16011 12x8 stratford no floor - heartlandlowes.com · 10/13/2017 · to ensure proper assembly you...
Post on 21-Jul-2020
0 Views
Preview:
TRANSCRIPT
16011
STOP!STOP!
Call Us First!DO NOT RETURN TO STORE.
For immediate help with assembly or product informationcall our toll free number:
1-800-577-9663or email:
customerservice@backyardproductsllc.com
Our staff is ready to provide assistanceApril through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM ESTNovember through March M - F 8:00 AM to 5:00 PM EST
(This page intentionally left blank.)
A Backyard Products Company
KEEP THIS MANUAL FOR FUTURE REFERENCE
ACTUAL FLOOR SIZE IS 141 x 96" (358 x 244 cm)STRATFORD 12' x 8' (366 x 244 cm)
ASSEMBLY MANUAL
BEFORE YOU BEGIN
VALUE SERIES
16011
IMPORTANT!READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
- CUSTOMER SERVICE -Call: 1-800-577-9663 email: customerservice@backyardproductsllc.com
• BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and/ or requirements before building.
• ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits.
• SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are listed on page 8.
• CHECK ALL PARTS Inventory all parts listed on pages 4 - 6. Contact out Customer Service Team if any parts are missing or damaged.
• ADDITIONAL MATERIALS You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
10/13/2017
2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have fi nished the assembly or installation.
= Level
q Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
q Safety Glasses
q Tape Measure
q Paint Tools
q Ladder
q Caulk Gun
q Hammer
q Level
FINISH
BEGIN
q Pencil
q Phillips Screwdriver
q Tool Belt/ Nail Pouch
q Chalk Line
q Nail Gun
• gun nails
q Tin Snips (for drip edge)
q Square or
q Utility Knifeq Shingle Blades
B C
q Hand Saw
q Drill / Driver
q #2 Philips Drive Bitq 3/8" Drill Bit
3
OPTIONAL MATERIALS
DRIP EDGE ..................... 40 Feet #15 ROOFING FELT To cover 114 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 LbFor roofi ng felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!Depending on your specifi c use, you may want to construct a heavy duty fl oor frame by adding additional fl oor joists. Below is a list in addition to the framing materials above (not included):
x3
x12
2 x 4 x 96" (5 x 10 x 244 cm) Treated LumberCut to (3) 2 x 4 x 93" (5 x 10 x 236,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized NailsOptional 12" (30,5 cm) spacing.
2 x 4 x 96" (5 x 10 x 243,8 cm) Treated Lumber
5/8 x 48 x 96” (1,6 x 122 x 243,8 cm) OSB Panels(Recommend 5/8” (1,6 cm) (minimum) thick OSB panels)
MATERIAL LIST:
MATERIAL LIST:
CUT LIST:
CUT LIST:
2 x 4 x 93" (5 x 10 x 236,2 cm)
2 x 4 x 144" (5 x 10 x 365,7 cm) Treated Lumber
10D 3” (7,6 cm) Hot Dipped Galvanized Nails
6D 2” (5,0 cm) Hot Dipped Galvanized Nails
2 x 4 x 141" (5 x 10 x 358,1 cm)
5/8 x 45 x 96" (1,6 x 1114 x 243,8 cm)
x10
x3
x10x2
x40
x186
x2
x1
ADDITIONAL MATERIALS FOR BUILDING YOUR SHED
3-TAB SHINGLES ............................. 5 Bundles
PAINT FOR SIDING .......................... 2 GallonsUse 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 3 TubesUse acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 2 LbsFor shingles.
PAINT FOR TRIM ............................ 1 QuartUse 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
• This shed kit does not include a wood fl oor frame or fl oor panels. See pages 10 through 14 for suggested fl oor construction.
• This shed does not include ANY leveling materials.
• See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level yourfl oor, as this will vary depending on your specifi c site.
• See the CONCRETE FOUNDATION section on page 9 for recommended methods to build your shed on a poured concrete slab.
WOOD FLOOR FRAME (NOT INCLUDED)
FOUNDATION
FLOOR PANELS (NOT INCLUDED)
Use Treated Lumber For Floor Framing
WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)
PARTS IDENTIFICATION AND SIZES
RS RS
Part identifi cationletters are stamped on some parts.
Check these locations forpart stamp.
WA
LLS
PARTS LISTINVENTORY YOUR PARTS before you begin.
We suggest sorting parts by the category they are listed in.
RA
FTE
RS
TR
IM
4
3/4"(19 mm)
2 x 3 x 24-1/16" (5 x 7,6 x 61 cm)
2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)Gauge Block for 3/4" (19 mm)measurement
2 x 3 x 14-1/2" (5 x 7,6 x 36,8 cm)
2 x 3 x 66-1/2" (5 x 7,6 x 169 cm)
2 x 3 x 29-1/2" (5 x 10 x 75 cm)
2 x 3 x 32-1/2" (5 x 10 x 83 cm)
2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)
2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm)
2 x 3 x 13" (5 x 7,6 x 33 cm)
2 x 3 x 68" (5 x 7,6 x 173 cm)
FL
x2x1
x1
x5x1 2 x 3 x 62-1/2" (5 x 7,6 x 158,8 cm)
x3
x3
x3x6x7
x5
x1
FN
DYFZ
KK
KZ
2 x 3 x 22-1/2" (5 x 7,6 x 57 cm) x2 LV2 x 3 x 21-1/2" (5 x 7,6 x 55)x2 LF
NF
PRPT
RK
OT
5/8 x 3 x 25" (1,6 x 7,6 x 63,5 cm) x6 KW5/8 x 3 x 8" (1,6 x 7,6 x 20 cm)x4 KV
x2 MM 2 x 3 x 76-1/4" (5 x 7,6 x 194 cm)
ZZ 5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x8
3/8 x 5-3/8 x 5-1/2" (1 x 13,6 x 14 cm) 1 Left / 1 Rightx2
NQx2 2 x 3 x 46-7/8" (5 x 7 x 119 cm)
2 x 3 x 65" (5 x 7,6 x 165 cm)NRx2
2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)x2 NO
BJ
2 x 4 x 65-5/8" (5 x 10 x 167 cm) RafterADx5
3/4 x 2-1/2 x 72-3/8" (1,9 x 6,3 x 184 cm)x2 KY
x1GAA
x2 KX 5/8 x 3 x 21-3/4" (1,6 x 7,6 x 55 cm)
8 x 24" (20 x 61 cm) Gussetx10
2 x 4 x 46-13/16" (5 x 10 x 119 cm) RafterNUx5
5
WALL PANELS / DOOR PARTS LIST
x1x2 x2
x3 x1x2 x1 x1 x1 x1
7/16 x 18 x 96”(1,1 x 46 x 244 cm)
x17/16 x 18 x 48”(1,1 x 46 x 122 cm)
7/16 x 48 x 96"(1,1 x 122 x 244 cm)
7/16 x 47-7/8 x 48"(1,1 x 122 x 122 cm)
x1 x1 3/8 x 7-7/8 x 94-1/2" (0,9 x 20 x 240 cm)
3/8 x 48 x 72" (1 x 122 x 183 cm)
3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)
3/8 x 7-7/8 x 46-1/2" (0,9 x 20 x 118 cm)
Roof Panels are7/16" (11 mm) thick
Left Door Right Doorx1 x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)x2OO
5/8 x 3-7/8 x 96" (1,6 x 9,8 x 244 cm)x1
ROOF PANELS
NOTES
OOx1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
6
7/16 x 20 x 96"(1,1 x 51 x 244 cm)
7/16 x 11-3/4 x 96"(1,1 x 30 x 244 cm)
1 x 3 x 96"(2,5 x 7,6 x 244 cm)
Window
23-7/8 x 96"(61 x 244 cm) Peg Board
x1 x2
x1
x1
x1
x30
x74
x36
x2 Boxes
x4 Boxes
x112
x112
x25
x75
3" (7,6 cm)
3" (7,6 cm)
2" (5,0 cm)
2" (5,0 cm)
2" (5,0 cm)
1-1/4" (3,2 cm)
1-1/2" (3,8 cm)
1" (2,5 cm)
3/4" (19 mm)
SHELF & WINDOW PARTS LIST
FASTENERS / HARDWARE BAG (Shown actual size)
NAIL BOXES (Shown actual size)
DOOR HARDWARE (Not actual size)
BE
3/4" (19 mm) 3/4" (19 mm) 3/4" (19 mm)
64" Metal Threshold
Bagged separately / special coating
x2
x8
x1 x1
x7 x11
7
BUILDING ANATOMY
1. Sub-assembled doors with attached hinges.
2. 2x3 wall studs have been engineered to support roof load and to meet demanding wind loads.
