1
Test Management Approach (TMap)
Chris Hampton, PMPPractice Manager, Software Control & Testing
Sogeti USASeptember 2007
2
3
Agenda:
• The State of, and Business Case for, Software Quality
• What is testing?
• Sogeti’s Test Management Approach® (Tmap®)
• Sogeti’s Test Process Improvement® (TPI®) Methodology
4
Poor State of Software Delivery
“Software failure costs the American economy $59.5 billion annually.”
Source: NIST (2002)
30% of projects cancelled early
54% of projects over budget
66% of projects rated unsuccessful
90% of projects are delivered late
Source: Standish 2003
4
5
The Business Case For QA
• Compliance– Basel II, Sarbanes Oxley, HIPAA, etc…– Reduced liability from defective software and defective
process
• Cost Savings– Quality processes now reduce support costs later– Lost revenue
• Satisfaction– Higher User satisfaction– Improved business alignment
• Growth– Better quality and measurements allows development
optimization– Increase ability to deliver
5
6
Where Quality Problems Originate
Source: James Martin
CodeOtherDesignRequirements
56%
7%
10%
27%
7April 19, 2023
How Quality Provides Tremendous Savings
Unit Test
Production
Code
COST TO REPAIR DEFECT
Planning AnalysisSystem Design$140
Planning AnalysisSystem Design$140
Unit Test
$1000
Unit Test
$1000
CodeCode
$14000
Time cost and resource effort increase exponentially later in the lifecycle
Source: Cutter Consortium/Forrester/Sogeti
Integration Test
$2500
Integration Test
$2500
SystemTest
$4500
SystemTest
$4500
Certification Test
$7000
8
What is testing?
Testing is a process aimed at:
• Finding defects in a controlled manner
• Detecting the level of quality of the test object
• Demonstrating the gap between specifications and the
actual product
• Demonstrating that the end product functions as called
for in the requirements
8
9
Testing is not . . . .
Testing is not:
• Implementation
• Acceptance
• Defect repair
• A phase after development – although testing includes a phase after development
• Training on a new system
9
10
Why do we test ?
• To mitigate business risks that have been identified:
– Validate software quality
– Verify integration of business processes
– Reduce time-to-market
– Competitive purposes
• To ensure business usability of the software:
– Release low-error/known-error software– Move high quality software (meets or exceeds quality
expectations) into production
– Demonstrate the usefulness of new technology
10
11
Testing of information systems
• Application Software
• Hardware
• System Software
• Procedures
• Documentation
• Functionality
• Continuity
• Performance
• Usability
• Interoperability (between different applications and systems)
What do we test?
11
12
Structured Software Testing
• Testing everything is impractical– Funding limitations– Limited time and resources– Diminishing value after a certain point
• Isn’t there a more effective way?
• Yes! Structured software testing: a risk-based, quality-centric approach to testing
13
Test Management Approach (TMap®)
• Sogeti’s methodology for structured testing of software products.
• TMap® has evolved to be the standard for software testing in Europe and quickly gaining traction in the US.– It is being used by more than three
hundred Dutch, Belgium and German organizations.
– Industry adoption includes : Financial Services Insurance Government Consumer Electronics Telecommunications Medical systems
13
14
4 Essentials of TMap®
• Business-driven test management (BDTM) approach
• Structured test process• Complete tool box • Adaptive test method
BDTM puts focus on risk-based testing—only testing what has impacts to the organization.
14
15
Business Driven Test Management
• Choices must be made in what is tested and how thoroughly.
• This is an economic decision based on:– The risks that an organization
thinks it will incur
– The availability of time and resources
– The results the customer wishes to achieve.
• The choices based on risks, result, time and cost constitutes the basis for the BDTM approach.
15
16
The BDTM Process
1. Formulate the test goals.2. Determine the risk class for each
combination of characteristic and object part.
3. Determining the depth of testing required.• Based on risk/resource trade off
4. Develop the test estimate and test plan.
5. Allocate the appropriate test techniques.
6. Throughout the test process, the test manager provides the stakeholders with insight into and control options over test process and test object.
16
17
Risk Definition
• Testing should be based on the mitigation of risk and validation of expected quality defined by the business requirements
• Definition of risk– A “risk” is a chance of a failure occurring, related to
expected damage to the project (should the failure occur)
• Risk Categories– Risks identified in different categories such as business
risks, project risks, product risks, process risks
• Risk Ranking– Risk are ranked in criticality relative to one another, by
instituting a method of risk ranking (or “risk rating”)
17
18
How Risk Ranking Works
1. Assemble a team of people representing various roles from the project – PMs, Business Leads/SMEs, Test Leads, Tech Leads
2. Create an initial list of risks3. Team assigns a numeric value to each risk = the
probability of occurrence of each risk4. Team assigns a second value to each risk, representing
the impact on the project/organization5. Multiply the two values together (the probability of
occurrence X the impact)6. The result is a relative value for each risk7. Order the risks by their relative risk values
– “risk rating” or “risk ranking”– Ranking helps manage the most critical risks, especially
those falling in the middle tier of the ranking
8. Periodically update the list of risks
19
Risks – quality characteristics matrix
High Priority
Low Priority
Medium Priority
Low High
Risks
Medium
High Priority/Low Risk
Low Priority/High Risk
Low Priority/Low Risk
High Priority/High Risk
Medium Priority/Low Risk
Medium Priority/Medium Risk
Medium Priority/High Risk
High Priority/Medium Risk
Low Priority/Medium Risk
Multi-Level Matrix
20
Ten steps for creating a test case
Step 1
Step 2
Step 3
Step 4
Step 5
Step 10
Step 9
Step 8
Step 7
Step 6
Identify sub-systems / sub-processes
Identify risks
Rank risks
Agree on relevant quality characteristics
Rank relevant quality characteristics
Create subsystem / quality characteristic pairings
Create test scenarios for each subsystem
Associate test scenarios with risks
Select suitable test techniques
CREATE TEST CASES
Facilitated Sessions
FUNCTIONAL AREA
21
Structured Test Process
• Master Test Plan, managing the total test process– Acceptance and System Tests– Developmental Test– Supporting Processes
• Lifecycle Model
22
Master Test Plan
• Developed by the test manager in partnership with the appropriate stakeholders
• Jointly define: – What will be tested for each test
level, – When it will be tested– To what degree of
thoroughness.
