Prepared By:- Er. Rabindra Shrestha Er. Samata Shrestha
CONTRACT IMPLEMENTATION STATUS OF SUPPLY OF SOLAR PV SYSTEM
UNDER REPLOT 2-LOT 5
Eastern DR (Lot 5)
PanchtharTaplejungSankhuwasabhaOkhaldhunga
Central DR (Lot 4)
DhadingDolakhaRamechhap
Western DR (Lot 4)
GorkhaMyagdiMustang
MidWestern DR (Lot 3)
HumlaJumlaMuguDolpaSalyan
Far Western DR (Lot 2)
BaitadiDotiAcchamBajuraBhajangDarchula
CONTRACT IMPLEMENTATION AREA
PROJECT DESCRIPTION
Health
Post
School 1
School 2
Community Computer
Liter
acy
Community En
tertai
nment
Community Communica
tion Center
0
50
100
150
200
250
206238
140
29 59124
To t a l N u m b e r o f Pa c k a g e s ( 7 9 6 : 6 5 3 + 1 4 3 a d d i ti o n a l )
Lot 2 (234) Lot 3 (156) Lot 4 (193) Lot 5 (213)0
10
20
30
40
50
60
70
80
68
3942
57
74
4547
72
3129
34
46
12
6
11
16 1721
5
33
20
38
33
Health Post
School 1
School 2
Community Computer Literacy
Community Enter-tainment
Community Commu-nication Center
PROJECT DESCRIPTION (contd…)
N u m b e r o f Pa c k a g e s ( Lo t w i s e i n c l u d i n g 1 4 3 a d d i ti o n a l sy s te m s )
CommissioningTrainingInstallationTransportation to Site Hub
Clearance and Sorting
Distribution to End User
Equipment Collection
SCOPE OF WORK
A Sorting and Packing in Centralized Facility
B Delivery Planning
C Coordination Meeting with REP and CO’s before Installation
D Installation
E Training and Commissioning
IMPLEMENTATION STRATEGY
Butwal for Lot 2, Biratnagar for Lot 5, Surkhet for Lot 3, Pokhara and Kathmandu for Lot 4
SORTING AND PACKING IN CENTRALIZED FACILITY
Transportation to Road-Head via Truck(over the blacktopped and primary road)
Transportation to Sites (secondary roads and foot trails) in Coordination with CO’s and End Users
Distribution of Equipments to the End Users by Porters Mobilization of Local People for Transportation
DELIVERY PLANNING
Deployment of Installation Team after Delivery of Equipments At least One Local Person to Assist and Receive Basic
Installation Training
INSTALLATION
Combined Operation Maintenance Training to End Users, Member of CO and Local People
TRAINING
4
Maintaining Coordination among CO’s, End Users and Installation Team
3
Deployment of Huge Installation Team
2
Delivery of Equipments to Respective Sites
1
Sorting and Packing Huge Volume of Equipments
CHALLENGES
IMPLEMENTED SCHEDULE
IMPLEMENTED SCHEDULE ( LOT 2 & LOT 5 )
IMPLEMENTATION SCHEDULE ( LOT 3 & LOT 4 )
PROJECT HIGHLIGHTS
Time Consumed in Custom
Temporary Inaccessibility During Rainy
Season Temporary Inaccessibility During Winter
Season
UNFORSEEN PROBLEM
CONCLUSION We have implemented the project on time as per the schedule
We are committed to complete the initial allocated projects as well as additional projects with little deviation in allocated time as the number of projects have been increased by 25%
We have maintained the high level quality standards as per the contract
We have tried to provide maximum benefits to the Locals by providing them opportunities like temporary employment and valuable trainings