3. Sidewall top and bottom plates tie wall studs together and provide nailing support for top and bottom edge of siding.
4. Rafters line up over wall studs to effectively transfer roof load to the fl oor and eliminate need for double top plate. Oversized wood gussets at peak provide a strong connection for rafter halves.
5. Treated siding overhangs the wall framing and fl oor to keep the elements out.
6. Collar tie and over-door header maintains door frame integrity.
7. Corner studs & end rafters are positioned to the outside of the siding where they serve the dual purpose of framing and trim.
8. The EZ Frame design transfers the roof load to the front and back walls allowing for reduced framing at the side walls.
9. Treated fl oor frame and Oriented Strand Board (OSB) fl oor (not included).
This building has been designed using our patented EZ Frame construction method. EZ Frame is a unique construction method which has been engineered to use fewer framing members. This reduces assembly time and cost by as much as 30% compared to conventional construction methods. EZ Frame patent no. 5,666,766
All of our buildings have been engineered to withstand demanding wind and snow loads.If you live in an area with extreme wind/snow load requirement, contact
us and we can assist with engineering to meet your local codes.
1
2
3
4
5
6
7
8
9
9
7
3
2
6
85
4
1
8
FLOOR LEVELING OPTIONSThere are multiple ways to level your fl oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS (NOT INCLUDED)
• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.
LEVELING METHODS
• If you are building your shed on a concrete foundation see the following page.CONCRETE
MATERIAL REQUIRED
x2
Fasteners for Frame to 4"x 4".(3" Screws shown as one option.) Minimum (28) 3" screws / exterior grade.
Use only wood treated for ground contact and fasteners approved for use with treated wood.
Always support frame seams.
Leveling higher than 16" not recommended.
LEVELING MATERIALSGravel
2x4 Treated LumberSolid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
8" Block4" BlockGravel
Gravel
Do not exceed 16".
4x4 Runner
Shingle
ShingleMaximum between levelingmaterial locations.
48"12"
2x4 Treated Lumber
2" Block
Level
12"
12"(30,5 cm)
12"(30,5 cm)
• 3" Screws angled into 4x4.• (2) at each point frame• and 4x4 touch.
4" x 4" x 12' (10 x 10 x 365,7 cm) Treated Lumber
9
A
B C
4"(10 cm)
3-1/2"(8,9 cm)
DOOR
2" x 4" x 12' (5 x 10 x 366 cm)
2" x 4" x 8' (5 x 10 x 244 cm)
Caulk
Requires:
x2x2x2
MUST be treated lumber.
MUST be treated lumber.
96" (244 cm)141" x 96" (358 x 244 cm) 89" (226 cm)12'x 8' (366 x 244 cm) 141" (358 cm)
AActual Size B CBuilding Size
CONCRETE FOUNDATIONIf you choose to install your kit on a concrete slab refer to the diagram below.
• A treated 2 x 4" (5 x 10 cm) sill plate is required when installing your shed on concrete. Hint: Purchase full length treated lumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4" (5 x 10 cm) sill plates to slab using approved concrete anchors (fasteners not included).
• Check local code for concrete foundation requirements.
NOTES
Treated Sill Plate
Caulk between sill plate and concrete.
Allow new concrete slabs to cure for at least seven (7) days.
10
93"(236 cm)
96"(244 cm)
141”(358 cm)
96”(243,8 cm)
80”(203,2 cm)
112”(248,4 cm)
64”(162,6 cm)
48”(122 cm)
32”(122 cm) 16”
(40,6 cm)
128”(325,1 cm)
13”(33 cm)
1-1/2”(3,8 cm)
x403" (7,6 cm)x10
x2
2 x 4 x 93" (5 x 10 x 236 cm)
2 x 4 x 141" (5 x 10 x 358 cm)
PARTS REQUIRED:
FINISH3 You have fi nished your Floor Frame.
Use two 3" nails at each mark.
Orient parts as shown on fl at surface. Measure and mark.
Centeron marks
FLOOR FRAME (NOT INCLUDED)
Flush
Flush
Use Treated lumber
2 HINT:For easier nailingstand on frame.
DOOR
11
First, secureat ends withone fastener.
Second,secureat ends withone fastener.
170-9/16"(433,3 cm)
170-9/16"(433,3 cm)
Fig. A
FINISH5
LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.
A level and square fl oor frame is required to correctly construct your shed.
2
3
4
Use level and check the frame is level before applying fl oor panels.Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 170-9/16" (433,3 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).
Once the fl oor frame is level and square fasten the frame to the x4 runners at each point the frame contacts the 4x4 runners.
See page 8 for the preferred fl oor leveling method.
12
Move to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is fl ush to the fl oor frame (Fig. B).Secure panel with two 2" nails in the corners.
2
BEGIN1
3
4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.Use a chalk line or use pre-painted grid lines to nail into joists under panel.
Ensure your fl oor frame is square by installing one paneland squaring frame.
Check the fl oor frame is square by measuring diagonally across the frame corners. If the measurements are the same your fl oor frame is square. The measurement will be approximately 170-9/16" (433,3 cm) (Fig. C).
PARTS REQUIRED:
x15/8 x 45 x 96"(1,6 x 114 x 243,8 cm)
x622" (5,1 cm)
FLOOR PANELS (NOT INCLUDED)
Attach the 5/8 x 45 x 96" panel with the rough side up (painted-grid lines side) with the 45" edge and corner fl ush to the fl oor frame (Fig A). Secure panel with two 2" nails in the corners.
Floor panels not included. See page 3 for panel sizes
and quantities.
170-9/16" (433,3 cm)
170-9/16" (433,3 cm)
Fig. C
3/4" (1,9 cm)
45"(114 cm)
141"(358 cm)
6"(15 cm)
Grid lines up
12" (30 cm)
Flush
Flush
Flush
(2) Nails
(2) Nails
3/4" (1,9 cm)
Fig. A
Fig. B
96”(243,8 cm)
DOOR
13
PARTS REQUIRED:
x25/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)
x1242" (5,1 cm)
FLOOR PANELS (NOT INCLUDED)
48"(122 cm)
48"(122 cm)
96"(243,8 cm)
141"(358 cm)
6"(15 cm)
12"(30) cm
Flush
FlushFlushDOOR
FINISH
6 You have fi nished attaching your fl oor panels.
Continue installing panels with rough side up (painted grid lines). Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.
5
14
Check the fl oor frame is level after installing fl oor panels.Re-level if needed.
HINT:
IMPORTANT!
• The fl oor should be used as a stable work surface for wall construction.
• Organize your assembly procedure during the build process to avoid over-handling of the walls.
GABLE WALL
FRONT WALL
GABLE WALL
BACK WALL
15
LEFT WALL
PARTS REQUIRED:
x12 x 3 x 76-1/4" (5 x 7,6 x 194 cm)
x1
MM
Flush
Primedside down
Fig. B
Fig. A
6"(15 cm)
2-1/2"(6,4 cm)
76-1/4"(194 cm)
76-1/4"(194 cm)
Check for correct panel shape.
2
3
Edges of panel should be fl ush to MM.
Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.
Orient parts on the fl at on fl oor as shown (Fig. A,B).
Panel should be primed side down (Fig. B).
x131-1/4" (3,2 cm)
MM
16
LEFT WALL
x1
Check for correct panel shape.
x121-1/4" (3,2 cm)
PARTS REQUIRED:
x1
5
4
6
Edges of panel should be fl ush to NO.
Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.
Orient parts on the fl at on fl oor as shown (Fig. A, B).
Panel should be primed side down (Fig. B).
Flush
6"(15 cm)
NO70-1/2"
(179 cm)
2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)NO
FINISH7 You have fi nished building your two Left Wall Assemblies.
Primedside down Fig. B
2-1/2"(6,4 cm)
Fig. A
70-1/2"(179 cm)
17
LEFT WALL
1"(2,5 cm)
2-1/2"(5,4 cm)
33-1/2"(85 cm)
1-1/4"(3,2 cm)
33-1/2"(85 cm)
2-1/2" (6,4 cm)
Flush
Flush12"
(30 cm)
6"(15 cm)
PT
PTtemporary support
RKtemporary support
x121-1/2" (3,8 cm)
PARTS REQUIRED:
3
2
4
Nail KZ fi rst, 1" (2,5 cm) from panel bottom.
Use 1-1/2" (3,8 cm) nails only 6" (15 cm) apart.
Place PT fl ush to KZ and edge of panel. Hold the 33-1/2" (85 cm) measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.
Orient KZ and PT on fl at on fl oor as shown.
Place panel on KZ and PT with primed side up.
Primed sideup
Use only 1-1/2"(3,8 cm) long nails
x1
x1x2
LEFT WALLREAR ASSEMBLY
KZ
2 x 3 x 32-1/2" (5 x 10 x 83 cm)2 x 3 x 96" (5 x 7,6 x 244 cm)
KZPT
2 x 3 x 13" (5 x 7,6 x 33 cm) x1 RK
Do not nailin groove.
18
58-1/4"(148 cm)
5/8"(16 mm)
2-1/2"(6,4 cm) Use
as spacer
Use Gauge Blockas spacer 3/4"
(19 mm)
Flush
58-1/4"(148 cm)
21-1/2"(54,6 cm)
29-1/2"(75 cm)
Flush
1-1/4"(3,2 cm)
2-1/2"(6,4 cm)
1-1/4"(3,2 cm)
12"(30 cm)
6"(15 cm)
LEFT WALL
BJ
Flush
LF
PT
RK temporary support
x171-1/2" (3,8 cm)
PARTS REQUIRED:
7
56
89
Use 1-1/2" (3,8 cm) nails only 6" (15 cm) apart.
Place PT fl ush to LF and panel edge. Hold the 58-1/4" (148 cm) measurement and nail with 1-1/2" (3,8 cm) nails 12" (30 cm) apart.
Place the 5/8" (16mm) spacer on PT.
Place BJ fl ush to spacer and nail.
Place 3/4" gauge block on PT.Place LF fl ush on gauge block and nail.
Use only 1-1/2"(3,8 cm) long nails
x12 x 3 x 96" (5 x 7,6 x 244 cm)
PT
2 x 3 x 29-1/2" (5 x 10 x 75 cm) BJx1
2 x 3 x 21-1/2" (5 x 7,6 x 55)x1 LF
5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)3/4" GAUGE
BLOCKTEMPORARY SPACERx1
Do not nailin groove.
19
1"(2,5 cm)
33-1/2"(85 cm)
58-1/4"(148 cm)
1"(2,5 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm) Flush
Flush
2-3/4"(7 cm)
2-3/4"(7 cm)
LEFT WALL
1"(2,5 cm)
2-1/2"(6,4 cm)
x331-1/2" (3,8 cm)
PARTS REQUIRED:
11
12
10
Nail using 1-1/2" (3,8 cm) nails 6" (15 cm) apart on edges, and 12" apart inside panel.
Nail RK using three 1-1/2" (3,8 cm) nails (Fig. A).
Place panel onto frame primed side up.
You have fi nished your left wall. Proceed to build your right wall.
FINISH13
LEFT WALL FRONT ASSEMBLY
x1
Primed sideup
RK
Fig. A RK
2 x 3 x 13" (5 x 7,6 x 33 cm) x2 RK
Do not nailin groove.
Use only 1-1/2"(3,8 cm) long nails
Flush 1-1/8"(2,8 cm)
20
RIGHT WALL
Check for correct panel shape.
PARTS REQUIRED:
x12 x 3 x 76-1/4" (5 x 7,6 x 194 cm)
x1
2
3
Edges of panel should be fl ush to MM.
Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.
Orient parts on the fl at on fl oor as shown (Fig. A,B).
Panel should be primed side down (Fig. B).
x131-1/4" (3,2 cm)
Flush
6"(15 cm)
MM76-1/4"
(194 cm)
Primedside down
Fig. B
2-1/2"(6,4 cm)
Fig. A
76-1/4"(194 cm)
MM
21
RIGHT WALL
Primedside down
Fig. B
x1
x121-1/4" (3,2 cm)
PARTS REQUIRED:
x1
5
4
6
Edges of panel should be fl ush to NO.
Use 1-1/4" (3,2 cm) screws spaced 6" (15 cm) apart as shown.
Orient parts on the fl at on fl oor as shown (Fig. A,B).
Panel should be primed side down (Fig. B).
2 x 3 x 70-1/2" (5 x 7,6 x 179 cm)NO
FINISH7 You have fi nished building your two right wall assemblies.
Check for correct panel shape.
Flush
6"(15 cm)
NO 70-1/2"(179 cm)
2-1/2"(6,4 cm)
Fig. A
NO
70-1/2"(179 cm)
22
1"(2,5 cm)
33-1/2"(85 cm)
1-1/4"(3,2 cm)
2-1/2"(6,4 cm)
33-1/2"(85 cm)
2-1/2" (6,4 cm)
Flush
Flush12"
(30 cm)
6"(15 cm)
RIGHT WALL
PT
RKtemporary support
x121-1/2" (3,8 cm)
PARTS REQUIRED:
3
2
4
Nail KZ fi rst, 1" (2,5 cm) from panel bottom.
Use 1-1/2" (3,8 cm) nails 6" (15 cm) apart.
Place PT fl ush to KZ and edge of panel. Hold the 33-1/2" (85 cm) measurement and nail with 1-1/2" (3,8 cm) 12" (30 cm) apart.
Orient KZ and PT on the fl at on fl oor as shown.
Place panel on KZ and PT with primed side up.
Primedside up
x1
x1x2
RIGHT WALLREAR ASSEMBLY
KZ
2 x 3 x 32-1/2" (5 x 10 x 83 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm)
KZPT
PTtemporary support
2 x 3 x 13" (5 x 7,6 x 33 cm) x1 RK
Use only 1-1/2"(3,8 cm) long nails
Do not nailin groove.
23
33-1/2"(85 cm)
5/8"(16 mm) Use
as spacer
Flush
32-1/2"(82,5 cm)
Flush
1-1/4"(3,2 cm)
2-1/2"(6,4 cm)
21-1/2"(54,6 cm)
1-1/4"(3,2 cm)
2-1/2"(6,4 cm)
6"(15 cm)
RIGHT WALL
x101-1/2" (3,8 cm)
PARTS REQUIRED:
7
5
6 Place the 5/8" (16 mm) spacer on KZ
Place LF fl ush to spacer and nail with 1-1/2" (3,8 cm) nails 6" (15 cm) apart.
Place KZ fl ush on PT and nail with 1-1/2" (3,8 cm) nails 6" (15 cm) apart.
PT
x1
2 x 3 x 21-1/2" (5 x 7,6 x 55)x1 LF
5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x1
2 x 3 x 32-1/2" (5 x 10 x 83 cm)KZ
Use only 1-1/2"(3,8 cm) long nails
Do not nailin groove.
LF
KZ
TEMPORARY SPACER
RK temporary support
24
1"(2,5 cm)
33-1/2"(85 cm)
1"(2,5 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm) Flush
Flush
2-3/4"(7 cm)
2-3/4"(7 cm)
12"(30 cm)
6"(15 cm)
Flush
RIGHT WALL
x281-1/2" (3,8 cm)
PARTS REQUIRED:
RIGHT WALL FRONT ASSEMBLY
x1
Primedside up
RK Fig. A
2 x 3 x 13" (5 x 7,6 x 33 cm) x2 RK
9
1010
8
Nail using 1-1/2" (3,8 cm) nails 6" (15 cm) apart on edges, and 12" apart inside panel.
