to SAVE/ALTENER 2001-2002)(compared to SAVE/ALTENER 2001-2002)
Enforcement of activities of horizontal character
Local actions Financing & Incentives Monitoring & evaluation Dissemination & Promotion
Concerted Actions with Member States
16Directorate General for Energy and Transport
What’s the same? What’s the same? (compared to SAVE/ALTENER 2001-2002)(compared to SAVE/ALTENER 2001-2002)
EIE is a non-technology programme
NOT funding costs for investments in demonstration
NOT funding research
BUT addressing non-technological barriers
17Directorate General for Energy and Transport
What’s the same? What’s the same? (compared to SAVE/ALTENER 2001-2002)(compared to SAVE/ALTENER 2001-2002)
EIE is a European programme looking for European added value
NOT for singular actions on a national or local level (subsidiarity)
BUT for learning together and from each other
18Directorate General for Energy and Transport
Information day28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
SAVESAVEWaltraud SchmidWaltraud Schmid
Unit D3, Demand Management
19Directorate General for Energy and Transport
SAVESAVE is is
Energy efficiency in buildings and industry
Total final energy consumption minus Final energy consumption of transport sector (STEER)
actions on the demand side, where users of energy play important role
increase of comfort and quality of life in addition to a reduction of energy intensity and energy consumption
20Directorate General for Energy and Transport
4 SAVE Key Actions4 SAVE Key Actions
VKA1: Multiplying success in buildings
VKA2: Retrofitting of social houses
VKA3: Innovative approaches in industry
VKA4: Energy using equipment and products
Red color = included in call for proposals 2003
21Directorate General for Energy and Transport
Multiplying success in buildings
Target areas
Tools for the take-off of the buildings directive (Attention: partly Call for tenders!)
Schemes for the implementation of energy services, (e.g. Energy Performance Contracting), in particular retrofitting
Public buildings as shining examples
Promotion of best practice examples of high energy performance buildings
SAVESAVE Key Action VKA1 Key Action VKA1
22Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under VKA1type of actions under VKA1
Pilot actions for the development of appropriate energy service concepts and related financial schemes (target area 2)
Activities to change the behaviour of building owners and tenants and their related organisations (target area 1+2)
Schemes for (Vocational) Training of market actors (target area 1)
Exchange of experience between key actors, such as housing associations and ESCOs (target area 2)
Proposals for improved institutional and legal (framework) conditions, e.g. changes of statutes of housing associations (target area 2)
23Directorate General for Energy and Transport
Key actors in VKA1Key actors in VKA1
Public authorities,
(associations of) building owners,
ESCOs,
Energy agencies,
Associations of installers, certifying authorities, vocational training institutes, architects, construction companies, financing institutions, tenants, consumers/households.
Building research institutes and standardisation institutes (mainly for tenders)
24Directorate General for Energy and Transport
Innovative approaches in industry
PROMOTE EFFICIENT USE OF ENERGY IN INDUSTRY AND THEREBY STRENGTHEN THE COMPETITIVENESS OF INDUSTRY - IN PARTICULAR OF SMEs - IN EU AND CEEC
Target areas (Instruments for) Energy Management Energy services in SMEs Polygeneration
SAVESAVE Key Action VKA3 Key Action VKA3
25Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under VKA3type of actions under VKA3
Dissemination on best practice in the field of energy management, energy services for SMEs and polygeneration (target areas 1-3),
Promotional schemes/programmes to stimulate the take-up of energy management and energy services, in particular in SMEs (TA 1+2),
Educational activities, in particular with “train the trainer” schemes to achieve high multiplying effects (target area 1),
Actions to establish and implement common quality standards for energy monitoring, audits, energy services (target areas 1+2)
Networking to exchange experience among programme actors of relevant programmes and initiatives (target areas 1+2),
Voluntary agreements with industry branches or companies to reduce energy consumption or CO2 emissions of industry (target area 1),
26Directorate General for Energy and Transport
Key actors in VKA3Key actors in VKA3
manufacturers,
consultants,
financiers,
ESCO’s,
