1Normalisation
Wim De Kesel
Codes and standards ChallengesGeneral overview
2
Normalisation Wim De Kesel
The International Electrotechnical Commission
The world’s leading organization that prepares and publishes International Standards for all electrical, electronic and related technologies.
Over 10 000 experts from industry, commerce, government, test and research labs, academia and consumer groups participate in IEC Standardization work.
All information is on www.iec.ch
3
Normalisation Wim De Kesel
The International Electrotechnical Commission
4
Normalisation Wim De Kesel
The International Electrotechnical Commission
IEC family (2011-03-18)Full members 60
Associate members 21
Affiliate countries 81
IEC – Central officeGeneva
IEC – Regional centersBoston, USA – 2 Technical Officers + 2 Assistants
Singapore – 2 Technical Officers + 2 Assistants + 1 Editor + 1 Office Manager
Sao Paulo, Brazil – 1 Regional Manager + 1 assistant
5
Normalisation Wim De Kesel
IEC in Figure (2011-03-18)IEC Technical Committees and Subcommittees (TC/SC)
174
Working Groups (WG) 425
Project Team (PT) 221
Maintenance (MT) 543
IEC Experts 10512
6
Normalisation Wim De Kesel
IEC SMB SG4
Set up in 2009Title:
LVDC distribution systems up to 1500V DCThe objective
a global systematic approach to align and coordinate activities in many areas where
LVDC is used such as green data centres, commercial buildings, electricity storage for all mobile products (with batteries), EVs etc, including all mobile products with batteries, lighting, multimedia, ICT
etc. with electronic supply units.
7
Normalisation Wim De Kesel
IEC SMB SG4
The SG4 had 4 meetings Twice in Stockholm (2009-12 and 2010-01)Tokyo was held as an ad hoc meeting due to little
participation due to the Icelandic volcano ashWashington (2010-09)Frankfurt (2011-02)
Next meetings are planned forJapan (2011-11/12)USA (2012/04)
8
Normalisation Wim De Kesel
IEC SMB SG4
Main topics achievedThe title
Dc linked to energy efficiency or wider? Decision:
LVDC distribution systems up to 1500V DC
The scopeThe objectivesThe deliverables
9
Normalisation Wim De Kesel
IEC SMB SG4 The scope
To address the IEC standardization needs on systems and products to be used with dc voltages up to 1500 V and to indicate to SMB the directions for future standardization in this field.
To facilitate the effective and safe use of dc to address market needs, such as. Energy efficiency Reduction of EM phenomena Reduction of the use of natural resources
To inform the concerned technical bodies on the draw backs related to dc, such as. Arcing Corrosion Overvoltages
10
Normalisation Wim De Kesel
IEC SMB SG4 The scope
To set up a road map on how to reach global systematic approach on LVDC Defining a structure for cross TC cooperation which promotes
coordination of the work. Encouraging the transfer of information between product
committees and horizontal committees (bidirectional). Encouraging regular TC reports on progress and planned work.
To accompany the progress in the implementation of the road map. To support SMB to clear up possible overlaps between
responsibilities of the related TCs and SCs To address certain topics to the advisory committees if relevant and
necessary
11
Normalisation Wim De Kesel
IEC SMB SG4 The objectives
Measuring methods Architecture of the system: 100% dc or hybrid System earthing (Grounding) Operation of equipment. Life cycle of equipment. Protective measures for hazards of LVDC distribution systems.
Fire hazard: Insulation faults, making and breaking of current, overcurrent, arcing
Electric shock / worker safety Overvoltage protection
The impact of dc on corrosion The characteristics of insulation material insulation coordination ignition and arcing
12
Normalisation Wim De Kesel
IEC SMB SG4 The objectives – applications
LVDC can be used in applications, such as: in the frame of Energy efficiency (reduction of conversion losses)
green data centres in US, JP, FR, SE, … high tech buildings – continuous supply of electricity (e.g. In hospitals) commercial buildings with a lot of lighting DC-Grid / Sub-Grid
easy integration of renewable energy sources (dc), such as Photovoltaic, fuel cells, wind turbines, osmotic power island energy network (including local production and storage)
Easy integration of storage in the network (e.g. Batteries, flywheels) to easily accommodate existing and new applications, e.g.