Nail RK using three 1-1/2" (3,8 cm) nails (Fig. A).
Place panel onto frame primed side up.
You have fi nished your right wall.FINISH11
Do not nailin groove.
Use only 1-1/2"(3,8 cm) long nails
RK
1"(2,5 cm)
2-1/2"(6,4 cm)
1-1/8"(2,8 cm)
25
141"(358 cm)
118-1/2"(301 cm)
94-1/2"(240 cm)
94-1/2"(240 cm)
70-1/2"(179 cm)
46-1/2"(118 cm)
22-1/2"(57 cm)
66-1/2"(169 cm)
94-1/2" 46-1/2"(240 cm) (118 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
BACK WALL
PARTS REQUIRED:x5
x2
x2
x243" (7,6 cm)2 x 3 x 66-1/2" (5 x 7,6 x 169 cm)
2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)
2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)
FZ
NF
PR
2 Attach with 3" (7,6 cm) nails, two at each connection.
Orient parts on edge on fl oor as shown. Measure and mark.
PROFFSETSEAM
OFFSETSEAM
FZ x5
PR
NF
NF
Centeron marks
HINT:For easier nailingstand on frame.
26
48"(122 cm)
3/4"(1,9 cm)
1-1/2"(3,8 cm)
3/4"(1,9 cm)
12"(30) cm
6"(15 cm)
BACK WALL
For squareness, maintain 3/4" and1-1/2" measurement along panel edges.
4
5
3
PARTS REQUIRED:
x1
x342" (5 cm)
3/8 x 48 x 72"(1 x 122 x 183 cm)
BEGIN HERE
HINT: Use RK as 1-1/2" gauge
2 x 3 x 13" (5 x 7,6 x 33 cm) as spacerx1 RK3/4" GAUGE
BLOCK
There will be an overhangat top and bottom
Do not nailin groove.
Primed side up
Fig. B
Fig. A
1-1/2"(3,8 cm)
1-1/2"(3,8 cm)
3/4"(1,9 cm)
3/4"(1,9 cm)
2 Nails
2 Nails
SQUAREEDGE
3/4"GAUGEBLOCK
Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges.
Use the gauge block to mark the 3/4" measurement on the wall stud. Use RK as a 1-1/2" gauge block at top. Secure panel with two 2" nails in the corners (Fig. A).
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure your wall frame is square by installing one panel and squaring frame.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig. B).
27
1-1/2"(3,8 cm)
3/4"(1,9 cm)
48" (122 cm)
12"(30 cm)
6"(15 cm)
Flush
1-1/2"(3,8 cm)
48" (122 cm)
12"(30 cm)
6"(15 cm)
Flush
BACK WALLPARTS REQUIRED:
x2
x1922" (5 cm)
3/8 x 48 x 72" (1 x 122 x 183 cm)
2 x 3 x 13" (5 x 7,6 x 33 cm) as spacerx1 RK
HINT:Use RK as 1-1/2" gauge
HINT:Use RK as 1-1/2" gauge
3/4" GAUGE BLOCK
There will be a side overhang
at top and bottom
LIPEDGE
SQUAREEDGE
LIPEDGE
Place center 48" panel on frame as shown with primed side facing up.NOTE THE SQUARE AND LIP EDGES.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
6
Do not nailin groove.
Place end 48" panel on frame as shown with primed side facing up.NOTE THE SQUARE AND LIP EDGES.
Nail using 2" nails 6" apart on edges and 12" apart inside panel.
7
You have fi nished building your back wall.FINISH
Primedside up
Primedside up
For squareness maintain fl ush and 1-1/2" measurement along panel edges.
For squareness maintain fl ush and 1-1/2" measurement along panel edges.
8
28
22-1/2"(57 cm)
13-3/4"(35 cm)
46-1/2"(118 cm)
94-1/2"(240 cm)
61-3/4"(157 cm)
64"(162,5 cm)
68"(172,7 cm)
65-1/2"(166,3 cm)
Dimensions are to center of studs
Maintain dimension between studs
62-1/2"(158,8 cm)
14-1/2"(36,8 cm)
Flush
Flush
FRONT WALL
PARTS REQUIRED:x1x1
x4x1
x1
x183" (7,6 cm)
2 x 3 x 46-1/2" (5 x 7,6 x 118 cm)
2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)
NF
PR
2 Nail using two 3" (7,6 cm) nails at each connection.
Orient parts on edge on fl oor as shown. Measure and mark.
2 x 3 x 14-1/2" (5 x 7,6 x 36,8 cm) FL
2 x 3 x 62-1/2" (5 x 7,6 x 158,8 cm)FN
2 x 3 x 68" (5 x 7,6 x 173 cm) OT
PRNF
FN FLOT x4
HINT:For easier nailingstand on frame.
29
Flush
94-1/2"(240 cm)
46-1/2"(118 cm)
7-7/8"(20 cm)
2-1/2"(6,4 cm)
2-1/2"(6,4 cm)
Flush
7-7/8"(20 cm)
OVERHANG PANELS
PARTS REQUIRED: x4
2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) x2x1x1
3/8 x 7-7/8 x 94-1/2" (0,9 x 20 x 240 cm)
3/8 x 7-7/8 x 46-1/2" (0,9 x 20 x 118 cm)
Orient two overhang panels with the primed side up.
Attach panels fl ush to 2 x 3 x 7-7/8" (5 x 7,6 x 20 cm) using two 1-1/4" (3,2 cm) screws as shown.
4
3
Primed side up
1-1/4" (3,2 cm)
30
FRONT WALLPARTS REQUIRED:
6
5
Screw into top plate using (14) 1-1/4"(3,2 cm) screws.
You have fi nished attaching your overhang.
Place overhang on wall panel, fl ush to back side and ends.
Place overhang fl ush to 2 x 3" (Fig. A.)
Keep overhang fl ush to 2 x 3" (Fig. B.)
Make sure overhangs are fl ush to 2 x 3" the entire length
SeamFlush
x1x1
Overhang
Overhang
Flush
DOOROPENING
Fig. AFig. B
FINISH7
Flush
Flush
Approximately10" (25,4 cm)
Approximately9" (22,9 cm)
94-1/2"(240 cm)
46-1/2"(118,1 cm)
Two screws near seams
x161-1/4" (3,2 cm)
DOOROPENING
31
3/4"(1,9 cm)
6" (15 cm)
Flush
48" (122 cm)
3/4"(1,9 cm)
12"(30 cm)
FRONT WALLPARTS REQUIRED:
x1
x342" (5 cm)
For squareness, maintain fl ush and 3/4" measurement along panel edges.
BEGIN HERE
3/4" GAUGE BLOCK
3/4" GAUGE BLOCK
There will be an overhang
at top and bottom
Flush panelunderoverhang
Fig. A.
2
3
1BEGIN
Do not nailin groove.
Primedside up
Place the panel onto wall frame fl ush under overhang with primed side up as shown (Fig. A).
Use the gauge block to mark the 3/4" measurement on the wall stud.Secure panel with two 2" nails in the corners (Fig. B).
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensure your wall frame is square by installing one panel and squaring frame.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud (Fig. C). Secure corner with two 2" nails.
Fig. C
Fig. B
3/4"(1,9 cm)
3/4"(1,9 cm)
2 Nails
Flush
2 Nails
32
6"(15 cm)
64"(163 cm)
Flush
PT
Flush
3"(7,6 cm) Screws
Use one (1) PT across door openingto maintain 64" dimens
FRONT WALLPARTS REQUIRED:
x2
x1
x49
x22" (5 cm)
3" (7,6 cm)
FINISH7 You have fi nished attaching your front wall panels.
Proceed to erect your walls.
Use PT as a brace to maintain 64" (163 cm) opening. Use two 3" screws to attach.