utilities incl. district heating companies,
industrial, professional and consumer associations,
energy agencies,
public administrations as parties in programmes / voluntary approaches for energy management
27Directorate General for Energy and Transport
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
ALTENERALTENERWilliam GillettWilliam Gillett
Deputy Head of Unit D2, “New and renewable Energies”
Information day28 November 2003
28Directorate General for Energy and Transport
ALTENER ALTENER isis
Support local implementation of EU legislation RES Electricity directive Biofuels directives Building directive Proposed CHP directive
Support local implementation of EU policies RES electricity, heating / cooling, liquid / gaseous fuels
Promote new and renewable energy sources, and
their efficient integration into the demand
29Directorate General for Energy and Transport
4 ALTENER Key Actions4 ALTENER Key Actions
VKA5: RES Electricity
VKA6: RES Heat
VKA7: Small Scale RES
VKA8: Alternative vehicle propulsion
Red colour = included in call for proposals 2003
30Directorate General for Energy and Transport
RES-ElectricitySUPPORT MEMBER STATES TO TAKE THE APPROPRIATE STEPS TO ENCOURAGE GREATER CONSUMPTION OF ELECTRICITY PRODUCED FROM RENEWABLE ENERGY
Target areas national indicative targets, (benchmarking, definitions) support schemes, (costs, prices regulatory frameworks) grid system issues, (connection costs, capacity) green electricity, (best practice, market study, promotion) distributed electricity production, (stimulate local action)
ALTENER Key Action VKA5ALTENER Key Action VKA5
31Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under VKA5type of actions under VKA5
Share experiences in collecting data on RES electricity, and in accelerating the processes of data collection, processing and publication
Compare the evolution of RES costs and public sector support, and assess the support needed to achieve stable market growth
Develop and assess possible links between schemes for guarantee of origin, renewable electricity certification, and CO2 certification
Benchmark grid connection and usage / services costs
Stimulate further integration of electricity market processes, with a focus on distributed generation (RES, CHP, other small generators)
Benchmark green electricity best practices, and perform campaigns to promote green electricity, and guarantee of origin across the EU
32Directorate General for Energy and Transport
Key actors in VKA5Key actors in VKA5
Regulators
Electricity exchanges (pools)
Electricity traders
Utilities
RES power producers
Research institutions, Agencies and consultants
33Directorate General for Energy and Transport
RES-heatENCOURAGE GREATER SHARE OF HEAT AND COOLING PRODUCED FROM RENEWABLE ENERGY
Target areas legislation, fuels standards and norms
(RES systems)
supply chain and market structures (RES products)
Promotion and training (best practice, training)
ALTENER Key Action VKA6ALTENER Key Action VKA6
34Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under VKA6type of actions under VKA6
Promote Standardisation of biomass fuels (eg pellets and wood chips), the solar Keymark scheme, and other RES heating standards
Assess best practices for RES heating and cooling, and for CHP based on biomass fuels
Compare RES heat prices within European markets
Develop policy and legislative instruments for promoting future RES heating and cooling markets
Develop supply chains for RES heat products and promote schemes aimed at reaching “critical mass” at local / regional levels
Establish ESCO’s which target RES heating and cooling markets
Train RES heating and cooling professionals, architects, and installers
35Directorate General for Energy and Transport
Key actors in VKA6Key actors in VKA6
Biomass, solar and geothermal industries
Biomass fuel suppliers / producers / distributors
Agricultural organisations, Agencies
Public authorities, local and regional
Associations of building owners, architects
Research institutions, Agencies and consultants
36Directorate General for Energy and Transport
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
STEERSTEERIan Hodgson
Unit D4, Clean Transport
Information day28 November 2003
37Directorate General for Energy and Transport
STEER Key actionsSTEER Key actions
KA8 - Alternative vehicle propulsion
KA9 - Policy measures for an efficient use of energy in transport
KA10 - Strengthening the knowledge of local management agencies in the transport field
Note: All address passenger and freight, in any
mode of transport in either rural or urban areas.
