16 years on the transport market. ppp – a tool of implementing compound integrated development...
Post on 27-Mar-2015
212 Views
Preview:
TRANSCRIPT
16 years on the transport market16 years on the transport market
PPP – a tool of implementing compound integrated development projects
PPP – a tool of implementing compound integrated development projects
as exemplified by the infrastructure
transport hub
of the Baltic region
Transport hub of the Baltic regionTransport hub of the Baltic region
One of the 3 competing traffic streams on the territory of the EU and Russia (MTC)
Transport hub of the Baltic regionTransport hub of the Baltic region
Significance for countries of Northern Europe and Barents-Arctic region
Significance for countries of Northern Europe and Barents-Arctic region
Integration character:
“cross-link” of territories and creation of surplus value in corridors of development
Integration character:
“cross-link” of territories and creation of surplus value in corridors of development
Interindustry interestsInterindustry interests
Transport hub of the Baltic regionTransport hub of the Baltic region
Major hub servicing export-import flows Major hub servicing export-import flows
Protection and promotion of Russia’s interests at the international level
Protection and promotion of Russia’s interests at the international level
Significance for Russia Significance for Russia
Formation of points of economic growthFormation of points of economic growth
Transport hub of the Baltic regionTransport hub of the Baltic region
Ground for working out standards of the transport-logistic industry
Ground for working out standards of the transport-logistic industry
Generation of elites in Saint PetersburgGeneration of elites in Saint Petersburg
Significance for Russia Significance for Russia
Federal power
Regional power
Industry business
Working group At the RF Ministry of Transport for development of Saint Petersburg transport hub
Working group At the RF Ministry of Transport for development of Saint Petersburg transport hub
In the current situation compound integrated projects can be implemented only on the basis of PPP
In the current situation compound integrated projects can be implemented only on the basis of PPP
Groups of interests
PPP today is:PPP today is:
dominance of oligopolies
existing contradiction of long-term and short-term money
lack of economic mechanisms of attracting operating business into infrastructure projects
imperfect mechanism of project implementation management
Practice of “micromanagement” of projects Practice of “micromanagement” of projects
generates:
• dominance of industrial natural monopolies
• lack of integrated approach
• emergence of the notion of an administrative reserve and
administrative annuity
• biased choice of an investor
Integrated strategic planningIntegrated strategic planning
• must not be discrete
• must provide for a mechanism of implementation and sources of financing
• must account for connection with social aspects
• must have an interindustry spatial character
• must not be discrete
• must provide for a mechanism of implementation and sources of financing
• must account for connection with social aspects
• must have an interindustry spatial character
WHAT DOES THIS MEAN?WHAT DOES THIS MEAN?
Integrated strategic planning
Application of an “author’s approach” in the conditions of economic restructuring with the ensuing responsibility
and the model to be implemented
Application of an “author’s approach” in the conditions of economic restructuring with the ensuing responsibility
and the model to be implemented
Planning is to assign the development vector and support of businesses in its implementation
Planning is to assign the development vector and support of businesses in its implementation
Division of responsibility and risksDivision of responsibility and risks
Strategic (market development)
state
Development of a joint tool of design and managementDevelopment of a joint tool of design and management
Operational (market efficiency)
Private business
Inter-budget relationsInter-budget relations
Regional budget
Costs of maintaining the assigned vector of development and
infrastructure support
Costs of maintaining the assigned vector of development and
infrastructure support
Costs of fixed-capital assets and operating activities ensuring
return of investments
Costs of fixed-capital assets and operating activities ensuring
return of investments
Federal budget
Private capital
AlliancesAlliances
Federal budgetFederal budget
Private capitalPrivate capital
+
Mechanism of project implementation management Mechanism of project implementation management
Creation of an investment company and a collegial body of project
implementation management
Creation of an investment company and a collegial body of project
implementation management
State MCState MC Private MCPrivate MC
Thank you for your attention!Thank you for your attention!
““Eurosib” CJSCEurosib” CJSCphonephone: +7 (812) 326-81-: +7 (812) 326-81-
1111 faxfax:+7 (812) 326-81-10:+7 (812) 326-81-10
www.eurosib.bizwww.eurosib.biz
““Eurosib” CJSCEurosib” CJSCphonephone: +7 (812) 326-81-: +7 (812) 326-81-
1111 faxfax:+7 (812) 326-81-10:+7 (812) 326-81-10
www.eurosib.bizwww.eurosib.biz
top related