Continue installing panels primed side up fl ush under overhang (Fig. A). Note 1/4" (6,4 mm) offset on right panel.
Use 2" nails 6" apart on edges, and 12" apart inside panel.
4
76
5
2 x 3 x 96" (5 x 7,6 x 244 cm) PT
3/8 x 15-7/8 x 72" (1 x 40 x 183 cm)
There will bean overhang
at topand bottom
Flush panelsunderoverhang
Fig. A
LIP EDGE1/4"(6 mm)
10 to12"
SQUAREEDGE
1/4"(6 mm)
Do not nailin groove.
Primedside up
PT
33
LEFT WALL INSTALLATIONPARTS REQUIRED:
x1
x6x4
3" (7,6 cm)
3" (7,6 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm) PT
3" Nails(7,6 cm)
6"(15 cm)
2" Nails(5 cm)
x18
LEFT
RK
PT
Fig. A
Angle to hitfl oor frame.
Nail 2" nails fi rst.
2" (5 cm)
Attach RK, using three 3" (7,6 cm) nails as shown. Angle nails to hit fl oor frame (Fig. A).
First, nail lower edge of panel to fl oor frame using 2" nails 6" apart Angle nail to hit fl oor frame (Fig. A).
3
Secure back wall uprights to fl oor using two 3" screws (Fig. B).
4
5
You have fi nished standing your left wall.
FINISH6
Center left wall assembly on the 96" (244 cm) fl oor dimension.
Use PT as a temporary brace. Secure with two 3" screws.
2
BEGIN1
Do not nailin groove.
(2) 3" Screws(7,6 cm)
96"(244 cm)
PT
(2)3" Screws(7,6 cm)
Fig. B
34
CENTER
BACK WALL INSTALLATIONPARTS REQUIRED:
x12
x2
x39
3" (7,6 cm)
3" (7,6 cm)
2" (5 cm)
FINISH4
Nail down the bottom plate using two 3" nails between the wall studs.
Screw through the backwall trim into the top and bottom plates using one 3" screw (Fig. D, E).
Stand Back Wall Assembly on Floor. 1-1/2" (3,8 cm) Panel overhang is at top.
It is important to secure the Back Wall in the following order.
Nail the lower back wall corner to the side wall trim with one 2" (5 cm) nail (Fig. A).
Center back wall on fl oor, side-to-side.
Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. B).
Nail along the panel edge into the trim using 2" nails spaced 6" apart.
Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit fl oor frame (Fig. C).
You have fi nished standing your Back Wall. Proceed to stand the Right Wall.
1
2
3
BEGIN¸
2" (5 cm) Nail
1-1/2"(3,8 cm)
2" (5 cm) Nail
3" (7,6 cm) Screw
6"(15 cm)
6"(15 cm)
3" (7,6 cm)nails
TrimPanel
Fig. A
Trim
Fig. C
Fig. B
Fig. D
Fig. E
Same Measurement
3" (7,6 cm) Screw
Trim
35
RIGHT WALL INSTALLATION
6"(15 cm)
PARTS REQUIRED:
x6
x4
x31
3" (7,6 cm)
3" (7,6 cm)
2" (5 cm)
FINISH4
Nail down RK using three 3" nails on each as shown and secure center wall frame using two 3" screws (Fig. D).
Screw through the right wall trim into the top and bottom plates using 3" screws (Fig. E, F).
Stand right wall assembly on fl oor. It is important to secure the right wall in the following order.
Nail the lower back wall corner to the right wall trim. Secure with one 2" (5 cm) nail (Fig. A).
Center right wall on fl oor, side-to-side.
Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. B).
Nail along the panel edge into the trim using 2" nails spaced 6" apart.
Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit fl oor frame (Fig. C).
You have fi nished standing your right wall. Proceed to stand the front Wall.
1
2
3
BEGIN
2" (5 cm) Nail
Fig. A
Trim
CENTER
2" (5 cm) Nail
3" (7,6 cm) Screw
Trim Fig. B
Fig. E
Fig. F
Same Measurement
6"(15 cm)
3" (7,6 cm)nails
BackPanel
Fig. C
Fig. D RK
(2)3" (7,6 cm)
Screws
3" (7,6 cm) Screw
Trim
36
6"(15 cm)
6"(15 cm)
64"(162,6 cm)
FRONT WALL INSTALLATION
Nail down the bottom plate using two 3" nails between the wall studs. (Fig. D).
Screw through the front wall trim into the top and bottom plates using one 3" screw (Fig. E, F).
Repeat process to secure the left side of the front wall.
You have fi nished standing your front wall.4
PARTS REQUIRED:x8
x41
6"(15 cm)
2"(5 cm) Nail
Fig. B
TrimFig. A
CENTER
2" (5 cm) Nail
TrimFig. C
Fig. D
Same Measurement
2" (5 cm) Nail
3" (7,6 cm) Screw
PanelFig. E
3" (7,6 cm) Screw
3" (7,6 cm) Nails
Fig. F
Center front wall on fl oor side-to-side.
Check the 64" door opening is held before nailing.
Nail the front wall fl ush to the fl oor using 2" nails 6" apart. Angle nails to hit fl oor frame (Fig. A).
Nail the lower side wall corner to the side wall trim with one 2" nail (Fig. B).
1
2
BEGIN
2" (5 cm) x26
3" (7,6 cm)
x43" (7,6 cm)
Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. C).
Nail along the panel edge into the trim using 2" nails spaced 6" apart.
3
Stand front wall on fl oor. It is important to secure the front wall in the following order.
37
Flush toopening1-1/2"
(3,8 cm)
FRONT WALL
PARTS REQUIRED: x8
LV
3" (7,6 cm)
2 x 3 x 22-1/2" (5 x 7,6 x 57 cm) x2 LV
3" (7,6 cm) nails(2) at each connection
On inside of front wall attach LV fl ush to window opening using 3" (7,6 cm) nails as shown.
5
LV
38
FRONT WALL
PARTS REQUIRED: x43" (7,6 cm)
2 x 3 x 13" (5 x 7,6 x 33 cm)
2 x 3 x 68" (5 x 7,6 x 173 cm)
x1
x1
RK
OT
Angle 3"(7,6 cm)screw
Two 3"(7,6 cm) screw
Remove
OT
RK
Fig. A
Assemble RK to OT with one 3" (7,6 cm) screw (Fig. A).
Use OT and RK as a temporary brace to support top plate.Screw securely in place.
Remove temporary support in door opening.
One 3"(7,6 cm)screw
1-1/2"(3,8 cm)
6
7
FINISH8
OT
RK
39
RAFTER JIG
x23" (7,6 cm)
x3
x1 3/8 x 5-3/8 x 5-1/2" (1 x 13,6 x 14 cm)
2 x 3 x 13" (5 x 7,6 x 33 cm) RK
101-3/8"(257,5 cm)
Importantmeasurement
DOOR
FINISH4
Make a rafter jig to make sure all rafters are assembled the same.
Measure from corner of backwall and RK (already installed) as shown.
Secure RK on the fl at square to back wall at measurement usingtwo 3" (7,6 cm) screws.
Attach a second RK on edge and 3/8" thick angle trim piece as shown (Fig. A).
You have fi nished building your rafter jig.
Required because rafter is uneven at bottom
2
3
PARTS REQUIRED:
RK
End Cap3/8 x 5-3/8 x 5-1/2"(1 x 13,6 x 14 cm)
3" (7,6 cm) screwmust drive in all the way
2-1/2"(6,4 cm)
RK
Fig. A
RK
40
101-3/8”257,5 cm
RAFTERS
NU
GLUE
2 x 4 x 65-5/8" (5 x 10 x 167 cm) Rafter
2 x 4 x 46-13/16" (5 x 10 x 119 cm) Rafter
ADx5
x10
x5
8 x 24" (20 x 61 cm) Gusset2" (5 cm)
x120
Short edge tometal plate side
Short edgeto this side
Endstouch
FINISH6
You will assemble (5) rafters. Place rafter parts on Jig as shown.
You have fi nished building your rafters.