• This plan constitutes the basis for the test plans for the separate test levels. – Unit Testing– Systems Integration Testing– Acceptance Testing– Developmental Testing
23
Life Cycle Model
• The life cycle model is a generic model. – Can be applied to all test levels and test types– Used in parallel with the life cycle models for system
development.
• Test activities are divided across seven phases:– Planning– Control– Setting up and maintaining infrastructure – Preparation,– Specification– Execution– Completion
24
TMap - Structured testing lifecycle
P&C
P S E C
PREPARATION-Testability review-Allocate techniques-Requirements review-Data cycle test-Process cycle test-Other tests-Specify test cases-Create/assess infrastructure-Test specification-Data flow test
EXECUTION-Pretest-(Re)test-Checking-Assessing-Debugger-Record and playback-Monitoring-Preserve testware-Evaluate process
PLANNING & CONTROL-Inspection and study -Test strategy-Develop test strategy -Test estimation
oRisk analysis-ReportsoTest Estimation (TPA) -Management tools-Setup organization -Budgeting tools-Prepare test plan -Defect management -Management and control tool
SPECIFICATION-Create test scripts-Create infrastructure
COMPLETION-Preserve testware for future use-Evaluate process
25
Complete Tool Kit
• Techniques – Many techniques can be used
in the test process. A test technique is a combination of actions to produce a test product in a universal manner.
• TMap provides techniques for the following: Test estimation Defect management Creating metrics Product risk analysis Test design Product evaluation.
26
Adaptive Test Method• Complete And Flexible• Works with any SDLC
– Iterative– RAD– Agile– Waterfall– RUP
• Works with any technology– Mainframe– Web– ERP– SOA
27
28
TMap® – Differentiators
• Business-Driven Test Management• Risk-based test strategy• Efficient testing—coverage without
overlap• Testing off of critical path as much
as possible• Criteria and metrics about
production readiness• Management of testing to project
timelines• Compliments industry tools
Proven methodology applied in hundreds of companies internationally over the past 14 years!
29
Benefits of Structure Testing
• Defects are found early, costing less time/money to reach production delivering a higher quality product
• Required quality of the various test objects is tested for and validated, by focusing on testing for quality as a risk mitigation strategy
• By keeping a larger percentage of the testing process/effort off the critical path, faster time-to-market results
• Structured software testing is more cost-effective and efficient than non-structured testing approaches
• Sound test coverage is provided, without the need to overlap phases
• Establishes a test organization that is prepared and efficient
• Delivers a repeatable process
29
30
Test Process Improvement (TPI)
• The Sogeti TPI® Model was developed to facilitate a stepwise improvement of the testing process.– Developed from practical experience from 30+ years of
Sogeti work in testing.– Offers a frame of reference to determine the strengths and
weaknesses of your current testing process.– Covers 20 key areas that need specific improvement to
achieve a well define testing process.
• Key TPI Areas:Test Strategy Life-Cycle ModelMoment of Involvement Estimating and Planning Test Specification TechniquesStatic Test Techniques Metrics Test Automation Test Environment Office Environment
Commitment and Motivation Test Functions and Training Scope ofMethodology Communication Reporting Defect Management Testware ManagementTest Process Management Evaluation and Low-Level Testing
31
Typical TPI Process Steps
1. Interview key people2. Describe the ‘As-Is’ process including Strengths &
Weaknesses 3. Describe the ‘To-Be’ process 4. Document process improvement actions5. Define expected benefits in terms of Objectives 6. Plan for Implementation of the Improvement Actions
(short-term and long-term)
32
TPI - Test Maturity Matrix
Increasing MaturityIncreasing Maturity
33
Resources
• Web Sites– Sogeti USA Web Site: www.us.sogeti.com– TMap Web Site: http://eng.tmap.net/Home/
• TMap® certification (Netherlands)– Foundation– TMap ® professional Advanced/Expert– TMap ® management Advanced/Expert
• Books
34
Sogeti SCT Services
• Managed Testing Services (MTS)
• Quality Management Services
• Test Automation Services• Testing Professional Services• SAP Testing Services
• 3000+ people worldwide in SCT space
• 30+ yrs experience
35
Sogeti’s Geographical Presence
A workforce of over 18,000 staff spread over 200 locations
USA
France
Spain
Sweden
Belux Germany Switzerland
NLIreland
India
UK Denmark
36
Thank you!
Chris Hampton, PMPPractice Manager, Software Control & Testing
Sogeti USAChris.Hampton@us.sogeti.com
Cell: (214) 549-7613Sogeti Office: (972) 892-3400
top related