Red colour = included in call for proposals 2003
38Directorate General for Energy and Transport
In the first call:
STEER funds around 3-4 M€
STEER part will be entirely devoted to KA 10 - developing agencies skills
First call for proposals
39Directorate General for Energy and Transport
KA10 - Strengthening the knowledge of local management agencies in the transport field
Training and education of local agencies
Supporting local actors to collaborate in programme and project participation
Key Action 10 target areas
40Directorate General for Energy and Transport
Some ideas: Consortium of agencies wishing to be trained in transport
energy issues needing funding to pay trainers.
Consortium of agencies with transport expertise wanting funding to enable delivery of training to other agencies.
Group of agencies wanting on-going training and assistance e.g. with mobility management.
Local transport organisations or groups wishing to be trained in transport energy issues.
Hope that agencies will bid in collaboration with other relevant transport stakeholders
What sort of actions?
41Directorate General for Energy and Transport
Possible partners in transport energy activity Local authorities
Public transport operators/organisations
Cycling organisations
Freight transporters/organisations
Mobility planners
Vehicle manufacturers
Energy suppliers
Further ideas
42Directorate General for Energy and Transport
Appropriateness of activity proposed
Scale of activity (adequate coverage)
Involvement of transport energy expertise (can be external to agencies)
Firm commitment of potential participants
How will activity lead to action (follow-up actions)
Important aspects
43Directorate General for Energy and Transport
Ian Hodgson
DG TREN D4
Tel: +32 2 299 9625
E-mail: ian.hodgson@cec.eu.int
Contact
44Directorate General for Energy and Transport
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
COOPENERCOOPENERWilliam Gillett
Deputy Head of Unit D2 “New and Renewable Energies”
Information day28 November 2003
45Directorate General for Energy and Transport
Partnerships with Developing Countries(Develop local policies, regulations, knowledge and skills, to provide sustainable energy services for poverty alleviation in urban, peri-urban and rural areas)
EU Member States
Developing Country
Governments
European Commission
NGO’s
Development BanksPrivate Sector
COOPENER and the EU Energy Initiative
46Directorate General for Energy and Transport
A key objective is to strengthen the existing capabilities in developing countries, so that those responsible will be better placed to negotiate their sustainable energy requirements with international market actors.
Two key actions : Energy policies, legislation and market conditions for
enabling poverty alleviation in developing countries
Strengthening local energy expertise in developing countries
COOPENER - Key ActionsCOOPENER - Key Actions
Red colour = included in call for proposals 2003
47Directorate General for Energy and Transport
1st Key action objective:AIMS TO STRENGTHEN LOCAL CAPACITY IN ENERGY POLICY AND REGULATION DEVELOPMENT BY HELPING LOCAL ENERGY POLICY MAKERS AND REGULATORS TO :
CREATE FAVOURABLE MARKET CONDITIONS FOR THE SUPPLY OF ENERGY SERVICES
ALLEVIATE POVERTY IN URBAN, PERI-URBAN AND RURAL AREAS OF DEVELOPING COUNTRIES
Energy policies, legislation and market conditions…(I)
48Directorate General for Energy and Transport
1st Key Action - Target areas The energy policy chain, from development to promotion and
implementation Pro-poor energy regulations, addressing sustainability,
targets, grid connection rules for decentralised generation, tariffs, etc.