PARTS REQUIRED:
NU
NU
Gusset AD
AD
Apply glue to rafters where the gusset will fi t. Note short side of gusset. (Fig. A)2Ends of rafters must touch together at the peak. Nail gusset to rafters using twelve 2" nails in pattern shown.
3
Flip over rafter assembly and repeat STEPS 2-3 to attach second gusset to other side.4
Repeat STEPS 1-4 to build FOUR additional rafter assemblies.5
Fig. A1/4" Gap(0.6 cm)
AD
41
TRIM CAPSPARTS REQUIRED:x2
Attach primed side out and fl ush with soffi t, using two 1-1/4" (3,2 cm) screws on both sides, as shown.
2-5/8 x 5-3/8 x 5-1/2" (6,6 x 13,6 x 14 cm) 1 Left / 1 Right
x41-1/4" (3,2 cm)
You have fi nished your trim caps.
LEFT SIDE RIGHT SIDE
Install with primed side facing out.
FINISH2
Flush Flush
Flush Flush
42
TRIM
Install the back trim fi rst, fl ush to back panel, trim, and panel edge as shown.
Secure using eight 1-1/4" (3,2 cm) screws 9" apart from inside shed.2
2 x 3 x 65" (5 x 7,6 x 165 cm)x2
Flush
Flushon trim
Flush to panel
NR
Flush to panel edge
PARTS REQUIRED: x161-1/4" (3,2 cm)
Flush
9" (22,9 cm)approximately
NR
43
TRIM
Install the front trim, fl ush to peak and panel edge as shown.
Secure using six 1-1/4" (3,2 cm) screws from inside shed.
Repeat Steps for opposite Side Wall.
4
3
5
NQx42 x 3 x 46-7/8" (5 x 7 x 119 cm)
Flush to panel FlushNQ
Flush to peak
PARTS REQUIRED: x121-1/4" (3,2 cm)
FINISH6 You have fi nished attaching your Trim. Proceed to installing your Rafters.
9" (22,9 cm)approximately
44
22-1/2"(57 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
22-1/2"(57 cm)
Dimensions are to center of rafters
Dimensions are from inside of panel
Flush
DOOR
ROOFPARTS REQUIRED:
3" (7,6 cm)x20
FINISH7
Mark top of wall frames to measurement shown.
Hold rafter end fl ush to back wall and overhang. Secure from under overhang using two 2" (5 cm) screw. (Fig. A)
Locate Rafter centered on marks.
Secure opposite end through panel into rafter end using one 2" (5 cm) screw (Fig. B)
Screw rafters at each end using two 3" (7,6 cm) screws as shown. (Fig. B, C)
Repeat steps to attach 5 rafters.
At each end(2) 3" (7,6 cm) screws
angle into 2 x 3"
2"(5 cm) Screw
Two 2"(5 cm)Screws
Fig. A
Fig. CFig. B
You have attached your rafters. Proceed to attaching your soffi t trim.
3
2
4
56
x15 2" (5 cm)
45
72-3/8"(184 cm)
TRIMPARTS REQUIRED:
2" (5 cm)x16
FINISH3
2
Orient parts as shown and attach to ends of rafters, using two 2" (5 cm) fi nish nails (Fig. A).
You have fi nished your soffi t trim.
Trim is fl ush at ends to sidewall trim.
Flush
Fig. A
KYFlush to trim at ends
3/4 x 2-1/2 x 72-3/8" (1,9 x 6,3 x 184 cm)x2 KY
46
DOOR SUPPORTPARTS REQUIRED:
2" (5 cm)x22
x15/8 x 3-7/8 x 96" (1,6 x 9,8 x 244 cm)
FINISH4
Position support fl ush with bottom edge of top plate and side wall panel and attach with 2" (5 cm) nails as shown.
Remove temporary brace after support is installed.
Use exterior-rated wood glue behind support. Apply to top plate and end of rafter
You have fi nished your door frame support.
2
3
Door opening
RemoveAfter door
Frame supportIs attached
Flush
Glue
FlushFlush
6"(15,2 cm)
47
1/4"(0,6 cm)
20"(51 cm)
WORKBENCHPARTS REQUIRED:
2" (5 cm)x10
7/16 x 20 x 96" (1,1 x 51 x 244 cm)
2 x 3 x 96" (5 x 7,6 x 244 cm)
x1
x1 PT
FINISH3
Attach with 2" (5 cm) nails as shown.
You have fi nished building your workbench top.
2
PT
Fig. A
2 x 3temporary support
Flush at ends
5/8"(1,6 cm)
Flushat ends
10-1/2"Approximately
2-1/2"(6,4 cm)
Position bench top to PT fl ush at ends and maintaining 1/4" (6 mm) overhang, as shown (Fig. A).
48
1/4"(0,6 cm)
11-3/4"(30 cm)
SHELVES
PARTS REQUIRED:2" (5 cm)
x10
2 x 3 x 96" (5 x 7,6 x 244 cm)
x2
x27/16 x 11-3/4 x 96" (1,1 x 30 x 244 cm)
PT
Fig. A
Flush at ends
Flushat ends
FINISH3
Attach with 2" (5 cm) nails as shown. Repeat steps to build second shelf.
You will build two shelves. Position shelf to PT fl ush at ends and maintaining 1/4" (6 mm) overhang, as shown (Fig. A).
You have fi nished building your shelves.
2
7/16"(1,1 cm)
2-1/2"(6,4 cm)
PT
10-1/2"Approximately
49
PEGBOARD
Fig. A
PARTS REQUIRED:3/4" (19 mm)
x13
1 x 3 x 96" (2,5 x 7,6 x 244 cm)
x1
x123-7/8 x 96" (61 x 244 cm) Peg Board
Flushat ends
Flushat ends
Flush
FINISH3
Attach with 3/4" (19 mm) screws as shown.
Rough side up
Rough side up
Position pegboard to 1 x 3" fl ush at ends and edge, as shown (Fig. A).
You have fi nished building your pegboard.
2
8"Approximately
50
20" (51 cm)
WORKBENCH
PARTS REQUIRED:
Place workbench into gap in side wall upright. Nail using 2" (5 cm) nails, as shown.
Level and attach KK to upright and workbench, using four 3" (,6 cm) screws as shown (Fig. A).
You will secure your workbench ends later. Proceed to attach your pegboard.
2
3" (7,6 cm)
x10
x1x1
x4
2 x 3 x 24-1/16" (5 x 7,6 x 61 cm)KK
2" (5 cm)
Window
FINISH3
Workbench2" (5 cm)
Nails
3" (7,6 cm)screws
KK
Fig. A
20"(51 cm)
10-1/2"Approximately
Angle top screwto hit KK
51
2-1/2"(6,4 cm)
PEGBOARD
PARTS REQUIRED:
Attach RK at back corner of workbench into outside trim, using 3" (7,6 cm) screws, as shown.
Attach pegboard at top using (13) 1" (25 mm) screws as shown.
Place pegboard onto workbench with 1 x 3 Trim to bottom, facing out.
Anchor bottom of pegboard, using one 2" (5 cm) screw at center, and 3" (7,6 cm) screws at lower corners.
You have fi nished your pegboard. Proceed to attach your shelf.
3
2
4
3" (7,6 cm)x4
x2
x1
x13
x12" (5 cm)
Window
Flush
Window
2 x 3 x 13" (5 x 7,6 x 33 cm) RK 1" (25 mm)
3" (7,6 cm)
FINISH5
2" (5 cm)Screw
1 x 3Trim to bottom
(13) 1" (2,5 cm)Screws across top
3" (7,6 cm)Screws
8"Approximately
RKRK
52
11-3/4"(30 cm)
SHELVES
Window
Shelf
PARTS REQUIRED: x102" (5 cm)
You will screw the ends of workbench and shelf from outside of shed.2
Place shelf into gap in side wall upright. Attach using 2" (5 cm) nails, as shown.
x1
11-3/4"(30 cm)
10-1/2"Approximately
53
59"(150 cm)
1"(2,5 cm)
12-5/8"(32 cm)
Measure fromcorner trim
Outside bottom ofwall panel
20-7/8"(53 cm)
34-1/4"(87 cm)
1"(2,5 cm)
SHELVES
3" (7,6 cm)Nail
PARTS REQUIRED: x83" (7,6 cm)
Measure and mark outside nail locations for workbench and shelf on back wallas shown.
