4 Storied building construction ProposalSuper Structure

Site Overview

Introduce

Client –Mr. Zakir Hossain Suman

Address -House36,Road-13

Nikunja-1,Khilkhat

Dhaka-1205

Company -TASK J MHM Ltd.

Address -House-5,Road-9,

Sector-7,Uttara,

Dhaka-1230

Site location

Proposed Drawing

Room layout plan

Plan of Floor Beam

Details drawing

Specification of Structure

SUPER STRUCTURE

Superstructure

Related

Items

Column

Beam

Floor Slab

Brick Wall

Superstructure of a building is the portion of the structure above the foundation. It provides the necessary utility of the building with comfort, structural safety ,ventilation etc.

Outlines

Resources Proposed Budget

Management Time Schedule

Financial Ability

•Materials & Products

•Equipment items

• Labor service

Resources

Management

Planning

Project Controlling

Quality Control

Laboratory Section

Mechanical Section

Safety Team

Time Schedule

Mobilization-----------------05.12.2014 – 11.12.2014

R.C.C Casting

Ground Floor

Column-------------------12.12.2014 – 20.12.2014

Roof Beam & Slab------21.12.2014 – 8.01.2015

1st Floor -------------10.01.2015 – 10.02.2015

2nd Floor ------------12.02.2015 – 10.03.2015

3rd Floor ------------12.03.2015 – 10.04.2015

4th Floor ------------12.04.2015 – 10.05.2015

Time-Table

Brick Work

Ground Floor-------01.02.2015 – 10.02.2015.

1st Floor -------------06.03.2015 – 15.03.2015.

2nd Floor ------------03.04.2015 – 12.04.2015.

3rd Floor ------------04.05.2015 – 13.05.2015.

4th Floor ------------03.06.2015 – 12.06.2015

De-Mobilization-------13.06.2015 – 19.06.2015.

Hand Over--------------20.06.2015.

Total Completion the Project – 6 Month 15 Days.

Test of Materials

Sand Test

Test FM Analysis

Reinforcement

All reinforcement steel to be used shall be the steel(ISO-9002 certified) 60-grade deformed bars.

Brick

Aggregates Test

Slump of Concrete

Instrument Test

Concrete test

Site Safety Issue

Safety In Site

Shuttering Work

Proposed Budget

Financial Ability

General Terms & Conditions

PAYMENTS- All payments of earnest money, installments, additional works and other

charges shall be made by bank draft or A/C payee cheque in favor of TASKJMHM for which respective receipts will be issued. Details payment schedule will submit at the agreement.

PANALTY-If the payment is delayed beyond 30 days TASKJMHM shall

have the right to cancel the allotment.

REFUND- If ,for any reason beyond the control of TASKJMHM Ltd the implementation of the project is abandoned, company will refund to the Earnest Money and all installments deposited within 30 days from the announcement made to this effect.

LIABILITY- Our company are fully liable for construction procedure overall the projects. We are also responsible for all materials we are supplied.

MONITORING AND EVALUATION- Monitoring and Evaluation is an important part of the project proposal. We are responsible for overall project first to up to handover to the Client.

Conclusion and Recommendation

Our all projects implemented by following Bangladesh national building code(BNBC) for safer living of city dwellers.

Our the experienced team are tasked in ensuring that the project is completed on time and within budget.

Construction of 4 storied residential building of super structure part will be cost approximately 6.894 million.

The proposed project is capable to bring a good atmosphere to the residents.

I would like to thank all of you for listening our speech such a long time with patience.