Energy planning for urban, peri-urban and rural areas Financing, investments, import / other taxes, and support
schemes for energy sector programmes and projects, with particular emphasis on SME’s
Promoting best practice in energy services to meet the needs of the poor
Energy policies, legislation and market conditions…(II)
49Directorate General for Energy and Transport
Strengthen local energy expertiseStrengthen local energy expertise in developing countries Iin developing countries I
2nd Key action objective:
AIMS TO PROMOTE AND SUPPORT INITIATIVES IN DEVELOPING COUNTRIES, WHICH WILL HELP TO BUILD A CRITICAL MASS OF HUMAN CAPITAL WITH UP TO DATE KNOWLEDGE AND EXPERTISE IN :
ENERGY POLICY MAKING ENERGY REGULATION ENERGY PLANNING RENEWABLE AND EFFICIENT ENERGY TECHNOLOGIES AND BEST
PRACTICES
50Directorate General for Energy and Transport
2nd Key Action - Target areas Training and networking for energy policy
makers, regulators, and planners Training, networking, mobility and study tours
for energy professionals Strengthening and reorienting existing Energy
Centres, Agencies, and Industry Associations
Strengthen local energy expertiseStrengthen local energy expertise in developing countries IIin developing countries II
51Directorate General for Energy and Transport
COOPENER - participation rulesCOOPENER - participation rules
1st Call will focus on sub-Saharan Africa
6 M€ available for the 1st Call
EC will support up to 50% of eligible costs, on a “no-profit” basis
Minimum of TWO European partners from TWO European countries per project
Projects must involve participants from developing countries, who must : have clear and substantial roles be sub-contractors
52Directorate General for Energy and Transport
COOPENER - proposal evaluation COOPENER - proposal evaluation
Quality of the action (important, relevant aims)
Quality of the approach (clear, appropriate methodology)
Community added value Coherence with poverty reduction strategy plans
Coherence with EU Member States actions and EUEI
Size / scope of LDC inputs, commitment of LDC organisations
Transferability of results to other LDC’s
Benefits of work being done at EU level
Costs and benefits (value for money)
Organisation of team (experienced market actors, balanced)
53Directorate General for Energy and Transport
HORIZONTAL KEY ACTION 2HORIZONTAL KEY ACTION 2
Pedro BallesterosPedro BallesterosUnit D3, Demand Management
Information day28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
54Directorate General for Energy and Transport
Horizontal Key Actions (HKA)Horizontal Key Actions (HKA)
Sustainable Energy Communities
Think globally, act locally
Financing mechanisms & Incentives
Dissemination & Promotion
Monitoring & Evaluation
Red colour = included in call for proposals 2003
55Directorate General for Energy and Transport
HORIZONTAL Key action 2
Think globally, Act locally
LOCAL ACTION IS KEY TO ACHIEVING EU’s ENERGY & ENVIRONMENT OBJECTIVES
Target areas ManagEnergy: the facilitating instrument for local
energy activities Support for the creation of local and regional energy
management agencies and for the operation of national associations of agencies
Think globally: Community added value (Reflection Group)
56Directorate General for Energy and Transport
Target area 1: ManagEnergyTarget area 1: ManagEnergy
Training activities for local actors
Good practice, benchmarking
Thematic networks
European meetings
Service & facility provider (not in this call)
57Directorate General for Energy and Transport
Target area 2: new agencies, Target area 2: new agencies, national associationsnational associations
Priority for creation of new agencies in Candidate countries
More limited number in the EU
Long-term commitment!
Support to the operation of existing associations (without previous support)
Support to the creation of new ones
58Directorate General for Energy and Transport
Target area 3: Reflection groupTarget area 3: Reflection group
A forum representing stakeholders
Exchange of ideas, recommendations
Feedback on EU initiatives & programmes
59Directorate General for Energy and Transport
Key actors in HKA2Key actors in HKA2
Energy management agencies with local activity
Municipalities and their associations
Regional, provincial authorities
National and European associations of agencies, municipalities and regions
Other stakeholders in the local energy scene
60Directorate General for Energy and Transport
HORIZONTAL KEY ACTIONS 3 + 4HORIZONTAL KEY ACTIONS 3 + 4
Waltraud SchmidWaltraud SchmidUnit D3, Demand Management
Information day28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
61Directorate General for Energy and Transport
Financing mechanism & IncentivesGIVE FINANCING ISSUES ADDED VALUE and IMPROVED VISIBILITY
Target areas
Cross-country analysis of different mechanisms Development and promotion of innovative financing
instruments and incentives schemes for RES / RUE investments
The right to fair competition Platform/Forum for exchange of experience
HORIZONTAL Key action 3
62Directorate General for Energy and Transport
Key actors in HKA3Key actors in HKA3
capital providers and financing experts,
energy agencies,
ESCO’s,
public authorities,