Nail through marks on wall panel into ends of workbench and shelf supports.
Repeat procedure at opposite ends of shelf and workbench.
Assistance may be required to hold shelf and workbench level.4
3
FINISH5
54
11-3/4"(30 cm)
SHELVES
PARTS REQUIRED: x6
x4
x2
1-1/4" (3,2 cm)
3" (7,6 cm)
3" (7,6 cm)
FINISH4
2
3
Place shelf into gap in side wall upright. Attach using 1-1/4" (3,2 cm) screws from underneath, as shown.
From outside shed, nail through the wall panel into end of shelf using two 3" (7,6 cm) nails.
You have fi nished installing your shelf. Proceed to building your roof.
Install RK fl ush against top plate and outer wall panel. Attach using 3" (7,6 cm) screws, as shown (Fig. A).
Install RK in corner fl ush against top plate and outer wall panel.
RK
Fig. A
(3)1-1/4" screw
(3,2 cm)
(3)1-1/4" screw
(3,2 cm)
3" (7,6 cm) nails
Shelf
Gap
x1 2 x 3 x 13" (5 x 7,6 x 33 cm) RK
x1
11-3/4"(30 cm)
You an easily locate nails looking over wall.
3" (7,6 cm)Screws
55
48"(122 cm)
ROOF PANELS
PARTS REQUIRED: x42" (5 cm)
x1
2
3
3/4" GAUGE BLOCK
7/16 x 48 x 96"(1,1 x 122 x 244 cm)
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is fl ush to the peak (Fig. C) and there is 3/8" measurement to the gable trim (Fig. D).
You may need to move your sidewall to get the 3/8" measurement. Secure panel with two 2" nails in the corners.
You must square the roof by attaching one panel fi st. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.
Roof panels may cause serious injury until securely fastened.
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 3/4" measurement on the rafter (Fig A) and the panel fl ush at the peak (Fig. B).
Secure panel with two 2" nails inthe corners.
3/8"(9,5 mm)
GableTrim
Fig. D
Fig. C
TwoNails
3/4"(1,9 cm)
Fig. A
GaugeBlock
Flushat peak
Flushat peak
Fig. B
56
22-1/2"(57 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
24"(61 cm)
22-1/2"(57 cm)
ROOF PANELS
3/8"(9,5 mm)
3/8"(9,5 mm)
12"(30,5 cm)
6"(15 cm)
PARTS REQUIRED:
x2
7/16 x 47-7/8 x 48"(1,1 x 122 x 122 cm)
x1082" (5 cm)
3/4" GAUGE BLOCK
x1
7/16 x 48 x 96"(1,1 x 122 x 244 cm)
Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E).
Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E).
Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.
Attach 47-7/8 x 48" roof panel fl ush to fi rst panel, fl ush at peak and with the 3/8" measurement on trim (Fig. F, G).
4
Move to the opposite side of the roof and repeat this process installing a 48 x 96” and 47-7/8 x 48” panel.
Note the panels edges are offset from the fi rst panels installed.
Make sure panels are fl ush at the peak (Fig H) and there is a 3/8” measurement at the gable trims (Fig. J).
Nail the roof panel using 2” nails 6” apart on edges and 12” apart inside panel.
5
GableTrim
NOTE: Measurements from inside of panels
Fig. F
Fig. H
Fig. J
Fig. G
Fig. E
2" Nails Flushat peak
Flushat peak
Flush
96"
48"
57
ROOF PANELS
3/8"(9,5 mm)
3/8"(9,5 mm)
3/4"(19 mm)
PARTS REQUIRED:
x1
x1
7/16 x 18 x 96” (1,1 x 46 x 244 cm)
7/16 x 18 x 48" (1,1 x 46 x 122 cm)
x282" (5 cm)
3/4" GAUGE BLOCK
Attach 18 x 96" panel as shown fl ush to panels and 3/4" on rafter (Fig. A) and with 3/8" at the gable trim (Fig. B).
Attach 18 x 48" roof panel fl ush to panels and with the 3/8" measurement on trim (Fig. B) and with 3/8" at the gable trim (Fig. C).
Nail the roof panels using 2" nails 6" apart on edges and 12" apart inside panel.
6
FINISH7 You have fi nished installing your roof panels.
Fig. A
Fig. C
Fig. B
Flush
Flush
96"
48"
Flush
58
DOORS
2 x 3 x 68" (5 x 7,6 x 173 cm) OTx1
OO
OT
Make sure spacer is attached.
Tighten screws securely.
OFFSET
3" (7,6 cm)screws
Bottom edges fl ush
3/8"(1 cm)3/8"
(1 cm)
3/8"(1 cm)
3/8"(1 cm)
OFFSETGREEN RED
Orient parts as shown on fl at surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
PARTS REQUIRED:
x1x1Left Door Right Door
3" (5 cm) x8
2 Attach temporary supports OO and OT with 3" screws in middle and at ends. Tighten securely.
HINT:Look for 3/8" SPACER
attached to doors.
BEGIN1
OOx11-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
59
DOORSPARTS REQUIRED: x13
3" (7,6 cm)
OO
72" from overhang
OO
Fig. A
Center doors on mark as shown (Fig. B).4
Check hinge board is fl ush under overhang (Fig. C).
Remove temporary supports and check doors open properly.6
FINISH7 You have fi nished installing your doors.
Screw hinge boards into wall supports and fl oor using ten 3" screws as shown.Make sure screws go into framing and fl oor (Fig. D, E).
5
3" (7,6 cm)Screws into the wall
support and fl oor frame.
Fig. B
Center 3/8" measurementon mark.
Fig. D
Fig. C
3/8"(1 cm)
Fig. E
Angle 3" (7,6 cm)Screw
Flush
Attach temporary support OO as a ledger board for doors to rest on, using three 3" screws. Measure 72" down from underside of overhang (Fig. A).
Locate center of door opening and mark.
72" (182,9 cm)from bottom of overhang to top of ledger board
3
OOx11-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
60
CENTER CENTER
Fig. B
DOORS
3/4" (1,9 cm)
Screw into framing.
Two Screws
DoorTrim
HingeBoard
Fig. A
DoorPanel
You have fi nished securing your door trim. FINISH4
Remove 3/8" spacers from doors.2
BEGINReinforce the door trim using 3/4" screws through door panel into trim (Fig. A).Locate screws as shown (Fig. B). Use two screws at seams.
1
PARTS REQUIRED: x46
Center metal threshold between doors and secure using eleven 3/4" screws into fl oor as shown (Fig, C).
3
Fig. C
x11Bagged separately/special coating
64" Metal Thresholdx1
61
DOORS
OO
Screws2"
(5 cm) x14
1"(2,5 cm)
OFFSETScrews
2"(5 cm)
1"(2,5 cm)
OFFSET
Secure OO using seven 3" screws through outside trim into OO (Fig. B)2
Fig. A Fig. B Fig. C
Center OO in door opening.
11" (28 cm)Approximately
PARTS REQUIRED: x142" (5 cm)
You have fi nished installing your door weatherstrips.
BEGIN
With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B).
1
FINISH5
On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C).
3
Secure OO using seven 3" screws through outside trim into OO (Fig. C).4
OOx11-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
62
PARTS REQUIRED:x2
3/4" (1,9 cm) x8
DOOR HARDWARE
35-1/2"(90 cm)
Install on right door.
x1
3/4" (1,9 cm) x7
Fig. B
3/4" (1,9 cm) Screw x7
3/8" (9 mm) Drill Bit
OO
OO
Fig. A
Fig. B
Flushon OO.
Flushon OO
Drill 3/8" holein-line with bolt.
Drill 3/8" holein-line with bolt.
LEFTDOOR
BEGIN
With door closed mark hole locations for bolts to extend into.
