Info 1409 Systems Analysis & Design Module

Lecture 5 - Feasibility

HND Year 12008/9

De Montfort University

2

Objectives

The objectives of this lecture are to build on our previous lecture (4) which explained the following 4 topics:

Analyzing the Business Case Systems Requests Users and their requirements

3

Preliminary Investigation

This lecture is concerned with the

The Preliminary investigation stage of the S.D.L.C.

This investigation stage follows the system request

It includes a Feasibility study.

4

Lecture objectives

By the end of this lecture you will:

Have learned about the types of feasibility that need to be considered

Have examined some of the techniques used in project management

Been introduced to the preliminary investigation model.

5

Project Planning The Preliminary investigation is

conducted by the Systems Analyst who follows a series of steps.

Sometimes project management tools are used (e.g. Microsoft Project software)

6

                                                                                                                               

Microsoft Project enables a project manager to define project tasks, list activities and participants, plan the sequence of work, estimate project milestone dates, and track all costs.

Fig 2.11 Shelley et al

7

Project software

Specialist software also provides a way of documenting the request formally

The following slide shows an example of an on-line request form.

Managers and analysts can then examine this to determine just what is required.

8

Example of an on-line request form

9

Risk Management

Every IT project involves risks.

A risk is an event which could affect the project negatively

Risk management is the process of identifying, controlling and evaluating risks.

Risk management also involves information handling.

10

Evaluation of request

In order to evaluate the system request

Often a group of key managers and users form a systems revue committee

The objective is to use their combined judgment and experience to evaluate the project.

11

Feasibility Studies

A system request must pass a series of tests

The results of these tests form the ‘Feasibility study’

The feasibility study will help to decide whether to proceed or not.

12

The need for Feasibility studies

Figure 2.13 on the following slide shows that a feasibility study uses 4 main yardsticks to measure a proposal.

(figure 2.12 taken from text book Shelley et al) & student learning tool.

13

We will examine each of these in turn in the following slides

14

Operational Feasibility

Operational feasibility means that the proposed system will be used effectively after it has been developed.

Questions:Will users have difficulty with the new

system?Will it provide the expected benefits?

15

Technical Feasibility

Technical Feasibility refers to the technical resources needed to develop, purchase, install or operate the system.

Questions:

Does the company have the necessary hardware, software and network resources?

Does the company have the needed technical expertise?

16

Economic Feasibility

Economic feasibility means that the projected benefits will outweigh the estimated costs of the project.

Questions:What are the tangible benefits?What is the cost of developing/not

developing the system?What are the intangible benefits?

17

Schedule Feasibility

Schedule feasibility means that the project can be implemented in an acceptable time.

Questions:Has management established a firm

timetable for the project?Will an accelerated schedule pose any

risks?Might these risks be acceptable?

18

Setting Priorities

The work of the systems revue committee includes the following:

Rejecting system requests that are not feasible.

Giving highest priority to projects that provide the greatest benefits.

Setting the priorities.

19

Preliminary Investigation Overview

P63 Shelley et al

20

Activities time

The first 19 slides describe the process of project management from a system request to the completion of the preliminary investigation.

Working in twos, create a model to show these initial stages. Use rectangles for the stages and list the activities in each.

You only have 5 mins.

21

Feedback time:

What stages did you identify?This is your chance to comment or

feedback –Use it!

22

Preliminary Investigation planning

Before the Investigation begins the Analyst needs to plan the process.

Planning the investigation involves a number of steps.

23P64 Shelley et al

24

Completion of stage 1

The investigation is completed when:

The system request has been evaluated Priorities are set A feasibility report has been prepared

and sent to management Management have considered the

available options and made a decision.

25

Analysis Activities

The exact procedure for the preliminary investigation depends upon the following:

1. The nature of the request2. the size of the project 3. the degree of urgency

(The activities of the Analyst will be examined in more detail in later Lectures).

26

In conclusion

At the end of this lecture you have:

Been introduced to the different types of feasibility

Examined the techniques used in the preliminary investigation stage.

Know what is meant by the preliminary investigation model

27

Background reading

(Phase 1)– Chapter 2

Systems Analysis & Design. Shelley Cashman and Rosenblatt

6th/7th EditionThomson Course Technology 2006/7