consultancies and industrial associations from all sectors
Associations (consumers, buildings, transport, industry)
(research) institutions with expertise in economic analysis or financing mechanisms
63Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under HKA3type of actions under HKA3
Studies to analyse financing related market barriers and to identify key factors for success and failure of financing instruments in the different countries (target area 1),
Pilot actions to improve existing instruments and to test new innovative instruments (target area 2),
Development of quality standards for instruments where appropriate, e.g. for Energy Performance Contracting (target area 2),
Dissemination and promotional activities towards specific target groups to accelerate the diffusion of successful financial instruments (target areas 1+2),
64Directorate General for Energy and Transport
Monitoring & Evaluation
STRENGTHEN MONITORING AND EVALUATION AND THUS IMPROVE THE DESIGN AND IMPACT OF PROJECTS AND PROGRAMMES
Target areas Monitoring and evaluation of different RES/RUE
policies and measures Methods, indicators and modelling of future trends
and policy impacts (partly call for tenders) Platform for exchange of experience
HORIZONTAL Key action 4
65Directorate General for Energy and Transport
Key actors in HKA4Key actors in HKA4
(applied research) institutions with experience of monitoring and evaluation in RES/RUE activities
authorities in charge of RES/RUE activities
energy agencies;
research, perspective and modelling institutions;
managers of RUE&RES related programmes,
consultancies,
dependent on the subject also interest groups and associations, utilities, ESCO’s and other intermediate financial actors, citizens associations etc.
66Directorate General for Energy and Transport
Examples of instruments and Examples of instruments and type of actions under HKA4type of actions under HKA4
studies and pilot actions (target areas 1 + 2)
workshops or seminars for the exchange of experience, (target area 3)
Capacity building regarding monitoring and evaluation (target area 1-3)
Dissemination of related knowledge (target area 1-3)
67Directorate General for Energy and Transport
Administrative and financial Administrative and financial arrangementsarrangements
Information day28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
68Directorate General for Energy and Transport
Principles of grants (3.1 of the work programme 2003-2006)
The types of actions under the grant scheme (3.3)
General rules for grants (3.2)
Evaluation process and criteria (4.1 and 4.2)
69Directorate General for Energy and Transport
Documents to consult - IDocuments to consult - I
Work programme 2003-2006
Annual work programme 2003 (both adopted by Decision of the Commission)
Text of the call for proposals
Soon available on the website of the EIE programme, http://europa.eu.int/comm/energy/intelligent/index_en.html and also on the website of managenergy
70Directorate General for Energy and Transport
Documents to consult - IIDocuments to consult - II
„Detailed description of the key actions“ – working document
„Guide for proposers“
Application forms
Model agreement (contract)
Soon available on the website of the EIE programme, http://europa.eu.int/comm/energy/intelligent/index_en.html and also on the website of managenergy
71Directorate General for Energy and Transport
Grants (subventions)Grants (subventions)
initiative comes from “the market”
co-financing principle; in EIE: max. 50% of total eligible costs
beneficiaries are owner of the results, Commission has right to use
generally via Call for proposals (CfP)
Financial regulation, Title VI
72Directorate General for Energy and Transport
4 Type of actions under 4 Type of actions under grantsgrants
Type 4 Type 1
General actions
(GA)
Type 2 Type 3
Support for
creation of
agencies
Specific support
for events (SSE)
Concer-ted
Actions (CoA)
Not included in Call for proposalsIncluded in Call for proposals 2003
73Directorate General for Energy and Transport
4 Type of actions under 4 Type of actions under grants Igrants I
Type 1 - General actions (GA) The majority of actions, comparable to
SAVE and ALTENER actions of the past
Type 2 - Support for creation of local and regional energy management agencies Comparable to the support for SAVE
agencies of the past
74Directorate General for Energy and Transport
4 Type of actions under 4 Type of actions under grants IIgrants II
Type 3 - Specific support for events (SSE) Comparable to “Direct subventions” in
SAVE and ALTENER 2001-2002
Type 4 - Concerted Actions with Member States and participating countries (CoA) NOT in call for proposals
75Directorate General for Energy and Transport
Who can participate? – Who can participate? – The Basics IThe Basics I
Basis set by Article 10 of Programme decision:
(public or private) legal persons
from Member States and European Economic Area (EEA), plus Candidate Countries on basis of agreements
EEA (Iceland, Norway, Liechtenstein) in SAVE, ALTENER, STEER, but not COOPENER
76Directorate General for Energy and Transport
Who can participate? – Who can participate? – The Basics IIThe Basics II
Accession and Candidate countries on the basis of MoU.