HINT: Extend bolts to leave marks in wood. Tap bolts with hammer. Drill 3/8" holes deep enough for each bolt to slide into.
3
2
Mount one barrel bolt fl ush at top of OO on left door using 3/4" screws as shown (Fig A).Mount the second barrel bolt fl ush at bottom of OO on left door using 3/4" screws as shown (Fig B).
1
HINT: With door closed extend bolt and tap with hammer to leave a mark in wood for drilling.
Secure hasp and latch as shown using 3/4" screws. You have fi nished mounting your door hardware.
FINISH4
63
LevelFlush
Flush
Glue
Rafter centeredover door opening.
Glue
COLLAR TIEPARTS REQUIRED: x6
3" (7,6 cm)x1
2 x 3 x 68" (5 x 7,6 x 173 cm)
OT
FINISH3
2
Position and level OT on rafter that is centered over door opening.
Glue OT and attach with 3" (7,6 cm) nails as shown.
You have fi nished installing your collar tie. Proceed to assemble and attachi your shutters.
OT
64
1/4"(0,6 cm)
3-1/2"(8,9 cm)
3-1/2"(8,9 cm)
1" (25 mm)
SHUTTERSPARTS REQUIRED:
FINISH4
Position parts primed side-down on fl oor, as shown. You will build two shutters the same.
You have fi nished building your window shutters. Proceed to install your window.
Install with primed side facing down
5/8 x 3 x 25" (1,6 x 7,6 x 63,5 cm)
5/8 x 3 x 8" (1,6 x 7,6 x 20 cm)
x6x4
KWKV
KV x2KW x3
Flush
Flushboth sides
Flushboth sides
2
3
Attach using 1" (25 mm) screws as shown.
Repeat steps to build your second shutter.
Primed side down
x12
65
CENTER
CENTER
CENTER
CENTER
1-1/4" (3,2 cm)
WINDOW
4 You have fi nished installing your window.
PARTS REQUIRED:
Seal window with high-quality exterior-grade caulk.
2
3
Attach window using four 1-1/4" (3,2 cm) screws as shown.
Mark center of window frame as shown.
Window23-3/4" x 16-1/2"(63 x 42 cm)
x1x4
HINT: Caulk behind frame near edge before installing.
66
KX
KX
3/4" (19 mm)
CENTER
Flush Flush
Flush2" Finish nails
2" Finish nailsinto wall frame
3/4" Screws from inside
Flush
Mark
Mark
SHUTTERS / WINDOW TRIM
FINISH4
PARTS REQUIRED:
Locate one shutter centered on marks as shown.
x6x20
2
3
First, attach shutter using a 2" fi nish nail at "dot". Nail into wall frame inside.
Then, from INSIDE of the shed, use three 3/4" screws to secure the shutter indicated at "X".
Repeat steps to attach shutter on opposite side.
Locate KX centered on mark and fl ush to shutters as shown. Attach using 2" fi nish nails. Nail into window frame inside.
You have fi nished installing your shuttersand window trim.
2" (5 cm)
5/8 x 3 x 21-3/4" (1,6 x 7,6 x 55 cm)x2 KX
x2
8-3/8"(21,3 cm)
8-3/8"(21,3 cm)
12-1/2"(31,8 cm)
12-1/2"(31,8 cm)
67
ZZ
DOOR TRIM
FINISH3 You have fi nished installing your door trim.
PARTS REQUIRED:
5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x8
x163/4" (19 mm)
Position parts on lower pane of Door Panel, as shown.
2 Attach each using two 3/4" (19 mm) screws as shown.
68
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges
Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)
PAINT & CAULK- NOT INCLUDED -
ROOF FELT- NOT INCLUDED -
DRIP EDGE- NOT INCLUDED -
• Install felt fl ush to all roof edges overlapping 3". Use minimal amount of roofi ng nails to hold in place.
OK to overlap at ridge.3" OVERLAP
Flush
Flush
• Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A).• Do not use nails on side of drip edge that hangs over side of building.• Only nail top of drip edge as shown.
Snip bottom side of drip edge andbend over to other side of roof.
(Follow directions provided by manufacturer.)
Edge fl ush to trim.
Fig. A
Drip edge Drip edge
Roof felt
69
• Follow directions provided by manufacturer and these instructions.
SHINGLES- NOT INCLUDED -
Install fi rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.Starter row must be straight and level all the way across with lower edge of roof deck.NOTE: If you have installed drip edge install shingles fl ush to drip edge.
BEGIN1
TABS UP
Shingle overlaps roof decking.
1" (2,5 cm) overhangpast roof deck.
1" (2,5 cm) overhang or fl ush with drip edge.
(4) Nails
BACK OF SHEDFRONT OF SHED
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
1"(2,5 cm)
NAILS
Sealing Strip 1"(2,5 cm)
1/2"(1,3 cm)
Full Rain Slot
Half A Rain Slot
NotchNotch
70
Beginning at front of shed, install fi rst row of shingles with notch at 1" past roof edge or fl ush with drip edge.22
FRONT OF SHED BACK OF
SHED
BACK OF SHED
Notch- or -
Drip Edge
Notch
Roof Deck
1"(2,5 cm)
Flush with starter row.
Flush with starter row.
Continue installing rows of shingles by staggering at front.
4
SHINGLEScontinued...
Install second row of shingles fl ush at top of fi rst row's rain slots. Ensure 1" overhang or fl ush to drip edge at front, stagger each row.
3
1"(2,5 cm)
1"(2,5 cm)
FRONT OF SHED
FRONT OF SHED
Flush with rain slots. Flush with rain slots.
Notch
Notch
71
You have fi nished shingling your roof. Proceed to capping the ridge.FINISH9
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
5
6
7
8
SHINGLEScontinued...
• If more than 5" to rain slot you must install another row of shingles.
5"(12,7 cm)or less.
5"(12,7 cm) MAX.
Top of rain slot.
Cut Off.CUT
72
SHINGLES - RIDGE CAP
• You will fi nish off the top of the roof with a ridge cap made from shingles.
Note: • You will need about 36 cut pieces.
Cut shingles into THREE pieces. Hint: Use cut-off pieces fi rst.
Score shingle,then snap-off angled cut.
Install fi rst ridge cap fl ush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
3
BEGIN1
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm)
2"(5 cm
Top of slot.Weather Seal
Flush
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
5"12,7 cm
FRONT OF SHED
FRONT OF SHED
Flush
36Pieces
73
SHINGLES - RIDGE CAPcontinued...
Continue installing ridge cap to back of roof.
Make sure there is 4" between the shingle-color and edge of shingles.
When you have 4" minimum of shingle color cut one piece to cap your roof.
Install fl ush to shingles.
4
5
6
7
(2) Nails per side.
You have fi nished your ridge cap.FINISH8
Cut at top of rain slot.
Flush to shingles
Trim cap off fl ush to shingles
Cap
4"(10 cm)
LIMITED CONDITIONAL WARRANTY*Backyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for 1 year.2. All accessories, hardware and metal components are warranted for 2 years.3. All Oriented Strand Board (OSB) is warranted for 2 years4. Siding and Trim is warranted for: 10 years: Value Series / Solar Shed 12 years: Classic Series / Architectural Series 15 years: Big Buildings5. Solar Shed windows are warranted for 1 year.6. Cedar lumber is warranted for 15 years.7. Preserved Pine is warranted for 10 years.
Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase.
CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions. 2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification of the failure in writing within the warranty period specified above.5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the failure prior to commencement of any repair work.
REQUIREMENTSStorage BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.
Gazebos & PergolasTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty.
Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit.This warranty gives you certain specific rights that vary from state to state.
CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or email: customerservice@backyardproducts.com. Please have ready the information below when you call or include the information in your email:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.4. Run code: found on exterior product label or assembly instructions enclosed in the product package.
All other inquiries can be mailed to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.
IMPORTANT: This is your warranty certificate.
WARRANTY REGISTRATIONPlease complete your warranty registration to properly validate your warranty.Register your product online at:www.OnlineWarranty.net.
Heartland LDR: 1/19/2016
top related