all mobile products (with batteries) all products having electronic supply units (lighting, multi-media equipment, ICT equipment, etc) wiring system for data transfer
for charging electrical vehicles / vehicle to grid
13
Normalisation Wim De Kesel
IEC SMB SG4 The deliverables
Analysing market and industry developments in its area, Identifying the TCs (technical committees) and SCs
(subcommittees) concerned,Analysing the current level of TCs/SCs (technical
committees/subcommittees) activities and identify where future activity is required,
Defining a structure for the coordination of cross TC/SC work, where required,
Monitoring TC/SC work to highlight any overlap of work or potential inconsistencies.
14
Normalisation Wim De Kesel
IEC SMB SG4 The deliverables - market and industry developments
Analyzing market and industry developments in its area,Workshops are organized
Now Washington 2011/09 Frankfurt
Goals of the Frankfurt workshop:To identify the market drivers for using LVDC
(market drivers are e.g. E², safety, easy to install, reliability, maintenance, cost, availability of energy, size factor, EMC)
Challenges and available technologyThe conclusion of the workshop is to report on market
needs/reality to IEC SMB SG4 The SG4 can use, during it’s further work, the report to work on the roadmap,
15
Normalisation Wim De Kesel
IEC SMB SG4 The deliverables – technical work
Identifying the TCs (technical committees) and SCs (subcommittees) concerned,
Analysing the current level of TCs/SCs (technical committees/subcommittees) activities and identify where future activity is required,
Defining a structure for the coordination of cross TC/SC work, where required,
Monitoring TC/SC work to highlight any overlap of work or potential inconsistencies.
16
Normalisation
IEC SMB SG4 The deliverables – technical work
technical bodies responsible for products generating, distributing and consuming energy to analyze the impact of dc within their fieldTC82 TC13 TC2
TC88 SC17B TC34
TC105 SC17D TC59
TC114 TC20 TC61
TC22 TC62
TC23 TC69
SC32B TC96
SC37A TC100
TC64 TC108
TC94
Technical bodies represented in the SG4Technical bodies represented in the SG4 via liaisons
technical bodies responsible for horizontal issues, to analyse the impact of dc within their field
SG1
SG3
TC8
TC15
TC64 (IEC61140)
TC73
TC77
TC89
TC106
TC109
TC112
There is need for participation of
17
Normalisation Wim De Kesel
IEC SMB SG4 The deliverables – technical work – challenges
To further analyze the hazards linked to the use of dc and to find the appropriate technical body to do the standardization work (see next slide on Challenges)
To make a final report on the standardization needs (Road Map)
To receive reports on dc of the different technical bodies and analyze the progress and report to SMB
18
Normalisation Wim De Kesel
IEC SMB SG4 The deliverables – challenges
Distribution voltage Challenges
dc Life cycle of equipment
Fire hazard Insultion faults
Making and breaking – no ‘0’ crossing
Overcurrent
Arcing/ignition
Overvoltage
Corrosion
400V dc(+/-200V)
Electric shock – RCD
Impact on insulation characteristics of material
48V/19V dc Voltage drop in the installation
SELV in the fixed installation
Class II in fixed installation
19
Normalisation Wim De Kesel
Global standards – global solutions
If the market decides, dc is a solution on certain case, this will give us the opportunity to create a package of real international standards applicable in all major markets
To achieve this, there is need for contributions of experts specialized in IEC type installations and NEC type installations
20
Normalisation Wim De Kesel
Progress of the work on dc in IEC
SG4: plans to have a workshop to define the market drivers for the use of dc – September 2011
TC23 WG8: has set together general rules for dc accessories: future
TR61916-2 is working on a standard for 5A-10A/400V dc plugs and SO
TC64: is analysing the installation rules to define the gaps in the standard where the use of dc is not covered
SC23E: is to start a discussion on protective devices for dc circuits
21
Normalisation Wim De Kesel
Thank you