Participation in 2003:
yes: Lithuania, Slovenia, Bulgaria, Romania.
Without response so far: Poland
no: Czech Republic, Estonia, Hungary, Latvia, Slovakia, Malta, Cyprus
77Directorate General for Energy and Transport
Minimum n° of partners IMinimum n° of partners I
Type 1: 3 independent legal persons from 3 different participating countries
Exception: COOPENER 2 independent legal persons based from 2 different EU or Candidate Countries + clear and substantial involvement from those developing countries in which the actions are to be carried out (included as subcontractors)
78Directorate General for Energy and Transport
Minimum n° of partners IIMinimum n° of partners II
Type 2: 2 local or regional authorities from 2 different participating countries
Type 3: 1 legal person from one of the participating countries
(Type 4: no minimum specified)
79Directorate General for Energy and Transport
Maximum EU supportMaximum EU support
EU support on basis of co-financing (no profit!)
Max support 50% of total eligible costs, actual support is decided during evaluation process
Co-ordination costs, up to 7% of total eligible costs, can be reimbursed 100% - within the limit of total max 50% EU support
For type 3 (support for events): max 50% and max. 40.000 EUR
80Directorate General for Energy and Transport
Eligibility of costs IEligibility of costs I
Eligibility based on financial regulation, Art. 117 (181 IR). To be considered eligible, costs must be connected with the subject of the agreement and provided for
in the estimated budget annexed to it;
necessary for performance of the action covered by the agreement;
reasonable and justified and accord with the principles of sound financial management;
generated during the lifetime of the action (duration of agreement);
actually incurred by the beneficiary, recorded in his accounts in accordance with the applicable accounting principles, and declared in accordance with the requirements of the applicable tax and social legislation;
identifiable and verifiable.
81Directorate General for Energy and Transport
Eligible Eligible directdirect costs … costs …
… are those costs which, with due regard for the conditions of eligibility,
are identifiable as specific costs directly linked to performance of the action and
can therefore be booked to it directly.
82Directorate General for Energy and Transport
Eligible Eligible directdirect costs - examples I costs - examples I
In particular, the following direct costs are eligible, provided that they satisfy the criteria as set:
cost of staff assigned to the action
travel and subsistence allowances for staff taking part in the action
costs entailed by other contracts awarded by the beneficiary for the purposes of carrying out the action (“Subcontracting”);
83Directorate General for Energy and Transport
“other costs” arising directly from requirements imposed by the agreement (workshops for dissemination of information, audits, reproduction, cost of financial services, etc.);
costs of consumables and supplies, provided
that they are identifiable and assigned to the action;
purchase cost of equipment (new or second‑hand), provided that it is written off in accordance with the tax and accounting rules applicable to the beneficiary and
generally accepted for items of the same kind.
Eligible Eligible directdirect costs - examples II costs - examples II
84Directorate General for Energy and Transport
Eligible Eligible indirectindirect costs … costs …
(“Overheads”) … are those costs which, with due regard for the conditions of eligibility,
are not identifiable as specific costs directly linked to performance of the action which can be booked to it directly,
but which can be identified and justified by the beneficiary using his accounting system as having been incurred in connection with the eligible direct costs for the action.
… may not include any eligible direct costs.
85Directorate General for Energy and Transport
Eligible Eligible indirectindirect costs - examples costs - examples
Differ considerable from company to company
Are typically
Costs of administration (secretariat, accounting, IT) and management (director),
Rent and maintenance of the office Office supplies
86Directorate General for Energy and Transport
2 ways2 ways to include eligible to include eligible indirectindirect costs in EIEcosts in EIE
If indirect costs are identifiable and justified: actual indirect costs related to the project are accepted on case-by-case basis
By way of derogation, the indirect costs incurred in carrying out the action may be eligible for flat‑rate funding fixed at not more than 7% of the total eligible direct costs, which then need not be supported by accounting documents.
87Directorate General for Energy and Transport
Non-eligibleNon-eligible costs costs
VAT (unless the beneficiary can show that he is unable to recover it);
In-kind contributions (contributions which are not recorded in the accounts of the beneficiary)
costs declared by the beneficiary and covered by another action or work programme receiving a Community grant;
return on capital; debt and debt service charges; provisions for losses or potential future liabilities; interest owed; doubtful debts; exchange losses; excessive or reckless expenditure.
Indirect costs, if a beneficiary receives an operating grant from the EC
88Directorate General for Energy and Transport
AgreementsAgreements
Model agreement (“model contract”) under preparation - ready for December 2003
Agreement
Has all beneficiaries (“Proposers”, “Partners”) as contractual parties
defines duration, reporting, payment schedule, ownership of results, bank guarantee, etc. + general conditions
Foresees start of action only once the agreement is signed by both parties
89Directorate General for Energy and Transport
Evaluation processEvaluation process
Evaluation by the
Commission
1. Eligibility criteria (formal)YES / NO
2. Selection criteria (legal & capacity check)
YES / NO
3. Award criteria (quality assessment)SCORES / MARKS
With all thresholds passed: inclusion in list of proposals recommended for selection - ranked
90Directorate General for Energy and Transport
Award criteria (for type1)Award criteria (for type1)
5 criteria
Quality of the action Quality of the approach Community added value Costs and benefits Organisation of the Team
91Directorate General for Energy and Transport
Weighting and thresholdsWeighting and thresholds
Equal weighting for the five criteria
Thresholds:
> 50% required for each of the first four criteria
> 70% will be required for the last criterion (Organisation of the team).
overall sum of the marks for all criteria should exceed 70% of the maximum total score to be classified “worth funding”
92Directorate General for Energy and Transport
How and when to submit?How and when to submit?
Deadline for type 1 +2 actions: 31 March 2004
2 deadlines for type 3 (events): 31 January 2004 and 31 May 2004
Submission by post (stamp of day of deadline) or by private courier (received by the Commission before
16:00 on day of deadline)
1 original (with original signatures) and 5 copies of the original
Partly additional electronic submission
93Directorate General for Energy and Transport
Next stepsNext steps
Read / study carefully the available documents
Attend information day in your country
Develop and specify your idea(s)
Find out about recent activities linked to your idea(s)
ASK in case of questions /doubts
Check regularly the EIE website, particularly for FAQ
94Directorate General for Energy and Transport
Further informationFurther information
Information day28 November 2003
Intelligent Energy - Europe (EIE)Intelligent Energy - Europe (EIE)
95Directorate General for Energy and Transport
Information days in countriesInformation days in countries
1st December 2003, Madrid (E)
2nd December 2003, Sevilla (E)
3rd December 2003, Valladolid (E)
4th December 2003, Lisbon (PT)
5th December 2003, Bilbao (E)
10th December 2003, Eindhoven (NL)
11th December 2003, Stockholm (S)
12th December 2003, Trondheim (N)
96Directorate General for Energy and Transport
Information days in countriesInformation days in countries
15th December 2003, Rome (IT)
6th January 2004, Copenhagen (DK)*
7th January 2004, Herning (DK)*
14th January 2004, Ljubljana (SI)
15th January 2004, Vienna (A)*
Further ones to follow soon – check the website!
All details are available in handouts and on website
* To be confirmed
97Directorate General for Energy and Transport
Further informationFurther information
EIE programme website (incl. project database!), http://europa.eu.int/comm/energy/intelligent/index_en.html
ManagEnergy website, www.managenergy.net
Tren-intelligentenergy@cec.eu.int for requests per email
+32-2-2966016 for requests per fax
top related